CN115263031B - Assembled toilet system and construction method thereof - Google Patents

Assembled toilet system and construction method thereof Download PDF

Info

Publication number
CN115263031B
CN115263031B CN202210993933.XA CN202210993933A CN115263031B CN 115263031 B CN115263031 B CN 115263031B CN 202210993933 A CN202210993933 A CN 202210993933A CN 115263031 B CN115263031 B CN 115263031B
Authority
CN
China
Prior art keywords
water
sealing
block
wallboard body
assembly groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210993933.XA
Other languages
Chinese (zh)
Other versions
CN115263031A (en
Inventor
陈勇
胡丽娟
吴辉
孙平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Royalstar Electronic Appliance Group Co Ltd
Original Assignee
Hefei Royalstar Electronic Appliance Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Royalstar Electronic Appliance Group Co Ltd filed Critical Hefei Royalstar Electronic Appliance Group Co Ltd
Priority to CN202210993933.XA priority Critical patent/CN115263031B/en
Publication of CN115263031A publication Critical patent/CN115263031A/en
Application granted granted Critical
Publication of CN115263031B publication Critical patent/CN115263031B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/125Small buildings, arranged in other buildings
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/12Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
    • E03C1/122Pipe-line systems for waste water in building
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34384Assembling details for foldable, separable, collapsible or retractable structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6801Fillings therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6806Waterstops
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6812Compressable seals of solid form
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6813Compressable seals of hollow form
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6815Expansion elements specially adapted for wall or ceiling parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B2001/6818Joints with swellable parts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Health & Medical Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sanitary Device For Flush Toilet (AREA)
  • Residential Or Office Buildings (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses an assembled toilet system and a construction method thereof, wherein the assembled toilet system comprises a frame body arranged on a waterproof chassis, a liquid discharge hole block is arranged at the bottom end of the inner wall of an assembly groove part, an inclined liquid guide channel is communicated between the bottom end of the inner wall of the assembly groove part and a liquid guide pipe, and the bottom of a wallboard body is inserted into the assembly groove part and is sleeved on the outer side of the liquid discharge hole block in a clamping way; the wallboard body inserting part is sleeved with a water-swelling rubber ring, the side part of the upper end of the water-swelling rubber ring is provided with a water-swelling rubber block, the side wall of a liquid discharging hole in the liquid discharging hole block is provided with an auxiliary flow hole, and an swelling water-passing component is arranged between the inner side wall of the water-swelling rubber ring and the auxiliary flow hole; and an outer pushing and propping assembly is arranged between the inner side wall of the frame body and the wallboard body, and the water-swelling rubber block is positioned between the wallboard body and the outer pushing and propping assembly. Ponding in the assembly groove part is discharged into the liquid guide pipe through the liquid discharge hole block, the inclined liquid guide channel and the auxiliary flow hole respectively, and the waterproof sealing effect between the wallboard body and the assembly groove part is improved.

Description

Assembled toilet system and construction method thereof
Technical Field
The invention belongs to the technical field of assembled toilets, and particularly relates to an assembled toilet system and a construction method thereof.
Background
The assembled integrated bathroom is characterized in that an integral frame is formed by an integrated waterproof chassis, wallboards and ceilings which are prefabricated in a factory, sanitary wares and accessories with various functions are assembled on site, the assembled integrated bathroom has the advantages of factory standardized production, quick installation, water leakage prevention and the like, a drainage system is arranged on the waterproof chassis in the assembled bathroom, waste water generated in the bathroom is intensively discharged into a building preset drain pipe through a drainage collector by the drainage system, an aluminum frame is preset at the edge part of the waterproof chassis, an assembly groove is preset at the edge part of the aluminum frame, the wallboards are connected in a matched mode through the assembly groove, glass sealant is required to be coated on gaps between the assembly groove and the wallboards in order to prevent the waste water from flowing into the assembly groove, and a waterproof effect is achieved.
The utility model discloses a chinese patent of publication No. CN112554352B, it discloses an assembled bathroom waterproof system, including the threshold, shown threshold bottom fixedly connected with rubber strip, the threshold bottom is close to the rubber strip and inlays there is the sealing strip, the inboard fixedly connected with baffle of sealing strip, inlay there is first sealed strip that absorbs water in the threshold bottom between the baffle, the pumping chamber has been seted up at first sealed strip top to the threshold, the threshold is fixedly connected with water pump in pumping chamber bottom, water pump left side fixedly connected with raceway, the drainage duct has been seted up on the threshold corresponds the raceway top, first water hole, second water hole and third water hole have been seted up at the drainage duct top equidistant at the threshold top, first water hole groove, second water hole groove and third water hole groove have been seted up at first water hole top, second water hole groove and third water hole groove, the sealed strip of threshold right side top fixedly connected with second, water pump right side fixedly connected with water pipe bottom, corrosion-resistant strip right side bottom has been seted up to the right side of water pipe.
However, the above scheme has the following disadvantages: the waterproof system in the above-mentioned prior art patent document is used on the threshold, to waterproof chassis, if waterproof chassis receives external vibration for a long time, the glass seal that is located gap portion between assembly groove and wallboard can take place dislocation separation, and then produces dislocation gap, leads to in the assembled bathroom ponding to enter into the assembly inslot through dislocation gap easily, and then makes wallboard bottom connecting portion can receive the soaking of ponding, how to improve the gap water-proof effects between assembly groove and the wallboard connecting portion is the problem that needs to solve at present.
For this purpose, we propose an assembled toilet system and its construction method to solve the above mentioned problems in the background art.
Disclosure of Invention
The invention aims to provide an assembled toilet system and a construction method thereof, which are used for solving the problems in the background technology.
In order to achieve the above purpose, the present invention provides the following technical solutions:
the assembly type toilet system comprises a frame body arranged on a waterproof chassis and a wallboard body inserted in an assembly groove part on the frame body, wherein the drainage end of the waterproof chassis is connected with a drain pipe through a drain collector, a sealant layer is coated between the assembly groove part and the wallboard body, a drain hole block is arranged at the bottom end of the inner wall of the assembly groove part, a liquid guide pipe communicated with the drain collector at the front part of the drain pipe is arranged at the liquid outlet end of the drain hole block, an inclined liquid guide channel is communicated between the bottom end of the inner wall of the assembly groove part and the liquid guide pipe, sealing strips and sealing blocks are respectively arranged on the opposite surfaces of the inner wall of the assembly groove part and the wallboard body, the bottom of the wallboard body is inserted in the assembly groove part and sleeved on the outer side of the drain hole block in a clamping manner, and a water guide channel for introducing accumulated water penetrating into the assembly groove part to the liquid inlet end of the drain hole block is arranged on the side wall of the wallboard body;
the water-swelling rubber ring is sleeved outside the wallboard body inserting part in a jogged manner, the water-swelling rubber block is vertically arranged on the side part of the upper end of the water-swelling rubber ring, the auxiliary flow hole is arranged on the side wall of the liquid discharge hole in the liquid discharge hole block, the expansion water-passing component is arranged between the inner side wall of the water-swelling rubber ring and the auxiliary flow hole, the expansion water-passing component comprises a water sealing plate arranged on the liquid outlet side of the auxiliary flow hole, the expansion water-passing component also comprises an expansion top strip arranged on the inner side of the water-swelling rubber ring, the side wall of the liquid discharge hole in the liquid discharge hole block is provided with a step slot hole, the corresponding positions on the side wall of the wallboard body are respectively provided with a step arc hole, the step slot hole and the step arc hole are respectively penetrated by a return spring sleeve rod and a double-top spring sleeve rod, the inner end of the return spring sleeve rod is arranged on the water sealing plate, and when the water-swelling rubber ring expands, the expansion water-passing component enables the auxiliary flow hole to be in a passage state;
the water-swelling rubber ring is characterized in that a water guide rope is arranged between the water-swelling rubber ring and the water-swelling rubber block, an outer pushing and pushing assembly is arranged between the inner side wall of the frame body and the wallboard body, the outer pushing and pushing assembly comprises a cover plate sleeved on the outer side of the water-swelling rubber block, an outer pushing spring sleeve is symmetrically arranged on the outer side of the cover plate, a groove is arranged on the side wall of the frame body, the outer end of the outer pushing spring sleeve is fixedly arranged in the groove, a limiting arc elastic sheet is arranged in the groove and used for limiting the inner pushing position quantity of the cover plate, a sealing air bag is detachably arranged at the top of the cover plate and used for filling and sealing a gap between the frame body and the outer surface of the wallboard body, and the water-swelling rubber block is positioned between the wallboard body and the outer pushing and pushing assembly.
Preferably, the sealing strip is arranged below the sealing block, the sealing glue layer is coated on the upper end face of the sealing block, and the water inlet end of the water guide channel is arranged between the sealing strip and the sealing block.
Preferably, when the water-swelling rubber ring and the swelling top strip swell in water, the swelling top strip, the double-top spring sleeve rod and the reset spring sleeve rod are sequentially moved close to each other and enable the water sealing plate to move out of the auxiliary flow hole end, so that the auxiliary flow hole is in a passage state.
Preferably, the front end face of the water-swellable rubber block is vertically provided with a perforation, a shaping arc spring plate penetrates through the perforation, liquid distribution holes are formed in two sides of the inner wall of the perforation, the bottom of the water guide rope penetrates through the bottom end face of the water-swellable rubber ring, and the upper part of the water guide rope penetrates through the perforation in sequence in a coil pipe mode.
A construction method is used for the assembled toilet system and comprises the following steps:
a, connecting the liquid outlet side of a liquid guide pipe with a drainage collector, simultaneously connecting the liquid outlet side of the drainage collector with a drainage pipe, pressing a cover plate and pushing the cover plate into a groove part, sleeving and fixing a water-swelling rubber ring and a water-swelling rubber block on an insertion part of a wallboard body, inserting the bottom end of the wallboard body into an assembly groove part and clamping and sleeving the assembly groove part on the outer side of a liquid discharge hole block, and covering the water-swelling rubber block under the action of an extrapolation spring sleeve by the cover plate;
b, injecting gas through a preset gas valve on the sealing air bag, filling and sealing a gap between the frame body and the outer surface of the wallboard body by the inflated sealing air bag, and coating a sealing adhesive layer between the wallboard body and the assembly groove part;
and C, if accumulated water is permeated into the assembly groove part, the water-swelling rubber ring and the water-swelling rubber block are swelled, the wallboard body is tightly attached to the sealing strip under the combined action of the push-out spring sleeve and the water-swelling rubber block, meanwhile, the attaching degree of the sealing block and the assembly groove part is further improved, and after the water-swelling rubber ring is swelled, the water-sealing plate is pushed to move out from the auxiliary flow hole end by sequentially pushing the expansion top strip, the double-top spring sleeve rod and the reset spring sleeve rod, so that accumulated water in the assembly groove part is discharged into the liquid guide pipe through the liquid discharge hole block, the inclined liquid guide channel and the auxiliary flow hole respectively and is discharged.
Compared with the prior art, the invention has the beneficial effects that: if the assembly groove part permeates ponding, firstly, the water-swelling rubber ring swells, and then the water-swelling rubber ring swells and then sequentially moves out from the auxiliary flow hole end through the swelling top strip, the double-top spring sleeve rod and the reset spring sleeve rod, so that the ponding in the assembly groove part is discharged into the liquid guide pipe through the liquid discharge hole block, the inclined liquid guide pipe and the auxiliary flow hole respectively, and the water guide rope sucks partial ponding in the assembly groove part into the perforation, and the ponding flowing into the perforation flows into the two side surfaces of the water-swelling rubber block through the liquid distribution hole, so that the vertically arranged water-swelling rubber block swells, and the wallboard body is respectively subjected to the external thrust of the push spring sleeve and the water-swelling rubber block under the limit of the limit arc spring plate, so that the wallboard body is tightly attached to the sealing strip, and simultaneously the sealing block is tightly attached to the notch part of the assembly groove part, so that the cooperation fixing strength between the wallboard body and the assembly groove part is improved, and the waterproof sealing effect between the wallboard body and the assembly groove part is also improved.
Drawings
FIG. 1 is a schematic view in partial cross-section of a waterproof chassis of the present invention;
FIG. 2 is a partial schematic view of FIG. 1;
FIG. 3 is a partial schematic view of the mating area of the push-out spring pocket and cover plate of FIG. 2;
FIG. 4 is a partial schematic view of the mating area of the wall panel body and the mounting groove of FIG. 2;
FIG. 5 is a schematic view of the water-swellable rubber ring of FIG. 4 in a water-swellable position;
FIG. 6 is a schematic diagram of a semi-sectional structure of the water-swellable rubber ring, water-swellable rubber block, cover plate and sealing bladder of the present invention in a mated state;
FIG. 7 is a partial schematic view of the push-out spring pocket and shroud mating region of FIG. 6;
FIG. 8 is a partial schematic view of the mating areas of the water-swellable rubber ring, the swelling top strip, the double-top spring retainer rod, the return spring retainer rod, and the water seal plate of FIG. 6;
FIG. 9 is a schematic view of the structure of the water-swellable rubber block 12 of the present invention in its expanded state.
In the figure: 1. a frame body; 2. a wall panel body; 3. a drain pipe; 4. a sealant layer; 5. a liquid discharge hole block; 6. a catheter; 7. an inclined liquid guide channel; 8. a sealing strip; 9. sealing the blocking block; 10. a water guide channel; 11. a water-swellable rubber ring; 12. a water-swellable rubber block; 13. auxiliary flow holes; 14. a water guide rope; 15. a water sealing plate; 16. a step slot; 17. a step arc hole; 18. a return spring sleeve rod; 19. a double-top spring sleeve rod; 20. perforating; 21. shaping the arc spring plate; 22. a liquid distribution hole; 23. a cover plate; 24. pushing out a spring sleeve; 25. a groove; 26. limiting arc spring plates; 27. sealing the air bag; 101. an assembly groove portion; 201. expanding the top strip.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Referring to fig. 1-9, the present invention provides a technical solution:
embodiment one:
an assembled toilet system comprises a frame body 1 arranged on a waterproof chassis, wherein the frame body 1 is an aluminum frame, and a wallboard body 2 inserted into an assembly groove part 101 arranged on the frame body 1, the assembly groove part 101 is embedded with the wallboard body 2, the wallboard body 2 and the installation part of the frame body 1 are arranged in a mutually perpendicular mode, the drainage end of the waterproof chassis is connected with a drainage pipe 3 through a drainage collector, a sealant layer 4 is coated between the assembly groove part 101 and the wallboard body 2, the sealant layer 4 is glass cement, the bottom end of the inner wall of the assembly groove part 101 is integrally formed or welded and fixed with four drain hole blocks 5, the number of the drain hole blocks 5 can be adaptively adjusted according to the section length of the assembly groove part 101, a drain hole vertically penetrated is arranged on the drain hole block 5, the section of the upper end surface of the liquid inlet of the drain hole is of a horn-shaped structure, the liquid outlet end of the drain hole block 5 is provided with a liquid guide tube 6 communicated with the drainage collector in front of the drainage pipe 3, an inclined liquid guide channel 7 is communicated between the bottom end of the inner wall of the assembly groove 101 and the liquid guide tube 6, a sealing strip 8 and a sealing block 9 are respectively arranged on the opposite surfaces of the inner wall of the assembly groove 101 and the wallboard body 2, the sealing strip 8 is made of sealing rubber, the sealing block 9 is made of nylon, a rubber sleeve with the thickness of two millimeters is sleeved on the outer surface of the sealing block 9, a notch groove is preset on the matched area of the inner wall of the assembly groove 101 and the sealing block 9, the sealing block 9 can be inserted into the notch groove in a fit manner, an installing and detaching groove is distributed on the bottom end surface of the wallboard body 2 and is matched with the drain hole block 5, the bottom of the wallboard body 2 is inserted into the assembly groove 101 and is clamped and sleeved on the outer side of the drain hole block 5, a water guide channel 10 for leading accumulated water permeated into the assembly groove 101 to the liquid inlet end of the drain hole block 5 is arranged on the side wall of the wallboard body 2, the liquid outlet end of the water guide channel 10 is communicated with the bottom end of the inner wall of the mounting and dismounting groove, and the liquid outlet end of the water guide channel 10 is positioned right above the liquid inlet end of the liquid discharge hole block 5;
the water-swelling rubber ring 11 is embedded and sleeved on the outer side of the insertion part of the wallboard body 2, the water-swelling rubber block 12 is vertically arranged on the left side part of the upper end of the water-swelling rubber ring 11, the volume of each of the water-swelling rubber ring 11 and the water-swelling rubber block 12 can be doubled after the water-swelling rubber ring 11 and the water-swelling rubber block 12 are swelled, water-swelling rubber of the product in the prior art is adopted by the water-swelling rubber ring 11 and the water-swelling rubber block 12, the auxiliary flow hole 13 is arranged on the side wall of the liquid discharge hole in the liquid discharge hole block 5, the liquid inlet end of the auxiliary flow hole 13 is close to the bottom end of the inner wall of the assembly groove part 101, and when the auxiliary flow hole 13 is in a conducting state, accumulated water in the assembly groove part 101 can flow into the liquid discharge hole block 5 through the auxiliary flow hole 13 for discharging, an expansion water-passing component is arranged between the inner side wall of the water-swelling rubber ring 11 and the auxiliary flow hole 13, and the expansion water-passing component enables the auxiliary flow hole 13 to be in a passage state when the water-swelling rubber ring 11 is swelled;
be provided with water guide rope 14 between water-swellable rubber ring 11 and the water-swellable rubber piece 12, water guide rope 14 is the cotton rope that absorbs water, can inhale the water-swellable rubber piece 12 of top with the part ponding that flows into assembly groove 101 through the setting of water guide rope 14, be convenient for the inflation of water-swellable rubber piece 12, and be provided with outer pushing tight subassembly between frame body 1 inside wall and the wallboard body 2, water-swellable rubber piece 12 is located between wallboard body 2 and the pushing tight subassembly of pushing out, when pushing out tight subassembly can play the auxiliary role that goes on to the top to wallboard body 2, can also match the water-swellable rubber piece 12 after the inflation to further carry out the pushing tight to wallboard body 2.
Embodiment two:
on the basis of the first embodiment, further description is made that the sealing strip 8 is arranged below the sealing block 9, the sealing glue layer 4 is coated on the upper end surface of the sealing block 9, the liquid inlet end of the water guide channel 10 is arranged between the sealing strip 8 and the sealing block 9, in the above arrangement, the sealing strip 8 can primarily block the permeated water, and the blocked water flows into the liquid discharge hole block 5 through the water guide channel 10;
the expansion water passing assembly comprises a water sealing plate 15 arranged on the liquid outlet side of an auxiliary flow hole 13, the auxiliary flow hole 13 is in a closed state when the water sealing plate 15 is close to the liquid outlet side of the auxiliary flow hole 13, the expansion water passing assembly also comprises an expansion top strip 201 arranged on the inner side of a water-swelling rubber ring 11, the expansion top strip 201 is made of a water-swelling rubber material, a step groove hole 16 is arranged on the side wall of a liquid discharging hole 5, a step arc hole 17 is arranged on the corresponding position on the side wall of a wallboard body 2, the opposite surfaces of the step arc hole 17 and the expansion top strip 201 are of an arc structure, the arc surface of the step arc hole 17 is attached to the appearance of the expanded top strip 201, a return spring sleeve 18 and a double-top spring sleeve 19 penetrate through the step groove 16 and the step arc hole 17 respectively, and the inner end of the return spring sleeve 18 is arranged on the water sealing plate 15, so that the return spring sleeve 18 can generate spring thrust force to the auxiliary flow hole 13, the water sealing plate 15 is in a closed state when the initial state, the water-swelling rubber ring 11 and the expansion top strip 201 swell, the opposite surfaces of the top strip 201 and the water-swelling top strip 201 are in a water-swelling state, the opposite surfaces of the top strip 201 and the water sealing plate 13 are removed from the water sealing plate 101, the water sealing plate is gradually retracted from the water sealing plate 13, and the water sealing plate 101 is gradually moved out, and the water sealing plate is gradually closed, and the water sealing plate 101 is completely is moved out, and the water sealing hole 101 is in the water sealing plate is in the water sealing hole is in the water sealing assembly;
the perforation 20 is vertically distributed on the front end face of the water-swellable rubber block 12, the shaping arc spring piece 21 penetrates through the perforation 20, the shaping arc spring piece 21 is made of elastic stainless steel, the section of the shaping arc spring piece 21 is of a major arc structure, the pressure bearing capacity and shaping capacity of the water-swellable rubber block 12 are improved through the arrangement of the shaping arc spring piece 21, liquid distribution holes 22 are formed in the lower portions of the two sides of the inner wall of the perforation 20, the bottom of the water guide rope 14 penetrates through the bottom end face of the water-swellable rubber ring 11, the upper portion of the water guide rope 14 sequentially penetrates through the perforation 20 in a coil mode, accumulated water in the assembly groove 101 can be sucked into the perforation 20 by the water guide rope 14, and the accumulated water sucked into the perforation 20 can flow into the two side portions of the water-swellable rubber block 12 through the liquid distribution holes 22, so that the water-swellable rubber block 12 is in an expanded state as shown in fig. 9.
Embodiment III:
further describing the outer pushing and propping assembly on the basis of the first embodiment, the outer pushing and propping assembly comprises a cover plate 23 sleeved on the outer side of the water-swellable rubber block 12, an inner concave surface is arranged on the outer side of the cover plate 23, the water-swellable rubber block 12 can be covered by the inner concave surface, an outer pushing spring sleeve 24 is symmetrically welded on the outer side of the cover plate 23, the outer pushing spring sleeve 24 is formed by matching an outer pushing spring and a sleeve, the sleeve is fixed on the left side of the cover plate 23, the outer pushing spring sleeve 24 further generates rightward spring thrust on the cover plate 23, a groove 25 is formed in the side wall of the frame body 1, the outer end of the outer pushing spring sleeve 24 is fixedly arranged in the groove 25, a limit arc spring 26 is welded or screwed in the groove 25, the limit arc spring 26 is used for limiting the inner pushing position quantity of the cover plate 23, when the cover plate 23 has a leftward moving trend, the limit arc spring 26 can generate reverse elasticity on the cover plate 23, a supporting limiting function on the position of the cover plate 23 is achieved, a sealing air bag 27 is detachably arranged on the top of the cover plate 23, the sealing air bag 27 is an inflatable air bag, the top of the sealing body 27 is preset on the top of the sealing body 27 for filling the air bag 1 into the gap 101, and the gap between the sealing body and the sealing body 2 is filled in the gap 101.
A construction method is used for the assembled toilet system and comprises the following steps:
a, connecting the liquid outlet side of a liquid guide pipe 6 with a drainage collector, simultaneously connecting the liquid outlet side of the drainage collector with a drainage pipe 3, pressing a cover plate 23 and pushing the cover plate 23 into a groove 25 part, sleeving and fixing a water-swelling rubber ring 11 and a water-swelling rubber block 12 on an insertion part of a wallboard body 2, inserting the bottom end of the wallboard body 2 into an assembly groove 101 and clamping and sleeving the assembly groove into the outer side of a drainage hole block 5, and covering the water-swelling rubber block 12 by the cover plate 23 under the action of an extrapolation spring sleeve 24;
b, injecting gas through a preset gas valve on the sealing gas bag 27, filling and sealing a gap between the frame body 1 and the outer surface of the wallboard body 2 by the inflated sealing gas bag 27, and coating a sealing adhesive layer 4 between the wallboard body 2 and the assembly groove part 101;
c, if the assembly groove part 101 is permeated with accumulated water, the water-swelling rubber ring 11 and the water-swelling rubber block 12 are swelled, the wallboard body 2 is tightly attached to the sealing strip 8 under the combined action of the push-out spring sleeve 24 and the water-swelling rubber block 12, meanwhile, the attaching degree of the sealing block 9 and the assembly groove part 101 is further improved, and after the water-swelling rubber ring 11 is swelled, the water sealing plate 15 is pushed to move out from the end of the auxiliary flow hole 13 by the expansion top strip 201, the double-top spring sleeve rod 19 and the reset spring sleeve rod 18 in sequence, so that accumulated water in the assembly groove part 101 is discharged into the liquid guide tube 6 through the liquid discharge hole block 5, the inclined liquid guide channel 7 and the auxiliary flow hole 13 respectively and discharged.
The working principle is as follows: the liquid outlet side of the liquid guide pipe 6 is connected with the drainage collector, the liquid outlet side of the drainage collector is connected with the drainage pipe 3, the cover plate 23 is pressed and pushed into the groove 25, the water-swelling rubber ring 11 and the water-swelling rubber block 12 are sleeved and fixed on the insertion part of the wallboard body 2, then the bottom end of the wallboard body 2 is inserted into the assembly groove 101 and is clamped and sleeved on the outer side of the liquid discharge hole block 5, the cover plate 23 covers the water-swelling rubber block 12 under the action of the push-out spring sleeve 24, gas is flushed through the preset gas valve body on the sealing gas bag 27, the gap between the frame body 1 and the outer surface of the wallboard body 2 is filled and sealed by the inflated sealing gas bag 27, the sealing glue layer 4 is coated between the wallboard body 2 and the assembly groove 101, if the assembly groove 101 is permeated with water, the water-swelling rubber ring 11 is firstly swelled, after the water-swelling rubber ring 11 swells, the water sealing plate 15 is pushed to move out from the end of the auxiliary flow hole 13 by the swelling top strip 201, the double-top spring sleeve rod 19 and the reset spring sleeve rod 18 in sequence, so that the accumulated water in the assembly groove 101 is discharged into the liquid guide tube 6 through the liquid discharge hole block 5, the inclined liquid guide channel 7 and the auxiliary flow hole 13 respectively, the water guide rope 14 sucks part of the accumulated water in the assembly groove 101 into the perforation 20, the accumulated water flowing into the perforation 20 flows into the two side surfaces of the water-swelling rubber block 12 through the liquid distribution hole 22, thereby swelling the vertically arranged water-swelling rubber block 12, the wallboard body 2 is respectively pushed by the push spring sleeve 24 and the water-swelling rubber block 12 under the limit of the limit arc spring plate 26 due to the limit of the cover plate 23, the wallboard body 2 is tightly attached to the sealing strip 8, and the sealing block 9 is tightly attached to the notch of the assembly groove 101 simultaneously, the waterproof sealing effect between the wall plate body 2 and the fitting groove portion 101 is improved.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present invention, and although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present invention.

Claims (5)

1. The utility model provides an assembled bathroom system, includes frame body (1) of setting on waterproof chassis to and insert wallboard body (2) of establishing assembly groove portion (101) on frame body (1), and waterproof chassis drainage end is connected with drain pipe (3) through the drainage collector, the coating has sealant layer (4) between assembly groove portion (101) and wallboard body (2), its characterized in that: the water draining device is characterized in that a liquid draining hole block (5) is arranged at the bottom end of the inner wall of the assembly groove part (101), a liquid draining pipe (6) communicated with a drainage collector at the front part of the drain pipe (3) is arranged at the liquid draining end of the liquid draining hole block (5), an inclined liquid guiding channel (7) is communicated between the bottom end of the inner wall of the assembly groove part (101) and the liquid draining pipe (6), sealing strips (8) and sealing blocks (9) are respectively arranged on the opposite surfaces of the inner side wall of the assembly groove part (101) and the wallboard body (2), the bottom of the wallboard body (2) is inserted into the assembly groove part (101) and sleeved on the outer side of the liquid draining hole block (5), and a water guiding channel (10) for introducing accumulated water permeated into the assembly groove part (101) to the liquid inlet end of the liquid draining hole block (5) is arranged on the side wall of the wallboard body (2);
the water-swelling rubber ring (11) is sleeved on the outer side of the insertion part of the wallboard body (2), the water-swelling rubber block (12) is vertically arranged on the side part of the upper end of the water-swelling rubber ring (11), the auxiliary flow hole (13) is arranged on the side wall of the liquid discharge hole in the liquid discharge hole block (5), an expansion water passing component is arranged between the inner side wall of the water-swelling rubber ring (11) and the auxiliary flow hole (13), the expansion water passing component comprises a water sealing plate (15) arranged on the liquid outlet side of the auxiliary flow hole (13), the expansion water passing component also comprises an expansion top strip (201) arranged on the inner side part of the water-swelling rubber ring (11), a step slot hole (16) is arranged on the side wall of the liquid discharge hole in the liquid discharge hole block (5), a step arc hole (17) is arranged at a corresponding position on the side wall of the wallboard body (2), a reset spring sleeve rod (18) and a double-top spring sleeve rod (19) are respectively penetrated, and the inner end of the reset spring sleeve rod (18) is arranged on the water sealing plate (15), when the water passing component is in an expansion water passing state when the water passing component is in the auxiliary flow passage state (13);
be provided with water guide rope (14) between meeting water inflation rubber ring (11) and meeting water inflation rubber piece (12), just be provided with outer pushing jack assembly between frame body (1) inside wall and wallboard body (2), pushing jack assembly is including cover plate (23) of establishing in meeting water inflation rubber piece (12) outside, and cover plate (23) outside lateral part symmetry is provided with pushing jack (24), frame body (1) side wall is equipped with recess (25), pushing jack (24) outer end is fixed to be set up in recess (25), and is provided with spacing arc shell fragment (26) in recess (25), and spacing arc shell fragment (26) are used for prescribing a limit to the inboard thrust position volume of cover plate (23), cover plate (23) top can be dismantled and are provided with sealed gasbag (27), and sealed gasbag (27) are used for filling seal to the space between frame body (1) and wallboard body (2) surface, water inflation rubber piece (12) are located between wallboard body (2) and the jack assembly.
2. A modular toilet system as claimed in claim 1, wherein: sealing strip (8) are located sealing block (9) below setting, and sealing glue film (4) coating are to sealing block (9) up end, water guide channel (10) feed liquor end is located and sets up between sealing strip (8) and sealing block (9).
3. A modular toilet system as claimed in claim 1, wherein: when the water-swelling rubber ring (11) and the swelling top strip (201) swell in water, the swelling top strip (201), the double-top spring sleeve rod (19) and the reset spring sleeve rod (18) are sequentially pushed to be close to each other and enable the water sealing plate (15) to be moved out of the end of the auxiliary flow hole (13), so that the auxiliary flow hole (13) is in a passage state.
4. A modular toilet system as claimed in claim 1, wherein: perforation (20) have been laid along vertical to the terminal surface before meeting water inflation rubber piece (12), run through in perforation (20) have moulding arc shell fragment (21), just perforation (20) inner wall both sides all are equipped with cloth liquid hole (22), water guide rope (14) bottom runs through in meeting water inflation rubber ring (11) bottom face, and water guide rope (14) upper portion runs through in perforation (20) through the coil pipe mode in proper order.
5. A construction method for the assembled toilet system according to any one of the preceding claims 1-4, characterized by the steps of:
a, connecting a liquid outlet side of a liquid guide pipe (6) with a drainage collector, simultaneously connecting the liquid outlet side of the drainage collector with a drainage pipe (3), pressing a cover plate (23) and pushing the cover plate into a groove (25), sleeving and fixing a water-swelling rubber ring (11) and a water-swelling rubber block (12) on an insertion part of a wallboard body (2), inserting the bottom end of the wallboard body (2) into an assembly groove part (101) and clamping and sleeving the bottom end into the outer side of a liquid discharge hole block (5), and covering the water-swelling rubber block (12) under the action of an extrapolation spring sleeve (24) by the cover plate (23);
b, injecting gas through a preset gas valve on the sealing gas bag (27), filling and sealing a gap between the frame body (1) and the outer surface of the wallboard body (2) by the inflated sealing gas bag (27), and coating a sealing adhesive layer (4) between the wallboard body (2) and the assembly groove part (101);
c, if the assembly groove part (101) is permeated with accumulated water, the water-swelling rubber ring (11) and the water-swelling rubber block (12) are swelled, the wallboard body (2) is tightly attached to the sealing strip (8) under the combined action of the push-out spring sleeve (24) and the water-swelling rubber block (12), meanwhile, the attaching degree of the sealing block (9) and the assembly groove part (101) is further improved, and after the water-swelling rubber ring (11) is swelled, the water-sealing plate (15) is pushed to move out from the auxiliary flow hole (13) end by sequentially pushing the expansion top strip (201), the double-top spring sleeve rod (19) and the reset spring sleeve rod (18), so that accumulated water in the assembly groove part (101) is discharged into the catheter (6) through the liquid discharge hole block (5), the inclined liquid guide channel (7) and the auxiliary flow hole (13) respectively.
CN202210993933.XA 2022-08-18 2022-08-18 Assembled toilet system and construction method thereof Active CN115263031B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210993933.XA CN115263031B (en) 2022-08-18 2022-08-18 Assembled toilet system and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210993933.XA CN115263031B (en) 2022-08-18 2022-08-18 Assembled toilet system and construction method thereof

Publications (2)

Publication Number Publication Date
CN115263031A CN115263031A (en) 2022-11-01
CN115263031B true CN115263031B (en) 2023-05-30

Family

ID=83754108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210993933.XA Active CN115263031B (en) 2022-08-18 2022-08-18 Assembled toilet system and construction method thereof

Country Status (1)

Country Link
CN (1) CN115263031B (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112302287A (en) * 2020-10-22 2021-02-02 北京宇航建筑工程有限公司 Assembled toilet overhead waterproof structure and construction method thereof
CN112554352B (en) * 2020-12-11 2022-03-18 德清扬泰建筑材料有限公司 Assembled toilet waterproof system and construction method thereof

Also Published As

Publication number Publication date
CN115263031A (en) 2022-11-01

Similar Documents

Publication Publication Date Title
CN115263031B (en) Assembled toilet system and construction method thereof
CN208792438U (en) A kind of double standpipes band water seal is from ventilation draining sub-assembly
CN211472798U (en) Waterproof chassis for integral bathroom
CZ291370B6 (en) Contraction joint rail and use thereof
CN112145026B (en) Sliding window section bar and mounting method thereof
CN111705894B (en) Bathroom waterproof structure and construction method thereof
CN114108848A (en) Indoor waterproof sealing device and method based on hard-package engineering
CN212897214U (en) Slope roofing hidden roofing pipeline
CN219138904U (en) Waterproof leaking stoppage structure of building window frame
CN217601684U (en) Assemble dirty pond of reinforced concrete collection
CN221219097U (en) Basement bottom plate sealing device
CN2236513Y (en) Rubber water sealing strip
CN219175566U (en) Building wallboard with sound insulation function
CN201695509U (en) Auxiliary leakage floor drain
CN217923758U (en) Ground is wall shear force groove regularization sealing device even
CN111894411B (en) Aluminum alloy window convenient to clean
CN218454677U (en) Adhesive tape structure for door and window glass installation
CN214838942U (en) Anti-seepage device for water supply and drainage pipes in building engineering
CN211369384U (en) Toilet waterproof structure
CN220379088U (en) Underground outdoor wall antiseep embedded sleeve
CN216046059U (en) Liquid diaphragm pump with good sealing performance
CN212689135U (en) Drain pipe for building engineering
CN221682835U (en) Drainage Kong Kougai for plastic window
CN212453015U (en) Assembling type toilet leakage-proof groove
CN219909717U (en) Indoor dampproofing decorative board

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant