CN115797101A - 湿润地区山丘区现状工程条件下历史可供水量折算方法 - Google Patents
湿润地区山丘区现状工程条件下历史可供水量折算方法 Download PDFInfo
- Publication number
- CN115797101A CN115797101A CN202211396534.1A CN202211396534A CN115797101A CN 115797101 A CN115797101 A CN 115797101A CN 202211396534 A CN202211396534 A CN 202211396534A CN 115797101 A CN115797101 A CN 115797101A
- Authority
- CN
- China
- Prior art keywords
- engineering
- water supply
- current
- water
- historical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 195
- 238000000034 method Methods 0.000 title claims abstract description 18
- 239000008400 supply water Substances 0.000 claims description 2
- 238000003809 water extraction Methods 0.000 description 3
- 238000004364 calculation method Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 239000002352 surface water Substances 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000004445 quantitative analysis Methods 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明公开了湿润地区山丘区现状工程条件下历史可供水量折算方法,基于可供水量将供水工程分成不变和可变两种类型;不变类工程可供水量采用现状年工程供水量替代;可变类工程可供水量根据大中型水库水位以及降雨数据进行折算;现状工程条件下历史年不变类工程可供水量与可变类工程可供水量之和即为湿润地区山丘区现状工程条件下历史年份可供水量。本发明可以在数据较少的情况下简便计算现状工程条件下山丘区遭遇历史典型干旱时供水工程的可供水量,从而合理规划新建供水工程,保障山丘区用水安全,具有较强的实用性和广泛的适用性。
Description
技术领域
本发明涉及水资源规划领域,尤其涉及湿润地区山丘区现状工程条件下历史可供水量折算方法。
背景技术
供水工程的规划需要考虑现状供水工程对于区域生活生产生态需水的满足程度,不仅要考虑现状年份的满足程度,还要考虑如果发生历史上某些特殊干旱年份时现状供水工程对于生活生产生态需水的满足程度,因此需要知道现状工程条件下历史年份可供水量。对于湿润地区来说,供水不足的地区主要发生在山丘区,而山丘区的监测资料相对不足,难以进行月尺度或旬尺度的供需平衡计算,需要一种简便的方法对山丘区现状工程条件下历史年份可供水量进行折算。
发明内容
本发明目的在于提供一种湿润地区山丘区现状工程条件下历史年份可供水量折算方法。
为实现上述技术目的,本发明采用如下方案:
一种湿润地区山丘区现状工程条件下历史可供水量折算方法,包括:
(1)将供水工程依据可供水量变化情况划分为不变类工程和可变类工程,其中蓄水工程为可变类工程,其他供水工程为不变类工程;
(2)对不变类工程和可变类工程分别计算现状工程条件下历史可供水量;
a. 对于不变类工程,以现状年工程总供水量表征其现状工程条件下历史可供水量;
b. 对于可变类工程,基于如下方式折算现状工程条件下历史可供水量:
获取区域内各大中型水库现状年初总蓄水量及区域蓄水工程现状年初总蓄水量,其比值定义为蓄水工程缩放系数;获取区域内各大中型水库历史年初总蓄水量,并基于蓄水工程缩放系数折算区域内蓄水工程历史年初总蓄水量;计算蓄水工程现状年初总蓄水量和蓄水工程历史年初总蓄水量的差值,为第一差值;
获取区域内各大中型水库历史年和现状年入库水量,计算其差值,即入库水量之差;
计算现状年蓄水工程供水量、所述第一差值和所述入库水量之差的差值,即现状工程条件下历史年蓄水工程可供水量;
(3)现状工程条件下历史年不变类工程可供水量与可变类工程可供水量之和即为湿润地区山丘区现状工程条件下历史可供水量。
作为一种优选的实施方式,所述a中,基于现状年水资源公报获取各不变类工程的现状年工程供水量,其总和即为不变类工程的现状年工程总供水量。
作为一种优选的实施方式,所述b中,所述大中型水库现状年初总蓄水量、大中型水库历史年初总蓄水量根据对应的大中型水库年初水位计算得到。
作为一种优选的实施方式,基于水文数据获取区域内各大中型水库的年初水位,根据水位库容曲线获取各大中型水库年初蓄水量。
作为一种优选的实施方式,所述b中,基于现状年水资源公报获取所述现状年蓄水工程供水量。
作为一种优选的实施方式,所述b中,现状工程条件下历史年蓄水工程可供水量基于下式计算:
作为一种优选的实施方式,所述历史年为历史干旱年。
本发明的原理如下:
将可供水量依据供水工程类型分为地表水、地下水和其他水源供水三种,其中地表水又可分为蓄水工程、引提水工程。对于湿润地区而言,地下水、其他水源和提水工程供水量受丰枯变化的影响较小,可以认为在工程条件一定的情况下保持不变。对于山丘区而言,引水工程较少,可与提水工程合并计算。因此对于湿润地区山丘区,不变类工程包括地下水、其他水源和引提水工程,可变类工程为蓄水工程。不变类工程可直接以现状年工程总供水量表征其历史可供水量,而蓄水工程包括水库、塘坝,由于小型水库和塘坝的监测数据较少或缺失,难以获取,本申请设计了缩放系数,利用大中型水库的数据缩放来代表所有的蓄水工程,并提供了蓄水工程现状工程条件下历史可供水量的折算方式。
本发明的方法可以在数据较少的情况下简便计算现状工程条件下山丘区遭遇历史典型干旱时供水工程的可供水量,从而合理规划新建供水工程,保障山丘区用水安全,具有较强的实用性和广泛的适用性。
附图说明
图1为本发明的流程图。
具体实施方式
下面结合附图对本发明作进一步说明。
该技术应用在江苏省南部某山丘区可供水量分析中,苏南地区处于湿润地区,过境水量丰富,但本地水量严重不足,山丘区由于工程能力的限制在气象干旱时期易受旱。
本发明提供的定量分析方法包括如下步骤:
a、将可供水量依据工程类型分成不变和可变两类。
可变类工程为蓄水工程,其余(地下水、其他水源和引提水工程)为可变类工程。
b、不变类工程可供水量采用现状年工程供水量替代。
以2019年作为现状年,该地区2019年的地下水、其他水源和引提水工程供水量分别为55万m3、2828万m3和19391万m3。因此该区域现状工程条件下历史年不变类工程可供水量为===22274万m 3。
c、可变类工程可供水量根据历史年大中型水库水位以及降雨数据进行折算。
对于现状工程条件下历史年蓄水工程可供水量的计算,首先查阅区域内各大中型水库的水位库容曲线,根据各大中型水库年初水位计算区域内大中型水库现状年初总蓄水量=304.8万m 3,查阅现状年水资源公报得到区域蓄水工程年初总蓄水量=400万m 3,计算蓄水工程缩放系数=1.3。以典型干旱年1978年作为历史年,查阅区域内各大中型水库历史年年初水位,计算区域内大中型水库历史年初总蓄水量=207.4万m 3。
最后,根据现状年蓄水工程供水量计算现状工程条件下历史年蓄水工程可供水量为
d、湿润地区山丘区现状工程条件下历史年份可供水量为现状工程条件下历史年不变类工程可供水量与可变类工程可供水量之和。
现状工程条件下历史年份可供水量为:
Claims (7)
1.一种湿润地区山丘区现状工程条件下历史可供水量折算方法,其特征在于,包括:
(1)将供水工程依据可供水量变化情况划分为不变类工程和可变类工程,其中蓄水工程为可变类工程,其他供水工程为不变类工程;
(2)对不变类工程和可变类工程分别计算现状工程条件下历史可供水量;
a. 对于不变类工程,以现状年工程总供水量表征其现状工程条件下历史可供水量;
b. 对于可变类工程,基于如下方式折算现状工程条件下历史可供水量:
获取区域内各大中型水库现状年初总蓄水量及区域蓄水工程现状年初总蓄水量,其比值定义为蓄水工程缩放系数;获取区域内各大中型水库历史年初总蓄水量,并基于蓄水工程缩放系数折算区域内蓄水工程历史年初总蓄水量;计算蓄水工程现状年初总蓄水量和蓄水工程历史年初总蓄水量的差值,为第一差值;
获取区域内各大中型水库历史年和现状年入库水量,计算其差值,即入库水量之差;
计算现状年蓄水工程供水量、所述第一差值和所述入库水量之差的差值,即现状工程条件下历史年蓄水工程可供水量;
(3)现状工程条件下历史年不变类工程可供水量与可变类工程可供水量之和即为湿润地区山丘区现状工程条件下历史可供水量。
2.根据权利要求1所述的方法,其特征在于,所述a中,基于现状年水资源公报获取各不变类工程的现状年工程供水量,其总和即为不变类工程的现状年工程总供水量。
3.根据权利要求1所述的方法,其特征在于,所述b中,所述大中型水库现状年初总蓄水量、大中型水库历史年初总蓄水量根据对应的大中型水库年初水位计算得到。
4.根据权利要求3所述的方法,其特征在于,基于水文数据获取区域内各大中型水库的年初水位,根据水位库容曲线获取各大中型水库年初蓄水量。
5.根据权利要求1所述的方法,其特征在于,所述b中,基于现状年水资源公报获取所述现状年蓄水工程供水量。
7.根据权利要求1所述的方法,其特征在于,所述历史年为历史干旱年。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211396534.1A CN115797101A (zh) | 2022-11-09 | 2022-11-09 | 湿润地区山丘区现状工程条件下历史可供水量折算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211396534.1A CN115797101A (zh) | 2022-11-09 | 2022-11-09 | 湿润地区山丘区现状工程条件下历史可供水量折算方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115797101A true CN115797101A (zh) | 2023-03-14 |
Family
ID=85436274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202211396534.1A Pending CN115797101A (zh) | 2022-11-09 | 2022-11-09 | 湿润地区山丘区现状工程条件下历史可供水量折算方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115797101A (zh) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103324814A (zh) * | 2013-07-15 | 2013-09-25 | 中国水利水电科学研究院 | 一种输水系统的设计方法 |
CN109103926A (zh) * | 2018-08-14 | 2018-12-28 | 清华大学 | 基于多辐照特性年气象场景的光伏发电接纳能力计算方法 |
CN111027825A (zh) * | 2019-11-26 | 2020-04-17 | 华中科技大学 | 基于典型枯水年和出力系数优选的蓄能调度图绘制方法 |
CN112966221A (zh) * | 2021-03-04 | 2021-06-15 | 江西省水利科学院 | 一种南方丰水地区考核年份用水总量折算方法 |
CN113256028A (zh) * | 2021-06-23 | 2021-08-13 | 中国水利水电科学研究院 | 一种面向大范围长历时干旱的应急供水调配方法 |
CN113793228A (zh) * | 2021-08-24 | 2021-12-14 | 中国水利水电科学研究院 | 现状防御条件下的不同干旱频率农业因旱减产率确定方法 |
WO2022135265A1 (zh) * | 2021-01-14 | 2022-06-30 | 中国长江三峡集团有限公司 | 气候变化影响下水库调度规则的失效预警分析方法 |
CN114723293A (zh) * | 2022-04-11 | 2022-07-08 | 湖南省水利水电科学研究院 | 基于历史典型干旱年旱灾影响指标的干旱风险评估方法 |
CN114997683A (zh) * | 2022-06-15 | 2022-09-02 | 中国水利水电科学研究院 | 一种基于旱限水位的水库精细化调度方法 |
-
2022
- 2022-11-09 CN CN202211396534.1A patent/CN115797101A/zh active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103324814A (zh) * | 2013-07-15 | 2013-09-25 | 中国水利水电科学研究院 | 一种输水系统的设计方法 |
CN109103926A (zh) * | 2018-08-14 | 2018-12-28 | 清华大学 | 基于多辐照特性年气象场景的光伏发电接纳能力计算方法 |
CN111027825A (zh) * | 2019-11-26 | 2020-04-17 | 华中科技大学 | 基于典型枯水年和出力系数优选的蓄能调度图绘制方法 |
WO2022135265A1 (zh) * | 2021-01-14 | 2022-06-30 | 中国长江三峡集团有限公司 | 气候变化影响下水库调度规则的失效预警分析方法 |
CN112966221A (zh) * | 2021-03-04 | 2021-06-15 | 江西省水利科学院 | 一种南方丰水地区考核年份用水总量折算方法 |
CN113256028A (zh) * | 2021-06-23 | 2021-08-13 | 中国水利水电科学研究院 | 一种面向大范围长历时干旱的应急供水调配方法 |
CN113793228A (zh) * | 2021-08-24 | 2021-12-14 | 中国水利水电科学研究院 | 现状防御条件下的不同干旱频率农业因旱减产率确定方法 |
CN114723293A (zh) * | 2022-04-11 | 2022-07-08 | 湖南省水利水电科学研究院 | 基于历史典型干旱年旱灾影响指标的干旱风险评估方法 |
CN114997683A (zh) * | 2022-06-15 | 2022-09-02 | 中国水利水电科学研究院 | 一种基于旱限水位的水库精细化调度方法 |
Non-Patent Citations (3)
Title |
---|
向茂森;: "淮河流域片水资源可利用量的分析计算", 治淮, no. 03 * |
娄妹非;张维认;: "棋盘山水库开辟工业供水的可行性分析与计算", 东北水利水电, no. 02 * |
屈艳萍 等: "现状防御条件下历史极端大旱重演影响分析——以明崇祯大旱为例", 水利学报, vol. 52, no. 7, pages 862 - 872 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Pandey et al. | Streamflow drought severity analysis of Betwa river system (India) | |
Renshaw | The management of ground water reservoirs | |
CN110781259A (zh) | 一种基于地貌单位线的水文模型 | |
Peranginangin et al. | Water accounting for conjunctive groundwater/surface water management: case of the Singkarak–Ombilin River basin, Indonesia | |
Naik et al. | Groundwater resources assessment of the Koyna River basin, India | |
Bonacci et al. | The water on a small karst island: the island of Korčula (Croatia) as an example | |
Micklin | Aral sea basin water resources and the changing aral water balance | |
Bozorg-Haddad et al. | Assessment of potential of intraregional conflicts by developing a transferability index for inter-basin water transfers, and their impacts on the water resources | |
CN115797101A (zh) | 湿润地区山丘区现状工程条件下历史可供水量折算方法 | |
Palanisami et al. | Wells for welfare or illfare? Cost of groundwater depletion in Coimbatore, Tamil Nadu, India | |
Davidsen et al. | The cost of ending groundwater overdraft on the North China Plain | |
Wang et al. | Application of SWAT model with CMADS data for hydrological simulation in western China | |
CN109284926A (zh) | 一种评价城市雨水可利用潜力的方法 | |
Karavitis et al. | Estimation of the water resources potential in the island system of the Aegean Archipelago, Greece | |
Gordon | Hydrological science and the development of waterpower for manufacturing | |
Mwakalila | Water resource use in the Great Ruaha Basin of Tanzania | |
Silva et al. | Yield-evaporation-spill relationship in semiarid reservoirs under different operating rules | |
Monjardin et al. | Effect of climate change to Ambuklao reservoir, simulation of El Niño and La Niña | |
Morabito et al. | The quality of service provided by the irrigation department to the users associations, Tunuyan System, Mendoza, Argentina | |
Peng et al. | A study of multi-objective dynamic water resources allocation modeling of Huai River | |
CN109992904A (zh) | 一种岩溶地区的洼地-泉水系统水均衡计算方法 | |
KR102549314B1 (ko) | 농업가뭄 대응 지하수 최대 취수량 모니터링 방법 | |
Qadem et al. | The Hydrogeological Behavior of Springs in Face of Rainfall Fluctuations in the Plain of Fez and its Middle Atlas Border, Morocco | |
Mazvimavi et al. | Assessing the effects of non‐stationarity on reservoir yield estimations: A case study of the Southern Okavango Integrated Water Development system in Botswana | |
Li et al. | Comparison of methods for separating flood frequency of reservoir by sub-seasons |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20230314 |
|
RJ01 | Rejection of invention patent application after publication |