CN115156299A - A device and method for quickly replacing roller-jointed shafts - Google Patents
A device and method for quickly replacing roller-jointed shafts Download PDFInfo
- Publication number
- CN115156299A CN115156299A CN202210759512.0A CN202210759512A CN115156299A CN 115156299 A CN115156299 A CN 115156299A CN 202210759512 A CN202210759512 A CN 202210759512A CN 115156299 A CN115156299 A CN 115156299A
- Authority
- CN
- China
- Prior art keywords
- connecting shaft
- bolt
- roller
- shaft
- connection shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 9
- 238000009434 installation Methods 0.000 claims abstract description 43
- 230000007246 mechanism Effects 0.000 claims abstract description 21
- 230000005540 biological transmission Effects 0.000 claims description 22
- 230000009471 action Effects 0.000 claims description 6
- 230000008878 coupling Effects 0.000 claims 1
- 238000010168 coupling process Methods 0.000 claims 1
- 238000005859 coupling reaction Methods 0.000 claims 1
- 230000006386 memory function Effects 0.000 abstract description 2
- 238000005096 rolling process Methods 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000009347 mechanical transmission Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B31/00—Rolling stand structures; Mounting, adjusting, or interchanging rolls, roll mountings, or stand frames
- B21B31/08—Interchanging rolls, roll mountings, or stand frames, e.g. using C-hooks; Replacing roll chocks on roll shafts
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Rolls And Other Rotary Bodies (AREA)
Abstract
本发明公开了一种用于快速更换辊接轴的装置和方法,包括托架、以及以及通过调整机构设置在托架上的上辊接轴和下辊接轴;所述调整机构包括上辊接轴安装组件和下辊接轴安装组件。本发明通过将现有技术整体安装的压板结构改为独立设置的上压板和下压板,且上压板和下压板上分别安装有上辊接轴安装组件和下辊接轴安装组件,实现了上辊接轴和下辊接轴的独立更换。本发明通过设置用于辅助安装辊接轴的调整机构,调整机构包括铰接的上辊接轴安装组件和下辊接轴安装组件,可在初次安装完辊接轴后实现记忆功能,当需更换上新的辊接轴时,可直接通过调整机构安装,无需过多调整。
The invention discloses a device and method for rapidly replacing a roller connection shaft, comprising a bracket, and an upper roller connection shaft and a lower roller connection shaft arranged on the bracket through an adjustment mechanism; the adjustment mechanism includes an upper roller connection shaft Axle Mounting Kit and Lower Roller Axle Mounting Kit. The present invention realizes the upper and lower pressure plates by changing the structure of the pressure plate integrally installed in the prior art into the upper pressure plate and the lower pressure plate which are arranged independently, and the upper and lower pressure plates are respectively installed with the upper roller connection shaft mounting assembly and the lower roller connection shaft installation assembly. Independent replacement of roll-on shafts and lower roll-on shafts. In the present invention, an adjustment mechanism for auxiliary installation of the roller connection shaft is provided, and the adjustment mechanism includes the hinged upper roller connection shaft installation component and the lower roller connection shaft installation component, and the memory function can be realized after the initial installation of the roller connection shaft, and when it needs to be replaced When installing a new roller shaft, it can be installed directly through the adjustment mechanism without excessive adjustment.
Description
技术领域technical field
本发明涉及机械传动装置领域,尤其涉及到一种用于快速更换辊接轴的装置和方法。The invention relates to the field of mechanical transmission devices, and in particular, to a device and method for rapidly replacing a roller connection shaft.
背景技术Background technique
辊接轴作为轧机等设备的重要传动部件,在其磨损严重或者报废的情况下需要更换。在现有结构中,多个辊接轴是安装在一块整体设置的压板上的,这种安装结构在需要更换辊接轴时,也需将压板上的其他辊接轴一并拆卸,否则无法完成更换。另外,现有辊接轴在拆卸过程中,还需要配置额外的吊机来拉住无需更换的辊接轴。As an important transmission component of equipment such as rolling mills, the rolling shaft needs to be replaced when it is seriously worn or scrapped. In the existing structure, a plurality of roller connection shafts are installed on an integrally arranged pressure plate. In this installation structure, when the roller connection shaft needs to be replaced, the other roller connection shafts on the pressure plate need to be disassembled together, otherwise it is impossible to Complete the replacement. In addition, during the disassembly process of the existing roller connection shaft, an additional crane needs to be configured to pull the roller connection shaft that does not need to be replaced.
因此,我们有必要对这样一种结构进行改善,以克服上述缺陷。Therefore, it is necessary for us to improve such a structure to overcome the above-mentioned defects.
发明内容SUMMARY OF THE INVENTION
本发明的目的是提供一种用于快速更换辊接轴的装置和方法,通过设置上辊接轴安装组件、下辊接轴安装组件、以及与两者配合的调整机构,可实现辊接轴的快速安装和拆卸。The purpose of the present invention is to provide a device and method for quickly replacing the roller connection shaft. By setting the upper roller connection shaft installation assembly, the lower roller connection shaft installation assembly, and an adjustment mechanism cooperating with the two, the roller connection shaft can be realized. quick installation and removal.
本发明的上述技术目的是通过以下技术方案实现的:The above-mentioned technical purpose of the present invention is achieved through the following technical solutions:
一种用于快速更换辊接轴的装置,包括托架、以及以及通过调整机构设置在托架上的上辊接轴和下辊接轴;A device for quickly replacing a roller connection shaft, comprising a bracket, and an upper roller connection shaft and a lower roller connection shaft arranged on the bracket through an adjustment mechanism;
所述托架包括基板,在基板上设有一组立板,所述立板之间的空间设为用于安装上辊接轴的上腔体和用于安装下辊接轴的下腔体;The bracket includes a base plate, and a set of vertical plates is arranged on the base plate, and the space between the vertical plates is set as an upper cavity for installing the upper rolling shaft and a lower cavity for installing the lower rolling shaft;
所述调整机构包括上辊接轴安装组件和下辊接轴安装组件;The adjustment mechanism includes an upper roller-connected shaft installation assembly and a lower roller-connected shaft installation assembly;
所述上辊接轴安装组件通过上压板安装在上腔体的侧壁上,上辊接轴安装组件包括铰接的支撑杆、传动块、调节杆和上轴套,所述传动块设置在支撑杆的顶部,传动块的两端分别连接支撑杆和调节杆,调节杆与上轴套连接,上辊接轴的两端分别通过与一上轴套的配合连接设置在上腔体内;The upper roller connection shaft installation assembly is installed on the side wall of the upper cavity through the upper pressure plate, and the upper roller connection shaft installation assembly includes a hinged support rod, a transmission block, an adjustment rod and an upper shaft sleeve, and the transmission block is arranged on the support rod. The top of the rod and the two ends of the transmission block are respectively connected to the support rod and the adjustment rod, the adjustment rod is connected to the upper shaft sleeve, and the two ends of the upper roller connecting shaft are respectively arranged in the upper cavity through the matching connection with an upper shaft sleeve;
所述下辊接轴安装组件通过下压板安装在下腔体的侧壁上,下辊接轴安装组件包括螺杆、锁紧弹簧、锁定螺栓和下轴套;所述螺杆的顶部与支撑杆的底部铰接,下轴套套设在螺杆上,在下轴套下方的螺杆上设有锁紧弹簧,在下轴套上方的螺杆上设有锁定螺栓。The lower roller connection shaft installation assembly is installed on the side wall of the lower cavity through the lower pressure plate, and the lower roller connection shaft installation assembly includes a screw rod, a locking spring, a locking bolt and a lower shaft sleeve; the top of the screw rod and the bottom of the support rod are The lower shaft sleeve is sleeved on the screw rod, a locking spring is arranged on the screw rod below the lower shaft sleeve, and a locking bolt is arranged on the screw rod above the lower shaft sleeve.
所述调整机构的数量为两个,其对称设置于托架的两侧,上辊接轴和下辊接轴两端分别与侧方的上轴套或下轴套连接。The number of the adjusting mechanisms is two, which are symmetrically arranged on both sides of the bracket.
所述上压板上开设有上限位调节槽,上轴套设置于所述上限位调节槽内,且可在上辊接轴安装组件的传动作用下沿上限位调节槽上下移动。The upper pressure plate is provided with an upper limit adjustment groove, and the upper shaft sleeve is arranged in the upper limit adjustment groove and can move up and down along the upper limit adjustment groove under the transmission action of the upper roller connecting shaft mounting assembly.
所述下压板上开设有下限位调节槽,且可在下辊接轴安装组件的传动作用下沿下限位调节槽上下移动。The lower pressure plate is provided with a lower limit adjustment groove, and can move up and down along the lower limit adjustment groove under the transmission action of the lower roller connecting shaft mounting assembly.
所述上轴套上设有铰接点,且通过所述铰接点与调节杆连接。The upper shaft sleeve is provided with a hinge point, and is connected with the adjusting rod through the hinge point.
所述下轴套包括轴套主体,在轴套主体的侧方设有连接端,所述连接端开设有贯穿孔,且通过贯穿孔套设在螺杆上。The lower bushing comprises a bushing main body, a connecting end is provided on the side of the bushing main body, the connecting end is provided with a through hole, and is sleeved on the screw rod through the through hole.
所述螺杆的底端设有限位螺栓,套设在螺杆上的锁紧弹簧的底部与限位螺栓接触,锁紧弹簧顶部与下轴套的下表面接触,锁定螺栓设置在下轴套的上方,其用于锁定下轴套的位置。The bottom end of the screw is provided with a limit bolt, the bottom of the locking spring sleeved on the screw is in contact with the limit bolt, the top of the locking spring is in contact with the lower surface of the lower sleeve, and the locking bolt is arranged above the lower sleeve, It is used to lock the position of the lower bushing.
在所述上压板和下压板上开设有一组通孔,在托架的立板上开设有与通孔配合的螺栓孔,上压板通过第一螺栓和第二螺栓安装在立板上,下压板通过第三螺栓和第四螺栓安装在立板上。A set of through holes are opened on the upper and lower pressure plates, and bolt holes matched with the through holes are opened on the vertical plate of the bracket. The upper pressure plate is installed on the vertical plate through the first bolt and the second bolt, and the lower pressure plate Installed on the vertical plate by the third bolt and the fourth bolt.
一种用于快速更换辊接轴的方法,包括如下步骤:A method for quickly replacing a roller connection shaft, comprising the steps of:
1)将待安装的下辊接轴通过吊机移动至下腔体内的安装位置;1) Move the lower roller connection shaft to be installed to the installation position in the lower cavity through the crane;
2)拆卸掉第四螺栓,拧松第三螺栓,通过旋转下压板带动下辊接轴安装组件靠近下辊接轴;2) Remove the fourth bolt, loosen the third bolt, and drive the lower roller connection shaft installation assembly to approach the lower roller connection shaft by rotating the lower pressure plate;
3)通过锁紧弹簧调节下轴套的位置,使其对准下辊接轴的端部,随后继续旋转下压板带动下辊接轴安装组件,直至下辊接轴端部进入下辊接轴内,最后通过锁定螺栓锁紧,并拧紧第三螺栓和第四螺栓,完成下辊接轴的快速安装;3) Adjust the position of the lower bushing through the locking spring so that it is aligned with the end of the lower roller connection shaft, and then continue to rotate the lower pressing plate to drive the lower roller connection shaft installation assembly until the end of the lower roller connection shaft enters the lower roller connection shaft Finally, lock it with the locking bolt, and tighten the third bolt and the fourth bolt to complete the rapid installation of the lower roller connection shaft;
4)将待安装的上辊接轴通过吊机移动至上腔体内的安装位置;4) Move the upper roller connection shaft to be installed to the installation position in the upper cavity through the crane;
5)拆卸掉第一螺栓,拧松第二螺栓,通过旋转上压板带动上辊接轴安装组件靠近上辊接轴;5) Remove the first bolt, loosen the second bolt, and drive the upper roller connection shaft installation assembly to approach the upper roller connection shaft by rotating the upper pressure plate;
6)传动块和调节杆调节上轴套的位置,使其对准上辊接轴(3)的端部,随后继续旋转上压板带动上辊接轴安装组件,直至上辊接轴端部进入上轴套内,最后锁紧传动块、调节杆和上轴套,并拧紧第一螺栓和第二螺栓,完成上辊接轴的快速安装;6) The transmission block and the adjusting rod adjust the position of the upper sleeve so that it is aligned with the end of the upper roller connection shaft (3), and then continue to rotate the upper pressure plate to drive the upper roller connection shaft installation assembly until the end of the upper roller connection shaft enters In the upper shaft sleeve, finally lock the transmission block, the adjusting rod and the upper shaft sleeve, and tighten the first bolt and the second bolt to complete the quick installation of the upper roller connection shaft;
7)当下辊接轴因磨损过度需更换时,只需用吊机拉住下辊接轴,然后拆卸掉第四螺栓,拧松第三螺栓,通过反向旋转下压板带动下辊接轴安装组件脱离下辊接轴;新的下辊接轴按步骤1)-3)便可完成安装,实现下辊接轴的快速更换;7) When the lower roller connection shaft needs to be replaced due to excessive wear, it is only necessary to use a crane to hold the lower roller connection shaft, then remove the fourth bolt, loosen the third bolt, and drive the lower roller connection shaft to install by rotating the lower pressure plate in the opposite direction. The assembly is separated from the lower roller connection shaft; the new lower roller connection shaft can be installed according to steps 1)-3) to realize the rapid replacement of the lower roller connection shaft;
8)当上辊接轴因磨损过度需更换时,只需用吊机拉住上辊接轴,然后拆卸掉第一螺栓,拧松第二螺栓,通过反向旋转上压板带动上辊接轴安装组件脱离上辊接轴;新的上辊接轴按步骤4)-6)便可完成安装,实现上辊接轴的快速更换。8) When the upper roller connection shaft needs to be replaced due to excessive wear, just use the crane to hold the upper roller connection shaft, then remove the first bolt, loosen the second bolt, and drive the upper roller connection shaft by rotating the upper platen in the opposite direction. The installation assembly is separated from the upper roller connection shaft; the new upper roller connection shaft can be installed according to steps 4)-6) to realize the rapid replacement of the upper roller connection shaft.
综上所述,本发明具有以下有益效果:To sum up, the present invention has the following beneficial effects:
1.本发明通过将现有技术整体安装的压板结构改为独立设置的上压板和下压板,且上压板和下压板上分别安装有上辊接轴安装组件和下辊接轴安装组件,实现了上辊接轴和下辊接轴的独立更换。1. In the present invention, the upper and lower pressing plates are independently arranged by changing the overall installed pressing plate structure of the prior art, and the upper pressing plate and the lower pressing plate are respectively installed with the upper roller connecting shaft mounting assembly and the lower roller connecting shaft mounting assembly, so as to realize Independent replacement of the upper and lower roller shafts.
2.本发明通过设置用于辅助安装辊接轴的调整机构,调整机构包括铰接的上辊接轴安装组件和下辊接轴安装组件,可在初次安装完辊接轴后实现记忆功能,当需更换上新的辊接轴时,可直接通过调整机构安装,无需过多调整。2. The present invention provides an adjustment mechanism for assisting the installation of the roller connection shaft. The adjustment mechanism includes the hinged upper roller connection shaft installation assembly and the lower roller connection shaft installation assembly, which can realize the memory function after the initial installation of the roller connection shaft. When a new roller shaft needs to be replaced, it can be installed directly through the adjustment mechanism without excessive adjustment.
附图说明Description of drawings
图1是本发明所述的用于快速更换辊接轴的装置的前视图。FIG. 1 is a front view of the apparatus for rapidly changing the roller shaft according to the present invention.
图2是本发明所述的用于快速更换辊接轴的装置的剖面图。Fig. 2 is a cross-sectional view of the apparatus for rapidly changing the roller shaft according to the present invention.
图3是本发明所述的用于快速更换辊接轴的装置的俯视图。FIG. 3 is a top view of the apparatus for rapidly changing the roller shaft according to the present invention.
图4是本发明所述的调整机构的示意图。FIG. 4 is a schematic diagram of the adjustment mechanism according to the present invention.
具体实施方式Detailed ways
为了使本发明实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合图示与具体实施例,进一步阐述本发明。In order to make the technical means, creation features, achievement goals and effects realized by the present invention easy to understand, the present invention will be further described below with reference to the drawings and specific embodiments.
如图1、图2、图3和图4所示,本发明提出的一种用于快速更换辊接轴的装置,包括托架(1)、以及以及通过调整机构(2)设置在托架(1)上的上辊接轴(3)和下辊接轴(4);As shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, a device for quickly replacing a roller connection shaft proposed by the present invention includes a bracket (1), and an adjustment mechanism (2) arranged on the bracket through an adjustment mechanism (2). (1) the upper roller connection shaft (3) and the lower roller connection shaft (4);
所述托架(1)包括基板(11),在基板(11)上设有一组立板(12),所述立板(12)之间的空间设为用于安装上辊接轴(3)的上腔体(14)和用于安装下辊接轴(4)的下腔体(15);The bracket (1) includes a base plate (11), a set of vertical plates (12) are arranged on the base plate (11), and the space between the vertical plates (12) is set for installing an upper roller shaft (3). ) of the upper cavity (14) and the lower cavity (15) for installing the lower roller shaft (4);
所述调整机构(2)包括上辊接轴安装组件(22)和下辊接轴安装组件(23);The adjustment mechanism (2) comprises an upper roller-connected shaft installation assembly (22) and a lower roller-connected shaft installation assembly (23);
所述上辊接轴安装组件(22)通过上压板(5)安装在上腔体(14)的侧壁上,上辊接轴安装组件(22)包括铰接的支撑杆(221)、传动块(222)、调节杆(223)和上轴套(224),所述传动块(222)设置在支撑杆(221)的顶部,传动块(222)的两端分别连接支撑杆(221)和调节杆(223),调节杆(223)与上轴套(224)连接,上辊接轴(3)的两端分别通过与一上轴套(224)的配合连接设置在上腔体(14)内;The upper roller connection shaft installation assembly (22) is installed on the side wall of the upper cavity (14) through the upper pressure plate (5), and the upper roller connection shaft installation assembly (22) includes a hinged support rod (221), a transmission block (222), an adjusting rod (223) and an upper shaft sleeve (224), the transmission block (222) is arranged on the top of the support rod (221), and the two ends of the transmission block (222) are respectively connected to the support rod (221) and The adjusting rod (223) is connected with the upper shaft sleeve (224), and the two ends of the upper roller connecting shaft (3) are respectively arranged in the upper cavity (14) through a matching connection with an upper shaft sleeve (224). )Inside;
所述下辊接轴安装组件(23)通过下压板(6)安装在下腔体(15)的侧壁上,下辊接轴安装组件(23)包括螺杆(231)、锁紧弹簧(232)、锁定螺栓(233)和下轴套(234);所述螺杆(231)的顶部与支撑杆(221)的底部铰接,下轴套(234)套设在螺杆(231)上,在下轴套(234)下方的螺杆(231)上设有锁紧弹簧(232),在下轴套(234)上方的螺杆(231)上设有锁定螺栓(233)。The lower roller connecting shaft mounting assembly (23) is mounted on the side wall of the lower cavity (15) through the lower pressing plate (6), and the lower roller connecting shaft mounting assembly (23) includes a screw rod (231) and a locking spring (232) , locking bolt (233) and lower bushing (234); the top of the screw (231) is hinged with the bottom of the support rod (221), the lower bushing (234) is sleeved on the screw (231), A locking spring (232) is provided on the screw rod (231) below the (234), and a locking bolt (233) is provided on the screw rod (231) above the lower bushing (234).
所述调整机构(2)的数量为两个,其对称设置于托架(1)的两侧,上辊接轴(3)和下辊接轴(4)两端分别与侧方的上轴套(224)或下轴套(234)连接。The number of the adjustment mechanisms (2) is two, which are symmetrically arranged on both sides of the bracket (1), and both ends of the upper roller connection shaft (3) and the lower roller connection shaft (4) are respectively connected with the upper shaft on the side. The sleeve (224) or the lower sleeve (234) is connected.
所述上压板(5)上开设有上限位调节槽(51),上轴套(224)设置于所述上限位调节槽(51)内,且可在上辊接轴安装组件(22)的传动作用下沿上限位调节槽(51)上下移动。The upper pressure plate (5) is provided with an upper limit adjustment groove (51), and the upper shaft sleeve (224) is arranged in the upper limit adjustment groove (51), and can be installed on the upper roller connecting shaft assembly (22). Under the action of transmission, it moves up and down along the upper limit adjustment groove (51).
所述下压板(6)上开设有下限位调节槽(61),且可在下辊接轴安装组件(23)的传动作用下沿下限位调节槽(61)上下移动。The lower pressure plate (6) is provided with a lower limit adjustment groove (61), and can move up and down along the lower limit adjustment groove (61) under the transmission action of the lower roller connecting shaft mounting assembly (23).
所述上轴套(224)上设有铰接点,且通过所述铰接点与调节杆(223连接。The upper shaft sleeve (224) is provided with a hinge point, and is connected with the adjusting rod (223) through the hinge point.
所述下轴套(234)包括轴套主体,在轴套主体的侧方设有连接端(235),所述连接端(235)开设有贯穿孔,且通过贯穿孔套设在螺杆(231)上。The lower bushing (234) comprises a bushing main body, a connecting end (235) is provided on the side of the bushing main body, the connecting end (235) is provided with a through hole, and is sleeved on the screw (231) through the through hole )superior.
所述螺杆(231)的底端设有限位螺栓(236),套设在螺杆(231)上的锁紧弹簧(232)的底部与限位螺栓(236)接触,锁紧弹簧(232)顶部与下轴套(234)的下表面接触,锁定螺栓(233)设置在下轴套(234)的上方,其用于锁定下轴套(234)的位置。The bottom end of the screw rod (231) is provided with a limit bolt (236), the bottom of the locking spring (232) sleeved on the screw rod (231) is in contact with the limit bolt (236), and the top of the locking spring (232) is in contact with the limit bolt (236). In contact with the lower surface of the lower bushing (234), a locking bolt (233) is provided above the lower bushing (234) for locking the position of the lower bushing (234).
在所述上压板(5)和下压板(6)上开设有一组通孔,在托架(1)的立板(12)上开设有与通孔配合的螺栓孔,上压板(5)通过第一螺栓(7)和第二螺栓(8)安装在立板(12)上,下压板(6)通过第三螺栓(9)和第四螺栓(10)安装在立板(12)上。A group of through holes are formed on the upper pressure plate (5) and the lower pressure plate (6), and bolt holes matched with the through holes are formed on the vertical plate (12) of the bracket (1), and the upper pressure plate (5) passes through The first bolt (7) and the second bolt (8) are mounted on the vertical plate (12), and the lower pressing plate (6) is mounted on the vertical plate (12) through the third bolt (9) and the fourth bolt (10).
一种用于快速更换辊接轴的方法,包括辊接轴的快速安装步骤和快速拆卸步骤。A method for quickly replacing a roller-joint shaft, comprising a quick-installation step and a quick-disassembly step of the roll-joint shaft.
其中,辊接轴的快速安装步骤如下:Among them, the quick installation steps of the roller shaft are as follows:
1)将待安装的下辊接轴(4)通过吊机移动至下腔体(15)内的安装位置;1) Move the lower roller shaft (4) to be installed to the installation position in the lower cavity (15) by the crane;
2)拆卸掉第四螺栓(10),拧松第三螺栓(9),通过旋转下压板(6)带动下辊接轴安装组件(23)靠近下辊接轴(4);2) Remove the fourth bolt (10), loosen the third bolt (9), and drive the lower roller connection shaft installation assembly (23) to approach the lower roller connection shaft (4) by rotating the lower pressing plate (6);
3)通过锁紧弹簧(232)调节下轴套(234)的位置,使其对准下辊接轴(4)的端部,随后继续旋转下压板(6)带动下辊接轴安装组件(23),直至下辊接轴(4)端部进入下辊接轴(4)内,最后通过锁定螺栓(233)锁紧,并拧紧第三螺栓(9)和第四螺栓(10),完成下辊接轴(4)的快速安装;3) Adjust the position of the lower bushing (234) through the locking spring (232) so that it is aligned with the end of the lower roller connection shaft (4), and then continue to rotate the lower pressing plate (6) to drive the lower roller connection shaft installation assembly ( 23), until the end of the lower roller connection shaft (4) enters the lower roller connection shaft (4), and finally lock it with the locking bolt (233), and tighten the third bolt (9) and the fourth bolt (10), complete Quick installation of the lower roller shaft (4);
4)将待安装的上辊接轴(3)通过吊机移动至上腔体(14)内的安装位置;4) Move the upper roller connecting shaft (3) to be installed to the installation position in the upper cavity (14) by the crane;
5)拆卸掉第一螺栓(7),拧松第二螺栓(8),通过旋转上压板(5)带动上辊接轴安装组件(22)靠近上辊接轴(3);5) Remove the first bolt (7), loosen the second bolt (8), and drive the upper roller connection shaft mounting assembly (22) to approach the upper roller connection shaft (3) by rotating the upper pressure plate (5);
6)传动块(222)和调节杆(223)调节上轴套(224)的位置,使其对准上辊接轴(3)的端部,随后继续旋转上压板(5)带动上辊接轴安装组件(22),直至上辊接轴(3)端部进入上轴套(224)内,最后锁紧传动块(222)、调节杆(223)和上轴套(224),并拧紧第一螺栓(7)和第二螺栓(8),完成上辊接轴(3)的快速安装。6) The transmission block (222) and the adjusting rod (223) adjust the position of the upper sleeve (224) so that it is aligned with the end of the upper roller connection shaft (3), and then continue to rotate the upper pressure plate (5) to drive the upper roller connection. Install the shaft assembly (22) until the end of the upper roller connection shaft (3) enters the upper shaft sleeve (224), and finally lock the transmission block (222), the adjusting rod (223) and the upper shaft sleeve (224), and tighten The first bolt (7) and the second bolt (8) complete the quick installation of the upper roller shaft (3).
其中,辊接轴的快速安装步骤如下:Among them, the quick installation steps of the roller shaft are as follows:
7)当下辊接轴(4)因磨损过度需更换时,只需用吊机拉住下辊接轴(4),然后拆卸掉第四螺栓(10),拧松第三螺栓(9),通过反向旋转下压板(6)带动下辊接轴安装组件(23)脱离下辊接轴(4);7) When the lower roller connection shaft (4) needs to be replaced due to excessive wear, just use a crane to hold the lower roller connection shaft (4), then remove the fourth bolt (10), loosen the third bolt (9), Drive the lower roller connecting shaft mounting assembly (23) to separate from the lower roller connecting shaft (4) by rotating the lower pressing plate (6) in the opposite direction;
拆卸完毕后,新的下辊接轴(4)按步骤1)-3)便可完成安装,实现下辊接轴(4)的快速更换;After the disassembly is completed, the new lower roller connection shaft (4) can be installed according to steps 1)-3), and the rapid replacement of the lower roller connection shaft (4) can be realized;
8)当上辊接轴(3)因磨损过度需更换时,只需用吊机拉住上辊接轴(4),然后拆卸掉第一螺栓(7),拧松第二螺栓(8),通过反向旋转上压板(5)带动上辊接轴安装组件(22)脱离上辊接轴(4);8) When the upper roller connection shaft (3) needs to be replaced due to excessive wear, just use a crane to hold the upper roller connection shaft (4), then remove the first bolt (7) and loosen the second bolt (8) , drive the upper roller connection shaft mounting assembly (22) to disengage from the upper roller connection shaft (4) by rotating the upper pressure plate (5) in the opposite direction;
拆卸完毕后,新的上辊接轴(4)按步骤4)-6)便可完成安装,实现上辊接轴(4)的快速更换。After the disassembly is completed, the new upper roller connecting shaft (4) can be installed according to steps 4)-6), so as to realize the rapid replacement of the upper roller connecting shaft (4).
在本文中,术语“上”、“下”、“前”、“后”、“左”、“右”、“顶”、“底”、“内”、“外”、“竖直”、“水平”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了表达技术方案的清楚及描述方便,因此不能理解为对本发明的限制。In this document, the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", "vertical", The orientation or positional relationship indicated by "horizontal" is based on the orientation or positional relationship shown in the accompanying drawings, and is only for the clarity of expressing the technical solution and the convenience of description, and therefore should not be construed as a limitation of the present invention.
在本文中,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,除了包含所列的那些要素,而且还可包含没有明确列出的其他要素。As used herein, the terms "comprising", "comprising" or any other variation thereof are intended to encompass non-exclusive inclusion, in addition to those elements listed, but also other elements not expressly listed.
以上显示和描述了本发明的基本原理、主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等同物界定。The foregoing has shown and described the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principle of the present invention. Such changes and improvements fall within the scope of the claimed invention. The claimed scope of the present invention is defined by the appended claims and their equivalents.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210759512.0A CN115156299A (en) | 2022-06-30 | 2022-06-30 | A device and method for quickly replacing roller-jointed shafts |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210759512.0A CN115156299A (en) | 2022-06-30 | 2022-06-30 | A device and method for quickly replacing roller-jointed shafts |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115156299A true CN115156299A (en) | 2022-10-11 |
Family
ID=83489263
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210759512.0A Pending CN115156299A (en) | 2022-06-30 | 2022-06-30 | A device and method for quickly replacing roller-jointed shafts |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115156299A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202479220U (en) * | 2011-12-29 | 2012-10-10 | 一重集团大连设计研究院有限公司 | Connecting shaft bracket device of large shape-steel rolling mill |
CN103084401A (en) * | 2013-01-25 | 2013-05-08 | 中冶南方工程技术有限公司 | Cross-shaped universal shaft bracket |
CN203124426U (en) * | 2012-09-03 | 2013-08-14 | 中冶南方工程技术有限公司 | Chain shock absorbing self-balancing connecting shaft bracket |
CN203791351U (en) * | 2014-04-28 | 2014-08-27 | 北京中传首高冶金成套设备有限公司 | Flexible adjustment device for universal spindle bracket of rolling mill |
CN105478489A (en) * | 2015-12-31 | 2016-04-13 | 中钢集团西安重机有限公司 | Connecting shaft self-balancing bracket device with floating adjusting function and adjusting method |
CN217665426U (en) * | 2022-06-30 | 2022-10-28 | 茂德传动机械(嘉兴)有限公司 | Device for quickly replacing roller connecting shaft |
-
2022
- 2022-06-30 CN CN202210759512.0A patent/CN115156299A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202479220U (en) * | 2011-12-29 | 2012-10-10 | 一重集团大连设计研究院有限公司 | Connecting shaft bracket device of large shape-steel rolling mill |
CN203124426U (en) * | 2012-09-03 | 2013-08-14 | 中冶南方工程技术有限公司 | Chain shock absorbing self-balancing connecting shaft bracket |
CN103084401A (en) * | 2013-01-25 | 2013-05-08 | 中冶南方工程技术有限公司 | Cross-shaped universal shaft bracket |
CN203791351U (en) * | 2014-04-28 | 2014-08-27 | 北京中传首高冶金成套设备有限公司 | Flexible adjustment device for universal spindle bracket of rolling mill |
CN105478489A (en) * | 2015-12-31 | 2016-04-13 | 中钢集团西安重机有限公司 | Connecting shaft self-balancing bracket device with floating adjusting function and adjusting method |
CN217665426U (en) * | 2022-06-30 | 2022-10-28 | 茂德传动机械(嘉兴)有限公司 | Device for quickly replacing roller connecting shaft |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111088571B (en) | Quick-mounting rubber roller of spinning machine | |
CN217665426U (en) | Device for quickly replacing roller connecting shaft | |
CN115156299A (en) | A device and method for quickly replacing roller-jointed shafts | |
CN201179738Y (en) | Quick change adjusting device for rubber roll in cardboard box machine | |
CN218716597U (en) | Road drilling machine | |
WO2025086415A1 (en) | Printing mechanism of printer | |
CN110509659A (en) | Cycle type flexible printing machine | |
CN212633220U (en) | Installation structure of transfer rubber roll and transfer rubber roll | |
CN113752117B (en) | A composite plate grinding mechanism with a structurally adjustable conversion plate | |
CN201092136Y (en) | Edition-touching roller pressure regulating device for curved press | |
CN113883256A (en) | Energy-saving belt pulley speed reducer | |
JP2007139191A (en) | Cylinder of printing machine, and bearing apparatus for the same | |
CN202479208U (en) | On-line adjustable tube rolling frame | |
CN111299063A (en) | Mounting structure of transfer rubber roller and replacement method of transfer rubber roller | |
CN205167873U (en) | Coupling mechanism is lockd up to multi -functional printing machine | |
CN220519716U (en) | Tensioning roller for film production | |
CN220739110U (en) | Upper press roller adjusting mechanism of aluminum veneer arc rolling machine | |
CN221625505U (en) | Adjusting device of air expansion shaft of die cutting machine | |
CN223011488U (en) | A brush roller capable of quickly replacing a working roller | |
CN209458307U (en) | A new type of vehicle bearing seat | |
CN219334118U (en) | Novel press roller adjusting mechanism of granulation machine | |
CN112744387A (en) | Hard alloy combined roller locking device | |
CN219027344U (en) | Auxiliary machining tool for cylindrical roller bearing | |
CN216429129U (en) | Novel wall body reinforcing device | |
CN220277424U (en) | Rubber roller mechanism capable of rapidly changing roller |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |