CN115203464A - Construction management method, system, device, storage medium and electronic equipment - Google Patents

Construction management method, system, device, storage medium and electronic equipment Download PDF

Info

Publication number
CN115203464A
CN115203464A CN202210596039.9A CN202210596039A CN115203464A CN 115203464 A CN115203464 A CN 115203464A CN 202210596039 A CN202210596039 A CN 202210596039A CN 115203464 A CN115203464 A CN 115203464A
Authority
CN
China
Prior art keywords
construction
gis
data
construction management
scene
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210596039.9A
Other languages
Chinese (zh)
Inventor
田晶
夏宁
刘大冰
张彬
何磊
朱傲
郑楠
王慕明
丁利明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Institute of Architectural Design Group Co Ltd
Original Assignee
Beijing Institute of Architectural Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Institute of Architectural Design Group Co Ltd filed Critical Beijing Institute of Architectural Design Group Co Ltd
Priority to CN202210596039.9A priority Critical patent/CN115203464A/en
Publication of CN115203464A publication Critical patent/CN115203464A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/50Information retrieval; Database structures therefor; File system structures therefor of still image data
    • G06F16/58Retrieval characterised by using metadata, e.g. metadata not derived from the content or metadata generated manually
    • G06F16/587Retrieval characterised by using metadata, e.g. metadata not derived from the content or metadata generated manually using geographical or spatial information, e.g. location
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • G06T17/05Geographic models

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Software Systems (AREA)
  • Geometry (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • General Engineering & Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Quality & Reliability (AREA)
  • Library & Information Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Remote Sensing (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Computer Graphics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a construction management method, a system, a device, a storage medium and electronic equipment, which are used for receiving GIS marking data of a construction scene sent by a construction terminal; acquiring a three-dimensional road model corresponding to the construction scene from a first model server according to the construction scene corresponding to the GIS marking data, wherein the three-dimensional road model which corresponds to various different construction scenes and contains the GIS marking data is stored in the first model server in advance; comparing the GIS marking data of the three-dimensional road model with the GIS marking data of the construction scene; calculating and analyzing the GIS marking data of the construction scene according to the comparison result and the GIS marking data of the three-dimensional road model to obtain construction management planning data; and sending the construction management planning data to the construction terminal. The method realizes the evaluation of the accuracy of the engineering construction and the guidance of the next construction scheme.

Description

Construction management method, system, device, storage medium and electronic equipment
Technical Field
The invention relates to the technical field of road construction, in particular to a construction management method, a construction management system, a construction management device, a construction management storage medium and electronic equipment.
Background
For long linear projects with large project scale such as high-speed railways and the like, the method has the characteristics of huge and complex construction data, large capital investment, more invested personnel and the like. In the prior art, the data of the whole construction process is generally managed in a manual mode, the efficiency is low, mistakes are easy to occur, and therefore a road construction management system is urgently needed to be provided to improve the management efficiency and avoid the influence of management mistakes on the construction quality and progress.
Disclosure of Invention
In view of this, embodiments of the present invention provide a construction management method, system, apparatus, storage medium, and electronic device, so as to solve technical problems in the prior art that construction management efficiency is low and errors are prone to occur, and construction quality and progress are affected.
The technical scheme provided by the invention is as follows:
a first aspect of an embodiment of the present invention provides a construction management method, which is applied to a construction management server, where the construction management server is connected to a construction terminal, and the construction management method includes: receiving GIS marking data of a construction scene sent by a construction terminal; acquiring a three-dimensional road model corresponding to the construction scene from a first model server according to the construction scene corresponding to the GIS marking data, wherein the three-dimensional road model which corresponds to various different construction scenes and contains the GIS marking data is stored in the first model server in advance; comparing the GIS marking data of the three-dimensional road model with the GIS marking data of the construction scene; calculating and analyzing the GIS marking data of the construction scene according to the comparison result and the GIS marking data of the three-dimensional road model to obtain construction management planning data; and sending the construction management planning data to the construction terminal.
Optionally, the obtaining of the construction management planning data by performing calculation analysis on the GIS marking data of the construction scene according to the comparison result and the GIS marking data of the three-dimensional road model includes: inputting the comparison result and the GIS mark data of the three-dimensional road model into a pre-trained construction management planning model; and determining the construction management planning data according to the output result of the construction management planning model.
A second aspect of an embodiment of the present invention provides a construction management method, which is applied to a construction terminal, where the construction terminal is connected to a construction management server, and the construction management method includes: acquiring GIS data of a construction scene and associating the GIS data with the construction scene to obtain GIS marking data of the construction scene; sending the GIS marking data of the construction scene to a corresponding construction management server, so that the construction management server obtains corresponding construction management planning data according to the GIS marking data of the construction scene; responsive to receiving operation of the construction management planning data.
Optionally, after the operation of receiving the construction management planning data in response, the method further includes: and acquiring a rendering model corresponding to the construction management planning data from a second model server according to the construction management planning data, wherein the second model server stores a plurality of rendering models corresponding to different construction management planning data in advance.
A third aspect of an embodiment of the present invention provides a construction management system, including: a construction terminal for executing the construction management method according to the second aspect of the embodiment of the present invention; the first model server is used for storing three-dimensional road models which correspond to various different construction scenes and contain GIS marking data; and the construction management server is respectively connected with the construction terminal and the first model server and is used for executing the construction management method according to any one of the first aspect and the first aspect of the embodiment of the invention.
Optionally, the system further comprises: and the second model server is connected with the construction terminal and is used for storing rendering models corresponding to various different construction management planning data, so that the construction terminal acquires the rendering models corresponding to the construction management planning data from the second model server.
A fourth aspect of the embodiments of the present invention provides a construction management apparatus applied to a construction management server, the construction management server being connected to a construction terminal, the construction management apparatus including: the receiving module is used for receiving GIS marking data of the construction scene sent by the construction terminal; the first acquisition module is used for acquiring a three-dimensional road model corresponding to the construction scene from a first model server according to the construction scene corresponding to the GIS marking data, and the first model server stores a plurality of three-dimensional road models which correspond to different construction scenes and contain the GIS marking data in advance; the comparison module is used for comparing the GIS marking data of the three-dimensional road model with the GIS marking data of the construction scene; and the processing module is used for calculating and analyzing the GIS marking data of the construction scene according to the comparison result and the GIS marking data of the three-dimensional road model to obtain construction management planning data.
A fifth aspect of an embodiment of the present invention provides a construction management apparatus applied to a construction terminal, where the construction terminal is connected to a construction management server, the construction management apparatus including: the second acquisition module is used for acquiring GIS data of a construction scene and associating the GIS data with the construction scene to obtain GIS marking data of the construction scene; the second sending module is used for sending the GIS marking data of the construction scene to a corresponding construction management server, so that the construction management server obtains corresponding construction management planning data according to the GIS marking data of the construction scene; and the response module is used for responding to the receiving operation of the construction management planning data.
A sixth aspect of the present embodiments provides a computer-readable storage medium, which stores computer instructions for causing a computer to execute the construction management method according to any one of the first aspect and the first aspect of the present embodiments, or the construction management method according to any one of the second aspect and the second aspect of the present embodiments.
A seventh aspect of the embodiments of the present invention provides an electronic device, including: the construction management method comprises a memory and a processor, wherein the memory and the processor are connected with each other in a communication mode, the memory stores computer instructions, and the processor executes the computer instructions so as to execute the construction management method according to any one of the first aspect and the first aspect of the embodiment of the invention or the construction management method according to any one of the second aspect and the second aspect of the embodiment of the invention.
The technical scheme provided by the invention has the following effects:
the construction management method provided by the embodiment of the invention is applied to a construction management server, wherein the construction management server is connected with a construction terminal and is used for receiving GIS marking data of a construction scene sent by the construction terminal; acquiring a three-dimensional road model corresponding to the construction scene from a first model server according to the construction scene corresponding to the GIS marking data, wherein the three-dimensional road model which corresponds to various different construction scenes and contains the GIS marking data is stored in the first model server in advance; comparing the GIS marking data of the three-dimensional road model with the GIS marking data of the construction scene; calculating and analyzing the GIS marking data of the construction scene according to the comparison result and the GIS marking data of the three-dimensional road model to obtain construction management planning data; and sending the construction management planning data to the construction terminal. The method compares the GIS marking data of the three-dimensional road model with the GIS marking data of the construction scene, and realizes the evaluation of the engineering construction execution accuracy; and obtaining construction management planning data through calculation and analysis according to the comparison result and the GIS marking data of the three-dimensional road model, and guiding a next construction scheme.
The construction management method provided by the embodiment of the invention is applied to a construction terminal, the construction terminal is connected with a construction management server, GIS data of a construction scene is obtained, and the GIS data is associated with the construction scene to obtain GIS marking data of the construction scene; sending the GIS marking data of the construction scene to a corresponding construction management server, so that the construction management server obtains corresponding construction management planning data according to the GIS marking data of the construction scene; responsive to receiving operation of the construction management planning data. The method associates the GIS data with the geographical position information of the construction site, facilitates management and searching, sends the GIS data to the construction management server for calculation and analysis to obtain construction management planning data, and can guide the next construction scheme.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
FIG. 1 is a flow chart of a construction management method according to an embodiment of the present invention;
FIG. 2 is a flow chart of a construction management method according to an embodiment of the present invention;
FIG. 3 is a block diagram of a construction management system according to an embodiment of the present invention;
fig. 4 is a block diagram of the construction management apparatus according to the embodiment of the present invention;
fig. 5 is a block diagram of the construction management apparatus according to the embodiment of the present invention;
FIG. 6 is a schematic structural diagram of a computer-readable storage medium provided according to an embodiment of the present invention;
fig. 7 is a schematic structural diagram of an electronic device according to an embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
An embodiment of the present invention provides a construction management method, which is applied to a construction management server 13, and as shown in fig. 3, the construction management server 13 is connected to a construction terminal 11. The construction terminal is used for acquiring corresponding construction data; the construction management server is used for processing the construction data; as shown in fig. 1, the method comprises the steps of:
step S101: and receiving GIS marking data of the construction scene sent by the construction terminal. Specifically, the construction terminal may be a portable device such as a tablet computer and a notebook computer; firstly, GIS data corresponding to a construction scene is obtained by utilizing measuring equipment corresponding to construction engineering on a construction site and uploaded to a corresponding construction terminal, then the obtained GIS data is detected at the construction terminal according to an industrial standard and a national standard, the detected GIS data is marked to the corresponding construction scene to obtain GIS marking data corresponding to the construction scene, and finally the GIS marking data of the construction scene is sent to a corresponding construction management server, namely the construction management server receives the GIS marking data of the construction scene sent by the construction terminal. The GIS data acquired by the measuring equipment can contain information such as actually measured foundation bearing capacity data, actually measured slope geological conditions, corresponding construction point coordinate positions and the like, and the construction point coordinate position information corresponds to the current construction scene, so that the method for marking the detected GIS data can be used for associating the GIS data with the corresponding measuring equipment. Through the association, the corresponding GIS data is convenient to manage and search.
Step S102: and acquiring a three-dimensional road model corresponding to the construction scene from a first model server according to the construction scene corresponding to the GIS marking data, wherein the three-dimensional road model which corresponds to various different construction scenes and contains the GIS marking data is stored in the first model server in advance. Specifically, firstly, a corresponding construction scene can be determined according to GIS marking data, then a three-dimensional road model corresponding to the construction scene is called from a corresponding first model server according to the construction scene, and the specific GIS marking data can include tunnel geological information corresponding to the construction scene, longitude and latitude of a building, plane rectangular coordinates, polar coordinates and other coordinate position information.
For example, in the construction of a railway engineering tunnel segment, after receiving information such as GIS (geographic information system) marking data provided by a construction terminal, a construction management server calls a tunnel model from a corresponding model server according to the GIS marking data. Specifically, when the GIS mark data includes tunnel geological information, tunnel GIS coordinates and other information, the tunnel model is retrieved correspondingly.
In roadbed filling and excavating quantity analysis, a construction terminal provides GIS position information, and a server calls a building model at a relevant position in a corresponding model server according to the GIS position information. Specifically, the terrain characteristics corresponding to the current construction scene can be obtained according to the GIS position information, the corresponding building is determined according to the terrain characteristics, and the building model corresponding to the building is called in the model server.
Step S103: and comparing the GIS marking data of the three-dimensional road model with the GIS marking data of the construction scene. Specifically, theoretical GIS marker data corresponding to the construction scene is stored in the three-dimensional road model, for example, when the three-dimensional road model is a tunnel model, the GIS marker data of the three-dimensional road model may include geological information of the tunnel, GIS coordinate information, and the like; when the three-dimensional road model is a building model of a relevant location, the GIS marker data of the three-dimensional road model may include raw terrain data of the relevant location, and the like. And the related position represents the position of the building in the terrain corresponding to the current construction scene determined according to the GIS marking data.
And comparing the GIS marking data of the construction scene with the GIS marking data of the three-dimensional road model to obtain the deviation and other conditions of the GIS marking data of the current construction scene and the GIS marking data corresponding to the current construction scene in theory.
Step S104: and calculating and analyzing the GIS marking data of the construction scene according to the comparison result and the GIS marking data of the three-dimensional road model to obtain construction management planning data. Specifically, according to the comparison result, calculating and analyzing the GIS marking data of the construction scene according to the GIS marking data of the three-dimensional road model again, and predicting the construction data of the adjacent segments, namely the construction management planning data. The calculation analysis method can be a method such as artificial background matching, database analysis, artificial intelligent calculation analysis and the like, and the method is not particularly limited in the invention, and only needs to be met.
For example, in the construction of a tunnel segment in railway engineering, after geological information and GIS coordinates of a tunnel sent by a construction terminal are received, the deviation between the construction data of the current tunnel segment and theoretical data is obtained by performing correlation comparison with a called tunnel model, and then the construction data corresponding to the adjacent tunnel segment can be obtained by performing analysis and calculation according to the deviation and GIS mark data of the three-dimensional road model. Specifically, for example, if the obtained deviation is the maximum deviation, the GIS mark data of the adjacent tunnel segment is obtained in the tunnel model, and when the adjacent tunnel segment is constructed, the construction management planning data of the adjacent tunnel segment can be obtained according to the GIS mark data in the tunnel model and the deviation, where the deviation between the construction management planning data and the GIS mark data in the tunnel model needs to be controlled in the maximum deviation, that is, the deviation is controlled to be less than or equal to the maximum deviation.
Step S105: and sending the construction management planning data to the construction terminal. Specifically, the construction management server transmits the obtained construction management planning data to the corresponding construction terminal for reference use by the construction technician.
According to the construction management method provided by the embodiment of the invention, the GIS marking data of the three-dimensional road model is compared with the GIS marking data of the construction scene, so that the accuracy of engineering construction execution is evaluated; and obtaining construction management planning data through calculation and analysis according to the comparison result and the GIS marking data of the three-dimensional road model, and guiding a next construction scheme.
As an optional implementation manner of the embodiment of the present invention, step S104 includes: inputting the comparison result and GIS mark data of the three-dimensional road model into a pre-trained construction management planning model; and determining the construction management planning data according to the output result of the construction management planning model. Specifically, the corresponding construction management planning data is obtained through AI calculation and analysis. Firstly, respectively comparing the GIS marking data of the three-dimensional road model with the GIS marking data of different construction scenes, inputting the obtained different comparison results and the GIS marking data of the three-dimensional road model into the corresponding model through a preset neural network for training to obtain the corresponding construction management planning model, then inputting the comparison results of the current construction scene and the GIS marking data of the corresponding three-dimensional road model into the construction management planning model for processing, and then outputting the corresponding construction management planning data. The preset neural network may be a common neural network such as a Hopfield network, a decentralized network, a general adaptive network, etc., and this is not specifically limited in the present invention as long as the requirement is satisfied.
The embodiment of the invention also provides a construction management method which is applied to a construction terminal, and as shown in figure 3, the construction terminal is connected with the construction management server. As shown in fig. 2, the method comprises the steps of:
step S201: and acquiring GIS data of a construction scene, and associating the GIS data with the construction scene to obtain GIS marking data of the construction scene. For a specific processing method, reference is made to the description in step S101, and details are not repeated here.
Step S202: and sending the GIS mark data of the construction scene to a corresponding construction management server, so that the construction management server obtains corresponding construction management planning data according to the GIS mark data analysis of the construction scene. Specifically, the GIS mark data is sent to the corresponding construction management server, and is analyzed and calculated in the construction management server to obtain the corresponding construction management planning data, and the specific analysis and calculation process refers to the description of step S102 to step S104, which is not described herein again.
Step S203: responsive to receiving operation of the construction management planning data. Specifically, construction management planning data sent by a construction management server is received.
The construction management method provided by the embodiment of the invention associates the GIS data with the geographical position information of the construction site, is convenient for management and search, and sends the GIS data to the construction management server for calculation and analysis to obtain construction management planning data, so that the construction management planning data can guide the next construction scheme.
As an optional implementation manner of the embodiment of the present invention, the method further includes: and acquiring a rendering model corresponding to the construction management planning data from a second model server according to the construction management planning data, wherein the second model server stores a plurality of rendering models corresponding to different construction management planning data in advance. Specifically, after receiving the construction management planning data sent by the construction management server, the construction terminal sends a rendering request to a corresponding second model server, and the second model server provides a rendering model corresponding to the construction management planning data to the construction terminal according to the rendering request and renders the construction management planning data.
An embodiment of the present invention further provides a construction management system, as shown in fig. 3, where the construction management system 1 includes:
the construction terminal 11 is used for executing the construction management method according to the embodiment of the invention. Specifically, the construction terminal 11 may adopt an open source webgl engine such as three.js, babylon.js, and the like, and may adopt the ceium as the three-dimensional GIS engine. The GIS represents a geographic information system, and can collect, store, manage, calculate, analyze, display and describe relevant geographic distribution data in the whole or partial earth surface (including the atmosphere) space under the support of a computer hardware and software system.
The first model server 12 is configured to store three-dimensional road models including GIS marker data corresponding to a plurality of different construction scenes. Specifically, the first model server may be integrated in the construction management server, or may be a single integrated model server, which is not specifically limited in the present invention, as long as the model server stores three-dimensional road models corresponding to different construction scenes.
And the construction management server 13 is connected with the construction terminal 11 and is used for executing the construction management method according to the embodiment of the invention. Specifically, the construction management server may adopt a java spring closed architecture + geoserver + psotGIS open source GIS server.
The construction management system provided by the embodiment of the invention interacts with the construction management server through the construction terminal, improves the construction management efficiency and avoids the influence of management errors on the construction quality and progress.
As an optional implementation manner of the embodiment of the present invention, the system further includes:
and the second model server 14 is connected with the construction terminal 11 and is used for storing rendering models corresponding to a plurality of different construction management planning data, so that the construction terminal 11 obtains the rendering models corresponding to the construction management planning data from the second model server 14. Specifically, the second model server may be integrated in a corresponding construction terminal, or integrated in a model server with the first model server, or be a separately integrated model server, which is not specifically limited in the present invention, as long as the model server stores a rendering model corresponding to the construction management planning data; the construction terminal can send the construction management planning data to the second model server, and the second model server identifies and matches the construction management scale data internally and then sends the matched rendering model to the construction terminal.
An embodiment of the present invention further provides a construction management device, as shown in fig. 4, the device includes:
the receiving module 401 is configured to receive GIS marking data of a construction scene sent by a construction terminal; for details, refer to the related description of step S101 in the above method embodiment.
A first obtaining module 402, configured to obtain, according to a construction scene corresponding to the GIS marker data, a three-dimensional road model corresponding to the construction scene from a first model server, where the three-dimensional road model corresponding to multiple different construction scenes and including GIS marker data is stored in advance in the first model server; for details, refer to the related description of step S102 in the above method embodiment.
A comparison module 403, configured to compare the GIS marking data of the three-dimensional road model with the GIS marking data of the construction scene; for details, refer to the related description of step S103 in the above method embodiment.
The processing module 404 is configured to calculate and analyze the GIS marker data of the construction scene according to the comparison result and the GIS marker data of the three-dimensional road model to obtain construction management planning data; for details, refer to the related description of step S104 in the above method embodiment.
A first sending module 405, configured to send the construction management planning data to the construction terminal; for details, refer to the related description of step S105 in the above method embodiment.
The construction management device provided by the embodiment of the invention compares the GIS mark data of the three-dimensional road model with the GIS mark data of the construction scene, thereby realizing the evaluation of the engineering construction execution accuracy; and obtaining construction management planning data through calculation and analysis according to the comparison result and the GIS marking data of the three-dimensional road model, and guiding a next construction scheme.
As an optional implementation manner of the embodiment of the present invention, the apparatus further includes: the first processing module is used for inputting the comparison result and the GIS marking data of the three-dimensional road model into a pre-trained construction management planning model; and the determining module is used for determining the construction management planning data according to the output result of the construction management planning model.
The description of the function of the construction management device provided by the embodiment of the invention refers to the description of the construction management method in the embodiment.
An embodiment of the present invention further provides a construction management device, as shown in fig. 5, the device includes:
a second obtaining module 501, configured to obtain GIS data of a construction scene and associate the GIS data with the construction scene to obtain GIS marking data of the construction scene; for details, refer to the related description of step S201 in the above method embodiment.
A second sending module 502, configured to send the GIS marking data of the construction scene to a corresponding construction management server, so that the construction management server obtains corresponding construction management planning data according to the GIS marking data of the construction scene; for details, refer to the related description of step S202 in the above method embodiment.
A response module 503, configured to respond to the receiving operation of the construction management planning data; for details, refer to the related description of step S203 in the above method embodiment.
The construction management device provided by the embodiment of the invention associates the GIS data with the geographical position information of the construction site, is convenient to manage and search, and sends the GIS data to the construction management server for calculation and analysis to obtain construction management planning data, so that the construction management planning data can guide the next construction scheme.
As an optional implementation manner of the embodiment of the present invention, the apparatus further includes: and the third acquisition module is used for acquiring the rendering model corresponding to the construction management planning data from a second model server according to the construction management planning data, and the second model server stores a plurality of rendering models corresponding to different construction management planning data in advance.
The description of the function of the construction management device provided by the embodiment of the invention refers to the description of the construction management method in the embodiment.
An embodiment of the present invention further provides a storage medium, as shown in fig. 6, on which a computer program 601 is stored, and when the instructions are executed by a processor, the steps of the construction management method in the foregoing embodiment are implemented. The storage medium is also stored with audio and video stream data, characteristic frame data, an interactive request signaling, encrypted data, preset data size and the like. The storage medium may be a magnetic Disk, an optical Disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a Flash Memory (Flash Memory), a Hard Disk (Hard Disk Drive, abbreviated as HDD), a Solid State Drive (SSD), or the like; the storage medium may also comprise a combination of memories of the kind described above.
It will be understood by those skilled in the art that all or part of the processes of the methods of the embodiments described above can be implemented by a computer program, which can be stored in a computer-readable storage medium, and when executed, can include the processes of the embodiments of the methods described above. The storage medium may be a magnetic Disk, an optical Disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a Flash Memory (Flash Memory), a Hard Disk (Hard Disk Drive, abbreviated as HDD), a Solid State Drive (SSD), or the like; the storage medium may also comprise a combination of memories of the kind described above.
An embodiment of the present invention further provides an electronic device, as shown in fig. 7, the electronic device may include a processor 71 and a memory 72, where the processor 71 and the memory 72 may be connected by a bus or in another manner, and fig. 7 takes the connection by the bus as an example.
Processor 71 may be a Central Processing Unit (CPU). The Processor 71 may also be other general purpose processors, digital Signal Processors (DSPs), application Specific Integrated Circuits (ASICs), field Programmable Gate Arrays (FPGAs) or other Programmable logic devices, discrete Gate or transistor logic devices, discrete hardware components, or combinations thereof.
The memory 72, which is a non-transitory computer readable storage medium, may be used to store non-transitory software programs, non-transitory computer executable programs, and modules, such as the corresponding program instructions/modules in the embodiments of the present invention. The processor 71 executes various functional applications and data processing of the processor by executing non-transitory software programs, instructions and modules stored in the memory 72, that is, implements the construction management method in the above method embodiment.
The memory 72 may include a storage program area and a storage data area, wherein the storage program area may store an operating device, an application program required for at least one function; the storage data area may store data created by the processor 71, and the like. Further, the memory 72 may include high speed random access memory, and may also include non-transitory memory, such as at least one magnetic disk storage device, flash memory device, or other non-transitory solid state storage device. In some embodiments, the memory 72 may optionally include memory located remotely from the processor 71, and such remote memory may be connected to the processor 71 via a network. Examples of such networks include, but are not limited to, the internet, intranets, local area networks, mobile communication networks, and combinations thereof.
The one or more modules are stored in the memory 72 and, when executed by the processor 71, perform a construction management method as in the embodiment of fig. 1-2.
The details of the electronic device may be understood by referring to the corresponding descriptions and effects in the embodiments shown in fig. 1 to fig. 2, and are not described herein again.
Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art can make various modifications and variations without departing from the spirit and scope of the invention, and such modifications and variations fall within the scope defined by the appended claims.

Claims (10)

1. A construction management method is applied to a construction management server, the construction management server is connected with a construction terminal, and the construction management method is characterized by comprising the following steps:
receiving GIS marking data of a construction scene sent by a construction terminal;
acquiring a three-dimensional road model corresponding to the construction scene from a first model server according to the construction scene corresponding to the GIS marking data, wherein the three-dimensional road model which corresponds to various different construction scenes and contains the GIS marking data is stored in the first model server in advance;
comparing the GIS marking data of the three-dimensional road model with the GIS marking data of the construction scene;
calculating and analyzing the GIS marking data of the construction scene according to the comparison result and the GIS marking data of the three-dimensional road model to obtain construction management planning data;
and sending the construction management planning data to the construction terminal.
2. The method of claim 1, wherein the calculating and analyzing the GIS tag data of the construction scene to obtain construction management planning data according to the comparison result and the GIS tag data of the three-dimensional road model comprises:
inputting the comparison result and GIS mark data of the three-dimensional road model into a pre-trained construction management planning model;
and determining the construction management planning data according to the output result of the construction management planning model.
3. A construction management method is applied to a construction terminal, the construction terminal is connected with a construction management server, and the construction management method is characterized by comprising the following steps:
acquiring GIS data of a construction scene and associating the GIS data with the construction scene to obtain GIS marking data of the construction scene;
sending the GIS marking data of the construction scene to a corresponding construction management server, so that the construction management server obtains corresponding construction management planning data according to the GIS marking data of the construction scene;
responsive to receiving operation of the construction management planning data.
4. The method of claim 3, wherein, subsequent to the operation of receiving the construction management plan data in response, the method further comprises:
and acquiring a rendering model corresponding to the construction management planning data from a second model server according to the construction management planning data, wherein the second model server stores a plurality of rendering models corresponding to different construction management planning data in advance.
5. A construction management system, comprising:
a construction terminal for executing the construction management method according to claim 3;
the first model server is used for storing three-dimensional road models which correspond to various different construction scenes and contain GIS marking data;
a construction management server connected to the construction terminal and the first model server, respectively, for performing the construction management method according to claim 1 or 2.
6. The system of claim 5, further comprising:
and the second model server is connected with the construction terminal and is used for storing rendering models corresponding to various different construction management planning data, so that the construction terminal acquires the rendering models corresponding to the construction management planning data from the second model server.
7. A construction management device is applied to a construction management server, and the construction management server is connected with a construction terminal, and is characterized by comprising:
the receiving module is used for receiving GIS marking data of the construction scene sent by the construction terminal;
the first acquisition module is used for acquiring a three-dimensional road model corresponding to the construction scene from a first model server according to the construction scene corresponding to the GIS marking data, and the first model server stores a plurality of three-dimensional road models which correspond to different construction scenes and contain the GIS marking data in advance;
the comparison module is used for comparing the GIS marking data of the three-dimensional road model with the GIS marking data of the construction scene;
the processing module is used for calculating and analyzing the GIS marking data of the construction scene according to the comparison result and the GIS marking data of the three-dimensional road model to obtain construction management planning data;
and the first sending module is used for sending the construction management planning data to the construction terminal.
8. The utility model provides a construction management device, is applied to construction terminal, construction terminal and construction management server are connected, its characterized in that includes:
the second acquisition module is used for acquiring GIS data of a construction scene and associating the GIS data with the construction scene to obtain GIS marking data of the construction scene;
the second sending module is used for sending the GIS marking data of the construction scene to a corresponding construction management server, so that the construction management server obtains corresponding construction management planning data according to the GIS marking data of the construction scene through analysis;
and the response module is used for responding to the receiving operation of the construction management planning data.
9. A computer-readable storage medium storing computer instructions for causing a computer to perform the construction management method according to any one of claims 1 to 4.
10. An electronic device, comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, the processor executing the computer instructions to perform the construction management method according to any one of claims 1 to 4.
CN202210596039.9A 2022-05-23 2022-05-23 Construction management method, system, device, storage medium and electronic equipment Pending CN115203464A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210596039.9A CN115203464A (en) 2022-05-23 2022-05-23 Construction management method, system, device, storage medium and electronic equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210596039.9A CN115203464A (en) 2022-05-23 2022-05-23 Construction management method, system, device, storage medium and electronic equipment

Publications (1)

Publication Number Publication Date
CN115203464A true CN115203464A (en) 2022-10-18

Family

ID=83575757

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210596039.9A Pending CN115203464A (en) 2022-05-23 2022-05-23 Construction management method, system, device, storage medium and electronic equipment

Country Status (1)

Country Link
CN (1) CN115203464A (en)

Similar Documents

Publication Publication Date Title
US10795056B2 (en) Local weather forecast
US9880012B2 (en) Hybrid road network and grid based spatial-temporal indexing under missing road links
KR20200121274A (en) Method, apparatus, and computer readable storage medium for updating electronic map
CN108874919B (en) Automatic checking method for planned land, electronic equipment, storage medium and system
WO2022105111A1 (en) Regional profile generation method and apparatus, computer device, and storage medium
CN108235736B (en) Positioning method, cloud server, terminal, system, electronic device and computer program product
CN110362895B (en) Land acquisition removal application management system based on BIM + GIS technology
CN113887143A (en) Spatial interpolation method and device for multi-source heterogeneous air pollutants and computer equipment
CN112116549A (en) Method and device for evaluating point cloud map precision
CN116384020A (en) Digital twin substation space layout method integrating multidimensional semantic information
CN111062970A (en) Track generation method and system based on thermodynamic diagram
CN117216341B (en) Visualization method and system for distributed space-time data of power grid
CN113094325B (en) Device deployment method, device, computer system and computer readable storage medium
CN114218629A (en) Urban underground pipe gallery system and big data analysis method
CN110647935B (en) Method and device for predicting tree growth trend in power transmission line area
CN115203464A (en) Construction management method, system, device, storage medium and electronic equipment
CN114882115B (en) Vehicle pose prediction method and device, electronic equipment and storage medium
CN113822892B (en) Evaluation method, device and equipment of simulated radar and computer storage medium
CN115617633A (en) Icing monitoring terminal maintenance method and related equipment
CN114238541A (en) Sensitive target information acquisition method and device and computer equipment
CN115147549A (en) Urban three-dimensional model generation and updating method based on multi-source data fusion
CN106443732B (en) Path diagram drawing method and system based on GPS
CN114445395B (en) Distribution line tree obstacle intelligent positioning method and device based on Internet and big data
Jakab et al. The use of viewshed analysis in creation of maps of potential visual exposure
CN117705138A (en) Power transmission line inspection path planning method, device, equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination