CN115613683A - Installation device of limited space steel gallery - Google Patents

Installation device of limited space steel gallery Download PDF

Info

Publication number
CN115613683A
CN115613683A CN202211121912.5A CN202211121912A CN115613683A CN 115613683 A CN115613683 A CN 115613683A CN 202211121912 A CN202211121912 A CN 202211121912A CN 115613683 A CN115613683 A CN 115613683A
Authority
CN
China
Prior art keywords
steel
hoisting
installation
column
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211121912.5A
Other languages
Chinese (zh)
Inventor
余桂亮
李少祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN202211121912.5A priority Critical patent/CN115613683A/en
Publication of CN115613683A publication Critical patent/CN115613683A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0046Loggias
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The application discloses installation device of restricted space steel vestibule. In the technical scheme, when the steel gallery is installed, the steel gallery is firstly conveyed to the position near the installation position in a loose piece mode, the component materials to be assembled into the steel gallery are hung on the hanging piece, the rotating posture of the track is adjusted through the spherical hinge assembly, the component materials are positioned at a proper height position through the lifting of the hanging piece until the installation components are stacked to a specified position, and then the steel gallery is assembled by the component materials. Not only practiced thrift crane machinery bench working cost, reduced the interim area of taking up an area of construction, solved that steel construction installation working face is little, the place is narrow, can't use hoist and mount machinery scheduling problem, reduced the steel vestibule installation degree of difficulty.

Description

Installation device of limited space steel gallery
Technical Field
The application relates to the technical field of steel vestibule installation, in particular to a mounting device of a limited space steel vestibule.
Background
In the construction field, a lot of reconstruction and extension projects are carried out, and the aim is to optimize the original production process and improve the production efficiency. The original buildings, equipment and the like are dismantled, installed, newly added and the like. The construction is carried out adjacent to various original buildings, the construction site is narrow, various peripheral working systems are complicated, and the hoisting vehicle cannot enter the construction site. Newly-increased steel construction vestibule in this engineering requires to build the top at original old steel construction vestibule, is covered completely by the production facility all around, only has the passageway of pedestrian, and hoist and mount vehicle and large haulage vehicle can't carry out near the place of construction.
In the related technology, most of the steel gallery installation methods are integrally hoisted in place by using a large-tonnage crane. The steel gallery is first divided into sections or sheets at the fabrication site, depending on the size of the vehicle that can be transported. And then, finding an open field near the installation position of the corridor, and splicing the segmented or flaky corridor into a whole by using a small crane. And then, hoisting the assembled vestibule on the support by using a large crane, and carrying out positioning, adjustment and welding.
In general, most steel structure vestibules are more than 20 meters in length and more than 20 tons in weight. However, the method needs to reserve the assembly site of the corridor and the required position of the large crane, and the requirement on the site is high. Meanwhile, the large crane is used more, and the construction cost is correspondingly higher.
Disclosure of Invention
In view of this, this application provides the installation device of restricted space steel vestibule, can effectively reduce the installation degree of difficulty of steel vestibule.
The application provides a mounting device of confined space steel vestibule has hoisting machine and constructs, hoisting machine constructs and includes:
a support platform;
a hanger column supported by the support platform, the hanger column being divided into a first column and a second column by a ball joint assembly, the ball joint assembly being configured to rotate the first and second columns in a plane perpendicular to an axial direction of the hanger column;
the track is fixedly connected with the second column;
the hoisting connecting piece can freely slide along the track;
and the lifting holding piece is arranged on the lifting connecting piece in a lifting way.
Optionally, the component for lifting the hanging piece is a chain block.
Optionally, the ball hinge assembly includes a seat body and a ball rod rotatably inserted into the seat body.
Optionally, the hoisting connector comprises a pulley for being accommodated in a rail, an end cover for mounting the pulley, and a hoisting head for fixedly connecting the end cover.
Optionally, the number of the hoisting mechanisms is two, and the two hoisting mechanisms are respectively located at the left side and the right side of the corridor to be installed.
In the installation device provided above, when the steel gallery is installed, the steel gallery is first transported to the vicinity of the installation position in a loose manner, the component material to be assembled into the steel gallery is hung on the hanger, the rotation posture of the rail is adjusted by the spherical hinge assembly, and the component material is brought into an appropriate height position by the lifting of the hanger until the installation components are stacked to a designated position, thereby completing the assembly of the steel gallery from the component material. Not only practiced thrift crane machinery bench working cost, reduced the interim area of taking up an area of construction, solved that steel construction installation working face is little, the place is narrow, can't use hoist and mount machinery scheduling problem, reduced the steel vestibule installation degree of difficulty.
Drawings
The technical solution and other advantages of the present application will become apparent from the detailed description of the embodiments of the present application with reference to the accompanying drawings.
Fig. 1 is a schematic structural diagram of a hoisting mechanism provided in an embodiment of the present application during hoisting operation.
Fig. 2 is a schematic structural diagram of a hoisting mechanism provided in the embodiment of the present application.
Fig. 3 is a schematic structural diagram of a ball joint assembly according to an embodiment of the present disclosure.
Fig. 4 is a schematic structural diagram of a hoisting connector provided in the embodiment of the present application.
Wherein the elements in the figures are identified as follows:
100-a hoisting mechanism; 110-hanger posts; 111-a first column; 112-a second column; 120-a support platform; 130-a track; 140-hoisting the connecting piece; 141-a pulley; 142-an end cap; 143-hanging head; 150-a ball-and-socket joint assembly; 151-an upper seat body; 152-a lower seat body; 153-club; 154-fastening bolts; 160-hanging piece.
200-vestibule.
Detailed Description
The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. It is to be understood that the embodiments described are only a few embodiments of the present application and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
In the description of the present application, it is to be understood that the terms "first", "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implying any number of technical features indicated. Thus, features defined as "first", "second", may explicitly or implicitly include one or more of the described features. In the description of the present application, "a plurality" means two or more unless specifically limited otherwise.
In the description of the present application, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; may be mechanically connected, may be electrically connected or may be in communication with each other; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meaning of the above terms in the present application can be understood by those of ordinary skill in the art as the case may be.
The following disclosure provides many different embodiments or examples for implementing different features of the application. In order to simplify the disclosure of the present application, specific example components and arrangements are described below. Of course, they are merely examples and are not intended to limit the present application. Moreover, the present application may repeat reference numerals and/or letters in the various examples, such repetition is for the purpose of simplicity and clarity and does not in itself dictate a relationship between the various embodiments and/or configurations discussed. In addition, examples of various specific processes and materials are provided herein, but one of ordinary skill in the art may recognize applications of other processes and/or use of other materials.
Before the technical solutions of the present application are introduced, it is necessary to explain the background of the invention of the present application.
It is common in the related art that most of the steel gallery installation methods are integrally hoisted in place by using a large-tonnage crane. The steel gallery is first divided into sections or slices at the fabrication site, depending on the size of the vehicle that can be transported. And then, finding an open field near the installation position of the corridor, and splicing the segmented or flaky corridor into a whole by using a small crane. And then, hoisting the assembled vestibule on the support by using a large crane, and carrying out positioning, adjustment and welding. In general, most steel structure vestibules are more than 20 meters in length and more than 20 tons in weight. However, the method needs to reserve the assembly site of the corridor and the required position of the large crane, and the requirement on the site is high. Meanwhile, the large crane is used more, and the construction cost is correspondingly higher.
Based on the difficult problem that the inventor realizes the installation difficulty caused by the limited installation space, the inventor provides the installation device of the limited space steel gallery. When the steel gallery is installed, the steel gallery is firstly conveyed to the vicinity of an installation position in a loose piece mode, component materials to be assembled into the steel gallery are hung on a hanging piece, the rotation posture of a track is adjusted through a spherical hinge assembly, the component materials are located at proper height positions through the lifting of the hanging piece until the installation components are stacked to a specified position, and the steel gallery is assembled by the component materials. Not only practiced thrift crane machinery bench working cost, reduced the interim area of taking up an area of construction, solved that steel construction installation working face is little, the place is narrow, can't use hoist and mount machinery scheduling problem, reduced the steel vestibule installation degree of difficulty. Therefore, the invention is created.
With reference to fig. 1 and 2, the present application provides a mounting device for a confined space steel gallery, having a hoisting mechanism 100, said hoisting mechanism 100 comprising:
a support platform 120;
a hanger post 110 supported by the support platform 120, the hanger post 110 being divided into a first post 111 and a second post 112 by a ball joint assembly 150, the ball joint assembly 150 being configured to allow the first and second posts 111, 112 to rotate in a plane perpendicular to an axial direction of the hanger post 110;
a rail 130 fixedly connected to the second column 112;
a hoisting connector 140 capable of freely sliding along the rail 130;
and a lifting member 160 which is arranged on the lifting connecting member 140 in a lifting manner.
As a concrete construction of the lifting and lowering movement of the lifting and lowering member 160, an exemplary implementation is that the component for lifting and lowering the lifting and lowering member 160 is a chain block.
Thus, the lifting of the hanging member 160 can be easily performed by manually pulling the chain block.
As an alternative to the chain block, the component for lifting the hanging member 160 may be a pulley 141.
As yet another alternative to the chain block, the component for lifting the hanging member 160 is an electric hoist.
It should be readily appreciated that the implementation of the hanging member 160 may be a hooked rod, or a mechanical grip, etc.
The "plane perpendicular to the axial direction of the hanger post 110" in the rotation of the first and second posts 111, 112 in the plane perpendicular to the axial direction of the hanger post 110 by the front Wen Qiujiao assembly 150 is a plane perpendicular to the extending direction of the post, i.e. the horizontal plane shown in fig. 2.
Referring to fig. 3, as an exemplary implementation of the spherical hinge assembly 150, the spherical hinge assembly 150 includes a base and a ball rod 153 rotatably inserted into the base.
Therefore, the end of the club 153 not inserted into the seat body is fixedly connected with the second column 112, and the seat body is fixedly connected with the first column 111, so that when the club 153 rotates, the relative rotation of the second column 112 and the first column 111 can be realized.
The base body can adopt a split structure, that is, the base body comprises an upper base body 151, a lower base body 152 and a fastening bolt 154 screwed with the upper base body 151 and the lower base body 152 through the fastening bolt 154.
Referring to fig. 4, as an exemplary implementation of the sliding member, the hoisting connection member 140 includes a pulley 141 for being received in the rail 130, an end cap 142 for mounting the pulley 141, and a hanging head 143 for fixedly connecting the end cap 142.
Thus, the pulley 141 is slidably connected to the rail 130, and the hanging head 143 is fixed to the hanging member 160.
The number of sling mechanisms 100 can be set according to the orientation of the placement of the materials of the components to be assembled into the steel gallery. As a practical situation with wider application, the number of the hoisting mechanisms 100 is two, and the two hoisting mechanisms are respectively positioned at the left side and the right side of the corridor to be installed.
The operation process of the construction method of the application is described in a common application scenario. It should be noted that this common embodiment is not to be taken as an identification basis for understanding the essential features of the technical problem to be solved as claimed in the present application, which is merely exemplary.
The construction process comprises the following steps:
s1, two sets of rotatable hoisting devices are obliquely and symmetrically installed on two sides of a corridor to be installed, and the device can realize lifting, front-back movement and 360-degree direction rotation of a component when the component is hoisted.
S2, after the single component of the corridor is manufactured according to the size requirement of the site (the upper chord crossbeam and the lower chord crossbeam are manufactured into two to three sections according to the size), the single component is conveyed to a construction site to be stacked, and then the single component is conveyed to the lower part of the rotatable device by using a trolley according to the installation sequence.
S3, mounting of a lower chord platform: firstly, hoisting the segmented steel gallery bottom chord cross beam in place, and butting and installing the segmented steel gallery bottom chord cross beam in the air by using two rotatable devices. And then the secondary beam and the platform plate are installed to connect the lower chord platform into a whole.
S4, supporting and installing two sides of the corridor: and then, the rotatable device is used for installing the upright posts on the two sides of the frame, the inclined pull flower and other members.
S5, mounting of the upper chord platform: the installation method is the same as that of the winding platform.
And S6, after the corridor is integrated, aligning the central line and the elevation of the corridor.
It should be noted that the present application makes the following obvious intelligent contributions to the related art:
1. the rotatable device is used for hoisting the component, and solves the problem that the mechanical hoisting cannot be used in a limited space!
2. The components are manufactured and transported to the site without assembling and crane station sites. The problems of narrow construction site and no construction operation surface are solved.
3. The rotatable device can also be used for other steel structure installation projects, the use of large-scale hoisting machinery is saved, and the construction cost is reduced.
The above description is only for the preferred embodiment of the present application, but the scope of the present application is not limited thereto, and any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present application should be covered within the scope of the present application.

Claims (5)

1. The utility model provides a mounting device of confined space steel vestibule which characterized in that has hoisting machine and constructs, hoisting machine constructs and includes:
a support platform;
a hanger column supported by the support platform, the hanger column being divided into a first column and a second column by a ball joint assembly, the ball joint assembly being configured to rotate the first and second columns in a plane perpendicular to an axial direction of the hanger column;
the track is fixedly connected with the second column;
the hoisting connecting piece can freely slide along the track;
and the lifting holding piece is arranged on the lifting connecting piece in a lifting way.
2. The mounting arrangement of claim 1, wherein the means for elevating movement of the lifting member is a chain block.
3. The mounting device of claim 1, wherein the ball-and-socket assembly comprises a base and a ball bar rotatably inserted into the base.
4. The mounting device of claim 1, wherein the hoisting connector comprises a pulley for being received in a rail, an end cap for mounting the pulley, and a hoisting head for fixedly connecting the end cap.
5. The mounting device according to claim 1, wherein the number of the hoisting mechanisms is two, and the two hoisting mechanisms are respectively positioned at the left side and the right side of the corridor to be mounted.
CN202211121912.5A 2022-09-15 2022-09-15 Installation device of limited space steel gallery Pending CN115613683A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211121912.5A CN115613683A (en) 2022-09-15 2022-09-15 Installation device of limited space steel gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211121912.5A CN115613683A (en) 2022-09-15 2022-09-15 Installation device of limited space steel gallery

Publications (1)

Publication Number Publication Date
CN115613683A true CN115613683A (en) 2023-01-17

Family

ID=84858928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211121912.5A Pending CN115613683A (en) 2022-09-15 2022-09-15 Installation device of limited space steel gallery

Country Status (1)

Country Link
CN (1) CN115613683A (en)

Similar Documents

Publication Publication Date Title
US7568575B2 (en) Engine support system
CN109335949B (en) Balance arm lifting appliance and method for lifting steel beam member by using balance arm lifting appliance
AU2016204008A1 (en) Hopper Handling Kit and Apparatus
US9701235B2 (en) Method of mounting a wind turbine
CN115613683A (en) Installation device of limited space steel gallery
CN218950827U (en) H shaped steel is carried and is used fixed knot constructs
CN108390291B (en) Special gallows of outdoor voltage transformer overhauls
CN108099927B (en) Unloading method of super-long steel rail conveying device
CN112605547B (en) Method for mounting flange plate of lifting support of tire crane saddle beam
JP3516056B2 (en) Rotary lift-up construction method for dome roof
CN211141292U (en) Special bracket for integral hoisting of air pipe
CN210064983U (en) High-rise building electromechanical device installation carrying device
CN110002345B (en) Assembly type building automatic hoisting platform based on self-jacking steel platform
CN110848089B (en) Installation jig, method for installing tower drum accessory and tower drum equipment
CN220130895U (en) Wrist arm turnover frame
CN213475233U (en) Double-mast type sliding hoisting system
CN113958131B (en) Suspended ceiling structure of steel structure truss string system roof and construction method thereof
CN212153738U (en) Quick mounting system for cross tie bar
CN211873885U (en) Beam body installation construction device under limit for height condition
CN217417929U (en) Overturning fixture for liquid rocket engine
CN219319011U (en) Supporting device for rotary kiln cylinder
CN216740909U (en) Positioner for assembling and butt-jointing iron tower sections and iron tower
EP3533750B1 (en) Girder beam installation and removal system and method
CN220317191U (en) Jig frame standard knot dismounting device
CN218860148U (en) Special holding pole and lifting system for hoisting shaft of Yangtze river large-span tower

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination