Gasification furnace module and fullerene preparation device Download PDFInfo
- Publication number
- CN115477961A CN115477961A CN202211020107.3A CN202211020107A CN115477961A CN 115477961 A CN115477961 A CN 115477961A CN 202211020107 A CN202211020107 A CN 202211020107A CN 115477961 A CN115477961 A CN 115477961A
- Authority
- CN
- China
- Prior art keywords
- gasifier
- section
- heat exchanger
- gasification furnace
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C10—PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
- C10J—PRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
- C10J3/00—Production of combustible gases containing carbon monoxide from solid carbonaceous fuels
- C10J3/46—Gasification of granular or pulverulent flues in suspension
- C10J3/48—Apparatus; Plants
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B82—NANOTECHNOLOGY
- B82Y—SPECIFIC USES OR APPLICATIONS OF NANOSTRUCTURES; MEASUREMENT OR ANALYSIS OF NANOSTRUCTURES; MANUFACTURE OR TREATMENT OF NANOSTRUCTURES
- B82Y40/00—Manufacture or treatment of nanostructures
-
- C—CHEMISTRY; METALLURGY
- C01—INORGANIC CHEMISTRY
- C01B—NON-METALLIC ELEMENTS; COMPOUNDS THEREOF; METALLOIDS OR COMPOUNDS THEREOF NOT COVERED BY SUBCLASS C01C
- C01B32/00—Carbon; Compounds thereof
- C01B32/15—Nano-sized carbon materials
- C01B32/152—Fullerenes
- C01B32/154—Preparation
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F28—HEAT EXCHANGE IN GENERAL
- F28D—HEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
- F28D21/00—Heat-exchange apparatus not covered by any of the groups F28D1/00 - F28D20/00
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F28—HEAT EXCHANGE IN GENERAL
- F28D—HEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
- F28D21/00—Heat-exchange apparatus not covered by any of the groups F28D1/00 - F28D20/00
- F28D2021/0019—Other heat exchangers for particular applications; Heat exchange systems not otherwise provided for
- F28D2021/0022—Other heat exchangers for particular applications; Heat exchange systems not otherwise provided for for chemical reactors
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Organic Chemistry (AREA)
- Nanotechnology (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Manufacturing & Machinery (AREA)
- Condensed Matter Physics & Semiconductors (AREA)
- Crystallography & Structural Chemistry (AREA)
- Mechanical Engineering (AREA)
- Materials Engineering (AREA)
- Inorganic Chemistry (AREA)
- Thermal Sciences (AREA)
- Combustion & Propulsion (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Processing Of Solid Wastes (AREA)
Abstract
The application relates to a device is prepared to gasifier module and fullerene, wherein, the gasifier module includes: the gasification furnace assembly comprises a gasification furnace and a heat exchanger, the heat exchanger is arranged in the gasification furnace and divides the gasification furnace into a first space and a second space, and a channel for communicating the first space and the second space is arranged between the heat exchanger and the gasification furnace; an electrode assembly at least partially disposed within the first space. The technical scheme of this application has solved the slower problem of the product cooling rate in the gasifier among the prior art effectively.
Description
Technical Field
The application relates to the technical field of fullerene preparation, in particular to a gasifier module and a fullerene preparation device.
Background
At present, with the development of the technology for preparing fullerene, a plurality of methods for preparing fullerene exist. Most methods consume graphite rods or other methods to obtain fullerene carbon powder by arc discharge in a closed gasifier, and cool and store the synthesized fullerene carbon powder, which are all completed in the gasifier.
When carbon powder containing fullerene is produced, carbon dust containing fullerene needs to be synthesized by an arc high-temperature gasification carbon rod, and the produced carbon powder needs to be cooled and stored. There is a certain contradiction between realizing high temperature and cooling protection in a gasification furnace. The synthesis of fullerene requires a high-temperature environment, and a high-temperature region centered on an arc is always present during the synthesis. The resulting fullerenes need to diffuse rapidly away from the arc-centered high temperature region and into a cool region for effective storage. The carbon powder of fullerene is synthesized in an electric arc area and needs to be cooled by diffusion to the periphery, and the diffusion process is relatively slow in a stable space, so that the carbon powder cannot leave a high-temperature area quickly.
The gasification furnace cools the inner wall of the gasification furnace by the introduced cooling water, and a cooled region is formed near the inner wall of the gasification furnace, and the size of the region is related to the size of the space inside the gasification furnace. Because the high-temperature area with the electric arc as the center exists all the time in the synthesis process, when the internal space of the gasification furnace is increased to enlarge the cooling area, the distance of carbon powder diffused to the cooling area is increased, the carbon powder is not beneficial to fast leaving, and when the distance of the compressed carbon powder diffused to the cooling area in the internal space of the gasification furnace is reduced, the cooling effect is reduced. This makes it difficult to satisfy the conditions in the same gasifier at the same time.
Disclosure of Invention
The application provides a device is prepared to gasifier module and fullerene for solve the slower problem of product cooling rate in the gasifier among the prior art.
In order to solve the above problems, the present application provides a gasification furnace module, which includes: the gasification furnace assembly comprises a gasification furnace and a heat exchanger, the heat exchanger is arranged in the gasification furnace and divides the gasification furnace into a first space and a second space, and a channel for communicating the first space and the second space is arranged between the heat exchanger and the gasification furnace; an electrode assembly at least partially disposed within the first space.
Further, the heat exchanger is of an obliquely arranged plate-shaped structure, the angle between the surface of the heat exchanger facing the electrode assembly and the axis of the gasification furnace is alpha, and alpha is more than 0 degrees and less than 90 degrees.
Further, the heat exchanger has a fluid channel, an inlet of the fluid channel is located at a low point of the heat exchanger, and an outlet of the fluid channel is located at a high point of the heat exchanger.
Further, the gasifier subassembly still includes the heat exchanger support, and the heat exchanger support sets up on the inner wall of gasifier, and the heat exchanger supports on the heat exchanger support.
Further, the gasifier subassembly still includes the gas blowing structure, and the gas blowing structure is located first space.
Further, the air blowing structure comprises an air blowing pipe, and the air blowing pipe is arranged on the side edge of the high position of the heat exchanger.
Furthermore, the air blowing pipe comprises an air inlet and an air blowing opening, the air blowing opening faces the surface of the heat exchanger, the angle between the air blowing opening and the surface of the heat exchanger is beta, and the beta is more than 0 degree and less than 90 degrees.
Further, the cross section of gasifier is circular, and the heat exchanger is the ellipse, and the gas blow pipe is the arc with the marginal looks adaptation of heat exchanger, and the gas blow mouth sets up in the one side towards the axis of gasifier.
Furthermore, the distance between the center of the heat exchanger and the graphite rod of the electrode assembly is H, and H is more than or equal to 30mm and less than or equal to 150mm.
Further, the side wall of the gasification furnace is provided with a cooling jacket, and the cooling jacket of the gasification furnace is provided with a cooling medium inlet and a cooling medium outlet.
Further, the gasifier subassembly still includes the reducing structure, and the reducing structure sets up the discharge gate at the gasifier, and the inner wall smooth transition of the inner wall of reducing structure and the discharge gate of gasifier, the internal diameter of reducing structure include by advancing to the direction that goes out and set up contraction section, stationary section and expansion section.
Further, the bottom of the gasification furnace is a tapered section which gradually shrinks, and the diameter of a large opening of the tapered section is the same as that of an outlet of the tapered section.
Further, the reducing structure includes flange, sleeve and sleeve briquetting, and flange is connected with gasifier detachably, and flange at least part is embedded in with the gasifier, and the sleeve is embedded in flange, and the sleeve briquetting links to each other with flange to fix the sleeve in flange.
Further, the bottom of gasifier has the discharge gate of drum section in order to form the gasifier, flange includes the linkage segment, flange board section and erection segment, the linkage segment is outstanding in the first side of flange board section, the erection segment is outstanding in the second side of flange board section, the outer wall of linkage segment and the inner wall looks adaptation of the discharge gate of gasifier, the inner wall of linkage segment is the same with the inclination of the inner wall of toper section, the inner wall of erection segment is cylindric, telescopic outer wall has the step, the external diameter that the sleeve is close to one side of gasifier is greater than the external diameter that the sleeve keeps away from one side of gasifier, the sleeve includes first sleeve section, second sleeve section and third sleeve section, the internal diameter of first sleeve section shrinks gradually, the internal diameter of second sleeve section is the same, the internal diameter of third sleeve section enlarges gradually, the inclination of the inner wall of first sleeve section is the same with the inclination of the inner wall of linkage segment and sets up with the linkage segment is adjacent.
Furthermore, the gasifier module also comprises a diffusion bin, the diffusion bin is connected with the connecting flange, the volume of the diffusion bin is 60-130 times of that of the gasifier, and the diameter of the inlet of the diffusion bin is 6-28 times of that of the outlet of the reducing structure.
Further, the wall surface of the diffusion bin is provided with a cooling channel.
Further, the diffusion bin is also provided with a purging structure, and an outlet of the purging structure is arranged on the inner wall surface of the diffusion bin.
According to another aspect of the application, the fullerene preparation device further comprises a gasification furnace module, and the gasification furnace module is the gasification furnace module.
Compared with the prior art, the technical scheme provided by the application has the following advantages:
according to the technical scheme, the electrode assembly reacts in the first space, and the product generated by the reaction is rapidly cooled through the heat exchanger, so that the yield of the product can be improved. The heat exchanger separates the inner space of gasifier for first space and second space, and the temperature in the second space is less than first space, can play like this and cool off the product that generates fast, has improved the effect of the productivity of product. The technical scheme of the application has solved the slower problem of product cooling speed in the gasifier among the prior art effectively.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the invention and together with the description, serve to explain the principles of the invention.
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without inventive exercise.
FIG. 1 illustrates a schematic internal structural view of a gasifier assembly of the present application;
FIG. 2 shows a schematic partial cross-sectional view of the gas sparge pipe and heat exchanger of the gasifier assembly of FIG. 1;
fig. 3 is a schematic view showing an internal structure of a heat exchanger of the gasification furnace assembly of fig. 1;
FIG. 4 shows a schematic overall construction of the gasifier assembly of FIG. 1;
FIG. 5 illustrates a schematic view of a reducing configuration of the gasifier assembly of FIG. 1;
FIG. 6 is a schematic structural view of a sleeve of the reducing structure of FIG. 5;
FIG. 7 illustrates a schematic view of the mounting structure of the insulation assembly of the present application;
FIG. 8 shows a schematic view of the internal structure of the insulation assembly of FIG. 7;
fig. 9 shows a schematic structural view of a collecting member of the apparatus for producing fullerenes of the present application;
fig. 10 shows a schematic of the construction of the filtering collection canister body of the collection assembly of fig. 9.
Wherein the figures include the following reference numerals:
10. a gasifier component; 11. a gasification furnace; 12. a heat exchanger; 13. a heat exchanger support; 14. an air blowing pipe; 141. an air blowing port; 15. a diameter-variable structure; 151. a connecting flange; 152. a sleeve; 153. pressing a sleeve; 16. a diffusion bin; 17. the arc generating device is connected with the flange; 20. an electrode assembly; 30. an insulating assembly; 31. blowing the flange; 311. a flange body; 3111. a first body section; 3112. a second body section; 312. a gas channel; 32. an insulating sleeve; 321. a first sleeve section; 322. a second sleeve section; 33. a purge channel; 331. a first gap; 332. a second gap; 333. a third gap; 40. a collection assembly; 41. a collection tank structure; 411. a collection storage tank; 412. a first valve; 413. a buffer tank; 414. a second valve; 42. a transfer transport structure; 421. a filtering and collecting tank body; 4211. filtering and collecting the tank body; 4212. a filter screen; 422. a spiral rolling brush; 423. transferring the tank body; 424. transferring the rolling brush; 43. a negative pressure suction port; 100. a first space; 200. a second space.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are some embodiments of the present application, but not all embodiments. All other embodiments obtained by a person of ordinary skill in the art based on the embodiments in the present application without making creative efforts shall fall within the protection scope of the present application.
As shown in fig. 1 to 6, the gasification furnace module of the present embodiment includes: a gasifier assembly 10 and an electrode assembly 20. The gasification furnace assembly 10 includes a gasification furnace 11 and a heat exchanger 12, the heat exchanger 12 is disposed in the gasification furnace 11 and divides the gasification furnace 11 into a first space 100 and a second space 200, and a passage communicating the first space 100 and the second space 200 is provided between the heat exchanger 12 and the gasification furnace 11. The electrode assembly 20 is at least partially disposed within the first space 100.
By applying the technical scheme of the embodiment, the electrode assembly 20 reacts in the first space 100, and the product generated by the reaction is rapidly cooled by the heat exchanger 12, so that the yield of the product can be improved. The heat exchanger 12 divides the inner space of the gasification furnace 11 into a first space 100 and a second space 200, and the temperature in the second space 200 is lower than that in the first space 100, so that the generated product can be cooled rapidly, and the yield of the product can be improved. The technical scheme of the application has solved the slower problem of product cooling speed in the gasifier among the prior art effectively.
It should be noted that the cooling function of the heat exchanger 12 is not only in the second space 200, but also the heat exchange temperature of the first space 100 in the heat exchanger 12 is rapidly decreased.
As shown in fig. 1, in the solution of the present embodiment, the heat exchanger 12 is a plate-shaped structure that is disposed obliquely, and the angle between the surface of the heat exchanger 12 facing the electrode assembly 20 and the axis of the gasification furnace 11 is α,0 ° < α < 90 °. The structure is beneficial to falling of products, carbon powder and other substances, namely the carbon powder and the products can be attached to the surface of the heat exchanger 12 when entering the second space 200 from the first space 100, and the carbon powder and the products can more easily enter the second space 200 under the action of gravity and purging through the obliquely arranged heat exchanger 12. More specifically, in the present embodiment, the angle α is set between 20 ° and 70 °, and the above structure is compact, and the landing effect and other comprehensive factors are good.
As shown in fig. 1 and fig. 2, in the solution of the present embodiment, the heat exchanger 12 has a fluid channel, an inlet of the fluid channel is located at a low point of the heat exchanger 12, and an outlet of the fluid channel is located at a high point of the heat exchanger 12. The heat exchanger 12 has better heat exchange effect, for example, the low point of the heat exchanger 12 has lower temperature than the high point of the heat exchanger 12, and the fluid flows from the low point of the low temperature to the high point of the high temperature, so that the heat exchange efficiency is higher. Specifically, the fluid channels are in an S shape with the ends communicating with each other, and the structure further improves the heat exchange efficiency of the heat exchanger 12.
As shown in fig. 1 and fig. 2, in the technical solution of the present embodiment, the gasification furnace assembly 10 further includes a heat exchanger support 13, the heat exchanger support 13 is disposed on an inner wall of the gasification furnace 11, and the heat exchanger 12 is supported on the heat exchanger support 13. The arrangement of the heat exchanger support 13 prevents the heat exchanger 12 from being directly fixed on the inner wall of the gasification furnace 11, and the heat exchanger 12 is directly fixed on the inner wall of the gasification furnace 11 to damage the overall structure, stress strain and the like of the gasification furnace 11. The inclination angle of the heat exchanger 12 can be adjusted by the up-and-down movement of the heat exchanger support 13, and the structure is easy to set, for example, the heat exchanger support 13 is connected with the inner wall of the gasification furnace through a fastener, and the angle adjustment of the heat exchanger 12 can be realized by adjusting different heights of the connection between the heat exchanger support 13 on one side of the heat exchanger 12 and the gasification furnace 11.
As shown in fig. 1 and fig. 2, in the solution of the present embodiment, the gasification furnace assembly 10 further includes a gas blowing structure, and the gas blowing structure is located in the first space 100. The blowing structure can blow off the attachments on the heat exchanger 12, and the product (fullerene) and carbon powder are prevented from being accumulated on the heat exchanger 12 due to the arrangement of the blowing structure. The fullerene and other substances enter the second space 200 from the first space 100, and the blowing structure is positioned in the first space 100 to be more beneficial to blowing off the fullerene.
As shown in fig. 1 and fig. 2, in the solution of the present embodiment, the air blowing structure includes an air blowing pipe 14, and the air blowing pipe 14 is disposed at a high side of the heat exchanger 12. The structure is convenient to set, the processing cost is low, and the purging effect is good. A gap is formed between the outer edge of the heat exchanger 12 and the inner wall of the gasification furnace 11, and substances such as fullerene enter the second space 200 from the surface of the first space 100 or the heat exchanger 12 under the action of actions such as purging, negative pressure, gravity and the like.
As shown in fig. 1 and fig. 2, in the solution of this embodiment, the blowing pipe 14 includes an air inlet and a blowing port 141, the blowing port 141 faces the surface of the heat exchanger 12, the angle between the blowing port 141 and the surface of the heat exchanger 12 is β, and β is greater than 0 ° < β < 90 °. The air blowing port 141 is angled with respect to the surface of the heat exchanger 12, which is more advantageous for blowing off substances such as fullerene. In the technical scheme of this embodiment, the value range of angle beta is between 10 to 40, and such angle setting sweeps the area bigger, and the effort is bigger, and the effect of sweeping is better.
As shown in fig. 1 and fig. 2, in the solution of this embodiment, the cross section of the gasification furnace 11 is circular, the heat exchanger 12 is elliptical, the air blowing pipe 14 is arc-shaped and adapted to the edge of the heat exchanger 12, and the air blowing opening 141 is arranged at one side facing the axis of the gasification furnace 11. The structure further ensures the purging area, and the purging of the gas blowing pipe 14 can fully cover the surface of the heat exchanger 12.
As shown in fig. 1, in the solution of the present embodiment, the distance between the center of the heat exchanger 12 and the graphite rod of the electrode assembly 20 is H, where H is greater than or equal to 30mm and less than or equal to 150mm. The selection of the distance integrates the factors such as the production rate of the product, the cooling effect, the space distance and the like, and ensures that the finished product rate of the fullerene is high.
As shown in fig. 4 and 5, in the present embodiment, the side wall of the gasification furnace 11 has a cooling jacket, and the cooling jacket of the gasification furnace 11 has a cooling medium inlet and a cooling medium outlet. The arrangement of the cooling jacket is more favorable for realizing rapid cooling, thereby ensuring that the yield of the fullerene is higher.
As shown in fig. 5 and fig. 6, in the technical solution of this embodiment, the gasification furnace assembly 10 further includes a reducing structure 15, the reducing structure 15 is disposed at the discharge port of the gasification furnace 11, an inner wall of the reducing structure 15 and an inner wall of the discharge port of the gasification furnace 11 are in smooth transition, and an inner diameter of the reducing structure 15 includes a contraction section, a stationary section and an expansion section disposed in a direction from the entrance to the exit. The arrangement of the reducing structure 15 is more beneficial to the substances such as fullerene, carbon powder and the like to enter the diffusion bin 16 from the gasification furnace 11 under the action of negative pressure, gravity and the like. The arrangement of the contraction section enables the position of the air flow at the reducing structure 15 to be enhanced, so that the acting force on the fullerene, the carbon powder and the like can be enhanced, and further the fullerene and the carbon powder can be favorably separated from the gasification furnace 11.
As shown in fig. 5, in the technical solution of this embodiment, the bottom of the gasification furnace 11 is a tapered section that gradually shrinks, and the diameter of the large opening of the tapered section is the same as the diameter of the outlet of the tapered section. The transition of 11 inner structure of gasifier has been guaranteed to above-mentioned structure, has avoided the inside of gasifier 11 to appear structures such as step, and the step structure can cause piling up of materials such as fullerene and carbon dust, and smooth transition has all been adopted to the inside and matched with structure of the gasifier 11 of the technical scheme of this embodiment, is difficult for causing piling up of fullerene and carbon dust.
As shown in fig. 5 and fig. 6, in the solution of the present embodiment, the reducing structure 15 includes a connecting flange 151, a sleeve 152, and a sleeve pressing block 153, the connecting flange 151 is detachably connected to the gasification furnace 11, the connecting flange 151 is at least partially embedded in the gasification furnace 11, the sleeve 152 is embedded in the connecting flange 151, and the sleeve pressing block 153 is connected to the connecting flange 151 and fixes the sleeve 152 in the connecting flange 151. The structure is convenient to disassemble and assemble and convenient to maintain. In addition, the arrangement of the reducing structure 15 can be adjusted according to the requirement, for example, the inner diameter d of the stable section can be adjusted by selecting a proper sleeve 152 according to the requirement.
As shown in fig. 5 and fig. 6, in the technical solution of this embodiment, the bottom of the gasification furnace 11 has a cylindrical section to form a discharge port of the gasification furnace 11, the connection flange 151 includes a connection section, a flange plate section and an installation section, the connection section protrudes from a first side of the flange plate section, the installation section protrudes from a second side of the flange plate section, an outer wall of the connection section is adapted to an inner wall of the discharge port of the gasification furnace 11, an inner wall of the connection section has the same inclination angle as an inner wall of the tapered section, an inner wall of the installation section is cylindrical, an outer wall of the sleeve 152 has a step, an outer diameter of a side of the sleeve 152 close to the gasification furnace 11 is larger than an outer diameter of a side of the sleeve 152 far away from the gasification furnace 11, the sleeve 152 includes a first sleeve section, a second sleeve section and a third sleeve section, an inner diameter of the first sleeve section gradually shrinks, an inner diameter of the second sleeve section is the same as an inner diameter of the second sleeve section, an inner diameter of the third sleeve section gradually enlarges, an inclination angle of an inner wall of the first sleeve section is the same as an inclination angle of an inner wall of the connection section and is adjacent to the connection section. As can be seen from the above, the small holes in the technical solution of the present embodiment have a large pressure difference, which is beneficial to the rapid diffusion of carbon powder, fullerene and other substances, and the inert gas is supplemented through the gas inlet of the plasma of the electrode assembly 20; the conicity of the contraction section and the expansion section of the embodiment is between 30 degrees and 60 degrees, the smaller the conicity is, the smaller the resistance is, and if a plane is generated, the falling of substances such as fullerene is not facilitated.
As shown in fig. 4, in the technical solution of this embodiment, the gasification furnace module further includes a diffusion bin 16, the diffusion bin 16 is connected to the connection flange 151, the volume of the diffusion bin 16 is 60 times to 130 times of the volume of the gasification furnace 11, and the diameter of the inlet of the diffusion bin 16 is 6 times to 28 times of the diameter of the outlet of the reducing structure 15. The diffusion chamber 16 is arranged to quickly reduce the speed of the fullerene and other substances passing through the reducing structure 15, and the wall surface of the diffusion chamber 16 is provided with a cooling jacket, so that the fullerene and other substances can be ensured to have enough cooling time in the diffusion chamber 16.
As shown in fig. 4, in the solution of the present embodiment, the wall surface of the diffusion chamber 16 has a cooling channel. The wall surface of the diffusion bin 16 is set to be a jacket structure, so that the cooling effect of the diffusion bin 16 is ensured, and the diffusion bin 16 has no blocking structure or a structure which is easy to attach fullerene. Specifically, the diffusion bin 16 is further provided with a purging structure, and an outlet of the purging structure is arranged on the inner wall surface of the diffusion bin 16. This allows the fullerene adhering to the wall surface of the diffusion chamber 16 to be blown out. The diffusion chamber 16 comprises two sections: the upper diffusion bin and the lower diffusion bin are connected through flanges, the upper diffusion bin and the lower diffusion bin are both provided with cooling jackets, and the cooling jacket of the upper diffusion bin and the cooling jacket of the lower diffusion bin are independent respectively.
The following is detailed in terms of experimental conditions:
experiment one: the apparatus was operated without installing a quenching device (heat exchanger 12). And adjusting parameters of an arc generating device, setting the current to be 300A, setting the voltage to be 70V, and setting the running power of the equipment to be about 21KW. Run time 1 hour. And opening a vacuum pump to vacuumize the gasification furnace 11, introducing inert gas, and operating an arc generation device to synthesize fullerene. And after the equipment stops running, collecting the produced carbon dust for analysis, wherein the comprehensive yield of the fullerene in the carbon dust is 3.4%.
Experiment two: a quenching device is installed in the gasification furnace, the height H of the quenching device in the gasification furnace is adjusted to be 50mm, and the axial angle alpha between the quenching device and an arc generating device (the upper part of the gasification furnace) is 45 degrees. And meanwhile, the periphery of the quenching device is adjusted to form a uniform gap with the inner wall of the gasification furnace. And a cooling pipeline arranged in the gasification furnace is respectively connected with a cooling water inlet and a cooling water outlet arranged on the quenching device, so that cooling water is introduced into the quenching device. And after the installation is finished, sealing the gasification furnace. Adjusting the parameters of the arc generating device, setting the current to be 300A, the voltage to be 70V and the equipment running power to be about 21KW, and synthesizing the fullerene under the same conditions. The run time was 1 hour. And opening a vacuum pump to vacuumize the gasification furnace, introducing inert gas, and operating an electric arc generating device to synthesize fullerene. In the operation process, the quenching device is observed through the observation window, after moving to the surface of the quenching device, some carbon powder enters the cooling area (the second space 200) along with the airflow, some carbon powder can be attached to the surface of the quenching device, and the carbon powder attached to the surface of the quenching device is continuously increased along with the increase of the generated carbon powder. And after the equipment stops running, collecting the generated carbon dust for analysis, wherein the comprehensive yield of the fullerene in the obtained carbon dust is 6.2%. After several repeated experiments under the same conditions, the yield of the fullerene does not change greatly and fluctuates about 0.5%.
Experiment three: a quenching device is installed in the gasification furnace, the height H of the quenching device in the gasification furnace 1 is adjusted to be 50mm, and the axial angle alpha between the quenching device and the arc generating device is 45 degrees. And meanwhile, the periphery of the quenching device is adjusted to form a uniform gap with the inner wall of the gasification furnace. And a cooling pipeline arranged in the gasification furnace is respectively connected with a cooling water inlet and a cooling water outlet arranged on the quenching device, so that cooling water is introduced into the quenching device. And the cold air blowing device is arranged and is connected with an air inlet arranged on the cold air blowing device through a gas pipeline. And after the installation is finished, sealing the gasification furnace. The parameters of the whole arc generating device are that the current is set to be 300A, the voltage is 70V, the equipment running power is about 21KW, and the fullerene is synthesized under the same conditions. The run time was 1 hour. And opening a vacuum pump to vacuumize the gasification furnace, introducing inert gas, and operating an electric arc generating device to synthesize fullerene. During synthesis, the valve connected to the pipeline of the cold air blower is opened to let the cold air blower pass gas. The gas is blown to the surface of the quenching device through a plurality of blowing holes which are arranged on the cold gas blowing device and form an angle beta with the quenching device. In the operation process, the quenching device is observed through the observation window, carbon powder rapidly enters a cooling area on the surface of the quenching device along with the working of the cold air blowing device, a small amount of carbon dust can be attached to the edge of the quenching device, and the attached carbon dust is not obviously increased along with the operation of equipment. And after the equipment stops running, collecting the generated carbon dust for analysis, wherein the comprehensive yield of the fullerene in the carbon dust is 8.3%. The yield of fullerene does not fluctuate much after several repeated experiments under the same conditions.
As demonstrated by the above examples, the cooling effect is increased and a portion of the soot enters the cooling zone after the addition of the quenching device. And a part of the carbon powder is attached to the surface of the quenching device and stays in the high-temperature area, and the fullerene in the carbon powder has secondary reaction in the high-temperature environment. The fullerene in the carbon powder entering the cooling area is preserved. So that the fullerene content in the carbon dust is increased to a certain extent. After the quenching device and the cold air blowing device are installed at the same time, the carbon dust rapidly cooled leaves the high-temperature area rapidly, and after entering the cooling area, most of fullerene in the carbon dust is stored. Thus, the yield of the fullerene is improved.
Fig. 4 is an assembly diagram of the gasification furnace, which mainly includes a lower conical section (lower diffusion chamber) of the diffusion cooling chamber, an upper section (upper diffusion chamber) of the diffusion cooling chamber, the gasification furnace 11, a carbon rod guide structure of the electrode assembly 20, a reducing pumping block (sleeve 152), a reducing block pressing cover (sleeve pressing block 153), a vacuum valve, and the like. The diffusion cooling bin consists of a lower conical section of the diffusion cooling bin and an upper section of the diffusion cooling bin, and the middle of the diffusion cooling bin is connected through a flange. The lower conical section of the diffusion cooling bin and the upper section of the diffusion cooling bin are of double-layer structures, and a plurality of cooling water inlets and a plurality of cooling water outlets are formed in the lower conical section of the diffusion cooling bin and the upper section of the diffusion cooling bin and used for introducing cooling water into the interlayer. The lower conical section of the diffusion cooling bin is connected with a vacuum valve so as to be connected with equipment such as a vacuum pump. The top flange of the upper section of the diffusion cooling bin is connected with the gasification gasifier, so that the gasification gasifier and the diffusion cooling bin are integrated. The gasification furnace has a double-layer structure and is provided with a plurality of cooling water inlets and outlets (not shown in the figure) for introducing cooling water into the interlayer. The top of the gasification furnace is provided with an electric arc generating device connecting flange 17 for connecting an electric arc generating device. The gasifier is provided with carbon-point guide structure and is used for installing the graphite rod. The gasification furnace is provided with an observation window for observing the synthesis condition in the gasification furnace. Vacuum pressure detection ports are arranged on the gasification furnace and the diffusion cooling bin (the diffusion bin 16) and are respectively used for connecting a pressure sensor of the diffusion cooling bin and a pressure sensor of the gasification furnace. The lower end of the gasification furnace is provided with a reducing air pumping block which is fixed on the gasification furnace through a reducing block gland. The reducing air extraction block is provided with a small hole with the diameter of d, and the gasification furnace and the diffusion cooling bin are separated into two spaces through the reducing air extraction block. The space volume of the gasification furnace is relatively small, and the sum of the internal space volume of the diffusion cooling bin (diffusion bin 16) and the internal space of other accessory equipment is about 100 times of the internal space of the gasification furnace. The inner diameter of the upper diffusion bin is about 1000 mm.
Before the equipment runs, the electric arc generating device is arranged at the connecting flange 17 of the electric arc generating device, a graphite rod guide rod connecting flange arranged on the gasification furnace is connected with an upper carbon rod guide device (carbon rod guide structure) and a transmission mechanism of a graphite rod, and the graphite rod is arranged. And the vacuum valve connected with the air exhaust connecting flange at the lower end of the diffusion cooling bin is connected to a vacuum pump through a vacuum pipeline so as to filter the collecting device.
When the equipment is in operation, the electric arc generating device in the gasification furnace gasifies the graphite rod to synthesize carbon dust containing fullerene, and the carbon dust enters the diffusion cooling bin through the small holes arranged on the reducing air extraction block to be cooled. Because the space of the gasification furnace is smaller than the volume in the diffusion cooling bin, the data detected by the pressure sensor of the diffusion cooling bin and the pressure sensor of the gasification furnace shows that the pressure in the gasification furnace is higher than the pressure in the diffusion cooling bin, so that the airflow containing carbon powder in the gasification furnace can quickly enter the diffusion cooling bin. The diffusion cooling bin is isolated from the gasification furnace through the reducing air pumping block, and a high-temperature region taking the electric arc as the center cannot enter the diffusion cooling bin, so that the cooling effect in the diffusion cooling bin is ensured. The diffusion cooling bin is in a vacuum state, and the pressure is lower than the pressure in the gasification furnace. After the gas containing the carbon dust enters the diffusion cooling bin, the gas can be rapidly diffused for cooling. This provides an effect of accelerating the rapid exit of the toner and rapid cooling, thereby better preserving the fullerene after the formation. The diameter of the middle hole of the variable diameter air extraction block is increased by adjusting the pressure in the gasification furnace and the pressure in the diffusion cooling bin, so that the resistance of the middle hole to the carbon powder is reduced while the pressure difference of two spaces exists. Wherein, the diameter of the middle hole of the reducing air pumping block 5 is more than 5mm.
The application also provides a device is prepared to fullerene. The fullerene preparation device further comprises a gasification furnace module, and the gasification furnace module is the gasification furnace module.
Usually only one or a few graphite rod electrodes can be installed at a time as consumable graphite rod electrodes. During the operation, carbon dust containing fullerene is synthesized, and since the synthesis furnace (gasification furnace) is sealed, the carbon dust adheres to the inner wall of the synthesis furnace, the surface of the insulating member, and the like. As graphite is a conductive material, with the continuous increase of carbon dust, the carbon dust attached to each part in the synthetic furnace is continuously increased, and the carbon dust attached to the surface of an insulating part (an insulating sleeve) is also continuously increased, so that the insulation failure is caused, and the equipment cannot normally operate. Because the efficiency of preparing fullerene by an electric arc method is low, only one or a plurality of graphite rods can be consumed each time, the quantity of generated carbon powder is not large, the insulation failure time can be properly slowed down by the methods of increasing the labyrinth insulation for isolation and the like through the surface area of an insulating part, but the insulation failure condition can occur after the quantity of the carbon powder is increased. After the insulation fails, the synthesis furnace needs to be disassembled, the insulation part and the synthesis furnace inside are cleaned, and after the cleaning is finished, a series of work such as closing the synthesis furnace, vacuumizing, filling inert gas and the like is carried out again, so that normal synthesis work can be carried out. The process can be carried out only after the temperature in the synthesis furnace reaches the room temperature, so that a large amount of time is wasted, the production efficiency is reduced, and the production cost is increased.
As shown in fig. 7 and 8, the insulating assembly 30 of the present embodiment is connected to the gasification furnace 11. The insulation assembly 30 includes: a purge flange 31 and an insulating sleeve 32. The purge flange 31 includes a flange body 311 and a gas passage 312, the gas passage 312 is provided in the flange body 311, and a gas inlet of the gas passage 312 is provided in an outer wall surface of the purge flange 31. The insulating sleeve 32 is disposed between the purge flange 31 and the gasification furnace 11, and the gas outlet of the gas passage 312 is disposed on the side of the purge flange 31 facing the insulating sleeve 32. Wherein, the electrode sleeve can pass through the purging flange 31 and the insulating sleeve 32 and extend into the gasification furnace 11, and the gas outlet of the gas channel 312 to the gasification furnace 11 is provided with a purging channel 33.
According to the technical scheme of the embodiment, the gas channel 312 is arranged in the flange body 311 of the blowing flange 31, and the gas outlet of the gas channel 312 faces the insulating sleeve 32, so that substances attached to the insulating sleeve 32, such as carbon dust, carbon powder and fullerene, can be blown off, and the insulating performance of the insulating sleeve 32 is further ensured. The gas channel 312 has a purge channel 33 from the gas outlet to the gasification furnace 11, so that the adhered substances can be purged into the gasification furnace, thereby avoiding the waste of the substances and polluting the environment. The technical scheme of this application has solved the problem of the insulation failure between electrode and gasifier among the prior art effectively.
As shown in fig. 8, in the solution of the present embodiment, the flange body 311 includes a first body section 3111 and a second body section 3112, inner diameters of the first body section 3111 and the second body section 3112 are the same, an outer diameter of the first body section 3111 is larger than an outer diameter of the second body section 3112, and the gas outlet of the gas passage 312 is disposed at a circumferential outer side of the second body section 3112. The gas outlet that sets up gas channel 312 has been made things convenient for in setting up of second body section 3112, and in addition, the processing burden can also be reduced in the setting of first body section 3111 and second body section 3112, for example, only is higher to the machining precision of first body section 3111 towards one side of insulating cover 32, and need not improve holistic machining precision.
As shown in fig. 7 and 8, in the solution of the present embodiment, the gas outlet of the gas channel 312 is multiple, and the multiple gas outlets are disposed at the connection position of the first body section 3111 and the second body section 3112 at intervals. The arrangement of the plurality of air outlets improves the purging area of the gas channel 312, and further ensures the insulation effect of the insulation sleeve 32. It should be noted that, in the technical solution of this embodiment, the gas channel 312 is a gas inlet, and a plurality of gas outlets are uniformly arranged at intervals along the circumferential direction of the flange body 311. Parameters such as flow and pressure of the gas can be adjusted according to the requirement to meet the requirement of purging.
As shown in fig. 8, in the solution of this embodiment, the insulating sleeve 32 includes a first sleeve section 321 and a second sleeve section 322 which are integrally formed, an inner diameter of the first sleeve section 321 is larger than an inner diameter of the second sleeve section 322, and a side of the first sleeve section 321 facing the purge flange 31 is connected with a side of the first body section 3111 facing the insulating sleeve 32 in a sealing manner. A sealing ring is arranged between the side of the first sleeve section 321 facing the purging flange 31 and the side of the first body section 3111 facing the insulating sleeve 32, and the sealing performance of the insulating assembly 30 is ensured by the structure. It should be noted that, the first body section 3111 and the second body section 3112 are matched with the first sleeve section 321 and the second sleeve section 322, so that not only can sealing be well realized, but also smooth purging can be realized. The insulating assembly 30 can be monitored in real time by arranging a sensor, and the start and stop of the purging can be controlled according to the monitored condition, for example, the purging is started when the insulating property of the insulating sleeve 32 is lower than a set threshold, and the purging is stopped when the insulating property of the insulating sleeve 32 is higher than the set threshold, and the purged gas is inert gas. Of course, a real-time, uninterrupted purge may also be performed.
As shown in fig. 8, in the solution of the present embodiment, a first gap 331 is formed between an inner wall of the first sleeve section 321 and an outer wall of the second body section 3112, a second gap 332 is formed between a side of the second sleeve section 322 facing the second body section 3112 and a side of the second body section 3112 facing the second sleeve section 322, a third gap 333 is formed between an inner wall of the second sleeve section 322 and an outer wall of the electrode sleeve, and the first gap 331, the second gap 332 and the third gap 333 form the purge channel 33. The structure is compact and reasonable, and the adhesion and accumulation of substances such as carbon dust and the like are not easy to occur. The inner diameter of the first sleeve section 321 is greater than the outer diameter of the second body section 3112, and the first sleeve section 321 is located circumferentially outward of the second body section 3112.
As shown in fig. 8, in the solution of the present embodiment, the width of the second gap 332 is greater than or equal to the width of the first gap 331, and the width of the third gap 333 is greater than the width of the second gap 332. The purge passage 33 having the above-described structure is less likely to be clogged, and for example, the width of the purge passage 33 from the start end to the end increases, and the substances adhered to the wall surface of the insulating sheath 32 and the wall surface of the electrode sheath are more likely to be blown off. Specifically, the width of the first gap 331 is between 2mm and 5mm, the width of the second gap 332 is between 2mm and 7mm, and the width of the third gap 333 is between 5mm and 10 mm.
As shown in fig. 7 and 8, in the present embodiment, the circumferential outer side of the insulating sheath 32 has an annular groove. The provision of the annular groove on the one hand reduces the weight and on the other hand gives the insulating sleeve 32 a certain elastic deformation.
As shown in fig. 7 and 8, in the solution of the present embodiment, the material of the insulating sheath 32 is insulating ceramic. The insulating ceramic is a material of the insulating sheath 32, and is not easily adhered with substances such as carbon dust. As another embodiment, the material of the insulating sheath 32 may be teflon.
The gas channel 312 further includes a gas inlet section, a gas buffer section and a gas outlet section which are sequentially communicated with each other, the gas buffer section is located in the purging flange 31, and both the cross-sectional area of the gas inlet section and the cross-sectional area of the gas outlet section are smaller than the cross-sectional area of the gas buffer section. The structure ensures that the purging airflow is relatively stable.
As shown in fig. 9 and 10, the apparatus for producing fullerene according to the present embodiment includes: a gasifier assembly 10 and a collection assembly 40. The gasifier component 10 has a discharge port and a gas replenishment port. The collection assembly 40 includes a collection tank structure 41 and a transfer structure 42, the transfer structure 42 is communicated between the gasifier assembly 10 and the collection tank structure 41, and the transfer structure 42 has a negative pressure suction interface.
The technical scheme of this embodiment, produce the product in the gasifier subassembly 10, collect subassembly 40 through the mechanical structure of transporting transport structure 42, the effort and the gravity of negative pressure etc. collect foretell product to collecting in the storage tank structure 41, avoided like this to adopt the brush to clean, scrape, shovel etc. the way through the manual work and collect the product that generates, manpower and materials have been saved to above-mentioned structure, have improved work efficiency, avoid the harm to operation personnel and environment. The technical scheme of the embodiment effectively solves the problems that the preparation of fullerene in the prior art wastes time and labor during collection and pollutes the environment.
The gas replenishment port is filled with an inert gas.
As shown in fig. 9, in the technical solution of this embodiment, the transferring and conveying structure 42 includes a filtering and collecting tank 421 and a spiral rolling brush 422, the filtering and collecting tank 421 is a cylindrical structure, the spiral rolling brush 422 is installed on the filtering and collecting tank 421 through a first end of the filtering and collecting tank 421, and a second end of the filtering and collecting tank 421 is communicated with the collecting tank structure 41. The separation of gas and product can be realized well to the collection jar body 421 of filtering, and material such as adnexed product can be swept away in spiral round brush 422's setting, and then has guaranteed the collection of material such as carbon dust, carbon dust and fullerene.
As shown in fig. 9 and fig. 10, in the technical solution of this embodiment, the filtration collection tank 421 includes a filtration collection tank body 4211 and a filter screen 4212, the filter screen 4212 is disposed on a side wall of the filtration collection tank body 4211, the negative pressure suction port 43 is located on the side wall of the filtration collection tank body 4211, the length of the spiral rolling brush 422 is greater than the length of the filter screen 4212, and the negative pressure suction port 43 is located on a side of the filter screen 4212 away from the spiral rolling brush 422. The structure can easily sweep off substances such as carbon dust, carbon powder, fullerene and the like attached to the filter screen. It should be noted that the mesh number of the filter screen 4212 is smaller than the diameter of the product particles, and the filter screen 4212 is convenient to set and is beneficial to separating the product particles. It should be noted that the negative pressure suction port is provided with a valve.
As shown in fig. 9, in the technical solution of this embodiment, the sidewall of the filtering and collecting tank 421 is further provided with a first blowing opening, and the first blowing opening is located on one side of the filter screen away from the spiral rolling brush 422. The structure further ensures the separation of products, and is beneficial to blowing off the products attached to the filter screen 4212 and the filtering and collecting tank body 4211. It should be noted that the first purge port is provided with a valve.
As shown in fig. 9, in the technical solution of this embodiment, the spiral rolling brush 422 includes a first motor, a first rolling shaft and a first rolling brush, the first motor is installed on the filtering and collecting tank 421, an output shaft of the first motor is connected to the first rolling brush, the first rolling brush is spirally disposed on a circumferential outer side of the first rolling shaft, and an end portion of the first rolling brush cleans a side wall of the filtering and collecting tank 421. The structure has lower processing cost and convenient operation. It should be noted that the length of the filter screen 4212 refers to the length along the axial direction of the filtration collection tank 421, and the filter screen 4212 forms a part of the side wall of the partial filtration collection tank 421. In this embodiment, the filtering and collecting tank 421 is vertically disposed.
As shown in fig. 9, in the technical solution of this embodiment, the transferring and conveying structure 42 further includes a transferring tank 423 and a transferring roller brush 424, the transferring tank 423 is connected between the filtering and collecting tank 421 and the collecting assembly 40, and the transferring roller brush 424 is disposed on the transferring tank 423 to clean the inner wall of the transferring tank 423. The transfer transport structure 42 facilitates the positioning of the collection tank 411, such as space issues, height placement issues, and the like.
As shown in fig. 9, in the technical solution of this embodiment, the transfer tank 423 has a cylindrical structure, the transfer brush 424 is mounted on the transfer tank 423 through the first end of the transfer tank 423, the inlet of the transfer tank 423 and the outlet of the transfer tank 423 are both disposed on the side wall of the transfer tank 423, the inlet of the transfer tank 423 is close to the first end of the transfer tank 423, and the outlet of the transfer tank 423 is close to the second end of the transfer tank 423. Therefore, the products can be guaranteed to move and be collected according to the preset track as much as possible.
As shown in fig. 9, in the technical solution of this embodiment, the transfer roller 424 includes a second motor, a second roller and a second roller, the second motor is installed on the transfer tank 423, an output shaft of the second motor is connected to the second roller, the second roller is spirally disposed on an outer side of the second roller in a circumferential direction, and an end of the second roller cleans a side wall of the transfer tank 423. The structure has the advantages of low processing cost and convenient operation. It should be noted that the axis of the spiral rolling brush 422 is vertically arranged, the axis of the transfer rolling brush 424 is horizontally arranged, the brush of the spiral rolling brush 422 and the brush of the transfer rolling brush 424 are both spirally arranged, and the spiral direction is to push the products and other substances to move towards the outlet direction when cleaning.
As shown in fig. 9, in the solution of the present embodiment, the collecting tank structure 41 includes a collecting tank 411 and a first valve 412, and the collecting tank 411 is connected to the transferring and transporting structure 42 through the first valve 412. The first valve 412 is arranged to cut off the communication, and the structure has two collecting methods, and the collecting tank 411 can be removed after the collection; alternatively, the valve and the collecting tank 411 may be transferred together after the collection is completed, so that the material in the collecting tank 411 does not escape to the outside of the collecting tank 411, and the external material does not enter the collecting tank 411 to contaminate the material in the collecting tank 411.
As shown in fig. 9, in the technical solution of this embodiment, the collecting storage tank structure 41 further includes a buffer tank 413 and a second valve 414, the buffer tank 413 is a cylindrical structure, a first end of the buffer tank 413 is connected to the first valve 412, and a second end of the buffer tank 413 is connected to the transferring and transporting structure 42 through the second valve 414. The above structure can realize the function of buffer collection, for example, when the collection tank 411 finishes collecting and there is product, the buffer tank 413 can perform temporary collection. The buffer tank 413 is provided with a purge port, and the purge port is provided with a valve.
According to fig. 9, it can be seen from the above description that one end of the air inlet valve is connected to the filtering and collecting tank 421, and the other end of the air inlet valve is connected to the gasification furnace through a pipeline. One end of the air outlet valve is connected with the filtering and collecting tank 421, and the other end of the air outlet valve (the negative pressure suction port 43) is connected with a vacuum pump through a pipeline to perform air suction. Through the pump-out of vacuum pump, the carbon dust that has fullerene in the gasifier enters into the filtration collection jar body along with the flow of gas through the air inlet valve, and gas is followed gas outlet valve department after the filter screen, discharges after getting into the vacuum pump through the pipeline. Wherein, the power precision of the filter screen is less than 1 μm, and the material of the filter screen is nickel-chromium alloy or titanium alloy, and can also be other filtering materials. The remaining carbon dust remains on the inner walls of the filter screen and the filter collection tank 421. The magnetic fluid is driven by the first motor to drive the spiral rolling brush (the first rolling brush) to rotate in a sealing transmission mode, carbon dust attached to the inner wall of the filtering and collecting tank body and the filter screen is cleaned, and the cleaned carbon dust falls into the transferring and conveying structure 42. Through the transport spiral round brush (second round brush) in carbon powder transport mechanism (transport structure 42), transport carbon powder buffer storage jar (buffer tank 413) to the carbon powder, through vacuum valve B (first valve 412), the carbon powder falls into carbon powder storage jar (collection storage tank 411). During operation, the direction of gas flow is in the direction of the arrows. During operation, both vacuum valve A (second valve 414) and vacuum valve B (first valve 412) are open so that toner falls into the toner reservoir. The filter screen is installed in filtering the collection tank body, seals through the sealing washer, prevents that the carbon dust from entering into in the exhaust duct through the filter core. The inlet and the outlet of the filtering and collecting tank body are provided with vacuum pressure detection interfaces, and the blockage degree of the filter screen and the quantity of carbon powder in the gas are detected through the pressure difference between the gas outlet pressure sensor and the gas inlet pressure sensor which are arranged on the filtering and collecting tank body. After the pressure difference is greater than the set value, open a plurality of admission valves of setting on filtering the collection jar body, let in inert gas and clear up the filter screen. The vacuum valve a of the inlet valve needs to be closed before the inlet valve is opened. The gas inlet valve is closed to prevent the carbon dust from returning to the gasification furnace through gas flow and entering the high-temperature reaction area, so that the produced fullerene can carry out secondary reaction, and the yield is reduced. And closing the vacuum valve A to prevent the carbon dust in the buffer storage tank and the carbon powder storage tank from entering the filtering and collecting tank body again.
Since the filtering and collecting processes are performed in a vacuum environment, the sealing performance of the device needs to be ensured, and meanwhile, the inert gas atmosphere in the sealed environment cannot be destroyed. There are two methods for collecting and transporting the collected carbon powder without destroying the inert gas atmosphere:
the method comprises the following steps: when carbon dust in the carbon powder storage tank reaches the time of just needing to shift away after a certain amount, at this moment close vacuum valve B, the carbon dust of transferring through carbon powder transport mechanism will fall into in the buffer storage tank, can not continue to enter into in the carbon powder storage tank through carbon powder buffer storage tank. By inertia provided on the carbon powder storage tankAnd the gas inlet is used for filling inert gas into the carbon powder storage tank to normal pressure, the carbon powder storage tank is disassembled after carbon ash in the carbon powder storage tank is stable for a period of time, the outlet of the carbon powder storage tank is rapidly sealed, and the carbon powder storage tank filled with carbon powder is transferred away after the sealing is finished. While a toner storage tank without toner is installed. After the carbon powder storage tank is installed, the vacuum pump is connected through a vacuum valve K2, the carbon powder storage tank is vacuumized, and when the pressure in the carbon powder storage tank is smaller than 1 multiplied by 10 -3 And after Pa, stopping air extraction. And filling inert gas into the carbon powder storage tank through an inert gas inlet arranged on the carbon powder storage tank, and stopping filling gas when the pressure value is consistent with the pressure sensor of the gas inlet. And opening the vacuum valve B, so that the carbon dust in the buffer storage tank can fall into the carbon powder storage tank.
The second method comprises the following steps: just need the transfer away after the carbon dust in the carbon dust holding tank reaches a certain amount, at this moment close vacuum valve A, the carbon dust of transferring through carbon dust transfer mechanism will fall into with carbon dust transfer mechanism and vacuum valve A in the pipeline in the middle of, can not continue to enter into in the carbon dust holding tank through the buffer storage jar. And closing the vacuum valve B, filling inert gas into the buffer storage tank to normal pressure through an inert gas inlet arranged on the buffer storage tank, detaching the joint between the buffer storage tank and the vacuum valve B after the carbon ash in the buffer storage tank is stable for a period of time, connecting the carbon powder storage tank with the vacuum valve B, and enabling the vacuum valve B to be in a closed state. In the process of disassembly, a dust suction device needs to be installed to quickly suck away carbon powder floating out of the pipeline, so that the injury to personnel is prevented. Keeping the vacuum state in the carbon powder storage tank, and transporting away the carbon powder storage tank filled with the carbon powder and the vacuum valve B in a closed state. Therefore, the negative pressure transfer of the collected carbon powder is realized, and the carbon powder is prevented from flying out to cause harm to human bodies and the environment while the carbon powder is prevented from contacting with air. When the carbon powder is transferred, a carbon powder storage tank without carbon powder and a vacuum valve B are arranged. After the installation is finished, the vacuum valve B is in an open state, the vacuum valve K1 arranged on the buffer storage tank is connected with a vacuum pump, and the carbon powder storage tank and the buffer storage tank are vacuumizedWhen the vacuum pressure in the toner storage tank and the buffer storage tank is less than 1 x 10 -3 And after Pa, stopping air extraction. And filling inert gas into the carbon powder storage tank and the buffer storage tank through an inert gas inlet arranged on the buffer storage tank, and stopping filling gas when the pressure value is consistent with the pressure sensor of the gas inlet. And opening the vacuum valve A, and allowing carbon dust in the carbon powder transfer mechanism to fall into the carbon powder storage tank which is replaced again through the buffer storage tank.
It is noted that, in this document, relational terms such as "first" and "second," and the like, may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrases "comprising one of 8230; \8230;" 8230; "does not exclude the presence of additional like elements in a process, method, article, or apparatus that comprises the element.
The foregoing are merely exemplary embodiments of the present invention, which enable those skilled in the art to understand or practice the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims (18)
1. A gasifier module, characterized in that the gasifier module comprises:
the gasifier assembly (10) comprises a gasifier (11) and a heat exchanger (12), the heat exchanger (12) is arranged in the gasifier (11) and divides the gasifier (11) into a first space (100) and a second space (200), and a channel for communicating the first space (100) with the second space (200) is arranged between the heat exchanger (12) and the gasifier (11);
an electrode assembly (20), the electrode assembly (20) being at least partially disposed within the first space (100).
2. The gasifier module according to claim 1, characterized in that the heat exchanger (12) is a plate-like structure disposed obliquely, and the angle of the surface of the heat exchanger (12) facing the electrode assembly (20) with the axis of the gasifier (11) is α,0 ° < α < 90 °.
3. The gasifier module according to claim 2, characterized in that the heat exchanger (12) has a fluid channel with an inlet at a low point of the heat exchanger (12) and an outlet at a high point of the heat exchanger (12).
4. A gasifier module according to claim 2, characterized in that the gasifier assembly (10) further comprises a heat exchanger bracket (13), the heat exchanger bracket (13) being arranged on an inner wall of the gasifier (11), the heat exchanger (12) being supported on the heat exchanger bracket (13).
5. The gasifier module according to claim 2, wherein the gasifier assembly (10) further comprises a gas blowing structure located within the first space (100).
6. The gasifier module according to claim 5, characterized in that the gas blowing structure comprises a gas blowing pipe (14), and the gas blowing pipe (14) is arranged at the high side of the heat exchanger (12).
7. The gasifier module according to claim 6, characterized in that the gas blow pipe (14) comprises a gas inlet and a gas blow port (141), the gas blow port (141) faces the surface of the heat exchanger (12), the gas blow port (141) is at an angle β with the surface of the heat exchanger (12), 0 ° < β < 90 °.
8. The gasification furnace module according to claim 6, wherein the gasification furnace (11) is circular in cross section, the heat exchanger (12) is elliptical, the gas blowing pipe (14) is arc-shaped to fit with the edge of the heat exchanger (12), and the gas blowing port (141) is provided on the side facing the axis of the gasification furnace (11).
9. A gasifier module according to claim 2, characterized in that the center of the heat exchanger (12) is at a distance H,30mm ≦ H ≦ 150mm from the graphite rods of the electrode assembly (20).
10. The gasifier module according to claim 1, wherein the sidewall of the gasifier (11) has a cooling jacket, the cooling jacket of the gasifier (11) having a cooling medium inlet and a cooling medium outlet.
11. The gasifier module according to any one of claims 1 to 10, wherein the gasifier assembly (10) further comprises a reducing structure (15), the reducing structure (15) is disposed at the discharge port of the gasifier (11), an inner wall of the reducing structure (15) is in smooth transition with an inner wall of the discharge port of the gasifier (11), and an inner diameter of the reducing structure (15) comprises a contraction section, a stationary section and an expansion section which are disposed from an inlet direction to an outlet direction.
12. The gasifier module according to claim 11, characterized in that the bottom of the gasifier (11) is a tapered section that gradually shrinks, and the large mouth of the shrinking section has the same diameter as the outlet of the tapered section.
13. The gasifier module according to claim 12, wherein the reducing structure (15) comprises a connecting flange (151), a sleeve (152) and a sleeve pressure block (153), the connecting flange (151) is detachably connected with the gasifier (11), the connecting flange (151) is at least partially embedded in the gasifier (11), the sleeve (152) is embedded in the connecting flange (151), and the sleeve pressure block (153) is connected with the connecting flange (151) and fixes the sleeve (152) in the connecting flange (151).
14. The gasification furnace module as claimed in claim 13, wherein the bottom of the gasification furnace (11) is provided with a cylindrical section to form a discharge port of the gasification furnace (11), the connecting flange (151) comprises a connecting section, a flange plate section and a mounting section, the connecting section protrudes from a first side of the flange plate section, the mounting section protrudes from a second side of the flange plate section, an outer wall of the connecting section is matched with an inner wall of the discharge port of the gasification furnace (11), an inner wall of the connecting section has the same inclination angle as that of an inner wall of the tapered section, the inner wall of the mounting section is cylindrical, an outer wall of the sleeve (152) has a step, an outer diameter of one side of the sleeve (152) close to the gasification furnace (11) is larger than an outer diameter of one side of the sleeve (152) far away from the gasification furnace (11), the sleeve (152) comprises a first sleeve section, a second sleeve section and a third sleeve section, an inner diameter of the first sleeve section gradually shrinks, an inner diameter of the second sleeve section is the same as that of the inner wall of the connecting section, and the inner wall of the first sleeve section has the same inclination angle as that of the inner wall of the connecting section and the inner wall of the connecting section.
15. The gasifier module according to claim 13, further comprising a diffusion bin (16), wherein the diffusion bin (16) is connected to the connection flange (151), wherein the volume of the diffusion bin (16) is 60 to 130 times the volume of the gasifier (11), and wherein the diameter of the inlet of the diffusion bin (16) is 6 to 28 times the diameter of the outlet of the reducing structure (15).
16. The gasifier module according to claim 15, characterized in that the wall of the diffusion bin (16) has cooling channels.
17. The gasifier module according to claim 15, characterized in that the diffusion bin (16) is further provided with a purging structure, the outlet of which is provided at the inner wall surface of the diffusion bin (16).
18. A fullerene preparation apparatus, further comprising a gasification furnace module according to any one of claims 1 to 17.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211020107.3A CN115477961A (en) | 2022-08-24 | 2022-08-24 | Gasification furnace module and fullerene preparation device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211020107.3A CN115477961A (en) | 2022-08-24 | 2022-08-24 | Gasification furnace module and fullerene preparation device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115477961A true CN115477961A (en) | 2022-12-16 |
Family
ID=84422250
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202211020107.3A Pending CN115477961A (en) | 2022-08-24 | 2022-08-24 | Gasification furnace module and fullerene preparation device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115477961A (en) |
-
2022
- 2022-08-24 CN CN202211020107.3A patent/CN115477961A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1809715A (en) | Condensing heat exchanger with gas/air heat exchanger | |
CN115477961A (en) | Gasification furnace module and fullerene preparation device | |
CN115321522A (en) | Fullerene processing method and fullerene preparation device | |
CN115321521A (en) | Device for preparing fullerene | |
CN115448292A (en) | Insulating assembly, device for preparing fullerene and method for preparing fullerene | |
CN115321523A (en) | Collecting assembly for preparing fullerene and device for preparing fullerene | |
CN212883013U (en) | Boiler flying dust sampling device of thermal power factory | |
CN217961694U (en) | Dust remover with blowback function | |
CN211963412U (en) | Bag type dust collector | |
CN214842554U (en) | Dust removal system for high-carbon ferrochrome smelting process | |
CN211885950U (en) | Flame-retardant low-pressure pulse bag dust collector of electric melting magnesium smelting furnace | |
CN215276274U (en) | Quick dust collecting device of box resistance furnace | |
CN111111942A (en) | Boiler flying dust sampling device of thermal power factory | |
CN217988675U (en) | Full-automatic dust discharging and sealing device of pulse bag-type dust collector | |
CN205698527U (en) | Medicine roasting machine assembly | |
CN219433312U (en) | Smoke discharging structure with waste heat recovery function | |
CN219400569U (en) | Cylinder type electric dust remover | |
CN218706007U (en) | Feeding device of industrial waste gasification furnace | |
CN217449351U (en) | Dust recovery device is used in zinc oxide production | |
CN221777031U (en) | Powder conveying device | |
CN221505765U (en) | Gasification furnace for coal chemical industry | |
CN219064180U (en) | Waste heat utilization structure for metal casting production | |
CN115851294B (en) | Dustproof pyrolysis oil gas outlet anti-blocking self-cleaning device | |
CN115382864B (en) | Gas pipe ash discharging device for biomass gasification furnace | |
CN216638168U (en) | Feeding device for pneumatic conveying device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|