CN115147018A - Road assessment evaluation method and device - Google Patents
Road assessment evaluation method and device Download PDFInfo
- Publication number
- CN115147018A CN115147018A CN202211067584.5A CN202211067584A CN115147018A CN 115147018 A CN115147018 A CN 115147018A CN 202211067584 A CN202211067584 A CN 202211067584A CN 115147018 A CN115147018 A CN 115147018A
- Authority
- CN
- China
- Prior art keywords
- task
- road
- target
- annual
- completion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000011156 evaluation Methods 0.000 title claims abstract description 52
- 238000010276 construction Methods 0.000 claims abstract description 175
- 238000012423 maintenance Methods 0.000 claims abstract description 104
- 238000000034 method Methods 0.000 claims abstract description 43
- 238000004364 calculation method Methods 0.000 claims description 20
- 238000007726 management method Methods 0.000 abstract description 11
- 230000000694 effects Effects 0.000 description 4
- 238000013210 evaluation model Methods 0.000 description 3
- 238000012886 linear function Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000003786 synthesis reaction Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000007062 medium k Substances 0.000 description 1
- 230000008685 targeting Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The embodiment of the invention provides a road assessment and evaluation method and device, and belongs to the technical field of road management. The method comprises the following steps: acquiring a regional planning target and an annual target of a target construction task in a regional planning, annual completion data of the target construction task, annual completion data of a target maintenance task and annual completion data of a target local financial input task; calculating a road construction task completion score according to a regional planning target and an annual target of a target construction task and annual completion data of the target construction task; calculating the road maintenance task completion score according to the annual completion data of the target maintenance task; calculating local financial investment task completion scores according to annual completion data of target local financial investment tasks; and calculating the evaluation score of the road assessment according to the completion score of the road construction task, the completion score of the road maintenance task and the completion score of the local financial investment task. The embodiment of the invention can realize scientific and effective assessment and evaluation of the road.
Description
Technical Field
The invention relates to the technical field of road management, in particular to a road assessment and evaluation method and device.
Background
Along with the development of economy in China, roads are also developed unprecedentedly, and road construction, road maintenance, local financial investment in the aspect of roads and the like are all important links in road management work.
At present, in the prior art, a road assessment and evaluation method does not exist, and a scientific and effective road assessment and evaluation standard is provided to scientifically reflect the efforts and effects of areas in the aspects of road construction, maintenance, investment and the like, so that the working enthusiasm of the areas in the aspects of road construction, management, maintenance, operation and the like can be promoted, a scientific basis is provided for reasonable allocation of vehicle purchase tax fund, and the road management capacity is improved.
Disclosure of Invention
In view of this, the embodiment of the invention provides a road assessment and evaluation method and device, which are used for realizing scientific and effective assessment and evaluation of roads. The technical scheme is as follows:
in a first aspect, an embodiment of the present invention provides a road assessment evaluation method, including:
acquiring a regional planning target and an annual target of a target construction task in a regional planning, annual completion data of the target construction task, annual completion data of a target maintenance task and annual completion data of a target local financial investment task;
calculating a road construction task completion score according to the regional planning target and the annual target of the target construction task and annual completion data of the target construction task;
calculating the road maintenance task completion score according to the annual completion data of the target maintenance task;
calculating local financial investment task completion scores according to annual completion data of the target local financial investment tasks;
and calculating the road assessment evaluation score according to the road construction task completion score, the road maintenance task completion score and the local financial investment task completion score.
Optionally, the targeting task comprises: the method comprises the following steps of regional highway construction investment amount, newly reconstructed mileage, rural town access three-level highway construction, natural village access hardened road construction, dangerous bridge reconstruction and village road security engineering;
the calculating of the road construction task completion score according to the regional planning target and the annual target of the target construction task and the annual completion data of the target construction task comprises the following steps:
calculating the annual completion rate of each target construction task according to the regional planning target and the annual target of each target construction task and the annual completion data of each target construction task;
Wherein,is the n-th i The assessment weight of the annual objective construction task k,is n th i The annual completion rate of a annual target construction task k is positive integer, m =6, wherein k =1 corresponds to the regional highway construction investment amount, k =2 corresponds to the new reconstruction mileage, and k =3 corresponds to the third-level village-town trafficThe highway construction corresponds the hardened road construction of natural village way when k =4, corresponds the modification of dangerous bridge when k =5, corresponds village way security protection engineering when k =6.
Optionally, the target maintenance task includes: evaluating the excellent road rate of the common provincial road, the first and second class bridge occupation ratio of the common provincial road bridge, evaluating the excellent road rate of the rural highway and the first and second class bridge occupation ratio of the rural highway bridge;
the step of calculating the road maintenance task completion score according to the annual completion data of the target maintenance task comprises the following steps:
Wherein,is n th i The assessment weight of the annual objective maintenance task k,is the n-th i The annual completion rate of a target maintenance task k is positive integer, m =4, wherein k =1 is corresponding to the excellent road rate of the ordinary provincial road, k =2 is corresponding to the first and second class bridge occupation ratio of the ordinary provincial road bridge, k =3 is corresponding to the excellent road rate of the rural highway, and k =4 is corresponding to the first and second class bridge occupation ratio of the rural highway bridge.
Optionally, the target local financial investment task comprises: the method comprises the following steps of (1) carrying out local financial investment on common provincial road construction, local financial investment on common provincial road maintenance, local financial investment on rural highway construction and local financial investment on rural highway maintenance;
the calculating of the local financial investment task completion score according to the annual completion data of the target local financial investment task comprises the following steps:
Wherein,is n th i Assessment weight of annual objective local financial investment task k,is n th i The annual target local financial input task k has an annual completion rate, k is a positive integer, m =4, wherein k =1 corresponds to the local financial input for building a common provincial road, k =2 corresponds to the local financial input for maintaining the common provincial road, k =3 corresponds to the local financial input for building a rural road, and k =4 corresponds to the local financial input for maintaining the rural road.
Optionally, the calculating the road assessment evaluation score according to the road construction task completion score, the road maintenance task completion score and the local financial investment task completion score includes:
wherein,a score is scored for completion of the road construction task,a score is scored for completion of the highway maintenance task,scoring the local financial investment task completion.
Optionally, the road construction task score is obtained based on an annual completion condition of the target construction task compared with an annual plan completion condition;
the road maintenance task completion score is obtained based on the annual completion condition of the target maintenance task compared with the previous annual base number;
the local financial investment task completion score is based on an annual completion of the target local financial investment task compared to a last annual base.
Optionally, the acquiring annual target of the target construction task, annual completion data of the target maintenance task, and annual completion data of the target local financial investment task in the regional plan includes:
from the annual industry statistical bulletin data, the regional planning target, the annual completion data of the target construction task, the annual completion data of the target maintenance task and the annual completion data of the target local financial investment task of the target construction task in the regional planning are obtained.
In a second aspect, an embodiment of the present invention provides a road assessment evaluation device, including:
the acquisition module is used for acquiring a regional planning target and an annual target of a target construction task in a regional plan, annual completion data of the target construction task, annual completion data of a target maintenance task and annual completion data of a target local financial investment task;
the first calculation module is used for calculating a road construction task completion score according to a regional planning target and an annual target of the target construction task and annual completion data of the target construction task;
the second calculation module is used for calculating the road maintenance task completion score according to the annual completion data of the target maintenance task;
a third calculation module, configured to calculate a local financial investment task completion score according to annual completion data of the target local financial investment task;
and the fourth calculation module is used for calculating the road assessment evaluation score according to the road construction task completion score, the road maintenance task completion score and the local financial investment task completion score.
The technical scheme of the invention has the beneficial effects that:
the embodiment of the invention provides a road assessment and evaluation method and device, and aims to comprehensively assess and evaluate roads by using a fuzzy comprehensive evaluation method. Firstly, for example, fuzzy comprehensive assessment can be performed by obtaining information such as a regional planning target and an annual target of a target construction task and annual completion data of the target construction task from statistical data in an annual industry, and a road construction task completion score is obtained through calculation; secondly, for example, the information such as annual completion data of the target maintenance task is obtained from the statistical data in the annual industry to carry out fuzzy comprehensive assessment, and the completion score of the highway maintenance task is obtained through calculation; thirdly, for example, the complete score of the local financial input task is calculated by obtaining annual complete data of the target local financial input task from the annual industrial statistical data to perform fuzzy comprehensive assessment and evaluation; and finally, calculating to obtain a road assessment evaluation score according to the calculated road construction task completion score, the calculated road maintenance task completion score and the calculated local financial investment task completion score by fuzzy synthesis again.
The embodiment of the invention establishes a road assessment and evaluation system on the aspects of construction completion condition, maintenance completion condition, local financial input condition and the like in the area by applying the fuzzy comprehensive evaluation method, can scientifically reflect the efforts and effects of the area in the aspects of road construction and maintenance, promotes the working enthusiasm of the area in the aspects of road construction, maintenance, transportation and the like, and also provides a scientific method for reasonable allocation of vehicle purchase tax fund. Meanwhile, the assessment system further promotes daily data updating and management work, and improves the quality of service data; the data link-up and cross-check between the traffic service data and the financial data are enhanced, the comprehensive management of the full life cycle of the service data is strengthened, and the informatization level of the service management is improved.
Drawings
FIG. 1 is a flow chart of a method for evaluating a road assessment according to an embodiment of the present invention;
FIG. 2 is a schematic flow chart of a road assessment evaluation method disclosed in the embodiment of the present invention;
fig. 3 is a schematic structural diagram of a road assessment evaluation device disclosed in the embodiment of the present invention.
Detailed Description
In order to make the technical problems, technical solutions and advantages of the present invention more apparent, the following detailed description is given with reference to the accompanying drawings and specific embodiments. In the following description, specific details such as specific configurations and components are provided only to help the full understanding of the embodiments of the present invention. Thus, it will be apparent to those skilled in the art that various changes and modifications may be made to the embodiments described herein without departing from the scope and spirit of the invention. In addition, descriptions of well-known functions and constructions are omitted for clarity and conciseness.
It should be appreciated that reference throughout this specification to "one embodiment" or "an embodiment" means that a particular feature, structure or characteristic described in connection with the embodiment is included in at least one embodiment of the present invention. Thus, the appearances of the phrases "in one embodiment" or "in an embodiment" in various places throughout this specification are not necessarily all referring to the same embodiment. Furthermore, the particular features, structures, or characteristics may be combined in any suitable manner in one or more embodiments.
In various embodiments of the present invention, it should be understood that the sequence numbers of the following processes do not mean the execution sequence, and the execution sequence of each process should be determined by its function and inherent logic, and should not constitute any limitation to the implementation process of the embodiments of the present invention.
The highway assessment evaluation method provided by the embodiment of the invention is used for establishing a highway assessment evaluation system for the construction completion condition, the maintenance completion condition and the local financial input condition in the regional planning by applying a fuzzy comprehensive evaluation method. As shown in fig. 1, the road assessment evaluation method provided by the embodiment of the invention comprises the following steps:
In the embodiment of the invention, the regional planning target and the annual target of the target construction task in the regional planning, the annual completion data of the target construction task, the annual completion data of the target maintenance task and the annual completion data of the target local financial input task can be obtained from the data of the annual industry statistical bulletin.
In the embodiment of the present invention, the target construction task may include: the method comprises the following steps of regional highway construction investment amount, newly reconstructed mileage, rural town access three-level highway construction, natural village access hardened road construction, dangerous bridge reconstruction and village road security engineering; the targeted maintenance tasks may include: evaluating the excellent road rate of the common provincial road, the first and second class bridge occupation ratio of the common provincial road bridge, evaluating the excellent road rate of the rural highway and the first and second class bridge occupation ratio of the rural highway bridge; the target local financial investment tasks may include: the method comprises the following steps of ordinary provincial road construction local financial investment, ordinary provincial road maintenance local financial investment, rural highway construction local financial investment and rural highway maintenance local financial investment. Of course, the target construction task, the target maintenance task, and the target local financial investment task in the embodiments of the present invention are not limited thereto, and other tasks that can be attributed to the target construction task, the target maintenance task, or the target local financial investment task, which are generally understood in the art, all belong to the scope of the present invention.
For a target construction task, comparing the annual completion condition of the target construction task with the annual plan completion condition; for a target maintenance task, the embodiment of the invention compares the annual completion condition of the target maintenance task with the previous annual base number; for a target local financial investment task, the embodiment of the invention compares the annual completion condition of the target local financial investment task with the previous annual base.
And 102, calculating a road construction task completion score according to the regional planning target and the annual target of the target construction task and the annual completion data of the target construction task.
In the embodiment of the invention, the regional planning target of the target construction task is the final target of regional planning, the annual target is the target which needs to be completed every year, and the regional planning target is mainly used for evaluating the target construction task in the last year, for example, taking five-year regional planning as an example, if the target of regional planning is not reached in the last year, that is, the target in the whole planning period is not reached, the completion score of the construction task needs to be subtracted.
According to the targets of regional medium-long term planning, five-year development planning and the like, construction tasks such as regional highway construction investment amount, new reconstruction mileage, village-town three-level highway construction, natural village-way hardened road construction, dangerous bridge reconstruction, village road security engineering and the like can be obtained from statistical communique data in the annual industry, and the planning number of each highway construction task in a regional planning period (namely a regional planning target) is determined by combining regional difference, financial difficulty degree and the likeAnd the target value of the construction task in the ith year (namely the annual target) in the planning periodAnd the annual completion rate of each road construction task can be obtained through calculation according to the annual completion data of each road construction task.
Establishing a dynamic comprehensive evaluation model according to different weights of 6 different construction tasks of regional highway construction investment amount, newly reconstructed mileage, village-town road three-level highway construction, natural village road hardened road construction, dangerous bridge reconstruction and village road security engineeringAccording to the modelCalculating road construction task completion scores 。
Wherein n represents the meaning of a year,expressed in the formula of year iIn (1)Denotes the firstYear, i.e., year i.
In the form of a linear function,is the n-th i The assessment weight of the annual objective construction task k,is n th i The annual completion rate of an annual target construction task k, wherein k is a positive integer and m =6. Specifically, for example, when k =1, the construction investment amount of a highway in a corresponding area, when k =2, the construction mileage of a newly reconstructed highway, when k =3, the construction of a third-level highway of a town way, when k =4, the construction of a hardened highway of a natural village way, when k =5, the reconstruction of a dangerous bridge, and when k =6, the security engineering of a village way are corresponded.
Further, the assessment weight of each target construction task kThe embodiment of the invention provides a calculation method, namely, the calculation method can be obtained according to the following method:
,W t w=1,W>0,H w to calculate theN represents the number of years, typically 5 years for a planning period;
And 103, calculating the road maintenance task completion score according to the annual completion data of the target maintenance task.
When the road maintenance task completion score is calculated, the related target maintenance tasks comprise 4 indexes of ordinary provincial road evaluation excellent road rate, ordinary provincial road bridge class I/II bridge occupation ratio, rural road evaluation excellent road rate, rural road bridge class I/II bridge occupation ratio and the like. Establishing a dynamic comprehensive evaluation model according to different weights of the 4 different maintenance tasksAccording to the modelCalculating to obtain the completion score of the highway maintenance task 。
Wherein n represents the meaning of a year,represents year i, y in the formulaIn (1)Is shown asYear, i.e., year i.In the form of a linear function,is n th i The assessment weight of the annual objective maintenance task k,is n th i And (3) the annual completion rate of a annual target maintenance task k, wherein k is a positive integer and m =4. Specifically, for example, when k =1, the excellent road rate is evaluated corresponding to a common provincial road, when k =2, the excellent road rate is evaluated corresponding to a first class bridge and a second class bridge of a common provincial road bridge, when k =3, the excellent road rate is evaluated corresponding to a rural highway, and when k =4, the first class bridge and the second class bridge of the rural highway bridge are evaluated.
Further, the examination weight of each target maintenance task kThe embodiment of the invention provides a calculation method, namely, the calculation method can be obtained according to the following method:
,W t w=1,W>0,H w to calculate theN represents the number of years, typically 5 years for a planning period;
And 104, calculating a local financial investment task completion score according to the annual completion data of the target local financial investment task.
When the local financial investment task score is calculated, the related target local financial investment tasks comprise 4 indexes such as the local financial investment of common provincial road construction, the local financial investment of common provincial road maintenance, the local financial investment of rural highway construction, the local financial investment of rural highway maintenance and the like. Establishing a dynamic comprehensive evaluation model according to different weights of the 4 different local financial investment tasksAccording to the modelAnd calculating to obtain local financial investment task completionScore of 。
Wherein n represents the meaning of a year,expressed in the formula of year iInIs shown asYear, i.e., year i.In the form of a linear function,is n th i Assessment weight of annual objective local financial investment task k,is n th i The annual completion rate of the annual target local financial investment task k is a positive integer, m =4, specifically, for example, k =1 corresponds to the local financial investment for building a common provincial road, k =2 corresponds to the local financial investment for maintaining the common provincial road, k =3 corresponds to the local financial investment for building a rural road, and k =4 corresponds to the local financial investment for maintaining the rural road.
Further, the assessment weight of each objective local financial investment task kThe embodiment of the invention provides a calculation method, namely, the calculation method can be obtained according to the following method:
,W t w=1,W>0,H w to calculate theN represents the number of years, typically 5 years for a planning period;
It should be noted that, in the embodiment of the present invention, the execution sequence of the above steps 102 to 104 is only an example, and the execution sequence of the steps 102 to 104 is not limited in the present invention, for example, three steps may be executed simultaneously, or three steps are executed sequentially, or one step is executed first, then two steps are executed simultaneously, or two steps are executed first, then one step is executed later, and the like.
And 105, calculating the road assessment evaluation score according to the road construction task completion score, the road maintenance task completion score and the local financial investment task completion score.
After obtaining the road construction task completion score, the road maintenance task completion score and the local financial investment task completion score, according to the dataFormula (la)Calculating to obtain a road assessment score; whereinA score is scored for completion of the road construction task,a score is scored for completion of the highway maintenance task,scoring the local financial investment task completion.
By combining the example shown in fig. 2, the road construction task completion condition assessment and evaluation: compared with the planned completion condition in the beginning of the year, the annual completion condition of aspects such as planned completion amount of fixed asset investment, planned new reconstruction mileage, planned new access to three or more levels of highway villages and towns, planned new access to hardened road with larger population scale natural village (group) number, planned completion of dangerous bridge reconstruction number, planned completion of village road security engineering mileage and the like is compared;
and (3) assessing and evaluating the completion condition of the road maintenance task: comparing the relevant indexes such as the good road rate of the common provincial road, the good road rate of the rural highway, the proportion of the first and second bridges of the common provincial road, the proportion of the first and second bridges of the rural highway and the proportion of the third bridges of the rural highway with the base number of the last year;
assessment and evaluation of the completion condition of local financial investment tasks: compared with the annual base number, relevant indexes such as the financial investment of a common provincial road construction place, the financial investment of a rural highway construction place, the financial investment of a common provincial road maintenance place, the financial investment of a rural highway maintenance place and the like are calculated according to the following formula:
the road assessment and evaluation method provided by the embodiment of the invention aims to comprehensively assess and evaluate roads by applying a fuzzy comprehensive evaluation method. Firstly, for example, fuzzy comprehensive assessment can be performed by obtaining information such as a regional planning target and an annual target of a target construction task and annual completion data of the target construction task from statistical data in an annual industry, and a road construction task completion score is obtained through calculation; secondly, for example, information such as annual completion data of the target maintenance task is obtained from the statistical data in the annual industry to perform fuzzy comprehensive assessment, and the road maintenance task completion score is calculated; thirdly, for example, the complete score of the local financial input task is calculated by obtaining annual complete data of the target local financial input task from the annual industrial statistical data to perform fuzzy comprehensive assessment and evaluation; and finally, calculating to obtain a road assessment evaluation score according to the calculated road construction task completion score, the calculated road maintenance task completion score and the calculated local financial investment task completion score by fuzzy synthesis again.
The embodiment of the invention establishes a road assessment and evaluation system on the aspects of construction completion condition, maintenance completion condition, local financial input condition and the like in the area by applying the fuzzy comprehensive evaluation method, can scientifically reflect the efforts and effects of the area in the aspects of road construction and maintenance, promotes the working enthusiasm of the area in the aspects of road construction, maintenance, transportation and the like, and also provides a scientific method for reasonable allocation of vehicle purchase tax fund. Meanwhile, the assessment system further promotes daily data updating and management work, and improves the quality of service data; the data link-up and cross-check between the traffic service data and the financial data are enhanced, the comprehensive management of the full life cycle of the service data is strengthened, and the informatization level of the service management is improved.
Based on the road assessment evaluation method provided by the embodiment of the invention of the previous text, the embodiment of the invention also provides a road assessment evaluation device, as shown in fig. 3, comprising:
an obtaining module 100, configured to obtain a regional planning target and an annual target of a target construction task in a regional plan, and annual completion data of the target construction task, annual completion data of a target maintenance task, and annual completion data of a target local financial investment task;
a first calculation module 200, configured to calculate a road construction task completion score according to a regional planning target and an annual target of the target construction task and annual completion data of the target construction task;
the second calculation module 300 is configured to calculate a road maintenance task completion score according to annual completion data of the target maintenance task;
a third calculating module 400, configured to calculate a local financial investment task completion score according to annual completion data of the target local financial investment task;
a fourth calculating module 500, configured to calculate the road assessment evaluation score according to the road construction task completion score, the road maintenance task completion score, and the local financial investment task completion score.
Wherein the target construction task comprises: the method comprises the following steps of (1) constructing investment amount of regional roads, newly-reconstructed mileage, constructing three-level roads for village and town access, constructing hardened roads for natural village access, reconstructing dangerous bridges and performing village road security engineering; the first computing module 200 is specifically configured to:
calculating the annual completion rate of each target construction task according to the regional planning target and the annual target of each target construction task and the annual completion data of each target construction task;
Wherein,is n th i The assessment weight of the annual objective construction task k,is n th i Annual target construction task k annual completion rate, k being a positive integer, m =6, whichThe method is characterized in that when the medium k =1, the method corresponds to the investment amount of road construction in an area, when k =2, the method corresponds to a newly-reconstructed mileage, when k =3, the method corresponds to the construction of a three-level highway of a town way, when k =4, the method corresponds to the construction of a hardened road of a natural village way, when k =5, the method corresponds to the reconstruction of a dangerous bridge, and when k =6, the method corresponds to the security engineering of a village way.
Wherein, the target maintenance task comprises: evaluating the excellent road rate of the common provincial road, the first and second class bridge occupation ratio of the common provincial road bridge, evaluating the excellent road rate of the rural highway and the first and second class bridge occupation ratio of the rural highway bridge; the second calculating module 300 is specifically configured to:
Wherein,is n th i The assessment weight of the annual objective maintenance task k,is n th i The annual completion rate of a target maintenance task k is positive integer, m =4, wherein k =1 is corresponding to the excellent road rate of the ordinary provincial road, k =2 is corresponding to the first and second class bridge occupation ratio of the ordinary provincial road bridge, k =3 is corresponding to the excellent road rate of the rural highway, and k =4 is corresponding to the first and second class bridge occupation ratio of the rural highway bridge.
Wherein, the target local financial investment task comprises: the method comprises the following steps of (1) carrying out local financial investment on common provincial road construction, local financial investment on common provincial road maintenance, local financial investment on rural highway construction and local financial investment on rural highway maintenance; the third computing module 400 is specifically configured to:
Wherein,is n th i Assessment weight of annual objective local financial investment task k,is n th i The annual target local financial input task k has an annual completion rate, k is a positive integer, m =4, wherein k =1 corresponds to the local financial input for building a common provincial road, k =2 corresponds to the local financial input for maintaining the common provincial road, k =3 corresponds to the local financial input for building a rural road, and k =4 corresponds to the local financial input for maintaining the rural road.
The fourth calculating module 500 is specifically configured to:
wherein,a score is completed for the road construction task,a score is scored for completion of the highway maintenance task,scoring the local financial investment task completion.
In the embodiment of the invention, the road construction task score is obtained based on the annual completion condition of the target construction task compared with the annual plan completion condition;
the road maintenance task completion score is obtained based on the annual completion condition of the target maintenance task compared with the previous annual base number;
the local financial investment task completion score is based on an annual completion of the target local financial investment task compared to a last annual base.
In the embodiment of the present invention, the obtaining module 100 is specifically configured to: and acquiring a regional planning target and an annual target of a target construction task in the regional planning, annual completion data of the target construction task, annual completion data of a target maintenance task and annual completion data of a target local financial input task from the annual industry internal statistical bulletin data.
It should be noted that the road assessment and evaluation device is a device corresponding to the road assessment and evaluation method in the foregoing embodiment, and all implementation means in the method embodiment are applicable to the embodiment of the road assessment and evaluation device, and the same technical effects can be achieved.
While the foregoing is directed to the preferred embodiment of the present invention, it will be appreciated by those skilled in the art that various changes and modifications may be made therein without departing from the principles of the invention as set forth in the appended claims.
Claims (10)
1. A road assessment evaluation method is characterized by comprising the following steps:
acquiring a regional planning target and an annual target of a target construction task in a regional planning, annual completion data of the target construction task, annual completion data of a target maintenance task and annual completion data of a target local financial investment task;
calculating a road construction task completion score according to a regional planning target and an annual target of the target construction task and annual completion data of the target construction task;
calculating the road maintenance task completion score according to the annual completion data of the target maintenance task;
calculating a local financial investment task completion score according to annual completion data of the target local financial investment task;
and calculating the road assessment evaluation score according to the road construction task completion score, the road maintenance task completion score and the local financial investment task completion score.
2. The method of claim 1, wherein the target construction task comprises: the method comprises the following steps of (1) constructing investment amount of regional roads, newly-reconstructed mileage, constructing three-level roads for village and town access, constructing hardened roads for natural village access, reconstructing dangerous bridges and performing village road security engineering;
the calculating of the road construction task completion score according to the regional planning target and the annual target of the target construction task and the annual completion data of the target construction task comprises the following steps:
calculating the annual completion rate of each target construction task according to the regional planning target and the annual target of each target construction task and the annual completion data of each target construction task;
Wherein,is the n-th i The assessment weight of the annual objective construction task k,is the n-th i The annual completion rate of a target construction task k is positive integer, m =6, wherein k =1 corresponds to the road construction investment amount of the region, k =2 corresponds to the newly-reconstructed mileage, k =3 corresponds to the construction of the third-level highway of the town road, k =4 corresponds to the construction of the hardened road of the natural village road, k =5 corresponds to the reconstruction of the dangerous bridge, and k =6 corresponds to the security engineering of the village road.
3. The method of claim 2, wherein the step of generating the second signal comprises generating a second signal based on the first signal and the second signalObtained according to the following method:
4. The method of claim 1, wherein the targeted maintenance tasks include: evaluating the excellent road rate of the common provincial road, the first and second bridge occupation ratio of the common provincial road bridge, evaluating the excellent road rate of the rural highway and the first and second bridge occupation ratio of the rural highway bridge;
the calculating of the road maintenance task completion score according to the annual completion data of the target maintenance task comprises the following steps:
Wherein,is n th i The assessment weight of the annual objective maintenance task k,is n th i The annual completion rate of the annual target maintenance task k is a positive integer, m =4, wherein k =1 is corresponding to the excellent road rate of the ordinary provincial road, k =2 is corresponding to the occupation ratio of the primary and secondary bridges of the ordinary provincial road bridge, k =3 is corresponding to the excellent road rate of the rural road, and k =4 is corresponding to the occupation ratio of the primary and secondary bridges of the rural road bridge.
5. The method of claim 4, wherein the step of determining the target position is performed by a computerObtained according to the following method:
6. The method of claim 1, wherein the target local financial commitment task comprises: the method comprises the following steps of (1) carrying out local financial investment on common provincial road construction, local financial investment on common provincial road maintenance, local financial investment on rural highway construction and local financial investment on rural highway maintenance;
the calculating a local financial investment task completion score according to the annual completion data of the target local financial investment task comprises the following steps:
Wherein,is n th i Assessment weight of annual objective local financial investment task k,is n th i Local financial investment of annual objectiveThe annual completion rate of the task k is a positive integer, m =4, wherein k =1 corresponds to the financial investment of a common provincial road building place, k =2 corresponds to the financial investment of a common provincial road maintenance place, k =3 corresponds to the financial investment of a rural road building place, and k =4 corresponds to the financial investment of a rural road maintenance place.
7. The method of claim 6, wherein the step of determining the target position is performed by a computerObtained according to the following method:
8. The method of claim 1, wherein said calculating the road assessment evaluation score based on the road construction task completion score, the road maintenance task completion score, and the local financial investment task completion score comprises:
9. The method of claim 1,
the road construction task score is obtained based on the annual completion condition of the target construction task compared with the annual plan completion condition;
the road maintenance task completion score is obtained based on the annual completion condition of the target maintenance task compared with the previous annual base number;
the local financial investment task completion score is based on an annual completion of the target local financial investment task compared to a last annual base.
10. A road assessment evaluation device is characterized by comprising:
the acquisition module is used for acquiring a regional planning target and an annual target of a target construction task in a regional plan, annual completion data of the target construction task, annual completion data of a target maintenance task and annual completion data of a target local financial investment task;
the first calculation module is used for calculating a road construction task completion score according to a regional planning target and an annual target of the target construction task and annual completion data of the target construction task;
the second calculation module is used for calculating the road maintenance task completion score according to the annual completion data of the target maintenance task;
the third calculation module is used for calculating the completion score of the local financial investment tasks according to the annual completion data of the target local financial investment tasks;
and the fourth calculation module is used for calculating the road assessment evaluation score according to the road construction task completion score, the road maintenance task completion score and the local financial investment task completion score.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211067584.5A CN115147018A (en) | 2022-09-01 | 2022-09-01 | Road assessment evaluation method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211067584.5A CN115147018A (en) | 2022-09-01 | 2022-09-01 | Road assessment evaluation method and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115147018A true CN115147018A (en) | 2022-10-04 |
Family
ID=83415638
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202211067584.5A Pending CN115147018A (en) | 2022-09-01 | 2022-09-01 | Road assessment evaluation method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115147018A (en) |
-
2022
- 2022-09-01 CN CN202211067584.5A patent/CN115147018A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Xu et al. | Highways and industrial development in the peripheral regions of China | |
CN111160728B (en) | Road and bridge maintenance decision optimization method and device | |
Berry et al. | Urban regeneration: property investment and development | |
Abraham George et al. | A performance benchmarking study of Indian Railway zones | |
Jia et al. | Effect of APCF policy on the haze pollution in China: A system dynamics approach | |
Chen et al. | High speed rail and China’s new economic geography: Impact assessment from the regional science perspective | |
CN112734213B (en) | Body-based highway bridge technical condition inspection and evaluation method | |
Nall et al. | What Did Interstate Highways Do to Urban Neighborhoods? | |
Dong et al. | Capital flows under integration: Evidence from China's metropolitan area development planning | |
CN105654722A (en) | Road programming method based on speeds | |
CN115147018A (en) | Road assessment evaluation method and device | |
Sun et al. | An AHP-Fuzzy comprehensive evaluation model for parking lots in urban CBD area | |
CN112100731B (en) | Method and system for establishing fatigue load calculation model | |
Ming et al. | The performance evaluation of expressway PPP project during operation period based on RF | |
Wang et al. | Study on the risk evaluation model of utility tunnel project under a PPP mode | |
Batouli et al. | A simulation framework for network level cost analysis in infrastructure systems | |
Cao et al. | Application of energy performance contracting in building energy saving | |
Barde et al. | Transportation Costs in the Age of Highways: Evidence from United States 1955-2010 | |
Siddiqui et al. | Impact of oil exports on growth of the economy of Oman | |
Kamal | GIS and Site Suitability for Sustainable Residential Communities: Three case studies from the USA | |
Morton et al. | Using TRANUS to construct a land use-transportation-emissions model of Charlotte, North Carolina | |
Zhang et al. | A smoothness control method for kilometer‐span railway bridges with analysis of track characteristics | |
Li et al. | Research on productive efficiency measurement and influence factors based on DEA window analysis and Tobit model: An illustrative example of Chinese toll highway enterprises | |
CN117522170A (en) | Urban village land utilization transformation potential analysis system | |
Fan et al. | Improving the movements of people and freight: A case study of the piedmont Atlantic megaregion |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20221004 |
|
RJ01 | Rejection of invention patent application after publication |