CN115405001A - Construction method of concrete outer wall heat-insulating layer and concrete outer wall - Google Patents

Construction method of concrete outer wall heat-insulating layer and concrete outer wall Download PDF

Info

Publication number
CN115405001A
CN115405001A CN202211108219.4A CN202211108219A CN115405001A CN 115405001 A CN115405001 A CN 115405001A CN 202211108219 A CN202211108219 A CN 202211108219A CN 115405001 A CN115405001 A CN 115405001A
Authority
CN
China
Prior art keywords
wall
insulation board
concrete
heat
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202211108219.4A
Other languages
Chinese (zh)
Other versions
CN115405001B (en
Inventor
郭志国
张桂军
白尧尧
陈小慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN202211108219.4A priority Critical patent/CN115405001B/en
Publication of CN115405001A publication Critical patent/CN115405001A/en
Application granted granted Critical
Publication of CN115405001B publication Critical patent/CN115405001B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/762Exterior insulation of exterior walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/78Heat insulating elements
    • E04B1/80Heat insulating elements slab-shaped
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/90Passive houses; Double facade technology

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Acoustics & Sound (AREA)
  • Building Environments (AREA)

Abstract

The application discloses a construction method of a concrete outer wall heat-insulating layer and a concrete outer wall body. The construction method comprises the following steps: A. installing an insulation board in a pouring space of the wall template for pouring the concrete outer wall, and fixedly connecting the insulation board to the wall template; B. and injecting concrete into the pouring space to form the concrete outer wall embedded with the heat insulation plate. The installation of the heat insulation board is creatively arranged in the concrete outer wall pouring process, so that the heat insulation board is installed in the formed concrete outer wall in a pre-buried mode, the problem that the construction efficiency is low due to the fact that the plastering process is needed in the heat insulation board installation in the related technology is avoided, the defect that the service life is short in the related technology is also avoided, and finally the construction efficiency and the construction quality are improved.

Description

Construction method of concrete outer wall heat-insulating layer and concrete outer wall
Technical Field
The application relates to the technical field of external wall heat insulation construction, in particular to a construction method of a concrete external wall heat insulation layer and a concrete external wall body.
Background
In recent years, along with the continuous popularization of double-carbon emission reduction and green building concepts, the related construction processes and materials integrating heat preservation and non-dismantling heat preservation templates in the field of building engineering emerge endlessly, and the research theme basically focuses on reducing the construction procedures, improving the heat preservation performance of heat preservation materials, prolonging the service life of the heat preservation materials and the like. Corresponding progress is made in the exploration process, but in the actual construction process, the disassembly-free heat-insulation formwork and heat-insulation integrated construction process also has a plurality of problems, such as: the non-dismantling heat preservation template pins are easy to fall off, the waterproof treatment difficulty of joints of the heat preservation template is high, the durability is poor, and the heat preservation plate is easy to damage in the construction process, so that the heat preservation performance of the outer wall is affected; after the heat-preservation integrated shear wall is poured, the heat-preservation plate still needs to be subjected to working procedures such as mortar protective layers and decorative surface layer construction.
Although the shear wall and thermal insulation material integrated construction process is rapidly developed for several years, in view of the current construction situation, the related technologies have some defects in the aspects of ensuring the construction quality and improving the thermal insulation performance. In order to further improve the external wall and heat insulation integrated construction process of the shear wall and build a plan for industry development, the patent provides a construction method for 'synchronous construction of the concrete external wall and the external wall heat insulation and synchronous pouring of a heat insulation protective layer'.
Disclosure of Invention
In view of this, the application provides a construction method of a concrete outer wall heat-insulating layer and a concrete outer wall body, which can improve the construction efficiency and the construction quality of the heat-insulating plate.
In a first aspect, the present application provides a method for constructing a concrete outer wall insulation layer, comprising:
A. installing an insulation board in a pouring space of the wall template for pouring the concrete outer wall, and fixedly connecting the insulation board to the wall template;
B. and injecting concrete into the pouring space to form the concrete outer wall embedded with the heat insulation plate.
Optionally, in the step a, the fixing component for fixedly connecting the heat-insulating board to the wall form includes an inner tie screw and an outer tie screw, the inner tie screw is used for fixedly locking the inner surface of the heat-insulating board to the inner form of the wall form, and the outer tie screw is used for fixedly locking the outer surface of the heat-insulating board to the outer form of the wall form.
Optionally, the fixing assembly further comprises a connecting sleeve arranged at the end of the inner and outer split screws.
Optionally, the connecting sleeve connecting the ends of the outer tie screw is provided with a press tab.
Optionally, the connecting sleeve connecting the ends of the outer opposing tie screws is provided with a protective gasket.
Optionally, in the step a, the heat insulation board is connected with a steel bar mesh through a fixing frame, and the steel bar mesh is a reinforcing member in the concrete outer wall.
Optionally, the mount includes for preceding clamping piece, back clamping piece, seal cap, cap pole and installs buckle on the reinforcing bar net piece, back clamping piece be used for with buckle looks lock, the cap pole is in wearing to establish in proper order behind back clamping piece, the preceding clamping piece by seal cap locking.
In a second aspect, the present application provides a concrete exterior wall formed by the above construction method.
According to the construction method, the insulation boards are creatively arranged in the concrete outer wall pouring process in the installation process, so that the insulation boards are installed in the formed concrete outer wall in a pre-embedded mode, the problem that the construction efficiency is low due to the fact that plastering procedures are needed for installation of the insulation boards in the related technology is solved, the defect that the related technology is short in service life can be overcome, and the construction efficiency and the construction quality are finally improved.
Drawings
The technical solution and other advantages of the present application will become apparent from the detailed description of the embodiments of the present application with reference to the accompanying drawings.
Fig. 1 is a schematic structural diagram of a wall formwork during casting according to an embodiment of the present application.
Fig. 2 is an exploded view of the wall form according to the embodiment of the present application.
Fig. 3 is a schematic structural diagram of an inner side surface of the insulation board provided by the embodiment of the present application.
Fig. 4 is a schematic structural diagram of an outer side surface of the insulation board provided in the embodiment of the present application.
Fig. 5 is a schematic structural diagram of a connection state of the insulation board provided in the embodiment of the present application.
Fig. 6 is a schematic structural diagram of the connection sleeve and the protection gasket according to the embodiment of the present application when connected.
Fig. 7 is a schematic structural view of a fixing frame according to an embodiment of the present application.
Wherein the elements in the figures are identified as follows:
1-inner template; 2-reinforcing steel bars; 3-heat insulation board; 4-reinforcing mesh; 5-external template; 6-connecting the sleeve; 7-polishing round anchor bars; 8-a protective gasket; 9-a fixing frame; 10-a buckle plate; 11-internal counter-pulling screw; 12-external counter-pulling screw; 13-a front jaw; 14-a rear clip; 15-plugging cap; 16-a cap stem; 17-a wall body; 18-protective layer.
Detailed Description
The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. It is to be understood that the embodiments described are only a few embodiments of the present application and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
In the description of the present application, it is to be understood that the terms "first", "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implying any number of technical features indicated. Thus, features defined as "first", "second", may explicitly or implicitly include one or more of the described features. In the description of the present application, "a plurality" means two or more unless specifically limited otherwise.
In the description of the present application, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; may be mechanically connected, may be electrically connected or may be in communication with each other; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meaning of the above terms in the present application can be understood by those of ordinary skill in the art as appropriate.
The following disclosure provides many different embodiments or examples for implementing different features of the application. To simplify the disclosure of the present application, specific example components and arrangements are described below. Of course, they are merely examples and are not intended to limit the present application. Further, the present application may repeat reference numerals and/or reference letters in the various examples for simplicity and clarity and does not in itself dictate a relationship between the various embodiments and/or arrangements discussed. In addition, examples of various specific processes and materials are provided herein, but one of ordinary skill in the art may recognize applications of other processes and/or use of other materials.
Before the technical solutions of the present application are introduced, it is necessary to explain the background of the invention of the present application.
It is common in the related art that the installation of the insulation board 3 usually requires the processes of mortar protection layer 18, finishing layer construction, etc. The problem of the low efficiency of construction that 3 installation of heated board need plaster the process and bring, but also can avoid the short defect of life that this correlation technique exists.
Based on the difficult problem of inventor consciousness, the inventor provides the construction method of the concrete outer wall heat-insulating layer and the concrete outer wall body, the installation of the heat-insulating plate 3 is creatively arranged in the concrete outer wall pouring process, so that the heat-insulating plate 3 is installed in the formed concrete outer wall in a pre-embedded mode, the problem that the construction efficiency is low due to the fact that the heat-insulating plate 3 needs to be installed in the related technology and a plastering process is avoided, the defect that the service life is short in the related technology can be avoided, and finally the construction efficiency and the construction quality are improved. Therefore, the invention is created.
Referring to fig. 1, 2 and 5, the application provides a construction method of a concrete outer wall heat insulation layer, comprising the following steps:
A. installing an insulation board 3 in a pouring space of the wall template for pouring the concrete outer wall, and fixedly connecting the insulation board 3 to the wall template;
B. and injecting concrete into the pouring space to form the concrete outer wall embedded with the insulation board 3.
The wall formwork comprises an outer formwork 5 and an inner formwork 1, and a space defined by the outer formwork 5 and the inner formwork 1 is a pouring space.
From the construction method described above, the concrete outer wall of the present application can be easily conceived in its concrete structure. Specifically, the concrete outer wall includes a wall body 17 formed by a cavity between the outer form 5 and the insulation board 3, a protective layer 18 formed by a cavity between the inner form 1 and the insulation board 3, and the insulation board 3.
Here, the wall body 17 may include a concrete body and reinforcing bars 2 pre-buried into the concrete body.
Here, the armor layer 18 may include a concrete body and a reinforcing member, such as a reinforcing mesh 4, pre-buried in the concrete. It should be emphasized that the mesh of reinforcing bars 4, in addition to serving as a mechanical reinforcement for the protective layer 18, may also serve as an auxiliary adhesive force for the insulation board 3 to be fixed to the external formwork 5.
The fixing component serving as the insulation board 3 and fixedly connected to the outer formwork 5 to provide main adhesive force comprises an inner counter-pulling screw 11 and an outer counter-pulling screw 12, wherein the inner counter-pulling screw 11 is used for locking the inner surface of the insulation board 3 on the inner formwork 1, and the outer counter-pulling screw 12 is used for locking the outer surface of the insulation board 3 on the outer formwork 5.
Therefore, the inner surface and the outer surface of the heat insulation plate 3 are respectively locked with the outer template 5 and the inner template 1 through the inner opposite-pulling screw rod 11 and the outer opposite-pulling screw rod 12. It should be understood that the pair of inner and outer tie rods 11 and 12 may be constructed by tie rods widely used in building forms, and will not be described herein.
It is easy to think of, the inner and outer opposite-drawing screw rods 11, 12 may be unconnected or connected. In the implementation mode of connecting the two, the joint of the inner counter-pulling screw rod 11 and the outer counter-pulling screw rod 12 penetrates through the heat insulation board 3.
As an exemplary implementation manner of installing the ends of the inner and outer opposite-pulling screws 11 and 12 in the insulation plate 3, the fixing assembly further includes a connection sleeve 6 disposed at the ends of the inner and outer opposite-pulling screws 11 and 12.
Therefore, the connecting sleeve 6 is mounted to the mounting member (for example, a metal rod) of the heat insulation board 3 in advance by being sleeved, and the mounting of the inner surface and the outer surface of the heat insulation board 3 with the inner counter-pull screw 11 and the outer counter-pull screw 12 is realized.
During actual construction, the arrangement positions and the number of the inner counter-pulling screws 11 and the outer counter-pulling screws 12 are determined by combining a construction scheme and an optimization model. Heated board 3 is adopted the special hole device processing of getting by heated board 3 manufacture factory by the suggestion that internal split screw 11, outer split screw 12 wear to establish, and it is too big to damage heated board 3 when avoiding non-professional technical personnel to operate, influences the material performance.
In the previous implementation with the protective layer 18 having the mesh of steel reinforcement 4, the connecting sleeve 6 connecting the ends of the outer counter-pulling screws 12 is provided with a pressing piece.
Therefore, the pressing sheet is used for preventing the connecting sleeve 6 at the end part of the external counter-pulling screw rod 12 from being incapable of being attached to the reinforcing mesh sheet 4 when the reinforcing mesh sheet 4 is penetrated, namely preventing the connecting sleeve 6 from being just positioned at the mesh position of the reinforcing mesh sheet 4, and the connecting sleeve 6 is obviously incapable of being attached to the reinforcing mesh sheet 4 at the moment. Moreover, the pressing sheet can also eliminate the sliding caused by the small contact area of the connecting sleeve 6 when the connecting sleeve 6 contacts the reinforcing mesh 4.
Referring to fig. 6 and 5, in an exemplary embodiment, the coupling sleeve 6 connecting the ends of the inner counter-pull screws 11 is provided with a protective washer 8.
The design objectives of the protective gasket 8 are thus: the protection gasket 8 can eliminate the slip that brings because of heated board 3 area of contact undersize when the adapter sleeve 6 contacts heated board 3, improves the locking effect of 11 tip of internal counter-pull screw and heated board 3. Furthermore, the concrete penetrates into the bore of the insulation board 3, which is intended to receive the aforementioned mounting.
The reinforcing mesh 4 can also be fixedly connected to the outer formwork 5 as the heat insulation board 3 to provide auxiliary adhesive force, and in the implementation mode that the outer counter-pulling screw 12 penetrates through the reinforcing mesh 4, the outer counter-pulling screw 12 is only used for connecting the reinforcing mesh 4. Referring to fig. 5, a fixing frame 9 may be further provided for connecting the insulation board 3 to the steel mesh 4.
Therefore, the fixing frame 9 can make up the defect that the reinforcing mesh 4 and the heat insulation plate 3 are connected in a penetrating manner by the external counter-pulling screw 12. At this time, the fixing frame 9 is disposed at the middle position of the steel mesh 4, and the external counter-pull screw 12 is disposed at the end position of the steel mesh 4.
Referring to fig. 7, as an exemplary implementation manner of a specific structure of the fixing frame 9, the fixing frame 9 includes a front clamping piece 13, a rear clamping piece 14, a blocking cap 15, a cap rod 16, and a buckling plate 10 installed on the steel mesh 4, the rear clamping piece 14 is configured to be buckled with the buckling plate 10, and the cap rod 16 is locked by the blocking cap 15 after sequentially passing through the rear clamping piece 14 and the front clamping piece 13.
Therefore, the detachable connection of the reinforcing mesh 4 and the heat insulation board 3 is realized through the mutual matching of the front clamping piece 13, the rear clamping piece 14, the plugging cap 15, the cap rod 16 and the buckling plate 10, and the position adjustment of the reinforcing mesh 4 relative to the heat insulation board 3 is facilitated.
Referring to fig. 3 again, in order to realize the connection between the inner surface of the insulation board 3 and the steel bars 2 of the wall main body 17, smooth round anchor bars 7 may be further provided to be connected and fixed with the steel bars 2 of the wall main body 17 through a member such as a binding wire.
In the concrete pouring process, please refer to fig. 5 again, the dead weight of the concrete is large, the pouring amount and the pouring speed are not controlled properly, the shear wall concrete is easy to extrude the insulation board 3, or the concrete between the insulation board 3 and the reinforcing mesh 4 extrudes the reinforcing mesh 4, so that the reinforcing steel bars 2 on the back of the insulation board 3 are extruded, deformed and expanded outwards, and occupy the space between the reinforcing mesh 4 and the outer template, i.e. the distance h2 between the reinforcing mesh 4 and the outer template cannot be ensured, which can cause the reinforcing mesh 4 to be not wrapped by the concrete, cause quality accidents and seriously affect the appearance of the concrete outer wall; in order to avoid the phenomenon, the belt pressing piece connecting sleeve 6 is connected with the screw arranged on the surface of the heat insulation board 3 and is cooperated with the fixing frame 9 of the reinforcing mesh piece 4 to play a role, so that the distances h1 and h2 between the reinforcing mesh piece 4 and the heat insulation board 3 and between the reinforcing mesh piece 4 and the outer template 5 are ensured, and the variation caused by the extrusion of concrete is avoided.
The operation process of the construction method of the application is described in a common application scenario. It should be noted that this common embodiment is not to be taken as an identification basis for understanding the essential features of the technical problem to be solved as claimed in the present application, which is merely exemplary.
The construction process comprises the following steps:
s1, compiling a special construction scheme of shear wall concrete pouring template engineering, determining reinforcement measures of shear wall templates, drawing a template matching detailed diagram of the shear wall templates, and checking and calculating the size of the shear wall templates and the positions and the number of template counter-pull rods;
s2, drawing a shear wall model by using three-dimensional modeling software such as BIM (building information modeling) and the like in combination with a special construction scheme of the template, wherein the content of the model comprises the position, the number relation and the like of a wood template, a heat insulation plate 3, a reinforcing mesh 4, a counter-pull screw rod and the like; deepening a template reinforcing scheme, and further optimizing the template matching size, the size of the heat insulation board 3, the number and the positions of tie rods; counting the size of a matched mould of the wood template, the size of the heat insulation plate 3, the number of tie rods and the like;
s3, manufacturing the heat-insulation board 3 by a heat-insulation board 3 manufacturer according to the content of the special construction scheme and the material statistics, preliminarily fixing the heat-insulation board 3 with the reinforcing mesh 4 when the heat-insulation board is out of the field, buckling and pressing the reinforcing mesh 4 by the buckling plates 10 of the reinforcing mesh 4, connecting the screw rod of the heat-insulation board 3 with the connecting sleeve 6, and connecting the screw rod with the connecting sleeve 6 with the pressing plate; if the fixed frame 9 of the reinforcing mesh 4 arranged on the heat-insulating plate 3 is not adjustable in height, whether the distance h1 between the heat-insulating plate 3 and the reinforcing mesh 4 meets the requirement of a scheme or not is checked in a processing plant; and randomly checking whether the position and the number of the screws of the insulation board 3 meet the requirements of the scheme; the sampling inspection process finds that the product does not accord with the design scheme, and the product is corrected; in the transportation and storage processes of the heat preservation plate 3, the connecting sleeve 6 can be protected by a plastic protection gasket 8, so that the corrosion is avoided;
s4, processing the template according to the detailed template matching diagram of the wood template in the scheme;
s5, binding the shear wall steel bars 2, and checking and accepting;
s6, after the heat-insulation plate 3 is qualified by incoming inspection, mounting the heat-insulation plate 3 by combining an optimization model, and connecting and fixing the smooth round anchor bars 7 on the inner side surface of the heat-insulation plate 3 and the shear wall steel bars 2 through binding wires during mounting;
s7, sealing the shear wall inner template 1, and connecting the inner split screw 11 with the connecting sleeve 6;
s8, adjusting the position of the connecting sleeve 6 with the pressing sheet to keep the distance h2 between the reinforcing mesh 4 on the surface of each insulation board 3 and the insulation board 3 consistent and meet the requirement of a scheme;
s9, sealing the outer template 5, connecting the outer counter-pulling screw 12 with the connecting sleeve 6 with the pressing sheet, and fixing the pull rod by using a screw cap;
s10, sampling the installation condition of the templates, checking the distance condition of the steel wire mesh with the heat insulation plate 3 and the outer template 5, and timely adjusting if the steel wire mesh does not meet the requirement of the scheme;
s11, checking and accepting the template, pouring concrete after the checking and accepting is passed, and vibrating; the inner layer of the insulation board 3 is vibrated by adopting a conventional vibrating mode, and the concrete outside the insulation board 3 can be vibrated and transferred by adopting a vibrating mode that a vibrating rod is pasted on a wooden template;
s12, curing the concrete and removing the mold;
and S13, waterproof plugging of holes reserved by the inner counter-pulling screw rod 11 and the outer counter-pulling screw rod 12.
It should be noted that the present application makes the following obvious intelligent contributions to the related art:
1. the heat-insulating plate and the shear wall template are synchronously erected, the functions of the templates are exerted, the synchronous construction of a main body structure, a heat-insulating layer and a heat-insulating layer protective layer is realized, the construction process of plastering the heat-insulating layer in the conventional construction process is simplified, and the construction efficiency is improved; meanwhile, the protective layer of the concrete heat-insulating plate has better protective performance than the conventional mortar protective layer, and the service life of the heat-insulating layer is prolonged;
2. the arrangement of the reinforcing mesh effectively improves the adhesion performance of the protective layer of the heat-insulation plate and the heat-insulation plate; the steel wire mesh fixing frame is matched with the connecting sleeve with the pressure plate for use, so that the accuracy of the position of the reinforcing mesh is improved, the mesh deformation in the concrete pouring process is effectively avoided, and the pouring construction quality of the concrete protective layer is ensured;
3. after the connecting sleeve, the screw rod and the connecting screw rod with the pressing sheet are removed from the counter-pulling screw rod, no metal material is in direct contact with the external environment, and the indoor cold bridge phenomenon is avoided.
The above description is only for the preferred embodiment of the present application, but the scope of the present application is not limited thereto, and any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present application should be covered within the scope of the present application.

Claims (8)

1. A construction method of a concrete outer wall heat-insulating layer is characterized by comprising the following steps:
A. installing an insulation board in a pouring space of the wall template for pouring the concrete outer wall, and fixedly connecting the insulation board to the wall template;
B. and injecting concrete into the pouring space to form the concrete outer wall embedded with the heat insulation plate.
2. The construction method according to claim 1, wherein in the step a, the fixing component for fixing the insulation board to the wall form comprises an inner tie screw and an outer tie screw, the inner tie screw is used for fixing the inner surface of the insulation board to the inner form of the wall form, and the outer tie screw is used for fixing the outer surface of the insulation board to the outer form of the wall form.
3. The method of claim 2, wherein the securing assembly further comprises a connecting sleeve disposed at the ends of the inner and outer tie rods.
4. The construction method according to claim 3, wherein a pressing piece is provided to a connection sleeve connecting the ends of the outer tie screw.
5. The construction method according to claim 3, wherein a protective washer is provided to a connection sleeve connecting ends of the inner tie screw.
6. The construction method according to claim 1, wherein in the step A, the heat insulation plate is connected with a steel bar net piece through a fixing frame, and the steel bar net piece is a reinforcing member in the concrete outer wall.
7. The construction method according to claim 6, wherein the fixing frame comprises a front clamping piece, a rear clamping piece, a sealing cap, a cap rod and a buckling plate arranged on the reinforcing mesh, the rear clamping piece is used for buckling with the buckling plate, and the cap rod is locked by the sealing cap after sequentially penetrating through the rear clamping piece and the front clamping piece.
8. An exterior concrete wall formed by the method of claim 1.
CN202211108219.4A 2022-09-13 2022-09-13 Construction method of concrete outer wall heat insulation layer and concrete outer wall body Active CN115405001B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211108219.4A CN115405001B (en) 2022-09-13 2022-09-13 Construction method of concrete outer wall heat insulation layer and concrete outer wall body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211108219.4A CN115405001B (en) 2022-09-13 2022-09-13 Construction method of concrete outer wall heat insulation layer and concrete outer wall body

Publications (2)

Publication Number Publication Date
CN115405001A true CN115405001A (en) 2022-11-29
CN115405001B CN115405001B (en) 2023-08-29

Family

ID=84165096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211108219.4A Active CN115405001B (en) 2022-09-13 2022-09-13 Construction method of concrete outer wall heat insulation layer and concrete outer wall body

Country Status (1)

Country Link
CN (1) CN115405001B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE841262A (en) * 1975-05-14 1976-08-16 THERMAL INSULATION PANELS
CN102839772A (en) * 2012-09-28 2012-12-26 河南锦源建设有限公司 Concrete thermal insulation curtain wall system
US20160083954A1 (en) * 2014-09-18 2016-03-24 Dongguan Vanke Building Technique Research Co., Ltd Composite cast-in-situ outer wall and construction method thereof
CN108612218A (en) * 2018-04-13 2018-10-02 山东金富地新型建材科技股份有限公司 A kind of fission sandwich heat preserving wall body combined type connector
CN110761456A (en) * 2019-11-01 2020-02-07 杜霄鹤 Cast-in-place meshed composite heat-insulation wall system with water stop bolts and implementation process
KR20200134511A (en) * 2019-05-22 2020-12-02 (주)다정하이테크 Building wall panel concurrently used as mold form
WO2022000718A1 (en) * 2020-07-03 2022-01-06 江苏东曌建筑产业创新发展研究院有限公司 Prefabricated construction device and use method therefor
CN216041836U (en) * 2021-07-16 2022-03-15 山东科易达节能科技有限公司 Installation assembly in single or double steel wire mesh combined heat preservation plate cast-in-place concrete wall

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE841262A (en) * 1975-05-14 1976-08-16 THERMAL INSULATION PANELS
CN102839772A (en) * 2012-09-28 2012-12-26 河南锦源建设有限公司 Concrete thermal insulation curtain wall system
US20160083954A1 (en) * 2014-09-18 2016-03-24 Dongguan Vanke Building Technique Research Co., Ltd Composite cast-in-situ outer wall and construction method thereof
CN108612218A (en) * 2018-04-13 2018-10-02 山东金富地新型建材科技股份有限公司 A kind of fission sandwich heat preserving wall body combined type connector
KR20200134511A (en) * 2019-05-22 2020-12-02 (주)다정하이테크 Building wall panel concurrently used as mold form
CN110761456A (en) * 2019-11-01 2020-02-07 杜霄鹤 Cast-in-place meshed composite heat-insulation wall system with water stop bolts and implementation process
WO2022000718A1 (en) * 2020-07-03 2022-01-06 江苏东曌建筑产业创新发展研究院有限公司 Prefabricated construction device and use method therefor
CN216041836U (en) * 2021-07-16 2022-03-15 山东科易达节能科技有限公司 Installation assembly in single or double steel wire mesh combined heat preservation plate cast-in-place concrete wall

Also Published As

Publication number Publication date
CN115405001B (en) 2023-08-29

Similar Documents

Publication Publication Date Title
CN209891444U (en) Connecting and supporting positioning piece, steel wire mesh frame heat insulation plate and composite wall
CN107718241A (en) Prefabricated panel with heat preservation sandwich layer and preparation method thereof
CN108252513B (en) Shaping connecting assembly, aluminum frame wood formwork and formwork construction method
CN210361827U (en) Be applied to prefabricated window frame mould with adjustable size of prefabricated building
CN115405001A (en) Construction method of concrete outer wall heat-insulating layer and concrete outer wall
CN205915488U (en) Reserve door and window pouring mold
CN110872889A (en) Prefabricated superposed outer wall integrated with heat-insulation formwork and construction method
CN216609427U (en) Mould for manufacturing concrete hollow column
CN215483056U (en) Assembled brick molding bed
CN215368043U (en) Waterproof heat preservation template of outer wall
CN115653280A (en) Concrete template pulling sheet, concrete pouring mold and construction method
CN204877022U (en) Energy -conservation attaches frame system
CN210552008U (en) Window frame positioning structure applied to prefabricated outer wall
CN108843016B (en) Shear wall template internal stay and tie bar combined type component and method
KR101834205B1 (en) Apparatus for constructing outside insulation wall and constructing method using the same
KR101803072B1 (en) Apparatus for constructing outside insulation wall and constructing method using the same
KR100655506B1 (en) Structure of a fabricated mold
KR100428200B1 (en) a form for structure and manufacturing method
CN220644666U (en) Aluminum alloy window frame seam plugging construction structure
KR20130076845A (en) Hybrid assembly and the used wall construction method
CN219826119U (en) Steel-plastic combined template for concrete decorative column
KR200345038Y1 (en) a form for structure
CN218205024U (en) Prefabricated stone-like wall and stone-like surface layer mould
CN218758696U (en) Quick pin-connected panel concrete exempts from to tear open template
CN210798297U (en) Floor board connection structure is worn to crane span structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant