CN115070645A CN202210798393.XA CN202210798393A CN115070645A CN 115070645 A CN115070645 A CN 115070645A CN 202210798393 A CN202210798393 A CN 202210798393A CN 115070645 A CN115070645 A CN 115070645A
Authority
CN
China
Prior art keywords
arc
shaped
rod
supporting
threaded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210798393.XA
Other languages
Chinese (zh)
Inventor
冯会强
张敏
冯亮亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Tianwei Pipe Industry Co ltd
Original Assignee
Dalian Tianwei Pipe Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Tianwei Pipe Industry Co ltd filed Critical Dalian Tianwei Pipe Industry Co ltd
Priority to CN202210798393.XA priority Critical patent/CN115070645A/en
Publication of CN115070645A publication Critical patent/CN115070645A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B11/00Work holders not covered by any preceding group in the subclass, e.g. magnetic work holders, vacuum work holders

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a lifting support device for pipeline processing, which comprises a bearing frame, wherein a lifting bearing structure is arranged on the bearing frame, and a fixed clamping structure is arranged on the lifting bearing structure; the lifting bearing structure comprises: the device comprises a first sleeve, a first supporting rod, a cross beam, a first arc-shaped cover body and an arc-shaped bracket; the pipeline supporting device has the advantages that two supporting pipelines can be used, the two ends of each pipeline can be supported, the pipeline can be conveniently and reasonably supported and carried through the lifting bearing structures, the position can be adjusted when the pipeline is supported, the pipeline can be fixedly clamped after the position is adjusted, the use is flexible, the supporting position is increased, and the pipeline can be conveniently and fixedly clamped through the fixing clamping structures, so that the requirement of fixed support is met.

Description

Lifting and supporting device for pipeline machining
Technical Field
The invention relates to the field of pipeline support, in particular to a lifting support device for pipeline processing.
Background
The pipeline is adding man-hour, often places subaerial, leads to the pipeline to spray paint again or other add man-hours, and the pipeline wall often directly contacts with ground, leads to processing to receive the resistance, so add man-hour in pipeline production, need carry out reasonable fixed stay to be convenient for support the back to the pipeline, process rationally.
Disclosure of Invention
The invention aims to solve the problems and designs a lifting support device for pipeline machining.
The technical scheme of the invention is that the lifting support device for pipeline processing comprises a bearing frame, wherein a lifting bearing structure is arranged on the bearing frame, and a fixed clamping structure is arranged on the lifting bearing structure;
the lifting bearing structure comprises: the device comprises a first sleeve, a first supporting rod, a cross beam, a first arc-shaped cover body and an arc-shaped bracket;
the first sleeve is arranged on the bearing frame, the first support rod is inserted on the first sleeve, the crossbeam is arranged on the first support rod, the first support rod is obliquely provided with a first support column, the arc-shaped bracket is arranged on the first support column, a first strip-shaped groove is formed in the arc-shaped bracket, a first arc-shaped rod is arranged in the first strip-shaped groove, the first arc-shaped rod is sleeved with a first roller, the arc-shaped bracket is provided with a first support column, a first support seat is fixed on the first sleeve, a second sleeve is arranged on the first support seat, a second support rod is sleeved on the second sleeve, a first support seat is fixed on the second support rod, the crossbeam is arranged on the first support seat, a connecting rod is fixed on the lower wall surface of the crossbeam, the first arc-shaped cover body is provided with a first clamping groove matched with the first support column, first circular through-hole has been seted up to first arc cover body lateral wall face, first arc cover body both sides are fixed with the first mount corresponding with first circular through-hole position, position hole has been seted up on the first mount, the interior cartridge of position hole has first guide arm, it is internal to stretch into first arc cover through first circular through-hole on the first guide arm, install the slope baffle on the first guide arm, the cover is equipped with first spring on the first guide arm, arc bracket both sides lateral wall face is fixed with the second guide arm, every all the cover is equipped with the annular frame on the second guide arm, install the bar seat on the annular frame, install a pair of corresponding arc tray in position on the bar seat, it is a pair of arc tray internal diameter variation in size.
The fixed clamp structure includes: the second bearing, the folding frame, the third sleeve and the third support rod;
the second bearing is arranged on the bearing frame, a cylinder is arranged on the second bearing, the third sleeve is arranged on the cylinder, a third supporting rod is inserted into the third sleeve, a second inserting hole is formed in the third supporting rod, a third guide rod is inserted into the second inserting hole, the folding frame is arranged on the third supporting rod, a third inserting hole is formed in the folding frame, a fourth guide rod is inserted into the third inserting hole, and an arc-shaped plate is arranged on each fourth guide rod.
A first slot is formed in the arc-shaped tray, an upright post is inserted into the first jack, and a moving roller is installed at the lower end of the upright post.
A first strip-shaped groove is formed in the inclined baffle, a third bearing with a corresponding position is inserted into the first strip-shaped groove, and a roller shaft is mounted on the third bearing with the corresponding position.
The bearing frame is provided with a support frame, and the support frame is provided with a pulley.
The folding frame is provided with a first barrel corresponding to the third jack, a first threaded hole is formed in the first barrel, a first threaded groove matched with the first threaded hole is formed in the fourth guide rod, and a first screw in lap joint with the first threaded groove is inserted in the first threaded hole.
The cylinder is sleeved with an annular gasket, a second threaded hole is formed in the annular gasket, a second threaded groove matched with the second threaded hole is formed in the bearing frame, and a second screw in lap joint with the second threaded groove is inserted in the second threaded hole.
The third cylinder is sleeved with a third guide rod, a third threaded opening is formed in the second cylinder, a third threaded groove matched with the third threaded opening is formed in the third guide rod, and a third screw lapped with the third threaded groove is inserted in the third threaded opening.
And a fourth threaded hole is formed in the annular frame, a fourth threaded groove matched with the fourth threaded hole is formed in the second guide rod, and a fourth screw in lap joint with the fourth threaded groove is inserted in the fourth threaded hole.
The first sleeve is provided with a fifth threaded hole, the first support rod is provided with a fifth threaded groove matched with the fifth threaded hole, and a fifth screw lapped with the fifth threaded groove is inserted into the fifth threaded hole.
The lifting support device for pipeline processing manufactured by the technical scheme of the invention is convenient for reasonably supporting and bearing a pipeline through the lifting bearing structure, can adjust the position when the pipeline is supported, and fixedly clamps the pipeline after adjusting the position, is convenient to use and flexible, and simultaneously increases the supporting position, and is convenient for fixedly clamping the pipeline through the fixed clamping structure, thereby meeting the requirement of fixed support.
Drawings
FIG. 1 is a schematic structural view of a lifting support device for pipe machining according to the present invention;
FIG. 2 is a side cross-sectional view of an arcuate cradle for a pipe machining lift support apparatus according to the present invention;
FIG. 3 is a side view of an arcuate pallet for a pipe machining lift support apparatus according to the present invention;
FIG. 4 is a side view of a folding frame for a pipe machining lifting support device according to the present invention;
in the drawings, 1, a loading frame; 2. a first sleeve; 3. a first support bar; 4. a cross beam; 5. a first arc-shaped cover body; 6. an arc bracket; 7. a first support column; 8. a fifth screw; 9. a first arcuate bar; 10. a first roller; 11. a first support; 12. a first support base; 13. a second sleeve; 14. a second support bar; 15. a first support; 16. a first fixing frame; 17. a first guide bar; 18. an inclined baffle plate; 19. a first spring; 20. a second guide bar; 21. an annular frame; 22. a strip-shaped seat; 23. an arc-shaped tray; 24. a second bearing; 25. folding a mould frame; 26. a third sleeve; 27. a third strut; 28. a cylinder; 29. a third guide bar; 30. a fourth guide bar; 31. an arc-shaped plate; 32. moving the roller; 33. a roll shaft; 34. a support frame; 35. a pulley; 36. a first cylinder; 37. an annular gasket; 38. a second screw; 39. a bar-shaped rod; 40. a third screw; 41. a fourth screw; 42. a second cylinder; 43. a column; 44. a connecting rod.
Detailed Description
The invention is described in detail with reference to the accompanying drawings, and as shown in fig. 1-4, a lifting support device for pipeline processing comprises a bearing frame 1, wherein a lifting bearing structure is mounted on the bearing frame 1, and a fixing and clamping structure is arranged on the lifting bearing structure; the lift load bearing structure includes: the device comprises a first sleeve 2, a first supporting rod 3, a cross beam 4, a first arc-shaped cover body 5 and an arc-shaped bracket 6; the first sleeve 2 is arranged on the bearing frame 1, the first support rod 3 is inserted on the first sleeve 2, the crossbeam 4 is arranged on the first support rod 3, the first support column 7 is obliquely arranged on the first support rod 3, the arc-shaped bracket 6 is arranged on the first support column 7, a first strip-shaped groove is arranged in the arc-shaped bracket 6, a first arc-shaped rod 9 is arranged in the first strip-shaped groove, a first roller 10 is sleeved on the first arc-shaped rod 9, a first support column 11 is arranged on the arc-shaped bracket 6, a first support seat 12 is fixed on the first sleeve 2, a second sleeve 13 is arranged on the first support seat 12, a second support rod 14 is sleeved on the second sleeve 13, a first support seat 15 is fixed on the second support rod 14, the crossbeam 4 is arranged on the first support seat 15, a connecting rod 44 is fixed on the lower wall surface of the crossbeam 4, the first arc-shaped cover body 5 is provided with a first clamping groove matched with the first support column 11, a first circular through hole is formed in the side wall surface of the first arc-shaped cover body 5, first fixing frames 16 corresponding to the first circular through hole are fixed on the two sides of the first arc-shaped cover body 5, position holes are formed in the first fixing frames 16, first guide rods 17 are inserted into the position holes, the first guide rods 17 extend into the first arc-shaped cover body 5 through the first circular through holes, inclined baffles 18 are installed on the first guide rods 17, first springs 19 are sleeved on the first guide rods 17, second guide rods 20 are fixed on the two side wall surfaces of the arc-shaped bracket 6, an annular frame 21 is sleeved on each second guide rod 20, a strip-shaped seat 22 is installed on each annular frame 21, a pair of arc-shaped trays 23 corresponding to the positions are installed on each strip-shaped seat 22, and the inner diameters of the pair of arc-shaped trays 23 are different; the fixed clamping structure includes: a second bearing 24, a folding frame 25, a third sleeve 26 and a third supporting rod 27; the second bearing 24 is arranged on the bearing frame 1, a cylinder 28 is arranged on the second bearing 24, a third sleeve 26 is arranged on the cylinder 28, a third supporting rod 27 is inserted into the third sleeve 26, a second inserting hole is formed in the third supporting rod 27, a third guide rod 29 is inserted into the second inserting hole, the folding frame 25 is arranged on the third supporting rod 27, a third inserting hole is formed in the folding frame 25, a fourth guide rod 30 is inserted into the third inserting hole, and an arc-shaped plate 31 is arranged on each fourth guide rod 30; a first slot is formed in the arc-shaped tray 23, an upright column 43 is inserted into the first slot, and a movable roller 32 is arranged at the lower end of the upright column 43; a first strip-shaped groove is formed in the inclined baffle 18, a third bearing with a corresponding position is inserted in the first strip-shaped groove, and a roller shaft 33 is arranged on the third bearing with the corresponding position; a support frame 34 is arranged on the bearing frame 1, and a pulley 35 is arranged on the support frame 34; the first barrel 36 corresponding to the third jack is mounted on the folding frame 25, a first threaded hole is formed in the first barrel 36, a first threaded groove matched with the first threaded hole is formed in the fourth guide rod 30, and a first screw lapped with the first threaded groove is inserted into the first threaded hole; the cylinder 28 is sleeved with an annular gasket 37, the annular gasket 37 is provided with a second threaded hole, the bearing frame 1 is provided with a second threaded groove matched with the second threaded hole, and a second screw 38 lapped with the second threaded groove is inserted in the second threaded hole; a bar-shaped rod 39 is obliquely arranged on the third supporting rod 27, a second cylinder 42 is arranged on the bar-shaped rod 39, the third guide rod 29 is sleeved in the second cylinder 42, a third threaded hole is formed in the second cylinder 42, a third threaded groove matched with the third threaded hole is formed in the third guide rod 29, and a third screw 40 lapped with the third threaded groove is inserted in the third threaded hole; a fourth threaded hole is formed in the annular frame 21, a fourth threaded groove matched with the fourth threaded hole is formed in the second guide rod 20, and a fourth screw 41 lapped with the fourth threaded groove is inserted into the fourth threaded hole; a fifth threaded hole is formed in the first sleeve 2, a fifth threaded groove matched with the fifth threaded hole is formed in the first support rod 3, and a fifth screw 8 lapped with the fifth threaded groove is inserted into the fifth threaded hole.
The lifting bearing structure is characterized by comprising a bearing frame 1 and characterized in that the bearing frame 1 is provided with a lifting bearing structure, and the lifting bearing structure is provided with a fixed clamping structure;
the lift load bearing structure includes: the device comprises a first sleeve 2, a first supporting rod 3, a cross beam 4, a first arc-shaped cover body 5 and an arc-shaped bracket 6;
the first sleeve 2 is arranged on the bearing frame 1, the first support rod 3 is inserted on the first sleeve 2, the crossbeam 4 is arranged on the first support rod 3, the first support column 7 is obliquely arranged on the first support rod 3, the arc-shaped bracket 6 is arranged on the first support column 7, a first strip-shaped groove is arranged in the arc-shaped bracket 6, a first arc-shaped rod 9 is arranged in the first strip-shaped groove, a first roller 10 is sleeved on the first arc-shaped rod 9, a first support column 11 is arranged on the arc-shaped bracket 6, a first support seat 12 is fixed on the first sleeve 2, a second sleeve 13 is arranged on the first support seat 12, a second support rod 14 is sleeved on the second sleeve 13, a first support seat 15 is fixed on the second support rod 14, the crossbeam 4 is arranged on the first support seat 15, a connecting rod 44 is fixed on the lower wall surface of the crossbeam 4, the first arc-shaped cover body 5 is provided with a first clamping groove matched with the first support column 11, the side wall surface of the first arc-shaped cover body 5 is provided with a first circular through hole, two sides of the first arc-shaped cover body 5 are fixed with a first fixing frame 16 corresponding to the first circular through hole, the first fixing frame 16 is provided with a position hole, a first guide rod 17 is inserted in the position hole, the first guide rod 17 extends into the first arc-shaped cover body 5 through the first circular through hole, the first guide rod 17 is provided with an inclined baffle 18, the first guide rod 17 is sleeved with a first spring 19, two side wall surfaces of the arc-shaped bracket 6 are fixed with second guide rods 20, each second guide rod 20 is sleeved with an annular frame 21, the annular frames 21 are provided with strip-shaped seats 22, the strip-shaped seats 22 are provided with a pair of arc-shaped trays 23 corresponding to the positions, the inner diameters of the pair of arc-shaped trays 23 are different in size, the pipeline can be reasonably supported and carried by a lifting bearing structure, and the device can adjust the position when the pipeline is supported, the pipeline is fixedly clamped after the position is adjusted, so that the use is flexible, the supporting position is additionally supported, and the pipeline is conveniently and fixedly clamped through a fixed clamping structure, so that the fixed support is met.
In the embodiment, the device comprises a bearing frame 1, wherein a lifting bearing structure is arranged on the bearing frame 1, and a fixed clamping structure is arranged on the lifting bearing structure;
the lift load bearing structure includes: the device comprises a first sleeve 2, a first supporting rod 3, a cross beam 4, a first arc-shaped cover body 5 and an arc-shaped bracket 6;
the first sleeve 2 is arranged on the bearing frame 1, the first support rod 3 is inserted on the first sleeve 2, the crossbeam 4 is arranged on the first support rod 3, the first support column 7 is obliquely arranged on the first support rod 3, the arc-shaped bracket 6 is arranged on the first support column 7, a first strip-shaped groove is arranged in the arc-shaped bracket 6, a first arc-shaped rod 9 is arranged in the first strip-shaped groove, a first roller 10 is sleeved on the first arc-shaped rod 9, a first support column 11 is arranged on the arc-shaped bracket 6, a first support seat 12 is fixed on the first sleeve 2, a second sleeve 13 is arranged on the first support seat 12, a second support rod 14 is sleeved on the second sleeve 13, a first support seat 15 is fixed on the second support rod 14, the crossbeam 4 is arranged on the first support seat 15, a connecting rod 44 is fixed on the lower wall surface of the crossbeam 4, the first arc-shaped cover body 5 is provided with a first clamping groove matched with the first support column 11, a first circular through hole is formed in the side wall surface of the first arc-shaped cover body 5, first fixing frames 16 corresponding to the first circular through hole are fixed on the two sides of the first arc-shaped cover body 5, position holes are formed in the first fixing frames 16, first guide rods 17 are inserted into the position holes, the first guide rods 17 extend into the first arc-shaped cover body 5 through the first circular through holes, inclined baffles 18 are installed on the first guide rods 17, first springs 19 are sleeved on the first guide rods 17, second guide rods 20 are fixed on the two side wall surfaces of the arc-shaped bracket 6, an annular frame 21 is sleeved on each second guide rod 20, a strip-shaped seat 22 is installed on each annular frame 21, a pair of arc-shaped trays 23 corresponding to the positions are installed on each strip-shaped seat 22, and the inner diameters of the pair of arc-shaped trays 23 are different;
it should be noted that: the bearing frame 1 plays a supporting role for supporting the first sleeve 2, the first support rod 3 on the first sleeve 2 can be pulled to reach the purpose that the first support rod 3 can be lifted and lowered to adjust the use height, the first support column 7 is used for supporting the arc bracket 6, the arc bracket 6 can be lifted and lowered to facilitate the placement of the pipe body, and the arc bracket 6 can be lifted and lowered to adjust the use height along with the first support rod 3, so as to adjust the use height, the first arc rod 9 on the arc bracket 6 is provided with the first idler wheel 10, the first idler wheel 10 is in lap joint with the pipe body, so that the pipe body can be pulled after being placed on the arc bracket 6, thereby reducing the friction resistance when moving the device or pulling the pipe body, the first support column 11 on the arc bracket 6 is convenient for the insertion of the first clamping groove on the first arc cover body 5, the first arc cover body 5 is supported by the connecting rod 44 on the cross beam 4, the crossbeam 4 is supported by the second support rod 14 on the second sleeve 13, the second support rod 14 can be pulled, so that the use height can be adjusted, the use height of the crossbeam 4 can be adjusted by moving up and down, the use height of the first arc cover body 5 can be adjusted, the pipe body is placed on the arc bracket 6, then the height of the second support rod 14 can be adjusted, so that the first arc cover body 5 is lowered, the first arc cover body 5 is conveniently inserted on the first support column 11 through the first clamping groove, the first arc cover body 5 is conveniently butted with the first arc bracket 6, then the inclined baffle 18 is pushed, the two sides of the pipeline are conveniently clamped through the inclined baffle 18, the first spring 19 has elasticity, the thrust of the inclined baffle 18 is conveniently given, the pipeline is conveniently clamped to be stable, the upper end of the pipeline is covered by the first arc cover body 5, the annular frame 21 on the second guide rod 20 can rotate, so that the arc trays 23 corresponding to one pair of positions can be conveniently turned over, the inner diameter of the arc-shaped tray 23 is different in size, so that the arc-shaped tray 23 can be adjusted conveniently according to different pipelines, the pipeline is supported by the arc-shaped tray 23, and a supporting pipeline is played.
The fixed clamping structure includes: a second bearing 24, a folding frame 25, a third sleeve 26 and a third supporting rod 27;
the second bearing 24 is arranged on the bearing frame 1, the second bearing 24 is provided with a cylinder 28, the third sleeve 26 is arranged on the cylinder 28, the third sleeve 26 is inserted with a third supporting rod 27, the third supporting rod 27 is provided with a second inserting hole, a third guide rod 29 is inserted in the second inserting hole, the folding frame 25 is arranged on the third supporting rod 27, the folding frame 25 is provided with a third inserting hole, a fourth guide rod 30 is inserted in the third inserting hole, and each fourth guide rod 30 is provided with an arc-shaped plate 31;
it should be noted that: bear on the frame 1 second bearing 24 the cylinder 28 of being convenient for and can rotate, the adjustment is rolled over type frame 25 use angle, roll over type frame 25 and rotate, insert the pipeline between the arc 31, through promoting third guide arm 29, let the arc 31 withstand the pipeline, be convenient for clip the pipeline, thereby play the fixed action, when the adjustment supported position, need not to clip the pipeline, it rotates or stimulates third guide arm 29 to rotate cylinder 28 the type frame 25 of being convenient for, let arc 31 and pipeline separately, be convenient for this device remove, or direct pulling pipeline.
As a preferred technical solution, furthermore, the arc tray 23 is provided with a first slot, the first slot is inserted with an upright column 43, and the lower end of the upright column 43 is provided with a moving roller 32; the arc-shaped tray 23 is convenient to support, the upright column 43 can be detached, and when any one arc-shaped tray 23 is used, the upright column 43 is detached and inserted into the arc-shaped tray 23 below to play a supporting role.
As a preferable technical scheme, furthermore, a first strip-shaped groove is formed in the inclined baffle 18, a second bearing 24 corresponding to the first strip-shaped groove is inserted in the first strip-shaped groove, and a roller shaft 33 is installed on the second bearing 24 corresponding to the first strip-shaped groove; the inclined baffle 18 supports the roller shaft 33 through the second bearing 24, and the roller shaft 33 is overlapped with the pipeline, so that friction is reduced, and the pipeline can move conveniently.
As a preferable technical scheme, furthermore, a supporting frame 34 is arranged on the bearing frame 1, and a pulley 35 is arranged on the supporting frame 34; the pulley 35 is used for facilitating the flexible movement of the device.
As a preferred technical solution, further, a first cylinder corresponding to the third insertion hole is installed on the folding frame 25, a first threaded hole is formed in the first cylinder 36, a first threaded groove matched with the first threaded hole is formed in the fourth guide rod 30, and a first screw overlapping with the first threaded groove is inserted into the first threaded hole; the fourth guide rod 30 is fixed by screwing the first screw.
As a preferable technical solution, further, an annular gasket 37 is sleeved on the cylinder 28, a second threaded hole is formed on the annular gasket 37, a second threaded groove matched with the second threaded hole is formed on the bearing frame 1, and a second screw 38 lapped with the second threaded groove is inserted into the second threaded hole; the second screw 38 is used for fixing the cylinder 28, thereby fixing the folding frame 25.
As a preferable technical solution, further, a bar-shaped rod 39 is obliquely installed on the third supporting rod 27, a second cylinder 42 is installed on the bar-shaped rod 39, the third guide rod 29 is sleeved in the second cylinder 42, a third threaded hole is formed in the second cylinder 42, a third threaded groove matched with the third threaded hole is formed in the third guide rod 29, and a third screw 40 overlapped with the third threaded groove is inserted in the third threaded hole; the third guide bar 29 is fixed by screwing the third screw 40.
As a preferable technical solution, further, a fourth threaded hole is formed on the annular frame 21, a fourth threaded groove matched with the fourth threaded hole is formed on the second guide rod 20, and a fourth screw 41 overlapped with the fourth threaded groove is inserted into the fourth threaded hole; the fourth screw 41 is screwed to fix the ring frame 21 and thus the arc-shaped tray 23.
As a preferable technical scheme, furthermore, a fifth threaded hole is formed in the first sleeve 2, a fifth threaded groove matched with the fifth threaded hole is formed in the first support rod 3, and a fifth screw 8 lapped with the fifth threaded groove is inserted into the fifth threaded hole; the first supporting rod 3 is convenient to fix by screwing the fifth screw 8.
The technical solutions described above only represent the preferred technical solutions of the present invention, and some possible modifications to some parts of the technical solutions by those skilled in the art all represent the principles of the present invention, and fall within the protection scope of the present invention.

Claims (10)

1. A lifting and supporting device for pipeline processing comprises a bearing frame (1), and is characterized in that a lifting bearing structure is mounted on the bearing frame (1), and a fixed clamping structure is arranged on the lifting bearing structure;
the lifting bearing structure comprises: the device comprises a first sleeve (2), a first support rod (3), a cross beam (4), a first arc-shaped cover body (5) and an arc-shaped bracket (6);
the first sleeve (2) is arranged on the bearing frame (1), the first supporting rod (3) is inserted into the first sleeve (2), the cross beam (4) is arranged on the first supporting rod (3), a first supporting column (7) is obliquely arranged on the first supporting rod (3), the arc-shaped bracket (6) is arranged on the first supporting column (7), a first strip-shaped groove is formed in the arc-shaped bracket (6), a first arc-shaped rod (9) is arranged in the first strip-shaped groove, a first roller (10) is sleeved on the first arc-shaped rod (9), a first supporting column (11) is arranged on the arc-shaped bracket (6), a first supporting seat (12) is fixed on the first sleeve (2), a second sleeve (13) is arranged on the first supporting seat (12), a second supporting rod (14) is sleeved on the second sleeve (13), and a first support (15) is fixed on the second supporting rod (14), the cross beam (4) is arranged on a first support (15), a connecting rod (44) is fixed on the lower wall surface of the cross beam (4), the first arc-shaped cover body (5) is provided with a first clamping groove matched with the first support (11), a first circular through hole is formed in the side wall surface of the first arc-shaped cover body (5), first fixing frames (16) corresponding to the first circular through hole are fixed on two sides of the first arc-shaped cover body (5), position holes are formed in the first fixing frames (16), a first guide rod (17) is inserted in the position holes, the first guide rod (17) extends into the first arc-shaped cover body (5) through the first circular through hole, an inclined baffle plate (18) is installed on the first guide rod (17), a first spring (19) is sleeved on the first guide rod (17), second guide rods (20) are fixed on two side wall surfaces of the arc-shaped bracket (6), every all the cover is equipped with annular frame (21) on second guide arm (20), install bar seat (22) on annular frame (21), install a pair of corresponding arc tray (23) in position on bar seat (22), it is a pair of arc tray (23) internal diameter variation in size.
2. The pipe machining lifting support device of claim 1, wherein the fixed clamp structure comprises: a second bearing (24), a folding frame (25), a third sleeve (26) and a third supporting rod (27);
the second bearing (24) is arranged on the bearing frame (1), a cylinder (28) is arranged on the second bearing (24), the third sleeve (26) is arranged on the cylinder (28), a third supporting rod (27) is inserted on the third sleeve (26), a second insertion hole is formed in the third supporting rod (27), a third guide rod (29) is inserted in the second insertion hole, the folding frame (25) is arranged on the third supporting rod (27), a third insertion hole is formed in the folding frame (25), a fourth guide rod (30) is inserted in the third insertion hole, and an arc-shaped plate (31) is arranged on each fourth guide rod (30).
3. The lifting and supporting device for the pipeline processing according to claim 1, wherein a first slot is formed on the arc-shaped tray (23), an upright column (43) is inserted into the first slot, and a moving roller (32) is installed at the lower end of the upright column (43).
4. The lifting and supporting device for pipeline processing according to claim 1, wherein a first strip-shaped groove is formed in the inclined baffle (18), a third bearing is inserted into the first strip-shaped groove and corresponds to the first strip-shaped groove, and a roller shaft (33) is mounted on the third bearing corresponding to the first strip-shaped groove.
5. The lifting and supporting device for the pipeline machining according to claim 1 is characterized in that a supporting frame (34) is arranged on the bearing frame (1), and a pulley (35) is arranged on the supporting frame (34).
6. The lifting support device for pipeline processing according to claim 2, wherein the folding frame (25) is provided with a first cylinder (36) corresponding to the third insertion hole, the first cylinder (36) is provided with a first threaded opening, the fourth guide rod (30) is provided with a first threaded groove matching with the first threaded opening, and a first screw overlapping with the first threaded groove is inserted into the first threaded opening.
7. The lifting support device for pipeline processing according to claim 1, wherein the cylinder (28) is sleeved with an annular gasket (37), the annular gasket (37) is provided with a second threaded opening, the bearing frame (1) is provided with a second threaded groove matched with the second threaded opening, and a second screw (38) overlapped with the second threaded groove is inserted into the second threaded opening.
8. The lifting and supporting device for pipeline processing according to claim 2, wherein a bar-shaped rod (39) is obliquely installed on the third supporting rod (27), a second cylinder (42) is installed on the bar-shaped rod (39), the third guide rod (29) is sleeved in the second cylinder (42), a third threaded hole is formed in the second cylinder (42), a third threaded groove matched with the third threaded hole is formed in the third guide rod (29), and a third screw (40) lapped with the third threaded groove is inserted in the third threaded hole.
9. The lifting and supporting device for the pipeline machining according to claim 1, wherein a fourth threaded hole is formed in the annular frame (21), a fourth threaded groove matched with the fourth threaded hole is formed in the second guide rod (20), and a fourth screw (41) overlapped with the fourth threaded groove is inserted into the fourth threaded hole.
10. The lifting and supporting device for the pipeline machining according to claim 1, wherein a fifth threaded hole is formed in the first sleeve (2), a fifth threaded groove matched with the fifth threaded hole is formed in the first supporting rod (3), and a fifth screw (8) overlapped with the fifth threaded groove is inserted into the fifth threaded hole.
CN202210798393.XA 2022-07-08 2022-07-08 Lifting and supporting device for pipeline machining Pending CN115070645A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210798393.XA CN115070645A (en) 2022-07-08 2022-07-08 Lifting and supporting device for pipeline machining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210798393.XA CN115070645A (en) 2022-07-08 2022-07-08 Lifting and supporting device for pipeline machining

Publications (1)

Publication Number Publication Date
CN115070645A true CN115070645A (en) 2022-09-20

Family

ID=83258071

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210798393.XA Pending CN115070645A (en) 2022-07-08 2022-07-08 Lifting and supporting device for pipeline machining

Country Status (1)

Country Link
CN (1) CN115070645A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201950799U (en) * 2010-12-27 2011-08-31 广东联塑机器制造有限公司 Support structure of variable-diameter pipe
KR20130049347A (en) * 2011-11-04 2013-05-14 한국항공우주연구원 Jig for mounting or demounting a pipe
CN209762442U (en) * 2019-03-01 2019-12-10 中国石油大学(华东) Multifunctional supporting equipment for pipeline installation
CN212986278U (en) * 2020-08-19 2021-04-16 济南建通管业有限公司 PPR pipe fitting is moulded to aluminum alloy lining
CN213177062U (en) * 2020-07-17 2021-05-11 西申(上海)新材料科技有限公司 Cold insulation pipe bracket
CN214274887U (en) * 2020-12-17 2021-09-24 武汉鑫丰腾工程科技有限公司 Be used for fire-fighting pipeline installation strutting arrangement
CN216045835U (en) * 2021-11-05 2022-03-15 罗仕富 Hydraulic pipeline strutting arrangement for hydraulic engineering

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201950799U (en) * 2010-12-27 2011-08-31 广东联塑机器制造有限公司 Support structure of variable-diameter pipe
KR20130049347A (en) * 2011-11-04 2013-05-14 한국항공우주연구원 Jig for mounting or demounting a pipe
CN209762442U (en) * 2019-03-01 2019-12-10 中国石油大学(华东) Multifunctional supporting equipment for pipeline installation
CN213177062U (en) * 2020-07-17 2021-05-11 西申(上海)新材料科技有限公司 Cold insulation pipe bracket
CN212986278U (en) * 2020-08-19 2021-04-16 济南建通管业有限公司 PPR pipe fitting is moulded to aluminum alloy lining
CN214274887U (en) * 2020-12-17 2021-09-24 武汉鑫丰腾工程科技有限公司 Be used for fire-fighting pipeline installation strutting arrangement
CN216045835U (en) * 2021-11-05 2022-03-15 罗仕富 Hydraulic pipeline strutting arrangement for hydraulic engineering

Similar Documents

Publication Publication Date Title
CN103506786B (en) A kind of rocking arm automatic welding device
CN209867761U (en) Assembled net rack support welding device
JPH10315085A (en) Aligning device for ring-shaped object
CN110757089A (en) Clamping device suitable for pipe fittings with different pipe diameters
CN115070645A (en) Lifting and supporting device for pipeline machining
CN203003381U (en) Clamp for welding side body assembly and underbody of automobile
CN111776623B (en) Books printing conveyer's holding down roller lifting structure
CN216781650U (en) Auxiliary device for butt joint installation of pressure pipelines
CN219211220U (en) Groove pressing machine for pipeline
CN216966874U (en) Assembling platform for abdominal tube of steel tube tower
CN211978578U (en) Hardness meter for pipeline detection
CN203357297U (en) Long pipe conveyor bracket
CN110861923B (en) Column-carrying type watch glass lens turn-over machine
JPH08276400A (en) Cutting device for foamed resin
CN114739828A (en) Mechanical property detection equipment for welding metal parts of suspension type magnetic levitation vehicle
CN210358624U (en) High-efficient adds clamping apparatus
CN213531170U (en) Automatic welding device for installing support weights at two ends of stabilizer bar
CN111482747A (en) Be applied to return bend fixed-position welding's tool
CN218983805U (en) Pipeline welding processing clamp convenient to butt joint
CN211102481U (en) Clamping device suitable for pipe fittings with different pipe diameters
CN211866969U (en) Positioning tool for spot welding of bus tube and bus joint
CN219263828U (en) Pipeline welding seam magnetic powder detection auxiliary device
CN216940371U (en) Pipeline under pressure installation bearing structure
CN213763808U (en) Aluminum ring bending forming device
CN219254860U (en) Cylinder sealing washer processing fixing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination