CN115849681A - Connecting device for platinum channel and molten tin bath - Google Patents

Connecting device for platinum channel and molten tin bath Download PDF

Info

Publication number
CN115849681A
CN115849681A CN202211698210.3A CN202211698210A CN115849681A CN 115849681 A CN115849681 A CN 115849681A CN 202211698210 A CN202211698210 A CN 202211698210A CN 115849681 A CN115849681 A CN 115849681A
Authority
CN
China
Prior art keywords
plate
structural component
steel structural
fixedly connected
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211698210.3A
Other languages
Chinese (zh)
Inventor
吴星达
刘长印
刘浩
孙继臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bengbu Zhongguangdian Technology Co Ltd
Original Assignee
Bengbu Zhongguangdian Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bengbu Zhongguangdian Technology Co Ltd filed Critical Bengbu Zhongguangdian Technology Co Ltd
Priority to CN202211698210.3A priority Critical patent/CN115849681A/en
Publication of CN115849681A publication Critical patent/CN115849681A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a connecting device of a platinum channel and a molten tin bath, which relates to the technical field of float glass and comprises a first steel structure component and two groups of second steel structure components, wherein the two groups of second steel structure components are fixed at the positions of two ends of the first steel structure component; the steel structure component is connected with a runner built by zirconia-corundum bricks which are made of materials in the steel structure, the width of the runner is equal to that of the bell mouth, the flow of molten glass is ensured, a closed space which only passes through high-temperature molten glass is formed, and the sealing connection of a platinum channel and a tin bath runner is ensured.

Description

Connecting device for platinum channel and molten tin bath
Technical Field
The invention relates to the technical field of float glass, in particular to a connecting device of a platinum channel and a tin bath runner.
Background
There are two main production processes for liquid crystal glass production in the world. One is the overflow downdraw process of corning, usa, and the other is the float process of asahi glass;
the company utilizes the float production technology which is independently researched and developed and the high-temperature clarification and atmosphere regulation technology of the platinum channel to ensure that the temperature and the viscosity of the high-temperature refractory molten glass meet the requirements of the tin bath forming process and control the flow entering the tin bath, so that the tail end bell mouth of the platinum channel and the inlet end of a tin bath launder need to be precisely butted, otherwise, the molten glass flowing from the channel cannot accurately enter the tin bath, and the requirement of the tin bath forming process cannot be met.
Disclosure of Invention
In order to overcome the technical problems, the invention aims to provide a connecting device of a platinum channel and a molten tin bath, wherein a horn mouth at the tail end of the platinum channel is transformed into a rectangular horn mouth from a cylinder with the diameter of 320mm, a steel structure part is connected with a flow channel built by zirconia-alumina bricks in a steel structure, the width of the flow channel is equal to that of the horn mouth, the depth of the flow channel is 410mm, the flow of molten glass is ensured, a lip brick with high zirconium is arranged below the flow channel, and the lip brick, the flow channel and a 0-shell structure of the molten tin bath are closely assembled with each other to form a closed space which only passes through the high-temperature molten glass, so that the sealed connection of the platinum channel and the molten tin bath is ensured.
The purpose of the invention can be realized by the following technical scheme:
the utility model provides a connecting device of platinum passageway and molten tin bath chute, includes steel structural component one and two sets of steel structural component two, and is two sets of the both ends position at steel structural component one is fixed to steel structural component two, the inboard of steel structural component one is equipped with the steel sheet, one side of steel sheet is rotated and is connected with the connecting rod, the inboard of steel structural component two is equipped with four group's stud, one side of keeping away from steel structural component one of steel structural component two is equipped with bolt one and bolt three, be equipped with bolt two between steel structural component one and the steel structural component two, the both ends of steel structural component one are equipped with the backing plate.
As a further scheme of the invention: stud includes the nut, the bottom surface fixedly connected with gasket of nut, the underrun stock of gasket is connected with steel structural component two, the side interlude of nut has the depression bar, the top surface threaded connection of nut has fastening bolt, and stability when four sets of stud can guarantee steel structural component one is fixed, and fastening bolt's inboard one end contacts with the side of depression bar, like this when rotatory fastening bolt, alright in order to fix the position of depression bar.
As a further scheme of the invention: one steel structural component includes the positive panel, the back fixedly connected with base of positive panel, the one end of base is equipped with riser one, the top surface fixedly connected with roof one of riser one, one side fixedly connected with riser two of riser one, the side fixedly connected with rectangular board of riser two, the back of riser two still is equipped with the posterior lateral plate, and the posterior lateral plate can improve steel structural component's bulk strength.
As a further scheme of the invention: the top surface intermediate position fixedly connected with pad frame of base, the top surface fixedly connected with dog of pad frame, the retaining groove of the main cooperation installation face of dog, after the dog embedding retaining groove, alright in order to fix the position of steel structural component one, also play the effect of supplementary installation steel structural component one simultaneously, guarantee that the position of steel structural component one is accurate.
As a further scheme of the invention: the other end fixedly connected with condenser tube of base, condenser tube's top surface is equipped with otic placode one, the outside of otic placode one is equipped with the gusset, and condenser tube can guarantee that the external temperature of steel structural component one is invariable, has guaranteed that steel structural component one can not warp because long-time high temperature.
As a further scheme of the invention: the steel structure component II comprises a lug plate II, side panels are arranged on two sides of the lug plate II, a top plate II is fixedly connected to the tops of the side panels, and a side plate is fixedly connected to the back of the top plate II.
As a further scheme of the invention: and welding bolts are arranged on the inner sides of the side panels.
As a further scheme of the invention: one side of the steel structure component II, which is close to the steel structure component I, is fixedly connected with a pressing plate I, one end of the pressing plate I is provided with a pressing plate II, and the strength of the steel structure component I and the strength of the steel structure component II can be improved by the pressing plate I and the pressing plate II.
The invention has the beneficial effects that: the terminal horn mouth of platinum passageway is warp to rectangle horn mouth by a diameter 320 mm's drum, the inside runner of building by laying bricks or stones for material zirconium corundum brick of steel construction component connection steel construction, the width is aequilate with the horn mouth, the degree of depth is 410mm, guarantee the flow of glass liquid, the runner below is the lip brick of high zirconium matter, lip brick and chute, the 0 shellfish structure of molten tin bath is assembled closely mutually, form an airtight space through high temperature glass liquid only, the sealing connection of platinum passageway and molten tin bath chute has been guaranteed.
Drawings
The invention will be further described with reference to the accompanying drawings.
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural diagram of a first steel structural component in the invention;
FIG. 3 is a schematic structural view of a second steel structural member according to the present invention.
In the figure: 1. a first steel structure component; 101. a front panel; 102. a first vertical plate; 103. a first top plate; 104. a second vertical plate; 105. a rear side plate; 106. a strip plate; 107. a cushion frame; 108. a stopper; 109. a rib plate; 1010. a first ear plate; 1011. a cooling water pipe; 1012. a base; 2. a steel structure component II; 201. a second ear plate; 202. welding a bolt; 203. a side panel; 204. a second top plate; 205. a side plate; 3. a connecting rod; 4. a steel plate; 5. a stud bolt; 6. a nut; 7. a gasket; 8. a pressure lever; 9. fastening a bolt; 10. a first bolt; 11. a base plate; 12. a second bolt; 13. a third bolt; 14. pressing a first plate; 15. and a second pressing plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1-3, a connecting device for a platinum channel and a molten tin bath comprises a first steel structure component 1 and two second steel structure components 2, wherein the two second steel structure components 2 are fixed at two ends of the first steel structure component 1, a steel plate 4 is arranged on the inner side of the first steel structure component 1, a connecting rod 3 is rotatably connected to one side of the steel plate 4, four groups of stud bolts 5 are arranged on the inner side of the second steel structure component 2, a first bolt 10 and a third bolt 13 are arranged on one side of the second steel structure component 2, which is far away from the first steel structure component 1, a second bolt 12 is arranged between the first steel structure component 1 and the second steel structure component 2, and backing plates 11 are arranged at two ends of the first steel structure component 1;
the terminal horn mouth of platinum passageway is warp to rectangle horn mouth by a diameter 320 mm's drum, steel structural component 1 connects the inside runner of building by laying bricks or stones for material zirconium corundum of steel construction, the width is aequilate with the horn mouth, the degree of depth is 410mm, guarantee the flow of glass liquid, the runner below is the lip brick of high zirconium matter, lip brick and chute, the 0 shellfish structure of molten tin bath is assembled closely mutually, form an airtight space through high temperature glass liquid only, the sealing connection of platinum passageway and molten tin bath chute has been guaranteed.
Stud 5 includes nut 6, the bottom surface fixedly connected with gasket 7 of nut 6, the bottom surface of gasket 7 passes through the stock and is connected with two 2 steel structural component, the side interlude of nut 6 has depression bar 8, the top surface threaded connection of nut 6 has fastening bolt 9, stud 5 is used for fixing steel structural component 1, stability when four stud 5 of group can guarantee steel structural component 1 is fixed, fastening bolt 9's inboard one end and depression bar 8's side contact, like this when rotatory fastening bolt 9, alright in order to fix the position of depression bar 8.
The first steel structural component 1 comprises a front panel 101, a base 1012 is fixedly connected to the back of the front panel 101, a first vertical plate 102 is arranged at one end of the base 1012, a first top plate 103 is fixedly connected to the top surface of the first vertical plate 102, a second vertical plate 104 is fixedly connected to one side of the first vertical plate 102, a long strip plate 106 is fixedly connected to the side surface of the second vertical plate 104, a rear side plate 105 is further arranged on the back surface of the second vertical plate 104, and the rear side plate 105 can improve the overall strength of the first steel structural component 1.
The top surface intermediate position fixedly connected with pad frame 107 of base 1012, the top surface fixedly connected with dog 108 of pad frame 107, the retaining groove of the main cooperation installation face of dog 108, after the dog 108 embedding retaining groove, alright with the position of fixed steel structural component 1, also play the effect of supplementary installation steel structural component 1 simultaneously, guarantee that steel structural component 1's position is accurate.
The other end fixedly connected with condenser tube 1011 of base 1012, condenser tube 1011's top surface is equipped with otic placode 1010, and the outside of otic placode 1010 is equipped with gusset 109, and condenser tube 1011 can guarantee that the external temperature of steel structural component 1 is invariable, has guaranteed that steel structural component 1 can not warp because the high temperature for a long time.
The second steel structural component 2 comprises a second lug plate 201, side panels 203 are arranged on two sides of the second lug plate 201, a second top plate 204 is fixedly connected to the tops of the side panels 203, and a side plate 205 is fixedly connected to the back of the second top plate 204.
The inner side of the side panel 203 is provided with a weld bolt 202.
One side fixedly connected with clamp plate one 14 that steel construction component two 2 is close to steel construction component one 1, the one end of clamp plate one 14 is equipped with clamp plate two 15, and clamp plate one 14 and clamp plate two 15 can improve steel construction component one 1 and steel construction component two 2's intensity.
While one embodiment of the present invention has been described in detail, the description is only a preferred embodiment of the present invention and should not be taken as limiting the scope of the invention. All equivalent changes and modifications made within the scope of the present invention shall fall within the scope of the present invention.

Claims (8)

1. The utility model provides a connecting device of platinum passageway and molten tin bath chute, its characterized in that, includes steel structural component one (1) and two sets of steel structural component two (2), and is two sets of the both ends position at steel structural component one (1) is fixed in steel structural component two (2), the inboard of steel structural component one (1) is equipped with steel sheet (4), one side of steel sheet (4) is rotated and is connected with connecting rod (3), the inboard of steel structural component two (2) is equipped with four sets of stud (5), one side of keeping away from steel structural component one (1) of steel structural component two (2) is equipped with bolt one (10) and three (13) of bolt, be equipped with bolt two (12) between steel structural component one (1) and steel structural component two (2), the both ends of steel structural component one (1) are equipped with backing plate (11).
2. The device for connecting a platinum channel and a molten tin bath launder according to claim 1, characterized in that the stud bolt (5) comprises a nut (6), a gasket (7) is fixedly connected to the bottom surface of the nut (6), the bottom surface of the gasket (7) is connected with the second steel structural component (2) through a long rod, a compression rod (8) is inserted through the side surface of the nut (6), and a fastening bolt (9) is connected to the top surface of the nut (6) in a threaded manner.
3. The device for connecting a platinum channel with a tin launder according to claim 1, wherein the first steel structural member (1) comprises a front panel (101), a base (1012) is fixedly connected to the back of the front panel (101), a first vertical plate (102) is arranged at one end of the base (1012), a first top plate (103) is fixedly connected to the top surface of the first vertical plate (102), a second vertical plate (104) is fixedly connected to one side of the first vertical plate (102), and a long strip plate (106) is fixedly connected to the side surface of the second vertical plate (104).
4. A platinum channel to tin bath runner connection as per claim 3, wherein a pad frame (107) is fixed on the middle of the top surface of the base (1012), and a stop block (108) is fixed on the top surface of the pad frame (107).
5. The device for connecting a platinum channel and a molten tin bath launder according to claim 3, characterized in that the other end of the base (1012) is fixedly connected with a cooling water pipe (1011), the top surface of the cooling water pipe (1011) is provided with a first lug plate (1010), and the outer side of the first lug plate (1010) is provided with a rib plate (109).
6. The connecting device of a platinum channel and a molten tin bath chute as claimed in claim 1, wherein the second steel structural component (2) comprises a second lug plate (201), two side panels (203) are arranged on two sides of the second lug plate (201), a second top plate (204) is fixedly connected to the tops of the side panels (203), and a side plate (205) is fixedly connected to the back of the second top plate (204).
7. A platinum channel to tin launder connection device according to claim 6, characterized in that the inside of the side panels (203) are provided with welding bolts (202).
8. The device for connecting the platinum channel and the molten tin bath groove is characterized in that a first pressing plate (14) is fixedly connected to one side, close to the first steel structure component (1), of the second steel structure component (2), and a second pressing plate (15) is arranged at one end of the first pressing plate (14).
CN202211698210.3A 2022-12-28 2022-12-28 Connecting device for platinum channel and molten tin bath Pending CN115849681A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211698210.3A CN115849681A (en) 2022-12-28 2022-12-28 Connecting device for platinum channel and molten tin bath

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211698210.3A CN115849681A (en) 2022-12-28 2022-12-28 Connecting device for platinum channel and molten tin bath

Publications (1)

Publication Number Publication Date
CN115849681A true CN115849681A (en) 2023-03-28

Family

ID=85655536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211698210.3A Pending CN115849681A (en) 2022-12-28 2022-12-28 Connecting device for platinum channel and molten tin bath

Country Status (1)

Country Link
CN (1) CN115849681A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2743342Y (en) * 2004-06-25 2005-11-30 中国洛阳浮法玻璃集团有限责任公司 Sealing structure of tin glove inlet of ultrathin glass production line
JP2015074574A (en) * 2013-10-08 2015-04-20 株式会社オハラ Method of manufacturing plate glass
CN205368107U (en) * 2015-12-23 2016-07-06 秦皇岛玻璃工业研究设计院 Float glass production and glass flow adjusting device and device's transmission pole setting structure thereof
CN208166837U (en) * 2018-04-23 2018-11-30 重庆万盛浮法玻璃有限公司 A kind of molten tin bath runner producing smoked glass
CN209537285U (en) * 2019-01-15 2019-10-25 绍兴旗滨玻璃有限公司 Float glass flow channel device
CN111875237A (en) * 2020-08-14 2020-11-03 蚌埠中光电科技有限公司 Tin bath inlet channel for float electronic display glass production
CN217297666U (en) * 2022-02-24 2022-08-26 河北光兴半导体技术有限公司 Tin bath runner structure of glass production line

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2743342Y (en) * 2004-06-25 2005-11-30 中国洛阳浮法玻璃集团有限责任公司 Sealing structure of tin glove inlet of ultrathin glass production line
JP2015074574A (en) * 2013-10-08 2015-04-20 株式会社オハラ Method of manufacturing plate glass
CN205368107U (en) * 2015-12-23 2016-07-06 秦皇岛玻璃工业研究设计院 Float glass production and glass flow adjusting device and device's transmission pole setting structure thereof
CN208166837U (en) * 2018-04-23 2018-11-30 重庆万盛浮法玻璃有限公司 A kind of molten tin bath runner producing smoked glass
CN209537285U (en) * 2019-01-15 2019-10-25 绍兴旗滨玻璃有限公司 Float glass flow channel device
CN111875237A (en) * 2020-08-14 2020-11-03 蚌埠中光电科技有限公司 Tin bath inlet channel for float electronic display glass production
CN217297666U (en) * 2022-02-24 2022-08-26 河北光兴半导体技术有限公司 Tin bath runner structure of glass production line

Similar Documents

Publication Publication Date Title
CN207646602U (en) A kind of bridge extension joint of no adhesive tape Anti-leakage type
CN115849681A (en) Connecting device for platinum channel and molten tin bath
CN204174064U (en) One kiln three line thin float glass production line
CN208230799U (en) The running gate system and mold of optical fiber module shell
CN209413081U (en) A kind of large-span glass curtain wall
CN207244926U (en) A kind of sealing structure of unit glass curtain wall
CN208895157U (en) The running gate system and mold of optical fiber module shell
CN206705950U (en) A kind of glass melter card neck glass metal part flow arrangement
CN109592883A (en) The hanging structure for preventing 3D high alumina glass channel front arch to be broken
CN208136730U (en) A kind of road and bridge formwork reinforcement support device
CN208294359U (en) A kind of double crimping mounting structures of door glass
CN208918096U (en) A kind of replaceable transverse beam system
CN220566124U (en) Water stop clamp
CN201486364U (en) Window sash
CN205550742U (en) Touch -sensitive screen point gum machine
CN217418513U (en) Steel flange device for rolled glass overflow port
CN207072907U (en) Sealing structure and photovoltaic glass production equipment
CN220451251U (en) Waterproof assembly for installation of daylighting panel
CN219158418U (en) Special hole plugging device for aluminum alloy template
CN204174061U (en) A kind of melting furnaces of three floatation glass production lines
CN208907284U (en) One kind being used for the big fissure of displacement connection structure of design of glass lighting roof multi-angle
CN214525792U (en) Capping-free steel coal bucket plugging structure
CN211285078U (en) Quick assembly type vibration reduction ballast bed support
CN209443777U (en) A kind of building concrete beam setting-up of construction joint mechanism
CN208912451U (en) A kind of coating of lithium-ion battery gasket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20230328

RJ01 Rejection of invention patent application after publication