CN115312267A - Production process of coated copper-clad steel - Google Patents

Production process of coated copper-clad steel Download PDF

Info

Publication number
CN115312267A
CN115312267A CN202210713940.XA CN202210713940A CN115312267A CN 115312267 A CN115312267 A CN 115312267A CN 202210713940 A CN202210713940 A CN 202210713940A CN 115312267 A CN115312267 A CN 115312267A
Authority
CN
China
Prior art keywords
box
box body
copper
water pipe
clad steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210713940.XA
Other languages
Chinese (zh)
Other versions
CN115312267B (en
Inventor
徐红良
徐红芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongxiang City Yongcheng Cable Co ltd
Original Assignee
Tongxiang City Yongcheng Cable Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongxiang City Yongcheng Cable Co ltd filed Critical Tongxiang City Yongcheng Cable Co ltd
Priority to CN202210713940.XA priority Critical patent/CN115312267B/en
Publication of CN115312267A publication Critical patent/CN115312267A/en
Application granted granted Critical
Publication of CN115312267B publication Critical patent/CN115312267B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B13/00Apparatus or processes specially adapted for manufacturing conductors or cables
    • H01B13/012Apparatus or processes specially adapted for manufacturing conductors or cables for manufacturing wire harnesses
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B13/00Apparatus or processes specially adapted for manufacturing conductors or cables
    • H01B13/30Drying; Impregnating

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Catalysts (AREA)

Abstract

The invention relates to a production process of coated copper-clad steel, which comprises a coating machine and a base, wherein the base is connected with the coating machine, the base is provided with a waste gas treatment device, a purification device and a winding device, the waste gas treatment device comprises a first box body, a first water pipe and a spray head, the interior of the first box body is connected with the first water pipe, the first water pipe is connected with the spray head, the purification device comprises a second box body, a first motor, a catalysis plate and a first connecting rod, the interior of the second box body is connected with the first connecting rod, the upper end of the exterior of the second box body is connected with the first motor, the winding device comprises a support column, a second motor, a first L-shaped plate and a second L-shaped plate, the support column is connected with the second motor, the second motor is connected with the first L-shaped plate, the first L-shaped plate is connected with the second L-shaped plate, the first L-shaped plate and the second L-shaped plate are provided with the second connecting rod, waste gas can be treated and purified, and winding drums with different types can be placed.

Description

Production process of coated copper-clad steel
Technical Field
The invention relates to the technical field of copper-clad steel production, in particular to a production process of clad copper-clad steel.
Background
The copper-clad steel is a copper-clad steel wire, namely a composite wire with a copper layer wrapped on the periphery of the steel wire, and the composite wire walks along the surface in a high-frequency area by using the skin effect of low-voltage high-frequency signals, so that signals of a certain frequency band can be transmitted assuredly as long as the thickness of the copper layer reaches a certain range. The copper plays a role in conducting weak electric signals, and the steel wire plays a role in supporting.
Chinese patent publication No. CN202099396U discloses a copper clad steel wire electroplating production apparatus, which has a simple and single structure, cannot treat the waste gas generated by the apparatus, and thus harms the body of the worker, and cannot purify the waste gas treated by the apparatus, and in addition, the apparatus cannot prevent winding drums of different sizes when winding, and cannot operate when winding drums of different types are required.
Disclosure of Invention
Technical problem to be solved
Aiming at the problems in the prior art, the invention provides a production process of coated copper-clad steel, which aims to solve the technical problems in the background art.
(II) technical scheme
In order to achieve the purpose, the invention provides the following technical scheme:
a production process of coated copper-clad steel comprises the following production steps:
the method comprises the following steps: preparing materials, namely preparing copper, steel and cladding type production equipment, pretreating the steel and the copper to remove impurities, rust matters and grease on the surface, and finally washing and drying the steel and the copper under high pressure;
step two: cladding production, namely putting prepared materials such as steel, copper and the like into cladding production equipment, and carrying out cladding production on the materials;
step three: taking up and loading a tray, loading the produced copper-clad steel on a cladding production device, and storing and classifying;
step four: and (3) detecting and packaging, namely monitoring the copper-clad steel on the production equipment, and monitoring whether the copper-clad steel is qualified or not, packaging the qualified copper-clad steel, and returning the unqualified copper-clad steel to the factory for re-production.
Preferably, the cladding formula production facility includes cladding machine and base, be connected with the cladding machine on the base, install exhaust treatment device, purifier and coiling mechanism on the base, exhaust treatment device includes first box, first water pipe and shower nozzle, first box inside and a plurality of water piping connection, every be connected with a plurality of shower nozzle on the first water pipe, first box outside is provided with the water feeding subassembly, purifier includes second box, first motor, catalysis board and head rod, the inside and head rod that is connected of second box is connected, be connected with the catalysis board on the head rod, the outside top of second box is connected with first motor, just the first motor runs through the second box and is connected with the head rod, can handle and purify the waste gas that produces in the production process.
It is preferred in further, coiling mechanism includes support column, second motor, first L template, second L template and reel, the top and the support column of base are connected, be connected with the second motor on the support column, second motor left side is connected with first L template, just first L template bottom is connected with the support frame, first L template is connected through flexible subassembly with second L template, all be equipped with the second connecting rod on first L template and the second L template, install the reel between the second connecting rod, can place the reel of different models.
In further preferred, send the water subassembly to include third box, water pump, second water pipe, third water pipe and water tank, the third box is connected with first box, the second water pipe is installed inside the third box, the one end of first water pipe runs through first box and is connected with the second water pipe, the second water pipe other end is connected with the water pump, the one end and the third water union coupling of second water pipe are kept away from to the water pump, the one end and the water tank connection of water pump are kept away from to the third water pipe, be equipped with the outlet pipe on the water tank, be equipped with the water valve on the outlet pipe, make things convenient for the inside delivery water of first box.
In further preferred, flexible subassembly includes casing, fixed plate and spring, first L template and casing fixed connection, inside and spring fixed connection of casing, the one end and the fixed plate fixed connection of casing are kept away from to the spring, second L template runs through the casing and stretches into inside, second L template and fixed plate fixed connection, just the fixed plate slides in the casing is inside, can stretch out and draw back second L template and then place not unidimensional reel.
Preferably in further, the cladding machine is externally provided with a fourth box body, and the first box body, the second box body and the fourth box body are respectively provided with a maintenance assembly, so that the interior of the box body can be maintained conveniently.
In further preferred, be equipped with first gas-supply pipe between fourth box and the first box, be equipped with the second gas-supply pipe between first box and the second box, the one end that the second gas-supply pipe was kept away from to the second box is equipped with the outlet duct, conveniently carries gas.
In further preferred, the maintenance subassembly is including maintenance lid, hinge and hasp, the maintenance mouth has all been seted up on first box, the fourth box of second box, install the maintenance lid on the maintenance mouth, maintenance lid one side is connected through the hinge in first box, second box and fourth box respectively, first box, second box and fourth box opposite side and maintenance lid pass through the hasp and are connected, the maintenance is covered and is equipped with the handle, conveniently maintains first box, second box and the inside maintenance of fourth box.
(III) advantageous effects
Compared with the prior art, the invention provides a production process of coated copper-clad steel, which has the following beneficial effects:
1. the production process is simple and easy to operate, is suitable for batch production, and the whole process can avoid defective products by strict quality inspection from the preparation of raw materials to the final finished product;
2. in the invention, the first box body, the first water pipe and the spray head are arranged, so that dust in waste gas generated in the production process can be settled, and dust particles in the waste gas are reduced;
3. in the invention, through arranging the first motor, the second box body, the catalytic plate and the first connecting rod, the gas treated in the first box body can enter the second box body for purification, thereby reducing the pollution to the environment;
4. in the invention, the first L-shaped plate, the second L-shaped plate, the support column, the second motor and the telescopic assembly are arranged, so that winding drums with different sizes can be fixed, the copper-clad steel can be wound, and in addition, the water supply assembly is arranged on the outer side of the first box body, so that water resources can be provided for the first water pipe.
Drawings
FIG. 1 is a schematic structural diagram of an overall production process of clad copper-clad steel in the invention;
FIG. 2 is a schematic view of the overall structure of the production process of the clad copper clad steel of the present invention with the fourth box removed;
FIG. 3 is a schematic view of the cross-sectional internal structure of the first case according to the present invention;
FIG. 4 is a schematic view of the cross-sectional internal structure of a third case according to the present invention;
FIG. 5 is a schematic view of the cross-sectional internal structure of the second case according to the present invention;
FIG. 6 is a schematic cross-sectional view of the inner structure of the housing according to the present invention.
In the figure: 1. a covering machine; 2. a base; 3. a first case; 4. a first water pipe; 5. a spray head; 6. a second case; 7. a first motor; 8. a catalyst plate; 9. a first connecting rod; 10. a support pillar; 11. a second motor; 12. a first L-shaped plate; 13. a second L-shaped plate; 14. a winding drum; 15. a second connecting rod; 16. a third box body; 17. a water pump; 18. a second water pipe; 19. a third water pipe; 20. a water tank; 21. a fourth water pipe; 22. a water valve; 23. a housing; 24. a fixing plate; 25. a spring; 26. a fourth case; 27. a first gas delivery pipe; 28. a second gas delivery pipe; 29. an air outlet pipe; 30. maintaining the cover; 31. a hinge; 32. a hasp; 33. a maintenance port; 34. a handle.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1:
referring to figures 1-6 of the drawings,
a production process of coated copper-clad steel comprises the following production steps:
the method comprises the following steps: preparing materials, namely preparing copper, steel and cladding type production equipment, pretreating the steel and the copper to remove impurities, rust matters and grease on the surface, and finally washing and drying the steel and the copper under high pressure;
step two: cladding production, namely putting prepared materials such as steel, copper and the like into cladding production equipment, and carrying out cladding production on the materials;
step three: taking up and loading a tray, loading the produced copper-clad steel on a cladding production device, and storing and classifying;
step four: and (3) detecting and packaging, namely monitoring the copper-clad steel on the production equipment, and monitoring whether the copper-clad steel is qualified or not, packaging the qualified copper-clad steel, and returning the unqualified copper-clad steel to the factory for re-production.
Example 2:
in summary, the coated production equipment mentioned in the first step, the second step and the third step comprises a coating machine 1 and a base 2, the base 2 is connected with the coating machine 1, the base 2 is provided with a waste gas treatment device, a purification device and a winding device, the waste gas treatment device comprises a first box body 3, first water pipes 4 and spray heads 5, the interior of the first box body 3 is connected with a plurality of first water pipes 4, each first water pipe 4 is connected with a plurality of spray heads 5, a water supply assembly is arranged outside the first box body 3, the purification device comprises a second box body 6, a first motor 7, a catalytic plate 8 and a first connecting rod 9, inside and the head rod 9 of being connected of second box 6, be connected with catalysis board 8 on the head rod 9, the outside top of second box 6 is connected with first motor 7, and first motor 7 runs through second box 6 and is connected with head rod 9, when beginning to produce copper clad steel, copper material and steel material that will prepare are put into cladding machine 1, waste gas that produces gets into inside first box 3 in the production process, the dust granule in with waste gas subsides through the 5 watering of shower nozzle, waste gas after the processing gets into inside second box 6, first motor 7 takes catalysis board 8 on the head rod 9 to rotate, make gas purify.
In this embodiment, the winding device includes support column 10, second motor 11, first L template 12, second L template 13 and reel 14, the top and the support column 10 of base 2 are connected, be connected with second motor 11 on the support column 10, second motor 11 left side is connected with first L template 12, and first L template 12 bottom is connected with the support frame, first L template 12 is connected through telescopic component with second L template 13, all be equipped with second connecting rod 15 on first L template 12 and the second L template 13, install reel 14 between the second connecting rod 15, the copper clad steel that produces is rolled up on reel 14, second motor 11 drives second connecting rod 15 and rotates for reel 14 on the second connecting rod 15 rotates, thereby roll up the copper clad steel.
In this embodiment, the water supply assembly includes a third tank 16, a water pump 17, a second water pipe 18, a third water pipe 19 and a water tank 20, the third tank 16 is connected to the first tank 3, the second water pipe 18 is installed inside the third tank 16, one end of the first water pipe 4 penetrates through the first tank 3 and is connected to the second water pipe 18, the other end of the second water pipe 18 is connected to the water pump 17, one end of the water pump 17 away from the second water pipe 18 is connected to the third water pipe 19, one end of the third water pipe 19 away from the water pump 17 is connected to the water tank 20, the water tank 20 is provided with a fourth water pipe 21, the third water pipe 19 is provided with a water valve 22, when waste gas is treated, the water tank 20 is filled with water through the fourth water pipe 21, the water valve 22 is opened, and the water pump 17 conveys the water in the water tank 20 to the spray head 5 through the second water pipe 18 and the first water pipe 4, so as to treat the waste gas.
In this embodiment, the telescopic assembly includes casing 23, fixed plate 24 and spring 25, first L template 12 and casing 23 fixed connection, casing 23 inside and spring 25 fixed connection, the one end and fixed plate 24 fixed connection that casing 23 was kept away from to spring 25, second L template 13 runs through casing 23 and stretches into inside, second L template 13 and fixed plate 24 fixed connection, and fixed plate 24 slides inside casing 23, when placing the reel 14 of different models, through pulling second L template 13, make reel 14 fix through second connecting rod 15.
In this embodiment, the fourth box 26 is provided outside the cladding machine 1, and the first box 3, the second box 6 and the fourth box 26 are all provided with maintenance components, so that when materials for production are placed and the first box 3 and the second box 6 are maintained, the maintenance components can be used for realizing.
In this embodiment, a first gas pipe 27 is arranged between the fourth box 26 and the first box 3, a second gas pipe 28 is arranged between the first box 3 and the second box 6, an outlet pipe 29 is arranged at one end of the second box 6 far away from the second gas pipe 28, waste gas generated in the fourth box 26 is conveyed to the inside of the first box 3 through the first gas pipe 27, and gas in the first box 3 enters the inside of the second box 6 through the second gas pipe 28.
In this embodiment, the maintenance subassembly is including maintaining lid 30, hinge 31 and hasp 32, has all seted up maintenance mouth 33 on first box 3, the fourth box 26 of second box 6, installs maintenance lid 30 on maintenance mouth 33, and maintenance lid 30 one side is connected through hinge 31 in first box 3, second box 6 and fourth box 26 respectively, first box 3, second box 6 and fourth box 26 opposite side and maintenance lid 30 pass through hasp 32 to be connected, are equipped with handle 34 on the maintenance lid 30, open hasp 32 when first box 3, the second box 6 of needs maintenance, open through handle 34 and maintain lid 30 and maintain.
Example 3:
on the basis of embodiment 2, when copper-clad steel is produced, prepared copper materials and steel materials are placed into a cladding machine 1, waste gas generated in the production process enters a first box body 3, when the waste gas is treated, the water inside a water tank 20 is filled with water through a fourth water pipe 21, a water valve 22 is opened, water in the water tank 20 is conveyed to a spray head 5 through a second water pipe 18 and a first water pipe 4 by a water pump 17, dust particles in the waste gas are settled through the spray head 5, the treated waste gas enters a second box body 6, a first motor 7 drives a catalytic plate 8 on a first connecting rod 9 to rotate, so that the gas is purified, and then the waste gas is conveyed to the outside through an air outlet pipe 29.
Example 4:
on embodiment 3's basis, the copper clad steel that produces is rolled up on reel 14, second motor 11 drives second connecting rod 15 and rotates, make reel 14 on the second connecting rod 15 rotate, thereby roll up the copper clad steel, when placing the reel 14 of different models, through pulling second L template 13, make reel 14 fix through second connecting rod 15, open hasp 32 when first box 3, second box 6 are maintained to needs, open maintenance lid 30 through handle 34 and maintain.
While embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and variations may be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (10)

1. A production process of coated copper-clad steel is characterized in that: comprises the following production steps:
the method comprises the following steps: preparing materials, namely preparing copper, steel and cladding type production equipment, pretreating the steel and the copper to remove impurities, rust matters and grease on the surface, and finally washing and drying the steel and the copper under high pressure;
step two: cladding production, namely putting prepared materials such as steel, copper and the like into cladding production equipment, and carrying out cladding production on the materials;
step three: taking up and loading the plate, and loading the produced copper-clad steel on a cladding type production device for storage and classification;
step four: and (3) detecting and packaging, namely monitoring the copper-clad steel on the production equipment, monitoring whether the copper-clad steel is qualified or not, packaging the qualified copper-clad steel finally, and returning the unqualified copper-clad steel to the factory for re-production.
2. The production process of the coated copper-clad steel according to claim 1, characterized in that: the cladding formula production facility includes cladding machine (1) and base (2), be connected with cladding machine (1) on base (2), install exhaust treatment device, purifier and coiling mechanism on base (2), exhaust treatment device includes first box (3), first water pipe (4) and shower nozzle (5), first box (3) inside is connected with a plurality of first water pipe (4), every be connected with a plurality of shower nozzle (5) on first water pipe (4), first box (3) outside is provided with and send the water subassembly, purifier includes second box (6), first motor (7), catalysis board (8) and head rod (9), second box (6) inside is connected with head rod (9), be connected with catalysis board (8) on head rod (9), the outside top of second box (6) is connected with first motor (7), just first motor (7) run through second box (6) and are connected with head rod (9).
3. The production process of the coated copper-clad steel according to claim 2, characterized in that: the winding device comprises a support column (10), a second motor (11), a first L-shaped plate (12), a second L-shaped plate (13) and a winding drum (14), the top end of the base (2) is connected with the support column (10), the support column (10) is connected with the second motor (11), the left side of the second motor (11) is connected with the first L-shaped plate (12), the bottom end of the first L-shaped plate (12) is connected with the support frame, the first L-shaped plate (12) is connected with the second L-shaped plate (13) through a telescopic assembly, second connecting rods (15) are arranged on the first L-shaped plate (12) and the second L-shaped plate (13), and the winding drum (14) is installed between the second connecting rods (15).
4. The production process of the coated copper-clad steel according to claim 2, characterized in that: the water supply assembly comprises a third box body (16), a water pump (17), a second water pipe (18), a third water pipe (19) and a water tank (20), the third box body (16) is connected with the first box body (3), the second water pipe (18) is installed inside the third box body (16), one end of the first water pipe (4) penetrates through the first box body (3) to be connected with the second water pipe (18), the other end of the second water pipe (18) is connected with the water pump (17), one end, far away from the second water pipe (18), of the water pump (17) is connected with the third water pipe (19), one end, far away from the water pump (17), of the third water pipe (19) is connected with the water tank (20), a fourth water pipe (21) is arranged on the water tank (20), and a water valve (22) is arranged on the third water pipe (19).
5. The production process of the coated copper-clad steel according to claim 3, characterized in that: the telescopic assembly comprises a shell (23), a fixing plate (24) and a spring (25), wherein the first L-shaped plate (12) is fixedly connected with the shell (23), the shell (23) is internally fixedly connected with the spring (25), one end of the spring (25) far away from the shell (23) is fixedly connected with the fixing plate (24), the second L-shaped plate (13) penetrates through the shell (23) to extend into the shell, the second L-shaped plate (13) is fixedly connected with the fixing plate (24), and the fixing plate (24) slides in the shell (23).
6. The production process of the coated copper-clad steel according to claim 2, characterized in that: the cladding machine (1) is externally provided with a fourth box body (26), and the first box body (3), the second box body (6) and the fourth box body (26) are all provided with maintenance components.
7. The production process of the coated copper-clad steel according to claim 6, characterized in that: be equipped with first gas-supply pipe (27) between fourth box (26) and first box (3), be equipped with second gas-supply pipe (28) between first box (3) and second box (6), the one end that second gas-supply pipe (28) were kept away from in second box (6) is equipped with outlet duct (29).
8. The production process of the coated copper-clad steel according to claim 7, characterized in that: the maintenance assembly comprises a maintenance cover (30), a hinge (31) and a hasp (32), and maintenance openings (33) are formed in the first box body (3) and the fourth box body (26) of the second box body (6).
9. The production process of the coated copper-clad steel according to claim 8, characterized in that: install maintenance lid (30) on maintenance mouth (33), maintenance lid (30) one side is connected through hinge (31) in first box (3), second box (6) and fourth box (26) respectively.
10. The production process of the coated copper-clad steel according to claim 9, characterized in that: the other sides of the first box body (3), the second box body (6) and the fourth box body (26) are connected with a maintenance cover (30) through hasps (32), and a handle (34) is arranged on the maintenance cover (30).
CN202210713940.XA 2022-06-22 2022-06-22 Coated copper-clad steel production process Active CN115312267B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210713940.XA CN115312267B (en) 2022-06-22 2022-06-22 Coated copper-clad steel production process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210713940.XA CN115312267B (en) 2022-06-22 2022-06-22 Coated copper-clad steel production process

Publications (2)

Publication Number Publication Date
CN115312267A true CN115312267A (en) 2022-11-08
CN115312267B CN115312267B (en) 2024-03-26

Family

ID=83855281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210713940.XA Active CN115312267B (en) 2022-06-22 2022-06-22 Coated copper-clad steel production process

Country Status (1)

Country Link
CN (1) CN115312267B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103531301A (en) * 2013-09-16 2014-01-22 浙江百川导体技术股份有限公司 Process for producing soft-state copper clad steel conductor by adopting welding cladding method
CN208005823U (en) * 2018-02-09 2018-10-26 金昌农友雨润节水器材有限公司 A kind of drip irrigation zone molding machine
CN209161042U (en) * 2018-10-25 2019-07-26 德阳天赐塑胶有限责任公司 A kind of plastic film winding device
CN111696712A (en) * 2020-07-27 2020-09-22 王社兵 Signal control cable for intelligent numerical control system
CN212091536U (en) * 2020-05-09 2020-12-08 张治刚 VOCs administers and uses adsorption equipment
CN212663224U (en) * 2020-06-16 2021-03-09 昆山皖源环境技术有限公司 Exhaust-gas treatment equipment with circulation processing structure
CN215276500U (en) * 2021-06-21 2021-12-24 江苏苏杰机械制造有限公司 Integrative equipment of desorption is inhaled to waste gas that sprays paint
CN216032655U (en) * 2021-08-31 2022-03-15 上海孚加新材料科技有限公司 Polytetrafluoroethylene film material turning device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103531301A (en) * 2013-09-16 2014-01-22 浙江百川导体技术股份有限公司 Process for producing soft-state copper clad steel conductor by adopting welding cladding method
CN208005823U (en) * 2018-02-09 2018-10-26 金昌农友雨润节水器材有限公司 A kind of drip irrigation zone molding machine
CN209161042U (en) * 2018-10-25 2019-07-26 德阳天赐塑胶有限责任公司 A kind of plastic film winding device
CN212091536U (en) * 2020-05-09 2020-12-08 张治刚 VOCs administers and uses adsorption equipment
CN212663224U (en) * 2020-06-16 2021-03-09 昆山皖源环境技术有限公司 Exhaust-gas treatment equipment with circulation processing structure
CN111696712A (en) * 2020-07-27 2020-09-22 王社兵 Signal control cable for intelligent numerical control system
CN215276500U (en) * 2021-06-21 2021-12-24 江苏苏杰机械制造有限公司 Integrative equipment of desorption is inhaled to waste gas that sprays paint
CN216032655U (en) * 2021-08-31 2022-03-15 上海孚加新材料科技有限公司 Polytetrafluoroethylene film material turning device

Also Published As

Publication number Publication date
CN115312267B (en) 2024-03-26

Similar Documents

Publication Publication Date Title
CN111468352B (en) Material-saving type equipment for uniformly spraying aluminum top plate
CN115312267A (en) Production process of coated copper-clad steel
CN216311456U (en) Cable penetrating equipment for processing flame-retardant motor winding lead flexible cable
CN207966580U (en) A kind of wire surface insulating layer extrusion molding production line
CN111299237B (en) Cable production equipment
CN205761931U (en) A kind of casting iron pan mould antirust solution spray equipment
CN215600159U (en) Cooling device for cable processing
CN218372536U (en) High-precision copper foil surface treatment machine
CN220861853U (en) Coating machine for electronic adhesive tape
CN211385528U (en) Low-toxicity environment-friendly spraying equipment for alloy processing
CN213492510U (en) Glass steel exhaust treatment device
CN213853600U (en) Waste gas collecting device of radiation-proof lens
CN217988846U (en) Chemical industry tail gas processing apparatus
CN219291802U (en) Packaging coating equipment
CN220678358U (en) Device for producing hydrolytic curved surface wrapping protective adhesive film
CN215696264U (en) Surface coating pretreatment cleaning device for coated plate
CN216726433U (en) Ferrocene guide system and tail gas recovery processing device thereof
CN213315755U (en) Online surface lubricating liquid coating device for enameled wire
CN221805182U (en) Coating equipment for enameled wire production
CN216107823U (en) Direct plating paper apparatus for producing
CN213495249U (en) Pre-nickel plating tank for copper-clad steel production
CN217527964U (en) Coating device for processing non-metallic mineral products
CN218291196U (en) Spray set is used in chemical fiber production
CN212284654U (en) Background wall painting coating equipment
CN213853217U (en) Adsorption tank is used in heparin sodium production

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant