CN115450441A - Green building energy-saving wallboard installation auxiliary structure - Google Patents

Green building energy-saving wallboard installation auxiliary structure Download PDF

Info

Publication number
CN115450441A
CN115450441A CN202211095750.2A CN202211095750A CN115450441A CN 115450441 A CN115450441 A CN 115450441A CN 202211095750 A CN202211095750 A CN 202211095750A CN 115450441 A CN115450441 A CN 115450441A
Authority
CN
China
Prior art keywords
frame
seat
fixed mounting
auxiliary structure
green building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202211095750.2A
Other languages
Chinese (zh)
Other versions
CN115450441B (en
Inventor
彭作泉
李岭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Dawei Construction And Installation Engineering Co ltd
Original Assignee
Shandong Dawei Construction And Installation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Dawei Construction And Installation Engineering Co ltd filed Critical Shandong Dawei Construction And Installation Engineering Co ltd
Priority to CN202211095750.2A priority Critical patent/CN115450441B/en
Publication of CN115450441A publication Critical patent/CN115450441A/en
Application granted granted Critical
Publication of CN115450441B publication Critical patent/CN115450441B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/26Strutting means for wall parts; Supports or the like, e.g. for holding in position prefabricated walls
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to the technical field of auxiliary wall board mounting tools, in particular to an auxiliary energy-saving wall board mounting structure for a green building. The invention improves the installation accuracy, ensures that the wallboard does not tilt forward in the installation process, and simultaneously ensures the stability in the supporting and installation process.

Description

Green building energy-saving wallboard installation auxiliary structure
Technical Field
The invention relates to the technical field of auxiliary wallboard mounting tools, in particular to an auxiliary structure for mounting an energy-saving wallboard of a green building.
Background
Carry out interim simple and easy room through the wallboard and build the in-process on open air soil, for making the wallboard be upright state and control adjacent wallboard and install mutually, people can adopt the bracing piece bracing to support the wallboard to order about the wallboard and keep upright state, this kind of support operation is difficult to ensure the wallboard and is in the vertical state at the support in-process, thereby influences subsequent installation degree of accuracy.
Disclosure of Invention
The invention aims to solve the defects in the background art and provides an auxiliary structure for mounting an energy-saving wall plate of a green building.
In order to achieve the purpose, the invention adopts the technical scheme that: the utility model provides a green building energy-saving wallboard installation auxiliary structure, includes the seat frame, the perpendicular piece that props is installed to the upper end of seat frame, the lower terminal surface of seat frame is close to the position of corner and installs the universal wheel, thorn firmware has been run through to install at the up end corner of seat frame, the shape of seat frame is L shape.
Preferably, prop the top piece perpendicularly and include two sets of connected channel racks of symmetry fixed mounting at the preceding terminal surface of seat frame, it is two sets of connect the inside of channel rack to rotate respectively and install two sets of L shape frame, it is two sets of the tip of L shape frame is inlayed respectively and is had two sets of grudging posts, L shape frame and grudging post integrated into one piece are two sets of fixed mounting has even solid frame between the opposite face middle part position of grudging post, the upper end middle part of seat frame is provided with the threaded rod, the surface of threaded rod is screwed and is had the promotion thread bush, promote the thread bush and be connected with the roof-rack even between solid frame, the roof-rack is the slope setting.
Preferably, the department extends to have the fixed block behind the up end of seat frame, the threaded rod runs through to rotate and inlays in the inboard of fixed block, the front end of threaded rod rotates with the upper end front edge department of seat frame to be connected, the coaxial fixed mounting in rear end of threaded rod has a hand wheel No. one, the up end that promotes the thread bush extends there is the engaging lug No. two, extend in the middle part of the rear end face of company's solid frame has the engaging lug No. one, two sets of recesses have been seted up respectively at the both ends of roof-rack, the inside in the lower extreme recess of roof-rack is installed in the rotation of engaging lug No. two, the inside in the upper end recess of roof-rack is installed in the rotation of engaging lug No. one.
Preferably, it is two sets of it has the fixed plate to inlay between the opposite face top edge department of grudging post, the upper end mid-rotation of fixed plate installs the propulsion frame, the front end of propulsion frame is inlayed and is had the mount, propulsion frame and mount integrated into one piece, the lower tip fixed mounting of mount has the pressure seat, the rear end face fixed mounting who presses the seat has the compression projection, the rear end fixed mounting of propulsion frame has a balancing weight, the rear of fixed plate is provided with the top and moves the screw thread post, the upper end of top and move the screw thread post is opened and is established to the sphere, the top is moved the upper end top of screw thread post and is tightly in the lower terminal surface of propulsion frame.
Preferably, compress tightly the projection and press seat integrated into one piece, it has the frame of stretching out to extend in the middle part of the rear end face of company's solid frame, the tip that stretches out the frame is inlayed and is had No. two L shape framves, the lower terminal surface of No. two L shape framves runs through to inlay and has the connecting thread cover, the top is moved the screw thread post and is screwed in the inboard of connecting thread cover.
Preferably, the coaxial fixed mounting in lower tip of top thread post has No. two hand wheels, it has the concave frame to link up the up end middle part fixed mounting of solid frame, promote the frame and rotate the inside of installing in the concave frame, stretch out frame and No. two L shape frame integrated into one piece, grudging post side is provided with the vertical location rope, the lower tip fixed mounting of vertical location rope has No. two balancing weights.
Preferably, the rear end upper portion fixed mounting of grudging post has the seat of stretching out, the side of stretching out the seat is run through to inlay and is had the projecting shaft, the surface of projecting shaft rotates and installs rings, the lower terminal surface fixed mounting of rings has the connection convex frame, the vertical positioning rope runs through and installs in the lower terminal surface of connecting convex frame.
Preferably, thorn firmware is including running through the rod cover of inlaying in the up end corner of seat frame, the dead lever is installed in the inside laminating of rod cover, the lower extreme of dead lever is the taper setting, the upper end coaxial of dead lever is provided with strikes the dish, the inboard surface upper portion of rod cover is provided with the internal thread, the external screw thread has been seted up at the surface middle part of dead lever, the external screw thread of dead lever closes with the internal thread of rod cover mutually soon.
Compared with the prior art, the invention has the following beneficial effects:
1. through the vertical stay piece that sets up, can observe the vertical location rope that is in the vertical state of being flare-outed by No. two balancing weights under the effect of gravity, rotate the threaded rod this moment, remove in order to order about promotion thread bush, and then drive the roof-rack motion and promote even solid frame, thereby order about two sets of grudging post synchronous motion, in order to adjust the grudging post to the state that parallels with the vertical location rope under the vertical state, ensure promptly that the grudging post is in the vertical state, in order to carry out the in-process that supports to the wallboard, ensure that the wallboard is in the vertical state, improve the installation accuracy with this.
2. Simultaneously can directly move the screw thread post to the top and rotate to order about the top and move the screw thread between the screw thread post utilization and the connecting thread cover and shift up, in order to promote the rear end portion of pushing away the frame at last in-process that moves, in order to order about the rotation of pushing away the frame, thereby drive and press the seat to overturn, in order to order about to press the projection that compresses tightly on the seat to compress tightly on the wallboard, make the wallboard can be pressed and cover on the grudging post, in order to ensure that the wallboard phenomenon that leans forward can not appear in the installation.
3. Through the thorn firmware that sets up, can rotate the dead lever earlier, make the screw thread between dead lever and the rod cover close partial phase separation soon to ensure that the dead lever can be normal move down, strike the dish afterwards, in order to order about the dead lever to pierce into the soil layer under the effect of knocking force, in order to consolidate the seat frame, in order to ensure to support the in-process seat frame of installation to the wallboard and can not appear shifting phenomenon, with this steadiness when guaranteeing to support the installation.
Drawings
FIG. 1 is a schematic structural diagram of an auxiliary structure for installing an energy-saving wall panel of a green building according to the present invention;
FIG. 2 is a schematic view of a vertical positioning rope of the auxiliary structure for installing the energy-saving wall panel of the green building;
FIG. 3 is a schematic view of a pushing frame of the auxiliary structure for installing the energy-saving wall panel of the green building;
FIG. 4 is a schematic view of another perspective of the installation auxiliary structure of the energy-saving wall panel for green buildings according to the present invention;
FIG. 5 is a cross-sectional view of a fixing rod of the auxiliary structure for mounting energy-saving wallboards of green buildings according to the invention;
FIG. 6 is a schematic view of a threaded rod of the auxiliary structure for mounting the energy-saving wall panel for green buildings according to the invention;
fig. 7 is a schematic view of the auxiliary structure for mounting the energy-saving wall panel of the green building at the position of a top-moving threaded column.
In the figure: 1. a seat frame; 2. connecting the slot frame; 3. a first L-shaped frame; 4. erecting a frame; 5. a connecting and fixing frame; 6. vertically positioning the rope; 7. pressing a base; 8. a fixed mount; 9. a pushing frame; 10. a fixing plate; 11. a threaded rod; 12. a universal wheel; 13. a fixing rod; 14. a top frame; 15. a first balancing weight; 16. a rod sleeve; 17. knocking the disc; 18. a second balancing weight; 19. a projecting seat; 20. an extension shaft; 21. a hoisting ring; 22. pushing the threaded sleeve; 23. a fixed block; 24. a first hand wheel; 25. extending out of the frame; 26. a second L-shaped frame; 27. jacking the threaded column; 28. a concave frame; 29. compressing the convex column; 30. connecting a threaded sleeve; 31. a second hand wheel; 32. a first connecting lug; 33. connecting the convex frame; 34. the second connecting lug.
Detailed Description
The following description is provided to disclose the invention so as to enable any person skilled in the art to practice the invention. The preferred embodiments in the following description are given by way of example only, and other obvious variations will occur to those skilled in the art.
As shown in figures 1-7, an energy-conserving wallboard installation auxiliary structure of green building, including seat frame 1, the perpendicular piece that props is installed to the upper end of seat frame 1, and universal wheel 12 is installed to the position that the lower terminal surface of seat frame 1 is close to the corner, and universal wheel 12 plays the effect that is convenient for seat frame 1 and removes, and thorn firmware runs through the installation in the up end corner of seat frame 1, and the shape of seat frame 1 is L shape.
Perpendicular propping piece is including two sets of connection groove frame 2 of symmetry fixed mounting at the preceding terminal surface of seat frame 1, the inside of two sets of connection groove frame 2 rotates respectively and installs two sets of L shape frame 3 No. one, connect groove frame 2 and play the effect of connecting L shape frame 3 No. one, the tip of two sets of L shape frame 3 is inlayed respectively and is had two sets of grudging post 4, L shape frame 3 and grudging post 4 integrated into one piece, L shape frame 3 plays the effect of stretching out grudging post 4, make the in-process wallboard that supports can fully laminate on grudging post 4, can not receive the hindrance, fixed mounting has even solid frame 5 between the middle part position of two sets of grudging post 4, the upper end middle part of seat frame 1 is provided with threaded rod 11, even solid frame 5 plays the effect of fixing two sets of grudging posts 4 together, the surface of 11 is screwed and is had promotion thread bush 22, threaded rod 11 plays the effect of ordering about promotion thread bush 22 to remove, be connected with roof-rack 14 between promotion thread bush 5, roof-rack 14 plays the effect of promoting even solid threaded rod 5 to promote, it is the slope to be in order to promote simultaneously, the setting up 14, the slope.
The rear edge of the upper end face of the seat frame 1 extends to form a fixing block 23, the threaded rod 11 penetrates through and is rotatably embedded in the inner side of the fixing block 23, the fixing block 23 plays a role in connecting the threaded rod 11, the front end of the threaded rod 11 is rotatably connected with the front edge of the upper end of the seat frame 1, a hand wheel 24 is coaxially and fixedly installed at the rear end of the threaded rod 11, the hand wheel 24 plays a role in facilitating rotation of the threaded rod 11, the threaded rod 11 can be driven to rotate to drive the push threaded sleeve 22 to move, the top frame 14 is driven to move to push the fixing frame 5, two groups of vertical frames 4 are driven to synchronously move, the vertical frames 4 are adjusted to be in a state parallel to the vertical positioning rope 6 in a vertical state, two connecting lugs 34 extend from the upper end face of the push threaded sleeve 22, a connecting lug 32 extends from the middle of the rear end face of the fixing frame 5, two groups of grooves are respectively formed in the two ends of the top frame 14, the second connecting lug 34 plays a role in connecting the pushing threaded sleeve 22 with the top frame 14, the connecting lug 32 is rotatably installed in the groove of the top frame 14, and the connecting lug 32 is connected with the top frame 14.
A fixed plate 10 is embedded between the upper edges of the opposite surfaces of the two groups of vertical frames 4, a pushing frame 9 is rotatably installed in the middle of the upper end of the fixed plate 10, the fixed plate 10 plays a role of fixing the two groups of vertical frames 4 together and also plays a role of bearing the pushing frame 9, a fixed frame 8 is embedded at the front end of the pushing frame 9, the fixed frame 8 plays a role of connecting and fixing, the pushing frame 9 and the fixed frame 8 are integrally formed, a pressing seat 7 is fixedly installed at the lower end part of the fixed frame 8, the pressing seat 7 plays a role of pressing and fixing a wallboard on the vertical frames 4 to prevent the wallboard from tilting forward, a pressing convex column 29 is fixedly installed on the rear end surface of the pressing seat 7, the pressing convex column 29 plays a role of fully contacting the wallboard during pressing, a first counter weight 15 is fixedly installed at the rear end part of the pushing frame 9, the first counter weight 15 plays a role of downward turning over the rear part of the pushing frame 9 when the wallboard is not pressed, so as to lift the pressing seat 7 and the pressing column 29, a jacking threaded column 27 is arranged behind the fixed plate 10, the upper end part of the pushing column 27 is opened, and the pushing column 27 can push the pushing column 9 to push the upper end of the wallboard.
The compression convex column 29 and the pressing base 7 are integrally formed, the middle part of the rear end face of the continuous fixing frame 5 is extended with an extension frame 25, the extension frame 25 plays a role of connection and fixation, the end part of the extension frame 25 is embedded with a second L-shaped frame 26, the second L-shaped frame 26 plays a role of connecting the connecting threaded sleeve 30, the lower end face of the second L-shaped frame 26 is embedded with the connecting threaded sleeve 30 in a penetrating way, the jacking threaded column 27 is screwed on the inner side of the connecting threaded sleeve 30, connecting thread cover 30 and the cooperation of top between the screw thread post 27 of moving can order about the top and move screw thread post 27 and reciprocate, directly moves screw thread post 27 to the top and moves screw thread post 27 utilization and connecting thread cover 30 between and shift up to promote the back tip that moves frame 9 at last in-process, rotate in order to order about pushing frame 9, thereby drive and press seat 7 to overturn, compress tightly the projection 29 on order to order about pressing seat 7 and compress tightly on the wallboard.
The lower end part of the jacking threaded column 27 is coaxially and fixedly provided with a second hand wheel 31, the middle part of the upper end surface of the connecting and fixing frame 5 is fixedly provided with a concave frame 28, the second hand wheel 31 plays a role in facilitating the rotation of the jacking threaded column 27, the pushing frame 9 is rotatably arranged inside the concave frame 28, the concave frame 28 plays a role in connecting the pushing frame 9, the extending frame 25 and the second L-shaped frame 26 are integrally formed, the vertical positioning rope 6 is arranged on the side of the vertical frame 4, the vertical positioning rope 6 plays a role in reference, so that the vertical frame 4 keeps vertical, lower tip fixed mounting of vertical location rope 6 has balancing weight 18 No. two, no. two balancing weights 18 can make vertical location rope 6 keep perpendicular under the action of gravity, can observe the vertical location rope 6 that is in the vertical state by No. two balancing weights 18 straightens under the effect of gravity in the use, can rotate threaded rod 11 afterwards, adjust grudging post 4 to the state that parallels with the vertical location rope 6 under the vertical state, ensure promptly that grudging post 4 is in the vertical state, be the vertical state in order to order about the wallboard that is supported by grudging post 4.
The rear end upper portion fixed mounting of grudging post 4 has the seat 19 of stretching out, the side of stretching out the seat 19 runs through to inlay has the projecting shaft 20, the seat 19 of stretching out plays the effect of connecting the projecting shaft 20, the surface rotation of projecting shaft 20 installs rings 21, rings 21 can rotate, in order to ensure that vertical positioning rope 6 keeps perpendicular under the effect of gravity, rings 21's lower terminal surface fixed mounting has the protruding frame 33 of connection, vertical positioning rope 6 runs through to be installed in the lower terminal surface of connecting protruding frame 33, it plays the effect of connecting vertical positioning rope 6 to connect protruding frame 33.
The fixing part comprises a rod sleeve 16 which penetrates through the corner of the upper end face of the seat frame 1 and is embedded in the corner of the upper end face of the seat frame 1, a fixing rod 13 is installed inside the rod sleeve 16 in a fit mode, the rod sleeve 16 plays a role of guiding the fixing rod 13 and enabling the fixing rod 13 to vertically move up and down, the lower end of the fixing rod 13 is arranged in a conical mode and can be conveniently penetrated into soil, a knocking disc 17 is coaxially arranged at the upper end of the fixing rod 13, the knocking disc 17 can increase a knocking face so as to achieve the knocking effect, the fixing rod 13 rotates and can enable a thread screwing part between the fixing rod 13 and the rod sleeve 16 to be separated so as to ensure that the fixing rod 13 can normally move down, then the knocking disc 17 is knocked so as to drive the fixing rod 13 to penetrate into the soil layer under the knocking effect, the seat frame 1 is reinforced, an inner thread is arranged on the upper portion of the inner side outer surface of the rod sleeve 16, an outer thread is formed in the middle portion of the outer surface of the fixing rod 13, the outer thread of the fixing rod 13 is screwed with the inner thread of the rod sleeve 16, the fixing rod 13, the outer thread of the fixing rod 13 is matched with the inner thread of the rod sleeve 16, and the fixing rod sleeve 13, and the inner thread of the seat frame 1 can be fixed in a fixed mode, and cannot be obstructed when the seat frame 1 is moved.
During installation, the seat frame 1 can be pushed to an installation area by the universal wheel 12, then the fixed rod 13 is rotated to separate the screwing part of the thread between the fixed rod 13 and the rod sleeve 16 to ensure that the fixed rod 13 can normally move downwards, then the knocking disc 17 is knocked to drive the fixed rod 13 to pierce into the soil layer under the action of knocking force to reinforce the seat frame 1 to ensure that the seat frame 1 cannot shift in the process of supporting and installing the wall panel, then the vertical positioning rope 6 in a vertical state is observed to be straightened by the second counter weight block 18 under the action of gravity, at the moment, the threaded rod 11 is rotated to drive the pushing threaded sleeve 22 to move to drive the top frame 14 to move to push the fixing frame 5, thereby driving the two groups of vertical frames 4 to synchronously move, so as to adjust the vertical frame 4 to be parallel to the vertical positioning rope 6 in the vertical state, namely, ensure that the vertical frame 4 is in the vertical state, then erect the wallboard and lean against the vertical frame 4, drive the wallboard to keep the vertical state and install with the wallboard adjacent to the left and the right under the supporting of the vertical frame 4, and simultaneously directly rotate the jacking threaded column 27, move the screw thread post 27 in order to order about and move up with the screw thread between the connecting thread cover 30 to move the back tip to pushing away frame 9 in-process at last and promote to push away frame 9 and rotate, thereby drive and press seat 7 to overturn, compress tightly on the wallboard with pressing the projection 29 in order to press on the seat 7, make the wallboard can be pressed and cover on founding frame 4, in order to ensure that the wallboard can not appear the phenomenon of leaning forward in the installation.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are merely illustrative of the principles of the invention, but that various changes and modifications may be made without departing from the spirit and scope of the invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (8)

1. The utility model provides a green building energy-saving wallboard installation auxiliary structure, includes seat frame (1), its characterized in that: perpendicular shore piece is installed to the upper end of seat frame (1), universal wheel (12) are installed to the position that the lower terminal surface of seat frame (1) is close to the corner, the upper end face corner of seat frame (1) runs through and is installed thorn firmware, the shape of seat frame (1) is L shape.
2. The auxiliary structure for installing green building energy-saving wall boards in claim 1, wherein: prop the top piece perpendicularly and include two sets of connection tank racks (2) of symmetry fixed mounting at the preceding terminal surface of seat frame (1), it is two sets of connect the inside of tank rack (2) to rotate respectively and install two sets of L shape frame (3), it is two sets of the tip of L shape frame (3) is inlayed respectively and is had two sets of grudging post (4), L shape frame (3) and grudging post (4) integrated into one piece, it is two sets of fixed mounting has even firm frame (5) between the opposite face middle part position of grudging post (4), the upper end middle part of seat frame (1) is provided with threaded rod (11), the surface of threaded rod (11) is screwed and is promoted thread bush (22), promote thread bush (22) and even be connected with between firm frame (5) roof-rack (14), roof-rack (14) are the slope and set up.
3. The auxiliary structure for installing green building energy-saving wall boards as claimed in claim 2, wherein: edge extends to the up end rear edge of seat frame (1) has fixed block (23), threaded rod (11) run through to rotate and inlay in the inboard of fixed block (23), the front end of threaded rod (11) rotates with the upper end front edge department of seat frame (1) to be connected, the coaxial fixed mounting in rear end of threaded rod (11) has hand wheel (24) No. one, the up end that promotes thread bush (22) extends there is engaging lug (34) No. two, it has engaging lug (32) to extend in the middle part of the rear end face of frame (5) even admittedly, two sets of recesses have been seted up respectively at the both ends of roof frame (14), no. two engaging lugs (34) rotate the inside of installing in the lower extreme recess of roof frame (14), engaging lug (32) rotate the inside of installing in the upper end recess of roof frame (14).
4. The energy-conserving wallboard installation auxiliary structure of green building of claim 2, characterized by that: it is two sets of it has fixed plate (10) to inlay between the opposite face top edge department of grudging post (4), the upper end middle part of fixed plate (10) is rotated and is installed and is pushed away frame (9), the front end of pushing away frame (9) is inlayed and is had mount (8), it has pressure seat (7) with mount (8) integrated into one piece to push away frame (9), the lower tip fixed mounting of mount (8) has pressure seat (7), the rear end face fixed mounting who presses seat (7) has the compression convex column (29), the rear end fixed mounting who pushes away frame (9) has a balancing weight (15), the rear of fixed plate (10) is provided with top and moves screw thread post (27), the upper end of top and moves screw thread post (27) is opened and is established to the sphere, the upper end top of top and moving screw thread post (27) is pressed tightly in the lower terminal surface of pushing away frame (9).
5. The auxiliary structure for installing green building energy-saving wall boards in claim 4, wherein: compress tightly projection (29) and press seat (7) integrated into one piece, extend in the middle part of the rear end face of company's solid frame (5) and have and stretch out frame (25), the tip that stretches out frame (25) is inlayed and is had No. two L shape framves (26), the lower terminal surface of No. two L shape framves (26) runs through to inlay and has connecting thread bush (30), top moves screw thread post (27) and screws in the inboard of connecting thread bush (30).
6. The auxiliary structure for installing green building energy-saving wall boards in claim 5, wherein: the coaxial fixed mounting in lower tip of top thread post (27) has No. two hand wheels (31), the up end middle part fixed mounting who links solid frame (5) has concave frame (28), it installs in the inside of concave frame (28) to push away frame (9) rotation, stretch out frame (25) and No. two L shape frame (26) integrated into one piece, grudging post (4) side is provided with vertical location rope (6), the lower tip fixed mounting of vertical location rope (6) has No. two balancing weights (18).
7. The energy-conserving wallboard installation auxiliary structure of green building of claim 6, characterized by that: the rear end upper portion fixed mounting of grudging post (4) has the seat (19) of stretching out, the side that stretches out seat (19) runs through to inlay has projecting shaft (20), the surface rotation of projecting shaft (20) installs rings (21), the lower terminal surface fixed mounting of rings (21) has connects protruding frame (33), vertical positioning rope (6) run through to install in the lower terminal surface of connecting protruding frame (33).
8. The auxiliary structure for installing green building energy-saving wall boards in claim 1, wherein: thorn firmware is including running through rod cover (16) of inlaying in the up end corner of seat frame (1), dead lever (13) are installed in the inside laminating of rod cover (16), the lower extreme of dead lever (13) is the taper setting, the coaxial disk (17) of strikeing that is provided with in upper end of dead lever (13), the inboard surface upper portion of rod cover (16) is provided with the internal thread, the external screw thread has been seted up at the surface middle part of dead lever (13), the external screw thread of dead lever (13) closes with the internal thread of rod cover (16) mutually soon.
CN202211095750.2A 2022-09-08 2022-09-08 Energy-conserving wallboard installation auxiliary structure of green building Active CN115450441B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211095750.2A CN115450441B (en) 2022-09-08 2022-09-08 Energy-conserving wallboard installation auxiliary structure of green building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211095750.2A CN115450441B (en) 2022-09-08 2022-09-08 Energy-conserving wallboard installation auxiliary structure of green building

Publications (2)

Publication Number Publication Date
CN115450441A true CN115450441A (en) 2022-12-09
CN115450441B CN115450441B (en) 2023-10-10

Family

ID=84302210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211095750.2A Active CN115450441B (en) 2022-09-08 2022-09-08 Energy-conserving wallboard installation auxiliary structure of green building

Country Status (1)

Country Link
CN (1) CN115450441B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116607798A (en) * 2023-07-17 2023-08-18 中铁城建集团第一工程有限公司 Prefabricated wallboard assembly positioning construction device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6247273B1 (en) * 1999-02-16 2001-06-19 Reechcraft, Inc. Adjustable form brace
CN210713895U (en) * 2019-09-15 2020-06-09 青岛鑫光正钢结构股份有限公司 Temporary wallboard support frame for assembly building
CN211666299U (en) * 2019-10-11 2020-10-13 浙江恒宸建设集团有限公司 Industrial and civil building wall construction correcting device
CN112459531A (en) * 2020-11-18 2021-03-09 金螳螂精装科技(苏州)有限公司 Assembled wallboard bearing structure convenient to installation
CN214834923U (en) * 2021-06-09 2021-11-23 段泽勇 Wall body erection equipment for assembly type structure
CN216109814U (en) * 2021-09-25 2022-03-22 常莎莎 Wall body straightness alignment ware that hangs down

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6247273B1 (en) * 1999-02-16 2001-06-19 Reechcraft, Inc. Adjustable form brace
CN210713895U (en) * 2019-09-15 2020-06-09 青岛鑫光正钢结构股份有限公司 Temporary wallboard support frame for assembly building
CN211666299U (en) * 2019-10-11 2020-10-13 浙江恒宸建设集团有限公司 Industrial and civil building wall construction correcting device
CN112459531A (en) * 2020-11-18 2021-03-09 金螳螂精装科技(苏州)有限公司 Assembled wallboard bearing structure convenient to installation
CN214834923U (en) * 2021-06-09 2021-11-23 段泽勇 Wall body erection equipment for assembly type structure
CN216109814U (en) * 2021-09-25 2022-03-22 常莎莎 Wall body straightness alignment ware that hangs down

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116607798A (en) * 2023-07-17 2023-08-18 中铁城建集团第一工程有限公司 Prefabricated wallboard assembly positioning construction device
CN116607798B (en) * 2023-07-17 2023-09-15 中铁城建集团第一工程有限公司 Prefabricated wallboard assembly positioning construction device

Also Published As

Publication number Publication date
CN115450441B (en) 2023-10-10

Similar Documents

Publication Publication Date Title
CN109184035B (en) Building installation equipment for light partition board and light partition board installation process
CN115450441A (en) Green building energy-saving wallboard installation auxiliary structure
CN113775170B (en) Building templates for construction
CN110948436A (en) Auxiliary assembly of domestic door installation
CN211974240U (en) Climbing frame with automatic lifting adjusting function
CN218580722U (en) Building foundation pile resistance to compression detection mechanism
CN114751345B (en) Power engineering overhauls frame with transformer
CN213927548U (en) Portable enclosure tile installation device
CN210561715U (en) Height-adjustable bridge guardrail
CN219193001U (en) Rack is used in toughened glass production
CN214988411U (en) Plate turnover machine
CN216444946U (en) Hand over-and-under type mirror cabinet installing support
CN218856405U (en) Energy-concerving and environment-protective wall grinds flat structure for construction
CN220622393U (en) Building curtain compresses tightly construction equipment
CN217778220U (en) Fitment is with wall paper auxiliary device
CN218581977U (en) Metal panel embedded touch screen structure
CN218508953U (en) Wall brick is decorated construction and is used neat seam auxiliary device
CN216984192U (en) Glass panel with detachable anti-aging glass sheet structure
CN215717000U (en) Be used for prefabricated staircase safety turning device
CN219485493U (en) Compressing mechanism suitable for narrow and small space
CN216656137U (en) Multi-angle steel bar bending device
CN216930433U (en) Roller type leveling device
CN219034146U (en) Ancient building wall reinforcing apparatus
CN221001840U (en) Auxiliary installation device for heavy-load air-floatation terrace armor joint
CN221052931U (en) Dry-hanging stone gypsum board combined wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant