CN115217258B - Construction method of assembled metal plate suspended ceiling - Google Patents

Construction method of assembled metal plate suspended ceiling Download PDF

Info

Publication number
CN115217258B
CN115217258B CN202210904694.6A CN202210904694A CN115217258B CN 115217258 B CN115217258 B CN 115217258B CN 202210904694 A CN202210904694 A CN 202210904694A CN 115217258 B CN115217258 B CN 115217258B
Authority
CN
China
Prior art keywords
main
main joist
construction method
assembled metal
installation procedure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210904694.6A
Other languages
Chinese (zh)
Other versions
CN115217258A (en
Inventor
张存明
魏新亚
孙建平
施郑昌
张华强
纪富升
袁森
李庆辉
李锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Konita Decoration Co ltd
Original Assignee
Konita Decoration Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Konita Decoration Co ltd filed Critical Konita Decoration Co ltd
Priority to CN202210904694.6A priority Critical patent/CN115217258B/en
Publication of CN115217258A publication Critical patent/CN115217258A/en
Application granted granted Critical
Publication of CN115217258B publication Critical patent/CN115217258B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/388Separate connecting elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/12Instruments for setting out fixed angles, e.g. right angles

Abstract

The invention relates to a construction method of an assembled metal plate suspended ceiling. The utility model provides an assembled metal sheet furred ceiling construction method includes jib installation procedure, fossil fragments installation procedure, decorative board installation procedure, and fossil fragments that use in the fossil fragments installation procedure include main joist and first detection component, and the main joist is the I-shaped, the top surface bilateral symmetry of main joist is equipped with adjusting part, can dismantle on the adjusting part and be connected with the auxiliary jib, the top surface of main joist is equipped with coupling assembling, can dismantle on the coupling assembling and be connected with the main jib, the bottom of main jib is equipped with the cylinder seat, the draw-in groove has been seted up at the bottom surface middle part of cylinder seat, be equipped with spacing subassembly and second detection component on the coupling assembling, first detection component includes the guide slot, the inboard roll fit of guide slot has the gyro wheel, the middle part of gyro wheel runs through there is hollow screw, and this assembled metal sheet furred ceiling construction can be convenient quick detection main joist level to can carry out quick leveling when main joist inclines, the practicality is stronger.

Description

Construction method of assembled metal plate suspended ceiling
Technical Field
The invention belongs to the technical field of suspended ceiling construction, and particularly relates to an assembled metal plate suspended ceiling construction method.
Background
The metal plate is a common material in decoration engineering, and the metal plate suspended ceiling is widely applied to public areas of building decoration, such as walkways, halls and the like. However, since these areas generally require the installation of a large number of equipment ducts, the installation progress of the sheet metal ceiling is affected to some extent by the installation progress of the equipment ducts. Therefore, in the prior art, the installation procedure of the metal plate suspended ceiling is generally divided into a plurality of procedures such as hanging rod installation, keel installation, veneer installation and the like, and holes are generally drilled on a concrete floor slab at intervals not more than 1200mm for installing expansion bolts, and then hot galvanizing full-thread hanging rods with the diameter of 8mm are installed on the expansion bolts, so that a main side keel can be installed on the hot galvanizing full-thread hanging rods, a matched side keel of the metal plate is installed on the main side keel, and then the metal plate is installed under the matched side keel. Wherein, according to the regulations of the current national regulations, when the length of the suspender is more than 1.5 meters and not more than 2.5 meters
When the rice is in use, the reverse support of the suspender is needed; when the length of the hanger rod is more than 2.5 meters, the hanger rod is also required to be installed after the steel structure conversion layer is installed. Therefore, the installation procedures of the metal plate suspended ceiling are more, complex and cumbersome, the construction efficiency is seriously affected, and more quality hidden troubles exist; in addition, because of the influence of pipeline, when installing the metal sheet furred ceiling, often the space distribution is unreasonable, and the limit fossil fragments layer of metal sheet and pipeline cross even conflict's the condition appears, consequently often can appear having to reduce the condition of installation elevation.
Disclosure of Invention
In order to solve the technical problems, the invention provides an assembled metal plate suspended ceiling construction method which is convenient and rapid to detect whether a main keel is horizontal or not, can be rapidly leveled when the main keel is inclined, has strong practicability and can effectively solve the problems in the background technology. In order to achieve the above purpose, the present invention provides the following technical solutions: assembled metal sheet furred ceiling
The keel comprises a main keel and a first detection component;
the main joist is I-shaped, adjusting components are symmetrically arranged on two sides of the top surface of the main joist, an auxiliary boom is detachably connected to the adjusting components, a connecting component is arranged on the top surface of the main joist, the main boom is detachably connected to the connecting component, a cylinder seat is arranged at the bottom end of the main boom, a clamping groove is formed in the middle of the bottom surface of the cylinder seat, and a limiting component and a second detecting component are arranged on the connecting component;
the first detection assembly comprises a guide groove, a roller is matched with the inner side of the guide groove in a rolling mode, a hollow screw penetrates through the middle of the roller, a side disc is movably sleeved at the positions, located on two sides of the roller, of the hollow screw, and a nut is connected with the end portion of the hollow screw in a threaded mode.
Further, the adjusting part includes the support, main joist top surface both ends are located to the support symmetry, the top of support articulates there is the connecting seat, the bottom at the auxiliary jib is cup jointed at the top of connecting seat, the position threaded connection that is close to the connecting seat top surface on the auxiliary jib has the nut, the bottom of auxiliary jib is close to the position threaded connection of the inside top surface of connecting seat has a screw thread section of thick bamboo, and the adjusting part can be when main joist has the slope in vertical direction, through the nut of the lower one end of position on the rotatory main joist, makes the nut upwards slide, and rotatory screw thread section of thick bamboo again makes the screw thread section of thick bamboo upwards slide to can make the lower one end upwards move of main joist upper position, thereby realize the leveling of main joist.
Further, coupling assembling includes extension board, round pin post, connecting plate, connecting hole, cylinder seat and draw-in groove, the both sides at the top surface middle part of main joist are located to the extension board symmetry, and the both sides the side symmetry rotation of extension board is connected with the round pin post, and the relative one end between the round pin post of both sides is passed through the connecting plate and is connected, the connecting hole has been seted up at the middle part of connecting plate, and the connecting plate with the draw-in groove corresponds.
Further, the limiting component comprises a side hole, the side hole penetrates through the side face of the clamping groove, a limiting plate is arranged on one side, close to the outside, in the side hole, a guide rod penetrates through the middle of the limiting plate, a limiting pin is arranged at the end, away from the limiting plate, of the guide rod, and the guide rod is located at a position between the limiting plate and the limiting pin
The reset spring is arranged, the limit pin is completely positioned in the side hole by pulling the guide rod outwards, and the reset spring is arranged at the moment
Compression, correspond the joint with draw-in groove and the connecting plate on the cylinder seat, the side opening corresponds with the connecting hole this moment, and release the guide arm can make the spacer pin roll-off side opening and run through the inboard butt of connecting hole and draw-in groove to realize the detachable connection between main jib and the main joist.
Further, the limiting pin corresponds to the connecting hole.
Further, the second detection assembly comprises a reference plate, a sphere is arranged at the bottom end of the reference plate, a detection rod penetrates through the middle of the sphere, and the detection rod corresponds to the central hole of the middle hole screw.
Further, the second detection component further comprises a square rod, the square rod runs through the top of reference plate, the one end that the square rod is close to the cylinder seat is equipped with the hemisphere seat of laminating with the cylinder seat side, the extrusion spring has been cup jointed to the position that lies in between reference plate and the hemisphere seat on the square rod, the scale groove has evenly been seted up to the side of square rod, because the axis of main jib is the coplane all the time with the axis of reference plate, when the top surface of main jib and main joist is not perpendicular, namely the axis of main jib deviates from the vertical axis of main joist, the reference plate also can deviate along with it, the gyro wheel is in initial state and lies in the center department of guide slot at this moment, spheroid center can deviate from the center of gyro wheel simultaneously, in addition, through the slip detection pole, if the dead man's of detection pole can's slip in the centre bore of hollow screw, then further prove spheroid deviation gyro wheel to can judge whether main joist top surface is perpendicular with the main jib, when the top surface of main jib and main joist is not perpendicular in the width direction, the cylinder seat can incline to the fulcrum plate of one of both sides in the side, thereby can press the side's semicircle seat when main jib and main joist top surface is not perpendicular in the width direction, so that the extrusion spring can further accurate the outside can not stretch out the main jib in the direction perpendicular direction of the main joist through the compression.
Compared with the prior art, the invention has the beneficial effects that: this fossil fragments are used in construction of assembled metal sheet furred ceiling has following benefit:
1. the adjusting component of the keel for the construction of the assembled metal plate suspended ceiling can be arranged on the main keel in the vertical direction
When the main keel is inclined, the nut is enabled to slide upwards by rotating the nut at the lower end of the main keel, and then the threaded cylinder is rotated to enable the threaded cylinder to slide upwards, so that the lower end of the main keel can move upwards, and the main keel is driven to move upwards
And the leveling of the main joist is realized.
2. This first detection component of fossil fragments for assembled sheet metal furred ceiling construction can be after detecting the straightness that hangs down between main joist surface and the jib, and the accessible loosens the nut, makes the side dish of both sides become flexible, and when main joist wholly is in the incline condition, the gyro wheel can roll to the lower one end in main joist position along the guide slot in middle part to can judge that main joist wholly is in the incline condition, can utilize adjusting part to leveling.
3. Because the axis of main jib and the axis of reference board are coplanar all the time, so when main jib is not perpendicular with the top surface of main joist, when the axis of main jib skew main joist's vertical axis, the reference board also can deviate along with it, and the gyro wheel is in initial state and is located the center department of guide slot this moment, and the spheroid center can deviate from the center of gyro wheel simultaneously, in addition, through the slip detection pole, if the detection pole can't slide into in the centre bore of cavity screw, can further prove that the spheroid deviates from the gyro wheel to can judge whether main joist top surface is perpendicular with main jib.
4. When the top surfaces of the main suspender and the main keels are not vertical in the width direction, the cylinder seat can incline to the support plate on one of the two sides, so that the half ball seat on the side can be pressed, the extrusion spring is compressed, the square rod extends outwards further, and the main suspender and the top surfaces of the main keels can be more accurately judged to be not vertical in the width direction by referring to the scale grooves on the side surfaces of the square rod.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention;
FIG. 2 is an enlarged schematic view of the structure of the invention at A;
FIG. 3 is an enlarged schematic view of the structure of FIG. 2B;
FIG. 4 is a schematic cross-sectional view of the present invention;
FIG. 5 is a schematic cross-sectional view of a cylindrical seat according to the present invention;
in the figure: 1. the device comprises a main keel, an 11 auxiliary suspender, a 12 main suspender, a 2 adjusting component, a 21 support, a 22 connecting seat, a 23 threaded cylinder, a 24 nut, a 3 first detecting component, a 31 guide groove, a 32 roller, a 33 side disc, a 34 hollow screw, a 35 nut, a 4 connecting component, a 41 support plate, a 42 pin, a 43 connecting plate, a 44 connecting hole, a 45 cylinder seat, a 46 clamping groove, a 5 limiting component, a 51 side hole, a 52 limiting plate, a 53 guide rod, a 54 return spring, a 55 limiting pin, a 6 second detecting component, a 61 reference plate, a 62 ball body, a 63 detecting rod, a 64 square rod, a 65 half ball seat, a 66 compression spring and a 67 scale groove.
Detailed Description
The invention is described in further detail below with reference to the attached drawings and detailed description:
the concrete embodiment of the construction method of the assembled metal plate suspended ceiling comprises a suspender installation procedure, a keel installation procedure and a veneer installation procedure, wherein the keel used in the keel installation procedure comprises a main keel 1 and a first detection component 3 as shown in fig. 1 to 5; the main joist 1 is I-shaped, the two sides of the top surface of the main joist 1 are symmetrically provided with adjusting components 2, the adjusting components 2 comprise supporting seats 21, the supporting seats 21 are symmetrically arranged at two ends of the top surface of the main joist 1, the tops of the supporting seats 21 are hinged with connecting seats 22, the tops of the connecting seats 22 are sleeved at the bottoms of auxiliary suspenders 11, screw caps 24 are connected to the positions, close to the top surfaces of the connecting seats 22, of the auxiliary suspenders 11, screw thread cylinders 23 are connected to the positions, close to the inner top surfaces of the connecting seats 22, of the bottom ends of the auxiliary suspenders 11, the auxiliary suspenders 11 are detachably connected to the adjusting components 2, the top surface of the main joist 1 is provided with connecting components 4, the connecting components 4 comprise supporting plates 41, pin columns 42, connecting plates 43, connecting holes 44, cylindrical seats 45 and clamping grooves 46, the support plates 41 are symmetrically arranged on two sides of the middle part of the top surface of the main keel 1, the side surfaces of the support plates 41 on two sides are symmetrically and rotatably connected with pin columns 42, opposite ends between the pin columns 42 on two sides are connected through connecting plates 43, connecting holes 44 are formed in the middle parts of the connecting plates 43, the connecting plates 43 correspond to clamping grooves 46, the connecting components 4 are detachably connected with main suspenders 12, cylindrical seats 45 are arranged at the bottom ends of the main suspenders 12, clamping grooves 46 are formed in the middle parts of the bottom surfaces of the cylindrical seats 45, limiting components 5 and second connecting components 6 are arranged on the connecting components 4, the limiting components 5 comprise side holes 51, the side holes 51 penetrate through the side surfaces of the clamping grooves 46, limiting plates 52 are arranged on one sides, close to the outside, of the side holes 51, guide rods 53 penetrate through the middle parts of the limiting plates 52, the end of the guide rod 53 far away from the limiting plate 52 is provided with a limiting pin 55, a reset spring 54 is arranged at a position, located between the limiting plate 52 and the limiting pin 55, on the guide rod 53, the limiting pin 55 corresponds to the connecting hole 44, the second detection assembly 6 comprises a reference plate 61, a ball 62 is arranged at the bottom end of the reference plate 61, the center of the ball 62 corresponds to the center of the roller in an initial state, a detection rod 63 penetrates through the middle part of the ball 62, the detection rod 63 corresponds to the center hole of the middle hole screw 34, the second detection assembly 6 further comprises a square rod 64, the square rod 64 penetrates through the top end of the reference plate 61, a hemispherical seat 65 attached to the side face of the cylindrical seat 45 is arranged at one end, close to the cylindrical seat 45, of the square rod 64, a pressing spring 66 is sleeved at a position, located between the reference plate 61 and the hemispherical seat 65, on the square rod 64, and scale grooves 67 are uniformly formed in the side face of the square rod 64; the first detection component 3 comprises a guide groove 31, a roller 32 is matched with the inner side of the guide groove 31 in a rolling mode, a hollow screw 34 penetrates through the middle of the roller 32, a side disc 33 is movably sleeved at positions, located on two sides of the roller 32, of the hollow screw 34, and nuts 35 are connected with the end portions of the hollow screw 34 in a threaded mode.
The initial state of the roller 32 is located at the center of the guide groove 31, and the nuts 35 are screwed on the hollow screws 34, so that the side plates 33 at two sides are respectively clung to two sides of the main joist 1, the roller 32 is positioned at the middle position of the guide groove, and when the top surfaces of the main boom 12 and the main joist 1 are not vertical in the length direction, that is, when the central axis of the main boom 12 deviates from the vertical central axis of the main joist 1, the reference plate 61 also deviates accordingly, at the moment, the roller 32 is in the initial state and is located at the center of the guide groove 31, and meanwhile, the center of the roller 32 of the ball 62 deviates. The working principle of the construction method of the assembled metal plate suspended ceiling is as follows: the central axis of the main boom 12 and the central axis of the reference plate 61 are always coplanar, the initial state of the roller 32 is located at the center of the guide groove 31, the nuts 35 are screwed on the hollow screws 34, the side plates 33 on two sides are respectively clung to two sides of the main boom 1, when the main boom 12 is not perpendicular to the top surface of the main boom 1 in the length direction, that is, when the central axis of the main boom 12 deviates from the vertical central axis of the main boom 1, the reference plate 61 is also deviated, at the moment, the roller 32 is in the initial state and is located at the center of the guide groove 31, and meanwhile, the center of the sphere 62 is deviated from the center of the roller 32, in addition, by sliding the detection rod 63, if the detection rod 63 cannot slide into the center hole of the hollow screws 34, the deviation of the sphere 62 from the roller 32 can be further proved, so that whether the top surface of the main boom 1 is perpendicular to the main boom 12 can be judged.
In addition, when the main boom 12 is not perpendicular to the top surface of the main boom 1 in the width direction, the cylindrical seat 45 is inclined to the support plate 41 on one of the two sides, so that the half ball seat 65 on the side can be pressed, the pressing spring 66 is compressed, the square rod 64 extends further outwards, at this time, the fact that the main boom 12 is not perpendicular to the top surface of the main boom 1 in the width direction can be judged more precisely by referring to the scale groove 67 on the side surface of the square rod 64, after the perpendicularity between the surface of the main boom 1 and the main boom 12 is detected, the side plates 33 on the two sides can be loosened by loosening the nuts 35, when the whole main boom 1 is in an inclined state, the roller 32 can roll along the guide groove 31 in the middle to the lower end of the main boom 1, so that the whole main boom 1 can be judged to be in an inclined state, the nut 24 at the lower end of the main boom 1 can be rotated, the nut 24 can slide upwards, the threaded cylinder 23 can slide upwards, and the lower end of the main boom 1 can be leveled.
The foregoing is only illustrative of the present invention and is not to be construed as limiting thereof, but rather as various modifications, equivalent arrangements, improvements, etc., within the spirit and principles of the present invention.

Claims (6)

1. The construction method of the assembled metal plate suspended ceiling comprises a suspender installation procedure, a keel installation procedure and a veneer installation procedure, and is characterized in that the keel used in the keel installation procedure comprises a main keel and a first detection component;
the main joist is I-shaped, adjusting components are symmetrically arranged on two sides of the top surface of the main joist, an auxiliary boom is detachably connected to the adjusting components, a connecting component is arranged on the top surface of the main joist, the main boom is detachably connected to the connecting component, a cylinder seat is arranged at the bottom end of the main boom, a clamping groove is formed in the middle of the bottom surface of the cylinder seat, and a limiting component and a second detecting component are arranged on the connecting component;
the first detection assembly comprises a guide groove, a roller is matched with the inner side of the guide groove in a rolling way, a hollow screw penetrates through the middle of the roller, side discs are movably sleeved at positions, located on two sides of the roller, of the hollow screw, and nuts are connected with the end parts of the hollow screw in a threaded way;
the second detection assembly comprises a reference plate, a sphere is arranged at the bottom end of the reference plate, the center of the sphere corresponds to the center of the roller in an initial state, a detection rod penetrates through the middle of the sphere, and the detection rod corresponds to a center hole of the hollow screw.
2. The construction method of the assembled metal plate suspended ceiling according to claim 1, wherein the adjusting component comprises supporting seats, the supporting seats are symmetrically arranged at two ends of the top surface of the main keel, connecting seats are hinged to the tops of the supporting seats, the tops of the connecting seats are sleeved at the bottoms of the auxiliary suspenders, nuts are connected to the positions, close to the top surfaces of the connecting seats, of the auxiliary suspenders in a threaded mode, and threaded cylinders are connected to the positions, close to the inner top surfaces of the connecting seats, of the bottom ends of the auxiliary suspenders in a threaded mode.
3. The construction method of the assembled metal plate suspended ceiling according to claim 1, wherein the connecting component comprises a support plate, pins, connecting plates, connecting holes, cylinder seats and clamping grooves, the support plate is symmetrically arranged on two sides of the middle of the top surface of the main keel, the pins are symmetrically connected to the sides of the support plate on two sides in a rotating mode, opposite ends of the pins on two sides are connected through the connecting plates, the connecting holes are formed in the middle of the connecting plates, and the connecting plates correspond to the clamping grooves.
4. The construction method of the assembled metal plate suspended ceiling according to claim 3, wherein the limiting component comprises a side hole, the side hole penetrates through the side face of the clamping groove, a limiting plate is arranged on one side, close to the outside, of the side hole, a guide rod penetrates through the middle of the limiting plate, a limiting pin is arranged at the end, far away from the limiting plate, of the guide rod, and a reset spring is arranged at the position, located between the limiting plate and the limiting pin, of the guide rod.
5. The method of claim 4, wherein the stopper pin corresponds to the connection hole.
6. The construction method of the assembled metal plate suspended ceiling according to claim 1, wherein the second detection assembly further comprises a square rod, the square rod penetrates through the top end of the reference plate, one end, close to the cylindrical seat, of the square rod is provided with a hemispherical seat attached to the side face of the cylindrical seat, an extrusion spring is sleeved on the square rod at a position between the reference plate and the hemispherical seat, and scale grooves are uniformly formed in the side face of the square rod.
CN202210904694.6A 2022-07-29 2022-07-29 Construction method of assembled metal plate suspended ceiling Active CN115217258B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210904694.6A CN115217258B (en) 2022-07-29 2022-07-29 Construction method of assembled metal plate suspended ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210904694.6A CN115217258B (en) 2022-07-29 2022-07-29 Construction method of assembled metal plate suspended ceiling

Publications (2)

Publication Number Publication Date
CN115217258A CN115217258A (en) 2022-10-21
CN115217258B true CN115217258B (en) 2023-09-05

Family

ID=83613178

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210904694.6A Active CN115217258B (en) 2022-07-29 2022-07-29 Construction method of assembled metal plate suspended ceiling

Country Status (1)

Country Link
CN (1) CN115217258B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1703034A1 (en) * 2005-03-18 2006-09-20 Chicago Metallic Continental Ceiling suspension system
CN106284815A (en) * 2016-08-12 2017-01-04 中国航天建设集团有限公司 Furred ceiling clean board construction technique
CN209457229U (en) * 2018-10-26 2019-10-01 深圳市库博建筑设计事务所有限公司 A kind of indoor verandas ceiling structure
CN111321838A (en) * 2020-03-11 2020-06-23 深圳机械院建筑设计有限公司 Heat insulation building suspended ceiling with ventilation effect
CN213115325U (en) * 2020-08-14 2021-05-04 蔡龙跃 A novel keel structure for building engineering
CN213180043U (en) * 2020-10-19 2021-05-11 杭州千鼎五金有限公司 Ceiling keel perpendicularity detection device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1703034A1 (en) * 2005-03-18 2006-09-20 Chicago Metallic Continental Ceiling suspension system
CN106284815A (en) * 2016-08-12 2017-01-04 中国航天建设集团有限公司 Furred ceiling clean board construction technique
CN209457229U (en) * 2018-10-26 2019-10-01 深圳市库博建筑设计事务所有限公司 A kind of indoor verandas ceiling structure
CN111321838A (en) * 2020-03-11 2020-06-23 深圳机械院建筑设计有限公司 Heat insulation building suspended ceiling with ventilation effect
CN213115325U (en) * 2020-08-14 2021-05-04 蔡龙跃 A novel keel structure for building engineering
CN213180043U (en) * 2020-10-19 2021-05-11 杭州千鼎五金有限公司 Ceiling keel perpendicularity detection device

Also Published As

Publication number Publication date
CN115217258A (en) 2022-10-21

Similar Documents

Publication Publication Date Title
CN109898652B (en) Steel part connecting structure and connecting method thereof
CN115217258B (en) Construction method of assembled metal plate suspended ceiling
CN112146635A (en) Building engineering straightness detection device that hangs down
CN209978866U (en) A verifying attachment that is used for reinforcing bar sleeve scene grout quality
CN214951287U (en) Building engineering detects with subsiding detection device
CN214738756U (en) Steel construction building connecting device
CN216523640U (en) Flange plate flatness inspection device
CN110658068B (en) Clamp for detecting tensile property of brittle plate
CN210288509U (en) Novel multifunctional model pile
CN209043712U (en) The detection device of scaffold
CN207036589U (en) A kind of hand-held panel strength detection means
CN206114275U (en) Plane node atress capability test device
CN218973379U (en) Integrated steel structure detection device
CN220227475U (en) Indoor beam lower clamping type heavy object hanging device
CN219297952U (en) Steel-pipe column top cap convenient to install and detach
CN214150166U (en) Precast concrete component pendant connection structure strength test device
CN220322364U (en) Measuring device for building steel structure engineering
CN219732891U (en) Adjustable support limiting plate
CN217005660U (en) Assembled quality detection mechanism
CN210767971U (en) Movable gallery bridge channel
CN113756449B (en) Large-span steel beam column structure and member thereof
CN215004632U (en) Loading device suitable for different-size stone curtain wall joint bearing capacity tests
CN216386571U (en) Side slope anchor rod drawing test device
CN216669552U (en) Board room steel construction joint strength check out test set
CN216339740U (en) Foundation pile bearing capacity identification device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant