CN115682278A - Method and device for controlling multi-split air conditioner, multi-split air conditioner and storage medium - Google Patents

Method and device for controlling multi-split air conditioner, multi-split air conditioner and storage medium Download PDF

Info

Publication number
CN115682278A
CN115682278A CN202211255637.6A CN202211255637A CN115682278A CN 115682278 A CN115682278 A CN 115682278A CN 202211255637 A CN202211255637 A CN 202211255637A CN 115682278 A CN115682278 A CN 115682278A
Authority
CN
China
Prior art keywords
indoor unit
standby
priority
target
air conditioner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211255637.6A
Other languages
Chinese (zh)
Inventor
李旭
毛守博
徐晶
罗建文
张心沛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Haier Air Conditioner Gen Corp Ltd
Qingdao Haier Air Conditioning Electric Co Ltd
Haier Smart Home Co Ltd
Original Assignee
Qingdao Haier Air Conditioner Gen Corp Ltd
Qingdao Haier Air Conditioning Electric Co Ltd
Haier Smart Home Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Haier Air Conditioner Gen Corp Ltd, Qingdao Haier Air Conditioning Electric Co Ltd, Haier Smart Home Co Ltd filed Critical Qingdao Haier Air Conditioner Gen Corp Ltd
Priority to CN202211255637.6A priority Critical patent/CN115682278A/en
Publication of CN115682278A publication Critical patent/CN115682278A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

The application relates to the technical field of intelligent household appliances, and discloses a method for controlling a multi-split air conditioner, which comprises the following steps: under the condition that the standby indoor units exist, sequencing all the standby indoor units according to a standby operation priority level rule; and under the condition that the operation conditions of the standby indoor unit are met, operating the standby indoor unit in the order of the standby operation priority from high to low. The method can improve the flexibility of the operation control of the standby indoor unit under the condition that the multi-split air conditioner is in over-distribution and the standby indoor unit exists. The application also discloses a device for controlling the multi-split air conditioner, the multi-split air conditioner and a storage medium.

Description

Method and device for controlling multi-split air conditioner, multi-split air conditioner and storage medium
Technical Field
The application relates to the technical field of intelligent household appliances, in particular to a method and a device for controlling a multi-split air conditioner, the multi-split air conditioner and a storage medium.
Background
The super-ratio of the multi-split air conditioner is the ratio of the sum of all indoor unit loads to the outdoor unit load. In order to save cost, the over-proportioning ratio is generally recommended to be 120-150% when the model is selected for installation. In this case, it is generally not recommended that the user turn-on load exceeds 100%, and if the indoor units turned on by the user at the same time exceed a limited ratio, the outdoor unit is not turned on. Thus, the user is provided with poor use effect experience, and complaints even can occur.
The related art discloses a control method of a multi-split air conditioner, which comprises the following steps: receiving an instruction of starting a target standby indoor unit; judging whether the target standby indoor unit meets a starting condition or not, wherein the starting condition comprises Q Inner part /Q Outer cover ≤K,Q Inner part Is the sum of the load of the target standby indoor unit and the load of all the operating indoor units, Q Outer cover The load of the outdoor unit, and K is a quota coefficient; if the target standby indoor unit meets the starting-up condition, controlling the target standby indoor unit to start up; and if the target standby indoor unit does not meet the starting-up condition, controlling the target standby indoor unit to enter a waiting queue until the target standby indoor unit is started up under the condition of meeting the starting-up condition.
In the process of implementing the embodiments of the present disclosure, it is found that at least the following problems exist in the related art:
although the technology can realize that the super-proportion of the multi-split air conditioner is not limited when the multi-split air conditioner is assembled, the problem that the load capacity of an outdoor unit is exceeded due to too many indoor units which operate simultaneously can be avoided. However, in the related art, when the standby indoor unit is turned on under overload, the standby indoor unit needs to run according to the standby sequence, and cannot be controlled according to the requirement. Therefore, in the related art, when the multi-split air conditioner is over-matched and a standby indoor unit exists, the flexibility of controlling the operation of the standby indoor unit is poor.
It is to be noted that the information disclosed in the above background section is only for enhancement of understanding of the background of the present application and therefore may include information that does not constitute prior art known to a person of ordinary skill in the art.
Disclosure of Invention
The following presents a simplified summary in order to provide a basic understanding of some aspects of the disclosed embodiments. This summary is not an extensive overview nor is intended to identify key/critical elements or to delineate the scope of such embodiments but rather as a prelude to the more detailed description that is presented later.
The embodiment of the disclosure provides a method and a device for controlling a multi-split air conditioner, the multi-split air conditioner and a storage medium, which can improve the flexibility of operation control of a standby indoor unit under the condition that the multi-split air conditioner is in over-distribution and the standby indoor unit exists.
In some embodiments, in the presence of a standby indoor unit, a method for multi-split air conditioner control includes: sequencing all the standby indoor units according to a standby operation priority level rule; and under the condition that the operation conditions of the standby indoor unit are met, operating the standby indoor unit in the order of the standby operation priority from high to low.
Optionally, the standby operation priority level rule includes: the standby operation priority of the first type of standby indoor unit is higher than that of the second type of standby indoor unit; the first type of standby indoor unit is a standby indoor unit which receives a user priority operation instruction during a standby period, and the second type of standby indoor unit is a standby indoor unit which does not receive the user priority operation instruction during the standby period.
Optionally, the standby operation priority level rule further includes: when there are a plurality of first-type standby indoor units, the later the time for receiving the user priority operation instruction, the higher the standby operation priority of the corresponding standby indoor unit.
Optionally, the standby operation priority level rule further includes: when there are a plurality of second type standby indoor units, the standby operation priority of the standby indoor unit with a person in the room is higher than that of the standby indoor unit without a person in the room.
Optionally, the rule of the standby running priority level further includes: in a second type standby indoor unit with people in a plurality of rooms, the higher the priority of the indoor unit is, the higher the standby operation priority is; in a second type of standby indoor units in a plurality of rooms where no people are located, the higher the priority of the indoor units is, the higher the priority of standby operation is.
Optionally, the standby indoor unit operation conditions include: calculating the total load of the first q standby indoor units according to the order of the standby operation priority from high to low
Figure BDA0003889632350000021
Presence of Q S ≤Q Waiting for Q is a positive integer; wherein Q is Waiting for =Q Outer cover -Q Internal transportation ,Q Outer cover For the running load of the outdoor unit, Q Internal transportation The total load of the operating indoor unit; q Inner wait u For the load of the u-th standby indoor unit, u = 1.., w, w is the number of standby indoor units.
Optionally, the operating the standby indoor unit in order of the standby operation priority from high to low includes: calculated to obtain Q S ≤Q Waiting for The maximum q value of; and operating the first q standby indoor units in the order of standby operation priority from high to low.
Optionally, the method further comprises: receiving a starting operation instruction of a first target indoor unit; under the condition that the total operation load of the indoor units is less than or equal to the operation load of the outdoor unit, operating a first target indoor unit according to an instruction; under the condition that the total operation load of the indoor units is greater than the operation load of the outdoor unit, judging whether the priority of the first target indoor unit is greater than or equal to a priority threshold value, if so, operating the first target indoor unit according to an instruction and adjusting one or more indoor units in the second target indoor units to be standby; wherein the second target indoor unit is a low priority indoor unit in operation.
In some embodiments, an apparatus for multiple on-line air conditioning control includes a processor and a memory storing program instructions, the processor configured to execute the method for multiple on-line air conditioning control described above when executing the program instructions.
In some embodiments, a multi-split air conditioner includes: an air conditioner main body; and the device for controlling the multi-split air conditioner is arranged on the air conditioner main body.
In some embodiments, a storage medium stores program instructions that, when executed, perform the method for multi-split air conditioner control described above.
The method and the device for controlling the multi-split air conditioner, the multi-split air conditioner and the storage medium provided by the embodiment of the disclosure can realize the following technical effects:
under the condition that the indoor unit is overloaded and started, the indoor unit can run from low to high according to the running priority order of the standby indoor unit under the condition that the running condition of the standby indoor unit is met. The operating priority represents a user's preferred operating requirements. In the related art, under the condition that the indoor unit is started in an overload mode, the indoor unit needs to run according to the standby sequence after standby waiting. Compared with the prior art, the method and the device can operate according to the user requirement condition under the conditions that the multi-split air conditioner is in super-distribution and the standby indoor unit exists, and improve the flexibility of operation control of the standby indoor unit.
The foregoing general description and the following description are exemplary and explanatory only and are not restrictive of the application.
Drawings
One or more embodiments are illustrated by way of example in the accompanying drawings, which correspond to the accompanying drawings and not in limitation thereof, in which elements having the same reference numeral designations are shown as like elements and not in limitation thereof, and wherein:
fig. 1 is a schematic diagram of a method for controlling a multi-split air conditioner according to an embodiment of the disclosure;
FIG. 2 is a schematic diagram of another method for controlling a multi-split air conditioner according to an embodiment of the disclosure;
FIG. 3 is a schematic diagram of another method for multi-split air conditioner control according to an embodiment of the disclosure;
FIG. 4 is a schematic diagram of another method for multi-split air conditioner control according to an embodiment of the disclosure;
FIG. 5 is a schematic diagram of another method for multi-split air conditioner control according to an embodiment of the disclosure;
FIG. 6 is a schematic diagram of another method for multi-split air conditioner control according to an embodiment of the disclosure;
FIG. 7 is a schematic diagram of another method for multi-split air conditioner control according to an embodiment of the disclosure;
FIG. 8 is a schematic diagram of another method for multi-split air conditioner control provided by an embodiment of the disclosure;
fig. 9 is a schematic diagram of another method for controlling a multi-split air conditioner according to an embodiment of the disclosure;
fig. 10 is a schematic diagram of an apparatus for controlling a multi-split air conditioner according to an embodiment of the disclosure.
Detailed Description
So that the manner in which the features and elements of the disclosed embodiments can be understood in detail, a more particular description of the disclosed embodiments, briefly summarized above, may be had by reference to the embodiments, some of which are illustrated in the appended drawings. In the following description of the technology, for purposes of explanation, numerous details are set forth in order to provide a thorough understanding of the disclosed embodiments. However, one or more embodiments may be practiced without these details. In other instances, well-known structures and devices may be shown in simplified form in order to simplify the drawing.
The terms "first," "second," and the like in the description and in the claims, and the above-described drawings of embodiments of the present disclosure, are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It should be understood that the data so used may be interchanged under appropriate circumstances such that embodiments of the present disclosure described herein may be made. Furthermore, the terms "comprising" and "having," as well as any variations thereof, are intended to cover non-exclusive inclusions.
In the embodiments of the present disclosure, the terms "upper", "lower", "inner", "middle", "outer", "front", "rear", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings. These terms are used primarily to better describe the disclosed embodiments and their examples and are not intended to limit the indicated devices, elements or components to a particular orientation or to be constructed and operated in a particular orientation. Moreover, some of the above terms may be used to indicate other meanings besides the orientation or positional relationship, for example, the term "on" may also be used to indicate some kind of attachment or connection relationship in some cases. The specific meanings of these terms in the embodiments of the present disclosure can be understood by those of ordinary skill in the art as appropriate.
The term "plurality" means two or more unless otherwise specified.
In the embodiment of the present disclosure, the character "/" indicates that the preceding and following objects are in an or relationship. For example, A/B represents: a or B.
The term "and/or" is an associative relationship that describes objects, meaning that three relationships may exist. For example, a and/or B, represents: a or B, or A and B.
The term "correspond" may refer to an association or binding relationship, and a corresponds to B refers to an association or binding relationship between a and B.
In addition, the term "set" should be interpreted broadly.
It should be noted that, in the case of no conflict, the embodiments and features in the embodiments of the present disclosure may be combined with each other.
The multi-split air conditioner usually selects an over-distribution configuration, namely the sum of all indoor unit loads of the multi-split air conditioner is greater than the rated load of an outdoor unit.
The embodiment of the disclosure provides a multi-split air conditioner, which comprises a plurality of indoor units, an outdoor unit and a processor. The processor can control the operation of a plurality of indoor units. Under the condition of overload starting, the processor can control the running or standby of the indoor unit which is newly started to run and the indoor unit which is running, and can control the running sequence of the indoor unit to be treated. In the operation process of the multi-split air conditioner, part of the indoor units are in an operation state, and the rest of the indoor units are in a standby state or a shutdown state.
In combination with the multi-split air conditioner, the embodiment of the disclosure provides a method for controlling the multi-split air conditioner. As shown in fig. 1, the method includes:
s101, the processor receives a starting operation instruction of the first target indoor unit.
The first target indoor unit is an indoor unit which is required to be operated when the user is started. For example, the a-subscriber turns on the indoor unit of the room using the remote controller and sets the heating operation to 26 ℃. At this time, the processor may receive a power-on heating operation instruction of the first target indoor unit.
And S102, under the condition that the total operation load of the indoor units is less than or equal to the operation load of the outdoor unit, the processor operates the first target indoor unit according to the instruction.
When part of indoor units of the multi-split air conditioner are in the running state, the rest indoor units are in the standby state or the shutdown state. In the case where the standby indoor unit exists in the indoor unit, the total operation load of the indoor unit is the sum of the load of the operating indoor unit, the load of the standby indoor unit, and the load of the first target indoor unit. In the case where the indoor unit does not have a standby indoor unit, the total operation load of the indoor unit is the sum of the load of the operating indoor unit and the load of the first target indoor unit. The operation load of the outdoor unit is the rated load of the outdoor unit. The total operation load of the indoor units is less than or equal to the operation load of the outdoor unit, so that the first target indoor unit can be operated according to the instruction under the condition that the first target indoor unit is not overloaded after being operated.
S103, under the condition that the total running load of the indoor units is greater than that of the outdoor unit, the processor judges whether the priority of the first target indoor unit is greater than or equal to a priority threshold value, if so, the processor runs the first target indoor unit according to an instruction and adjusts one or more indoor units in the second target indoor units to be standby; wherein the second target indoor unit is a low priority indoor unit in operation.
The total operation load of the indoor units is larger than that of the outdoor unit, which shows that the first target indoor unit can be operated in an overload mode, so that the first target indoor unit cannot be operated directly according to instructions under the overload condition. The priority of the indoor unit is set in advance. For example, the priority of the indoor unit is set by using indoor unit codes, and the lower the indoor unit code, the higher the priority. Different indoor units are provided with different indoor unit codes. The priority threshold may be set according to the needs of the user. For example, the priority threshold may be set to the priority of the indoor unit with an indoor unit code of 4. Then the priority of the indoor units coded as 1, 2, 3 is greater than the priority threshold. The low-priority indoor unit is an indoor unit with the priority smaller than the priority threshold. Or the low-priority indoor unit is an indoor unit with the priority lower than that of the first target indoor unit.
In the embodiment of the disclosure, the first target indoor unit may operate according to the priority of the indoor unit when the indoor unit is turned on in an overload state. Meanwhile, some low-priority indoor units in operation need to be in standby mode to avoid overload operation. The priority represents the priority requirements of the user. In the related art, under the condition that the indoor units are started in an overload mode, the first target indoor unit needs to wait in a standby mode and operates according to the standby sequence. Compared with the prior art, the method can improve the flexibility of the operation control of the indoor unit under the conditions of the overload start of the multi-split air conditioner and the overload start of the indoor unit.
Optionally, before the processor adjusts one or more indoor units of the second target indoor unit to be in standby, the method further includes: and the processor accumulates the running loads of one or more indoor units in the second target indoor unit according to the sequence of the priorities of the indoor units in the second target indoor unit from low to high until the accumulated running load is greater than or equal to the running load of the first target indoor unit. The processor determines one or more indoor units in the second target indoor units as the indoor units needing to be in standby. For example, the second target indoor unit has 4 indoor units, with indoor unit codes 7, 8, 9, 10, respectively. The smaller the intra coding, the higher the priority. Then, the operation loads of the indoor units encoded as 10 are sequentially accumulated from the indoor unit. And comparing the running load of the first target indoor unit every time of accumulation, and stopping accumulation under the condition that the accumulated running load is greater than or equal to the running load of the first target indoor unit. For example, the operation load of the first target indoor unit is 3500W, the operation load of the indoor unit with the indoor unit code of 10 is 2500W, and the operation load of the indoor unit with the indoor unit code of 9 is 2500W. Then the running load sum of the indoor unit with indoor unit code 10 and the indoor unit with indoor unit code 9 is already greater than the running load of the first target indoor unit. Therefore, the indoor unit having the indoor unit number of 10 and the indoor unit having the indoor unit number of 9 are determined as the indoor units that need to be on standby. In this way, the indoor unit with the highest priority is preferentially operated, and the indoor unit with the lowest priority is on standby. Under the condition of avoiding overload operation of the multi-split air conditioner, the indoor unit with high priority requirement of a user can be ensured to operate preferentially. Therefore, the flexibility of the operation control of the indoor unit is improved and the user experience is improved under the conditions of the overload start of the multi-split air conditioner and the overload start of the indoor unit.
With reference to fig. 2, another method for controlling a multi-split air conditioner according to an embodiment of the present disclosure includes:
s201, the processor receives a starting operation instruction of the first target indoor unit.
And S202, under the condition that the total running load of the indoor units is greater than the running load of the outdoor unit, the processor judges whether the priority of the first target indoor unit is greater than or equal to a priority threshold value, if so, the processor accumulates the running loads of one or more indoor units in the second target indoor units according to the sequence from low to high of the priorities of the indoor units in the second target indoor units until the accumulated running load is greater than or equal to the running load of the first target indoor unit.
S203, the processor determines one or more indoor units in the second target indoor units as the indoor units that need to be in standby.
And S204, the processor operates the first target indoor unit according to the instruction and adjusts one or more indoor units in the second target indoor units to be in standby.
And the second target indoor unit is a running low-priority indoor unit.
In the embodiment of the disclosure, under the condition that the indoor unit is turned on in an overload state, the first target indoor unit can operate according to the priority of the indoor unit. Meanwhile, a part of the indoor units with low priority in operation need to be in standby state to avoid overload operation. The priority represents the priority requirements of the user. And preferentially operating the indoor unit with high priority, and waiting the indoor unit with the lowest priority. Under the condition of avoiding overload operation of the multi-split air conditioner, the indoor unit with high priority requirement of a user can be ensured to operate preferentially. Therefore, the flexibility of the operation control of the indoor unit is improved and the user experience is improved under the conditions of the overload start of the multi-split air conditioner and the overload start of the indoor unit.
Optionally, in a case that the priority of the first target indoor unit is less than the priority threshold, the method further includes: the processor determines that the first target indoor unit operates or is in standby according to the indoor environment temperature, the target temperature and the operation load of the first target indoor unit. The indoor environment temperature is the real-time environment temperature of the room where the indoor unit is located, and the target temperature is the set temperature of the indoor unit. Therefore, under the condition that the priority of the first target indoor unit is low, whether the first target indoor unit is operated or not can be determined according to the indoor environment temperature, the target temperature and the operation load of the first target indoor unit, and the comfort degree of a user is ensured to a high degree. Therefore, the flexibility of the operation control of the indoor unit is improved and the user experience is improved under the conditions of the overload start of the multi-split air conditioner and the overload start of the indoor unit.
With reference to fig. 3, another method for controlling a multi-split air conditioner according to an embodiment of the present disclosure includes:
s301, the processor receives a starting operation instruction of the first target indoor unit.
S302, the processor judges whether the total operation load of the indoor unit is less than or equal to the operation load of the outdoor unit. If so, step S303 is performed. Otherwise, step S304 is executed.
And S303, the processor operates the first target indoor unit according to the instruction.
S304, the processor judges whether the priority of the first target indoor unit is larger than or equal to a priority threshold value. If so, step S305 is performed. Otherwise, step S306 is executed.
S305, the processor operates the first target indoor unit according to the instruction and adjusts one or more indoor units in the second target indoor units to be in standby; wherein the second target indoor unit is a low priority indoor unit in operation.
And S306, the processor determines the first target indoor unit to run or stand by according to the indoor environment temperature, the target temperature and the running load of the first target indoor unit.
In the embodiment of the disclosure, the first target indoor unit may operate according to the priority of the indoor unit when the indoor unit is turned on in an overload state. Meanwhile, a part of the indoor units with low priority in operation need to be in standby state to avoid overload operation. The priority represents the priority requirements of the user. And preferentially operating the indoor unit with high priority, and waiting the indoor unit with the lowest priority. Under the condition of avoiding overload operation of the multi-split air conditioner, the indoor unit with high priority requirement of a user can be ensured to operate preferentially. And under the condition that the priority of the first target indoor unit is low, whether the first target indoor unit is operated or not can be determined according to the indoor environment temperature, the target temperature and the operation load of the first target indoor unit, and the comfort level of a user is ensured to a higher degree. Therefore, the flexibility of the operation control of the indoor unit is improved and the user experience is improved under the conditions of the overload start of the multi-split air conditioner and the overload start of the indoor unit.
Optionally, the determining, by the processor, that the first target indoor unit is in operation or in standby according to the indoor ambient temperature, the target temperature, and the operation load of the first target indoor unit includes: processor calculates Δ T m =∣T ao-m -T set-m | a. If Δ T m Satisfies the first condition, and Q m And if the second condition is met, the processor operates the first target indoor unit according to the instruction and adjusts part of indoor units in the second target indoor units to be in standby. Otherwise, the processor controls the first target indoor unit to be in standby. Wherein, T ao-m Is the indoor ambient temperature, T, of the first target indoor unit set-m Is a target temperature, Q, of the first target indoor unit m Is the operating load of the first target indoor unit. Thus, whether to operate the first target indoor unit is determined by judging the temperature difference between the indoor ambient temperature and the target temperature, and the operation load of the first target indoor unit. Therefore, the flexibility of the operation control of the indoor unit is improved and the user experience is improved under the conditions of the overload start of the multi-split air conditioner and the overload start of the indoor unit.
Alternatively, Δ T m Satisfying the first condition includes: delta T m >T 1 . Wherein, T 1 Is a first temperature difference threshold. T is 1 The value range of (A) is [3 ℃,7 DEG C]. Alternatively, T 1 At 3 ℃, 5 ℃ or 7 ℃. When the temperature difference between the indoor environment temperature and the target temperature exceeds a certain value, it indicates that the difference between the indoor environment temperature of the user at the moment and the suitable temperature of the human body is large. Therefore, whether the first target indoor unit is operated or not is determined according to the first condition, and the user requirements can be met. Therefore, the flexibility of the operation control of the indoor unit is improved and the user experience is improved under the conditions of the overload start of the multi-split air conditioner and the overload start of the indoor unit.
Alternatively, Q m Satisfying the second condition includes: q m ≤Q z . Wherein Q is z The total operation load of the third target indoor unit; the third target indoor unit is that the absolute value of the temperature difference between the indoor environment temperature and the target temperature in the second target indoor unit is less than or equal to the second temperature difference threshold T 2 The indoor unit of (1). T is a unit of 2 The value range of (A) is [2 ℃,4 DEG C]. Alternatively, T 2 At 2 ℃,3 ℃ or 4 ℃. In this way, by comparing the operation load of the first target indoor unit with the operation load of the third target indoor unit, it can be determined whether the indoor unit whose temperature difference between the indoor ambient temperature and the target temperature is less than or equal to a certain value can satisfy the first target indoor waiting conditionAnd (5) operating the machine. The indoor unit with the temperature difference smaller than or equal to a certain value is not uncomfortable to a user when in standby, and the first target indoor unit with the larger temperature difference can be preferentially operated. Therefore, the flexibility of the operation control of the indoor unit is improved and the user experience is improved under the conditions of the overload start of the multi-split air conditioner and the overload start of the indoor unit.
Optionally, before the processor adjusts a part of the indoor units in the second target indoor unit to be in standby, the method further includes: and the processor determines a third target indoor unit according to the indoor environment temperature and the target temperature of the second target indoor unit. And the processor determines the indoor unit needing to be in standby according to the running load of the third target indoor unit. Therefore, the third target indoor unit needing to be in standby is determined according to the indoor environment temperature and the target temperature, and the first target indoor unit can be operated preferentially. Therefore, the flexibility of the operation control of the indoor unit is improved and the user experience is improved under the conditions of the overload start of the multi-split air conditioner and the overload start of the indoor unit.
With reference to fig. 4, another method for controlling a multi-split air conditioner according to an embodiment of the present disclosure includes:
s401, the processor receives a starting operation instruction of the first target indoor unit.
S402, the processor judges whether the total operation load of the indoor unit is less than or equal to the operation load of the outdoor unit. If so, step S403 is performed. Otherwise, step S404 is executed.
And S403, the processor operates the first target indoor unit according to the instruction.
S404, the processor judges whether the priority of the first target indoor unit is larger than or equal to a priority threshold value. If so, step S405 is performed. Otherwise, steps S406 to S407 are performed.
S405, the processor operates the first target indoor unit according to the instruction and adjusts one or more indoor units in the second target indoor units to be in standby; and the second target indoor unit is a running low-priority indoor unit.
S406, the processor calculates delta T m =∣T ao-m -T set-m | a. Wherein, T ao-m Is firstIndoor ambient temperature, T, of the target indoor unit set-m Is the target temperature of the first target indoor unit.
S407, the processor judges the delta T m Whether or not the first condition is satisfied, and, Q m Whether the second condition is satisfied, and if so, steps S408 to S410 are performed. Otherwise, step S411 is executed. Wherein Q m Is the operation load of the first target indoor unit.
And S408, the processor determines a third target indoor unit according to the indoor environment temperature and the target temperature of the second target indoor unit.
And S409, the processor determines the indoor unit needing to be in standby according to the running load of the third target indoor unit.
And S410, the processor operates the first target indoor unit according to the instruction and adjusts indoor units needing to be in standby in the second target indoor unit to be in standby.
And S411, the processor controls the first target indoor unit to stand by.
In the embodiment of the disclosure, the first target indoor unit may operate according to the priority of the indoor unit when the indoor unit is turned on in an overload state. Meanwhile, a part of the indoor units with low priority in operation need to be in standby state to avoid overload operation. The priority represents the priority requirements of the user. And preferentially operating the indoor unit with high priority, and waiting the indoor unit with the lowest priority. Under the condition of avoiding overload operation of the multi-split air conditioner, the indoor unit with high priority requirement of a user can be ensured to operate preferentially. And under the condition that the priority of the first target indoor unit is low, determining a third target indoor unit needing to be standby according to the indoor environment temperature and the target temperature, and preferentially operating the first target indoor unit to ensure the comfort level of a user to a higher degree. Therefore, the flexibility of operation control of the indoor unit is improved and the user experience is improved under the conditions of the overload start of the multi-split air conditioner and the overload start of the indoor unit.
Optionally, the determining, by the processor, the third target indoor unit according to the indoor ambient temperature and the target temperature of the second target indoor unit includes: processor calculates Δ T mi =∣T ao-mi -T set-mi | obtaining the ith indoor unit in the second target indoor unitAbsolute value of the temperature difference of (1). Processor determines Δ T mi Whether or not T is less than or equal to 2 Obtaining an absolute value of the temperature difference of less than or equal to T 2 The indoor unit of (1). The processor makes all the absolute values of the temperature difference less than or equal to T 2 Is determined as a third target indoor unit. Wherein, T ao-mi Is the indoor ambient temperature, T, of the ith indoor unit in the second target indoor unit set-mi The target temperature of the ith indoor unit in the second target indoor units is set, i =1,.. N, n is the number of the second target indoor units; t is 2 Is a second temperature difference threshold. In this way, the standby indoor unit can be further specified by determining the indoor unit whose temperature difference between the indoor ambient temperature and the target temperature is less than or equal to a predetermined value. The indoor unit with the temperature difference smaller than or equal to a certain value is not uncomfortable to a user when in standby, and the first target indoor unit with the larger temperature difference can be preferentially operated. Therefore, the flexibility of the operation control of the indoor unit is improved and the user experience is improved under the conditions of the overload start of the multi-split air conditioner and the overload start of the indoor unit.
Optionally, the determining, by the processor, the indoor unit needing to be standby according to the operation load of the third target indoor unit includes: the processor obtains the operation load Q of the jth indoor unit in the third target indoor unit j J = 1.. M, m is the number of third target indoor units. The processor calculates the absolute value of the temperature difference of the indoor units in the third target indoor unit from small to large
Figure BDA0003889632350000121
P is a positive integer. And the processor determines the front p indoor units in the third target indoor unit as the indoor units needing to be in standby. Wherein Q is m Is the operation load of the first target indoor unit. For example, the third target indoor units have 4 units, and the absolute values of the temperature difference are 2 ℃,3 ℃, 2.5 ℃ and 1 ℃, and the corresponding operation loads are 2000W, 2500W, 2000W and 1500W, respectively. If Q is m 3000W, and the operation loads of the corresponding indoor units are respectively Q according to the sequence of the absolute value of the temperature difference of the indoor units from small to large 1 =1500W、Q 2 =2000W、Q 3 =2000W、Q 4 =2500W. Then, the summation calculation is sequentially accumulated so that
Figure BDA0003889632350000122
Has a minimum p value of 2. Therefore, the first 2 indoor units among the third target indoor units are determined as the indoor units that need to be on standby. In this way, by identifying the indoor unit that is in standby from among the indoor units whose temperature difference between the indoor ambient temperature and the target temperature is less than or equal to a certain value, the user does not experience discomfort by having the indoor unit with a smaller temperature difference in standby. Meanwhile, the first target indoor unit with a large temperature difference can be preferentially operated. Therefore, the flexibility of the operation control of the indoor unit is improved and the user experience is improved under the conditions of the overload start of the multi-split air conditioner and the overload start of the indoor unit.
Optionally, the method further comprises: the processor calculates the absolute value of the temperature difference between the indoor ambient temperature and the target temperature of each indoor unit in the second target indoor unit. And the processor waits for the indoor unit with the absolute temperature difference value in the first temperature difference interval. And the processor operates the indoor unit with the absolute temperature difference value in the second temperature difference interval at a low wind speed. And the processor operates the indoor unit with the absolute temperature difference value in the third temperature difference interval at the medium wind speed. The first temperature difference interval is [ T ] 3 ,T 4 ) The second temperature difference interval is [ T ] 4 ,T 5 ) The third temperature difference interval is [ T ] 5 ,T 6 )。T 3 Is a third temperature difference threshold, T 4 Is a fourth temperature difference threshold, T 5 Is a fifth temperature difference threshold, T 6 Is a sixth temperature difference threshold. T is 6 >T 5 >T 4 >T 3 。T 3 The value range of (C) is [0 ℃,1 DEG C]. Alternatively, T 3 At 0 ℃, 0.5 ℃ or 1 ℃. T is 4 The value range of (1 deg.C, 2 deg.C)]. Alternatively, T 4 At 1 deg.C, 1.5 deg.C or 2 deg.C. T is 5 The value range of (A) is [2 ℃,3 DEG C]. Alternatively, T 5 At 2 ℃, 2.5 ℃ or 3 ℃. T is 6 The value range of (A) is [3 ℃,4 DEG C]. Alternatively, T 6 At 3 deg.C, 3.5 deg.C or 4 deg.C. When the indoor environment temperature approaches to the target temperature, the air speed of the indoor unit is reduced to redistribute the refrigerant, so that the indoor unit is ensured to be smallThe load is required to operate. The target temperature can not be reached quickly, the standby is carried out, and then the reciprocating starting is carried out after the indoor environment temperature is reduced. Therefore, the problem that the frequency of the compressor and the reliability of the whole machine are influenced due to too large change of the load requirement of the whole machine can be avoided. Thus, the reliability of the operation of the compressor is improved.
Optionally, in the presence of a standby indoor unit, the method further includes: and the processor sorts all the standby indoor units according to the standby operation priority level rule. And under the condition that the operation conditions of the standby indoor unit are met, the processor operates the standby indoor unit in the order of the standby operation priority from high to low. The standby operation priority refers to the operation sequence of all the standby indoor units under the condition that the operation conditions of the standby indoor units are met, wherein the standby operation priority of the representative operating first is high, and the standby operation priority of the representative operating later is low. In this way, when the indoor unit is turned on in an overload state, the operation of the standby indoor unit can be performed from high to low in the order of the operation priority of the standby indoor unit when the operation condition of the standby indoor unit is satisfied. The operating priority represents a user's preferred operating requirements. In the related art, under the condition that the indoor unit is started in an overload mode, the indoor unit needs to run according to the standby sequence after standby waiting. Compared with the prior art, the method can operate according to the user requirement under the condition that the multi-split air conditioner is in super-distribution and the standby indoor unit exists, and improves the flexibility of operation control of the standby indoor unit.
With reference to fig. 5, another method for controlling a multi-split air conditioner according to an embodiment of the present disclosure includes:
s501, when the standby indoor units exist, the processor sorts all the standby indoor units according to the standby operation priority level rule.
And S502, under the condition that the operation conditions of the standby indoor unit are met, the processor operates the standby indoor unit according to the standby operation priority from high to low.
And S503, the processor receives a starting operation instruction of the first target indoor unit.
And S504, under the condition that the total operation load of the indoor units is less than or equal to the operation load of the outdoor unit, the processor operates the first target indoor unit according to the instruction.
S505, under the condition that the total operation load of the indoor units is greater than the operation load of the outdoor unit, the processor judges whether the priority of the first target indoor unit is greater than or equal to a priority threshold value, if so, the processor operates the first target indoor unit according to an instruction and adjusts one or more indoor units in the second target indoor units to be in standby; wherein the second target indoor unit is a low priority indoor unit in operation.
In the embodiment of the disclosure, under the condition that the indoor unit is overloaded and started up, and under the condition that the operation condition of the standby indoor unit is met, the indoor unit can be operated from high to low according to the operation priority order of the standby indoor unit. The operating priority represents a user's preferred operating requirements. Under the condition that the indoor unit is overloaded and started, the first target indoor unit can run according to the priority of the indoor unit. Meanwhile, a part of the indoor units with low priority in operation need to be in standby state to avoid overload operation. The priority represents the priority requirements of the user. Therefore, the multi-split air conditioner can operate according to the user requirement condition under the conditions of over-distribution of the multi-split air conditioner and overload starting of the indoor unit, and the flexibility of operation control of the indoor unit is improved.
With reference to fig. 6, another method for controlling a multi-split air conditioner according to an embodiment of the present disclosure includes:
and S601, under the condition that the standby indoor units exist, sequencing all the standby indoor units according to a standby operation priority level rule by the processor.
And S602, under the condition that the operation conditions of the standby indoor unit are met, the processor operates the standby indoor unit from high to low according to the priority of the standby operation.
In the embodiment of the disclosure, under the condition that the indoor unit is overloaded and started up, and under the condition that the operation condition of the standby indoor unit is met, the indoor unit can be operated from high to low according to the operation priority order of the standby indoor unit. The operating priority represents a user's preferred operating requirements. Therefore, the multi-split air conditioner can operate according to the user requirement under the conditions of over-distribution and standby indoor units, and the flexibility of operation control of the standby indoor units is improved.
Optionally, the standby operation priority level rule includes: the standby operation priority of the first type of standby indoor unit is higher than that of the second type of standby indoor unit. The first type of standby indoor unit is a standby indoor unit which receives a user priority operation instruction during a standby period, and the second type of standby indoor unit is a standby indoor unit which does not receive the user priority operation instruction during the standby period. The priority operation instruction may be an air conditioner custom function. For example, a standby priority operation key is set, or a standby priority operation is set. For example, the standby priority operation may be an operation in which the user turns on the indoor unit again after turning off the indoor unit after standby. The user sends a priority operation instruction to represent that the user urgently needs the indoor unit to operate as soon as possible. Therefore, under the condition that the multi-split air conditioner is in overload distribution and the indoor unit is in overload starting, the standby indoor unit can operate according to the user requirement. Therefore, the flexibility of the operation control of the standby indoor unit is improved, and the user experience is improved.
Optionally, the standby operation priority level rule further includes: when there are a plurality of first-type standby indoor units, the later the time for receiving the user priority operation instruction, the higher the standby operation priority of the corresponding standby indoor unit. The later the time of the user priority operation is, the greater the requirement of the user on the operation of the indoor unit is, and therefore the higher the priority of the standby operation is. Therefore, under the condition that the multi-split air conditioner is in overload distribution and the indoor unit is in overload starting, the standby indoor unit can operate according to the user requirement. Therefore, the flexibility of the operation control of the standby indoor unit is improved, and the user experience is improved.
Optionally, the standby operation priority level rule further includes: when there are a plurality of second type standby indoor units, the standby operation priority of the standby indoor unit with a person in the room is higher than that of the standby indoor unit without a person in the room. People in the room indicate that the operation requirement of the corresponding standby indoor unit is larger. Therefore, under the condition that the multi-split air conditioner is in overload distribution and the indoor unit is in overload starting, the standby indoor unit can operate according to the user requirement. Therefore, the flexibility of the operation control of the standby indoor unit is improved, and the user experience is improved.
Optionally, the standby operation priority level rule further includes: in a second type of standby indoor unit in which a person is present in a plurality of rooms, the higher the priority of the indoor unit is, the higher the priority of the standby operation is. In a second type of standby indoor units in which no person is present in a plurality of rooms, the higher the priority of the indoor units is, the higher the priority of standby operation is. Therefore, under the condition that the multi-split air conditioner is in overload distribution and the indoor unit is in overload starting, the standby indoor unit can operate according to the user requirement. Therefore, the flexibility of the operation control of the standby indoor unit is improved, and the user experience is improved.
Optionally, the standby indoor unit operation conditions include: the processor calculates the total load of the first q standby indoor units according to the standby operation priority from high to low
Figure BDA0003889632350000151
Presence of Q s ≤Q Waiting for Q is a positive integer. Wherein Q is Waiting for =Q Outer cover -Q Internal transportation ,Q Outer cover For the operating load of the outdoor unit, Q Internal transportation The total load of the operating indoor unit; q Inner wait u For the load of the u-th standby indoor unit, u = 1.., w, w is the number of standby indoor units. For example, there are 3 standby indoor units, and the loads are 1500W, 2000W, and 2000W in the order of priority of standby operation from high to low, the operation load of the outdoor unit is 12000W, and the total load of the operating indoor units is 8000W. Q Waiting for 4000W, from which it can be calculated that Q is present s ≤Q Waiting for Q is 1 or 2. Therefore, under the conditions that the multi-split air conditioner is in overload and the indoor unit is in overload starting, the indoor unit is guaranteed not to be in overload operation, and the standby indoor unit can operate according to the user requirement. Therefore, the flexibility of the operation control of the standby indoor unit is improved, and the user experience is improved.
With reference to fig. 7, another method for controlling a multi-split air conditioner according to an embodiment of the present disclosure includes:
and S701, under the condition that the standby indoor units exist, the processor sorts all the standby indoor units according to the standby operation priority level rule.
S702, the processor calculates the total load of the first q standby indoor units according to the order of the standby operation priority from high to low
Figure BDA0003889632350000161
Wherein Q is Inner wait u For the load of the u-th standby indoor unit, u = 1.., w, w is the number of standby indoor units.
S703, the processor judges whether Q is enabled s ≤Q Waiting for Q is a positive integer. If so, step S704 is performed. Otherwise, the process returns to step S701. Wherein Q is Waiting for =Q Outer cover -Q Internal transportation ,Q Outer cover For the operating load of the outdoor unit, Q Internal transportation Is the total load of the operating indoor unit.
And S704, the processor operates the standby indoor units in the sequence of the standby operation priority from high to low.
In the embodiment of the disclosure, under the condition that the indoor unit is turned on in an overload mode, and under the condition that the rated load of the outdoor unit is greater than the running load of the running indoor unit, whether the standby indoor unit is allowed to run currently can be judged through calculation. In case of meeting the operation condition of the standby indoor unit, the operation can be performed from high to low in the order of the operation priority of the standby indoor unit. The operational priority represents a user's preferential operational need. Under the condition that the multi-split air conditioner is in overload and the indoor unit is switched on in overload, the indoor unit can be guaranteed not to be in overload during operation, and the standby indoor unit can operate according to the user requirement. Therefore, the flexibility of the operation control of the standby indoor unit is improved, and the user experience is improved.
Optionally, the processor operating the standby indoor unit in order of the standby operation priority from high to low includes: the processor calculates to get Q s ≤Q Waiting for The maximum q value of. The processor operates the first q standby indoor units in the order of standby operation priority from high to low. For example, there are 3 standby indoor units, the loads are 1500W, 2000W and 2000W in the order of priority of standby operation from high to low, and the operation load of the outdoor unit is 12000W, the total load of the running indoor unit is 8000W. Q Waiting for At 4000W, Q is present s ≤Q Waiting for admission And the maximum q value is 2. Therefore, under the conditions that the multi-split air conditioner is overloaded and the indoor unit is overloaded and started, the indoor unit is guaranteed not to be overloaded during operation, and the standby indoor unit can operate according to the user demand. Therefore, the flexibility of the operation control of the standby indoor unit is improved, and the user experience is improved.
With reference to fig. 8, another method for controlling a multi-split air conditioner according to an embodiment of the present disclosure includes:
and S801, under the condition that the standby indoor units exist, the processor sorts all the standby indoor units according to the standby operation priority level rule.
S802, the processor calculates the total load of the first q standby indoor units according to the standby operation priority from high to low
Figure BDA0003889632350000171
Wherein Q is Inner wait u For the load of the u-th standby indoor unit, u = 1.., w, w is the number of standby indoor units.
S803, the processor judges whether or not Q is enabled s ≤Q Waiting for Q is a positive integer. If so, steps S804 to S805 are performed. Otherwise, the process returns to step S801. Wherein Q is Waiting for admission =Q Outer cover -Q Internal transportation ,Q Outer cover For the operating load of the outdoor unit, Q Internal transportation Is the total load of the operating indoor unit.
S804, the processor calculates Q s ≤Q Waiting for The maximum q value of.
And S805, the processor operates the first q standby indoor units in the order of the standby operation priority from high to low.
In the embodiment of the disclosure, under the condition that the indoor unit is turned on in an overload mode, and under the condition that the rated load of the outdoor unit is greater than the running load of the running indoor unit, whether the standby indoor unit is allowed to run currently can be judged through calculation. And under the condition that the operation conditions of the standby indoor unit are met, the standby indoor unit can be operated from high to low according to the operation priority order. The operating priority represents a user's preferred operating requirements. Under the conditions that the multi-split air conditioner is overloaded and the indoor unit is overloaded and started, the indoor unit can be ensured not to be overloaded during operation, and the standby indoor unit can operate according to the user requirement. Therefore, the flexibility of the operation control of the standby indoor unit is improved, and the user experience is improved.
Another method for controlling the multi-split air conditioner during actual operation of the multi-split air conditioner is shown in fig. 9 and includes:
and S901, receiving a starting operation instruction of the first target indoor unit.
And S902, judging whether the total operation load of the indoor unit is less than or equal to the operation load of the outdoor unit. If so, step S903 is performed. Otherwise, step S904 is executed. For example, if the operation load of the outdoor unit is 12000W and the total operation load of the indoor units is 14000W, step S904 is executed.
And S903, operating the first target indoor unit according to the instruction.
And S904, judging whether the priority of the first target indoor unit is greater than or equal to a priority threshold. If so, steps S905 to S907 are performed. Otherwise, steps S908 to S909 are executed. For example, the priority of the indoor unit is encoded, and the indoor unit is encoded according to the priority from small to large. The smaller the encoding, the higher the priority. For example, if the priority threshold is code 3 and the first target indoor unit is code 2, the priority of the first target indoor unit is greater than the priority threshold. Then, steps S905 to S907 are performed. For example, if the priority threshold is code 3 and the first target indoor unit is code 4, the priority of the first target indoor unit is less than the priority threshold. Then, steps S908 to S909 are executed.
And S905, accumulating the running loads of one or more indoor units in the second target indoor unit according to the sequence from low to high of the priorities of the indoor units in the second target indoor unit until the accumulated running loads are greater than or equal to the running loads of the first target indoor unit. Wherein the second target indoor unit is a low priority indoor unit in operation. For example, the second target indoor unit has 4 indoor units, and the indoor unit codes are respectively 10, 9, 8 and 7. The smaller the intra coding, the higher the priority. For example, the operation load of the first target indoor unit is 3500W, the operation load of the indoor unit with the indoor unit code 10 is 2500W, and the operation load of the indoor unit with the indoor unit code 9 is 2500W. Then the running load sum of the indoor unit with indoor unit code 10 and the indoor unit with indoor unit code 9 is already greater than the running load of the first target indoor unit.
S906, one or more indoor units of the second target indoor units are determined as the indoor units that need to be on standby. For example, in step S905, an indoor unit with an indoor unit number of 10 and an indoor unit with an indoor unit number of 9 are determined as indoor units that need to be on standby.
And S907, operating the first target indoor unit according to the instruction and adjusting one or more indoor units in the second target indoor units to be in standby. For example, in step S906, the indoor unit with the indoor unit code 10 and the indoor unit with the indoor unit code 9 are set to standby.
S908, calculating Delta T m =∣T ao-m -T set-m | a. Wherein, T ao-m Is the indoor ambient temperature, T, of the first target indoor unit set-m Is the target temperature of the first target indoor unit. E.g. T ao-m At 12 ℃ and T set-m At 23 ℃ and. Delta.T m It was 11 ℃.
S909, determine Δ T m Whether or not the first condition is satisfied, and Q m Whether the second condition is satisfied, and if so, steps S910 to S916 are performed. Otherwise, step S917 is performed. Wherein Q is m Is the operation load of the first target indoor unit. For example, the first condition is Δ T m Greater than 3 ℃ and the second condition is Q m Less than or equal to 3500W. For example, Δ T m At 11 ℃ Q m At 2500W, steps S910 to S916 are performed. For example, Δ T m At 11 ℃ Q m 4000W, step S917 is performed.
S910, calculating delta T mi =∣T ao-mi -T set-mi | obtaining the absolute value of the temperature difference of the ith indoor unit in the second target indoor unit. Wherein, T ao-mi Is the indoor ambient temperature, T, of the ith indoor unit in the second target indoor unit set-mi For the second purposeTarget temperature of the ith indoor unit in the standard indoor units, i =1,.. And n is the number of the second target indoor units. For example, the second target indoor unit has 5 units, and Δ T is calculated m1 At a temperature of 8 ℃ and a.DELTA.T m2 Is 2 ℃ and. DELTA.T m3 Is at 3 ℃ and. Delta.T m4 At 7 ℃ and. Delta.T m5 Is 10 ℃.
S911, determining Delta T mi Whether or not T is less than or equal to 2 Obtaining an absolute value of the temperature difference of less than or equal to T 2 The indoor unit of (1). Wherein, T 2 Is a second temperature difference threshold. E.g. T 2 At 3 deg.C,. DELTA.T according to the example of step S910 m2 And Δ T m3 Corresponding indoor unit conforms to delta T mi Less than or equal to T 2
S912, the absolute value of all temperature differences is less than or equal to T 2 Is determined as a third target indoor unit. For example, according to the example of steps S910 and S911, Δ T is calculated m2 And Δ T m3 And the corresponding indoor unit is determined as a third target indoor unit.
S913, obtaining the operation load Q of the jth indoor unit in the third target indoor unit j J = 1.. M, m is the number of third target indoor units.
S914, calculating the absolute value of the temperature difference of the indoor units in the third target indoor unit from small to large
Figure BDA0003889632350000191
P is a positive integer. For example, the third target indoor unit has 2 units, and the absolute values of the temperature difference are 2 ℃ and 3 ℃, and the corresponding operation loads are 2000W and 1500W, respectively. If Q is m 3000W, and the operation loads of the corresponding indoor units are respectively Q according to the sequence of the absolute value of the temperature difference of the indoor units from small to large 1 =1500W、Q 2 =2000W. Then, the summation calculation is sequentially accumulated so that
Figure BDA0003889632350000192
Has a minimum p value of 2.
S915, the front p indoor units in the third target indoor unit are determined as the indoor units that need to be on standby. For example, according to the example of step S914, the top p indoor units in the third target indoor unit are determined as the indoor units that need to be on standby.
And S916, operating the first target indoor unit according to the instruction and adjusting indoor units needing to be standby in the second target indoor units to be standby.
S917, controlling the first target indoor unit to stand by.
Referring to fig. 10, an embodiment of the present disclosure provides another apparatus 300 for controlling a multi-split air conditioner, which includes a processor (processor) 100 and a memory (memory) 101 storing program instructions. Optionally, the apparatus may also include a Communication Interface (Communication Interface) 102 and a bus 103. The processor 100, the communication interface 102, and the memory 101 may communicate with each other through the bus 103. The communication interface 102 may be used for information transfer. The processor 100 may call logic instructions in the memory 101 to perform the method for device detection of the above-described embodiment.
In addition, the logic instructions in the memory 101 may be implemented in the form of software functional units and stored in a computer readable storage medium when the logic instructions are sold or used as independent products.
The memory 101 is a storage medium and can be used for storing software programs, computer executable programs, such as program instructions/modules corresponding to the methods in the embodiments of the present disclosure. The processor 100 executes functional applications and data processing, i.e., implements the method for device detection in the above-described embodiments, by executing program instructions/modules stored in the memory 101.
The memory 101 may include a storage program area and a storage data area, wherein the storage program area may store an operating system, an application program required for at least one function; the storage data area may store data created according to the use of the terminal device, and the like. In addition, the memory 101 may include a high-speed random access memory, and may also include a nonvolatile memory.
The embodiment of the disclosure provides a multi-split air conditioner, which comprises an air conditioner main body and the device 300 for controlling the multi-split air conditioner. The device 300 for controlling the multi-split air conditioner is installed in the air conditioner main body. Optionally, the air conditioner main body includes a plurality of indoor units, an outdoor unit, or the air conditioner main body includes a plurality of indoor units, outdoor units, and a control unit. The apparatus 300 for controlling the multiple on-line air conditioner may be installed in an indoor unit, an outdoor unit, or a control unit. The installation relationship stated herein is not limited to being placed inside the product, but also includes installation connection with other components of the product, including but not limited to physical connection, electrical connection, or signal transmission connection. It will be appreciated by those skilled in the art that the apparatus 300 for device detection may be adapted to a feasible product body, thereby enabling other feasible embodiments.
Embodiments of the present disclosure provide a computer-readable storage medium storing computer-executable instructions configured to perform the above-described method for device detection.
The computer-readable storage medium described above may be a transitory computer-readable storage medium or a non-transitory computer-readable storage medium.
The technical solution of the embodiments of the present disclosure may be embodied in the form of a software product, which is stored in a storage medium and includes one or more instructions for enabling a computer device (which may be a personal computer, a server, or a network device) to execute all or part of the steps of the method of the embodiments of the present disclosure. And the aforementioned storage medium may be a non-transitory storage medium comprising: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk or an optical disk, and other various media capable of storing program codes, and may also be a transient storage medium.
The above description and drawings sufficiently illustrate embodiments of the disclosure to enable those skilled in the art to practice them. Other embodiments may incorporate structural, logical, electrical, process, and other changes. The examples merely typify possible variations. Individual components and functions are optional unless explicitly required, and the sequence of operations may vary. Portions and features of some embodiments may be included in or substituted for those of others. Furthermore, the words used in the specification are words of description only and are not intended to limit the claims. As used in the description of the embodiments and the claims, the singular forms "a", "an" and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise. Similarly, the term "and/or" as used in this application is meant to encompass any and all possible combinations of one or more of the associated listed. Furthermore, the terms "comprises" and/or "comprising," when used in this application, specify the presence of stated features, integers, steps, operations, elements, and/or components, but do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, and/or groups thereof. Without further limitation, an element described by the phrase "comprising" does not exclude the presence of other identical elements in the process, method or device in which the element is included. In this document, each embodiment may be described with emphasis on differences from other embodiments, and the same and similar parts between the respective embodiments may be referred to each other. For methods, products, etc. of the embodiment disclosures, reference may be made to the description of the method section for relevance if it corresponds to the method section of the embodiment disclosure.
Those of skill in the art would appreciate that the various illustrative elements and algorithm steps described in connection with the embodiments disclosed herein may be implemented as electronic hardware or combinations of computer software and electronic hardware. Whether such functionality is implemented as hardware or software may depend upon the particular application and design constraints imposed on the solution. Skilled artisans may implement the described functionality in varying ways for each particular application, but such implementation decisions should not be interpreted as causing a departure from the scope of the disclosed embodiments. It can be clearly understood by the skilled person that, for convenience and brevity of description, the specific working processes of the system, the apparatus and the unit described above may refer to the corresponding processes in the foregoing method embodiments, and are not described herein again.
In the embodiments disclosed herein, the disclosed methods, products (including but not limited to devices, apparatuses, etc.) may be implemented in other ways. For example, the above-described apparatus embodiments are merely illustrative, and for example, the division of the units may be merely a logical division, and in actual implementation, there may be another division, for example, multiple units or components may be combined or integrated into another system, or some features may be omitted, or not executed. In addition, the shown or discussed mutual coupling or direct coupling or communication connection may be an indirect coupling or communication connection through some interfaces, devices or units, and may be in an electrical, mechanical or other form. The units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the units can be selected according to actual needs to implement the present embodiment. In addition, functional units in the embodiments of the present disclosure may be integrated into one processing unit, or each unit may exist alone physically, or two or more units are integrated into one unit.
The flowchart and block diagrams in the figures illustrate the architecture, functionality, and operation of possible implementations of systems, methods and computer program products according to embodiments of the present disclosure. In this regard, each block in the flowchart or block diagrams may represent a module, segment, or portion of code, which comprises one or more executable instructions for implementing the specified logical function(s). In some alternative implementations, the functions noted in the block may occur out of the order noted in the figures. For example, two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality involved. In the description corresponding to the flowcharts and block diagrams in the figures, operations or steps corresponding to different blocks may also occur in different orders than disclosed in the description, and sometimes there is no specific order between different operations or steps. For example, two sequential operations or steps may in fact be executed substantially concurrently, or they may sometimes be executed in the reverse order, depending upon the functionality involved. Each block of the block diagrams and/or flowchart illustrations, and combinations of blocks in the block diagrams and/or flowchart illustrations, can be implemented by special purpose hardware-based systems that perform the specified functions or acts, or combinations of special purpose hardware and computer instructions.

Claims (11)

1. A method for multi-split air conditioner control, characterized in that in the presence of a standby indoor unit, the method comprises:
sequencing all the standby indoor units according to a standby operation priority level rule;
and under the condition that the operation conditions of the standby indoor unit are met, operating the standby indoor unit in the order of the standby operation priority from high to low.
2. The method of claim 1, wherein the standby operation priority level rule comprises:
the standby operation priority of the first type of standby indoor unit is higher than that of the second type of standby indoor unit;
the first type of standby indoor unit is a standby indoor unit which receives a user priority operation instruction during a standby period, and the second type of standby indoor unit is a standby indoor unit which does not receive the user priority operation instruction during the standby period.
3. The method of claim 2, wherein the standby operation priority level is a low rule, further comprising:
when there are a plurality of first-type standby indoor units, the later the time for receiving the user priority operation instruction, the higher the standby operation priority of the corresponding standby indoor unit.
4. The method of claim 3, wherein the standby operation priority level is a low rule, further comprising:
when there are a plurality of second type standby indoor units, the standby operation priority of the standby indoor unit with a person in the room is higher than that of the standby indoor unit without a person in the room.
5. The method of claim 4, wherein the standby operation priority level is a low rule, further comprising:
in a second type standby indoor unit with people in a plurality of rooms, the higher the priority of the indoor unit is, the higher the standby operation priority is;
in a second type of standby indoor units in which no person is present in a plurality of rooms, the higher the priority of the indoor units is, the higher the priority of standby operation is.
6. The method according to any one of claims 1 to 5, characterized in that the standby indoor unit operating conditions comprise:
calculating the total load of the first q standby indoor units according to the sequence of the standby operation priority from high to low
Figure FDA0003889632340000021
Presence of Q S ≤Q Waiting for Q is a positive integer;
wherein Q is Waiting for =Q Outer cover -Q Internal transportation ,Q Outer cover For the running load of the outdoor unit, Q Internal transportation The total load of the operating indoor unit; q Inner wait u For the load of the u-th standby indoor unit, u = 1.., w, w is the number of standby indoor units.
7. The method of claim 6, wherein operating the standby indoor units in order of their standby operation priorities from high to low comprises:
calculated to result in Q S ≤Q Waiting for The maximum q value of;
and operating the first q standby indoor units in the order of standby operation priority from high to low.
8. The method of any of claims 1 to 5, further comprising:
receiving a starting operation instruction of a first target indoor unit;
under the condition that the total operation load of the indoor units is less than or equal to the operation load of the outdoor unit, operating a first target indoor unit according to an instruction;
under the condition that the total operation load of the indoor units is greater than the operation load of the outdoor unit, judging whether the priority of the first target indoor unit is greater than or equal to a priority threshold value, if so, operating the first target indoor unit according to an instruction and adjusting one or more indoor units in the second target indoor units to be standby; and the second target indoor unit is a running low-priority indoor unit.
9. An apparatus for multiple on-line air conditioning control, comprising a processor and a memory storing program instructions, characterized in that the processor is configured to execute the method for multiple on-line air conditioning control according to any one of claims 1 to 8 when executing the program instructions.
10. A multi-split air conditioner, comprising:
an air conditioner main body; and (c) and (d),
the apparatus for multi-split air conditioner control as claimed in claim 9, which is installed at the air conditioner main body.
11. A storage medium storing program instructions, characterized in that the program instructions, when executed, perform the method for multi-split air conditioner control according to any one of claims 1 to 8.
CN202211255637.6A 2022-10-13 2022-10-13 Method and device for controlling multi-split air conditioner, multi-split air conditioner and storage medium Pending CN115682278A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211255637.6A CN115682278A (en) 2022-10-13 2022-10-13 Method and device for controlling multi-split air conditioner, multi-split air conditioner and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211255637.6A CN115682278A (en) 2022-10-13 2022-10-13 Method and device for controlling multi-split air conditioner, multi-split air conditioner and storage medium

Publications (1)

Publication Number Publication Date
CN115682278A true CN115682278A (en) 2023-02-03

Family

ID=85066987

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211255637.6A Pending CN115682278A (en) 2022-10-13 2022-10-13 Method and device for controlling multi-split air conditioner, multi-split air conditioner and storage medium

Country Status (1)

Country Link
CN (1) CN115682278A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024078090A1 (en) * 2022-10-13 2024-04-18 青岛海尔空调电子有限公司 Method and apparatus for controlling multi-split air conditioner, multi-split air conditioner, and storage medium

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024078090A1 (en) * 2022-10-13 2024-04-18 青岛海尔空调电子有限公司 Method and apparatus for controlling multi-split air conditioner, multi-split air conditioner, and storage medium

Similar Documents

Publication Publication Date Title
CN115682278A (en) Method and device for controlling multi-split air conditioner, multi-split air conditioner and storage medium
CN112747514B (en) Method and device for controlling running frequency of air conditioner compressor and air conditioner
CN112240633B (en) Method and device for controlling air conditioner and air conditioner
CN113341808A (en) Method, system, device and server for controlling household appliance
CN113137701B (en) Method and device for controlling air conditioner and air conditioner
CN115751637A (en) Control method and device for linkage fresh air device and intelligent household system
CN113091231B (en) Control method and device for air conditioner and air conditioner
CN113531819B (en) Method and device for preheating air conditioner, air conditioner and air conditioning system
CN113531667B (en) Method and device for dehumidifying air conditioner and intelligent air conditioner
CN113531797B (en) Method and device for preheating air conditioner, air conditioner and air conditioning system
CN114704934A (en) Method and device for controlling direct current air conditioner and direct current air conditioner
CN112984742A (en) Control method and device for self-cleaning of air conditioner and air conditioner
CN112944642A (en) Method and device for anti-condensation control and air conditioner
CN117928061A (en) Method and device for controlling multi-split air conditioner, multi-split air conditioner and storage medium
CN113819635B (en) Method and device for adjusting indoor air parameters and smart home system
CN115264842A (en) Method and device for controlling air conditioner, electronic equipment and storage medium
CN113357803B (en) Method and device for controlling electronic expansion valve of air conditioner and air conditioner
CN115614964A (en) Method and device for regulating oxygen concentration, electronic equipment and storage medium
CN115076863A (en) Method and device for controlling air conditioner, air conditioner and storage medium
CN115077004A (en) Method and device for air conditioning, control device, storage medium
CN112856747A (en) Method and device for controlling power of air conditioner and air conditioner
CN113465134A (en) Control method and device of air conditioner, storage medium and air conditioner
CN114251819B (en) Method and device for controlling operation of air conditioner compressor and air conditioner
CN113359521B (en) Household appliance control method and device and household appliance
CN116294108A (en) Method and device for controlling air conditioner, electronic equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination