CN115509602A - Project management method, device, equipment and storage medium - Google Patents

Project management method, device, equipment and storage medium Download PDF

Info

Publication number
CN115509602A
CN115509602A CN202211197296.1A CN202211197296A CN115509602A CN 115509602 A CN115509602 A CN 115509602A CN 202211197296 A CN202211197296 A CN 202211197296A CN 115509602 A CN115509602 A CN 115509602A
Authority
CN
China
Prior art keywords
project
information
management information
current
code
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211197296.1A
Other languages
Chinese (zh)
Inventor
常鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Agricultural Bank of China
Original Assignee
Agricultural Bank of China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Agricultural Bank of China filed Critical Agricultural Bank of China
Priority to CN202211197296.1A priority Critical patent/CN115509602A/en
Publication of CN115509602A publication Critical patent/CN115509602A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/70Software maintenance or management
    • G06F8/72Code refactoring
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/70Software maintenance or management
    • G06F8/71Version control; Configuration management

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Security & Cryptography (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a project management method, a project management device, project management equipment and a storage medium. The method comprises the following steps: acquiring a project code under the current version of a project to be managed; extracting information of the project codes to obtain detailed code information; determining current project management information under the current version of the project to be managed according to the detailed code information; acquiring historical project management information under a historical version of a project to be managed; and performing project management on the project to be managed according to the current project management information and the historical project management information. The embodiment of the invention realizes the automatic management of the application items and improves the accuracy of the management of the application items.

Description

Project management method, device, equipment and storage medium
Technical Field
The present invention relates to the field of data processing technologies, and in particular, to a project management method, apparatus, device, and storage medium.
Background
In an IT (Internet Technology ) project implementation process, a plurality of project management processes such as version management, interface management, model management and the like are involved, most of information such as interfaces, models, versions and the like generated in a research and development process is manually managed and checked in a registration management mode, and due to the possibility of information errors in manual management, breakpoints occur in the research and development process and the management process, information deviation occurs between the research and development process and the management process, and difficulty is brought to management of an enterprise information architecture.
Disclosure of Invention
The invention provides a project management method, a project management device, project management equipment and a storage medium, which are used for realizing automatic management of application projects and improving the accuracy of the management of the application projects.
According to an aspect of the present invention, there is provided a project management method, the method including:
acquiring a project code under the current version of a project to be managed;
extracting information of the project code to obtain detailed code information;
determining current project management information under the current version of the project to be managed according to the code detailed information;
acquiring historical project management information under the historical version of the project to be managed;
and performing project management on the project to be managed according to the current project management information and the historical project management information.
According to another aspect of the present invention, there is provided an item management apparatus, the apparatus including:
the project code acquisition module is used for acquiring the project code of the project to be managed under the current version;
the information extraction module is used for extracting the information of the project code to obtain the detailed code information;
a current management information determining module, configured to determine, according to the code detailed information, current project management information in a current version of the project to be managed;
the historical management information acquisition module is used for acquiring historical project management information under the historical version of the project to be managed;
and the project management module is used for performing project management on the project to be managed according to the current project management information and the historical project management information.
According to another aspect of the present invention, there is provided an electronic apparatus including:
at least one processor; and
a memory communicatively coupled to the at least one processor; wherein, the first and the second end of the pipe are connected with each other,
the memory stores a computer program executable by the at least one processor, the computer program being executable by the at least one processor to enable the at least one processor to perform a project management method according to any of the embodiments of the present invention.
According to another aspect of the present invention, there is provided a computer-readable storage medium storing computer instructions for causing a processor to implement a project management method according to any one of the embodiments of the present invention when executed.
The embodiment of the invention obtains the project code of the project to be managed under the current version; extracting information of the project codes to obtain detailed code information; determining current project management information under the current version of the project to be managed according to the detailed code information; acquiring historical project management information under a historical version of a project to be managed; and performing project management on the project to be managed according to the current project management information and the historical project management information. According to the scheme, the interface, the model and the component change generated in the research and development process are automatically managed, the project research and development process and the management process are integrated, the automatic management of the project to be managed is realized, the management difference caused by manual intervention is effectively avoided, and the efficiency and the accuracy of project management are improved.
It should be understood that the statements in this section are not intended to identify key or critical features of the embodiments of the present invention, nor are they intended to limit the scope of the invention. Other features of the present invention will become apparent from the following description.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the description below are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without creative efforts.
FIG. 1A is a flowchart of a project management method according to an embodiment of the present invention;
FIG. 1B is a flow chart of a project management system according to an embodiment of the present invention;
FIG. 1C is a flow chart of a project management system according to an embodiment of the present invention;
FIG. 2 is a schematic structural diagram of a project management apparatus according to a second embodiment of the present invention;
fig. 3 is a schematic structural diagram of an electronic device implementing a project management method according to an embodiment of the present invention.
Detailed Description
In order to make the technical solutions of the present invention better understood, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that the terms "first," "second," and the like in the description and claims of the present invention and in the drawings described above are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It is to be understood that the data so used is interchangeable under appropriate circumstances such that the embodiments of the invention described herein are capable of operation in sequences other than those illustrated or described herein. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
Example one
Fig. 1A is a flowchart of a project management method according to an embodiment of the present invention, where the present embodiment is applicable to a situation where an application project is automatically managed, and the method may be executed by a project management apparatus, where the project management apparatus may be implemented in a form of hardware and/or software, and the project management apparatus may be configured in an electronic device. As shown in fig. 1A, the method includes:
and S110, acquiring the project code of the current version of the project to be managed.
The project to be managed may be an application project which is developed by a developer and is to be managed. At least one version of project code may exist for a project to be managed. For example, a developer may update a project to be managed and generate a new project code after the update, thereby obtaining a corresponding project version.
Project codes for different versions of a project to be managed may be stored in a pre-built code database. And, can store the project code of at least one edition correspondent to project to be managed in the code database; the code database can also store project codes of different versions of other projects to be managed.
For example, the project to be managed may be determined according to actual project management requirements, and the project code of the latest version of the project to be managed may be obtained from the code database.
And S120, extracting information of the project code to obtain detailed code information.
It should be noted that the project code migrated from the code database is written in a compiling language, such as C language or JAVA language, and cannot be directly executed, so that the project code needs to be compiled into a binary file that can be executed.
In an optional embodiment, before extracting information from the item code to obtain code detail information, the method further includes: performing code compiling on the project code to obtain a compiled project code; performing code testing on the compiled project codes; and if the code test is passed, performing information extraction on the project code to obtain detailed code information.
Illustratively, the project code is code compiled to result in compiled project code that can be executed. For example, the file format to which the compiled project code may be executed may be an EXE file.
And performing code test on the compiled project codes to test the correctness of the compiled project codes. For example, the compiled project code may be tested using an existing automated test platform or project management tool, maven. The specific test content may include at least one of a unit integration test, a static detection and interface test, an integration test, a system test, and the like. Alternatively, the portions of the automated test platform or project management tool that cannot be tested may be manually tested by a technician.
Illustratively, if the code test of the project code passes, extracting information of the project code to obtain detailed code information; if the code test on the project code fails, human intervention by relevant and personnel can be performed, and the failure reason can be determined.
The code detailed information may include code annotation, document annotation, test environment data table interface, data entity annotation, component configuration information, and the like. The project code can be obtained by code analysis or information extraction, and part of detailed information can be obtained from a code database to which the project code belongs.
And S130, determining the current project management information under the current version of the project to be managed according to the detailed code information.
The current project management information may be project management information of a project to be managed in a current version. The project management information may include interface management information, model management information, component management information, and the like.
For example, the obtained code detail information may be semantically analyzed by using an existing semantic analysis technology, so as to determine current project management information in a current version of the project to be managed.
In an alternative embodiment, the current project management information includes current interface management information; correspondingly, according to the detailed code information, determining the current project management information of the current version of the project to be managed, including: acquiring a code annotation and a document annotation in the code detailed information; and performing text analysis on the code annotation and the document annotation to obtain the current interface management information of the current version of the project to be managed.
The code annotation may be an annotation of a function, a class, a method, or a functional module in a code project, and is obtained by annotating a project code by a related technician in a development process. The document annotation may be a help document generated to facilitate understanding of the project code by others.
Illustratively, the corresponding code annotation and document annotation may be obtained from the code details parsed from the project code. And carrying out semantic analysis on the code annotation and the document annotation so as to obtain the current interface management information of the current version of the project to be managed. For example, the current interface management information may be the result of semantic parsing of the code annotation and the document annotation.
In an alternative embodiment, the current project management information includes current model management information; correspondingly, according to the detailed code information, determining the current project management information of the current version of the project to be managed, including: acquiring a test environment data table structure and/or a data entity annotation in the code detailed information; and performing text analysis on the test environment data table structure and/or the data entity annotation to obtain the current model management information of the current version of the project to be managed.
The test environment data table structure may include a data model name, a data element configuration, and a specific meaning of each data element. Included in the data entity annotations are model annotations for each data model that have been previously written by the relevant technician.
Illustratively, the corresponding test environment data table structure and data entity annotation may be obtained from a code detail information center that parses from the project code. And performing semantic analysis on the test environment data table structure and/or the data entity annotation so as to obtain the current model management information of the current version of the project to be managed. For example, the current model management information may be the result of semantic parsing of the test environment data table structure and/or data entity annotations.
In an alternative embodiment, the current project management information includes current component management information; correspondingly, according to the detailed code information, determining the current project management information of the current version of the project to be managed, including: acquiring component configuration information in the code detailed information; and performing text analysis on the component configuration information to obtain the current component management information of the current version of the project to be managed.
The component configuration information may be specific configuration information of the code environment variable, such as a component name and a component version.
Illustratively, the corresponding component configuration information may be obtained from a code detail information center that parses from the project code. And carrying out semantic analysis on the component configuration information so as to obtain the current component management information of the current version of the project to be managed. For example, the current component management information may be a result of semantic parsing of the component configuration information.
S140, historical item management information under the historical version of the item to be managed is obtained.
The history item management information may be item management information of an item to be managed in a history version. The history item management information may include history interface management information, history model management information, history component management information, and the like.
And S150, performing project management on the project to be managed according to the current project management information and the historical project management information.
For example, the updated management information of the item to be managed may be determined according to the current item management information and the historical item management information, and the item to be managed may be managed based on the updated management information.
In an optional embodiment, performing project management on the project to be managed according to the current project management information and the historical project management information includes: comparing the current project management information with the historical project management information to generate incremental information of the project to be managed for auditing; and performing project management on the project to be managed corresponding to the increment information which passes the examination.
Illustratively, information comparison is carried out on current project management information and historical project management information to generate incremental information of a project to be managed, the generated incremental information is used for information change registration to allow relevant examination and approval personnel to examine and approve the registered incremental information, and therefore after the examination and approval are completed and passed, information such as a data model, an interface and a component of the project to be managed is deployed in a production environment.
In an alternative embodiment, the historical item management information historical interface management information, historical model management information, and historical component management information; correspondingly, the information comparison is carried out on the current project management information and the historical project management information, and the incremental information of the project to be managed is generated, and the method comprises the following steps: comparing the current interface management information with historical interface management information to obtain interface increment information; comparing the current model management information with the historical model management information to obtain model increment information; comparing the current component management information with the historical component management information to obtain component increment information; and taking the interface increment information, the model increment information and the component increment information as increment information of the project to be managed.
For example, the current interface management information is compared with the historical interface management information, and a difference result of the information comparison is used as interface increment information, where the interface increment information may be interface difference information between the current interface management information and the historical interface management information. Comparing the current model management information with the historical model management information, and taking the difference result of the information comparison as model increment information, wherein the model increment information can be model difference information between the current model management information and the historical model management information; and comparing the current component management information with the historical component management information, and taking the difference result of the information comparison as component increment information, wherein the component increment information can be interface difference information between the current component management information and the historical component management information. And taking the interface increment information, the model increment information and the component increment information as increment information of the project to be managed.
The embodiment of the invention obtains the project code under the current version of the project to be managed; extracting information of the project code to obtain detailed code information; determining current project management information under the current version of the project to be managed according to the detailed code information; acquiring historical project management information under a historical version of a project to be managed; and performing project management on the project to be managed according to the current project management information and the historical project management information. According to the scheme, the interface, the model and the component change generated in the research and development process are automatically managed, the integration of the project research and development process and the management process is realized, the automatic management of the project to be managed is realized, the management difference caused by manual intervention is effectively avoided, and the efficiency and the accuracy of project management are improved.
In an alternative embodiment, a project management method of this embodiment may be executed by a project management system, such as the schematic structural diagram of a project management system shown in fig. 1B. The project management System comprises 8 modules such as a TFS (Taobao File System) working engine, a version management subsystem, a test management subsystem, an interface management subsystem, a model management subsystem, a component management subsystem, a change management subsystem and a production management subsystem.
The TFS workflow engine realizes the automatic extraction, collection and registration of information in the research and development process through the butt joint with each subsystem, and gets through the breakpoints of the research and development process and the management process. The version management subsystem mainly realizes the version management of the application project, including but not limited to the management of contents such as source codes, data models, open source component configuration and the like; the test management subsystem mainly realizes the test management of application items, including but not limited to interface test, function test, performance test, test case library and the like; the interface management subsystem is used for managing interfaces issued by the application projects and the call relation among the systems, and realizing an enterprise-level system interactive view; the model management subsystem is used for managing the data model of the application project, realizing the registration of the management information of the data model and providing support for the research and development process and the management process. The component management subsystem is used for managing the component version management and control of the application system, realizing the information management of the components related to the application and providing a means for the management and control of the basic software. The change management subsystem realizes the control of the flow of the product from the test environment to the production environment and is used for the serial development process and the application production. The production management subsystem mainly completes the management of the production process of the application item, including but not limited to the production online of related contents such as application products, data models, configuration data and the like.
Fig. 1C is a schematic diagram of a project management system.
STEP1, version management and construction management. The method comprises the processes of code sign-out, code compiling, version building and the like. The test management subsystem is used for testing the application items.
STEP2, application project testing. After the code compiling is finished, unit integration test, static inspection, interface test, integration test, system test and the like are realized by using a Maven and an automatic test platform.
STEP3, information extraction. The interface management subsystem, the model management subsystem and the component management subsystem are respectively used for information extraction, and information extraction of the interface, the data model and the dependent component is achieved. The interface utilizes code annotation, document annotation and the like to realize automatic extraction of interface information. The data model is extracted in a mode of reading a data table structure of the test environment or data entity annotation and the like. The dependent component automatically acquires the version of the related component depending on the component configuration information of the system.
STEP4, differential alignment. By comparing the total information acquired in STEP3 with the information in the current interface/model/component management subsystem, incremental information is generated for changing registration.
STEP5, information registration. And calling a registration interface of the interface/model/component management subsystem to register the incremental information.
STEP6, change management registration and approval. And submitting the change information of the interface increment change, the data model increment change and the component increment change to an authorized person for approval.
STEP7, deployment of production environment. After the change approval is completed, the approved application projects, including data models, interfaces and the like, are automatically deployed in the production environment.
Example two
Fig. 2 is a schematic structural diagram of a project management apparatus according to a second embodiment of the present invention. The project management apparatus provided in the embodiment of the present invention is applicable to a situation where an application project is automatically managed, and the project management apparatus may be implemented in a form of hardware and/or software, as shown in fig. 2, and specifically includes: an item code acquisition module 201, an information extraction module 202, a current management information determination module 203, a history management information acquisition module 204, and an item management module 205. Wherein, the first and the second end of the pipe are connected with each other,
an item code obtaining module 201, configured to obtain an item code in a current version of an item to be managed;
the information extraction module 202 is configured to perform information extraction on the project code to obtain code detailed information;
a current management information determining module 203, configured to determine, according to the code detail information, current project management information in a current version of the project to be managed;
a history management information obtaining module 204, configured to obtain history item management information in a history version of the item to be managed;
and the project management module 205 is configured to perform project management on the project to be managed according to the current project management information and the historical project management information.
The embodiment of the invention obtains the project code of the project to be managed under the current version; extracting information of the project codes to obtain detailed code information; determining current project management information under the current version of the project to be managed according to the detailed code information; acquiring historical project management information under a historical version of a project to be managed; and performing project management on the project to be managed according to the current project management information and the historical project management information. According to the scheme, the interface, the model and the component change generated in the research and development process are automatically managed, the project research and development process and the management process are integrated, the automatic management of the project to be managed is realized, the management difference caused by manual intervention is effectively avoided, and the efficiency and the accuracy of project management are improved.
Optionally, the apparatus further comprises:
the code compiling module is used for compiling the project code to obtain a compiled project code before the information of the project code is extracted to obtain the detailed code information;
the code testing module is used for carrying out code testing on the compiling project code;
and the code judging module is used for executing the information extraction of the project code to obtain the detailed code information if the code test passes.
Optionally, the current project management information includes current interface management information;
accordingly, the current management information determining module 203 includes:
the comment acquisition unit is used for acquiring a code comment and a document comment in the code detailed information;
and the first text analysis unit is used for performing text analysis on the code annotation and the document annotation to obtain the current interface management information under the current version of the project to be managed.
Optionally, the current project management information includes current model management information;
accordingly, the current management information determining module 203 includes:
the table structure acquisition unit is used for acquiring a test environment data table structure and/or a data entity annotation in the code detailed information;
and the second text parsing unit is used for performing text parsing on the test environment data table structure and/or the data entity annotation to obtain current model management information of the current version of the item to be managed.
Optionally, the current project management information includes current component management information;
accordingly, the current management information determining module 203 includes:
a configuration information acquisition unit, configured to acquire component configuration information in the code detail information;
and the second text analysis unit is used for performing text analysis on the component configuration information to obtain the current component management information of the current version of the project to be managed.
Optionally, the item management module 205 includes:
the information comparison unit is used for performing information comparison on the current project management information and the historical project management information to generate incremental information of the project to be managed for auditing;
and the project management unit is used for performing project management on the to-be-managed project corresponding to the increment information which passes the examination.
Optionally, the historical item management information includes historical interface management information, historical model management information, and historical component management information;
correspondingly, the information comparing unit includes:
an interface increment information determining subunit, configured to perform information comparison between the current interface management information and the historical interface management information to obtain interface increment information;
a model increment information determining subunit, configured to perform information comparison between the current model management information and the historical model management information to obtain model increment information;
the component increment information determining subunit is used for performing information comparison on the current component management information and the historical component management information to obtain component increment information;
and the increment information determining subunit is used for taking the interface increment information, the model increment information and the component increment information as increment information of the item to be managed.
The project management device provided by the embodiment of the invention can execute the project management method provided by any embodiment of the invention, and has corresponding functional modules and beneficial effects of the execution method.
EXAMPLE III
FIG. 3 shows a schematic block diagram of an electronic device 30 that may be used to implement an embodiment of the invention. Electronic devices are intended to represent various forms of digital computers, such as laptops, desktops, workstations, personal digital assistants, servers, blade servers, mainframes, and other appropriate computers. The electronic device may also represent various forms of mobile devices, such as personal digital assistants, cellular phones, smart phones, wearable devices (e.g., helmets, glasses, watches, etc.), and other similar computing devices. The components shown herein, their connections and relationships, and their functions, are meant to be exemplary only, and are not meant to limit implementations of the inventions described and/or claimed herein.
As shown in fig. 3, the electronic device 30 includes at least one processor 31, and a memory communicatively connected to the at least one processor 31, such as a Read Only Memory (ROM) 32, a Random Access Memory (RAM) 33, and the like, wherein the memory stores a computer program executable by the at least one processor, and the processor 31 may perform various suitable actions and processes according to the computer program stored in the Read Only Memory (ROM) 32 or the computer program loaded from the storage unit 38 into the Random Access Memory (RAM) 33. In the RAM 33, various programs and data necessary for the operation of the electronic apparatus 30 can also be stored. The processor 31, the ROM 32, and the RAM 33 are connected to each other through a bus 34. An input/output (I/O) interface 35 is also connected to bus 34.
A plurality of components in the electronic device 30 are connected to the I/O interface 35, including: an input unit 36 such as a keyboard, a mouse, etc.; an output unit 37 such as various types of displays, speakers, and the like; a storage unit 38 such as a magnetic disk, an optical disk, or the like; and a communication unit 39 such as a network card, modem, wireless communication transceiver, etc. The communication unit 39 allows the electronic device 30 to exchange information/data with other devices via a computer network such as the internet and/or various telecommunication networks.
The processor 31 may be a variety of general and/or special purpose processing components having processing and computing capabilities. Some examples of processor 31 include, but are not limited to, a Central Processing Unit (CPU), a Graphics Processing Unit (GPU), various specialized Artificial Intelligence (AI) computing chips, various processors running machine learning model algorithms, a Digital Signal Processor (DSP), and any suitable processor, controller, microcontroller, or the like. The processor 31 performs the various methods and processes described above, such as the project management method.
In some embodiments, the project management method may be implemented as a computer program tangibly embodied in a computer-readable storage medium, such as storage unit 38. In some embodiments, part or all of the computer program may be loaded and/or installed onto the electronic device 30 via the ROM 32 and/or the communication unit 39. When the computer program is loaded into the RAM 33 and executed by the processor 31, one or more steps of the project management method described above may be performed. Alternatively, in other embodiments, the processor 31 may be configured to perform the project management method by any other suitable means (e.g., by means of firmware).
Various implementations of the systems and techniques described here above may be implemented in digital electronic circuitry, integrated circuitry, field Programmable Gate Arrays (FPGAs), application Specific Integrated Circuits (ASICs), application Specific Standard Products (ASSPs), system on a chip (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and/or combinations thereof. These various embodiments may include: implemented in one or more computer programs that are executable and/or interpretable on a programmable system including at least one programmable processor, which may be special or general purpose, receiving data and instructions from, and transmitting data and instructions to, a storage system, at least one input device, and at least one output device.
A computer program for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general purpose computer, special purpose computer, or other programmable data processing apparatus, such that the computer programs, when executed by the processor, cause the functions/acts specified in the flowchart and/or block diagram block or blocks to be performed. A computer program can execute entirely on a machine, partly on a machine, as a stand-alone software package partly on a machine and partly on a remote machine or entirely on a remote machine or server.
In the context of the present invention, a computer-readable storage medium may be a tangible medium that can contain, or store a computer program for use by or in connection with an instruction execution system, apparatus, or device. A computer readable storage medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any suitable combination of the foregoing. Alternatively, the computer readable storage medium may be a machine readable signal medium. More specific examples of a machine-readable storage medium would include an electrical connection based on one or more wires, a portable computer diskette, a hard disk, a Random Access Memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a compact disc read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
To provide for interaction with a user, the systems and techniques described here can be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to a user; and a keyboard and a pointing device (e.g., a mouse or a trackball) by which a user can provide input to the electronic device. Other kinds of devices may also be used to provide for interaction with a user; for example, feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form, including acoustic, speech, or tactile input.
The systems and techniques described here can be implemented in a computing system that includes a back-end component (e.g., as a data server), or that includes a middleware component (e.g., an application server), or that includes a front-end component (e.g., a user computer having a graphical user interface or a web browser through which a user can interact with an implementation of the systems and techniques described here), or any combination of such back-end, middleware, or front-end components. The components of the system can be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: local Area Networks (LANs), wide Area Networks (WANs), blockchain networks, and the internet.
The computing system may include clients and servers. A client and server are generally remote from each other and typically interact through a communication network. The relationship of client and server arises by virtue of computer programs running on the respective computers and having a client-server relationship to each other. The server can be a cloud server, also called a cloud computing server or a cloud host, and is a host product in a cloud computing service system, so that the defects of high management difficulty and weak service expansibility in the traditional physical host and VPS service are overcome.
It should be understood that various forms of the flows shown above may be used, with steps reordered, added, or deleted. For example, the steps described in the present invention may be executed in parallel, sequentially, or in different orders, and are not limited herein as long as the desired results of the technical solution of the present invention can be achieved.
The above-described embodiments should not be construed as limiting the scope of the invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions may be made in accordance with design requirements and other factors. Any modification, equivalent replacement, and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. A method for project management, comprising:
acquiring a project code under the current version of a project to be managed;
extracting information of the project code to obtain detailed code information;
determining current project management information under the current version of the project to be managed according to the code detailed information;
acquiring historical project management information under the historical version of the project to be managed;
and performing project management on the project to be managed according to the current project management information and the historical project management information.
2. The method of claim 1, wherein before the extracting information from the project code to obtain code detail information, the method further comprises:
compiling the item code to obtain a compiled item code;
performing code testing on the compiled project codes;
and if the code passes the test, executing the information extraction of the project code to obtain the detailed code information.
3. The method of claim 1, wherein the current project management information includes current interface management information;
correspondingly, the determining, according to the code detail information, current project management information under the current version of the project to be managed includes:
acquiring a code annotation and a document annotation in the code detailed information;
and performing text analysis on the code annotation and the document annotation to obtain the current interface management information of the current version of the project to be managed.
4. The method of claim 3, wherein the current project management information includes current model management information;
correspondingly, the determining, according to the code detail information, current project management information under the current version of the project to be managed includes:
acquiring a test environment data table structure and/or a data entity annotation in the code detailed information;
and performing text analysis on the test environment data table structure and/or the data entity annotation to obtain current model management information of the current version of the project to be managed.
5. The method of claim 4, wherein the current project management information comprises current component management information;
correspondingly, the determining, according to the code detail information, current project management information under the current version of the project to be managed includes:
acquiring component configuration information in the code detailed information;
and performing text analysis on the component configuration information to obtain the current component management information of the current version of the project to be managed.
6. The method according to claim 5, wherein said performing item management on the item to be managed according to the current item management information and the historical item management information comprises:
comparing the current project management information with the historical project management information to generate incremental information of the project to be managed for auditing;
and performing project management on the project to be managed corresponding to the increment information which passes the examination.
7. The method of claim 6, wherein the historical item management information historical interface management information, historical model management information, and historical component management information;
correspondingly, the information comparison between the current project management information and the historical project management information to generate incremental information of the project to be managed includes:
comparing the current interface management information with the historical interface management information to obtain interface increment information;
comparing the current model management information with the historical model management information to obtain model increment information;
comparing the current component management information with the historical component management information to obtain component increment information;
and taking the interface increment information, the model increment information and the component increment information as increment information of the project to be managed.
8. An item management apparatus, comprising:
the project code acquisition module is used for acquiring the project code of the project to be managed under the current version;
the information extraction module is used for extracting information of the project codes to obtain detailed code information;
the current management information determining module is used for determining current project management information under the current version of the project to be managed according to the code detailed information;
the historical management information acquisition module is used for acquiring historical project management information under the historical version of the project to be managed;
and the project management module is used for performing project management on the project to be managed according to the current project management information and the historical project management information.
9. An electronic device, characterized in that the electronic device comprises:
at least one processor; and
a memory communicatively coupled to the at least one processor; wherein the content of the first and second substances,
the memory stores a computer program executable by the at least one processor to enable the at least one processor to perform the project management method of any of claims 1-7.
10. A computer-readable storage medium storing computer instructions for causing a processor to perform the project management method of any one of claims 1 to 7 when executed.
CN202211197296.1A 2022-09-29 2022-09-29 Project management method, device, equipment and storage medium Pending CN115509602A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211197296.1A CN115509602A (en) 2022-09-29 2022-09-29 Project management method, device, equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211197296.1A CN115509602A (en) 2022-09-29 2022-09-29 Project management method, device, equipment and storage medium

Publications (1)

Publication Number Publication Date
CN115509602A true CN115509602A (en) 2022-12-23

Family

ID=84507494

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211197296.1A Pending CN115509602A (en) 2022-09-29 2022-09-29 Project management method, device, equipment and storage medium

Country Status (1)

Country Link
CN (1) CN115509602A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115904764A (en) * 2023-03-09 2023-04-04 北京全路通信信号研究设计院集团有限公司 Version management method and device for radio block center

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115904764A (en) * 2023-03-09 2023-04-04 北京全路通信信号研究设计院集团有限公司 Version management method and device for radio block center

Similar Documents

Publication Publication Date Title
CN111061833A (en) Data processing method and device, electronic equipment and computer readable storage medium
CN111309343A (en) Development deployment method and device
CN113360144A (en) Auxiliary processing method, device, storage medium and program product for software development
CN116089258A (en) Data migration test method, device, equipment, storage medium and program product
CN115576828A (en) Test case generation method, device, equipment and storage medium
CN115509602A (en) Project management method, device, equipment and storage medium
CN115599679A (en) Test rule base updating method and device, electronic equipment and storage medium
CN113138767B (en) Code language conversion method, device, electronic equipment and storage medium
CN115269431A (en) Interface testing method and device, electronic equipment and storage medium
CN115048352A (en) Log field extraction method, device, equipment and storage medium
CN114693116A (en) Method and device for detecting code review validity and electronic equipment
CN112328473A (en) Code automation integration test method and device and electronic equipment
CN117806981B (en) CFD software automatic testing method and system
CN115374010A (en) Function testing method, device, equipment and storage medium
CN118051439A (en) API automatic test case generation method and device, electronic equipment and readable medium
CN115238212A (en) Page designated element detection and replacement method, device, equipment and storage medium
CN116737121A (en) Software development management method, device, system, equipment and storage medium
CN115686479A (en) File creation method and related device
CN116955189A (en) Automatic testing method, device and equipment for user interface and storage medium
CN113868215A (en) Log data processing method and device, storage medium and electronic equipment
CN115599422A (en) Component processing method and device, electronic equipment and storage medium
CN115617680A (en) User experience test case generation method, device, equipment and storage medium
CN115495382A (en) Automatic test system, automatic test method, automatic test equipment and storage medium
CN113962382A (en) Training sample construction method and device, electronic equipment and readable storage medium
CN117724980A (en) Method and device for testing software framework performance, electronic equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination