CN115705520A - BIM platform-based material generation method and device, electronic equipment and storage medium - Google Patents

BIM platform-based material generation method and device, electronic equipment and storage medium Download PDF

Info

Publication number
CN115705520A
CN115705520A CN202110880923.0A CN202110880923A CN115705520A CN 115705520 A CN115705520 A CN 115705520A CN 202110880923 A CN202110880923 A CN 202110880923A CN 115705520 A CN115705520 A CN 115705520A
Authority
CN
China
Prior art keywords
information
component
library
endowed
endowing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110880923.0A
Other languages
Chinese (zh)
Inventor
于彦凯
陈景常
岳亮
张振华
龙兵
许江锋
陈冠坚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Bozhilin Software Technology Co ltd
Original Assignee
Guangdong Bozhilin Robot Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Bozhilin Robot Co Ltd filed Critical Guangdong Bozhilin Robot Co Ltd
Priority to CN202110880923.0A priority Critical patent/CN115705520A/en
Publication of CN115705520A publication Critical patent/CN115705520A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)

Abstract

The application provides a method, a device, electronic equipment and a storage medium for generating materials based on a BIM platform, and the method for generating the materials based on the BIM platform comprises the following steps: creating a component material information file; generating a corresponding material ball according to the component material information file, and creating a material library; and based on the material library, according to the material applying information of the material applying component, applying materials to the material applying component by using the corresponding material ball. According to the method, the device, the electronic equipment and the storage medium for generating the material based on the BIM platform, when building model building is carried out in the BIM platform, a worker can endow the member with the material only by determining endowing material information of the member to be endowed with the material, so that the time spent by the worker can be greatly reduced, the operation of the worker is greatly simplified, and the working efficiency of the worker is improved.

Description

BIM platform-based material generation method and device, electronic equipment and storage medium
Technical Field
The application relates to the technical field of building information models, in particular to a method and device for generating materials based on a BIM platform, electronic equipment and a storage medium.
Background
BIM (Building Information Modeling) refers to a Building Information model; the material is one of important parameters of the BIM component, and plays an important role in the quality of the building model and the efficiency of the map. At present, the material of building element is various, and its material of same type material of same building element has multiple usually, consequently develops when building model builds in the BIM platform, and the staff often need spend a large amount of times to set up the material parameter of component, and gives the material in-process at the component and just can accomplish through loaded down with trivial details operation, has leaded to staff's work efficiency to have received obvious influence.
Disclosure of Invention
An object of the embodiments of the present application is to provide a method, an apparatus, an electronic device, and a storage medium for generating a material based on a BIM platform, where when building model building is developed in the BIM platform, a worker may only determine material-endowing information of a member to be endowed with a material, so that the time that the worker needs to spend may be greatly reduced, the operation of the worker may be greatly simplified, and the work efficiency of the worker may be improved.
In a first aspect, an embodiment of the present application provides a method for generating a material based on a BIM platform, including:
creating a component material information file;
generating a corresponding material ball according to the component material information file, and creating a material library;
and based on the material library, according to the material applying information of the material applying component, applying materials to the material applying component by using the corresponding material ball.
In the implementation process, when building model building is carried out in the BIM platform, the method for generating materials based on the BIM platform generates corresponding material balls and creates a material library through the created component material information file; based on the material library, the material adding component is added by utilizing the corresponding material ball according to the material adding information of the material adding component, and in the process, a worker can complete the material adding of the component only by determining the material adding information of the material adding component, so that the time spent by the worker can be greatly reduced, the operation of the worker is greatly simplified, and the working efficiency of the worker is improved.
Further, the component material information file comprises a material information table;
the creating of the component material information file comprises:
acquiring a component material file corresponding to a target building project;
extracting material information from the component material file;
and creating the material information table according to the material information.
In the implementation process, the method extracts the material information through the acquired component material file corresponding to the target building project, and then creates the material information table according to the material information, so that the material of the component contained in the created material information table is only the material of the component required by the building project, and further the staff can conveniently determine the material assigning information of the material to be assigned component, thereby the time spent by the staff can be better reduced, the operation of the staff is better simplified, the work efficiency of the staff is better improved, and meanwhile, the material assigning of the material to be assigned component is also facilitated.
Further, the component material information file also comprises a material mapping file;
the creating of the component material information file further comprises:
acquiring a target material map;
and storing the target material map into a target file, wherein the target material map is named by corresponding material codes in the target file respectively.
In the implementation process, the method further stores the obtained target material map into a target file, and names the target material map by corresponding material codes in the target file respectively, so that a worker can determine the corresponding material map when determining the material endowing information of the member to be endowed, and further can endow the member with rendering requirements better when endowing the member with materials, so that the endowing effect and the rendering effect are better, and the operation of the worker can be more convenient.
Further, the material applying to the member to be material-applied by using the corresponding material ball according to the material applying information of the member to be material-applied based on the material library includes:
and on the basis of the material library, according to the material endowing information of each member to be endowed with materials, each member to be endowed with materials is rapidly endowed with materials by utilizing the corresponding material ball.
In the implementation process, the method can be based on the material library, and according to the material endowing information of each material component to be endowed, each material component to be endowed is endowed with a material rapidly by using the corresponding material ball, so that the material is endowed to the material component to be endowed well, and the working efficiency of workers is improved well.
Further, the material applying to the member to be material-applied by using the corresponding material ball according to the material applying information of the member to be material-applied based on the material library includes:
and based on the material library, batch material endowing is carried out on the plurality of members to be endowed with materials by utilizing the corresponding material balls according to endowing material information of the plurality of members to be endowed with materials.
In the implementation process, the method can be used for carrying out batch material endowing on the plurality of members to be endowed with materials by utilizing the corresponding material balls according to endowing material information of the plurality of members to be endowed with materials based on the material library, so that the materials of the members to be endowed with materials are better endowed with materials, and the working efficiency of workers is better improved.
Further, after the material is assigned to the member to be assigned with the material ball according to the assignment information of the member to be assigned based on the material library, the method further includes:
and outputting the corresponding target building design drawing and/or rendering the corresponding target building model.
In the implementation process, the method can rapidly output the corresponding target building design drawing and/or render the corresponding target building model on the basis of rapidly assigning materials to the member to be assigned.
In a second aspect, an embodiment of the present application provides an apparatus for generating a material based on a BIM platform, including:
the first establishing module is used for establishing a component material information file;
the second establishing module is used for generating a corresponding material ball according to the component material information file and establishing a material library;
and the component material endowing module is used for endowing materials to the components to be endowed with materials by utilizing the corresponding material balls according to endowing material information of the components to be endowed with materials based on the material library.
In the implementation process, when building model building is carried out in the BIM platform, the device for generating materials based on the BIM platform generates corresponding material balls and creates a material library through the created component material information file; based on the material library, the material is assigned to the member to be assigned by utilizing the corresponding material ball according to the material assigning information of the member to be assigned, and in the process, a worker can complete the material assigning of the member only by determining the material assigning information of the member to be assigned, so that the time spent by the worker can be greatly reduced, the operation of the worker is greatly simplified, and the working efficiency of the worker is improved.
Further, the member material-applying module is specifically configured to:
on the basis of the material library, according to the material adding information of each member to be added, each member to be added is subjected to rapid material adding by utilizing the corresponding material ball;
and/or performing batch material endowing on the plurality of members to be endowed with materials by utilizing the corresponding material balls according to endowing material information of the plurality of members to be endowed with materials based on the material library.
In the implementation process, the device can better endow the materials to the material-giving members by endowing the material to the material-giving members, and the working efficiency of workers is better improved.
In a third aspect, an embodiment of the present application provides an electronic device, including a memory and a processor, where the memory is used to store a computer program, and the processor runs the computer program to enable the electronic device to execute the above method for generating a material based on a BIM platform.
In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, which stores a computer program, and when the computer program is executed by a processor, the computer program implements the method for generating a material based on a BIM platform.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings that are required to be used in the embodiments of the present application will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present application and therefore should not be considered as limiting the scope, and that those skilled in the art can also obtain other related drawings based on the drawings without inventive efforts.
Fig. 1 is a first flowchart of a method for generating a material based on a BIM platform according to an embodiment of the present disclosure;
fig. 2 is a first flowchart of step S110 according to an embodiment of the present disclosure;
fig. 3 is a second flowchart of the step S110 according to an embodiment of the present application;
fig. 4 is a second flowchart of a method for generating a material based on a BIM platform according to an embodiment of the present disclosure;
fig. 5 is a block diagram of a structure of a device for generating a material based on a BIM platform according to a second embodiment of the present disclosure.
Detailed Description
The technical solutions in the embodiments of the present application will be described below with reference to the drawings in the embodiments of the present application.
It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined or explained in subsequent figures. Meanwhile, in the description of the present application, the terms "first", "second", and the like are used only for distinguishing the description, and are not to be construed as indicating or implying relative importance.
At present, the material of building element is various, and its material of same type material of same building element has multiple usually, consequently develops when building model builds in the BIM platform, and the staff often need spend a large amount of times to set up the material parameter of component, and gives the material in-process at the component and just can accomplish through loaded down with trivial details operation, has leaded to staff's work efficiency to have received obvious influence.
In view of the above problems in the prior art, the present application provides a method, an apparatus, an electronic device, and a storage medium for generating a material based on a BIM platform, where when building model building is performed in the BIM platform, a worker may only determine material attaching information of a member to be attached, and then attach a material to the member, so that time that the worker needs to spend may be greatly reduced, operation of the worker may be greatly simplified, and work efficiency of the worker may be improved.
Example one
Referring to fig. 1, fig. 1 is a first flowchart of a method for generating a material based on a BIM platform according to an embodiment of the present disclosure. The method for generating materials based on the BIM platform, which is described in the embodiment of the application, can be applied to a server.
The method for generating the material based on the BIM platform comprises the following steps:
in step S110, a component material information file is created.
In this embodiment, the BIM platform may be an Autodesk review, bimfa ebim platform, or BIMEX macro-picture building BIM cloud platform, and the staff carries out building of the building model corresponding to the target building project through the BIM platform.
The created component material information file may be a file such as a material information table.
And step S120, generating a corresponding material ball according to the component material information file, and creating a material library.
In this embodiment, the generated material ball may have information of material code and/or material name, and may have information of material subdivision name, use room, use location, reference model, specification, thickness, physical material, surface style, fire-proof grade, and the like.
If the generated material ball has the information, the requirement of data statistics can be met, and the data flow can be transferred to services such as cost calculation amount and model checking.
Step S130, based on the material library, according to the material applying information of the material applying component, the material applying component is applied with the corresponding material ball.
In this embodiment, based on the created material library, the worker may determine the material attaching information of the material member to be attached according to the design requirement, that is, the material attaching information of the material member to be attached is determined by the worker.
The material applying information of the material applying component can at least comprise information of component name and material name.
It is understood that the material is assigned to the material-to-be-assigned member, and the material attribute of the whole material-to-be-assigned member is assigned.
According to the method for generating the material based on the BIM platform, when building model building is carried out in the BIM platform, corresponding material balls are generated through the created component material information file, and a material library is created; based on the material library, the material adding component is added by utilizing the corresponding material ball according to the material adding information of the material adding component, and in the process, a worker can complete the material adding of the component only by determining the material adding information of the material adding component, so that the time spent by the worker can be greatly reduced, the operation of the worker is greatly simplified, and the working efficiency of the worker is improved.
Referring to fig. 2, fig. 2 is a schematic view of a first process of step S110 according to the embodiment of the present disclosure.
In some embodiments of the present application, the component material information file may include a table of material information;
step S110, creating a component material information file, which may include the following steps:
step S111, acquiring a component material file corresponding to the target building project;
step S112, extracting material information from the component material file;
in step S113, a material information table is created based on the material information.
It should be understood that the material of the member contained in the member material file corresponding to the target construction project is the material of the member required for the construction project.
Optionally, if the BIM platform is an Autodesk review, the component material file corresponding to the target building project may be obtained from drawing information corresponding to AutoCAD.
Alternatively, when the material information is extracted from the component material file, different materials may be classified by category.
The material information may include information such as a material code, a picture style, a material name, a material breakdown name, a use room, a use location, a reference model, a specification, a physical material, and the like.
In the process, the method extracts the material information through the acquired component material file corresponding to the target building project, and then creates the material information table according to the material information, so that the material of the component contained in the created material information table is only the material of the component required by the building project, and further the personnel can conveniently determine the material assigning information of the material to be assigned, thereby the time spent by the personnel can be better reduced, the operation of the personnel can be better simplified, the working efficiency of the personnel is better improved, and meanwhile, the material assigning of the material to be assigned component is also facilitated.
Referring to fig. 3, fig. 3 is a second flowchart of step S110 provided in the embodiment of the present application.
In other embodiments of the present application, the component material information file may further include a material map file;
step S110, creating a component material information file, and may further include the steps of:
step S114, obtaining a target material chartlet;
step S115, storing the target material map into a target file, wherein the target material map is named by corresponding material codes in the target file.
It should be noted that, steps S114 to S115 may be executed after steps S111 to S113, before steps S111 to S113, or simultaneously with steps S111 to S113, and the execution of steps S111 to S113 and steps S114 to S115 are not limited herein.
The target material map can be a material map collected by a worker in advance; the target material map may be used for a component having a rendering request when the component is provided with a material.
In the process, the method also stores the obtained target material map into a target file, and names the target material map by corresponding material codes in the target file respectively, so that a worker can determine the corresponding material map when determining the material endowing information of the member to be endowed, and further can better endow the member with rendering requirements when endowing the member with materials, so that the endowing effect and the rendering effect are better, and the operation of the worker can be more convenient.
In some embodiments of the application, the step S130 of assigning materials to the member to be assigned with the corresponding material ball according to the assigning information of the member to be assigned based on the material library may include:
and based on the material library, according to the material endowing information of each member to be endowed with the material, each member to be endowed with the material is rapidly endowed with the material by utilizing the corresponding material ball.
The building model building method based on the material ball can be used for solving the problem that the building model building method based on the material ball is complex in structure, and is convenient to operate, and the building model building method based on the material ball is convenient to operate.
In the process, the method can be used for quickly assigning materials to each member to be assigned by utilizing the corresponding material ball according to the assigning material information of each member to be assigned based on the material library, so that the members to be assigned can be better assigned, and the working efficiency of workers can be better improved.
In another embodiment of the present application, the step S130 of assigning materials to the material members to be assigned by using the corresponding material balls according to the material assigning information of the material members to be assigned based on the material library may include:
and based on the material library, batch material endowing is carried out on the plurality of members to be endowed by utilizing the corresponding material balls according to endowing information of the plurality of members to be endowed.
When the plurality of members to be subjected to material batch endowing are subjected to material batch endowing, a worker can determine endowing information of the plurality of members to be subjected to material batch endowing according to the types of the members, and then batch endowing is performed on the plurality of members to be subjected to material batch endowing through the corresponding material balls.
In the process, the method can be used for batch material endowing of the plurality of members to be endowed by utilizing the corresponding material balls according to endowing information of the plurality of members to be endowed on the basis of the material library, so that the members to be endowed can be endowed well, and the working efficiency of workers can be improved well.
Referring to fig. 4, fig. 4 is a second flowchart of a method for generating a material based on a BIM platform according to an embodiment of the present disclosure.
In some embodiments of the present application, the method for generating a material based on a BIM platform according to an embodiment of the present application, after the material is assigned to the member to be assigned by using the corresponding material ball according to the assignment information of the member to be assigned based on the material library in step S130, may further include the following steps:
and step S140, outputting the corresponding target building design drawing and/or rendering the corresponding target building model.
In the process, the method can quickly output the corresponding target building design drawing and/or render the corresponding target building model on the basis of quickly endowing the member to be endowed with the material.
Example two
In order to implement the method corresponding to the above embodiment to achieve the corresponding functions and technical effects, an apparatus for generating materials based on a BIM platform is provided below.
Referring to fig. 5, fig. 5 is a block diagram of a structure of a device for generating a material based on a BIM platform according to an embodiment of the present disclosure.
The device based on BIM platform generation material of this application embodiment includes:
a first creating module 210 for creating a component material information file;
a second creating module 220, configured to generate a corresponding material ball according to the component material information file, and create a material library;
the component material assigning module 230 is configured to assign materials to the to-be-assigned material members by using corresponding material balls according to the material assigning information of the to-be-assigned material members based on the material library.
According to the device for generating the material based on the BIM platform, when building model building is carried out in the BIM platform, the corresponding material ball is generated through the created component material information file, and a material library is created; based on the material library, the material is assigned to the member to be assigned by utilizing the corresponding material ball according to the material assigning information of the member to be assigned, and in the process, a worker can complete the material assigning of the member only by determining the material assigning information of the member to be assigned, so that the time spent by the worker can be greatly reduced, the operation of the worker is greatly simplified, and the working efficiency of the worker is improved.
As an optional implementation manner, the first creating module 210 may specifically be configured to:
acquiring a component material file corresponding to a target building project;
extracting material information from the component material file;
and creating a material information table according to the material information.
As an optional implementation manner, the first creating module 210 may be further specifically configured to:
obtaining a target material map;
and storing the target material mapping into a target file, and naming the target material mapping in the target file by using the corresponding material codes respectively.
As an optional implementation manner, the member material endowing module 230 may be specifically configured to:
and based on the material library, according to the material endowing information of each member to be endowed, each member to be endowed with materials is endowed with materials rapidly by utilizing the corresponding material ball.
As an optional implementation manner, the member material endowing module 230 may be specifically configured to:
and based on the material library, performing batch material endowing on the plurality of members to be endowed with materials by using corresponding material balls according to the endowing material information of the plurality of members to be endowed with materials.
As an optional implementation manner, the device for generating a material based on a BIM platform in this embodiment of the present application may further include:
the output module is used for outputting a corresponding target building design drawing;
and the rendering module is used for rendering the corresponding target building model.
The device for generating a material based on a BIM platform may implement the method for generating a material based on a BIM platform in the first embodiment. The options in the first embodiment above are also applicable to the present embodiment, and are not described in detail here.
The rest of the embodiments of the present application may refer to the contents of the first embodiment, and in this embodiment, details are not repeated.
EXAMPLE III
An embodiment of the present application provides an electronic device, which includes a memory and a processor, where the memory is used to store a computer program, and the processor runs the computer program to enable the electronic device to execute the above method for generating a material based on a BIM platform.
Alternatively, the electronic device may be a server.
In addition, an embodiment of the present application further provides a computer-readable storage medium, which stores a computer program, and when the computer program is executed by a processor, the method for generating a material based on a BIM platform is implemented.
In the several embodiments provided in the present application, it should be understood that the disclosed apparatus and method may be implemented in other manners. The apparatus embodiments described above are merely illustrative, and for example, the flowchart and block diagrams in the figures illustrate the architecture, functionality, and operation of possible implementations of apparatus, methods and computer program products according to various embodiments of the present application. In this regard, each block in the flowchart or block diagrams may represent a module, segment, or portion of code, which comprises one or more executable instructions for implementing the specified logical function(s). It should also be noted that, in some alternative implementations, the functions noted in the block may occur out of the order noted in the figures. For example, two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality involved. It will also be noted that each block of the block diagrams and/or flowchart illustration, and combinations of blocks in the block diagrams and/or flowchart illustration, can be implemented by special purpose hardware-based systems which perform the specified functions or acts, or combinations of special purpose hardware and computer instructions.
In addition, functional modules in the embodiments of the present application may be integrated together to form an independent part, or each module may exist separately, or two or more modules may be integrated to form an independent part.
The functions may be stored in a computer-readable storage medium if they are implemented in the form of software functional modules and sold or used as separate products. Based on such understanding, the technical solution of the present application or portions thereof that substantially contribute to the prior art may be embodied in the form of a software product stored in a storage medium and including instructions for causing a computer device (which may be a personal computer, a server, or a network device) to execute all or part of the steps of the method according to the embodiments of the present application. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk or an optical disk, and other various media capable of storing program codes.
The above description is only an example of the present application and is not intended to limit the scope of the present application, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, improvement and the like made within the spirit and principle of the present application shall be included in the protection scope of the present application. It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined or explained in subsequent figures.
The above description is only for the specific embodiments of the present application, but the scope of the present application is not limited thereto, and any person skilled in the art can easily conceive of the changes or substitutions within the technical scope of the present application, and shall be covered by the scope of the present application. Therefore, the protection scope of the present application shall be subject to the protection scope of the claims.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrases "comprising a," "8230," "8230," or "comprising" does not exclude the presence of additional like elements in a process, method, article, or apparatus that comprises the element.

Claims (10)

1. A method for generating materials based on a BIM platform is characterized by comprising the following steps:
creating a component material information file;
generating a corresponding material ball according to the component material information file, and creating a material library;
and based on the material library, according to the material applying information of the material applying component, applying materials to the material applying component by using the corresponding material ball.
2. The BIM platform based material generation method of claim 1, wherein the component material information file comprises a material information table;
the creating of the component material information file includes:
acquiring a component material file corresponding to a target building project;
extracting material information from the component material file;
and creating the material information table according to the material information.
3. The BIM platform based material generation method of claim 2, wherein the component material information file further comprises a material map file;
the creating of the component material information file further comprises:
obtaining a target material map;
and storing the target material map into a target file, wherein the target material map is named by corresponding material codes in the target file respectively.
4. The BIM platform based material generation method of claim 1, wherein the assigning of the material to the material-to-be-assigned member by the corresponding material ball according to the material-to-be-assigned information of the material-to-be-assigned member based on the material library comprises:
and on the basis of the material library, according to the material endowing information of each member to be endowed with materials, each member to be endowed with materials is rapidly endowed with materials by utilizing the corresponding material ball.
5. The BIM platform based material generation method of claim 1, wherein the assigning of the material to the material-to-be-assigned member by the corresponding material ball according to the material-to-be-assigned information of the material-to-be-assigned member based on the material library comprises:
and based on the material library, batch material endowing is carried out on the plurality of members to be endowed with materials by utilizing the corresponding material balls according to endowing material information of the plurality of members to be endowed with materials.
6. The BIM-based platform material generation method of claim 1, wherein after the material to be assigned to the material member is assigned by the corresponding material ball according to the assignment information of the material to be assigned to the material member based on the material library, the method further comprises:
and outputting the corresponding target building design drawing and/or rendering the corresponding target building model.
7. The utility model provides a device based on BIM platform generates material which characterized in that includes:
the first establishing module is used for establishing a component material information file;
the second establishing module is used for generating a corresponding material ball according to the component material information file and establishing a material library;
and the component material endowing module is used for endowing the material to be endowed with the component by utilizing the corresponding material ball according to endowing material information of the component to be endowed with the material based on the material library.
8. The BIM platform-based material generation apparatus of claim 7, wherein the component material assigning module is specifically configured to:
based on the material library, according to the material adding information of each member to be added, each member to be added is added with a material rapidly by using the corresponding material ball;
and/or batch material endowing is carried out on the plurality of members to be endowed by utilizing the corresponding material balls according to endowing information of the plurality of members to be endowed based on the material library.
9. An electronic device comprising a memory for storing a computer program and a processor for executing the computer program to cause the electronic device to perform the method of generating a material based on a BIM platform according to any one of claims 1 to 6.
10. A computer-readable storage medium, in which a computer program is stored, which, when being executed by a processor, implements the method for generating a material based on a BIM platform according to any one of claims 1 to 6.
CN202110880923.0A 2021-08-02 2021-08-02 BIM platform-based material generation method and device, electronic equipment and storage medium Pending CN115705520A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110880923.0A CN115705520A (en) 2021-08-02 2021-08-02 BIM platform-based material generation method and device, electronic equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110880923.0A CN115705520A (en) 2021-08-02 2021-08-02 BIM platform-based material generation method and device, electronic equipment and storage medium

Publications (1)

Publication Number Publication Date
CN115705520A true CN115705520A (en) 2023-02-17

Family

ID=85178396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110880923.0A Pending CN115705520A (en) 2021-08-02 2021-08-02 BIM platform-based material generation method and device, electronic equipment and storage medium

Country Status (1)

Country Link
CN (1) CN115705520A (en)

Similar Documents

Publication Publication Date Title
US7808498B2 (en) CAD data evaluation method and evaluation apparatus
JP4759580B2 (en) Plant construction simulation data creation method and system
JP2002157282A (en) Method/device for estimating man-hour and storage medium
JP2005293578A5 (en)
KR102279061B1 (en) Methdo for Optimizing Analysed Model based on Lightweight Models
CN106709985B (en) Virtual sacrifice three-dimensional scene generation method and device
CA2844757A1 (en) Method for mapping elements of a construction project
KR101184981B1 (en) Evaluation method for biotop area of building
CN110427358A (en) Data cleaning method and device and information recommendation method and device
CN115705520A (en) BIM platform-based material generation method and device, electronic equipment and storage medium
CN112861059A (en) Visual component generation method and device, computer equipment and readable storage medium
CN110597789B (en) Automatic generation method, device and equipment of architecture diagram and computer readable storage medium
Fischer et al. Towards a holistic tool for the selection and validation of usability method sets supporting human-centered design
CN112068812A (en) Micro-service generation method and device, computer equipment and storage medium
JP2008003931A (en) Solution proposition support system
Huynh et al. A development process based on variability modeling for building adaptive software architectures
JP5903390B2 (en) Document generation apparatus, document generation method, and program
JP2018106716A5 (en)
CN109145098B (en) Chinese culture element information searching method based on knowledge graph
CN109491892B (en) Project environment configuration method and device
CN107992614B (en) Anatomical data processing method and device
JP2001188673A (en) Software reuse assisting device
Gomes et al. A B-Rep data structure and object GUI programming to implement 2D boundary elements
JP2011158932A (en) Work instruction generation system, method and program
CN114676288B (en) ID pull-through method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20230710

Address after: A4-04, Floor 4, Building A1, No. 1, Panpu Road, Country Garden Community, Beijiao Town, Shunde District, Foshan City, Guangdong Province, 528000 (residence declaration is only for office purposes)

Applicant after: Guangdong Bozhilin Software Technology Co.,Ltd.

Address before: 528000 a2-05, 2nd floor, building A1, 1 Panpu Road, Biguiyuan community, Beijiao Town, Shunde District, Foshan City, Guangdong Province (for office use only) (residence declaration)

Applicant before: GUANGDONG BOZHILIN ROBOT Co.,Ltd.

TA01 Transfer of patent application right