CN115409490A CN202211127743.6A CN202211127743A CN115409490A CN 115409490 A CN115409490 A CN 115409490A CN 202211127743 A CN202211127743 A CN 202211127743A CN 115409490 A CN115409490 A CN 115409490A
Authority
CN
China
Prior art keywords
project
management
information
project management
architecture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202211127743.6A
Other languages
Chinese (zh)
Inventor
马华坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Telecom Digital Intelligence Technology Co ltd Hebei Branch
Original Assignee
China Telecom Digital Intelligence Technology Co ltd Hebei Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Telecom Digital Intelligence Technology Co ltd Hebei Branch filed Critical China Telecom Digital Intelligence Technology Co ltd Hebei Branch
Priority to CN202211127743.6A priority Critical patent/CN115409490A/en
Publication of CN115409490A publication Critical patent/CN115409490A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/903Querying
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/906Clustering; Classification

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Data Mining & Analysis (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Engineering & Computer Science (AREA)
  • Operations Research (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Computational Linguistics (AREA)
  • Marketing (AREA)
  • Economics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a project management system and method based on an intelligent park, and relates to the technical field of intelligent park management. The method comprises the following steps: acquiring product project information under a target intelligent park; classifying the product project information to generate project classification information; constructing an initial project management architecture according to the project classification information; importing product project information into a preset project management model to generate a project management scheme; adjusting the initial project management architecture according to the project management scheme to construct a target project management architecture; and acquiring and managing corresponding product projects in the target intelligent park based on a target project management architecture according to the real-time project management requirements. The intelligent park project management system can be used for carrying out accurate and effective management on each project in a targeted manner, realizing comprehensive and accurate project data intercommunication and improving the project management efficiency and effect of the intelligent park.

Description

Project management system and method based on intelligent park
Technical Field
The invention relates to the technical field of intelligent park management, in particular to a project management system and method based on an intelligent park.
Background
The construction of the smart park is an important component of the smart city and is also an advanced stage of the development of the smart city. The intelligent park takes the Internet as a carrier and takes an industry mode of 'Internet + industry' integration as a means, provides a solution of full-industry chain support service for the park, and can help the park to establish a unified organization management coordination framework in the aspect of informatization.
Because the project that the wisdom garden relates to is numerous, manages comparatively complicatedly, and traditional wisdom garden system generally carries out whole management with the project that relates to in the garden, but because project data is huge, each project has different characteristics again, and current wisdom garden project management inefficiency just makes mistakes easily, and the accurate interconnection intercommunication of each project information of unable real realization wisdom garden leads to the wisdom garden to construct the effect not good.
Disclosure of Invention
In order to overcome the above problems or at least partially solve the above problems, embodiments of the present invention provide a project management system and method based on a smart park, which can perform precise and effective management on each project, implement comprehensive and precise project data intercommunication, and improve the project management efficiency and effect of the smart park.
The embodiment of the invention is realized by the following steps:
in a first aspect, an embodiment of the present invention provides a project management system based on an intelligent park, including: the project management system comprises a project acquisition module, a classification module, an initial architecture establishment module, a scheme matching module, an architecture adjustment module and a project management module, wherein:
the project acquisition module is used for acquiring product project information in a target intelligent park;
the classification module is used for classifying the product project information to generate project classification information;
the initial architecture establishing module is used for establishing an initial project management architecture according to the project classification information;
the scheme matching module is used for importing the product project information into a preset project management model to generate a project management scheme;
the architecture adjusting module is used for adjusting the initial project management architecture according to the project management scheme so as to construct a target project management architecture;
and the project management module is used for acquiring and managing corresponding product projects in the target intelligent park based on a target project management architecture according to real-time project management requirements.
In order to solve the problems in the prior art, the system combines the actual situation of a corresponding intelligent park through the cooperation of a plurality of modules such as a project acquisition module, a classification module, an initial architecture establishment module, a scheme matching module, an architecture adjustment module and a project management module, classifies all product projects, establishes a reasonable initial project management architecture aiming at different properties and different categories, and manages pertinently; in order to further improve the management efficiency, a reasonable project management scheme is quickly matched for reference based on the project management model and the characteristics of different product projects, and the initial project management architecture is optimized and adjusted, so that a more accurate target project management architecture is obtained; and based on the target project management architecture, the corresponding project is efficiently managed by combining with the actual association requirement. This system can be targeted carry out accurate effectual management to each project to realize comprehensive accurate project data intercommunication, improve wisdom garden project management efficiency and effect.
Based on the first aspect, in some embodiments of the present invention, the classification module includes a feature matching unit and a scene classification unit, wherein:
the characteristic matching unit is used for extracting and carrying out scene matching in a preset application scene database according to the characteristic data of each project in the product project information so as to obtain the application scene information of each project;
and the scene classification unit is used for classifying the product project information according to the application scene information of each project to generate project classification information.
Based on the first aspect, in some embodiments of the present invention, the initial architecture establishing module includes a base framework unit, a node association unit, and an architecture establishing unit, where:
the basic frame unit is used for constructing a basic management frame according to the application scene category in the project classification information, and the basic management frame comprises a management main node and a plurality of scene management sub-nodes;
the node association unit is used for importing the project information of each product into corresponding scene management sub-nodes in the basic management frame according to the project classification information, associating the scene management sub-nodes according to the feature data of each project and generating association information;
and the architecture establishing unit is used for storing the association information into the management main node so as to construct and obtain an initial project management architecture.
Based on the first aspect, in some embodiments of the present invention, the item management module includes a node retrieving unit and an item retrieving unit, where:
the node calling unit is used for extracting and calling corresponding scene management sub-nodes according to application scene information in real-time project management requirements through a management main node in a target project management architecture;
and the project calling unit is used for calling and managing the corresponding product project according to the project information in the real-time project management requirement through the corresponding scene management sub-node.
In a second aspect, an embodiment of the present invention provides a project management method based on an intelligent park, including the following steps:
acquiring product project information under a target intelligent park;
classifying the product project information to generate project classification information;
constructing an initial project management architecture according to the project classification information;
importing product project information into a preset project management model to generate a project management scheme;
adjusting the initial project management architecture according to the project management scheme to construct a target project management architecture;
and acquiring and managing corresponding product projects under the target intelligent park based on a target project management architecture according to the real-time project management requirement.
In order to solve the problems in the prior art, the method combines the actual situation of the corresponding intelligent park, classifies each product item, and further establishes a reasonable initial item management framework aiming at different properties and different categories, and manages the items in a targeted manner; in order to further improve the management efficiency, a reasonable project management scheme is quickly matched for reference based on the project management model and the characteristics of different product projects, and the initial project management architecture is optimized and adjusted to obtain a more accurate target project management architecture; and based on the target project management architecture, the corresponding project is efficiently managed by combining with the actual association requirement. The method can be used for carrying out accurate and effective management on each project in a targeted manner, realizing comprehensive and accurate project data intercommunication and improving the project management efficiency and effect of the intelligent park.
According to a second aspect, in some embodiments of the present invention, the method for classifying product item information to generate item classification information includes the following steps:
extracting and carrying out scene matching in a preset application scene database according to the characteristic data of each project in the product project information to obtain the application scene information of each project;
and classifying the product project information according to the application scene information of each project to generate project classification information.
According to a second aspect, in some embodiments of the present invention, the method for constructing an initial project management framework according to project classification information includes the following steps:
constructing a basic management frame according to the application scene category in the project classification information, wherein the basic management frame comprises a management main node and a plurality of scene management sub-nodes;
importing the project information of each product into corresponding scene management sub-nodes in a basic management framework according to the project classification information, associating the scene management sub-nodes according to the feature data of each project, and generating association information;
and storing the associated information into a management main node to construct and obtain an initial project management architecture.
According to a second aspect, in some embodiments of the present invention, the method for managing corresponding product items under a target intelligent park based on a target item management framework according to real-time item management requirements includes the following steps:
extracting and calling corresponding scene management sub-nodes according to application scene information in real-time project management requirements through a management main node in a target project management architecture;
and calling and managing corresponding product projects according to the project information in the real-time project management requirements through corresponding scene management sub-nodes.
In a third aspect, an embodiment of the present application provides an electronic device, which includes a memory for storing one or more programs; a processor. The program or programs, when executed by a processor, implement the method of any of the second aspects as described above.
In a fourth aspect, embodiments of the present application provide a computer-readable storage medium, on which a computer program is stored, and the computer program, when executed by a processor, implements the method according to any one of the second aspect described above.
The embodiment of the invention at least has the following advantages or beneficial effects:
the embodiment of the invention provides a project management system and method based on an intelligent park, which combine the actual situation of the corresponding intelligent park and classify each product project, thereby establishing a reasonable initial project management architecture aiming at different properties and different categories and managing the projects in a targeted manner; in order to further improve the management efficiency, a reasonable project management scheme is quickly matched for reference based on the project management model and the characteristics of different product projects, and the initial project management architecture is optimized and adjusted, so that a more accurate target project management architecture is obtained; and based on the target project management architecture, the corresponding project is efficiently managed by combining with the actual association requirement. The intelligent park management system can be used for carrying out accurate and effective management on each project in a targeted manner, realizing comprehensive and accurate project data intercommunication and improving the project management efficiency and effect of the intelligent park.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings needed to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
FIG. 1 is a schematic block diagram of a project management system based on an intelligent park according to an embodiment of the present invention;
FIG. 2 is a flowchart illustrating item classification in a method for managing items based on an intelligent park according to an embodiment of the present invention;
FIG. 3 is a flowchart illustrating the establishment of an initial project management architecture in a project management method based on an intelligent park according to an embodiment of the present invention;
FIG. 4 is a flowchart of a project management method based on an intelligent park according to an embodiment of the present invention;
fig. 5 is a block diagram of an electronic device according to an embodiment of the present invention.
Description of reference numerals: 100. a project acquisition module; 200. a classification module; 300. an initial architecture building module; 400. a scheme matching module; 500. a framework adjustment module; 600. a project management module; 101. a memory; 102. a processor; 103. a communication interface.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. The components of embodiments of the present invention generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the present invention, as presented in the figures, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined and explained in subsequent figures.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrases "comprising a," "8230," "8230," or "comprising" does not exclude the presence of additional like elements in a process, method, article, or apparatus that comprises the element.
In the description of the embodiments of the present invention, "a plurality" represents at least 2.
Example (b):
as shown in fig. 1, in a first aspect, an embodiment of the present invention provides a project management system based on an intelligent campus, including: the project management system comprises a project acquisition module 100, a classification module 200, an initial architecture establishment module 300, a scheme matching module 400, an architecture adjustment module 500 and a project management module 600, wherein:
the project acquisition module 100 is used for acquiring product project information in a target intelligent park; the product item information includes an item name, item configuration information, item feature data, item attribute information, and the like.
The classification module 200 is configured to classify the product item information to generate item classification information; the item classification information includes an item category, an application scenario category, and the like.
An initial architecture building module 300, configured to build an initial project management architecture according to the project classification information;
the scheme matching module 400 is used for importing the product project information into a preset project management model to generate a project management scheme; the project management scheme includes project information, management policies, and the like. The project management model is a mathematical model which is obtained by performing machine learning based on a large amount of historical project management data and then establishing a corresponding management scheme based on different product projects.
A framework adjusting module 500, configured to adjust the initial project management framework according to the project management scheme to construct a target project management framework;
the project management module 600 is configured to obtain and manage corresponding product projects in a target smart park based on a target project management architecture according to real-time project management requirements.
In order to solve the problems in the prior art, the system combines the actual situation of a corresponding intelligent park through the cooperation of a plurality of modules such as a project acquisition module 100, a classification module 200, an initial architecture establishing module 300, a scheme matching module 400, an architecture adjusting module 500, a project management module 600 and the like, classifies all product projects, and further establishes a reasonable initial project management architecture aiming at different properties and different categories to manage the projects in a targeted manner; in order to further improve the management efficiency, a reasonable project management scheme is quickly matched for reference based on the project management model and the characteristics of different product projects, and the initial project management architecture is optimized and adjusted, so that a more accurate target project management architecture is obtained; and based on the target project management architecture, the corresponding project is efficiently managed by combining with the actual association requirement. This system can be targeted carry out accurate effectual management to each project to realize comprehensive accurate project data intercommunication, improve wisdom garden project management efficiency and effect.
Based on the first aspect, in some embodiments of the present invention, the classification module 200 includes a feature matching unit and a scene classification unit, wherein:
the characteristic matching unit is used for extracting and carrying out scene matching in a preset application scene database according to the characteristic data of each project in the product project information so as to obtain the application scene information of each project; the application scene information includes a scene category, a scene size, and the like.
And the scene classification unit is used for classifying the product project information according to the application scene information of each project to generate project classification information.
In order to ensure the accurate management of each project subsequently, the corresponding possible application scenes are matched through the feature matching unit according to the feature data of the product project, and then the product project information is classified through the scene classification unit in combination with the application scenes of each project, so that effective data reference is provided for the subsequent process.
Based on the first aspect, in some embodiments of the present invention, the initial architecture building module 300 includes a base framework unit, a node association unit, and an architecture building unit, where:
the basic frame unit is used for constructing a basic management frame according to the application scene category in the project classification information, and the basic management frame comprises a management main node and a plurality of scene management sub-nodes;
the node association unit is used for importing the project information of each product into corresponding scene management sub-nodes in the basic management frame according to the project classification information, associating the scene management sub-nodes according to the feature data of each project and generating association information;
and the architecture establishing unit is used for storing the association information into the management main node so as to construct and obtain an initial project management architecture.
In order to improve project management efficiency and management effect, a basic management frame is established based on different application scene categories through the cooperation of various units such as a basic frame unit, a node association unit and a framework establishment unit, a primary complete frame is established, product project information is guided into corresponding scene management sub-nodes in the basic management frame, the basic management frame is filled with data accurately, the sub-nodes are associated in combination with project characteristics, association information is generated and stored in a management main node, so that a complete and effective initial project management frame is obtained, and project management is performed by rapidly calling corresponding nodes through the main node on the basis of the association information of the sub-nodes.
Based on the first aspect, in some embodiments of the present invention, the item management module 600 includes a node invoking unit and an item invoking unit, where:
the node calling unit is used for extracting and calling corresponding scene management sub-nodes according to application scene information in real-time project management requirements through a management main node in a target project management architecture;
and the project calling unit is used for calling and managing the corresponding product project according to the project information in the real-time project management requirement through the corresponding scene management sub-node.
When project management is carried out, the node calling unit and the project calling unit are matched with each other, real-time management requirements are combined, the management main node in the target project management framework is used for analyzing the requirements, then appropriate scene management sub-nodes are called for carrying out specific project management, management of corresponding projects is carried out through the scene management sub-nodes, overall management pressure can be relieved, and the error rate can be reduced when the sub-nodes are managed in a targeted mode. The reasonable target project management architecture based on the constructed pertinence can greatly improve the efficiency and the accuracy of project management, and further promote the development of an intelligent park.
As shown in fig. 2-4, in a second aspect, an embodiment of the present invention provides a project management method based on an intelligent park, including the following steps:
s1, acquiring product project information in a target intelligent park; the product project information includes project name, project configuration information, project feature data, project attribute information, and the like.
S2, classifying the product project information to generate project classification information; the item classification information includes an item category, an application scenario category, and the like.
Further, as shown in fig. 3, the method includes:
s21, extracting and carrying out scene matching in a preset application scene database according to the feature data of each project in the product project information to obtain the application scene information of each project; the application scene information includes a scene category, a scene size, and the like.
And S22, classifying the product project information according to the application scene information of each project to generate project classification information.
In some embodiments of the present invention, in order to ensure accurate management of each subsequent project, corresponding application scenarios that may exist are matched according to feature data of a product project, and then product project information is classified in combination with the application scenarios of each project, so as to provide effective data reference for the subsequent projects.
S3, constructing an initial project management architecture according to the project classification information;
further, as shown in fig. 4, the method includes:
s31, constructing a basic management framework according to the application scene categories in the project classification information, wherein the basic management framework comprises a management main node and a plurality of scene management sub-nodes;
s32, importing the project information of each product into corresponding scene management sub-nodes in the basic management frame according to the project classification information, associating the scene management sub-nodes according to the feature data of each project, and generating association information;
and S33, storing the associated information into a management main node to construct and obtain an initial project management architecture.
In some embodiments of the present invention, in order to improve the project management efficiency and management effect, a basic management frame is established based on different application scene categories, a preliminary complete frame is established, then, product project information is imported into corresponding scene management sub-nodes in the basic management frame, the basic management frame is accurately filled with data, the sub-nodes are associated according to project characteristics, and associated information is generated and stored in a management main node, so as to obtain a complete and effective initial project management frame, so that the corresponding nodes are quickly called by the main node to perform project management based on the associated information of the sub-nodes.
S4, importing the product project information into a preset project management model to generate a project management scheme; the project management scheme includes project information, management policies, and the like. The project management model is a mathematical model which is obtained by performing machine learning based on a large amount of historical project management data and then establishing a corresponding management scheme capable of being matched quickly and accurately based on different product projects.
S5, adjusting the initial project management architecture according to the project management scheme to construct a target project management architecture;
and S6, acquiring and managing corresponding product projects in the target intelligent park based on the target project management architecture according to the real-time project management requirements.
Further, comprising: extracting and calling corresponding scene management sub-nodes according to application scene information in real-time project management requirements through a management main node in a target project management architecture; and calling and managing corresponding product projects according to the project information in the real-time project management requirements through corresponding scene management sub-nodes.
In some embodiments of the present invention, when project management is performed, real-time management requirements are combined to analyze the requirements through a management master node in a target project management architecture, and then appropriate scene management sub-nodes are called to perform specific project management, and management of corresponding projects is performed through each scene management sub-node, so that overall management pressure can be reduced, and error rate can also be reduced when sub-nodes are managed in a targeted manner. The targeted and reasonable target project management architecture based on the construction can greatly improve the efficiency and accuracy of project management, and further promote the development of the intelligent park.
In order to solve the problems in the prior art, the method combines the actual situation of the corresponding intelligent park, classifies each product item, and further establishes a reasonable initial item management framework aiming at different properties and different categories, and manages the items in a targeted manner; in order to further improve the management efficiency, a reasonable project management scheme is quickly matched for reference based on the project management model and the characteristics of different product projects, and the initial project management architecture is optimized and adjusted, so that a more accurate target project management architecture is obtained; and based on the target project management architecture, the corresponding project is efficiently managed by combining with the actual association requirement. The method can be used for pertinently and accurately and effectively managing each project, realizes comprehensive and accurate project data intercommunication and improves the project management efficiency and effect of the intelligent park.
As shown in fig. 5, in a third aspect, an embodiment of the present application provides an electronic device, which includes a memory 101 for storing one or more programs; a processor 102. The one or more programs, when executed by the processor 102, implement the method of any of the second aspects as described above.
Also included is a communication interface 103, with the memory 101, processor 102, and communication interface 103 being electrically connected to each other, directly or indirectly, to enable transfer or interaction of data. For example, the components may be electrically connected to each other via one or more communication buses or signal lines. The memory 101 may be used to store software programs and modules, and the processor 102 executes the software programs and modules stored in the memory 101 to thereby execute various functional applications and data processing. The communication interface 103 may be used for communicating signaling or data with other node devices.
The Memory 101 may be, but is not limited to, a Random Access Memory (RAM), a Read Only Memory (ROM), a Programmable Read-Only Memory (PROM), an Erasable Read-Only Memory (EPROM), an electrically Erasable Read-Only Memory (EEPROM), and the like.
The processor 102 may be an integrated circuit chip having signal processing capabilities. The Processor 102 may be a general-purpose Processor, including a Central Processing Unit (CPU), a Network Processor (NP), and the like; but also Digital Signal Processors (DSPs), application Specific Integrated Circuits (ASICs), field Programmable Gate Arrays (FPGAs) or other Programmable logic devices, discrete Gate or transistor logic devices, discrete hardware components.
In the embodiments provided in the present application, it should be understood that the disclosed method and system and method can be implemented in other ways. The method and system embodiments described above are merely illustrative and, for example, the flowcharts and block diagrams in the figures illustrate the architecture, functionality, and operation of possible implementations of methods and systems, methods and computer program products according to various embodiments of the present application. In this regard, each block in the flowchart or block diagrams may represent a module, segment, or portion of code, which comprises one or more executable instructions for implementing the specified logical function(s). It should also be noted that, in some alternative implementations, the functions noted in the block may occur out of the order noted in the figures. For example, two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality involved. It will also be noted that each block of the block diagrams and/or flowchart illustration, and combinations of blocks in the block diagrams and/or flowchart illustration, can be implemented by special purpose hardware-based systems which perform the specified functions or acts, or combinations of special purpose hardware and computer instructions.
In addition, functional modules in the embodiments of the present application may be integrated together to form an independent part, or each module may exist separately, or two or more modules may be integrated to form an independent part.
In a fourth aspect, embodiments of the present application provide a computer-readable storage medium, on which a computer program is stored, and the computer program, when executed by the processor 102, implements the method according to any one of the second aspect described above. The functions may be stored in a computer-readable storage medium if they are implemented in the form of software functional modules and sold or used as separate products. Based on such understanding, the technical solutions of the present application or portions thereof that substantially contribute to the prior art may be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for causing a computer device (which may be a personal computer, a server, or a network device) to execute all or part of the steps of the methods described in the embodiments of the present application. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk or an optical disk, and other various media capable of storing program codes.
The above is only a preferred embodiment of the present invention, and is not intended to limit the present invention, and various modifications and changes will occur to those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
It will be evident to those skilled in the art that the present application is not limited to the details of the foregoing illustrative embodiments, and that the present application may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the application being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (10)

1. A project management system based on a smart park, comprising: the project management system comprises a project acquisition module, a classification module, an initial architecture establishment module, a scheme matching module, an architecture adjustment module and a project management module, wherein:
the project acquisition module is used for acquiring product project information in a target intelligent park;
the classification module is used for classifying the product project information to generate project classification information;
the initial architecture building module is used for building an initial project management architecture according to the project classification information;
the scheme matching module is used for importing the product project information into a preset project management model to generate a project management scheme;
the architecture adjusting module is used for adjusting the initial project management architecture according to the project management scheme so as to construct a target project management architecture;
and the project management module is used for acquiring and managing corresponding product projects in the target intelligent park based on a target project management architecture according to real-time project management requirements.
2. The intelligent park-based project management system of claim 1, wherein the classification module comprises a feature matching unit and a scene classification unit, wherein:
the characteristic matching unit is used for extracting and carrying out scene matching in a preset application scene database according to the characteristic data of each project in the product project information so as to obtain the application scene information of each project;
and the scene classification unit is used for classifying the product project information according to the application scene information of each project to generate project classification information.
3. The intelligent park-based project management system according to claim 1, wherein the initial architecture building module comprises a basic framework unit, a node association unit and an architecture building unit, wherein:
the basic management framework unit is used for constructing a basic management framework according to the application scene category in the project classification information, and the basic management framework comprises a management main node and a plurality of scene management sub-nodes;
the node association unit is used for importing the project information of each product into corresponding scene management sub-nodes in the basic management frame according to the project classification information, associating the scene management sub-nodes according to the feature data of each project and generating association information;
and the architecture establishing unit is used for storing the association information into the management main node so as to construct and obtain an initial project management architecture.
4. The intelligent park-based project management system of claim 1, wherein the project management module comprises a node retrieval unit and a project retrieval unit, wherein:
the node calling unit is used for extracting and calling corresponding scene management sub-nodes according to application scene information in real-time project management requirements through a management main node in a target project management architecture;
and the project calling unit is used for calling and managing corresponding product projects according to project information in the real-time project management requirements through corresponding scene management sub-nodes.
5. A project management method based on an intelligent park is characterized by comprising the following steps:
acquiring product project information under a target intelligent park;
classifying the product project information to generate project classification information;
constructing an initial project management architecture according to the project classification information;
importing product project information into a preset project management model to generate a project management scheme;
adjusting the initial project management architecture according to the project management scheme to construct a target project management architecture;
and acquiring and managing corresponding product projects under the target intelligent park based on a target project management architecture according to the real-time project management requirement.
6. The intelligent park-based project management method according to claim 5, wherein the method for classifying product project information and generating project classification information comprises the following steps:
extracting and carrying out scene matching in a preset application scene database according to the characteristic data of each project in the product project information to obtain the application scene information of each project;
and classifying the product project information according to the application scene information of each project to generate project classification information.
7. The intelligent park-based project management method according to claim 6, wherein the method for constructing an initial project management framework based on project classification information comprises the following steps:
constructing a basic management framework according to the application scene category in the project classification information, wherein the basic management framework comprises a management main node and a plurality of scene management sub-nodes;
importing the product project information into corresponding scene management sub-nodes in a basic management frame according to the project classification information, associating the scene management sub-nodes according to the feature data of each project, and generating association information;
and storing the associated information into a management main node to construct and obtain an initial project management architecture.
8. The method of claim 5, wherein the method for managing corresponding product items under a target smart campus based on a target item management architecture according to real-time item management requirements comprises the steps of:
extracting and calling corresponding scene management sub-nodes according to application scene information in real-time project management requirements through a management main node in a target project management architecture;
and calling and managing corresponding product projects according to project information in the real-time project management requirements through corresponding scene management sub-nodes.
9. An electronic device, comprising:
a memory for storing one or more programs;
a processor;
the one or more programs, when executed by the processor, implement the method of any of claims 5-8.
10. A computer-readable storage medium, on which a computer program is stored which, when being executed by a processor, carries out the method according to any one of claims 5-8.
CN202211127743.6A 2022-09-16 2022-09-16 Project management system and method based on intelligent park Withdrawn CN115409490A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211127743.6A CN115409490A (en) 2022-09-16 2022-09-16 Project management system and method based on intelligent park

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211127743.6A CN115409490A (en) 2022-09-16 2022-09-16 Project management system and method based on intelligent park

Publications (1)

Publication Number Publication Date
CN115409490A true CN115409490A (en) 2022-11-29

Family

ID=84166844

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211127743.6A Withdrawn CN115409490A (en) 2022-09-16 2022-09-16 Project management system and method based on intelligent park

Country Status (1)

Country Link
CN (1) CN115409490A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115204693A (en) * 2022-07-21 2022-10-18 滦南铭瑞技术服务有限公司 Intelligent park management method based on artificial intelligence and cloud platform
CN116797405A (en) * 2023-06-29 2023-09-22 华腾建信科技有限公司 Engineering data processing method and system based on data intercommunication of participating parties

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115204693A (en) * 2022-07-21 2022-10-18 滦南铭瑞技术服务有限公司 Intelligent park management method based on artificial intelligence and cloud platform
CN115204693B (en) * 2022-07-21 2023-10-17 中交西北投资发展有限公司 Intelligent park management method based on artificial intelligence and cloud platform
CN116797405A (en) * 2023-06-29 2023-09-22 华腾建信科技有限公司 Engineering data processing method and system based on data intercommunication of participating parties
CN116797405B (en) * 2023-06-29 2023-12-19 华腾建信科技有限公司 Engineering data processing method and system based on data intercommunication of participating parties

Similar Documents

Publication Publication Date Title
US10997142B2 (en) Cognitive blockchain automation and management
CN115409490A (en) Project management system and method based on intelligent park
CN109344170B (en) Stream data processing method, system, electronic device and readable storage medium
CN109697456B (en) Service analysis method, device, equipment and storage medium
CN111046237B (en) User behavior data processing method and device, electronic equipment and readable medium
CN109213758B (en) Data access method, device, equipment and computer readable storage medium
CN104579909B (en) Method and equipment for classifying user information and acquiring user grouping information
CN104951544A (en) User data processing method and system and method and system for providing user data
CN104462222A (en) Distributed storage method and system for checkpoint vehicle pass data
CN107220376B (en) Data query method and device
TW201805888A (en) Method for analyzing tax data by using block chain
CN113505265B (en) Data query method and device, electronic equipment, storage medium and program product
CN111435304A (en) Space unit generation method and device, storage medium and processor
CN107748753A (en) It is a kind of based on double random extraction systems, method and device
CN111144938A (en) Sales lead rating method and system suitable for automobile industry
CN115880075A (en) Financial data management method, device and equipment and readable storage medium
CN116382916A (en) Resource scheduling method and system for cloud computer computing power cluster and electronic equipment
CN114071515B (en) Network optimization method, device, equipment and storage medium
CN114153860A (en) Business data management method and device, electronic equipment and storage medium
CN115270947A (en) Standardized energy efficiency service model construction method, system, terminal and storage medium
CN114022295A (en) Group fraud identification method and system
CN115114519A (en) Artificial intelligence based recommendation method and device, electronic equipment and storage medium
CN111026705A (en) Building engineering file management method, system and terminal equipment
CN116796999A (en) Digital rural management platform and management method
CN113793131A (en) Administrative affair statistical management system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20221129