CN115689197A - Operation ticket distribution method and device of power networking system and computer equipment - Google Patents

Operation ticket distribution method and device of power networking system and computer equipment Download PDF

Info

Publication number
CN115689197A
CN115689197A CN202211343709.2A CN202211343709A CN115689197A CN 115689197 A CN115689197 A CN 115689197A CN 202211343709 A CN202211343709 A CN 202211343709A CN 115689197 A CN115689197 A CN 115689197A
Authority
CN
China
Prior art keywords
ticket
main
distribution network
operation ticket
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211343709.2A
Other languages
Chinese (zh)
Inventor
黄光磊
刘雪飞
杨宇翔
田启东
李俊
戚思睿
胡明曜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Power Supply Bureau Co Ltd
Original Assignee
Shenzhen Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Power Supply Bureau Co Ltd filed Critical Shenzhen Power Supply Bureau Co Ltd
Priority to CN202211343709.2A priority Critical patent/CN115689197A/en
Publication of CN115689197A publication Critical patent/CN115689197A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The application relates to an operation ticket distributing method and device of a power networking system, computer equipment, storage media and a computer program product. The method comprises the following steps: acquiring scheduling main body equipment in a main network scheduling system and a distribution network scheduling system, and determining a main body operation order of the scheduling main body equipment; generating a related operation ticket based on the main operation ticket and a full ticket rehearsal result under the condition that the full ticket rehearsal of the main operation ticket passes; under the condition that the single-step rehearsal of the associated operation ticket passes, obtaining a target operation ticket based on the associated operation ticket and the main body operation ticket; and dispatching a first operation sequence corresponding to the target operation order to the main network dispatching system and the distribution network dispatching system so as to instruct the main network dispatching system and the distribution network dispatching system to execute the first operation sequence. By adopting the method, the dispatching efficiency of the operation ticket can be improved.

Description

Operation ticket distribution method and device of power networking system and computer equipment
Technical Field
The present application relates to the field of computer technologies, and in particular, to a method and an apparatus for dispatching an operation ticket of an electrical networking system, a computer device, a storage medium, and a computer program product.
Background
With the construction and development of intelligent substations, the scheduling technology for the power networking system is widely applied, and the equipment state is usually shifted by using an operation ticket, so that the expected power grid scheduling is achieved. The operation ticket is a written basis for performing an electrical operation in the power system. The conventional operation order needs to be filled and checked by related professionals, for a power grid networking system with a complex topological result, due to the fact that a main network scheduling system and a distribution network scheduling system are relatively independent, related cooperative scheduling in a main network and a distribution network is difficult to determine quickly, and the dispatching efficiency of the operation order is influenced under the condition that the main network and the distribution network need to be communicated for scheduling.
Disclosure of Invention
In view of the above, it is necessary to provide an operation ticket distribution method, an apparatus, a computer device, a computer-readable storage medium, and a computer program product of an electric power networking system capable of improving distribution efficiency of an operation ticket in view of the above technical problems.
In a first aspect, the application provides an operation order dispatching method for an electric power networking system. The method comprises the following steps:
acquiring scheduling main body equipment from a main network scheduling system and a distribution network scheduling system, and determining a main body operation order of the scheduling main body equipment;
under the condition that the whole ticket of the main body operation ticket is previewed and passed, generating a related operation ticket based on the main body operation ticket and a whole ticket previewing result;
under the condition that the single-step preview of the associated operation ticket passes, obtaining a target operation ticket based on the associated operation ticket and the main operation ticket;
and dispatching the first operation sequence corresponding to the target operation order to the main network dispatching system and the distribution network dispatching system so as to instruct the main network dispatching system and the distribution network dispatching system to execute the first operation sequence.
In one embodiment, determining a subject operation ticket for scheduling a subject device includes:
acquiring the equipment name of a scheduling main equipment;
inquiring a matched ticketing scheme in a ticketing expert library based on the equipment name;
and converting the ticketing scheme into a main operation ticket based on the term libraries of the main network scheduling system and the distribution network scheduling system.
In one embodiment, the full-ticket preview results include: a power grid situation rendering result, a topological trend coloring result and a remote measuring remote signaling result;
generating an associated operation ticket based on the main operation ticket and the whole ticket preview result, including
Obtaining the ticket face content of a main body operation ticket;
when the ticket face content comprises equipment of a main network scheduling system, determining the preview state of at least one result of a power grid situation rendering result, a topological power flow coloring result or a remote measuring remote signaling result of the distribution network equipment of the distribution network scheduling system;
and generating a correlation operation ticket aiming at the distribution network equipment with the preview state being the displacement state in the distribution network equipment.
In one embodiment, the method further comprises:
when the ticket face content comprises equipment of a distribution network scheduling system, determining a preview state of main network equipment of the main network scheduling system in at least one of a power grid situation rendering result, a topological power flow coloring result or a remote measuring remote signaling result;
and generating a related operation ticket for the main network equipment of which the preview state is the displacement state in the main network equipment.
In one embodiment, the method further comprises:
performing error checking on the associated operation tickets to obtain a single-step preview result;
when the operation object of the associated operation ticket is the distribution network equipment, the anti-error check comprises topology five-prevention check and loop closing trend check;
when the operation object of the associated operation order is the main network equipment, the anti-error check comprises topology five-prevention check, equipment state real-time check and ticket surface term check.
In one embodiment, dispatching a first operation sequence corresponding to a target operation ticket to a main network dispatching system and a distribution network dispatching system includes:
determining an initial state and a target state of corresponding main network equipment and distribution network equipment based on target ticket face content of a target operation ticket;
generating a plurality of operation instructions based on the initial state and the target state, and generating a first operation sequence according to the plurality of operation instructions;
and dispatching the first operation sequence to the main network dispatching system and the distribution network dispatching system.
In a second aspect, the application further provides an operation order dispatching device of the power networking system. The device comprises:
the main body operation ticket determining module is used for acquiring scheduling main body equipment in the main network scheduling system and the distribution network scheduling system and determining a main body operation ticket of the scheduling main body equipment;
the associated operation ticket determining module is used for generating an associated operation ticket based on the main body operation ticket and a whole ticket rehearsal result under the condition that the whole ticket rehearsal of the main body operation ticket passes;
the target operation ticket determining module is used for obtaining a target operation ticket based on the associated operation ticket and the main body operation ticket under the condition that the single-step rehearsal of the associated operation ticket passes;
and the dispatching module is used for dispatching the first operation sequence corresponding to the target operation order to the main network dispatching system and the distribution network dispatching system so as to instruct the main network dispatching system and the distribution network dispatching system to execute the first operation sequence.
In a third aspect, the application also provides a computer device. The computer device comprises a memory storing a computer program and a processor implementing the following steps when executing the computer program:
acquiring scheduling main body equipment in a main network scheduling system and a distribution network scheduling system, and determining a main body operation order of the scheduling main body equipment;
under the condition that the whole ticket of the main body operation ticket is previewed and passed, generating a related operation ticket based on the main body operation ticket and a whole ticket previewing result;
under the condition that the single-step rehearsal of the associated operation ticket passes, obtaining a target operation ticket based on the associated operation ticket and the main body operation ticket;
and dispatching the first operation sequence corresponding to the target operation order to the main network dispatching system and the distribution network dispatching system so as to instruct the main network dispatching system and the distribution network dispatching system to execute the first operation sequence.
In a fourth aspect, the present application further provides a computer-readable storage medium. The computer-readable storage medium having stored thereon a computer program which, when executed by a processor, performs the steps of:
acquiring scheduling main body equipment in a main network scheduling system and a distribution network scheduling system, and determining a main body operation order of the scheduling main body equipment;
under the condition that the whole ticket of the main body operation ticket is previewed and passed, generating a related operation ticket based on the main body operation ticket and a whole ticket previewing result;
under the condition that the single-step rehearsal of the associated operation ticket passes, obtaining a target operation ticket based on the associated operation ticket and the main body operation ticket;
and dispatching the first operation sequence corresponding to the target operation order to the main network dispatching system and the distribution network dispatching system so as to instruct the main network dispatching system and the distribution network dispatching system to execute the first operation sequence.
In a fifth aspect, the present application further provides a computer program product. The computer program product comprising a computer program which when executed by a processor performs the steps of:
acquiring scheduling main body equipment from a main network scheduling system and a distribution network scheduling system, and determining a main body operation order of the scheduling main body equipment;
under the condition that the whole ticket of the main body operation ticket is previewed and passed, generating a related operation ticket based on the main body operation ticket and a whole ticket previewing result;
under the condition that the single-step preview of the associated operation ticket passes, obtaining a target operation ticket based on the associated operation ticket and the main operation ticket;
and dispatching the first operation sequence corresponding to the target operation order to the main network dispatching system and the distribution network dispatching system so as to instruct the main network dispatching system and the distribution network dispatching system to execute the first operation sequence.
According to the operation ticket dispatching method, device, computer equipment, storage medium and computer program product of the power networking system, relevant service systems and processes of a main network scheduling system and a distribution network scheduling system are communicated, the operation tickets are remotely checked through full ticket rehearsal and single step rehearsal to generate target operation tickets which are adaptive to the current main network scheduling system and distribution network scheduling system, a first operation sequence of the target operation tickets is generated, and power grid scheduling is achieved through the first operation sequence. According to the operation ticket dispatching method of the power networking system, relevant professionals are not required to perform verification, the target operation tickets matched with the current main network scheduling system and the current distribution network scheduling system can be automatically generated, the relevant professionals are not required to perform verification, the dispatching efficiency of the operation tickets is improved, in addition, the whole ticket rehearsal and the single step rehearsal are combined, the occurrence of mis-dispatching is avoided, and the accuracy of power grid dispatching is improved.
Drawings
FIG. 1 is a diagram of an application environment of an operation ticket distribution method of an electric power networking system in one embodiment;
FIG. 2 is a flowchart illustrating an operation order distribution method of the power networking system according to an embodiment;
FIG. 3 is a flow chart illustrating a method for dispatching an operation order of the power networking system in an embodiment;
FIG. 4 is a block diagram showing an operation order distribution apparatus of the power grid system in one embodiment;
FIG. 5 is a diagram of the internal structure of a computer device in one embodiment.
Detailed Description
In order to make the objects, technical solutions and advantages of the present application more apparent, the present application is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the present application and are not intended to limit the present application.
The operation order dispatching method of the power networking system provided by the embodiment of the application can be applied to the application environment shown in fig. 1. Wherein the terminal 102 communicates with the server 104 via a network. The data storage system may store data that the server 104 needs to process. The data storage system may be integrated on the server 104 or may be placed on the cloud or other network server. The terminal 102 includes a main device in the main network scheduling system and a distribution network device in the distribution network scheduling system.
The server 104 acquires the scheduling main body equipment from the main network scheduling system and the distribution network scheduling system, and determines that the main body operation ticket of the scheduling main body equipment passes through the full ticket preview of the main body operation questions, the server 104 generates a related operation ticket based on the main body operation ticket and the full ticket preview result, and the server 104 obtains a target operation ticket based on the related operation ticket and the main body operation ticket under the condition that the single step preview of the related operation ticket passes; the terminal server 104 dispatches the first operation sequence corresponding to the target operation ticket to the main network scheduling system and the distribution network scheduling system to instruct the main network scheduling system and the distribution network scheduling system to execute the first operation sequence.
The terminal 102 may be, but not limited to, various personal computers, notebook computers, smart phones, tablet computers, internet of things devices and portable wearable devices, and the internet of things devices may be smart speakers, smart televisions, smart air conditioners, smart car-mounted devices, and the like. The portable wearable device can be a smart watch, a smart bracelet, a head-mounted device, and the like. The server 104 may be implemented as a stand-alone server or as a server cluster comprised of multiple servers.
In one embodiment, as shown in fig. 2, there is provided an operation ticket dispatching method for an electric power networking system, which is described by taking the method as an example applied to the server in fig. 1, and includes the following steps:
s202, obtaining scheduling main body equipment in the main network scheduling system and the distribution network scheduling system, and determining a main body operation ticket of the scheduling main body equipment.
The main network scheduling system is used for power supply and transmission, and the distribution network scheduling system is used for directly supplying power to users. The power equipment in the main network scheduling system is main equipment, and the power equipment in the distribution network scheduling system is distribution network equipment. The scheduling main device is a main network device or a distribution network device.
Specifically, the server obtains relevant information of the main device, and the relevant information includes but is not limited to: and inquiring a ticketing scheme matched with the relevant information of the main equipment in a pre-established ticketing expert library according to the equipment name and the running state of the main equipment, and determining and scheduling a main operation ticket of the main equipment based on the ticketing scheme.
And S204, under the condition that the whole ticket of the main body operation ticket is previewed, generating a related operation ticket based on the main body operation ticket and the whole ticket previewing result.
Specifically, the server establishes a simulation model library and a simulation rehearsal module based on a main distribution network regulation and control integrated graphic platform, and establishes a distribution network operation animation rehearsal model, a network situation rendering model, a topology trend coloring model and a remote measurement remote signaling model.
The method comprises the steps of obtaining real-time operation data of main body equipment, setting the real-time operation data as analog data, generating a preview instruction according to the nominal content of a main body operation ticket, inputting the preview instruction and the analog data into a distribution network operation animation preview model, carrying out displacement animation demonstration on scheduling main body equipment to obtain a distribution network operation animation preview result, and respectively inputting the analog data after displacement animation demonstration into a power grid situation rendering model, a topology trend coloring model and a remote monitoring model to respectively obtain the power grid situation rendering result, the topology trend coloring result and the remote monitoring result under the condition that the distribution network operation animation preview is used for reflecting that the animation preview passes.
And determining a full-ticket rehearsal result based on the results of distribution network operation animation rehearsal, power grid situation rendering, topological trend coloring and remote measurement remote signaling, and generating a related operation ticket according to the main operation ticket and the full-ticket rehearsal result under the condition that the full-ticket rehearsal result reflects the passing of the full-ticket rehearsal.
In the whole ticket simulation rehearsal process, the simulation rehearsal module can carry out power failure coloring and power failure out-of-limit early warning pushing, supports demonstration preview operations such as fast forward, pause and backward of a dispatcher, and can cancel the whole ticket early warning result to reinitiate rehearsal so as to update the whole ticket rehearsal result.
And S206, under the condition that the single-step rehearsal of the associated operation ticket passes, obtaining a target operation ticket based on the associated operation ticket and the main body operation ticket.
Specifically, the single-step rehearsal of the associated operation ticket comprises the steps of performing false-proof check on the associated operation ticket, performing false-proof check on the associated operation ticket to obtain a single-step rehearsal result, and supplementing the ticket face content of the associated operation ticket into the main body operation ticket under the condition that the single-step rehearsal result reflects that the single-step rehearsal passes, so as to obtain the target operation ticket.
S208, the first operation sequence corresponding to the target operation ticket is dispatched to the main network dispatching system and the distribution network dispatching system so as to instruct the main network dispatching system and the distribution network dispatching system to execute the first operation sequence.
Specifically, the ticket face content of the target operation ticket is analyzed to split the target operation ticket into a plurality of operation instructions, a first operation sequence is generated according to the operation instructions, and the first operation sequence is dispatched to the main network dispatching system and the distribution network dispatching system.
In the operation ticket dispatching method of the power networking system, related service systems and processes of a main network scheduling system and a distribution network scheduling system are communicated, operation tickets are remotely checked through whole ticket rehearsal and single step rehearsal to generate target operation tickets which are adaptive to the current main network scheduling system and distribution network scheduling system, a first operation sequence of the target operation tickets is generated, and power grid scheduling is achieved through the first operation sequence. According to the operation ticket dispatching method of the power networking system, relevant professionals are not required to perform verification, the target operation tickets matched with the current main network scheduling system and the current distribution network scheduling system can be automatically generated, the relevant professionals are not required to perform verification, the dispatching efficiency of the operation tickets is improved, in addition, the whole ticket rehearsal and the single step rehearsal are combined, the occurrence of mis-dispatching is avoided, and the accuracy of power grid dispatching is improved.
In some embodiments, determining a subject operation ticket for scheduling a subject device includes: acquiring the equipment name of a scheduling main equipment; inquiring a matched ticketing scheme in a ticketing expert library based on the equipment name; and converting the ticketing scheme into a main body operation ticket based on the main network scheduling system and the term library of the distribution network scheduling system.
Specifically, the server creates a ticket expert database according to the historical device operation logs of the main network scheduling system and the distribution network scheduling system and the ticket forming rule. After the main body equipment is determined, the equipment name of the main body equipment is obtained, the equipment name is used as a key word, a ticketing scheme matched with the key word is searched in a ticketing expert library, and the ticketing scheme is converted into a main body operation ticket by combining a main network scheduling system and a term library of a distribution network scheduling system.
In some implementation manners, after the device name of the main device is obtained, real-time operation data of the main device is obtained based on the device name, the real-time operation data is converted into a real-time operation state, the real-time operation state and the device name are used as keywords, and a ticketing scheme matched with the keywords is searched in a ticketing expert library.
In some embodiments, the full-ticket preview results include: a power grid situation rendering result, a topological trend coloring result and a remote measuring remote signaling result; generating a related operation ticket based on the main operation ticket and the whole ticket rehearsal result, wherein the related operation ticket comprises ticket face content of the main operation ticket; when the ticket face content comprises equipment of a main network scheduling system, determining the preview state of at least one result of a power grid situation rendering result, a topological power flow coloring result or a remote measuring remote signaling result of the distribution network equipment of the distribution network scheduling system; and generating a correlation operation ticket aiming at the distribution network equipment with the preview state being the displacement state in the distribution network equipment.
Specifically, when the device mentioned in the ticket content is a main network device in the main network scheduling system, whether the distribution network device in the distribution network scheduling system needs to be shifted in at least one of a power grid situation rendering result, a topology trend coloring result or a remote sensing remote signaling result is judged, and if the shifting is needed, a correlation operation ticket is generated based on the distribution network device needing to be shifted.
In some embodiments, the operation order dispatching method of the power networking system further includes: when the ticket face content comprises equipment of a distribution network scheduling system, determining a preview state of main network equipment of the main network scheduling system in at least one of a power grid situation rendering result, a topological power flow coloring result or a remote measuring remote signaling result; and generating a related operation ticket for the main network equipment of which the preview state is the displacement state in the main network equipment.
Specifically, when the device mentioned in the ticket face content is a distribution network device in a distribution network scheduling system, whether the main network device in the main network scheduling system needs to be shifted in at least one of a power grid situation rendering result, a topology trend coloring result or a remote sensing remote signaling result is judged, and if the main network device needs to be shifted, an associated operation ticket is generated based on the main network device needing to be shifted.
In some embodiments, the operation order dispatching method of the power networking system further includes: performing error checking on the associated operation ticket to obtain a single-step preview result; when the operation object of the associated operation ticket is the distribution network equipment, the anti-error check comprises topology five-prevention check and loop closing trend check; when the operation object of the associated operation order is the main network equipment, the anti-error check comprises topology five-prevention check, equipment state real-time check and ticket surface term check.
Specifically, the topology five-defense checking comprises the following steps: the method comprises the steps of making the rules of the electric five-prevention knowledge known, coding a circuit breaker and a disconnecting switch, forming judgment conditions by combining equipment and the rules, storing the judgment conditions in a rule base, matching the rules by a wiring mode and equipment types, and realizing an inference process by adopting a forward inference mechanism; and when a certain operation item is not in accordance with the rule in the rule base, sending out an anti-error prompt. The system rule base covers the rules of five-prevention, line main transformer power failure, asynchronous on-off loop, electromagnetic looped network, plate hanging error prevention and the like.
For the operation of loop closing, after the operation sequence is generated, loop closing flow check needs to be performed, and the loop closing flow check includes: and generating a parameter file according to the generated associated operation ticket or an operation sequence corresponding to the associated operation ticket, and performing loop closing load flow calculation based on the parameter file to obtain a loop closing load flow check result. If the loop closing flow check result is used for reflecting that the loop closing flow check fails, an alarm prompt can be sent out, and follow-up operation is not executed.
The equipment state real-time checking comprises the following steps: when the operation order is returned and confirmed, the equipment state real-time checking function is started, after the operation of the associated operation order is completed, report information is obtained, wherein the report information can be report information fed back by a dispatcher according to the operation condition of the associated operation order, and the server determines the equipment real-time state according to the report information and checks the equipment real-time state. That is, the device status real-time check includes: checking the command information, checking the real-time state of the equipment, and determining the real-time checking result of the equipment state according to the checking results of the command information and the equipment state.
The check of the term of the ticket includes: scheduling operation term normalization checking and device naming normalization checking. And traversing each operation command corresponding to the associated operation ticket one by one to perform scheduling operation term standardized checking and equipment naming standardized checking on each operation command to obtain ticket term checking. If the check of the ticket term is used for reflecting that the ticket belongs to the check failure, abnormal information can be pushed, and the abnormal information can comprise abnormal text contents of the check failure.
In some embodiments, dispatching the first operation sequence corresponding to the target operation ticket to the main network scheduling system and the distribution network scheduling system includes: determining initial states and target states of corresponding main network equipment and distribution network equipment based on target ticket face contents of the target operation ticket; generating a plurality of operation instructions based on the initial state and the target state, and generating a first operation sequence according to the plurality of operation instructions; and dispatching the first operation sequence to the main network dispatching system and the distribution network dispatching system.
Specifically, analyzing the target ticket face content of the target operation ticket, and acquiring the initial state and the target state of a main network device and a distribution network device related to the target ticket face content; and generating an operation instruction converted from the initial state to the target state, forming a first operation sequence according to the operation instruction, and dispatching the first operation sequence to corresponding main network equipment in the main network dispatching system and corresponding distribution network equipment in the distribution network dispatching system.
In some embodiments, the operation order dispatching method of the power networking system further includes: and if the associated operation order cannot be determined based on the main operation order and the global order preview result, dispatching a second operation sequence corresponding to the main operation order to the main network dispatching system or the distribution network dispatching system so as to instruct the main network dispatching system or the distribution network dispatching system to execute the second operation sequence.
Specifically, when the device mentioned in the ticket surface content is a main network device in the main network scheduling system, whether the distribution network device in the distribution network scheduling system needs to be shifted in at least one of a power grid situation rendering result, a topology tide coloring result or a remote sensing remote signaling result is judged, and if not, the associated operation ticket cannot be determined.
When the device mentioned in the ticket surface content is a distribution network device in a distribution network scheduling system, whether the main network device in the main network scheduling system needs to be shifted in at least one of a power grid situation rendering result, a topology trend coloring result or a remote sensing remote signaling result is judged, and if not, the associated operation ticket cannot be determined.
Analyzing the ticket surface content of the main body operation ticket, and acquiring the initial state and the target state of the main network equipment or the distribution network equipment related to the ticket surface content of the main body operation ticket; and generating an operation instruction converted from the initial state to the target state, forming a second operation sequence according to the operation instruction, and dispatching the second operation sequence to corresponding main network equipment in the main network dispatching system or corresponding distribution network equipment in the distribution network dispatching system.
In a specific embodiment, as shown in fig. 3, the operation order distribution of the power networking system includes:
s301, acquiring scheduling main body equipment from a main network scheduling system and a distribution network scheduling system, acquiring the equipment name of the scheduling main body equipment, inquiring a matched ticketing scheme in a ticketing expert library based on the equipment name, and converting the ticketing scheme into a main body operation ticket based on the term libraries of the main network scheduling system and the distribution network scheduling system;
S302A, under the condition that the whole operation ticket of the main operation ticket is previewed, obtaining the ticket face content of the main operation ticket; when the ticket face content comprises equipment of a main network scheduling system, determining the preview state of at least one result of a power grid situation rendering result, a topological power flow coloring result or a remote measuring remote signaling result of the distribution network equipment of the distribution network scheduling system; generating association operation aiming at the distribution network equipment with the preview state being the displacement state in the distribution network equipment;
S302B, under the condition that the main operation ticket is previewed and passed, obtaining the ticket surface content of the main operation ticket, when the ticket surface content comprises equipment of a distribution network scheduling system, determining main network equipment of the main network scheduling system, and generating a related operation ticket aiming at the main network equipment of which the previewing state is a displacement state in a power grid situation rendering result, a topology trend coloring result or a remote sensing remote signaling result;
s303, performing error check on the associated operation ticket to obtain a single-step preview result; when the operation object of the associated operation ticket is the distribution network equipment, the anti-error check comprises topology five-prevention check and loop closing trend check; when the operation object of the associated operation order is the main network equipment, the anti-error check comprises topology five-prevention check, equipment state real-time check and ticket surface term check;
s304, under the condition that the single-step rehearsal of the associated operation ticket passes, obtaining a target operation ticket based on the associated operation ticket and the main body operation ticket;
s305, determining the initial state and the target state of the corresponding main network device and the corresponding distribution network device based on the target ticket face content of the target operation ticket, generating a plurality of operation instructions based on the initial state and the target state, generating a first operation sequence according to the operation instructions, and dispatching the first operation sequence to the main network dispatching system and the distribution network dispatching system.
It should be understood that, although the steps in the flowcharts related to the embodiments are shown in sequence as indicated by the arrows, the steps are not necessarily executed in sequence as indicated by the arrows. The steps are not performed in the exact order shown and described, and may be performed in other orders, unless explicitly stated otherwise. Moreover, at least a part of the steps in the flowcharts related to the above embodiments may include multiple steps or multiple stages, which are not necessarily performed at the same time, but may be performed at different times, and the order of performing the steps or stages is not necessarily sequential, but may be performed alternately or alternately with other steps or at least a part of the steps or stages in other steps.
In the operation ticket dispatching method of the power networking system, the related service systems and processes of the main network scheduling system and the distribution network scheduling system are communicated, the automatic generation of an operation sequence is realized, the operation tickets are remotely checked through the whole ticket rehearsal and the single step rehearsal, the automatic remote control is performed in the single step rehearsal process, the remote measurement and the remote signaling are realized, the intelligent level in the regulation and control integrated mode is improved, and the dispatching and monitoring operation is safer and more efficient. Under the conditions of full ticket previewing and single step previewing, automatically generating a target operation ticket, and realizing remote power grid dispatching through a first operation sequence corresponding to the target operation ticket; through the whole ticket rehearsal and the single step rehearsal, the occurrence of various misschedules, misremote controls and misoperations is avoided, the working efficiency of distribution network plan type power conversion, large-area power failure power supply and power cut-off services and secondary equipment operation is improved, the intelligent level in a regulation and control integrated mode is improved, and the scheduling and monitoring operation is safer and more efficient.
Based on the same inventive concept, the embodiment of the application also provides an operation ticket dispatching device of the power networking system, which is used for realizing the operation ticket dispatching method of the power networking system. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the method, so specific limitations in the following embodiments of the operation ticket dispatching device for one or more power networking systems can be referred to the limitations on the operation ticket dispatching method for the power networking system, and are not described herein again.
In one embodiment, as shown in fig. 4, there is provided an operation ticket issuing apparatus of an electric power networking system, including: a main body operation ticket determining module 401, an associated operation ticket determining module 402, a target operation ticket determining module 403 and a distributing module 404, wherein:
a main body operation ticket determining module 401, configured to obtain a scheduling main body device in the main network scheduling system and the distribution network scheduling system, and determine a main body operation ticket for scheduling the main body device;
the associated operation ticket determining module 402 is configured to generate an associated operation ticket based on the main operation ticket and a result of the whole ticket preview when the main operation ticket is previewed;
a target operation ticket determining module 403, configured to obtain a target operation ticket based on the associated operation ticket and the main operation ticket when the single-step preview of the associated operation ticket passes;
and a dispatching module 404, configured to dispatch the first operation sequence corresponding to the target operation ticket to the main network scheduling system and the distribution network scheduling system, so as to instruct the main network scheduling system and the distribution network scheduling system to execute the first operation sequence.
In some embodiments, the subject operation ticket determination module 401 includes:
the device name determining unit is used for acquiring the device name of the scheduling main device;
the ticketing scheme determining unit is used for inquiring the matched ticketing scheme in the ticketing expert library based on the equipment name;
and the main body operation ticket determining unit is used for converting the ticketing scheme into a main body operation ticket based on the main network scheduling system and the term library of the distribution network scheduling system.
In some embodiments, the full-ticket preview results include: a power grid situation rendering result, a topological tide coloring result and a remote measuring remote signaling result; the associated operation ticket determining module 402 includes:
the ticket face content determining unit is used for acquiring the ticket face content of the main body operation ticket;
the first rehearsal state determining unit is used for determining the distribution network equipment of the distribution network scheduling system when the ticket face content comprises the equipment of the main network scheduling system, and determining the rehearsal state of at least one result in a power grid situation rendering result, a topological power flow coloring result or a remote measuring and remote signaling result;
and the first associated operation ticket determining unit is used for generating an associated operation ticket aiming at the distribution network equipment of which the preview state is the displacement state in the distribution network equipment.
In some embodiments, the association operation ticket determination module 402 further includes:
the second rehearsal state determining unit is used for determining the distribution network equipment of the distribution network scheduling system when the ticket face content comprises the equipment of the main network scheduling system, and determining the rehearsal state of at least one result in a power grid situation rendering result, a topological power flow coloring result or a remote measuring and remote signaling result;
and the second rehearsal state determining unit is used for generating a correlation operation ticket aiming at the distribution network equipment of which the rehearsal state is the displacement state in the distribution network equipment.
In some embodiments, the operation order issuing device of the power networking system includes:
the single-step rehearsal module is used for carrying out error check on the associated operation ticket to obtain a single-step rehearsal result; when the operation object of the associated operation ticket is the distribution network equipment, the anti-error check comprises topology five-prevention check and loop closing trend check; when the operation object of the associated operation order is the main network equipment, the anti-error check comprises topology five-prevention check, equipment state real-time check and ticket surface term check.
In some embodiments, the dispatch module 404 includes:
the state determining unit is used for determining the initial state and the target state of the corresponding main network equipment and the corresponding distribution network equipment based on the target ticket face content of the target operation ticket;
an operation sequence determining unit, configured to generate a plurality of operation instructions based on the initial state and the target state, and generate a first operation sequence according to the plurality of operation instructions;
and the dispatching unit is used for dispatching the first operation sequence to the main network dispatching system and the distribution network dispatching system.
The modules in the operation ticket issuing device of the power networking system can be wholly or partially realized by software, hardware and a combination thereof. The modules can be embedded in a hardware form or independent from a processor in the computer device, and can also be stored in a memory in the computer device in a software form, so that the processor can call and execute operations corresponding to the modules.
In one embodiment, a computer device is provided, which may be a server, and the internal structure thereof may be as shown in fig. 5. The computer device includes a processor, a memory, and a network interface connected by a system bus. Wherein the processor of the computer device is configured to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program, and a database. The internal memory provides an environment for the operation of an operating system and computer programs in the non-volatile storage medium. The network interface of the computer device is used for communicating with an external terminal through a network connection. The computer program is executed by a processor to implement a XXX method.
Those skilled in the art will appreciate that the architecture shown in fig. 5 is merely a block diagram of some of the structures associated with the disclosed aspects and is not intended to limit the computing devices to which the disclosed aspects apply, as particular computing devices may include more or less components than those shown, or may combine certain components, or have a different arrangement of components.
In one embodiment, there is provided a computer device comprising a memory and a processor, the memory having stored therein a computer program that when executed by the processor effects:
acquiring scheduling main body equipment in a main network scheduling system and a distribution network scheduling system, and determining a main body operation order of the scheduling main body equipment;
under the condition that the whole operation ticket of the main operation ticket passes the preview, generating a related operation ticket based on the main operation ticket and the preview result of the whole ticket;
under the condition that the single-step rehearsal of the associated operation ticket passes, obtaining a target operation ticket based on the associated operation ticket and the main body operation ticket;
and dispatching the first operation sequence corresponding to the target operation order to the main network dispatching system and the distribution network dispatching system so as to instruct the main network dispatching system and the distribution network dispatching system to execute the first operation sequence.
In one embodiment, a computer-readable storage medium is provided, having a computer program stored thereon, which when executed by a processor, performs the steps of:
acquiring scheduling main body equipment from a main network scheduling system and a distribution network scheduling system, and determining a main body operation order of the scheduling main body equipment;
under the condition that the whole ticket of the main body operation ticket is previewed and passed, generating a related operation ticket based on the main body operation ticket and a whole ticket previewing result;
under the condition that the single-step rehearsal of the associated operation ticket passes, obtaining a target operation ticket based on the associated operation ticket and the main body operation ticket;
and dispatching the first operation sequence corresponding to the target operation order to the main network scheduling system and the distribution network scheduling system so as to instruct the main network scheduling system and the distribution network scheduling system to execute the first operation sequence.
In one embodiment, a computer program product is provided, comprising a computer program which, when executed by a processor, performs the steps of:
acquiring scheduling main body equipment from a main network scheduling system and a distribution network scheduling system, and determining a main body operation order of the scheduling main body equipment;
under the condition that the whole ticket of the main body operation ticket is previewed and passed, generating a related operation ticket based on the main body operation ticket and a whole ticket previewing result;
under the condition that the single-step rehearsal of the associated operation ticket passes, obtaining a target operation ticket based on the associated operation ticket and the main body operation ticket;
and dispatching the first operation sequence corresponding to the target operation order to the main network dispatching system and the distribution network dispatching system so as to instruct the main network dispatching system and the distribution network dispatching system to execute the first operation sequence.
It will be understood by those skilled in the art that all or part of the processes of the methods of the embodiments described above may be implemented by hardware that is instructed by a computer program, and the computer program may be stored in a non-volatile computer-readable storage medium, and when executed, may include the processes of the embodiments of the methods described above. Any reference to memory, database, or other medium used in the embodiments provided herein may include at least one of non-volatile and volatile memory. The nonvolatile Memory may include Read-Only Memory (ROM), magnetic tape, floppy disk, flash Memory, optical Memory, high-density embedded nonvolatile Memory, resistive Random Access Memory (ReRAM), magnetic Random Access Memory (MRAM), ferroelectric Random Access Memory (FRAM), phase Change Memory (PCM), graphene Memory, and the like. Volatile Memory can include Random Access Memory (RAM), external cache Memory, and the like. By way of illustration and not limitation, RAM can take many forms, such as Static Random Access Memory (SRAM) or Dynamic Random Access Memory (DRAM), among others. The databases referred to in various embodiments provided herein may include at least one of relational and non-relational databases. The non-relational database may include, but is not limited to, a block chain based distributed database, and the like. The processors referred to in the embodiments provided herein may be general purpose processors, central processing units, graphics processors, digital signal processors, programmable logic devices, quantum computing based data processing logic devices, etc., without limitation.
The technical features of the above embodiments can be arbitrarily combined, and for the sake of brevity, all possible combinations of the technical features in the above embodiments are not described, but should be considered as the scope of the present specification as long as there is no contradiction between the combinations of the technical features.
The above examples only express several embodiments of the present application, and the description thereof is more specific and detailed, but not construed as limiting the scope of the present application. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the concept of the present application, which falls within the scope of protection of the present application. Therefore, the protection scope of the present application shall be subject to the appended claims.

Claims (10)

1. An operation order dispatching method of an electric power networking system is characterized by comprising the following steps:
acquiring scheduling main body equipment in a main network scheduling system and a distribution network scheduling system, and determining a main body operation order of the scheduling main body equipment;
generating a related operation ticket based on the main operation ticket and a whole ticket rehearsal result under the condition that the whole ticket rehearsal of the main operation ticket passes;
under the condition that the single-step rehearsal of the associated operation ticket passes, obtaining a target operation ticket based on the associated operation ticket and the main body operation ticket;
and dispatching a first operation sequence corresponding to the target operation order to the main network dispatching system and the distribution network dispatching system so as to instruct the main network dispatching system and the distribution network dispatching system to execute the first operation sequence.
2. The method of claim 1, wherein the determining of the subject operation ticket for the scheduled subject device comprises:
acquiring the equipment name of the scheduling main equipment;
inquiring a matched ticketing scheme in a ticketing expert library based on the equipment name;
and converting the ticketing scheme into a main operation ticket based on the main network scheduling system and the term library of the distribution network scheduling system.
3. The method of claim 1, wherein the full-ticket preview results comprise: a power grid situation rendering result, a topological tide coloring result and a remote measuring remote signaling result;
generating an associated operation ticket based on the main operation ticket and the whole ticket rehearsal result, including
Obtaining the ticket face content of the main body operation ticket;
when the ticket face content comprises equipment of the main network scheduling system, determining the preview state of at least one result of the power grid situation rendering result, the topology power flow coloring result or the remote measuring and signaling result of the distribution network equipment of the distribution network scheduling system;
and generating a correlation operation ticket aiming at the distribution network equipment with the preview state being the displacement state in the distribution network equipment.
4. The method of claim 3, further comprising:
when the ticket face content comprises equipment of the distribution network scheduling system, determining a preview state of at least one result of a power grid situation rendering result, a topological power flow coloring result or a remote sensing remote signaling result of main network equipment of the main network scheduling system;
and generating an associated operation ticket aiming at the main network equipment of which the preview state is the displacement state in the main network equipment.
5. The method of claim 1, further comprising:
performing error checking on the associated operation order to obtain a single-step preview result;
when the operation object of the associated operation ticket is a distribution network device, the anti-error check comprises a topology five-prevention check and a loop closing power flow check;
when the operation object of the associated operation order is the main network equipment, the anti-error check comprises topology five-prevention check, equipment state real-time check and ticket term check.
6. The method of claim 1, wherein dispatching the first operation sequence corresponding to the target operation ticket to the main network scheduling system and the distribution network scheduling system comprises:
determining an initial state and a target state of corresponding main network equipment and distribution network equipment based on the target ticket face content of the target operation ticket;
generating a plurality of operation instructions based on the initial state and the target state, and generating a first operation sequence according to the operation instructions;
and dispatching the first operation sequence to the main network dispatching system and the distribution network dispatching system.
7. An operation ticket distributing apparatus of an electric power networking system, characterized by comprising:
the main body operation ticket determining module is used for acquiring scheduling main body equipment in the main network scheduling system and the distribution network scheduling system and determining a main body operation ticket of the scheduling main body equipment;
the associated operation ticket determining module is used for generating an associated operation ticket based on the main body operation ticket and a full ticket rehearsal result under the condition that the full ticket rehearsal of the main body operation ticket passes;
the target operation ticket determining module is used for obtaining a target operation ticket on the basis of the associated operation ticket and the main body operation ticket under the condition that the single-step preview of the associated operation ticket passes;
and the dispatching module is used for dispatching the first operation sequence corresponding to the target operation order to the main network dispatching system and the distribution network dispatching system so as to instruct the main network dispatching system and the distribution network dispatching system to execute the first operation sequence.
8. A computer device comprising a memory and a processor, the memory storing a computer program, characterized in that the processor, when executing the computer program, implements the steps of the method of any of claims 1 to 6.
9. A computer-readable storage medium, on which a computer program is stored which, when being executed by a processor, carries out the steps of the method according to any one of claims 1 to 6.
10. A computer program product comprising a computer program, characterized in that the computer program, when being executed by a processor, carries out the steps of the method of any one of claims 1 to 6.
CN202211343709.2A 2022-10-31 2022-10-31 Operation ticket distribution method and device of power networking system and computer equipment Pending CN115689197A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211343709.2A CN115689197A (en) 2022-10-31 2022-10-31 Operation ticket distribution method and device of power networking system and computer equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211343709.2A CN115689197A (en) 2022-10-31 2022-10-31 Operation ticket distribution method and device of power networking system and computer equipment

Publications (1)

Publication Number Publication Date
CN115689197A true CN115689197A (en) 2023-02-03

Family

ID=85045253

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211343709.2A Pending CN115689197A (en) 2022-10-31 2022-10-31 Operation ticket distribution method and device of power networking system and computer equipment

Country Status (1)

Country Link
CN (1) CN115689197A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113937753A (en) * 2021-09-03 2022-01-14 国网浙江省电力有限公司杭州供电公司 N-1 automatic calibration method based on power distribution network full model

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113937753A (en) * 2021-09-03 2022-01-14 国网浙江省电力有限公司杭州供电公司 N-1 automatic calibration method based on power distribution network full model

Similar Documents

Publication Publication Date Title
US10852716B2 (en) Secure models for model-based control and optimization
US10767885B2 (en) Building automation system with an energy optimization builder and generic data model designer
CN101179195B (en) Power distribution network planning scheme assistant decision system
US20140163758A1 (en) Solving large-scale security-constrained economic dispatch problem in real-time
CN108958729A (en) A kind of data processing method, device and storage medium
CN110780856B (en) Electricity data release platform based on micro-service
CN115689197A (en) Operation ticket distribution method and device of power networking system and computer equipment
US8795481B2 (en) Optimization of power system including electrolyzer
JP7369868B2 (en) Methods for processing solar radiation prediction, methods for training stacked generalized models, and apparatus thereof
CN115564073A (en) Power grid power operation method and device, computer equipment and storage medium
CN115936399A (en) Operation ticket generation method and device, computer equipment and storage medium
CN115269176A (en) Task allocation method, device, computer equipment, storage medium and product
CN114116376A (en) Contact cabinet monitoring method and device, computer equipment and storage medium
CN111798050A (en) Wisdom energy management system
CN113297170A (en) Monitoring method and device for power network, computer equipment and storage medium
US20240103959A1 (en) Intelligent dynamic condition-based infrastructure maintenance scheduling
CN117149750A (en) Data processing method, apparatus, device, storage medium and computer program product
JPH07227040A (en) Device for monitoring reliability of electric power system
WO2023172287A9 (en) Controller for modular power systems
CN114819884A (en) Power transmission asset management and control platform and method based on Internet of things
CN117996847A (en) Scheduling control method, device and equipment of main distribution network and storage medium
CN117744985A (en) Bypass job data processing method, device, computer equipment and storage medium
CN116151648A (en) Real-time evaluation method for reliability of object-oriented aircraft power supply and distribution system
CN118199091A (en) Power system stability control strategy checking method and device and storage medium
CN116722530A (en) Power grid abnormality processing strategy generation method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination