CN115140605A - Cable construction draw gear for power engineering - Google Patents

Cable construction draw gear for power engineering Download PDF

Info

Publication number
CN115140605A
CN115140605A CN202210756150.XA CN202210756150A CN115140605A CN 115140605 A CN115140605 A CN 115140605A CN 202210756150 A CN202210756150 A CN 202210756150A CN 115140605 A CN115140605 A CN 115140605A
Authority
CN
China
Prior art keywords
fixedly connected
power engineering
cable
plate
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210756150.XA
Other languages
Chinese (zh)
Inventor
王培川
蔺颖平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Power Transmission And Distribution Engineering Co ltd
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
Tianjin Power Transmission And Distribution Engineering Co ltd
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Power Transmission And Distribution Engineering Co ltd, State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical Tianjin Power Transmission And Distribution Engineering Co ltd
Priority to CN202210756150.XA priority Critical patent/CN115140605A/en
Publication of CN115140605A publication Critical patent/CN115140605A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H49/00Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
    • B65H49/38Skips, cages, racks, or containers, adapted solely for the transport or storage of bobbins, cops, or the like
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B1/00Cleaning by methods involving the use of tools
    • B08B1/20Cleaning of moving articles, e.g. of moving webs or of objects on a conveyor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H49/00Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
    • B65H49/18Methods or apparatus in which packages rotate
    • B65H49/20Package-supporting devices
    • B65H49/30Swifts or skein holders
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H57/00Guides for filamentary materials; Supports therefor
    • B65H57/14Pulleys, rollers, or rotary bars
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/34Handled filamentary material electric cords or electric power cables

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention relates to the technical field of electric power engineering, in particular to a cable construction traction device for electric power engineering, which comprises a moving trolley, wherein the upper surface of the moving trolley is fixedly connected with a push handle, the upper surface of the moving trolley is fixedly connected with a positioning frame, the inner wall of the positioning frame is rotatably connected with a winding roller, the upper surface of the moving trolley is fixedly connected with a guide frame, the left side of the moving trolley is fixedly connected with a positioning plate, the upper surface of the positioning plate is provided with a through hole, the inner wall of the through hole is fixedly connected with the guide roller, the lower surface of the positioning plate is fixedly connected with a strip-shaped frame, the inner top wall of the strip-shaped frame is fixedly connected with a first spring, the inner wall of the strip-shaped frame is slidably connected with a moving plate, the lower surface of the moving plate is fixedly connected with an ejector rod, and the bottom end of the ejector rod is fixedly connected with an arc-shaped pressing plate. Need not staff's manual operation, it is better to the pulling effect of cable, has improved cable installation efficiency, and has reduced staff's intensity of labour.

Description

Cable construction draw gear for power engineering
Technical Field
The invention relates to the technical field of power engineering, in particular to a cable construction traction device for power engineering.
Background
The cable is an electric energy or signal transmission device, comprises several or several group's wire usually, in all kinds of electric power engineering work progress, all need install fixedly to the cable usually to ensure that electric power and signal can normally carry the use, consequently need draw the operation to the cable.
Current cable traction mode, mostly all be with the one end fixed mounting back of cable, through the manual roll-up roller of taking of staff to carry out the manual unwrapping wire of slow moving's mode and pull the operation, however this kind of traction mode is not only inefficient, needs the staff to compress tightly the processing with the cable after pulling many times moreover, and intensity of labour is higher, and is comparatively inconvenient.
Disclosure of Invention
In order to effectively solve the problems in the background technology, the invention provides a cable construction traction device for an electric power engineering.
The specific technical scheme is as follows:
the utility model provides a cable construction draw gear for power engineering, includes the travelling car, the last fixed surface of travelling car is connected with and pushes away the handle, the last fixed surface of travelling car is connected with the locating rack, the inner wall of locating rack rotates and is connected with the roll-up roller, the last fixed surface of travelling car is connected with the guide frame, the left side fixedly connected with locating plate of travelling car, the through-hole has been seted up to the upper surface of locating plate, the inner wall fixedly connected with guide roller of through-hole, the lower fixed surface of locating plate is connected with the bar frame, the first spring of interior roof fixedly connected with of bar frame, the inner wall sliding connection of bar frame has the movable plate, the lower fixed surface of movable plate is connected with the ejector pin, the bottom fixedly connected with arc clamp plate of ejector pin.
Preferably, the bottom end of the first spring is fixedly connected with the upper surface of the moving plate, and the lower surface of the strip-shaped frame is provided with a fixing hole matched with the ejector rod.
Preferably, a round hole is formed in the side face of the guide frame, and two fixing cavities are formed in the guide frame.
Preferably, the inner wall of the fixed cavity is slidably connected with a movable plate, and the inner wall of the fixed cavity is fixedly connected with a second spring.
Preferably, opposite ends of the two second springs are fixedly connected with the opposite sides of the two movable plates respectively.
Preferably, the opposite surfaces of the two movable plates are fixedly connected with connecting rods, and the opposite ends of the two connecting rods are fixedly connected with arc-shaped cleaning pads.
Compared with the prior art, the invention has the beneficial effects that: 1. this cable construction draw gear for power engineering, with the one end fixed mounting back of cable, the pulling travelling car, drive the roll-up roller and rotate, make the cable automatic carry out the unwrapping wire at the roll-up roller, the cable passes through the through-hole and the overlap joint is on the guide roll simultaneously, effort through first spring can drive the movable plate all the time, ejector pin and arc clamp plate compress tightly the cable in ground, need not staff manual operation, the pulling effect to the cable is better, the cable installation efficiency is improved, and staff's intensity of labour has been reduced.
2. This cable construction draw gear for power engineering, when the round hole of guide frame side was passed to the cable, two second springs can drive the surface contact of two arc cleaning pads and cable through fly leaf and connecting rod to quick with the impurity clean up of cable surface, ensure that the cable can not have impurity on its surface after the installation, improved the protection effect to the cable, it is more convenient during the use.
Drawings
FIG. 1 is a schematic front sectional view of the present invention;
FIG. 2 is an enlarged view of the structure at A in FIG. 1;
FIG. 3 is a schematic side sectional view of the guide frame of the present invention;
in the figure: the cleaning pad comprises a moving trolley 1, a positioning frame 2, a winding roller 3, a guide frame 4, a positioning plate 5, a guide roller 6, a strip-shaped frame 7, a first spring 8, a moving plate 9, a push rod 10, an arc-shaped pressing plate 11, a moving plate 12, a second spring 13, a connecting rod 14 and an arc-shaped cleaning pad 15.
Detailed Description
For ease of description, spatially relative terms such as "over 8230 \ 8230;,"' over 8230;, \8230; upper surface "," above ", etc. may be used herein to describe the spatial relationship of one device or feature to another device or feature as shown in the figures. It will be understood that the spatially relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the figures. For example, if a device in the figures is turned over, devices described as "above" or "on" other devices or configurations would then be oriented "below" or "under" the other devices or configurations. Thus, the exemplary terms "at 8230; \8230; above" may include both orientations "at 8230; \8230; above" and "at 8230; \8230; below". The device may also be oriented 90 degrees or at other orientations and the spatially relative descriptors used herein interpreted accordingly.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a cable construction draw gear for power engineering, includes travelling car 1, the last fixed surface of travelling car 1 is connected with and pushes away the handle, the last fixed surface of travelling car 1 is connected with locating rack 2, the inner wall of locating rack 2 rotates and is connected with roll-up roller 3, the last fixed surface of travelling car 1 is connected with guide frame 4, the left side fixedly connected with locating plate 5 of travelling car 1, the through-hole has been seted up to the upper surface of locating plate 5, the inner wall fixedly connected with guide roll 6 of through-hole.
The lower fixed surface of locating plate 5 is connected with bar frame 7, the first spring 8 of the interior roof fixedly connected with of bar frame 7, and the inner wall sliding connection of bar frame 7 has movable plate 9, and the bottom of first spring 8 is connected with the last fixed surface of movable plate 9, and the lower fixed surface of movable plate 9 is connected with ejector pin 10, and the fixed orifices with ejector pin 10 looks adaptation is seted up to the lower surface of bar frame 7, and the bottom fixedly connected with arc clamp plate 11 of ejector pin 10.
After the one end fixed mounting with the cable, pulling travelling car 1 drives the roll-up roller 3 and rotates, makes the cable automatic carry out the unwrapping wire at roll-up roller 3, and the cable passes through the through-hole and the overlap joint is on guide roll 6 simultaneously, through the effort of first spring 8, can drive movable plate 9, ejector pin 10 and arc clamp plate 11 all the time and compress tightly the cable in ground, need not staff manual operation, and is better to the pulling effect of cable, has improved cable installation efficiency, and has reduced staff's intensity of labour.
The round hole has been seted up to the side of guide frame 4, two fixed chambeies have been seted up to the inside of guide frame 4, the inner wall sliding connection in fixed chamber has fly leaf 12, the inner wall fixedly connected with second spring 13 in fixed chamber, two second spring 13 the looks remote site respectively with two fly leaf 12 back of the body fixed connection, the equal fixedly connected with connecting rod 14 of the opposite face of two fly leaves 12, and the equal fixedly connected with arc cleaning pad 15 of the looks remote site of two connecting rods 14.
When the cable passes the round hole of guide frame 4 side, two second springs 13 can drive the surface contact of two arc cleaning pads 15 and cable through fly leaf 12 and connecting rod 14 to quick with the surperficial impurity clean up of cable, ensure that its surface of cable can not have impurity after the installation, improved the protection effect to the cable, it is more convenient during the use.
The working principle is as follows: when using this cable construction draw gear, at first carry out fixed mounting with the one end of cable, pulling travelling car 1 removes, the one end of cable on the roll-up roller 3, though travelling car 1 removes, can drive roll-up roller 3 automatically through the tension of cable and rotate, make the cable can be pulled automatically and drag, travelling car 1 is at the removal in-process, first spring 8 can compress tightly the cable subaerial through movable plate 9, ejector pin 10 and arc clamp plate 11 all the time, thereby it compresses tightly the cable to need not the staff manual, the pulling effect to the cable has been improved, staff's intensity of labour has been reduced, the cable is when passing guide frame 4 simultaneously, two arc cleaning pads 15 can with cable surface contact, thereby clear up the impurity on cable surface fast, ensure that the cable can not have impurity in the installation back surface, thereby the protection effect to the cable has been improved.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (6)

1. The utility model provides a cable construction draw gear for electric power engineering which characterized in that: including the travelling car, the last fixed surface of travelling car is connected with and pushes away the handle, the last fixed surface of travelling car is connected with the locating rack, the inner wall of locating rack rotates and is connected with the roll-up roller, the last fixed surface of travelling car is connected with the guide frame, the left side fixedly connected with locating plate of travelling car, the through-hole has been seted up to the upper surface of locating plate, the inner wall fixedly connected with guide roller of through-hole, the lower fixed surface of locating plate is connected with the bar frame, the first spring of interior roof fixedly connected with of bar frame, the inner wall sliding connection of bar frame has the movable plate, the lower fixed surface of movable plate is connected with the ejector pin, the bottom fixedly connected with arc clamp plate of ejector pin.
2. The cable construction traction device for the electric power engineering as claimed in claim 1, wherein the bottom end of the first spring is fixedly connected with the upper surface of the moving plate, and the lower surface of the bar-shaped frame is provided with a fixing hole matched with the ejector rod.
3. The power engineering cable construction traction device as claimed in claim 1, wherein a circular hole is formed in a side surface of the guide frame, and two fixing cavities are formed in the guide frame.
4. The cable construction traction device for the electric power engineering according to claim 1, wherein a movable plate is slidably connected to the inner wall of the fixed cavity, and a second spring is fixedly connected to the inner wall of the fixed cavity.
5. The cable construction pulling device for power engineering according to claim 1, wherein opposite ends of the two second springs are fixedly connected to opposite sides of the two movable plates, respectively.
6. The cable construction pulling apparatus for power engineering as defined in claim 1, wherein the opposite surfaces of the two movable plates are fixedly connected with connecting rods, and opposite ends of the two connecting rods are fixedly connected with arc-shaped cleaning pads.
CN202210756150.XA 2022-06-30 2022-06-30 Cable construction draw gear for power engineering Pending CN115140605A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210756150.XA CN115140605A (en) 2022-06-30 2022-06-30 Cable construction draw gear for power engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210756150.XA CN115140605A (en) 2022-06-30 2022-06-30 Cable construction draw gear for power engineering

Publications (1)

Publication Number Publication Date
CN115140605A true CN115140605A (en) 2022-10-04

Family

ID=83410899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210756150.XA Pending CN115140605A (en) 2022-06-30 2022-06-30 Cable construction draw gear for power engineering

Country Status (1)

Country Link
CN (1) CN115140605A (en)

Similar Documents

Publication Publication Date Title
CN211769417U (en) Cable winding device
CN115140605A (en) Cable construction draw gear for power engineering
CN219058116U (en) Convenient wire and cable coiling device
CN218102339U (en) Construction is with supplementary threading instrument
CN217807694U (en) Coiling mechanism of elastic cord production usefulness
CN216105397U (en) Cable winding and unwinding devices that electromechanical engineering facilitates use
CN216982005U (en) Network monitoring camera device capable of sensing temperature
CN216335779U (en) Electric power installation pay-off
CN212863634U (en) Automatic cable winding and unwinding device for electromechanical installation
CN112279009A (en) Hand-push type cable pulling device
CN113579959B (en) Portable rust cleaning equipment for H-shaped steel welding bead in steel structure parking equipment
CN216818113U (en) Use stable brake pull rod
CN216035649U (en) Join in marriage net terminal label sticking device for power shell
CN212831984U (en) Cable traction auxiliary device capable of avoiding deviation
CN212503380U (en) Draw gear is used in cable processing
CN219173888U (en) Colliery well cable traction mechanism
CN217087339U (en) Based on building threading construction equipment for electrical engineering
CN217239950U (en) Connecting device for cable and wire
CN219567154U (en) Threading construction device
CN214455781U (en) Iron accessory line bundling device for high-altitude power transmission line
CN214243319U (en) Cable removes fixing device for electric power construction
CN215183306U (en) Waste aluminum alloy wire recovery device
CN220011535U (en) Irrigation coiled pipe equipment for farmland construction
CN213802324U (en) Electric wire uniform winding and winding device capable of erasing dust adhered to outer wall of electric wire
CN216141067U (en) Camera with cable winding and unwinding functions

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination