CN115360707A - 一种中低压配电网分布式光伏最大承载力的评估方法 - Google Patents

一种中低压配电网分布式光伏最大承载力的评估方法 Download PDF

Info

Publication number
CN115360707A
CN115360707A CN202211279585.6A CN202211279585A CN115360707A CN 115360707 A CN115360707 A CN 115360707A CN 202211279585 A CN202211279585 A CN 202211279585A CN 115360707 A CN115360707 A CN 115360707A
Authority
CN
China
Prior art keywords
bearing capacity
distributed photovoltaic
voltage
load
capacity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202211279585.6A
Other languages
English (en)
Other versions
CN115360707B (zh
Inventor
马超
钱琪
夏宗阳
王鹏程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Hanyuan Technology Co ltd
Original Assignee
Nanjing Hanyuan Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Hanyuan Technology Co ltd filed Critical Nanjing Hanyuan Technology Co ltd
Priority to CN202211279585.6A priority Critical patent/CN115360707B/zh
Publication of CN115360707A publication Critical patent/CN115360707A/zh
Application granted granted Critical
Publication of CN115360707B publication Critical patent/CN115360707B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • G06F30/27Design optimisation, verification or simulation using machine learning, e.g. artificial intelligence, neural networks, support vector machines [SVM] or training a model
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N3/00Computing arrangements based on biological models
    • G06N3/004Artificial life, i.e. computing arrangements simulating life
    • G06N3/006Artificial life, i.e. computing arrangements simulating life based on simulated virtual individual or collective life forms, e.g. social simulations or particle swarm optimisation [PSO]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/004Generation forecast, e.g. methods or systems for forecasting future energy generation
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/04Constraint-based CAD
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2113/00Details relating to the application field
    • G06F2113/04Power grid distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/10Power transmission or distribution systems management focussing at grid-level, e.g. load flow analysis, node profile computation, meshed network optimisation, active network management or spinning reserve management
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • Power Engineering (AREA)
  • Artificial Intelligence (AREA)
  • Software Systems (AREA)
  • General Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Biophysics (AREA)
  • Biomedical Technology (AREA)
  • Molecular Biology (AREA)
  • Computing Systems (AREA)
  • Data Mining & Analysis (AREA)
  • Computational Linguistics (AREA)
  • Mathematical Physics (AREA)
  • General Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Medical Informatics (AREA)
  • Computer Hardware Design (AREA)
  • Geometry (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开了一种中低压配电网分布式光伏最大承载力的评估方法。本发明方法可较为准确的评估计算出中低压配电网分布式光伏的最大承载力,对于指导中低压用户接入合适容量的分布式光伏,具有更好的工程实践和应用价值。

Description

一种中低压配电网分布式光伏最大承载力的评估方法
技术领域
本发明属于太阳能发电技术领域,尤其涉及一种中低压配电网分布式光伏最大承载力的评估方法。
背景技术
近年来,国家提出碳达峰碳中和的双碳目标,为了构建绿色低碳循环发展经济体系、提升能源利用效率和非化石能源的消费比重,风电、水电和太阳能等新能源发电得到大力发展。其中为了加快新能源发电的推进,于2021年6月,国家能源局发布了《关于报送整县(市、区)屋顶分布式光伏开发试点方案的通知》,随着国家政策对整县光伏的推动,分布式光伏装机规模迅猛增加。但大量的分布式光伏如何合理的接入中低压配电网,评估其分布式光伏的最大承载力成为目前研究的热点。
有学者针对中压配电网,以分布式光伏最大渗透率为目标,考虑多个约束条件进行求解,但其未考虑每个负荷节点都接入分布式光伏的情况,也未考虑低压配电网各个负荷节点分布式光伏的承载力。也有学者针对低压配电网,以分布式光伏最大接入容量为目标函数,考虑电压和短路容量等约束,计算低压配电网可接纳光伏的最大承载力,但其未考虑上级10kV馈线上对配变光伏承载力的约束,导致低压配电网计算出来的光伏承载力数值可能偏大。也有学者针对地区电网进行分布式光伏接纳能力的估算,其考虑了中低压不同电压等级的分布式光伏接纳能力及上级电网对低压配电网光伏承载力的约束,但其对低压配电网分布式光伏全部以三相光伏的接入情况进行分析,未考虑到低压配电网中大部分用户都是单相光伏接入电网所引起的三相不平衡问题。还有学者针对低压配电网中大多数单相用户接入分布式光伏的情况,考虑三相不平衡的约束条件来计算分布式光伏的承载力,但其未考虑上级电网对低压配电网分布式光伏承载力的约束,且其未考虑三相光伏和单相光伏都需接入该如何优化的问题。
发明内容
发明目的:为了克服现有技术中存在的不足,综上所述,针对以上研究中出现的不足,本发明提供一种中低压配电网分布式光伏最大承载力的评估方法。
技术方案:为实现上述目的,本发明采用以下技术方案:一种中低压配电网分布式光伏最大承载力的评估方法,包括以下步骤:
步骤S1,分布式光伏承载力潮流计算断面的选取:以典型符合日的负荷数据与光伏发电功率数据比较,以两者功率差值最大对应的时刻,作为评估中低压配电网分布式光伏承载力的潮流计算断面;
步骤S2,馈线下各负荷点可接入最大分布式光伏容量获取:以馈线下各个负荷点可接入分布式光伏的最大容量之和为目标函数,以节点功率平衡、节点电压偏差、光伏发电容量、线路热稳定和短路容量为约束条件,基于粒子群优化算法得到馈线下各个负荷点可接入的最大分布式光伏容量;
步骤S3,低压台区分布式光伏承载力获取:在以节点功率平衡、节点电压偏差、光伏发电容量、线路热稳定和短路容量为约束条件之外,增加对变压器负载率的约束,电压三相不平衡度的约束及馈线分布式光伏承载力计算结果中对应的配变可接入分布式光伏承载力的约束,然后通过粒子群优化算法和低压三相潮流算法对低压台区各个用户可接入的分布式光伏的承载力进行计算;
步骤S4,低压台区各用户的分布式光伏承载力修正:根据馈线承载力求得配变负荷点分布式光伏的承载力,并与台区承载力评估得到的分布式承载力进行比较,修正各个低压用户接入点的分布式光伏承载力和整条馈线的分布式光伏最大承载力。
进一步的,步骤S1中所述潮流计算断面的具体获取的具体步骤如下:
首先,选取典型负荷日时间区间在上午11点至下午3点的负荷数据和全天整点光伏发电功率数据;
然后,通过下式计算该时间区间内各个时刻对应的负荷数据与光伏发电功率的功率差
Figure 897692DEST_PATH_IMAGE001
Figure 795110DEST_PATH_IMAGE002
式中,
Figure 742337DEST_PATH_IMAGE003
为某时刻的光伏发电功率,
Figure 916967DEST_PATH_IMAGE004
为某时刻的负荷功率,
最后,以负荷数据与光伏发电功率的功率差
Figure 406460DEST_PATH_IMAGE005
最大值时对应的时刻,作为评估中低压配电网分布式光伏承载力要选取的潮流计算断面。
进一步的,步骤S2中馈线下各负荷点可接入最大分布式光伏容量获取的具体步骤如下:
首先,以馈线各个负荷点作为分布式光伏待接入位置,并以各负荷点可计入分布式光伏的最大容量之和为目标函数
Figure 932120DEST_PATH_IMAGE006
,如式(1)所示:
Figure 417459DEST_PATH_IMAGE007
式中,
Figure 446595DEST_PATH_IMAGE008
为第
Figure 608455DEST_PATH_IMAGE009
个负荷点可计入分布式光伏的最大容量,
Figure 355831DEST_PATH_IMAGE010
为馈线下负荷点的总个数;
然后,确定各个负荷点的电压约束、短路电流约束、负荷率约束和线路传输容量的约束条件,约束条件如式(1),
(1)节点功率平衡约束条件
Figure 644861DEST_PATH_IMAGE011
式中,
Figure 528503DEST_PATH_IMAGE012
为与第
Figure 893888DEST_PATH_IMAGE013
个负荷点相邻的所有负荷点的集合,
Figure 3926DEST_PATH_IMAGE014
为集合
Figure 955702DEST_PATH_IMAGE015
中负荷点的序号;
Figure 84063DEST_PATH_IMAGE016
Figure 463092DEST_PATH_IMAGE017
分别为第
Figure 794848DEST_PATH_IMAGE018
个负荷点处连接负荷的有功和无功功率;
Figure 550314DEST_PATH_IMAGE019
Figure 25858DEST_PATH_IMAGE020
分别为负荷点
Figure 982313DEST_PATH_IMAGE021
Figure 925998DEST_PATH_IMAGE022
的电压;
Figure 344210DEST_PATH_IMAGE023
为负荷点
Figure 56951DEST_PATH_IMAGE024
Figure 184307DEST_PATH_IMAGE025
之间的电导,
Figure 615288DEST_PATH_IMAGE026
为负荷点
Figure 338656DEST_PATH_IMAGE027
Figure 905904DEST_PATH_IMAGE028
之间的电纳;
(2)节点电压偏差约束条件
Figure 938582DEST_PATH_IMAGE029
Figure 856859DEST_PATH_IMAGE030
为负荷点
Figure 616874DEST_PATH_IMAGE031
的电压,
Figure 304207DEST_PATH_IMAGE032
Figure 773365DEST_PATH_IMAGE033
分别为国标规定的电压允许下限值和上限值;
(3)光伏发电容量约束条件
Figure 536529DEST_PATH_IMAGE034
式中,
Figure 241179DEST_PATH_IMAGE035
为负荷点
Figure 658385DEST_PATH_IMAGE036
的光伏接入容量,
Figure 157500DEST_PATH_IMAGE037
Figure 175003DEST_PATH_IMAGE038
分别为光伏接入容量的下限值和上限值;
(4)线路热稳定约束条件
Figure 152187DEST_PATH_IMAGE039
式中,
Figure 689478DEST_PATH_IMAGE040
为该馈线中第
Figure 359494DEST_PATH_IMAGE041
条线段的实际功率,
Figure 365758DEST_PATH_IMAGE042
为该馈线中第
Figure 881053DEST_PATH_IMAGE043
条线段的上限值;
(5)短路容量约束条件
Figure 538431DEST_PATH_IMAGE044
式中,
Figure 503982DEST_PATH_IMAGE045
为故障点的线电流有效值,
Figure 105864DEST_PATH_IMAGE046
为国标规定的短路电流最大值。
进一步的,步骤S3中所述增加的对变压器负载率的约束、电压三相不平衡度的约束,以及馈线分布式光伏承载力计算结果中的配变分布式光伏承载力的约束的具体约束条件如下:
(1)变压器负载率约束条件
Figure 565796DEST_PATH_IMAGE047
Figure 202313DEST_PATH_IMAGE048
为变压器的视在功率,
Figure 843160DEST_PATH_IMAGE049
为变压器的额定功率;
(2)电压三相不平衡度约束条件
Figure 666760DEST_PATH_IMAGE050
Figure 930382DEST_PATH_IMAGE051
为配电网中负序电压不平衡度,
Figure 155827DEST_PATH_IMAGE052
为接于公共连接点的每个用户引起的该点负序电压不平衡度,
Figure 463180DEST_PATH_IMAGE053
Figure 39655DEST_PATH_IMAGE054
为配电网中的负序电压和正序电压,
Figure 841389DEST_PATH_IMAGE055
Figure 921340DEST_PATH_IMAGE056
为接于公共连接点的每个用户引起的负序电压和正序电压;
(3)馈线分布式光伏承载力计算结果中的配变分布式光伏承载力约束条件
如式(8)所示,馈线分布式光伏承载力计算出的配变分布式光伏承载力
Figure 166639DEST_PATH_IMAGE057
与台区分布式光伏承载力
Figure 964831DEST_PATH_IMAGE058
进行比较,对台区承载力
Figure 570256DEST_PATH_IMAGE059
进行调整得到得到调整后的各个低压用户的分布式光伏承载力
Figure 894927DEST_PATH_IMAGE060
Figure 950607DEST_PATH_IMAGE061
Figure 845882DEST_PATH_IMAGE062
式中,
Figure 268380DEST_PATH_IMAGE060
为调整后的各个低压用户的分布式光伏承载力,
Figure 322924DEST_PATH_IMAGE063
为低压台区中第
Figure 893713DEST_PATH_IMAGE064
个低压用户的分布式光伏承载力,
Figure 666497DEST_PATH_IMAGE065
为台区低压用户承载力调整率,
Figure 862992DEST_PATH_IMAGE066
为馈线分布式光伏承载力计算出的配变分布式光伏承载力,
Figure 772042DEST_PATH_IMAGE067
为台区分布式光伏承载力,
Figure 779313DEST_PATH_IMAGE068
为低压台区接入的分布式光伏总个数。
进一步的,步骤S4后,通过式(9)对各个低压台区的分布式光伏承载力总和
Figure 773814DEST_PATH_IMAGE069
及整条馈线的分布式光伏承载力之和
Figure 541044DEST_PATH_IMAGE070
进行统计,
Figure 570179DEST_PATH_IMAGE071
Figure 748351DEST_PATH_IMAGE072
式中,
Figure 620361DEST_PATH_IMAGE073
为整条馈线的分布式光伏承载力,
Figure 34025DEST_PATH_IMAGE074
为第
Figure 793033DEST_PATH_IMAGE075
个低压台区的分布式光伏承载力,
Figure 1161DEST_PATH_IMAGE076
为第
Figure 423501DEST_PATH_IMAGE077
个中压用户接入点的分布式光伏承载力,
Figure 640856DEST_PATH_IMAGE078
为该条馈线的配变总个数,
Figure 254371DEST_PATH_IMAGE079
为该条馈线的中压用户接入点总个数。
有益效果:与现有技术相比,本发明方法可较为准确的评估计算出中低压配电网分布式光伏的最大承载力,对于指导中低压用户接入合适容量的分布式光伏,具有更好的工程实践和应用价值。
附图说明
图1为本发明所述中低压配电网分布式光伏承载力评估算法整体流程图;
图2为本发明具体实施例所述10kV中压测试拓扑图;
图3为本发明具体实施例所述配变T4对应的低压台区拓扑图;
图4本发明具体实施例基于粒子群算法的配变T4台区总分布式光伏承载力的优化过程。
具体实施方式
下面结合附图对本发明作更进一步的说明。以下所述仅是本发明的优选实施方式,应当指出:对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。
如图1所示,本发明所述一种中低压配电网分布式光伏最大承载力的评估方法的技术方案流程如下:
首先以10kV馈线各个负荷点作为分布式光伏待接入位置,以各个负荷点(中压用户接入点和配变)可接入分布式光伏的最大容量之和为目标函数,以电压约束、短路电流约束、负载率约束和线路传输容量限制等约束,基于粒子群优化算法求解馈线下各个负荷点可接入的最大分布式光伏容量;
然后分别计算该馈线下各个配变台区下各个低压用户可接入分布式光伏的最大容量,同样以各个低压用户接入点可接入分布式光伏容量之和为目标函数,以配变容量、配变负载率、低压线路传输容量和负载率,及低压线路的短路容量的约束、电压偏差约束及电压三相不平衡度约束,基于粒子群优化算法求解各个低压用户可接入的分布式光伏的容量;
最后对各个配变台区各个低压用户的分布式光伏承载力进行修正,根据馈线承载力求出的配变分布式光伏的承载力,与台区承载力评估求出的分布式承载力进行对比,以修正各个低压用户接入点的分布式光伏承载力和整条馈线的分布式光伏最大承载力。
实施例
以某地实际10kV中低压配电网验证所提方法的有效性。10kV中压测试拓扑结构如图2所示。各个线段的型号及长度参数如下:
表1 各个中压线段的型号及长度
Figure 898979DEST_PATH_IMAGE080
1、该馈线下典型日的负荷数据与光伏发电功率之差在13点时刻达到最小,此时配变负载率为15.6%。因此选取13点时刻对应的各个负荷数据作为潮流计算的断面数据。
2、然后基于pandapower库和粒子群优化算法,以10kV中压馈线各个接入点和配变为优化变量,进行分布式光伏最大承载力的全局最优解的计算。粒子群优化算法的学习因子
Figure 745581DEST_PATH_IMAGE081
都取值为2.1,收缩因子
Figure 641993DEST_PATH_IMAGE082
。约束条件如上式(2)-(6),不等式约束转化为式(7)-(9)进行求解,得到馈线各个负荷点的分布式光伏承载力,求解得到的结果如表2所示。
表2 10kV馈线分布式光伏承载力评估结果
Figure 500227DEST_PATH_IMAGE083
3、低压台区各个用户分布式光伏承载力的计算
然后以配变T4为例,说明低压台区各个用户分布式光伏承载力的评估步骤。配变T4对应的台区如图3所示。低压台区承载力采用三相潮流计算,以台区可接入的总的光伏容量为目标函数,约束条件为潮流功率约束、配变容量、配变负载率、线路传输容量及负载率、低压线路的短路容量、电压偏差及电压不平衡度。各个低压线段的型号及长度如表3所示。
表3 各个低压线段的型号及长度
Figure 207414DEST_PATH_IMAGE084
基于粒子群优化算法的配变T4台区总的分布式最大光伏承载力的优化过程如图4所示,各个负荷点可接入的光伏容量如表4所示,
表4 台区低压各个用户负荷可接入的分布式光伏承载力
Figure 26466DEST_PATH_IMAGE085
4、修正配变台区低压用户分布式承载力
根据步骤2中计算得到的配变T4的分布式光伏承载力容量为228.6 kW,而步骤3中低压台区各个用户分布式光伏承载力之和为179.3 kW,根据上述式子(13)得到台区低压用户承载力调整率
Figure 851202DEST_PATH_IMAGE086
为1,因此调整后的各个低压用户分布式光伏承载力和调整前的相同。
5、同理得到配变T1-配变T3所在台区各个低压用户分布式光伏承载力的修正结果。修正后的馈线分布式光伏承载力结果如下表5所示。
表5 修正后的10kV馈线分布式光伏承载力评估结果
Figure 688577DEST_PATH_IMAGE087
最后,确定整条馈线可接入分布式光伏承载力总容量为1701.1 kW。

Claims (5)

1.一种中低压配电网分布式光伏最大承载力的评估方法,其特征在于包括以下步骤:
步骤S1,分布式光伏承载力潮流计算断面的选取:以典型符合日的负荷数据与光伏发电功率数据比较,以两者功率差值最大对应的时刻,作为评估中低压配电网分布式光伏承载力的潮流计算断面;
步骤S2,馈线下各负荷点可接入最大分布式光伏容量获取:以馈线下各个负荷点可接入分布式光伏的最大容量之和为目标函数,以节点功率平衡、节点电压偏差、光伏发电容量、线路热稳定和短路容量为约束条件,基于粒子群优化算法得到馈线下各个负荷点可接入的最大分布式光伏容量;
步骤S3,低压台区分布式光伏承载力获取:在以节点功率平衡、节点电压偏差、光伏发电容量、线路热稳定和短路容量为约束条件之外,增加对变压器负载率的约束,电压三相不平衡度的约束及馈线分布式光伏承载力计算结果中对应的配变可接入分布式光伏承载力的约束,然后通过粒子群优化算法和低压三相潮流算法对低压台区各个用户可接入的分布式光伏的承载力进行计算;
步骤S4,低压台区各用户的分布式光伏承载力修正:根据馈线承载力求得配变负荷点分布式光伏的承载力,并与台区承载力评估得到的分布式承载力进行比较,修正各个低压用户接入点的分布式光伏承载力和整条馈线的分布式光伏最大承载力。
2.根据权利要求1所述中低压配电网分布式光伏最大承载力的评估方法,其特征在于:步骤S1中所述潮流计算断面的具体获取的具体步骤如下:
首先,选取典型负荷日时间区间在上午11点至下午3点的负荷数据和全天整点光伏发电功率数据;
然后,通过下式计算该时间区间内各个时刻对应的负荷数据与光伏发电功率的功率差
Figure 289688DEST_PATH_IMAGE001
Figure 720669DEST_PATH_IMAGE002
式中,
Figure 942572DEST_PATH_IMAGE003
为某时刻的光伏发电功率,
Figure 509820DEST_PATH_IMAGE004
为某时刻的负荷功率,
最后,以负荷数据与光伏发电功率的功率差
Figure 808077DEST_PATH_IMAGE005
最大值时对应的时刻,作为评估中低压配电网分布式光伏承载力要选取的潮流计算断面。
3.根据权利要求1所述中低压配电网分布式光伏最大承载力的评估方法,其特征在于:步骤S2中馈线下各负荷点可接入最大分布式光伏容量获取的具体步骤如下:
首先,以馈线各个负荷点作为分布式光伏待接入位置,并以各负荷点可计入分布式光伏的最大容量之和为目标函数
Figure 460775DEST_PATH_IMAGE006
,如式(1)所示:
Figure 987834DEST_PATH_IMAGE007
式中,
Figure 675167DEST_PATH_IMAGE008
为第
Figure 144326DEST_PATH_IMAGE009
个负荷点可计入分布式光伏的最大容量,
Figure 408954DEST_PATH_IMAGE010
为馈线下负荷点的总个数;
然后,确定各个负荷点的电压约束、短路电流约束、负荷率约束和线路传输容量的约束条件,约束条件如式(1),
(1)节点功率平衡约束条件
Figure 848025DEST_PATH_IMAGE011
式中,
Figure 265231DEST_PATH_IMAGE012
为与第
Figure 764346DEST_PATH_IMAGE013
个负荷点相邻的所有负荷点的集合,
Figure 274525DEST_PATH_IMAGE014
为集合
Figure 517287DEST_PATH_IMAGE015
中负荷点的序号;
Figure 320158DEST_PATH_IMAGE016
Figure 114808DEST_PATH_IMAGE017
分别为第
Figure 229394DEST_PATH_IMAGE018
个负荷点处连接负荷的有功和无功功率;
Figure 151214DEST_PATH_IMAGE019
Figure 667646DEST_PATH_IMAGE020
分别为负荷点
Figure 134662DEST_PATH_IMAGE021
Figure 470965DEST_PATH_IMAGE022
的电压;
Figure 196476DEST_PATH_IMAGE023
为负荷点
Figure 301835DEST_PATH_IMAGE024
Figure 703866DEST_PATH_IMAGE025
之间的电导,
Figure 668411DEST_PATH_IMAGE026
为负荷点
Figure 791088DEST_PATH_IMAGE027
Figure 905281DEST_PATH_IMAGE028
之间的电纳;
(2)节点电压偏差约束条件
Figure 88001DEST_PATH_IMAGE029
Figure 539842DEST_PATH_IMAGE030
为负荷点
Figure 466210DEST_PATH_IMAGE013
的电压,
Figure 936374DEST_PATH_IMAGE031
Figure 289995DEST_PATH_IMAGE032
分别为国标规定的电压允许下限值和上限值;
(3)光伏发电容量约束条件
Figure 963553DEST_PATH_IMAGE033
式中,
Figure 693612DEST_PATH_IMAGE034
为负荷点
Figure 519747DEST_PATH_IMAGE013
的光伏接入容量,
Figure 44270DEST_PATH_IMAGE035
Figure 205124DEST_PATH_IMAGE036
分别为光伏接入容量的下限值和上限值;
(4)线路热稳定约束条件
Figure 738873DEST_PATH_IMAGE037
式中,
Figure 918051DEST_PATH_IMAGE038
为该馈线中第
Figure 613474DEST_PATH_IMAGE039
条线段的实际功率,
Figure 261624DEST_PATH_IMAGE040
为该馈线中第
Figure 333486DEST_PATH_IMAGE039
条线段的上限值;
(5)短路容量约束条件
Figure 871564DEST_PATH_IMAGE041
式中,
Figure 3468DEST_PATH_IMAGE042
为故障点的线电流有效值,
Figure 873335DEST_PATH_IMAGE043
为国标规定的短路电流最大值。
4.根据权利要求1所述中低压配电网分布式光伏最大承载力的评估方法,其特征在于:步骤S3中所述增加的对变压器负载率的约束、电压三相不平衡度的约束,以及馈线分布式光伏承载力计算结果中的配变分布式光伏承载力的约束的具体约束条件如下:
(1)变压器负载率约束条件
Figure 748887DEST_PATH_IMAGE044
Figure 637078DEST_PATH_IMAGE045
为变压器的视在功率,
Figure 939883DEST_PATH_IMAGE046
为变压器的额定功率;
(2)电压三相不平衡度约束条件
Figure 562625DEST_PATH_IMAGE047
Figure 867967DEST_PATH_IMAGE048
为配电网中负序电压不平衡度,
Figure 751610DEST_PATH_IMAGE049
为接于公共连接点的每个用户引起的该点负序电压不平衡度,
Figure 100682DEST_PATH_IMAGE050
Figure 69775DEST_PATH_IMAGE051
为配电网中的负序电压和正序电压,
Figure 411764DEST_PATH_IMAGE052
Figure 149913DEST_PATH_IMAGE053
为接于公共连接点的每个用户引起的负序电压和正序电压;
(3)馈线分布式光伏承载力计算结果中的配变分布式光伏承载力约束条件
如式(8)所示,馈线分布式光伏承载力计算出的配变分布式光伏承载力
Figure 935466DEST_PATH_IMAGE054
与台区分布式光伏承载力
Figure 15024DEST_PATH_IMAGE055
进行比较,对台区承载力
Figure 36070DEST_PATH_IMAGE056
进行调整得到得到调整后的各个低压用户的分布式光伏承载力
Figure 35250DEST_PATH_IMAGE057
Figure 709814DEST_PATH_IMAGE058
Figure 653499DEST_PATH_IMAGE059
式中,
Figure 353602DEST_PATH_IMAGE057
为调整后的各个低压用户的分布式光伏承载力,
Figure 800764DEST_PATH_IMAGE060
为低压台区中第
Figure 678852DEST_PATH_IMAGE061
个低压用户的分布式光伏承载力,
Figure 844254DEST_PATH_IMAGE062
为台区低压用户承载力调整率,
Figure 82469DEST_PATH_IMAGE063
为馈线分布式光伏承载力计算出的配变分布式光伏承载力,
Figure 39929DEST_PATH_IMAGE064
为台区分布式光伏承载力,
Figure 462820DEST_PATH_IMAGE065
为低压台区接入的分布式光伏总个数。
5.根据权利要求1所述中低压配电网分布式光伏最大承载力的评估方法,其特征在于:步骤S4后,通过式(9)对各个低压台区的分布式光伏承载力总和
Figure 990885DEST_PATH_IMAGE066
及整条馈线的分布式光伏承载力之和
Figure 798171DEST_PATH_IMAGE067
进行统计,
Figure 485504DEST_PATH_IMAGE068
Figure 954663DEST_PATH_IMAGE069
式中,
Figure 94657DEST_PATH_IMAGE070
为整条馈线的分布式光伏承载力,
Figure 658362DEST_PATH_IMAGE071
为第
Figure 200202DEST_PATH_IMAGE072
个低压台区的分布式光伏承载力,
Figure 574683DEST_PATH_IMAGE073
为第
Figure 93651DEST_PATH_IMAGE074
个中压用户接入点的分布式光伏承载力,
Figure 336414DEST_PATH_IMAGE075
为该条馈线的配变总个数,
Figure 608126DEST_PATH_IMAGE076
为该条馈线的中压用户接入点总个数。
CN202211279585.6A 2022-10-19 2022-10-19 一种中低压配电网分布式光伏最大承载力的评估方法 Active CN115360707B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211279585.6A CN115360707B (zh) 2022-10-19 2022-10-19 一种中低压配电网分布式光伏最大承载力的评估方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211279585.6A CN115360707B (zh) 2022-10-19 2022-10-19 一种中低压配电网分布式光伏最大承载力的评估方法

Publications (2)

Publication Number Publication Date
CN115360707A true CN115360707A (zh) 2022-11-18
CN115360707B CN115360707B (zh) 2023-06-20

Family

ID=84008000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211279585.6A Active CN115360707B (zh) 2022-10-19 2022-10-19 一种中低压配电网分布式光伏最大承载力的评估方法

Country Status (1)

Country Link
CN (1) CN115360707B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116526557A (zh) * 2023-05-08 2023-08-01 国网安徽省电力有限公司合肥供电公司 一种优选分布式光伏接入方案的方法及系统

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109599892A (zh) * 2018-11-30 2019-04-09 国网浙江省电力有限公司宁波供电公司 一种10千伏规划电网分布式光伏消纳能力的评估方法
CN115021308A (zh) * 2022-05-16 2022-09-06 国网北京市电力公司经济技术研究院 一种考虑负荷脱网的配电网中分布式光伏承载能力计算方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109599892A (zh) * 2018-11-30 2019-04-09 国网浙江省电力有限公司宁波供电公司 一种10千伏规划电网分布式光伏消纳能力的评估方法
CN115021308A (zh) * 2022-05-16 2022-09-06 国网北京市电力公司经济技术研究院 一种考虑负荷脱网的配电网中分布式光伏承载能力计算方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王婷等: "配电网对分布式电源和电动汽车的承载力评估及提升方法综述", 《电力建设》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116526557A (zh) * 2023-05-08 2023-08-01 国网安徽省电力有限公司合肥供电公司 一种优选分布式光伏接入方案的方法及系统

Also Published As

Publication number Publication date
CN115360707B (zh) 2023-06-20

Similar Documents

Publication Publication Date Title
Behravesh et al. Control strategy for improving voltage quality in residential power distribution network consisting of roof-top photovoltaic-wind hybrid systems, battery storage and electric vehicles
CN112087055B (zh) 一种应用于低压台区电表网络的拓扑识别方法
CN108462210B (zh) 基于数据挖掘的光伏可开放容量计算方法
CN110264110B (zh) 基于配电网多应用场景的储能电站选址定容方法
CN102403716A (zh) 一种多馈入交直流电网动态等值的方法
CN109787297A (zh) 一种考虑暂态特性的特高压直流送端电网无功优化方法
CN111009925A (zh) 一种分布式光伏接入低压配电网最大容量的计算方法
CN115360707A (zh) 一种中低压配电网分布式光伏最大承载力的评估方法
CN114626575A (zh) 考虑暂态电压稳定的含高渗透率风电的受端电网无功规划方法
CN109560568B (zh) 基于短路电流裕度的双馈风电场最大可接入容量确定方法
CN107134783B (zh) 一种基于灵敏度快速筛选的母线电压优化调整方法
CN111080149A (zh) 一种高中低压一体化配电网络可靠性混合计算方法
Pippi et al. Assessing the provision of ancillary services considering BES capacity degradation
CN104268798B (zh) 一种分布式电源及电动汽车对配电网影响的评估方法
CN102868177B (zh) 风电场并网点系统阻抗自动辨识及修正方法
CN115719972A (zh) 一种分布式电源接入配电网的节能降损优化方法
CN111641204B (zh) 一种分布式能源准入容量的计算方法及装置
Chintakindi et al. WAMS based Thevenin Index for voltage stability assessment with increasing wind power penetration and additional distributed load
Permana et al. Impact of Photovoltaic Interconnection on Power Flow of Selayar Island Power System South Sulawesi
CN106300443B (zh) 一种用于减少弃风的三层热电联供微网能量控制方法
CN115912384B (zh) 改善特高压直流受端含高比例新能源系统的电压稳定方法
CN105490311B (zh) 发电机组降压运行备选方案的选择方法
Qian et al. A multi-level reactive power control strategy for PV power plant based on sensitivity analysis
CN110783955B (zh) 有利于降低台区三相不平衡的光伏单相接入容量配置方法
CN111082428B (zh) 一种基于大数据分析的新能源电站电压控制基准调整方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant