CN115262843A - Aluminum ceiling and integrated belt integrated hoisting modular structure - Google Patents
Aluminum ceiling and integrated belt integrated hoisting modular structure Download PDFInfo
- Publication number
- CN115262843A CN115262843A CN202210998455.1A CN202210998455A CN115262843A CN 115262843 A CN115262843 A CN 115262843A CN 202210998455 A CN202210998455 A CN 202210998455A CN 115262843 A CN115262843 A CN 115262843A
- Authority
- CN
- China
- Prior art keywords
- integrated
- aluminum ceiling
- module
- integrated belt
- modular structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910052782 aluminium Inorganic materials 0.000 title claims abstract description 74
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 title claims abstract description 72
- 241000700647 Variola virus Species 0.000 claims description 16
- 239000004411 aluminium Substances 0.000 claims description 16
- 230000003287 optical effect Effects 0.000 claims description 14
- 238000003780 insertion Methods 0.000 claims description 12
- 230000037431 insertion Effects 0.000 claims description 12
- 238000005452 bending Methods 0.000 claims description 10
- 238000010276 construction Methods 0.000 abstract description 19
- 238000004904 shortening Methods 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 6
- 239000007921 spray Substances 0.000 description 5
- 239000012634 fragment Substances 0.000 description 4
- 210000001503 joint Anatomy 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 238000011900 installation process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000004891 communication Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 230000017525 heat dissipation Effects 0.000 description 1
- 238000005286 illumination Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 239000000523 sample Substances 0.000 description 1
- 239000000779 smoke Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 230000036413 temperature sense Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/006—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation with means for hanging lighting fixtures or other appliances to the framework of the ceiling
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/02—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation having means for ventilation or vapour discharge
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/18—Means for suspending the supporting construction
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/22—Connection of slabs, panels, sheets or the like to the supporting construction
- E04B9/225—Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like hanging at a distance below the supporting construction
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Building Environments (AREA)
Abstract
The invention discloses an aluminum ceiling and integrated belt integrated hoisting modular structure which comprises a group of main keels (1), wherein a suspender (2) is arranged above each main keel (1), an integrated belt module is arranged on each main keel (1), aluminum ceiling modules which are mutually spliced are arranged on the side surface of each integrated belt module, and the aluminum ceiling modules are fixed on the main keels (1); the integrated belt module comprises a hook module (3) fixed on the main keel (1), and an integrated belt (4) is inserted below the hook module (3); the integrated belt (4) is also provided with a movable decorative mounting plate (8) matched with the terminal equipment; the aluminum ceiling module comprises a keel pendant module (5) fixed on the main keel (1), a hook keel (6) is arranged below the keel pendant module (5), and an aluminum ceiling (7) is lapped on the hook keel (6). The invention has the characteristics of effectively shortening the construction time and improving the construction quality.
Description
Technical Field
The invention relates to a suspended ceiling, in particular to an aluminum suspended ceiling and integrated belt integrated hoisting modular structure.
Background
The integrated belt integrates the functions of the equipment belt or indoor fire-fighting spray head, fire-fighting smoke sense, temperature sense, acoustic horn, point light source illumination, engraved light guide plate, communication wireless cover, monitor, infrared probe, sensor point collection, intelligent controller, control switch box and other terminal equipment; the top function is optimized to the maximum extent, the top function can be combined and integrated freely according to the requirements of users, new sub-function modules can be added at any time and at will, and the wireless extensible system has infinite expansibility.
The aluminum ceiling is a ceiling partition decorative material which is convenient for air circulation, air exhaust and heat dissipation and has good aesthetic property; when finishing the ceiling inside a building, a hook-and-pile aluminum plate is generally used for ceiling suspension.
However, in the installation and construction process of the integrated belt and the aluminum ceiling, the integrated belt and the aluminum ceiling are independently constructed, so that a plurality of construction procedures are repeated, the whole construction time is long, and the construction efficiency is low; moreover, procedures such as alignment splicing and the like are required to be carried out between the integrated belt and the aluminum ceiling, so that the construction procedures are increased, the quality is easily influenced, and the attractiveness is easily influenced. Therefore, the prior art has the problems of long construction time and low construction quality.
Disclosure of Invention
The invention aims to provide an aluminum ceiling and integrated belt integrated hoisting modular structure. The invention has the characteristics of effectively shortening the construction time and improving the construction quality.
The technical scheme of the invention is as follows: aluminum ceiling and integrated lifting modular structure of taking, including a set of main joist, the main joist top is equipped with the jib, is equipped with the integrated module of taking on the main joist, and the integrated module side of taking is equipped with the aluminum ceiling module of assembling each other, and the aluminum ceiling module is fixed in on the main joist.
In the aluminum ceiling and integrated belt integrated hoisting modular structure, the integrated belt module comprises a hook module fixed on the main keel, and an integrated belt is inserted below the hook module; the integrated belt is also provided with a movable decorative mounting plate matched with the terminal equipment;
the aluminium smallpox module is equipped with the hook keel including being fixed in the fossil fragments pendant module on the main joist, fossil fragments pendant module below, and the overlap joint has the aluminium smallpox on the hook keel.
In the integrated hoisting modular structure of the aluminum ceiling and the integrated belt, the aluminum ceiling comprises an aluminum ceiling body, one end of the aluminum ceiling body is provided with an outward lap joint, and the other end of the aluminum ceiling body is provided with an inward lap joint; the height of the outward lap joint opening is higher than that of the inward lap joint opening.
In the integrated hoisting modular structure of the aluminum ceiling and the integrated belt, the integrated belt comprises a light groove and a frame, an integrated belt bottom plate is arranged between the light groove and the frame, a grating clamping piece is further arranged below the integrated belt bottom plate, and a grating is arranged on the grating clamping piece; the movable decorative mounting plate is lapped between the light groove and the frame, and the movable decorative mounting plate is positioned between the front and the rear grids.
Among the aforesaid aluminium smallpox and integrated area integral type hoist and mount modular structure, the light trough includes the light trough body, and the upper portion in the light trough body outside is equipped with horizontal inserting groove, and the bottom of light trough body inboard is equipped with light trough overlap joint limit, and the top of light trough overlap joint limit is equipped with the light trough joint limit of bending.
In the integrated hoisting modular structure of the aluminum ceiling and the integrated belt, the frame comprises a frame body, a vertical insertion groove is formed in the upper part of the outer side surface of the frame body, and a hook-and-lap edge is arranged below the vertical insertion groove; the inboard bottom of frame body is equipped with the frame overlap edge, and the top on frame overlap edge is equipped with the frame joint limit of bending.
Among the aforementioned aluminium smallpox and integrated area integral type hoist and mount modular structure, the grid fastener includes grid fastener body, and the both ends of grid fastener body are equipped with the joint groove, and the lower part of grid fastener body is equipped with a set of evenly distributed's grid joint board, is equipped with arc joint mouth on the grid joint board.
Among the aforesaid aluminium smallpox and integrated area integral type hoist and mount modular structure, the grid includes the grid body, and grid body upper end is equipped with the circular joint pipe corresponding with arc joint mouth.
In the integrated hoisting modular structure of the aluminum ceiling and the integrated belt, the integrated belt bottom plate comprises a spliced C-shaped splicing bottom plate, a spliced C-shaped splicing air port plate and a spliced C-shaped splicing fire fighting plate; the C-shaped plug-in fire-fighting plate comprises two bottom plates which are mutually plugged, and a fire-fighting semi-circle opening is formed in each bottom plate.
Among the aforesaid aluminium smallpox and integrated integral type hoist and mount modular structure of taking, movable decoration mounting panel includes two decorative boards of splicing each other, is equipped with the semicircle orifice on one of them side of decorative board, forms circular mouth after two decorative boards splice.
Compared with the prior art, the integrated belt and the aluminum ceiling are arranged on the same keel group through the hook module, the keel hanging module and the hook keel respectively, the integrated belt, the aluminum ceiling and the adjacent aluminum ceiling are mutually overlapped to form a modular structure, and the integrated installation of the integrated belt and the aluminum ceiling is completed, so that the repeated operation can be effectively reduced, the construction period is shortened, the construction quality between the integrated belt and the aluminum ceiling can be effectively improved, and the integral attractiveness of the ceiling is improved. Meanwhile, the invention also has the following advantages:
1) And (3) environmental protection: the invention adopts a modularized design, does not need on-site cutting and processing, can be directly transported to a construction site from a manufacturer, reduces material waste and effectively improves the overall environmental protection;
2) Safety: the integral bearing keel is adopted, and a disconnected bearing keel is not needed, so that the firmness of the suspended ceiling can be effectively improved, and the safety performance is improved;
3) Energy conservation: by adopting the splicing structure, the construction is quick and simple; the movable decorative mounting plate, the C-shaped splicing bottom plate, the C-shaped splicing air port plate and the C-shaped splicing fire fighting plate which are spliced with one another are adopted, the measurement of the distance between equipment terminals on the site is not needed, and an independent suspender and punching are not needed, so that the construction period is shortened, various energy consumption required by construction can be reduced, and the energy-saving effect is improved;
4) Fire prevention: because the integrated belt is installed without independently installing a suspender and a wooden frame, the fire resistance is effectively improved;
5) Quality: the integrated belt and the aluminum ceiling are spliced and installed by adopting the uniform keel and the uniform hanging rod, the integral hanging ceiling is flat and straight, and the installation quality and the attractiveness are effectively improved; the subsequent equipment is convenient to maintain and replace; the line is convenient to be checked.
In conclusion, the invention has the characteristics of effectively shortening the construction time and improving the construction quality.
Drawings
FIG. 1 is a structural view of the present invention;
FIG. 2 is a top three-dimensional view of the present invention;
FIG. 3 is a bottom three-dimensional view of the present invention;
FIG. 4 is a side view of the present invention;
FIG. 5 is a structural view of the aluminum ceiling of FIG. 4;
FIG. 6 is an enlarged view of a portion of FIG. 5;
FIG. 7 is a structural view of the integrated strap of FIG. 4;
FIG. 8 is an enlarged view of a portion of FIG. 7;
FIG. 9 is an enlarged partial view of FIG. 8;
FIG. 10 is a top view of the invention;
FIG. 11 is a structural view of a C-shaped socket fire panel;
fig. 12 is a structural view of the movable decorative mounting plate.
The labels in the figures are: 1-main keel, 2-hanger bar, 3-hook module, 4-integration band, 5-keel hanger module, 6-hook keel, 7-aluminum ceiling, 8-movable decorative mounting plate, 701-aluminum ceiling body, 702-outward lap joint, 703-inward lap joint, 401-light groove, 402-frame, 403-integrated band base plate, 404-grid clip, 405-grid, 411-light groove body, 412-horizontal insertion groove, 413-light groove lap joint, 414-light groove snap joint bent edge, 421-frame body, 422-vertical insertion groove, 423-hook lap edge, 424-frame lap edge, 425-frame snap joint bent edge, 441-grid clip body, 442-snap joint groove, 443-grid snap joint plate, 444-arc snap joint, 451-grid body, 452-circular snap joint tube, 431-C type insertion base plate, 432-C type insertion tuyere plate, 433-C type insertion fire fighting plate, 434-base plate, 435-semicircle orifice, 801-semicircle orifice, 802-semicircle orifice decorative plate.
Detailed Description
The invention is further illustrated by the following figures and examples, which are not to be construed as limiting the invention.
Examples are given. Aluminium smallpox and integrated area integral type hoist and mount modular structure constitute as shown in fig. 1 to 12, including a set of main joist 1, 1 tops of main joist are equipped with jib 2, are equipped with integrated area module on the main joist 1, and integrated area module side is equipped with the aluminium smallpox module of assembling each other, and on aluminium smallpox module was fixed in main joist 1.
The integrated belt module comprises a hook module 3 fixed on the main keel 1, and an integrated belt 4 is inserted below the hook module 3; the integrated belt 4 is also provided with a movable decorative mounting plate 8 matched with the terminal equipment;
the aluminium smallpox module is equipped with the hook keel 6 including being fixed in fossil fragments pendant module 5 on the main joist 1, fossil fragments pendant module 5 below, and the overlap joint has aluminium smallpox 7 on the hook keel 6.
And the two sides of the integrated belt 4 are provided with matched aluminum ceilings 7.
The aluminum ceiling 7 comprises an aluminum ceiling body 701, one end of the aluminum ceiling body 701 is provided with an outward lapping port 702, and the other end of the aluminum ceiling body 701 is provided with an inward lapping port 703; the height of the outward lap joint 702 is higher than the height of the inward lap joint 703.
The integrated belt 4 comprises a light groove 401 and a frame 402, an integrated belt bottom plate 403 is arranged between the light groove 401 and the frame 402, a grating clamping piece 404 is arranged below the integrated belt bottom plate 403, and a grating 405 is arranged on the grating clamping piece 404; the movable decorative mounting plate 9 is mounted between the light groove 401 and the frame 402, and the movable decorative mounting plate 9 is located between the front and rear grills 405.
The optical groove 401 includes an optical groove body 411, the upper portion of the outer side of the optical groove body 411 is provided with a horizontal insertion groove 412, the bottom of the inner side of the optical groove body 411 is provided with an optical groove overlapping edge 413, and an optical groove clamping bending edge 414 is arranged above the optical groove overlapping edge 413.
The frame 402 comprises a frame body 421, a vertical insertion groove 422 is arranged at the upper part of the outer side surface of the frame body 421, and a hooked side 423 is arranged below the vertical insertion groove 422; the bottom of frame body 421 inboard is equipped with frame overlap joint 424, and the top of frame overlap joint 424 is equipped with frame joint limit 425 of bending.
The grating clamping piece 404 comprises a grating clamping piece body 441, clamping grooves 442 are formed in two ends of the grating clamping piece body 441, a group of grating clamping plates 443 which are uniformly distributed are arranged on the lower portion of the grating clamping piece body 441, and arc-shaped clamping openings 444 are formed in the grating clamping plates 443.
The grating 405 comprises a grating body 451, and a circular clamping pipe 452 corresponding to the arc-shaped clamping interface 444 is arranged at the upper end of the grating body 451.
The integrated belt bottom plate 403 comprises a C-shaped splicing bottom plate 431, a C-shaped splicing tuyere plate 432 and a C-shaped splicing fire-fighting plate 433 which are spliced; the C-shaped spliced fire-fighting plate 433 comprises two bottom plates 434 spliced with each other, and a fire-fighting semi-circular opening 435 is formed in each bottom plate 434.
The movable decorative mounting plate 8 comprises two decorative plates 801 which are spliced with each other, a semicircular hole 802 is formed in one side edge of each decorative plate 801, and a circular opening is formed after the two decorative plates 801 are spliced.
The outside of horizontal inserting groove is equipped with the corresponding overlap joint step of outside overlap joint mouth.
The installation process of the invention is as follows: because the terminals of the air conditioner air inlet, the fire-fighting spray inlet and the like are arranged on the same straight line,
according to design requirements, a hanger rod and a main keel are installed on a ceiling of a building, a hook module is installed on the main keel at a position corresponding to an equipment terminal, then an integrated belt is installed on the corresponding hook module, then a keel hanging module is installed on the main keel, a hook keel is installed below the keel hanging module, and then an aluminum ceiling is installed on the corresponding hook keel, wherein an inward lap joint of the aluminum ceiling is positioned on the inner side of an outward lap joint of another aluminum ceiling; the outside lap joint mouth overlap joint on the overlap joint step at the aluminium smallpox corresponding with the overlap joint step of integrated area, is located the below on hook scrap at the inside lap joint mouth of the aluminium smallpox that corresponds with the hook scrap in integrated area, and this department is equipped with hook scrap keel.
The installation process of the integrated belt comprises the following steps: the light groove and the frame are installed on the main keel through the hook module, the C-shaped splicing bottom plate, the C-shaped splicing air port plate and the C-shaped splicing fire fighting plate are sequentially installed at corresponding positions according to the positions of a fire fighting spray port and an air outlet of an air conditioner, and the C-shaped splicing bottom plate, the C-shaped splicing air port plate and the C-shaped splicing fire fighting plate are spliced between the frame clamping bending edge and the light groove clamping bending edge; then, the movable decorative mounting plate is arranged at a position corresponding to the fire-fighting spraying port, and is lapped between the lapping edge of the frame and the lapping edge of the light groove; and finally, clamping grooves at two ends of the grating clamping piece are respectively clamped on the frame clamping bending edge and the light groove clamping bending edge, and the grating is arranged at the arc-shaped clamping interface. Thereby need not to measure the position at each fire control terminal, only need according to actual conditions adjustment C type grafting fire control board, C type grafting wind gap board and the movable position of decorating the mounting panel can, simple structure, simple to operate.
Assembling process of the movable decorative mounting plate: two decorative boards are respectively placed on two sides of the fire-fighting spray port, and then the two decorative boards are butted together (magnet attraction bodies can be arranged on the butt joint surfaces of the two decorative boards to complete the butt joint of the two decorative boards).
The assembling process of the C-shaped splicing fire-fighting plate comprises the following steps: two bottom plates are placed on two sides of the fire-fighting spray pipe, and then the two bottom plates are butted together (the butt joint of the two decorative plates can be completed by arranging the magnet on the butt joint surface of the two bottom plates).
Claims (10)
1. Aluminium smallpox and integrated integral type hoist and mount modular structure of taking, its characterized in that: including a set of main joist (1), main joist (1) top is equipped with jib (2), is equipped with integrated area module on main joist (1), and integrated area module side is equipped with the aluminium smallpox module of assembling each other, and on aluminium smallpox module was fixed in main joist (1).
2. The aluminum ceiling and integrated belt integrated hoisting modular structure of claim 1, wherein: the integrated belt module comprises a hook module (3) fixed on the main keel (1), and an integrated belt (4) is inserted below the hook module (3); the integrated belt (4) is also provided with a movable decorative mounting plate (8) matched with the terminal equipment;
the aluminum ceiling module comprises a keel pendant module (5) fixed on the main keel (1), a hook keel (6) is arranged below the keel pendant module (5), and an aluminum ceiling (7) is lapped on the hook keel (6).
3. The aluminum ceiling and integrated belt integrated lifting modular structure as claimed in claim 2, wherein: the aluminum ceiling (7) comprises an aluminum ceiling body (701), one end of the aluminum ceiling body (701) is provided with an outward lapping port (702), and the other end of the aluminum ceiling body (701) is provided with an inward lapping port (703); the height of the outward lap joint opening (702) is higher than that of the inward lap joint opening (703).
4. The aluminum ceiling and integrated belt integrated hoisting modular structure of claim 2, wherein: the integrated belt (4) comprises a light groove (401) and a frame (402), an integrated belt bottom plate (403) is arranged between the light groove (401) and the frame (402), a grating clamping piece (404) is arranged below the integrated belt bottom plate (403), and a grating (405) is arranged on the grating clamping piece (404); the movable decorative mounting plate (8) is lapped between the light groove (401) and the frame (402), and the movable decorative mounting plate (8) is positioned between the front and the rear grilles (405).
5. The aluminum ceiling and integrated belt integrated hoisting modular structure of claim 4, wherein: the optical groove (401) comprises an optical groove body (411), a horizontal inserting groove (412) is arranged on the upper portion of the outer side of the optical groove body (411), an optical groove overlapping edge (413) is arranged at the bottom of the inner side of the optical groove body (411), and an optical groove clamping bending edge (414) is arranged above the optical groove overlapping edge (413).
6. The aluminum ceiling and integrated belt integrated hoisting modular structure of claim 4, wherein: the frame (402) comprises a frame body (421), the upper part of the outer side surface of the frame body (421) is provided with a vertical insertion groove (422), and a hooked side (423) is arranged below the vertical insertion groove (422); the bottom of frame body (421) inboard is equipped with frame overlap joint limit (424), and the top of frame overlap joint limit (424) is equipped with frame joint limit of bending (425).
7. The aluminum ceiling and integrated belt integrated hoisting modular structure of claim 4, wherein: the grating clamping pieces (404) comprise grating clamping piece bodies (441), clamping grooves (442) are formed in two ends of the grating clamping piece bodies (441), a group of uniformly distributed grating clamping plates (443) are arranged on the lower portions of the grating clamping piece bodies (441), and arc-shaped clamping openings (444) are formed in the grating clamping plates (443).
8. The aluminum ceiling and integrated belt integrated hoisting modular structure of claim 7, wherein: the grating (405) comprises a grating body (451), and a circular clamping pipe (452) corresponding to the arc-shaped clamping interface (444) is arranged at the upper end of the grating body (451).
9. The aluminum ceiling and integrated belt integrated hoisting modular structure of claim 4, wherein: the integrated belt bottom plate (403) comprises a C-shaped splicing bottom plate (431), a C-shaped splicing air port plate (432) and a C-shaped splicing fire-fighting plate (433) which are spliced; the C-shaped splicing fire-fighting plate (433) comprises two bottom plates (434) spliced with each other, and a fire-fighting semicircular opening (435) is formed in each bottom plate (434).
10. The aluminum ceiling and integrated belt integrated hoisting modular structure of claim 1, wherein: the movable decorative mounting plate (8) comprises two decorative plates (801) which are spliced with each other, a semicircular hole (802) is formed in one side edge of each decorative plate (801), and a circular opening is formed after the two decorative plates (801) are spliced.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210998455.1A CN115262843B (en) | 2022-08-19 | Aluminum ceiling and integrated belt integrated hoisting modular structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210998455.1A CN115262843B (en) | 2022-08-19 | Aluminum ceiling and integrated belt integrated hoisting modular structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN115262843A true CN115262843A (en) | 2022-11-01 |
CN115262843B CN115262843B (en) | 2024-10-29 |
Family
ID=
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204626738U (en) * | 2015-04-30 | 2015-09-09 | 山东万得福装饰工程有限公司 | A kind of ceiling structure |
CN206016029U (en) * | 2016-08-25 | 2017-03-15 | 广东华途仕建材实业有限公司 | A kind of c-type buckle furred ceiling |
CN206310444U (en) * | 2016-12-28 | 2017-07-07 | 上海合富新材料科技股份有限公司 | The integrated air-conditioning lamp band mechanism of modular |
CN208502028U (en) * | 2018-05-30 | 2019-02-15 | 刘艺 | A kind of multifunction combined indoor ceiling and top apparatus staging system |
CN209323805U (en) * | 2018-12-21 | 2019-08-30 | 湖北永浩泰德幕墙装饰有限公司 | Aluminum-pinch furred ceiling |
CN111395626A (en) * | 2020-03-06 | 2020-07-10 | 浙江宝兰电气有限公司 | Combined integrated panel structure |
CN112360039A (en) * | 2020-11-17 | 2021-02-12 | 金螳螂精装科技(苏州)有限公司 | Modular dust-reducing ventilation integrated ceiling mounting structure |
CN212562125U (en) * | 2020-05-15 | 2021-02-19 | 倍途建筑智能科技(上海)有限公司 | Clamping type single light groove integrated equipment belt |
CN213174413U (en) * | 2020-08-07 | 2021-05-11 | 苏州嘉德泰环保材料有限公司 | Integrated belt with anti-condensation function |
CN214941519U (en) * | 2021-03-15 | 2021-11-30 | 深装总建设集团股份有限公司 | Assembled unit smallpox that articulates |
CN215330846U (en) * | 2021-03-15 | 2021-12-28 | 深装总建设集团股份有限公司 | Close piece together overlap joint formula aluminum plate smallpox |
CN113969639A (en) * | 2021-10-08 | 2022-01-25 | 中铁建工集团有限公司 | Corridor decorative ceiling structure and construction method |
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204626738U (en) * | 2015-04-30 | 2015-09-09 | 山东万得福装饰工程有限公司 | A kind of ceiling structure |
CN206016029U (en) * | 2016-08-25 | 2017-03-15 | 广东华途仕建材实业有限公司 | A kind of c-type buckle furred ceiling |
CN206310444U (en) * | 2016-12-28 | 2017-07-07 | 上海合富新材料科技股份有限公司 | The integrated air-conditioning lamp band mechanism of modular |
CN208502028U (en) * | 2018-05-30 | 2019-02-15 | 刘艺 | A kind of multifunction combined indoor ceiling and top apparatus staging system |
CN209323805U (en) * | 2018-12-21 | 2019-08-30 | 湖北永浩泰德幕墙装饰有限公司 | Aluminum-pinch furred ceiling |
CN111395626A (en) * | 2020-03-06 | 2020-07-10 | 浙江宝兰电气有限公司 | Combined integrated panel structure |
CN212562125U (en) * | 2020-05-15 | 2021-02-19 | 倍途建筑智能科技(上海)有限公司 | Clamping type single light groove integrated equipment belt |
CN213174413U (en) * | 2020-08-07 | 2021-05-11 | 苏州嘉德泰环保材料有限公司 | Integrated belt with anti-condensation function |
CN112360039A (en) * | 2020-11-17 | 2021-02-12 | 金螳螂精装科技(苏州)有限公司 | Modular dust-reducing ventilation integrated ceiling mounting structure |
CN214941519U (en) * | 2021-03-15 | 2021-11-30 | 深装总建设集团股份有限公司 | Assembled unit smallpox that articulates |
CN215330846U (en) * | 2021-03-15 | 2021-12-28 | 深装总建设集团股份有限公司 | Close piece together overlap joint formula aluminum plate smallpox |
CN113969639A (en) * | 2021-10-08 | 2022-01-25 | 中铁建工集团有限公司 | Corridor decorative ceiling structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20220228366A1 (en) | Ceiling Grid Lighting Assembly with Configured Alignment | |
CN112554425B (en) | Can install drop-level suspended ceiling connecting piece, suspended ceiling system and installation method fast | |
CN109779120B (en) | Light and shade combined ceiling mounting system and mounting method thereof | |
CN210263600U (en) | Suspended ceiling mounting structure | |
CN115262843A (en) | Aluminum ceiling and integrated belt integrated hoisting modular structure | |
CN113323228B (en) | Multifunctional drop-level suspended ceiling and installation method | |
CN115262843B (en) | Aluminum ceiling and integrated belt integrated hoisting modular structure | |
CN216042094U (en) | Honeycomb panel fast-assembling owner skeleton structure | |
CN210439537U (en) | Modeling suspended ceiling and mounting structure thereof | |
CN208182420U (en) | A kind of lift car suspended ceiling mounting structure | |
CN211817316U (en) | Floating U-shaped platform for iron chain | |
CN212562125U (en) | Clamping type single light groove integrated equipment belt | |
CN209468911U (en) | Fit up grid for suspended ceiling connector | |
CN216042101U (en) | Novel steel structure purline hanging component | |
CN215722872U (en) | Lamp device | |
CN102535719A (en) | Integration belt of building function device terminal and indoor top surface structure | |
CN218323413U (en) | Integrated furred ceiling of assembled with wind gap | |
CN220814519U (en) | Assembled furred ceiling receives limit piece structure | |
CN216042077U (en) | Honeycomb panel fast-assembling edging | |
CN220133420U (en) | Wall top connecting piece and suspended ceiling | |
CN212562253U (en) | Clamping type double-light-slot integrated equipment belt | |
CN214948602U (en) | House type ceiling lamp | |
CN218176302U (en) | Baking varnish keel structure, main keel structure, auxiliary keel structure and splicing structure | |
CN221546079U (en) | Quick-dismantling ceiling lighting ceiling structure | |
CN212053419U (en) | Assembled smallpox light trough integrated structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant |