CN115431400A - Box girder jig frame - Google Patents
Box girder jig frame Download PDFInfo
- Publication number
- CN115431400A CN115431400A CN202211196700.3A CN202211196700A CN115431400A CN 115431400 A CN115431400 A CN 115431400A CN 202211196700 A CN202211196700 A CN 202211196700A CN 115431400 A CN115431400 A CN 115431400A
- Authority
- CN
- China
- Prior art keywords
- positioning
- frame
- fixed
- pedestal
- bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
- B28B23/022—Means for inserting reinforcing members into the mould or for supporting them in the mould
- B28B23/024—Supporting means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
- B28B23/18—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members for the production of elongated articles
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
一种箱梁胎架,属于桥梁建筑施工技术领域;包括腹板胎架和顶板胎架,所述腹板胎架包括底座、支架和侧部支撑架,支架和侧部支撑架上均设有滚轮,所述顶板胎架包括支撑座和剪力筋小车,底座包括基座和台座,基座和台座上均设有第一滑轨,侧部支撑架设有第一定位件,支架上设有第二定位件,第一定位件包括直线轴承、套管和定位齿耙,第二定位件包括套管、定位杆和调节杆,支架上设有定位齿板和定位角钢,侧部支撑架上设有定位角钢;本发明公开的箱梁胎架中的腹板胎架适用于不同规格预制箱梁的腹板钢筋骨架的绑扎,减少工人为定制腹板胎架付出的劳动,从而达到降低工人劳动强度和节省时间的目的,进而提高预制箱梁的制备效率。
A box beam frame, belonging to the technical field of bridge building construction; comprising a web frame and a roof frame, the web frame includes a base, a bracket and a side support frame, and the bracket and the side support frame are equipped with Rollers, the roof frame includes a support seat and a shear tendon trolley, the base includes a base and a pedestal, the base and the pedestal are provided with a first slide rail, the side support frame is provided with a first positioning piece, and the support is provided with a The second positioning piece, the first positioning piece includes linear bearings, sleeves and positioning rakes, the second positioning piece includes sleeves, positioning rods and adjustment rods, the bracket is provided with positioning tooth plates and positioning angle steel, and the side support frame Positioning angle steel is provided; the web frame in the box beam frame disclosed by the present invention is suitable for binding the web steel frame of prefabricated box girders of different specifications, reducing the labor paid by workers for customizing the web frame, thereby reducing the labor cost of workers. The purpose of reducing labor intensity and saving time, thereby improving the preparation efficiency of prefabricated box girders.
Description
技术领域technical field
本发明属于桥梁建筑施工技术领域,具体是涉及一种箱梁胎架。The invention belongs to the technical field of bridge building construction, and in particular relates to a box girder tire frame.
背景技术Background technique
在公路桥梁建设中,普遍采用预制箱梁方式进行架设。在预制箱梁过程中,为克服钢筋安装过程中纵横向间距不均匀、钢筋定位不精准、钢筋保护层合格率不达标等问题,采用了固定钢筋胎架法对钢筋进行标准化安装,即顶腹板钢筋骨架在分别在固定好的顶腹板钢筋胎架上进行安装,安装好后通过龙门架将其吊出组装,然而现有的腹板钢筋胎架在绑扎不同规格的腹板钢筋骨架时需要工人根据其规格专门定做,这种胎架只能用于单一规格腹板钢筋骨架的绑扎,绑扎其他规格的腹板钢筋骨架需要根据规格再定制或将现有的胎架进行更改后再使用,存在工人的劳动强度大,耗时长进而导致预制箱梁制备效率低的问题。In the construction of highway bridges, prefabricated box girders are generally used for erection. In the process of prefabricating box girders, in order to overcome the problems of uneven vertical and horizontal spacing during the installation of steel bars, inaccurate positioning of steel bars, and substandard pass rate of steel bar cover, the fixed steel bar frame method was adopted to standardize the installation of steel bars, that is, the top web The plate steel frame is installed on the fixed top web steel frame, and after installation, it is hoisted out by the gantry frame for assembly. However, when the existing web steel frame is bound with different specifications of the web steel frame Workers need to customize according to their specifications. This kind of tire frame can only be used for binding web steel skeletons of a single specification. Binding web steel skeletons of other specifications needs to be customized according to specifications or the existing tire frame should be changed before use. , there is a problem that the labor intensity of the workers is high, and the time consumption is long, which leads to the low production efficiency of the prefabricated box girder.
发明内容Contents of the invention
本发明主要是解决上述现有技术所存在的技术问题,提供一种箱梁胎架。The present invention mainly solves the technical problems existing in the above-mentioned prior art, and provides a box beam tire frame.
本发明的上述技术问题主要是通过下述技术方案得以解决的:一种箱梁胎架,包括腹板胎架和顶板胎架,所述腹板胎架包括底座、支架和侧部支撑架,所述底座包括基座和台座,所述台座两侧对称设有基座,支架设置在台座上,位于台座两侧的基座上对称设有侧部支撑架,所述台座和基座上均设有第一滑轨,支架和侧部支撑架上均设有滚轮,支架通过滚轮与台座滑动连接,侧部支撑架通过滚轮与基座滑动连接,侧部支撑架上设有第一定位件,支架上设有第二定位件和固定套,侧部支撑架和支架之间设有固定件;The above-mentioned technical problems of the present invention are mainly solved by the following technical solutions: a box beam tire frame, comprising a web tire frame and a top plate tire frame, and the web tire frame includes a base, a bracket and a side support frame, The base includes a pedestal and a pedestal, the two sides of the pedestal are symmetrically provided with pedestals, the brackets are arranged on the pedestal, and side support frames are symmetrically arranged on the pedestals on both sides of the pedestal, and the pedestal and the pedestal are both There is a first slide rail, rollers are provided on the bracket and the side support frame, the bracket is slidingly connected with the pedestal through the rollers, the side support frame is slidingly connected with the base through the rollers, and the first positioning piece is provided on the side support frame , the bracket is provided with a second positioning piece and a fixing sleeve, and a fixing piece is arranged between the side support frame and the bracket;
所述顶板胎架包括支撑座和剪力筋小车,所述支撑座上设有第二滑轨、定位槽钢、梳齿板和水平筋定位板,剪力筋小车上设有滚轮,滚轮与第二滑轨滑动连接。The roof frame includes a support seat and a shear tendon trolley, the support seat is provided with a second slide rail, a positioning channel steel, a comb plate and a horizontal rib positioning plate, and the shear tendon trolley is provided with rollers, and the rollers and The second slide rail is slidingly connected.
作为优选,所述侧部支撑架上设有立柱和龙骨,第一定位件包括直线轴承、套管和定位齿耙,套管设置在龙骨上,直线轴承设置在立柱上,定位齿耙滑动设置在直线轴承和套管内,所述龙骨的上下两端均设有定位角钢。Preferably, a column and a keel are arranged on the side support frame, and the first positioning member includes a linear bearing, a bushing and a positioning rake, the bushing is arranged on the keel, the linear bearing is arranged on the column, and the positioning rake is slidably set In the linear bearing and the casing, the upper and lower ends of the keel are provided with positioning angle steel.
作为优选,所述支架上设有立柱,立柱底部固定有固定螺杆,固定螺杆上螺纹连接有内螺纹管,所述内螺纹管插在固定套内,支架上位于立柱左右两侧对称固定有定位齿板,所述第二定位件包括套管和定位杆和调节杆,所述套管固定在立柱侧面上,定位杆滑动设置在套管内,立柱侧面的顶部和底部均旋转连接有调节杆,调节杆上螺纹连接有螺母,调节杆上固定有定位角钢。Preferably, the bracket is provided with a column, the bottom of the column is fixed with a fixed screw, and the fixed screw is threaded with an internally threaded pipe. The tooth plate, the second positioning member includes a sleeve, a positioning rod and an adjustment rod, the sleeve is fixed on the side of the column, the positioning rod is slidably arranged in the sleeve, and the top and bottom of the side of the column are rotatably connected to the adjustment rod. A nut is threaded on the adjusting rod, and a positioning angle steel is fixed on the adjusting rod.
作为优选,所述支架上的立柱为20根,20根立柱以10根为一组呈两列设置在支架上。每相邻的2根立柱上均固定有连接杆。As a preference, there are 20 columns on the support, and the 20 columns are arranged on the support in two rows in groups of 10. Connecting rods are fixed on every two adjacent uprights.
作为优选,所述固定件包括固定角钢和固定槽钢,所述支架和侧部支撑架上均设有固定角钢,固定槽钢设置在固定角钢上。Preferably, the fixing piece includes a fixed angle steel and a fixed channel steel, the bracket and the side support frame are provided with a fixed angle steel, and the fixed channel steel is arranged on the fixed angle steel.
作为优选,所述侧部支撑架和支架上均设有呈纵向的定位角钢,侧部支撑架和支架之间横向设有定位齿板,所述定位齿板设置在固定槽钢上且位于2个呈纵向设置的定位角钢之间。As a preference, the side support frame and the bracket are provided with longitudinal positioning angle steel, and the positioning tooth plate is arranged horizontally between the side support frame and the support, and the positioning tooth plate is arranged on the fixed channel steel and is located at 2 between two vertical positioning angles.
作为优选,所述定位槽钢、梳齿板和水平筋定位板均固定在支撑架上,梳齿板底部固定在支撑架上,梳齿板的侧部与定位槽钢的侧部固定,水平筋定位板底部固定在支撑座上,水平筋定位板的侧部固定在梳齿板上。As a preference, the positioning channel steel, the comb tooth plate and the horizontal rib positioning plate are all fixed on the support frame, the bottom of the comb tooth plate is fixed on the support frame, the side of the comb tooth plate is fixed to the side of the positioning channel steel, horizontal The bottom of the rib positioning plate is fixed on the support seat, and the side of the horizontal rib positioning plate is fixed on the comb tooth plate.
本发明具有的有益效果:The beneficial effect that the present invention has:
本发明中的腹板胎架在台座和基座上设置第一滑轨,侧部支撑架设置在基座上,侧部支撑架通过滚轮在基座上滑动来调节2个侧部支撑架之间的距离,使该腹板胎架能够应用于不同规格箱梁腹板钢筋骨架的绑扎,台座上设置的支架,支架上设置的立柱、套管、定位杆、调节杆和定位角钢,能够使该腹板胎架用于单箱梁和单箱双室梁的预制,提高腹板胎架的适用范围;减少工人为定制不同规格的腹板胎架所付出的工作量,降低了工人的劳动强度同时也节省了时间,工人可把节省出的时间用于预制箱梁的钢筋骨架绑扎和梁体的浇注上,提高了预制箱梁的工作效率,定位齿耙、直线轴承和套管能够提高钢筋的定位精度的同时也便于定位齿耙的取放。The web frame in the present invention is provided with a first slide rail on the pedestal and the base, and the side support frame is arranged on the base, and the side support frame slides on the base by rollers to adjust the distance between the two side support frames. The distance between the web base frame can be applied to the binding of the steel frame of the box girder web of different specifications. The web base frame is used for the prefabrication of single box girder and single box double-chamber girder, which improves the application range of the web base frame; reduces the workload of workers for customizing web base frames of different specifications, and reduces the labor of workers The strength also saves time. Workers can use the saved time for binding the steel skeleton of the prefabricated box girder and pouring the girder body, which improves the work efficiency of the prefabricated box girder. Positioning rakes, linear bearings and bushings can improve The positioning accuracy of the steel bar is also convenient for picking and placing the positioning rake.
附图说明Description of drawings
图1是腹板胎架的一种结构示意图;Fig. 1 is a kind of structural representation of web tire frame;
图2是图1中A处的放大示意图;Fig. 2 is the enlarged schematic diagram of place A in Fig. 1;
图3是图1中B处的放大示意图;Fig. 3 is the enlarged schematic diagram of place B in Fig. 1;
图4是腹板胎架的另一种结构示意图;Fig. 4 is another kind of structural representation of web frame;
图5是图4中C处的放大示意图;Fig. 5 is the enlarged schematic diagram of place C in Fig. 4;
图6是腹板胎架的底座结构示意图;Fig. 6 is a schematic diagram of the base structure of the web tire frame;
图7是腹板胎架支架的结构示意图;Fig. 7 is a schematic structural view of the web tire frame support;
图8是图7中D处的放大示意图;Fig. 8 is an enlarged schematic view at D in Fig. 7;
图9是顶板胎架结构示意图;Fig. 9 is a structural schematic diagram of the roof tire frame;
图10是图9中E处的放大示意图。FIG. 10 is an enlarged schematic view at E in FIG. 9 .
图中:1、腹板胎架;2、顶板胎架;3、底座;4、支架;5、侧部支撑架;6、基座;7、台座;8、第一滑轨;9、滚轮;10、第一定位件;11、第二定位件;12、固定套;13、固定件;14、支撑座;15、剪力筋小车;16、第二滑轨;17、定位槽钢;18、梳齿板;19、水平筋定位板;20、立柱;21、龙骨;22、直线轴承;23、套管;24、定位齿耙;25、定位角钢;26、固定螺杆;27、内螺纹管;28、定位齿板;29、定位杆;30、调节杆;31、螺母;32、连接杆;33、固定角钢;34、固定槽钢;35、固定杆。In the figure: 1. web frame; 2. roof frame; 3. base; 4. bracket; 5. side support frame; 6. base; 7. platform; 8. first slide rail; 9. roller ; 10, the first positioning piece; 11, the second positioning piece; 12, the fixed sleeve; 13, the fixing piece; 14, the support seat; 15, the shear tendon trolley; 16, the second slide rail; 17, the positioning channel steel; 18. Comb tooth plate; 19. Horizontal rib positioning plate; 20. Column; 21. Keel; 22. Linear bearing; 23. Sleeve; 24. Positioning rake; 25. Positioning angle steel; Threaded pipe; 28, positioning tooth plate; 29, positioning rod; 30, adjusting rod; 31, nut; 32, connecting rod; 33, fixed angle steel; 34, fixed channel steel; 35, fixed rod.
具体实施方式detailed description
下面通过实施例,并结合附图,对本发明的技术方案作进一步具体的说明。The technical solutions of the present invention will be further specifically described below through the embodiments and in conjunction with the accompanying drawings.
一种箱梁胎架,包括腹板胎架1和顶板胎架2,A box beam frame, comprising a web frame 1 and a roof frame 2,
实施例一:如图1、2、3、6、7、8所示,所述腹板胎架1包括底座3、支架4和侧部支撑架5,底座3包括基座6和台座7,台座7两侧对称设有基座6,支架4设置在台座7上,支架4上焊接有固定套12,支架4上设置有立柱20,立柱20底部焊接有固定螺杆26,固定螺杆26上螺纹连接有内螺纹管27,内螺纹管27插在固定套12内,支架4上的立柱20数量为20根,20根立柱20分为2列,每列有10根立柱20,横向相邻的2根立柱20之间固定有连接杆32,立柱20上设有第二定位件11,第二定位件11包括套管23、定位杆29和调节杆30,套管23焊接在立柱20上,定位杆29滑动设置在套管23内;纵向相邻的2根立柱20之间的上下两端均旋转设置有调节杆30,调节杆30的两端均螺纹连接有螺母31,调节杆30上焊接有定位角钢25,位于台座7两侧的基座6上对称设有侧部支撑架5,侧部支撑架5上一端焊接有立柱20,侧部支撑架5的另一端上焊接有龙骨21,龙骨21、立柱20和侧部支撑架5组成直角三角形,龙骨21的上下两端均焊接有定位角钢25,所述台座7和基座6上均设有第一滑轨8,第一滑轨8由槽钢和角钢组成,角钢焊接在槽钢上方,支架4和侧部支撑架5底部均设有滚轮9,支架4通过滚轮9与台座7滑动连接,侧部支撑架5通过滚轮9与基座6滑动连接,侧部支撑架5上设有第一定位件10,侧部支撑架5和支架4之间设有固定件13;所述第一定位件10包括直线轴承22、套管23和定位齿耙24,直线轴承22焊接在立柱20上,套管23焊接在龙骨21上,定位齿耙24插在直线轴承22和套管23内。固定件13包括固定角钢33和固定槽钢34,支架4和侧部支撑架5相对的侧面上对称焊接有固定角钢33,固定槽钢34的两端分别焊接在2个固定角钢33上,支架4和侧部支撑架5上对称纵向焊接有定位角钢25,2个定位角钢25之间设置有横向的定位齿板28,定位齿板28底部两端分别焊接在支架4和侧部支撑架5上,定位齿板28底部正下方焊接在固定槽钢34上。Embodiment 1: As shown in Figures 1, 2, 3, 6, 7, and 8, the web frame 1 includes a base 3, a
如图9-10所示,顶板胎架2包括支撑座14和剪力筋小车15,所述支撑座14上设有第二滑轨16、定位槽钢17、梳齿板18和水平筋定位板19,剪力筋小车15上设有滚轮9,滚轮9与第二滑轨16滑动连接,图9中的虚线框为顶板钢筋架的轮廓,顶板钢筋架上方固定有承载板,剪力筋小车15正下方的滚轮9可在承载板上滚动,定位槽钢17、定位齿板28和水平筋定位板19均固定在支撑架上,定位齿板28底部固定在支撑架上,定位齿板28的侧部与定位槽钢17的侧部固定,水平筋定位板19底部固定在支撑座14上,水平筋定位板19的侧部固定在梳齿板18上。As shown in Figures 9-10, the roof tire frame 2 includes a
实施例二:如图4-6所示,所述腹板胎架1包括底座3侧部支撑架5,所述底座3包括基座6和台座7,所述台座7两侧对称设有基座6,台座7上基座6上均设有第一滑轨8,台座7两侧的基座6上对称设有侧部支撑架5,侧部支撑架5底部设有滚轮9,侧部支撑架5通过滚轮9在第一滑轨8上滑动,侧部支撑架5上设有立柱20、龙骨21和第一定位件10,立柱20和龙骨21分别焊接在侧部支撑架5的两端,立柱20竖直设置,龙骨21向立柱20倾斜,侧部支撑架5、立柱20和龙骨21呈直角三角形,第一定位件10包括直线轴承22、套管23和定位齿耙24,直线轴承22焊接在立柱20上,套管23焊接在龙骨21上,定位齿耙24插在直线轴承22和套管23内;2个侧部支撑架5之间设有固定件13,固定件13包括固定角钢33和固定槽钢34,2个侧部支撑架5相对的侧面上对称焊接有固定角钢33,固定槽钢34两端分别焊接在2个固定角钢33上;2个侧部支撑架5上对称焊接有呈纵向的定位角钢25,2个侧部支撑架5之间焊接有横向设置的定位齿板28且位于2个定位角钢25之间,定位齿板28底部两端分别焊接在2个侧部支撑架5上,定位齿板28底部正下方焊接在固定槽钢34上,2个侧部支撑架5的立柱20上均焊接有与基座6相固定的固定杆35,固定杆35为角钢。Embodiment 2: As shown in Figure 4-6, the web tire frame 1 includes a side support frame 5 of a base 3, and the base 3 includes a
如图9-10所示,顶板胎架2包括支撑座14和剪力筋小车15,所述支撑座14上设有第二滑轨16、定位槽钢17、定位齿板28和水平筋定位板19,剪力筋小车15上设有滚轮9,滚轮9与第二滑轨16滑动连接,图9中的虚线框为顶板钢筋架的轮廓,顶板钢筋架上方固定有承载板,剪力筋小车15正下方的滚轮9可在承载板上滚动,定位槽钢17、定位齿板28和水平筋定位板19均固定在支撑架上,定位齿板28底部固定在支撑架上,定位齿板28的侧部与定位槽钢17的侧部固定,水平筋定位板19底部固定在支撑座14上,水平筋定位板19的侧部固定在定位齿板28上。As shown in Figures 9-10, the roof frame 2 includes a
本发明的原理:Principle of the present invention:
绑扎前,工人根据预制箱梁的规格调整腹板胎架1和制备所需的顶板胎架2,工人根据预制箱梁的规格移动台座7的支架4和调整基座6上的侧部支撑架5与支架4之间距离,然后在侧部支撑架5之间和支架4之间依次焊接固定角钢33和固定槽钢34将支架4和侧部支撑架5固定在一起,然后根据腹板钢筋骨架的参数在支架4上安装立柱20,然后通过连接杆32将立柱20固定在一起,在立柱20之间安装上调节杆30后,再根据腹板钢筋骨架的参数依次焊接直线轴承22、套管23、定位齿板28和定位角钢25,焊接好后工人转动调节杆30将固定在其上的定位角钢25调整好角度后转动螺母31固定调节杆30,然后将定位齿耙24插在侧部支撑架5上的直线轴承22套管23内,将定位杆29插入支架4上的套管23内;准备工作完成后进行腹板钢筋骨架的绑扎;绑扎结束后工人将定位杆29和定位齿耙24依次取出,转动螺母31松动调节杆30,转动调节杆30使其上的定位角钢25与钢筋骨架上的钢筋分离后驱动龙门吊或其他设备将支架4上的立柱20吊出,然后将绑扎好的腹板钢筋骨架和顶板钢筋骨架吊出后进行组装。Before binding, the workers adjust the web frame 1 and prepare the required roof frame 2 according to the specifications of the prefabricated box girder, and the workers move the
本发明的原理:Principle of the present invention:
绑扎前,工人根据预制箱梁的规格调整腹板胎架和制备所需的顶板胎架,工人根据预制箱梁的规格移动台座的支架和调整基座上的侧部支撑架与支架之间距离,然后在侧部支撑架之间和支架之间依次焊接固定角钢和固定槽钢将支架和侧部支撑架固定在一起,然后根据腹板钢筋骨架的参数在支架上安装立柱,然后通过连接杆将立柱固定在一起,在立柱之间安装上调节杆后,再根据腹板钢筋骨架的参数依次焊接直线轴承、套管、定位齿板和定位角钢,焊接好后工人转动调节杆将固定在其上的定位角钢调整好角度后转动螺母固定调节杆,然后将定位齿耙插在侧部支撑架上的直线轴承套管内,将定位杆插入支架上的套管内;准备工作完成后进行腹板钢筋骨架的绑扎;绑扎结束后工人将定位杆和定位齿耙依次取出,转动螺母松动调节杆,转动调节杆使其上的定位角钢与钢筋骨架上的钢筋分离后驱动龙门吊或其他设备将支架上的立柱吊出,然后将绑扎好的腹板钢筋骨架和顶板钢筋骨架吊出后进行组装。Before binding, the workers adjust the web frame and prepare the required roof frame according to the specifications of the prefabricated box girder. The workers move the bracket of the pedestal and adjust the distance between the side support frame and the bracket on the base according to the specification of the prefabricated box girder , and then weld the fixed angle steel and the fixed channel steel between the side support frames and the brackets to fix the bracket and the side support frames together, and then install the column on the bracket according to the parameters of the web reinforcement skeleton, and then pass the connecting rod Fix the columns together, install the adjusting rod between the columns, and then weld the linear bearing, bushing, positioning tooth plate and positioning angle steel in sequence according to the parameters of the web steel skeleton. After welding, the worker rotates the adjusting rod to fix it After adjusting the angle of the positioning angle steel on the top, turn the nut to fix the adjusting rod, then insert the positioning rake into the linear bearing bushing on the side support frame, and insert the positioning rod into the bushing on the bracket; Skeleton binding; after binding, the worker will take out the positioning rod and the positioning tooth rake in turn, turn the nut to loosen the adjusting rod, turn the adjusting rod to separate the positioning angle steel on the steel bar from the steel bar on the steel frame, and then drive the gantry crane or other equipment. The column is hoisted out, and then the bundled web steel skeleton and roof steel skeleton are hoisted out and assembled.
最后,应当指出,以上实施例仅是本发明较有代表性的例子。显然,本发明不限于上述实施例,还可以有许多变形。凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均应认为属于本发明的保护范围。Finally, it should be pointed out that the above embodiments are only representative examples of the present invention. Obviously, the present invention is not limited to the above-mentioned embodiments, and many variations are possible. All simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention shall be deemed to belong to the protection scope of the present invention.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211196700.3A CN115431400A (en) | 2022-09-29 | 2022-09-29 | Box girder jig frame |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211196700.3A CN115431400A (en) | 2022-09-29 | 2022-09-29 | Box girder jig frame |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN115431400A true CN115431400A (en) | 2022-12-06 |
Family
ID=84251594
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202211196700.3A Pending CN115431400A (en) | 2022-09-29 | 2022-09-29 | Box girder jig frame |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115431400A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116442381A (en) * | 2023-03-30 | 2023-07-18 | 绍兴市城投建筑工业化制造有限公司 | Prefabricated box girder steel bar binding jig frame system and construction method |
| CN117183083A (en) * | 2023-11-03 | 2023-12-08 | 山西潇河建筑产业有限公司 | Novel assembly adjustable expansion type supporting jig frame |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20110011018A1 (en) * | 2009-07-15 | 2011-01-20 | Frank Johnson | Modular construction mold apparatus and method for constructing concrete buildings and structures |
| CN204076497U (en) * | 2014-07-28 | 2015-01-07 | 中国建筑第六工程局有限公司 | A kind of prefabricated case beam reinforcing bar binding location moulding bed |
| CN205521875U (en) * | 2016-03-24 | 2016-08-31 | 浙江大学城市学院 | Whole shaping die carrier of case breast web reinforcing bar |
| CN206633202U (en) * | 2017-04-10 | 2017-11-14 | 中交二公局第三工程有限公司 | A kind of Precast T-Beam binding clamping fixture |
| CN208514715U (en) * | 2018-07-16 | 2019-02-19 | 云南建投基础工程有限责任公司 | A kind of scalable moulding bed of adhesion type for reinforcing bar binding |
| CN112405833A (en) * | 2020-11-18 | 2021-02-26 | 四川交投建设工程股份有限公司 | A box girder steel frame binding device |
| CN216914328U (en) * | 2022-01-29 | 2022-07-08 | 浙江永峰模具制造有限公司 | Shear rib trolley |
-
2022
- 2022-09-29 CN CN202211196700.3A patent/CN115431400A/en active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20110011018A1 (en) * | 2009-07-15 | 2011-01-20 | Frank Johnson | Modular construction mold apparatus and method for constructing concrete buildings and structures |
| CN204076497U (en) * | 2014-07-28 | 2015-01-07 | 中国建筑第六工程局有限公司 | A kind of prefabricated case beam reinforcing bar binding location moulding bed |
| CN205521875U (en) * | 2016-03-24 | 2016-08-31 | 浙江大学城市学院 | Whole shaping die carrier of case breast web reinforcing bar |
| CN206633202U (en) * | 2017-04-10 | 2017-11-14 | 中交二公局第三工程有限公司 | A kind of Precast T-Beam binding clamping fixture |
| CN208514715U (en) * | 2018-07-16 | 2019-02-19 | 云南建投基础工程有限责任公司 | A kind of scalable moulding bed of adhesion type for reinforcing bar binding |
| CN112405833A (en) * | 2020-11-18 | 2021-02-26 | 四川交投建设工程股份有限公司 | A box girder steel frame binding device |
| CN216914328U (en) * | 2022-01-29 | 2022-07-08 | 浙江永峰模具制造有限公司 | Shear rib trolley |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116442381A (en) * | 2023-03-30 | 2023-07-18 | 绍兴市城投建筑工业化制造有限公司 | Prefabricated box girder steel bar binding jig frame system and construction method |
| CN116442381B (en) * | 2023-03-30 | 2025-08-01 | 绍兴市城投建筑工业化制造有限公司 | Prefabricated box girder steel bar binding jig frame system and construction method |
| CN117183083A (en) * | 2023-11-03 | 2023-12-08 | 山西潇河建筑产业有限公司 | Novel assembly adjustable expansion type supporting jig frame |
| CN117183083B (en) * | 2023-11-03 | 2024-02-06 | 山西潇河建筑产业有限公司 | A new type of adjustable and extended support tire frame |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN212534174U (en) | Raft foundation steel bar supporting tool | |
| CN115431400A (en) | Box girder jig frame | |
| CN103614967A (en) | Stiff framework and method for constructing bridge tower column by means of same | |
| CN114770706B (en) | A kind of light T-beam prefabricated equipment and prefabricated installation and construction method | |
| CN111851317B (en) | Method for installing arch ring of arch bridge | |
| CN117863349A (en) | Prefabricated small box girder steel bar binding method | |
| CN212925807U (en) | Cast-in-place continuous box girder side span straightway template support system | |
| CN107186878B (en) | Adjustable prefabricated U-shaped beam steel bar binding clamping fixture and construction method | |
| CN213358344U (en) | Adjustable bracket for cast-in-situ beam | |
| CN204817843U (en) | Prefabricated utility tunnel's steel reinforcement cage processingequipment | |
| CN210948697U (en) | A portal steel formwork support system for the construction of a rectangular tunnel secondary lining structure | |
| CN110670873B (en) | A kind of support system and construction method of steel formwork for ultra-high-section concrete column | |
| CN209141128U (en) | Bracket is used in a kind of binding of prefabricated small box girder reinforcing bar | |
| CN219586553U (en) | Variable cross-section special-shaped cable tower upper tower column | |
| CN111576845A (en) | Adjustable constructional engineering outer frame cantilever steel beam mounting structure and construction method | |
| CN217169018U (en) | Whole hole prefabricated box beam bottom web reinforcing bar modularization assembly mould | |
| CN206256388U (en) | A kind of bridge jig structure | |
| CN112127288B (en) | Cantilever pouring beam trackless triangular hanging basket construction method | |
| CN205329549U (en) | Corbel frame device is deposited to steel case roof beam temporarily | |
| CN213013932U (en) | A kind of bridge deck anti-collision guardrail reinforcement positioning frame | |
| CN223813695U (en) | Cast-in-situ beam side span construction combined bracket | |
| CN217924898U (en) | House steel construction building plane template support supporting device | |
| CN218375189U (en) | Novel superimposed sheet makeup mounting structure | |
| CN219866618U (en) | Large-span steel girder comprehensive supporting and hanging bracket device for steel structure factory building | |
| CN221052396U (en) | Variable cross-section cast-in-situ box girder web steel bar prefabrication jig |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20221206 |