CN115700637A - 一种协调削峰和调压的配电网两阶段随机优化方法 - Google Patents

一种协调削峰和调压的配电网两阶段随机优化方法 Download PDF

Info

Publication number
CN115700637A
CN115700637A CN202211456932.8A CN202211456932A CN115700637A CN 115700637 A CN115700637 A CN 115700637A CN 202211456932 A CN202211456932 A CN 202211456932A CN 115700637 A CN115700637 A CN 115700637A
Authority
CN
China
Prior art keywords
node
phase
tap
distribution network
constraint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202211456932.8A
Other languages
English (en)
Other versions
CN115700637B (zh
Inventor
卢卓涛
魏颖豪
周雷
彭勇兵
刘毅
石文涛
陈国齐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUBEI ELECTRIC POWER Co JINGZHOU POWER SUPPLY Co
Original Assignee
HUBEI ELECTRIC POWER Co JINGZHOU POWER SUPPLY Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI ELECTRIC POWER Co JINGZHOU POWER SUPPLY Co filed Critical HUBEI ELECTRIC POWER Co JINGZHOU POWER SUPPLY Co
Priority to CN202211456932.8A priority Critical patent/CN115700637B/zh
Publication of CN115700637A publication Critical patent/CN115700637A/zh
Application granted granted Critical
Publication of CN115700637B publication Critical patent/CN115700637B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明提供了一种协调削峰和调压的配电网两阶段随机优化方法,与现有的单一的配电网削峰方法或者配电网电压/无功优化方法相比,在分布式电源DG、电池储能系统BESS和调压装置的协调作用下的建立了对配电网进行削峰和调压的联合优化框架,实现了对配电网进行削峰和调压的功能;将建立的协调削峰和调压的配电网两阶段随机优化模型转化为确定性的混合整数二阶段优化模型求解;通过调度DG、BESS和电压调节装置进行电压/无功调节和削峰,避免了单一调峰和调压的操作冲突矛盾和物理耦合的问题,实现了总运营成本的最小化。

Description

一种协调削峰和调压的配电网两阶段随机优化方法
技术领域
本发明属于配电网运行优化技术领域,具体涉及一种协调削峰和调压的配电网两阶段随机优化方法。
背景技术
近几十年来,世界各国政府鼓励支持风能、光伏(PV)、燃料电池、生物质等等分布式电源(DG)发展,基于可再生能源的DG具有经济和环保效益;然而,大量分散的DG并网给配电网运营商带来了调控压力,比如,电能质量和网络拥塞问题。电池储能系统(BESS)是解决可再生能源并网的最直接、最有效的技术途径,它能以模块化和分布式方式灵活配置。显然,随着高渗透率的可再生能源DG并网,实际负荷可能会大大偏离预测,这将影响到配电网运营商的市场竞价行为。另一方面,馈线电压分布也将随净负荷波动而变化。因此,虽然可再生能源DG和BESS的不断渗透对配电网的能量管理提出了挑战,但同时也推动了以成本效益高的方式开发可再生能源。
调峰和电压/无功调节是配电网管理系统的两项基本功能。调峰是通过储能和需求侧管理将高峰负荷需求转移到非高峰时段,从而使负荷曲线平坦化的过程。它有利于整个电力系统,包括发电厂、配电网运营商以及终端用户。特别是对于配电网运营商来说,有效的调峰可以推迟昂贵的配电网升级改造。电压/无功调节是通过有优化电压调节装置,如有载分接开关(OLTC)、电压调节器(SVR)和电容器组,将馈线电压保持在可行范围内。此外,基于逆变器接口的DG和BESS能够在本地提供快速和连续的电压/无功支持,从而减轻传统设备的工作负荷。
传统的配电网调峰和电压/无功优化是分开进行的,长期以来,大量的研究也是仅研究了调峰或电压/无功调节。然而,实际运行表明,由于电网的物理性质,它们之间相互影响:1)调峰改变了净负荷曲线也会改变馈线电压分布曲线,特别是对于一些具有高R/X比的低压馈线;2)调节电压也可以降低线路损耗和负荷需求来降低峰值负荷。
有鉴于此,配电网的调峰与电压/无功联合优化可以最大限度地利用DG和储能,从而在运营成本、电能质量、供电可靠性以及缓解网络拥塞等方面优势突出,而传统的独立优化则难以实现。
发明内容
本发明要解决的技术问题是:提供一种协调削峰和调压的配电网两阶段随机优化方法,用于对配电网进行削峰和调压。
本发明为解决上述技术问题所采取的技术方案为:一种协调削峰和调压的配电网两阶段随机优化方法,包括以下步骤:
S1:建立包括联合优化的目标函数和约束条件的日前协调削峰和调压的配电网联合优化模型;
S2:将目标函数和约束条件线性化,并转化为矢量表达式得到确定性的配电网联合优化模型;
S3:将确定性的配电网联合优化模型转化为两阶段随机优化模型,并重新调度无功电源。
按上述方案,所述的步骤S1中,目标函数为总体运营成本C最小;总体运营成本C包括购电成本Cele、电池储能系统BESS寿命退化的电池老化成本Cbat、分接开关动作成本Ctap和电容器组动作成本Ccap
S201:设λele。为预测电价,单位为$/kWh;
Figure BDA0003953592410000021
为在t时段从节点i流向节点j的三相潮流;
Figure BDA0003953592410000022
为支路(i,j)的阻抗矩阵;S01,t为在t时段从变电站节点0流向配电网节点1的三相潮流;
Figure BDA0003953592410000023
为从节点i流向节点j的三相线路电流;Re表示取实部,Tr表示矩阵的迹;ΔT为时间间隔,单位为h;E表示支路集合;T为时间周期;则购电成本Cele为:
Figure BDA0003953592410000024
S202:设λbat为电池老化成本系数,单位为$/kWh;
Figure BDA0003953592410000025
为在t时段节点i处
Figure BDA0003953592410000026
相的BESS注入的复功率,
Figure BDA0003953592410000027
Φi∈{a,b,c};N表示节点总数;则电池老化成本Cbat为:
Figure BDA0003953592410000028
S203:设λtap为有载分接开关的调整成本系数,单位为$/次;
Figure BDA00039535924100000320
分别为支路(i,j)处在t时段和在t-1时段的抽头位置;则分接开关动作成本Ctap为:
Figure BDA0003953592410000031
S204:设λcap为电容器组的动作成本系数,单位为$/次;
Figure BDA00039535924100000321
分别为节点i处
Figure BDA0003953592410000032
相的电容器组在t时段和在t-1时段的数量;则电容器组动作成本Ccap为:
Figure BDA0003953592410000033
则总体运营成本C为:
C=Cele+Cbat+Ctap+Ccap
进一步的,所述的步骤S1中,约束条件包括三相潮流方程约束、系统安全约束、峰值负荷需求约束、变电站容量约束、分接开关约束、电容器组约束、BESS约束和基于逆变器的DG约束;
S205:采用线性化的三相Disflow模型,设
Figure BDA0003953592410000034
为Sij,t对角线元素的近似项,
Figure BDA0003953592410000035
为节点j处
Figure BDA0003953592410000036
相的负荷在t时段的需求复功率;
Figure BDA0003953592410000037
为节点j处
Figure BDA0003953592410000038
相DG在t时段注入的复功率;
Figure BDA0003953592410000039
为节点j处
Figure BDA00039535924100000310
相的BESS在t时段注入的复功率;
Figure BDA00039535924100000311
为节点j处
Figure BDA00039535924100000312
相电容器组在t时段的注入复功率;
Figure BDA00039535924100000313
为节点j的子节点集合;a=[1,e-i2π/3,ei2π/3]T,上标T表示对矩阵进行转置;
Figure BDA00039535924100000314
表示t时段从节点i流向节点j的三相潮流矩阵;
Figure BDA00039535924100000315
表示节点i处在t时段的三相电压矩阵;上标H表示对复数矩阵进行共轭转置;
Figure BDA00039535924100000316
为支路(i,j)处
Figure BDA00039535924100000317
相分接头在t时刻的抽头位置,
Figure BDA00039535924100000318
为支路(i,j)处
Figure BDA00039535924100000319
相分接头在t时刻的抽头位置;ΔTapij为每一步抽头比率变化;如果支路(i,j)没有分接开关,则kij,t=diag(1,1,1);对于任意一条支路(i,j)∈E,三相潮流方程约束为:
Figure BDA0003953592410000041
Figure BDA0003953592410000042
Figure BDA0003953592410000043
Figure BDA0003953592410000044
设Vn为节点的额定电压;
Figure BDA0003953592410000045
为在t时段从节点i流向节点j的三相线路电流;
Figure BDA0003953592410000046
表示电流平方矩阵;为了估计线路损耗,对于任一支路(i,j)∈E的线路电流按下式进行近似估计:
Figure BDA0003953592410000047
Figure BDA0003953592410000048
S206:系统安全约束包括节点电压运行约束和线路电流运行约束;
设Vi max和Vi min分别表示节点i处电压幅值的上限和下限;
Figure BDA0003953592410000049
为节点i在t时段的三相电压矩阵;则节点电压运行约束为:
(Vi min)2≤diag(vi,t)≤(Vi max)2,i∈N,t∈T;
Figure BDA00039535924100000410
为支路(i,j)电流上限;则线路电流运行约束为:
Figure BDA00039535924100000411
S207:峰值负荷需求约束为将一天内净峰值负荷约束在最大峰值负荷Peak内:
Figure BDA00039535924100000412
S208:设Im表示取虚部,[]2表示向量取二范数;
Figure BDA00039535924100000413
为变压器容量的上限;则变电站容量约束为:
Figure BDA00039535924100000414
S209:设
Figure BDA00039535924100000415
Figure BDA00039535924100000416
分别为支路(i,j)处的抽头最小位置和最大位置;
Figure BDA00039535924100000417
Figure BDA00039535924100000418
分别为支路(i,j)处抽头在t时段和t-1时段的位置;
Figure BDA00039535924100000419
为前后时间间隔的抽头动作次数约束;
Figure BDA0003953592410000051
为一个周期T内抽头动作次数约束;则分接开关约束为对于任何(i,j)∈E和
Figure BDA0003953592410000052
分接开关的动作次数满足以下约束:
Figure BDA0003953592410000053
Figure BDA0003953592410000054
Figure BDA0003953592410000055
S210:设
Figure BDA0003953592410000056
为节点i处
Figure BDA0003953592410000057
相的电容器组在t时段的数量,
Figure BDA0003953592410000058
为节点i处
Figure BDA0003953592410000059
相的每个电容器组的容量,Z为整数;
Figure BDA00039535924100000510
为节点i处
Figure BDA00039535924100000511
相的电容器组投入的最大数量;
Figure BDA00039535924100000512
为在T周期内节点i处
Figure BDA00039535924100000513
相电容器组的允许变化范围;对于任意节点i∈N和
Figure BDA00039535924100000514
电容器组约束为:
Figure BDA00039535924100000515
Figure BDA00039535924100000516
Figure BDA00039535924100000517
Figure BDA00039535924100000518
S211:BESS约束为将电池操作限制在放电区域的一定放电深度内,以避免过充和过放电,循环深度增加的边际成本是恒定的;设λbat为电池老化成本系数,单位为$/kWh;λcell为电池价格,单位为$/kWh;SoCmin和SoCmax分别为SoC的上限和下限;M为电池在范围为[SoCmin,SoCmax]可能的循环次数;根据充放电能量将电池老化成本按比例分摊到每kWh的成本λbat为:
Figure BDA00039535924100000519
Figure BDA00039535924100000520
分别为节点i处BESS的充电功率和放电功率;
Figure BDA00039535924100000521
为节点i处
Figure BDA00039535924100000522
相的BESS额定功率;
Figure BDA00039535924100000523
节点i处
Figure BDA00039535924100000524
相的BESS在t时段的充放电状态;
Figure BDA00039535924100000525
为节点i处
Figure BDA00039535924100000526
相BESS在t时段的SoC;ηch,ηdc分别为BESS的充放电效率,
Figure BDA00039535924100000527
节点i处
Figure BDA0003953592410000061
相的BESS额定容量;SoCmin,SoCmax分别为SoC的最小/最大运行约束;则在节点i∈N处,
Figure BDA0003953592410000062
的BESS模型和BESS约束为:
Figure BDA0003953592410000063
Figure BDA0003953592410000064
Figure BDA0003953592410000065
Figure BDA0003953592410000066
Figure BDA0003953592410000067
Figure BDA0003953592410000068
Figure BDA0003953592410000069
Figure BDA00039535924100000610
S212:设
Figure BDA00039535924100000611
为DG允许的可用有功功率;
Figure BDA00039535924100000612
为节点i处
Figure BDA00039535924100000613
相的BESS额定功率;则基于逆变器的DG约束为:
Figure BDA00039535924100000614
Figure BDA00039535924100000615
进一步的,所述的步骤S2中,具体步骤为:
目标函数和周期T内分接开关的总动作次数约束、周期T内电容器组约束、与抽头位置有关的绝对项之和以及与电容器组有关的绝对项之和为待进行线性化的非线性项;引入辅助变量
Figure BDA00039535924100000616
Figure BDA00039535924100000617
对上述各项进行重构;
Figure BDA00039535924100000618
为与
Figure BDA00039535924100000619
相支路(i,j)上的分接开关有关的辅助变量;则周期T内分接开关约束重构为:
Figure BDA00039535924100000620
Figure BDA00039535924100000621
Figure BDA0003953592410000071
Figure BDA0003953592410000072
为节点i处
Figure BDA0003953592410000073
相电容器组的辅助变量;则周期T内电容器组约束重构为:
Figure BDA0003953592410000074
Figure BDA0003953592410000075
Figure BDA0003953592410000076
成本函数Ctap、Ccap以及Cbat改写为:
Figure BDA0003953592410000077
Figure BDA0003953592410000078
Figure BDA0003953592410000079
设u为决策向量;U为实数、复数和整数集合的笛卡尔积,以元素方式表征u;将上述建立的联合优化模型表达为矢量形式得到确定性的配电网联合优化模型:
Figure BDA00039535924100000710
确定性的配电网联合优化模型是一个混合整数二阶锥优化模型Mis,通过直接调用包括Cplex、Mosek的求解器求解。
进一步的,其特征在于:所述的步骤S3中,具体步骤为:
S31:生成和缩减负荷和可再生能源的预测场景;
S32:建立确定性的配电网联合优化模型的两阶段随机优化模型;
S33:将两阶段随机优化模型近似等价为确定性优化模型并直接求解。
进一步的,所述的步骤S31中,具体步骤为:
采用截断正态分布模拟负荷预测误差;在天气晴朗的情况下,设
Figure BDA00039535924100000711
为最大太阳辐照度,Ir为太阳辐照度水平,
Figure BDA00039535924100000712
表示投影到集合[0,1]上;在预测
Figure BDA00039535924100000713
中引入一个校正因子,遵循取决于给定云覆盖水平的正态分布:
Figure BDA0003953592410000081
基于已知的负荷和可再生能源的预测误差概率分布,采用蒙特卡洛抽样生成所需的太阳辐照度和负荷场景;然后通过向后缩减方法精简为少量的典型场景。
进一步的,所述的步骤S32中,具体步骤为:
S321:将所有的决策u∈U分为两组,u={x,y};第一阶段决策变量x表示与BESS充电、放电、分接开关动作以及电容器组相关的决策变量;第二阶段决策变量y由其它剩余变量组成;设C1(x)对应Cbat+Ctap+Ccap,C2(y)对应Cele;则确定性的配电网联合优化模型重塑为下式:
Figure BDA0003953592410000082
S322:将随机场景定义为
Figure BDA0003953592410000083
i∈N,t∈T,则确定性的配电网联合优化模型的两阶段随机优化模型为:
Figure BDA0003953592410000084
设第一阶段决策变量x对应ξ实现之前的第一阶段决策here-and-now,第一阶段决策变量x包括BESS的充放电功率、分接开关的位置和电容器组的投切数量;第二阶段决策变量y对应给定ξ实现下的第二阶段决策wait-and-see,第二阶段决策变量y是BESS和DG的无功功率。
进一步的,所述的步骤S33中,具体步骤为:
通过有限场景集表示不确定性集合Ξ={ξ1,...,ξ|Ξ|},概率分布为ρ1,...,ρ|Ξ|;将两阶段随机优化模型近似等价为确定性优化模型为:
Figure BDA0003953592410000091
Figure BDA0003953592410000092
一种计算机存储介质,其内存储有可被计算机处理器执行的计算机程序,该计算机程序执行一种协调削峰和调压的配电网两阶段随机优化方法。
本发明的有益效果为:
1.本发明的一种协调削峰和调压的配电网两阶段随机优化方法,在分布式电源DG、电池储能系统BESS和调压装置的协调作用下的建立了对配电网进行削峰和调压的联合优化框架,实现了对配电网进行削峰和调压的功能;通过调度DG、BESS和电压调节装置进行电压/无功调节和削峰,避免了单一调峰和调压的操作冲突矛盾和物理耦合的问题,实现了总运营成本的最小化。
2.与现有的单一的配电网削峰方法或者配电网电压/无功优化方法相比,本发明考虑可再生能源分布式电源出力的不确定性和负荷的预测不确定性,将建立的协调削峰和调压的配电网两阶段随机优化模型转化为确定性的混合整数二阶段优化模型求解;BESS的荷电状态(SoC)和调压装置在第一阶段进行日前调度优化,而DG和BESS的无功功率在第二阶段进行实时优化,最后通过典型场景法将其转化为一个混合整数二阶段优化模型求解。
附图说明
图1是本发明实施例的协调削峰和调压的配电网联合优化框架图。
图2是本发明实施例的流程图。
具体实施方式
下面结合附图和具体实施方式对本发明作进一步详细的说明。
参见图2,本发明实施例的一种协调削峰和调压的配电网两阶段随机优化方法,包括以下步骤:
第一步:建立日前协调削峰和调压的配电网联合优化框架,包括联合优化的目标函数和约束条件;如附图1所示;
(1)目标函数
联合优化框架旨在最小化总运营成本,包括购电成本、电池老化成本、分接开关动作成本和电容器组动作成本,其表达式如下:
1)购电成本:
Figure BDA0003953592410000101
式中,Cele为购电成本,λele为预测电价($/kWh),
Figure BDA0003953592410000102
为在t时段从节点i流向节点j的三相潮流,
Figure BDA0003953592410000103
为支路(i,j)的阻抗矩阵;S01,t为在t时段从变电站节点0流向配电网节点1的三相潮流;
Figure BDA0003953592410000104
为从节点i流向节点j的三相线路电流。Re表示取实部,Tr表示矩阵的迹。ΔT为时间间隔(h)。E表示支路集合。T为时间周期。
2)电池老化成本:
Figure BDA0003953592410000105
式中,Cbat表示BESS寿命退化的老化成本,λbat为电池老化成本系数($/kWh),
Figure BDA0003953592410000106
为在t时段节点i处
Figure BDA0003953592410000107
相的BESS注入的复功率,
Figure BDA0003953592410000108
Φi∈{a,b,c}。N表示节点总数。
3)分接开关的操作成本:
Figure BDA0003953592410000109
式中,Ctap分接开关的动作成本,λtap为有载分接开关的调整成本系数($/次),
Figure BDA00039535924100001010
分别为支路(i,j)处在t时段和在t-1时段的抽头位置。
4)电容器组的动作成本:
Figure BDA00039535924100001011
式中,Ccap为电容器组的动作成本,λcap为电容器组的动作成本系数[$/次],
Figure BDA00039535924100001012
Figure BDA00039535924100001013
分别为节点i处
Figure BDA00039535924100001014
相的电容器组在t时段和在t-1时段的数量。
因此,总体运营成本由下式给出:
C=Cele+Cbat+Ctap+Ccap
式中,C为总体运营成本。
(2)约束条件
1)三相潮流方程约束:本发明采用线性化的三相Disflow模型,对于任意一条支路(i,j)∈E,
Figure BDA0003953592410000111
Figure BDA0003953592410000112
Figure BDA0003953592410000113
式中,
Figure BDA0003953592410000114
为Sij,t对角线元素的近似项,
Figure BDA0003953592410000115
为节点j处
Figure BDA0003953592410000116
相的负荷在t时段的需求复功率;
Figure BDA0003953592410000117
为节点j处
Figure BDA0003953592410000118
相DG在t时段注入的复功率;
Figure BDA0003953592410000119
为节点j处
Figure BDA00039535924100001110
相的BESS在t时段注入的复功率;
Figure BDA00039535924100001111
为节点j处
Figure BDA00039535924100001112
相电容器组在t时段的注入复功率。
Figure BDA00039535924100001113
为节点j的子节点集合;a=[1,e-i2π/3,ei2π/3]T,上标T表示对矩阵进行转置;
Figure BDA00039535924100001114
表示t时段从节点i流向节点j的三相潮流矩阵。
Figure BDA00039535924100001115
表示节点i处在t时段的三相电压矩阵。上标H表示对复数矩阵进行共轭转置。
Figure BDA00039535924100001116
Figure BDA00039535924100001117
式中,
Figure BDA00039535924100001118
为支路(i,j)处
Figure BDA00039535924100001119
相分接头在t时刻的抽头位置,
Figure BDA00039535924100001120
为支路(i,j)处
Figure BDA00039535924100001121
相分接头在t时刻的抽头位置,ΔTapij每一步抽头比率变化。如果支路(i,j)没有分接开关,则kij,t=diag(1,1,1)。
此外,为了估计线路损耗,对于任一支路(i,j)∈E,线路电流可以按下式进行近似估计:
Figure BDA00039535924100001122
Figure BDA00039535924100001123
式中,Vn节点的额定电压,
Figure BDA00039535924100001124
为在t时段从节点i流向节点j的三相线路电流。
Figure BDA00039535924100001125
表示电流平方矩阵。
2)系统安全约束:包括节点电压运行约束和线路电流运行约束。
节点电压运行约束如下:
(Vi min)2≤diag(vi,t)≤(Vi max)2,i∈N,t∈T
式中,Vi max,Vi min分别表示节点i处电压幅值的上下限,
Figure BDA00039535924100001126
节点i在t时段的三相电压矩阵。
线路电流运行约束如下:
Figure BDA0003953592410000121
式中,
Figure BDA0003953592410000122
为支路(i,j)电流上限。
3)峰值负荷需求约束:本发明将一天内净峰值负荷约束在最大峰值负荷Peak内,如下
Figure BDA0003953592410000123
4)变电站容量约束:
Figure BDA0003953592410000124
式中,Im表示取虚部,[]2表示向量取二范数;
Figure BDA0003953592410000125
为变压器容量的上限。
5)分接开关约束:分接开关的动作次数,对于任何(i,j)∈E和
Figure BDA0003953592410000126
满足以下约束:
Figure BDA0003953592410000127
Figure BDA0003953592410000128
Figure BDA0003953592410000129
式中,
Figure BDA00039535924100001210
分别为支路(i,j)处的抽头最小、最大位置,
Figure BDA00039535924100001211
分别为支路(i,j)处抽头在t、t-1时段的位置;
Figure BDA00039535924100001212
为前后时间间隔的抽头动作次数约束,
Figure BDA00039535924100001213
为一个周期T内抽头动作次数约束。
6)电容器组约束:对于任意节点i∈N和
Figure BDA00039535924100001214
电容器组的运行约束如下:
Figure BDA00039535924100001215
Figure BDA00039535924100001216
Figure BDA00039535924100001217
Figure BDA00039535924100001218
式中,
Figure BDA00039535924100001219
为节点i处
Figure BDA00039535924100001220
相的电容器组在t时段的数量,
Figure BDA00039535924100001221
为节点i处
Figure BDA00039535924100001222
相的每个电容器组的容量,Z为整数;
Figure BDA00039535924100001223
为节点i处
Figure BDA00039535924100001224
相的电容器组投入的最大数量;
Figure BDA0003953592410000131
为在T周期内节点i处
Figure BDA0003953592410000132
相电容器组的允许变化范围。
7)BESS约束:本发明将电池操作限制在放电区域的一定放电深度内,以避免过充和过放电,那么循环深度增加的边际成本是恒定的。这样,电池老化成本可以根据充放电能量按比例分摊到每kWh的成本λbat,如下所示
Figure BDA0003953592410000133
式中,λbat为电池老化成本系数[$/kWh],λcell为电池价格[$/kWh],SoCmin、SoCmax分别为SoC的上下限,M为电池在范围为[SoCmin,SoCmax]可能的循环次数。
节点i∈N处,
Figure BDA0003953592410000134
的BESS的模型和运行约束可以表示为
Figure BDA0003953592410000135
Figure BDA0003953592410000136
Figure BDA0003953592410000137
Figure BDA0003953592410000138
Figure BDA0003953592410000139
Figure BDA00039535924100001310
Figure BDA00039535924100001311
Figure BDA00039535924100001312
式中,
Figure BDA00039535924100001313
分别为节点i处BESS的充电功率和放电功率;
Figure BDA00039535924100001314
为节点i处
Figure BDA00039535924100001315
相的BESS额定功率,
Figure BDA00039535924100001316
节点i处
Figure BDA00039535924100001317
相的BESS在t时段的充放电状态。
Figure BDA00039535924100001318
为节点i处
Figure BDA00039535924100001319
相BESS在t时段的SoC;ηch,ηdc分别为BESS的充放电效率,
Figure BDA00039535924100001320
节点i处
Figure BDA00039535924100001321
相的BESS额定容量;SoCmin,SoCmax分别为SoC的最小/最大运行约束。
8)基于逆变器的DG约束:基于逆变器四象限运行的DG运行约束如下:
Figure BDA00039535924100001322
Figure BDA00039535924100001323
式中,
Figure BDA00039535924100001324
为DG允许的可用有功功率;
Figure BDA00039535924100001325
为节点i处
Figure BDA00039535924100001326
相的BESS额定功率。
第二步:将第一步建立的目标函数和约束条件线性化,并转化为矢量表达式;
目标函数和周期T内分接开关的总动作次数约束、周期T内电容器组的允许变化范围约束,以及与抽头位置和电容器组有关的绝对项之和,这些项为非线性项,需要进行线性化。因此,本发明通过引入辅助变量
Figure BDA0003953592410000141
Figure BDA0003953592410000142
来重构它们。然后,周期T内分接开关的总动作次数约束可以重构为
Figure BDA0003953592410000143
Figure BDA0003953592410000144
Figure BDA0003953592410000145
式中,
Figure BDA0003953592410000146
Figure BDA0003953592410000147
相支路(i,j)上的分接开关有关的辅助变量。
类似地,周期T内电容器组的允许变化范围约束可以重构为
Figure BDA0003953592410000148
Figure BDA0003953592410000149
Figure BDA00039535924100001410
式中,
Figure BDA00039535924100001411
节点i处
Figure BDA00039535924100001412
相电容器组的辅助变量。
相应地,成本函数Ctap、Ccap以及Cbat可以改写为
Figure BDA00039535924100001413
Figure BDA00039535924100001414
Figure BDA00039535924100001415
然后将上述建立的联合优化模型表达为矢量形式:
确定性优化模型:
Figure BDA00039535924100001416
其中u是决策向量;U是实数、复数和整数集合的笛卡尔积,它以元素方式表征u。上述的确定性优化模型是一个混合整数二阶锥优化模型(Mis),可以直接调用Cplex、Mosek等求解。
第三步:考虑负荷和可再生能源预测的不确定性,将确定性的配电网削峰和电压联合优化模型转化为两阶段随机优化模型,并重新调度无功电源;
1)负荷和可再生能源预测的场景生成和缩减;
本发明采用截断正态分布的来模拟负荷预测误差。由于太阳能发电量取决于入射太阳辐照度,而辐照度在很大程度上取决于云层覆盖情况。因此,本发明的太阳辐照度预测误差的建模方法是在天气晴朗的情况下,在预测
Figure BDA0003953592410000158
中引入一个校正因子,遵循取决于给定云覆盖水平的正态分布,如下
Figure BDA0003953592410000151
式中,
Figure BDA0003953592410000152
为最大太阳辐照度,Ir为太阳辐照度水平,其中
Figure BDA0003953592410000153
表示投影到集合[0,1]上。
基于已知的负荷和可再生能源的预测误差概率分布,采用蒙特卡洛抽样生成所需的太阳辐照度和负荷场景。然后,通过向后缩减方法将精简为少量的典型场景。
2)建立配电网削峰和电压联合优化的两阶段随机优化模型;
首先将所有的决策u∈U分为两组,即u={x,y},其中:
x表示与BESS充电/放电、分接开关动作以及电容器组相关的决策变量,即为第一阶段决策变量。
y由其它剩余变量组成,即为第二阶段决策变量。相应地,确定性的配电网联合优化模型可以重塑为下式:
Figure BDA0003953592410000154
Figure BDA0003953592410000155
其中C1(x)对应Cbat+Ctap+Ccap,C2(y)对应Cele
然后,将随机场景定义为
Figure BDA0003953592410000156
i∈N,t∈T,则配电网削峰和电压联合优化的两阶段随机优化模型表示为
(两阶段随机优化模型):
Figure BDA0003953592410000157
其中x对应于ξ实现之前的第一阶段(here-and-now)决策,y对应于给定ξ实现下的第二阶段(wait-and-see)决策。第一阶段的决策变量包括BESS的充放电功率、分接开关的位置和电容器组的投切数量。第二阶段决策变量是BESS和DG的无功功率。
3)通过有限场景集表示不确定性集合Ξ={ξ1,...,ξ|Ξ|},概率分布为ρ1,...,ρ|Ξ|,将两阶段随机优化模型的近似等价为确定性优化模型求解,如下式所示:
Figure BDA0003953592410000161
Figure BDA0003953592410000162
上述本质上也是一个混合整数二阶锥优化模型,可以直接求解。
以上实施例仅用于说明本发明的设计思想和特点,其目的在于使本领域内的技术人员能够了解本发明的内容并据以实施,本发明的保护范围不限于上述实施例。所以,凡依据本发明所揭示的原理、设计思路所作的等同变化或修饰,均在本发明的保护范围之内。

Claims (9)

1.一种协调削峰和调压的配电网两阶段随机优化方法,其特征在于:包括以下步骤:
S1:建立包括联合优化的目标函数和约束条件的日前协调削峰和调压的配电网联合优化模型;
S2:将目标函数和约束条件线性化,并转化为矢量表达式得到确定性的配电网联合优化模型;
S3:将确定性的配电网联合优化模型转化为两阶段随机优化模型,并重新调度无功电源。
2.根据权利要求1所述的一种协调削峰和调压的配电网两阶段随机优化方法,其特征在于:所述的步骤S1中,目标函数为总体运营成本C最小;总体运营成本C包括购电成本Cele、电池储能系统BESS寿命退化的电池老化成本Cbat、分接开关动作成本Ctap和电容器组动作成本Ccap
S201:设λele为预测电价,单位为$/kWh;
Figure FDA0003953592400000011
为在t时段从节点i流向节点j的三相潮流;
Figure FDA0003953592400000012
为支路(i,j)的阻抗矩阵;S01,t为在t时段从变电站节点0流向配电网节点1的三相潮流;
Figure FDA0003953592400000013
为从节点i流向节点j的三相线路电流;Re表示取实部,Tr表示矩阵的迹;ΔT为时间间隔,单位为h;E表示支路集合;T为时间周期;则购电成本Cele为:
Figure FDA0003953592400000014
S202:设λbat为电池老化成本系数,单位为$/kWh;
Figure FDA0003953592400000015
为在t时段节点i处
Figure FDA0003953592400000016
相的BESS注入的复功率,
Figure FDA0003953592400000017
Φi∈{a,b,c};N表示节点总数;则电池老化成本Cbat为:
Figure FDA0003953592400000018
S203:设λtap为有载分接开关的调整成本系数,单位为$/次;
Figure FDA0003953592400000019
分别为支路(i,j)处在t时段和在t-1时段的抽头位置;则分接开关动作成本Ctap为:
Figure FDA00039535924000000110
S204:设λcap为电容器组的动作成本系数,单位为$/次;
Figure FDA0003953592400000021
分别为节点i处
Figure FDA0003953592400000022
相的电容器组在t时段和在t-1时段的数量;则电容器组动作成本Ccap为:
Figure FDA0003953592400000023
则总体运营成本C为:
C=Cele+Cbat+Ctap+Ccap
3.根据权利要求2所述的一种协调削峰和调压的配电网两阶段随机优化方法,其特征在于:所述的步骤S1中,约束条件包括三相潮流方程约束、系统安全约束、峰值负荷需求约束、变电站容量约束、分接开关约束、电容器组约束、BESS约束和基于逆变器的DG约束;
S205:采用线性化的三相Disflow模型,设
Figure FDA0003953592400000024
为Sij,t对角线元素的近似项,
Figure FDA0003953592400000025
Figure FDA0003953592400000026
为节点j处
Figure FDA0003953592400000027
相的负荷在t时段的需求复功率;
Figure FDA0003953592400000028
Figure FDA0003953592400000029
为节点j处
Figure FDA00039535924000000210
相DG在t时段注入的复功率;
Figure FDA00039535924000000211
Figure FDA00039535924000000212
为节点j处
Figure FDA00039535924000000213
相的BESS在t时段注入的复功率;
Figure FDA00039535924000000214
Figure FDA00039535924000000215
为节点j处
Figure FDA00039535924000000216
相电容器组在t时段的注入复功率;
Figure FDA00039535924000000217
为节点j的子节点集合;a=[1,e-i2π/3,ei2π/3]T,上标T表示对矩阵进行转置;
Figure FDA00039535924000000218
表示t时段从节点i流向节点j的三相潮流矩阵;
Figure FDA00039535924000000219
表示节点i处在t时段的三相电压矩阵;上标H表示对复数矩阵进行共轭转置;
Figure FDA00039535924000000220
Figure FDA00039535924000000221
为支路(i,j)处
Figure FDA00039535924000000222
相分接头在t时刻的抽头位置,
Figure FDA00039535924000000223
为支路(i,j)处
Figure FDA00039535924000000224
相分接头在t时刻的抽头位置;ΔTapij为每一步抽头比率变化;如果支路(i,j)没有分接开关,则kij,t=diag(1,1,1);对于任意一条支路(i,j)∈E,三相潮流方程约束为:
Figure FDA00039535924000000225
Figure FDA00039535924000000226
Figure FDA00039535924000000227
Figure FDA0003953592400000031
设Vn为节点的额定电压;
Figure FDA0003953592400000032
为在t时段从节点i流向节点j的三相线路电流;
Figure FDA0003953592400000033
表示电流平方矩阵;为了估计线路损耗,对于任一支路(i,j)∈E的线路电流按下式进行近似估计:
Figure FDA0003953592400000034
Figure FDA0003953592400000035
S206:系统安全约束包括节点电压运行约束和线路电流运行约束;
设Vi max和Vi min分别表示节点i处电压幅值的上限和下限;
Figure FDA0003953592400000036
为节点i在t时段的三相电压矩阵;则节点电压运行约束为:
(Vi min)2≤diag(vi,t)≤(Vi max)2,i∈N,t∈T;
Figure FDA0003953592400000037
为支路(i,j)电流上限;则线路电流运行约束为:
Figure FDA0003953592400000038
S207:峰值负荷需求约束为将一天内净峰值负荷约束在最大峰值负荷Peak内:
Figure FDA0003953592400000039
S208:设Im表示取虚部,[]2表示向量取二范数;
Figure FDA00039535924000000310
为变压器容量的上限;则
变电站容量约束为:
Figure FDA00039535924000000311
S209:设
Figure FDA00039535924000000312
Figure FDA00039535924000000313
分别为支路(i,j)处的抽头最小位置和最大位置;
Figure FDA00039535924000000314
分别为支路(i,j)处抽头在t时段和t-1时段的位置;
Figure FDA00039535924000000315
为前后时间间隔的抽头动作次数约束;
Figure FDA00039535924000000316
为一个周期T内抽头动作次数约束;则分接开关约束为对于任何(i,j)∈E和
Figure FDA00039535924000000317
分接开关的动作次数满足以下约束:
Figure FDA00039535924000000318
Figure FDA00039535924000000319
Figure FDA0003953592400000041
S210:设
Figure FDA0003953592400000042
为节点i处
Figure FDA0003953592400000043
相的电容器组在t时段的数量,
Figure FDA0003953592400000044
为节点i处
Figure FDA0003953592400000045
相的每个电容器组的容量,Z为整数;
Figure FDA0003953592400000046
为节点i处
Figure FDA0003953592400000047
相的电容器组投入的最大数量;
Figure FDA0003953592400000048
为在T周期内节点i处
Figure FDA0003953592400000049
相电容器组的允许变化范围;对于任意节点i∈N和
Figure FDA00039535924000000410
电容器组约束为:
Figure FDA00039535924000000411
Figure FDA00039535924000000412
Figure FDA00039535924000000413
Figure FDA00039535924000000414
S211:BESS约束为将电池操作限制在放电区域的一定放电深度内,以避免过充和过放电,循环深度增加的边际成本是恒定的;设λbat为电池老化成本系数,单位为$/kWh;λcell为电池价格,单位为$/kWh;SoCmin和SoCmax分别为SoC的上限和下限;M为电池在范围为[SoCmin,SoCmax]可能的循环次数;根据充放电能量将电池老化成本按比例分摊到每kWh的成本λbat为:
Figure FDA00039535924000000415
Figure FDA00039535924000000416
分别为节点i处BESS的充电功率和放电功率;
Figure FDA00039535924000000417
为节点i处
Figure FDA00039535924000000418
相的BESS额定功率;
Figure FDA00039535924000000419
节点i处
Figure FDA00039535924000000420
相的BESS在t时段的充放电状态;
Figure FDA00039535924000000421
为节点i处
Figure FDA00039535924000000422
相BESS在t时段的SoC;ηchdc分别为BESS的充放电效率,
Figure FDA00039535924000000423
节点i处
Figure FDA00039535924000000424
相的BESS额定容量;SoCmin,SoCmax分别为SoC的最小/最大运行约束;则在节点i∈N处,
Figure FDA00039535924000000425
的BESS模型和BESS约束为:
Figure FDA00039535924000000426
Figure FDA00039535924000000427
Figure FDA00039535924000000428
Figure FDA0003953592400000051
Figure FDA0003953592400000052
Figure FDA0003953592400000053
Figure FDA0003953592400000054
Figure FDA0003953592400000055
S212:设
Figure FDA0003953592400000056
为DG允许的可用有功功率;
Figure FDA0003953592400000057
为节点i处
Figure FDA0003953592400000058
相的BESS额定功率;则基于逆变器的DG约束为:
Figure FDA0003953592400000059
Figure FDA00039535924000000510
4.根据权利要求3所述的一种协调削峰和调压的配电网两阶段随机优化方法,其特征在于:所述的步骤S2中,具体步骤为:
目标函数和周期T内分接开关的总动作次数约束、周期T内电容器组约束、与抽头位置有关的绝对项之和以及与电容器组有关的绝对项之和为待进行线性化的非线性项;引入辅助变量
Figure FDA00039535924000000511
Figure FDA00039535924000000512
对上述各项进行重构;
Figure FDA00039535924000000513
为与
Figure FDA00039535924000000514
相支路(i,j)上的分接开关有关的辅助变量;则周期T内分接开关约束重构为:
Figure FDA00039535924000000515
Figure FDA00039535924000000516
Figure FDA00039535924000000517
Figure FDA00039535924000000518
为节点i处
Figure FDA00039535924000000519
相电容器组的辅助变量;则周期T内电容器组约束重构为:
Figure FDA00039535924000000520
Figure FDA00039535924000000521
Figure FDA0003953592400000061
成本函数Ctap、Ccap以及Cbat改写为:
Figure FDA0003953592400000062
Figure FDA0003953592400000063
Figure FDA0003953592400000064
设u为决策向量;U为实数、复数和整数集合的笛卡尔积,以元素方式表征u;将上述建立的联合优化模型表达为矢量形式得到确定性的配电网联合优化模型:
Figure FDA0003953592400000065
Figure FDA0003953592400000066
确定性的配电网联合优化模型是一个混合整数二阶锥优化模型Mis,通过直接调用包括Cplex、Mosek的求解器求解。
5.根据权利要求4所述的一种协调削峰和调压的配电网两阶段随机优化方法,其特征在于,其特征在于:所述的步骤S3中,具体步骤为:
S31:生成和缩减负荷和可再生能源的预测场景;
S32:建立确定性的配电网联合优化模型的两阶段随机优化模型;
S33:将两阶段随机优化模型近似等价为确定性优化模型并直接求解。
6.根据权利要求5所述的一种协调削峰和调压的配电网两阶段随机优化方法,其特征在于:所述的步骤S31中,具体步骤为:
采用截断正态分布模拟负荷预测误差;在天气晴朗的情况下,设
Figure FDA0003953592400000067
为最大太阳辐照度,Ir为太阳辐照度水平,
Figure FDA0003953592400000068
表示投影到集合[0,1]上;在预测
Figure FDA0003953592400000069
中引入一个校正因子,遵循取决于给定云覆盖水平的正态分布:
Figure FDA00039535924000000610
基于已知的负荷和可再生能源的预测误差概率分布,采用蒙特卡洛抽样生成所需的太阳辐照度和负荷场景;然后通过向后缩减方法精简为少量的典型场景。
7.根据权利要求6所述的一种协调削峰和调压的配电网两阶段随机优化方法,其特征在于:所述的步骤S32中,具体步骤为:
S321:将所有的决策u∈U分为两组,u={x,y};第一阶段决策变量x表示与BESS充电、放电、分接开关动作以及电容器组相关的决策变量;第二阶段决策变量y由其它剩余变量组成;设C1(x)对应Cbat+Ctap+Ccap,C2(y)对应Cele;则确定性的配电网联合优化模型重塑为下式:
Figure FDA0003953592400000071
Figure FDA0003953592400000072
S322:将随机场景定义为
Figure FDA0003953592400000073
则确定性的配电网联合优化模型的两阶段随机优化模型为:
Figure FDA0003953592400000074
Figure FDA0003953592400000075
设第一阶段决策变量x对应ξ实现之前的第一阶段决策here-and-now,第一阶段决策变量x包括BESS的充放电功率、分接开关的位置和电容器组的投切数量;第二阶段决策变量y对应给定ξ实现下的第二阶段决策wait-and-see,第二阶段决策变量y是BESS和DG的无功功率。
8.根据权利要求7所述的一种协调削峰和调压的配电网两阶段随机优化方法,其特征在于:所述的步骤S33中,具体步骤为:
通过有限场景集表示不确定性集合Ξ={ξ1,...,ξ|Ξ|},概率分布为ρ1,...,ρ|Ξ|;将两阶段随机优化模型近似等价为确定性优化模型为:
Figure FDA0003953592400000076
Figure FDA0003953592400000077
9.一种计算机存储介质,其特征在于:其内存储有可被计算机处理器执行的计算机程序,该计算机程序执行如权利要求1至权利要求8中任意一项所述的一种协调削峰和调压的配电网两阶段随机优化方法。
CN202211456932.8A 2022-11-21 2022-11-21 一种协调削峰和调压的配电网两阶段随机优化方法 Active CN115700637B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211456932.8A CN115700637B (zh) 2022-11-21 2022-11-21 一种协调削峰和调压的配电网两阶段随机优化方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211456932.8A CN115700637B (zh) 2022-11-21 2022-11-21 一种协调削峰和调压的配电网两阶段随机优化方法

Publications (2)

Publication Number Publication Date
CN115700637A true CN115700637A (zh) 2023-02-07
CN115700637B CN115700637B (zh) 2024-08-20

Family

ID=85121138

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211456932.8A Active CN115700637B (zh) 2022-11-21 2022-11-21 一种协调削峰和调压的配电网两阶段随机优化方法

Country Status (1)

Country Link
CN (1) CN115700637B (zh)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109754112A (zh) * 2018-11-27 2019-05-14 国网江苏省电力有限公司南京供电分公司 一种考虑配电网削峰填谷的光储充电塔随机优化调度方法
CN110880791A (zh) * 2019-12-24 2020-03-13 国网节能服务有限公司 一种混合交直流配电网协调优化方法
US20200313433A1 (en) * 2018-06-06 2020-10-01 Nanjing Institute Of Technology Data-driven three-stage scheduling method for electricity, heat and gas networks based on wind electricity indeterminacy
WO2021098352A1 (zh) * 2019-11-22 2021-05-27 国网福建省电力有限公司 一种考虑电动汽车充电站选址定容的主动配电网规划模型的建立方法
CN113178868A (zh) * 2021-05-19 2021-07-27 南京工程学院 一种柔性互联配电系统电压优化方法
CN114139780A (zh) * 2021-11-16 2022-03-04 国网山西省电力公司电力科学研究院 含分布式电源的虚拟电厂与配电网协调优化方法及系统

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20200313433A1 (en) * 2018-06-06 2020-10-01 Nanjing Institute Of Technology Data-driven three-stage scheduling method for electricity, heat and gas networks based on wind electricity indeterminacy
CN109754112A (zh) * 2018-11-27 2019-05-14 国网江苏省电力有限公司南京供电分公司 一种考虑配电网削峰填谷的光储充电塔随机优化调度方法
WO2021098352A1 (zh) * 2019-11-22 2021-05-27 国网福建省电力有限公司 一种考虑电动汽车充电站选址定容的主动配电网规划模型的建立方法
CN110880791A (zh) * 2019-12-24 2020-03-13 国网节能服务有限公司 一种混合交直流配电网协调优化方法
CN113178868A (zh) * 2021-05-19 2021-07-27 南京工程学院 一种柔性互联配电系统电压优化方法
CN114139780A (zh) * 2021-11-16 2022-03-04 国网山西省电力公司电力科学研究院 含分布式电源的虚拟电厂与配电网协调优化方法及系统

Also Published As

Publication number Publication date
CN115700637B (zh) 2024-08-20

Similar Documents

Publication Publication Date Title
Jannesar et al. Optimal placement, sizing, and daily charge/discharge of battery energy storage in low voltage distribution network with high photovoltaic penetration
Shivashankar et al. Mitigating methods of power fluctuation of photovoltaic (PV) sources–A review
García-Triviño et al. Optimized operation combining costs, efficiency and lifetime of a hybrid renewable energy system with energy storage by battery and hydrogen in grid-connected applications
Torreglosa et al. Decentralized energy management strategy based on predictive controllers for a medium voltage direct current photovoltaic electric vehicle charging station
García-Triviño et al. Power control based on particle swarm optimization of grid-connected inverter for hybrid renewable energy system
Manbachi et al. AMI-based energy management for islanded AC/DC microgrids utilizing energy conservation and optimization
Tan et al. A review of technical challenges in planning and operation of remote area power supply systems
Parra et al. Modeling of PV generation, battery and hydrogen storage to investigate the benefits of energy storage for single dwelling
Kerdphol et al. Battery energy storage system size optimization in microgrid using particle swarm optimization
CN107069814B (zh) 配网分布式电源容量布点的模糊机会约束规划方法与系统
CN106992549A (zh) 一种独立微电网系统的容量优化配置方法及装置
Khosravi et al. Improvement of harmonic conditions in the AC/DC microgrids with the presence of filter compensation modules
Zaree et al. An MILP formulation for centralized energy management strategy of microgrids
Wang et al. An improved min-max power dispatching method for integration of variable renewable energy
Eluri et al. Challenges of res with integration of power grids, control strategies, optimization techniques of microgrids: a review
Naidu et al. Integration of hybrid controller for power quality improvement in photo-voltaic/wind/battery sources
Xiao et al. Optimal power quality compensation of energy storage system in distribution networks based on unified multi-phase OPF model
Garces et al. Optimal operation of distributed energy storage units for minimizing energy losses
CN110224397B (zh) 一种风光接入背景下用户侧电池储能成本效益分析方法
Jain et al. A Simple Methodology for Sizing of Stand-Alone PV-Battery System
CN114726008B (zh) 一种主动配电网与多微电网联合鲁棒优化方法及系统
Ru et al. Battery sizing for grid connected PV systems with fixed minimum charging/discharging time
CN115700637B (zh) 一种协调削峰和调压的配电网两阶段随机优化方法
Salkuti Feeder reconfiguration in unbalanced distribution system with wind and solar generation using ant lion optimization
Rouhani et al. A teaching learning based optimization for optimal design of a hybrid energy system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant