CN115065047A - Power distribution fault processing method and device based on continuous step-by-step power failure simulation - Google Patents

Power distribution fault processing method and device based on continuous step-by-step power failure simulation Download PDF

Info

Publication number
CN115065047A
CN115065047A CN202210527282.5A CN202210527282A CN115065047A CN 115065047 A CN115065047 A CN 115065047A CN 202210527282 A CN202210527282 A CN 202210527282A CN 115065047 A CN115065047 A CN 115065047A
Authority
CN
China
Prior art keywords
simulation
fault
result
data
target
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210527282.5A
Other languages
Chinese (zh)
Inventor
余文辉
吴争荣
章坚
周强辅
孙奇珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southern Power Grid Co Ltd
Original Assignee
China Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Southern Power Grid Co Ltd filed Critical China Southern Power Grid Co Ltd
Priority to CN202210527282.5A priority Critical patent/CN115065047A/en
Publication of CN115065047A publication Critical patent/CN115065047A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/001Methods to deal with contingencies, e.g. abnormalities, faults or failures
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/26Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开了一种基于可连续分步停电模拟的配电故障处理方法及装置,该方法包括:检测是否接收到模拟分析指令,若是,根据该指令确定执行线路故障模拟操作对应的当前进度,并根据当前进度加载对应的目标数据;根据目标数据生成模拟线路图,检测是否接收到图模编辑指令,若是,根据图模编辑指令确定目标变更图模并切换目标变更图模对应的图模状态,得到第一切换结果并生成对应的变更记录;分析第一切换结果,得到故障分析报告,并重复执行上述的检测是否接收到图模编辑指令对应的操作至检测到终止指令时,终止当前的模拟流程。可见,实施本发明能够通过分步式停电模拟技术,实现停复电模拟与实际抢修一致,提高了停复电信息的时效性和准确性。

Figure 202210527282

The invention discloses a power distribution fault processing method and device based on continuous step-by-step power failure simulation. The method includes: detecting whether a simulation analysis command is received; if so, determining the current progress corresponding to the line fault simulation operation according to the command; And load the corresponding target data according to the current progress; generate an analog circuit diagram according to the target data, detect whether the pattern editing instruction is received, if so, determine the target changing pattern according to the pattern editing instruction and switch the pattern state corresponding to the target changing pattern , obtain the first switching result and generate the corresponding change record; analyze the first switching result, obtain the failure analysis report, and repeat the above-mentioned operation of detecting whether the pattern editing instruction is received until the termination instruction is detected, terminate the current Simulate the process. It can be seen that the implementation of the present invention can realize the consistency between the power failure recovery simulation and the actual emergency repair through the step-by-step power failure simulation technology, and improve the timeliness and accuracy of the power failure recovery information.

Figure 202210527282

Description

基于可连续分步停电模拟的配电故障处理方法及装置Distribution fault processing method and device based on continuous step-by-step power outage simulation

技术领域technical field

本发明涉及停电模拟技术领域,尤其涉及一种基于可连续分步停电模拟的配电故障处理方法及装置。The invention relates to the technical field of power failure simulation, in particular to a power distribution fault processing method and device based on continuous step-by-step power failure simulation.

背景技术Background technique

中压配电网故障抢修通常包括故障跳闸、故障定位、故障点隔离、非故障段复电以及故障段抢修复电等环节。其中,故障抢修的关键在于故障点能否精准定位,然而在实际故障抢修过程中,受环境等多方面因素限制,往往存在查无故障设备的情况,导致需要通过多次逐级试送线路进行故障定位,因此,中压配电网故障抢修通常不是一次性完成复电,而是分步、分段完成的。The fault repair of medium voltage distribution network usually includes fault tripping, fault location, fault point isolation, non-fault section restoration, and fault section emergency repair. Among them, the key to fault repair is whether the fault point can be accurately located. However, in the actual fault repair process, due to environmental and other factors, there is often a situation where no faulty equipment can be checked, which leads to the need to pass multiple test delivery lines. Therefore, the emergency repair of medium-voltage distribution network faults is usually not completed at one time, but completed in steps and sections.

现行中压配电网故障抢修的技术中,包括有基于中压配电网拓扑关系的停电模拟分析,该停电模拟分析在故障抢修中的应用主要在于事后一次性模拟停复电全过程,能够自动生成供电可靠性运行数据。但是,在中压配电网故障的抢修过程中,该停电模拟分析技术则不适用,且由于缺乏可连续、分步的停电模拟分析工具,每一步故障处理操作对停电用户的复电影响需人工基于线路拓扑图纸进行线下沟通、分析以及传达,既影响现场抢修效率,又难以满足停复电信息传递的实时性、准确性要求。可见,如何提高停复电信息的传递效率以及传递准确性,从而提高现场抢修效率显得尤为重要。The current medium-voltage distribution network fault repair technology includes a power outage simulation analysis based on the topology relationship of the medium-voltage distribution network. Automatically generate power supply reliability operation data. However, in the process of emergency repair of medium-voltage distribution network faults, the power outage simulation analysis technology is not applicable, and due to the lack of continuous and step-by-step power outage simulation analysis tools, the impact of each step of fault handling operations on the restoration of power outage users needs to be Manual offline communication, analysis and communication based on line topology drawings will not only affect the efficiency of on-site repairs, but also cannot meet the real-time and accuracy requirements of power outage and restoration information transmission. It can be seen that how to improve the transmission efficiency and transmission accuracy of power outage and restoration information, so as to improve the efficiency of on-site emergency repairs, is particularly important.

发明内容SUMMARY OF THE INVENTION

本发明所要解决的技术问题在于,提供一种基于可连续分步停电模拟的配电故障处理方法及装置,能够在实际抢修过程中,实时模拟还原抢修现场以及模拟复电影响,提高了停复电信息传递的时效性和准确性。The technical problem to be solved by the present invention is to provide a power distribution fault processing method and device based on continuous and step-by-step power failure simulation, which can simulate the restoration of the emergency repair site and the impact of power restoration in real time during the actual emergency repair process, thereby improving the power failure recovery process. The timeliness and accuracy of electrical information transmission.

为了解决上述技术问题,本发明第一方面公开了一种基于可连续分步停电模拟的配电故障处理方法,所述方法包括:In order to solve the above technical problems, the first aspect of the present invention discloses a power distribution fault processing method based on continuous step-by-step power failure simulation, the method includes:

检测是否接收到模拟分析指令,所述模拟分析指令用于执行预设线路故障模拟操作;Detecting whether a simulation analysis command is received, the simulation analysis command is used to perform a preset line fault simulation operation;

当检测出接收到所述模拟分析指令时,根据所述模拟分析指令确定执行所述线路故障模拟操作对应的当前进度,并根据所述当前进度加载对应的目标数据,所述目标数据包括线路发生故障的区域对应的区域线路图以及线路发生故障的区域对应的故障因子,所述故障因子包括故障开关、故障设备以及故障线路中的至少一种;When it is detected that the simulation analysis instruction is received, the current progress corresponding to the line fault simulation operation is determined according to the simulation analysis instruction, and the corresponding target data is loaded according to the current progress, and the target data includes the line occurrence The area circuit diagram corresponding to the faulty area and the fault factor corresponding to the area where the line is faulty, the fault factor includes at least one of the faulty switch, the faulty device and the faulty line;

根据所述目标数据生成模拟线路图,所述模拟线路图包括组成电力传输线路的电力器件对应的器件图模以及电力传输线路对应的线路图模;Generate an analog circuit diagram according to the target data, where the analog circuit diagram includes a device pattern pattern corresponding to the power devices constituting the power transmission line and a circuit pattern pattern corresponding to the power transmission line;

检测是否接收到图模编辑指令,当检测出接收到所述图模编辑指令时,根据所述图模编辑指令确定目标变更图模,所述图模编辑指令用于对所述模拟线路图所包括的图模进行状态切换;Detect whether a pattern editing instruction is received, and when it is detected that the pattern editing instruction is received, determine the target change pattern according to the pattern editing instruction, and the pattern editing instruction is used to modify all parts of the analog circuit diagram. Included patterns for state switching;

根据所述图模编辑指令,切换所述目标变更图模对应的图模状态,得到第一切换结果并生成所述第一切换结果对应的变更记录,所述图模状态包括正常运行状态或故障状态,所述变更记录为切换所述目标变更图模对应的图模状态后对应生成的记录;According to the pattern editing instruction, the pattern state corresponding to the target change pattern is switched, a first switching result is obtained, and a change record corresponding to the first switching result is generated, and the pattern state includes a normal operation state or a fault state, the change record is a record correspondingly generated after switching the pattern state corresponding to the target change pattern;

分析所述第一切换结果,得到故障分析报告,并重复执行所述的检测是否接收到图模编辑指令对应的操作至检测到用于结束当前模拟流程的终止指令时,终止当前的模拟流程,其中,所述故障分析报告用于提供给故障处理人员,以触发所述故障处理人员根据所述故障分析报告进行故障处理。Analyzing the first switching result, obtaining a fault analysis report, and repeating the detection of whether an operation corresponding to the pattern editing instruction is received until a termination instruction for ending the current simulation process is detected, the current simulation process is terminated, Wherein, the fault analysis report is used to provide the fault processing personnel to trigger the fault processing personnel to perform fault processing according to the fault analysis report.

作为一种可选的实施方式,在本发明第一方面中,所述终止当前的模拟流程之后,所述方法还包括:As an optional implementation manner, in the first aspect of the present invention, after the current simulation process is terminated, the method further includes:

采集所有所述变更记录以及所有所述故障分析报告;collect all said change records and all said failure analysis reports;

对所有所述变更记录执行预设归集操作,得到汇总变更记录,所述汇总变更记录包括每个所述变更记录对应的单一结果以及由所有所述单一结果归集得到的汇总结果;Performing a preset collection operation on all the change records to obtain a summary change record, where the summary change record includes a single result corresponding to each of the change records and a summary result obtained by collecting all the single results;

根据所述汇总变更记录,对所述故障分析报告执行所述归集操作,得到汇总分析报告,其中,所述汇总分析报告包括与所述单一结果对应的单一报告以及与所述汇总结果对应的子汇总报告;According to the summary change record, the collection operation is performed on the fault analysis report to obtain a summary analysis report, wherein the summary analysis report includes a single report corresponding to the single result and a summary report corresponding to the summary result. sub-aggregate reports;

根据所述汇总变更记录以及所述汇总分析报告,确定执行所述线路故障模拟操作对应的模拟结果,所述模拟结果用于提供给故障处理人员,以触发所述故障处理人员根据所述模拟结果调整后续的故障处理操作,所述模拟结果包括模拟停电结果以及模拟复电结果,其中所述模拟复电结果为模拟出的线路故障修复后恢复供电对应的结果。According to the summary change record and the summary analysis report, determine the simulation result corresponding to the execution of the line fault simulation operation, and the simulation result is used to provide the fault handling personnel to trigger the fault handling personnel according to the simulation result. The subsequent fault handling operations are adjusted, and the simulation results include a simulated power outage result and a simulated power restoration result, wherein the simulated power restoration result is a result corresponding to the restoration of power supply after the simulated line fault is repaired.

作为一种可选的实施方式,在本发明第一方面中,所述根据所述汇总变更记录以及所述汇总分析报告,确定执行所述线路故障模拟操作对应的模拟结果之后,所述方法还包括:As an optional implementation manner, in the first aspect of the present invention, after the simulation result corresponding to the execution of the line fault simulation operation is determined according to the summary change record and the summary analysis report, the method further include:

检测是否接收到模拟反馈信息,所述模拟反馈信息为所述故障处理人员根据所述模拟结果对当前线路故障进行处理后反馈的信息;Detecting whether simulation feedback information is received, where the simulation feedback information is the information fed back by the fault handler after processing the current line fault according to the simulation result;

当检测到所述模拟反馈信息时,根据所述模拟反馈信息确定反馈类型,所述反馈类型包括表示所述模拟结果无误的确证类型或表示所述模拟结果错误的重溯类型;When the simulation feedback information is detected, a feedback type is determined according to the simulation feedback information, and the feedback type includes a confirmation type indicating that the simulation result is correct or a retrace type indicating that the simulation result is wrong;

当确定出所述反馈类型为所述确证类型时,将所述模拟结果存储至预设数据库中,以用于后续进行线路故障总结时作为分析数据;When it is determined that the feedback type is the confirmation type, the simulation result is stored in a preset database, which is used as analysis data in subsequent line fault summaries;

当确定出所述反馈类型为所述重溯类型时,根据所述模拟反馈信息确定需要执行重溯操作的目标变更记录、所述目标变更记录对应的目标变更操作;When it is determined that the feedback type is the retrace type, determining the target change record that needs to perform the retrace operation and the target change operation corresponding to the target change record according to the simulated feedback information;

根据所述模拟反馈信息更新所述目标变更图模,并根据所述目标变更操作切换更新后的所述目标变更图模对应的图模状态,得到第二切换结果同时生成与所述第二切换结果对应的变更记录,以更新所述目标变更记录;The target changing graph is updated according to the simulation feedback information, and the graph state corresponding to the updated target changing graph is switched according to the target changing operation, and a second switching result is obtained and the second switching result is generated at the same time. a change record corresponding to the result to update the target change record;

将所述第一切换结果更新为所述第二切换结果,并触发执行所述的分析所述第一切换结果,得到故障分析报告,并重复执行所述的检测是否接收到图模编辑指令对应的操作至检测到用于结束当前模拟流程的终止指令时,终止当前的模拟流程对应的操作。Update the first switching result to the second switching result, and trigger the execution of the analysis of the first switching result, obtain a fault analysis report, and repeat the detection of whether the corresponding pattern editing instruction is received. The operation corresponding to the current simulation process is terminated when a termination instruction for terminating the current simulation process is detected.

作为一种可选的实施方式,在本发明第一方面中,所述模拟反馈信息还包括确证记录,所述确证记录具体为实际修复线路故障后对应的实际修复结果对应的记录;以及所述将所述第一切换结果更新为所述第二切换结果之前,所述方法还包括:As an optional implementation manner, in the first aspect of the present invention, the analog feedback information further includes a confirmation record, and the confirmation record is specifically a record corresponding to the actual repair result corresponding to the actual repair of the line fault; and the Before updating the first handover result to the second handover result, the method further includes:

判断更新后的所述目标变更记录是否与所述确证记录相匹配,当判断出所述目标变更记录与所述确证记录相匹配时,触发执行所述的将所述第一切换结果更新为所述第二切换结果对应的操作;It is judged whether the updated target change record matches the confirmation record, and when it is judged that the target change record matches the confirmation record, triggering the execution of the update of the first switching result to the confirmation record. Describe the operation corresponding to the second switching result;

当判断出所述目标变更记录与所述确证记录不匹配时,分析所述确证记录以及所述目标变更记录,得到所述目标变更记录对应的辨证参数,所述辨证参数包括所述目标变更记录所记录的操作和/或所述目标变更记录所记录的结果中导致所述模拟结果出错的参数;When it is determined that the target change record does not match the corroboration record, analyze the corroboration record and the target change record to obtain dialectical parameters corresponding to the target change record, where the dialectical parameters include the target change record Parameters in the recorded operations and/or the results recorded in the target change record that caused the simulation results to be erroneous;

将所述辨证参数以及所述目标变更记录归集到预设研判记录集中,以用于后续处理与所述目标变更记录匹配的故障事件时作为数据支撑。The dialectical parameters and the target change record are collected into a preset research and judgment record set to be used as data support for subsequent processing of fault events matching the target change record.

作为一种可选的实施方式,在本发明第一方面中,所述检测是否接收到模拟分析指令之前,所述方法还包括:As an optional implementation manner, in the first aspect of the present invention, before the detecting whether a simulation analysis instruction is received, the method further includes:

检测是否存在配电故障的报障信息,所述报障信息包括中压开关跳闸对应的故障信息;Detecting whether there is fault reporting information of a power distribution fault, where the fault reporting information includes fault information corresponding to the tripping of the medium voltage switch;

当检测到所述报障信息时,根据所述报障信息,确定跳闸馈线的目标参数,所述目标参数包括所述跳闸馈线所在环网组运行态的中压拓扑连接关系;When the fault report information is detected, according to the fault report information, the target parameter of the tripping feeder is determined, and the target parameter includes the medium voltage topology connection relationship in the operating state of the ring network group where the tripping feeder is located;

根据所述目标参数以及预设停电模拟分析算法,在当前模拟进程中叠加与所述报障信息对应的开关跳闸动作,得到模拟叠加结果;According to the target parameter and the preset power failure simulation analysis algorithm, superimpose the switch tripping action corresponding to the fault report information in the current simulation process to obtain the simulation superposition result;

根据所述停电模拟分析算法,分析所述模拟叠加结果,得到所述跳闸馈线对应的故障模拟数据,所述故障模拟数据包括所述跳闸馈线对应的跳闸开关,所述跳闸开关发生故障后所影响的模拟故障区域,以及所述故障模拟数据用于后续生成发生线路故障的模拟线路图时作为加载数据。According to the power failure simulation analysis algorithm, the simulation superposition result is analyzed, and the fault simulation data corresponding to the trip feeder is obtained, and the fault simulation data includes the trip switch corresponding to the trip feeder. The simulated fault area, and the fault simulation data is used as loading data when the simulated circuit diagram of the line fault occurs subsequently.

作为一种可选的实施方式,在本发明第一方面中,所述根据所述目标数据生成模拟线路图之前,所述方法还包括:As an optional implementation manner, in the first aspect of the present invention, before generating the analog circuit diagram according to the target data, the method further includes:

检测是否存在历史模拟数据,所述历史模拟数据包括前置模拟数据以及留存数据,所述前置模拟数据为在所述当前进度之前已完成执行的前置模拟操作对应的数据,所述留存数据为存储在数据库中的与当前线路故障事件匹配的数据;Detecting whether there is historical simulation data, the historical simulation data includes pre-simulation data and retained data, the pre-simulation data is the data corresponding to the pre-simulation operation that has been completed before the current progress, and the retained data For the data stored in the database that matches the current line fault event;

当检测出不存在所述历史模拟数据时,触发执行所述的根据所述目标数据生成模拟线路图对应的操作;When it is detected that the historical simulation data does not exist, trigger the execution of the operation corresponding to the generation of the simulation circuit diagram according to the target data;

当检测出存在所述历史模拟数据时,所述根据所述目标数据生成模拟线路图,包括:When it is detected that the historical simulation data exists, the generating a simulation circuit diagram according to the target data includes:

调用所述历史模拟数据,并根据所述历史模拟数据生成基准态拓扑,所述基准台拓扑用于构建模拟线路图;Calling the historical simulation data, and generating a reference state topology according to the historical simulation data, and the reference platform topology is used to construct a simulation circuit diagram;

根据生成的所述基准态拓扑以及所述目标数据生成模拟线路图。A simulated circuit diagram is generated according to the generated reference state topology and the target data.

作为一种可选的实施方式,在本发明第一方面中,所述方法还包括:As an optional implementation manner, in the first aspect of the present invention, the method further includes:

在所述故障处理人员根据所述模拟结果执行故障处理操作的过程中,采集实操数据,所述实操数据包括执行所述故障处理操作对应修复的故障部件、所述故障处理操作对应的复电结果、所述故障处理操作对应的停电原因以及所述故障处理操作对应的抢修策略中的至少一种;In the process that the fault handling personnel performs the fault handling operation according to the simulation result, collects actual operation data, the actual operation data includes the faulty component repaired corresponding to the execution of the fault handling operation, and the complex corresponding to the fault handling operation. at least one of a power outage result, a power outage cause corresponding to the fault handling operation, and a rush repair strategy corresponding to the fault handling operation;

当所述实操数据包括所述故障部件或所述复电结果时,根据所述实操数据更新所述模拟线路图所包括的图模对应的图模状态,并得到与更新后的所述图模状态对应的实操仿真结果;When the actual operation data includes the faulty component or the power recovery result, update the pattern state corresponding to the pattern included in the analog circuit diagram according to the actual operation data, and obtain the updated state of the pattern The actual operation simulation results corresponding to the graphical mode state;

根据所述实操数据,分析所述实操仿真结果,得到对应的分析结果;According to the actual operation data, analyze the actual operation simulation result, and obtain the corresponding analysis result;

根据所述分析结果以及所述实操数据,确定执行所述故障处理操作时修复故障线路对应的修复策略,所述修复策略用于后续进行线路故障模拟时作为优化模拟进程的辅助数据。According to the analysis result and the actual operation data, a repair strategy corresponding to repairing the faulty line when the fault handling operation is performed is determined, and the repair strategy is used as auxiliary data for optimizing the simulation process in subsequent line fault simulation.

本发明第二方面公开了一种基于可连续分步停电模拟的配电故障处理装置,所述装置包括:The second aspect of the present invention discloses a power distribution fault processing device based on continuous step-by-step power failure simulation, the device includes:

检测模块,用于检测是否接收到模拟分析指令,所述模拟分析指令用于执行预设线路故障模拟操作;a detection module, configured to detect whether a simulation analysis command is received, the simulation analysis command is used to perform a preset line fault simulation operation;

确定模块,用于当检测出接收到所述模拟分析指令时,根据所述模拟分析指令确定执行所述线路故障模拟操作对应的当前进度;a determining module, configured to determine the current progress corresponding to the line fault simulation operation according to the simulation analysis instruction when it is detected that the simulation analysis instruction is received;

加载模块,用于根据所述当前进度加载对应的目标数据,所述目标数据包括线路发生故障的区域对应的区域线路图以及线路发生故障的区域对应的故障因子,所述故障因子包括故障开关、故障设备以及故障线路中的至少一种;The loading module is used to load corresponding target data according to the current progress, the target data includes the area circuit diagram corresponding to the area where the line is faulty and the fault factor corresponding to the area where the line is faulty, and the fault factor includes the fault switch, at least one of faulty equipment and faulty lines;

生成模块,用于根据所述目标数据生成模拟线路图,所述模拟线路图包括组成电力传输线路的电力器件对应的器件图模以及电力传输线路对应的线路图模;a generating module, configured to generate an analog circuit diagram according to the target data, where the analog circuit diagram includes a device diagram corresponding to the power devices constituting the power transmission line and a circuit diagram corresponding to the power transmission line;

所述检测模块,还用于检测是否接收到图模编辑指令;The detection module is also used to detect whether a pattern editing instruction is received;

所述确定模块,还用于当所述检测模块检测出接收到所述图模编辑指令时,根据所述图模编辑指令确定目标变更图模,所述图模编辑指令用于对所述模拟线路图所包括的图模进行状态切换;The determining module is further configured to, when the detection module detects that the graphic pattern editing instruction is received, determine the target change graphic pattern according to the graphic pattern editing instruction, and the graphic pattern editing instruction is used for the simulation The patterns included in the circuit diagram perform state switching;

切换模块,用于根据所述图模编辑指令,切换所述目标变更图模对应的图模状态,得到第一切换结果;a switching module, configured to switch the graphics mode state corresponding to the target change graphics mode according to the graphics mode editing instruction to obtain a first switching result;

所述生成模块,还用于生成所述第一切换结果对应的变更记录,所述图模状态包括正常运行状态或故障状态,所述变更记录为切换所述目标变更图模对应的图模状态后对应生成的记录;The generating module is further configured to generate a change record corresponding to the first switching result, the pattern state includes a normal operation state or a fault state, and the change record is to switch the pattern state corresponding to the target change pattern Then the corresponding generated records;

分析模块,用于分析所述第一切换结果,得到故障分析报告,并触发所述检测模块重复执行所述的检测是否接收到图模编辑指令对应的操作,其中,所述故障分析报告用于提供给故障处理人员,以触发所述故障处理人员根据所述故障分析报告进行故障处理;An analysis module, configured to analyze the first switching result, obtain a fault analysis report, and trigger the detection module to repeatedly perform the operation corresponding to the detection of whether a pattern editing instruction is received, wherein the fault analysis report is used for Provide it to the fault handling personnel to trigger the fault handling personnel to perform fault processing according to the fault analysis report;

终止模块,用于当检测到用于结束当前模拟流程的终止指令时,终止当前的模拟流程。The termination module is used for terminating the current simulation process when a termination instruction for terminating the current simulation process is detected.

作为一种可选的实施方式,在本发明第二方面中,第一采集模块,用在所述终止模块终止当前的模拟流程之后,采集所有所述变更记录以及所有所述故障分析报告;As an optional implementation manner, in the second aspect of the present invention, the first collection module is used to collect all the change records and all the fault analysis reports after the termination module terminates the current simulation process;

归集模块,用于对所有所述变更记录执行预设归集操作,得到汇总变更记录,所述汇总变更记录包括每个所述变更记录对应的单一结果以及由所有所述单一结果归集得到的汇总结果;The collection module is used to perform a preset collection operation on all the change records to obtain a summary change record, and the summary change record includes a single result corresponding to each of the change records and a collection of all the single results obtained. aggregated results;

所述归集模块,还用于根据所述汇总变更记录,对所述故障分析报告执行所述归集操作,得到汇总分析报告,其中,所述汇总分析报告包括与所述单一结果对应的单一报告以及与所述汇总结果对应的子汇总报告;The collection module is further configured to perform the collection operation on the fault analysis report according to the summary change record to obtain a summary analysis report, wherein the summary analysis report includes a single result corresponding to the single result. reports and sub-aggregated reports corresponding to said aggregated results;

所述确定模块,还用于根据所述汇总变更记录以及所述汇总分析报告,确定执行所述线路故障模拟操作对应的模拟结果,所述模拟结果用于提供给故障处理人员,以触发所述故障处理人员根据所述模拟结果调整后续的故障处理操作,所述模拟结果包括模拟停电结果以及模拟复电结果,其中所述模拟复电结果为模拟出的线路故障修复后恢复供电对应的结果。The determining module is further configured to determine a simulation result corresponding to executing the line fault simulation operation according to the summary change record and the summary analysis report, and the simulation result is used to provide the fault handling personnel to trigger the The fault handling personnel adjust subsequent fault handling operations according to the simulation results, which include simulated power outage results and simulated power restoration results, wherein the simulated power restoration results are the results corresponding to the restoration of power supply after the simulated line fault is repaired.

作为一种可选的实施方式,在本发明第二方面中,所述检测模块,还用于在所述确定模块根据所述汇总变更记录以及所述汇总分析报告,确定执行所述线路故障模拟操作对应的模拟结果之后,检测是否接收到模拟反馈信息,所述模拟反馈信息为所述故障处理人员根据所述模拟结果对当前线路故障进行处理后反馈的信息;As an optional implementation manner, in the second aspect of the present invention, the detection module is further configured to, in the determination module, determine to execute the line fault simulation according to the summary change record and the summary analysis report After operating the corresponding simulation result, check whether simulation feedback information is received, where the simulation feedback information is the information fed back by the fault handler after processing the current line fault according to the simulation result;

所述确定模块,还用于当所述检测模块检测到所述模拟反馈信息时,根据所述模拟反馈信息确定反馈类型,所述反馈类型包括表示所述模拟结果无误的确证类型或表示所述模拟结果错误的重溯类型;The determining module is further configured to, when the detection module detects the simulation feedback information, determine a feedback type according to the simulation feedback information, where the feedback type includes a confirmation type indicating that the simulation result is correct or a confirmation type indicating that the simulation result is correct. The type of retrace with wrong simulation results;

所述装置还包括:The device also includes:

存储模块,用于当所述确定模块确定出所述反馈类型为所述确证类型时,将所述模拟结果存储至预设数据库中,以用于后续进行线路故障总结时作为分析数据;a storage module, configured to store the simulation result in a preset database when the determination module determines that the feedback type is the confirmation type, so as to be used as analysis data in subsequent line fault summaries;

所述确定模块,还用于当确定出所述反馈类型为所述重溯类型时,根据所述模拟反馈信息确定需要执行重溯操作的目标变更记录、所述目标变更记录对应的目标变更操作;The determining module is further configured to, when it is determined that the feedback type is the retrace type, determine, according to the simulated feedback information, a target change record that needs to perform a retrace operation, and a target change operation corresponding to the target change record. ;

第一更新模块,用于根据所述模拟反馈信息更新所述目标变更图模;a first update module, configured to update the target change pattern according to the simulation feedback information;

所述切换模块,还用于根据所述目标变更操作切换更新后的所述目标变更图模对应的图模状态,得到第二切换结果;The switching module is further configured to switch the image mode state corresponding to the updated target change image mode according to the target change operation to obtain a second switching result;

所述生成模块,还用于生成与所述第二切换结果对应的变更记录,以更新所述目标变更记录;The generating module is further configured to generate a change record corresponding to the second switching result to update the target change record;

所述第一更新模块,还用于将所述第一切换结果更新为所述第二切换结果,并触发所述分析模块执行所述的分析所述第一切换结果,得到故障分析报告,并重复执行所述的检测是否接收到图模编辑指令对应的操作至检测到用于结束当前模拟流程的终止指令时,触发所述终止模块终止当前的模拟流程对应的操作。The first update module is further configured to update the first switching result to the second switching result, and trigger the analysis module to perform the analysis of the first switching result to obtain a fault analysis report, and Repeatedly executing the operation corresponding to the detection of whether the graphics editing instruction is received until a termination instruction for ending the current simulation process is detected, triggering the termination module to terminate the operation corresponding to the current simulation process.

作为一种可选的实施方式,在本发明第二方面中,所述模拟反馈信息还包括确证记录,所述确证记录具体为实际修复线路故障后对应的实际修复结果对应的记录;所述装置还包括:As an optional implementation manner, in the second aspect of the present invention, the analog feedback information further includes a confirmation record, and the confirmation record is specifically a record corresponding to the actual repair result corresponding to the actual repair of the line fault; the device Also includes:

判断模块,用于在所述第一更新模块将所述第一切换结果更新为所述第二切换结果之前,判断更新后的所述目标变更记录是否与所述确证记录相匹配,当判断出所述目标变更记录与所述确证记录相匹配时,触发所述第一更新模块执行所述的将所述第一切换结果更新为所述第二切换结果对应的操作;A judging module for judging whether the updated target change record matches the confirmation record before the first update module updates the first switching result to the second switching result, and when it is judged that When the target change record matches the verification record, triggering the first update module to perform the operation corresponding to updating the first switching result to the second switching result;

所述分析模块,还用于当所述判断模块判断出所述目标变更记录与所述确证记录不匹配时,分析所述确证记录以及所述目标变更记录,得到所述目标变更记录对应的辨证参数,所述辨证参数包括所述目标变更记录所记录的操作和/或所述目标变更记录所记录的结果中导致所述模拟结果出错的参数;The analysis module is further configured to analyze the confirmation record and the target change record when the judgment module judges that the target change record does not match the confirmation record, and obtain a dialectical corresponding to the target change record. parameters, the dialectical parameters include the operations recorded in the target change record and/or the parameters in the results recorded in the target change record that cause errors in the simulation results;

所述归集模块,还用于将所述辨证参数以及所述目标变更记录归集到预设研判记录集中,以用于后续处理与所述目标变更记录匹配的故障事件时作为数据支撑。The collecting module is further configured to collect the dialectical parameters and the target change record into a preset research and judgment record set, which is used as a data support for subsequent processing of the fault event matching the target change record.

作为一种可选的实施方式,在本发明第二方面中,所述检测模块,还用于检测是否接收到模拟分析指令之前,检测是否存在配电故障的报障信息,所述报障信息包括中压开关跳闸对应的故障信息;As an optional implementation manner, in the second aspect of the present invention, the detection module is further configured to detect whether there is fault report information of a power distribution fault before receiving the simulation analysis command, the fault report information Including the fault information corresponding to the tripping of the medium voltage switch;

所述确定模块,还用于当所述检测模块检测到所述报障信息时,根据所述报障信息,确定跳闸馈线的目标参数,所述目标参数包括所述跳闸馈线所在环网组运行态的中压拓扑连接关系;The determining module is further configured to, when the detection module detects the fault report information, determine the target parameter of the trip feeder according to the fault report information, where the target parameter includes the operation of the ring network group where the trip feeder is located The state of the medium voltage topology connection relationship;

所述装置还包括:The device also includes:

叠加模块,用于根据所述目标参数以及预设停电模拟分析算法,在当前模拟进程中叠加与所述报障信息对应的开关跳闸动作,得到模拟叠加结果;a superimposition module, configured to superimpose the switch tripping action corresponding to the fault report information in the current simulation process according to the target parameter and the preset power failure simulation analysis algorithm to obtain a simulation superposition result;

所述分析模块,还用于根据所述停电模拟分析算法,分析所述模拟叠加结果,得到所述跳闸馈线对应的故障模拟数据,所述故障模拟数据包括所述跳闸馈线对应的跳闸开关,所述跳闸开关发生故障后所影响的模拟故障区域,以及所述故障模拟数据用于后续生成发生线路故障的模拟线路图时作为加载数据。The analysis module is further configured to analyze the simulation superposition result according to the power failure simulation analysis algorithm, and obtain the fault simulation data corresponding to the trip feeder, where the fault simulation data includes the trip switch corresponding to the trip feeder, so The simulated fault area affected by the trip switch after the fault occurs, and the fault simulation data is used as loading data when the simulated circuit diagram of the line fault occurs subsequently.

作为一种可选的实施方式,在本发明第二方面中,所述检测模块,还用于所述生成模块根据所述目标数据生成模拟线路图之前,检测是否存在历史模拟数据,所述历史模拟数据包括前置模拟数据以及留存数据,所述前置模拟数据为在所述当前进度之前已完成执行的前置模拟操作对应的数据,所述留存数据为存储在数据库中的与当前线路故障事件匹配的数据;当检测出不存在所述历史模拟数据时,触发所述生成模块执行所述的根据所述目标数据生成模拟线路图对应的操作;As an optional implementation manner, in the second aspect of the present invention, the detection module is further configured to detect whether there is historical simulation data before the generation module generates the simulation circuit diagram according to the target data, and the history The simulation data includes pre-simulation data and retained data, the pre-simulation data is the data corresponding to the pre-simulation operation that has been completed before the current progress, and the retained data is stored in the database and is related to the current line fault. Event matching data; when it is detected that the historical simulation data does not exist, trigger the generation module to perform the operation corresponding to the generation of the simulation circuit diagram according to the target data;

所述生成模块根据所述目标数据生成模拟线路图的方式具体包括:The manner in which the generation module generates the analog circuit diagram according to the target data specifically includes:

当检测出存在所述历史模拟数据时,调用所述历史模拟数据,并根据所述历史模拟数据生成基准态拓扑,所述基准台拓扑用于构建模拟线路图;When it is detected that the historical simulation data exists, the historical simulation data is called, and a reference state topology is generated according to the historical simulation data, and the reference platform topology is used to construct a simulation circuit diagram;

根据生成的所述基准态拓扑以及所述目标数据生成模拟线路图。A simulated circuit diagram is generated according to the generated reference state topology and the target data.

作为一种可选的实施方式,在本发明第二方面中,所述装置还包括:As an optional implementation manner, in the second aspect of the present invention, the device further includes:

第二采集模块,用于在所述故障处理人员根据所述模拟结果执行故障处理操作的过程中,采集实操数据,所述实操数据包括执行所述故障处理操作对应修复的故障部件、所述故障处理操作对应的复电结果、所述故障处理操作对应的停电原因以及所述故障处理操作对应的抢修策略中的至少一种;The second collection module is configured to collect actual operation data during the process of the fault handling personnel performing the fault handling operation according to the simulation result, and the actual operation data includes the faulty components repaired corresponding to the execution of the fault handling operation, all the at least one of a power restoration result corresponding to the fault handling operation, a power outage cause corresponding to the fault handling operation, and a rush repair strategy corresponding to the fault handling operation;

第二更新模块,用于当所述实操数据包括所述故障部件或所述复电结果时,根据所述实操数据更新所述模拟线路图所包括的图模对应的图模状态,并得到与更新后的所述图模状态对应的实操仿真结果;a second update module, configured to update the pattern state corresponding to the pattern included in the analog circuit diagram according to the actual operation data when the actual operation data includes the faulty component or the power recovery result, and Obtain the actual operation simulation result corresponding to the updated state of the graphic model;

所述分析模块,还用于根据所述实操数据,分析所述实操仿真结果,得到对应的分析结果;The analysis module is further configured to analyze the actual operation simulation results according to the actual operation data, and obtain corresponding analysis results;

所述确定模块,还用于根据所述分析结果以及所述实操数据,确定执行所述故障处理操作时修复故障线路对应的修复策略,所述修复策略用于后续进行线路故障模拟时作为优化模拟进程的辅助数据。The determining module is further configured to determine, according to the analysis result and the actual operation data, a repair strategy corresponding to repairing the faulty line when the fault handling operation is performed, and the repair strategy is used as an optimization for subsequent line failure simulations. Auxiliary data for the simulation process.

本发明第三方面公开了另一种基于可连续分步停电模拟的配电故障处理装置,所述装置包括:The third aspect of the present invention discloses another power distribution fault processing device based on continuous step-by-step power failure simulation, the device includes:

存储有可执行程序代码的存储器;a memory in which executable program code is stored;

与所述存储器耦合的处理器;a processor coupled to the memory;

所述处理器调用所述存储器中存储的所述可执行程序代码,执行本发明第一方面公开的基于可连续分步停电模拟的配电故障处理方法。The processor invokes the executable program code stored in the memory to execute the power distribution fault processing method based on the continuous step-by-step power failure simulation disclosed in the first aspect of the present invention.

本发明第四方面公开了一种计算机存储介质,所述计算机存储介质存储有计算机指令,所述计算机指令被调用时,用于执行本发明第一方面公开的基于可连续分步停电模拟的配电故障处理方法。A fourth aspect of the present invention discloses a computer storage medium. The computer storage medium stores computer instructions. When the computer instructions are invoked, the computer instructions are used to execute the power distribution simulation based on the continuous step-by-step power failure simulation disclosed in the first aspect of the present invention. How to deal with electrical faults.

与现有技术相比,本发明实施例具有以下有益效果:Compared with the prior art, the embodiments of the present invention have the following beneficial effects:

本发明实施例中,提供了一种基于可连续分步停电模拟的配电故障处理方法及装置,该方法包括:检测是否接收到模拟分析指令,模拟分析指令用于执行预设线路故障模拟操作;当检测出接收到模拟分析指令时,根据模拟分析指令确定执行线路故障模拟操作对应的当前进度,并根据当前进度加载对应的目标数据,目标数据包括线路发生故障的区域对应的区域线路图以及线路发生故障的区域对应的故障因子,故障因子包括故障开关、故障设备以及故障线路中的至少一种;根据目标数据生成模拟线路图,模拟线路图包括组成电力传输线路的电力器件对应的器件图模以及电力传输线路对应的线路图模;检测是否接收到图模编辑指令,当检测出接收到图模编辑指令时,根据图模编辑指令确定目标变更图模,图模编辑指令用于对模拟线路图所包括的图模进行状态切换;根据图模编辑指令,切换目标变更图模对应的图模状态,得到第一切换结果并生成第一切换结果对应的变更记录,图模状态包括正常运行状态或故障状态,变更记录为切换目标变更图模对应的图模状态后对应生成的记录;分析第一切换结果,得到故障分析报告,并重复执行上述的检测是否接收到图模编辑指令对应的操作至检测到用于结束当前模拟流程的终止指令时,终止当前的模拟流程,其中,故障分析报告用于提供给故障处理人员,以触发故障处理人员根据故障分析报告进行故障处理。可见,实施本发明能够在接收到模拟分析指令后,智能化加载实际线路抢修现场对应的线路和线路故障数据,提高了停复电信息的传递效率;还能够根据图模编辑指令智能化切换图模状态、生成变更记录以及分析得到故障报告,实现了模拟连续停电处理的流程,有利于实际抢修根据该变更记录以及故障报告进行复电操作的调整,从而提高复电效率以及复电成功率;进一步的,还能够在检测到终止指令时自适应终止当前模拟流程,实现停电模拟的分步模拟、分步研判功能,提高了停电操作的可控性,在一定程度上有利于提高复电成功率以及复电的安全性。In the embodiment of the present invention, there is provided a power distribution fault processing method and device based on continuous step-by-step power failure simulation. The method includes: detecting whether a simulation analysis command is received, and the simulation analysis command is used to perform a preset line fault simulation operation ; When it is detected that the simulation analysis command is received, the current progress corresponding to the line fault simulation operation is determined according to the simulation analysis command, and the corresponding target data is loaded according to the current progress, and the target data includes the area corresponding to the line failure area. The fault factor corresponding to the area where the line is faulty, and the fault factor includes at least one of the faulty switch, the faulty device, and the faulty line; the simulated circuit diagram is generated according to the target data, and the simulated circuit diagram includes the device diagram corresponding to the power devices constituting the power transmission line It detects whether a pattern editing instruction is received, and when it is detected that a pattern editing instruction is received, the target change pattern is determined according to the pattern editing instruction, and the pattern editing instruction is used to simulate the The patterns included in the circuit diagram are switched between states; according to the pattern editing instructions, the switch target changes the pattern state corresponding to the pattern, obtains the first switching result and generates a change record corresponding to the first switching result, and the pattern state includes normal operation. Status or fault status, the change record is the record generated after the switching target changes the graphics mode corresponding to the graphics mode; analyze the first switching result, obtain the failure analysis report, and repeat the above-mentioned detection whether the graphics mode editing instruction is received corresponding to When a termination instruction for ending the current simulation process is detected, the current simulation process is terminated, wherein the fault analysis report is used to provide the fault processing personnel to trigger the fault processing personnel to perform fault processing according to the fault analysis report. It can be seen that the implementation of the present invention can intelligently load the line and line fault data corresponding to the actual line emergency repair site after receiving the simulation analysis command, which improves the transmission efficiency of the power failure and restoration information; and can also intelligently switch diagrams according to the diagram editing instructions. It can realize the process of simulating continuous power failure processing, which is helpful for the actual emergency repair to adjust the power recovery operation according to the change record and fault report, thereby improving the power recovery efficiency and the power recovery success rate; Furthermore, it can self-adaptively terminate the current simulation process when the termination command is detected, and realize the step-by-step simulation and step-by-step research and judgment functions of the power failure simulation, which improves the controllability of the power failure operation, which is conducive to improving the success of power recovery to a certain extent. rate and safety of power recovery.

附图说明Description of drawings

为了更清楚地说明本发明实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the technical solutions in the embodiments of the present invention more clearly, the following briefly introduces the accompanying drawings used in the description of the embodiments. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained from these drawings without creative effort.

图1是本发明实施例公开的一种基于可连续分步停电模拟的配电故障处理方法的流程示意图;1 is a schematic flowchart of a power distribution fault processing method based on continuous step-by-step power outage simulation disclosed in an embodiment of the present invention;

图2是本发明实施例公开的另一种基于可连续分步停电模拟的配电故障处理方法的流程示意图;2 is a schematic flowchart of another power distribution fault processing method based on continuous step-by-step power outage simulation disclosed in an embodiment of the present invention;

图3是本发明实施例公开的一种基于可连续分步停电模拟的配电故障处理装置的结构示意图;3 is a schematic structural diagram of a power distribution fault processing device based on continuous step-by-step power failure simulation disclosed in an embodiment of the present invention;

图4是本发明实施例公开的另一种基于可连续分步停电模拟的配电故障处理装置的结构示意图;4 is a schematic structural diagram of another power distribution fault processing device based on continuous step-by-step power failure simulation disclosed in an embodiment of the present invention;

图5是本发明实施例公开的又一种基于可连续分步停电模拟的配电故障处理装置的结构示意图。FIG. 5 is a schematic structural diagram of another power distribution fault processing device based on continuous step-by-step power failure simulation disclosed in an embodiment of the present invention.

具体实施方式Detailed ways

为了使本技术领域的人员更好地理解本发明方案,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。In order to make those skilled in the art better understand the solutions of the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only These are some embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

本发明的说明书和权利要求书及上述附图中的术语“第一”、“第二”等是用于区别不同对象,而不是用于描述特定顺序。此外,术语“包括”和“具有”以及它们任何变形,意图在于覆盖不排他的包含。例如包含了一系列步骤或单元的过程、方法、装置、产品或端没有限定于已列出的步骤或单元,而是可选地还包括没有列出的步骤或单元,或可选地还包括对于这些过程、方法、产品或端固有的其他步骤或单元。The terms "first", "second" and the like in the description and claims of the present invention and the above drawings are used to distinguish different objects, rather than to describe a specific order. Furthermore, the terms "comprising" and "having" and any variations thereof are intended to cover non-exclusive inclusion. For example, a process, method, device, product or process comprising a series of steps or units is not limited to the listed steps or units, but optionally also includes unlisted steps or units, or optionally also includes Other steps or units inherent to these processes, methods, products or ends.

在本文中提及“实施例”意味着,结合实施例描述的特定特征、结构或特性可以包含在本发明的至少一个实施例中。在说明书中的各个位置出现该短语并不一定均是指相同的实施例,也不是与其它实施例互斥的独立的或备选的实施例。本领域技术人员显式地和隐式地理解的是,本文所描述的实施例可以与其它实施例相结合。Reference herein to an "embodiment" means that a particular feature, structure, or characteristic described in connection with the embodiment can be included in at least one embodiment of the present invention. The appearances of the phrase in various places in the specification are not necessarily all referring to the same embodiment, nor a separate or alternative embodiment that is mutually exclusive of other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

本发明公开了一种基于可连续分步停电模拟的配电故障处理方法及装置,能够在接收到模拟分析指令后,智能化加载实际线路抢修现场对应的线路和线路故障数据,提高了停复电信息的传递效率;还能够根据图模编辑指令智能化切换图模状态、生成变更记录以及分析得到故障报告,实现了模拟连续停电处理的流程,有利于实际抢修根据该变更记录以及故障报告进行复电操作的调整,从而提高复电效率以及复电成功率;进一步的,还能够在检测到终止指令时自适应终止当前模拟流程,实现停电模拟的分步模拟、分步研判功能,提高了停电操作的可控性,在一定程度上有利于提高复电成功率以及复电的安全性。以下分别进行详细说明。The invention discloses a power distribution fault processing method and device based on continuous step-by-step power failure simulation, which can intelligently load the line and line fault data corresponding to the actual line emergency repair site after receiving a simulation analysis command, thereby improving the outage recovery process. The transmission efficiency of electrical information; it can also intelligently switch the state of the pattern according to the pattern editing instructions, generate the change record and analyze the fault report, which realizes the process of simulating continuous power failure processing, which is beneficial to the actual emergency repair according to the change record and fault report. Adjustment of power recovery operation, thereby improving power recovery efficiency and success rate of power recovery; further, it can self-adaptively terminate the current simulation process when a termination command is detected, and realize the step-by-step simulation and step-by-step research and judgment functions of power failure simulation, which improves the The controllability of power failure operation is beneficial to improve the success rate of power recovery and the safety of power recovery to a certain extent. Each of them will be described in detail below.

实施例一Example 1

请参阅图1,图1是本发明实施例公开的一种基于可连续分步停电模拟的配电故障处理方法的流程示意图。其中,图1所描述的基于可连续分步停电模拟的配电故障处理方法可以应用于基于可连续分步停电模拟的配电故障处理装置中,本发明实施例不做限定。如图1所示,该基于可连续分步停电模拟的配电故障处理方法可以包括以下操作:Please refer to FIG. 1 . FIG. 1 is a schematic flowchart of a power distribution fault processing method based on continuous step-by-step power failure simulation disclosed in an embodiment of the present invention. Wherein, the power distribution fault processing method based on continuous step-by-step power failure simulation described in FIG. 1 can be applied to a power distribution fault processing device based on continuous step-by-step power failure simulation, which is not limited in the embodiment of the present invention. As shown in Figure 1, the power distribution fault processing method based on continuous step-by-step power failure simulation can include the following operations:

101、检测是否接收到模拟分析指令。101. Detect whether a simulation analysis command is received.

本发明实施例中,模拟分析指令用于执行预设线路故障模拟操作。In this embodiment of the present invention, the simulation analysis instruction is used to perform a preset line fault simulation operation.

本发明实施例中,检测是否接收到模拟分析指令之前,该基于可连续分步停电模拟的配电故障处理方法还可以包括以下操作:In this embodiment of the present invention, before detecting whether the simulation analysis command is received, the method for processing power distribution faults based on continuous step-by-step power failure simulation may further include the following operations:

检测是否存在配电故障的报障信息,报障信息包括中压开关跳闸对应的故障信息;Detect whether there is fault report information of power distribution fault, and the fault report information includes the fault information corresponding to the tripping of the medium voltage switch;

当检测到报障信息时,根据报障信息,确定跳闸馈线的目标参数,目标参数包括跳闸馈线所在环网组运行态的中压拓扑连接关系;When the fault report information is detected, the target parameters of the trip feeder are determined according to the fault report information, and the target parameters include the medium voltage topology connection relationship of the ring network group where the trip feeder is located;

根据目标参数以及预设停电模拟分析算法,在当前模拟进程中叠加与报障信息对应的开关跳闸动作,得到模拟叠加结果;According to the target parameters and the preset power failure simulation analysis algorithm, the switch tripping action corresponding to the fault report information is superimposed in the current simulation process, and the simulation superposition result is obtained;

根据停电模拟分析算法,分析模拟叠加结果,得到跳闸馈线对应的故障模拟数据,故障模拟数据包括跳闸馈线对应的跳闸开关,跳闸开关发生故障后所影响的模拟故障区域,以及故障模拟数据用于后续生成发生线路故障的模拟线路图时作为加载数据。According to the power outage simulation analysis algorithm, the simulation superposition results are analyzed to obtain the fault simulation data corresponding to the trip feeder. The fault simulation data includes the trip switch corresponding to the trip feeder, the simulated fault area affected by the trip switch failure, and the fault simulation data for subsequent use. Used as load data when generating a simulated circuit diagram with a circuit failure.

可见,在本发明实施例中,能够智能化处理检测到的报障信息,得到目标参数,提高了报障信息的处理效率;还能够自动叠加开关跳闸动作并分析模拟叠加结果,实现出现线路报障时的自主模拟,有利于后续进行实际线路故障处理时作为辅助数据,从而提高故障处理数据。It can be seen that in the embodiment of the present invention, the detected fault report information can be intelligently processed, target parameters can be obtained, and the processing efficiency of the fault report information can be improved; the switch tripping action can also be automatically superimposed and the simulation superposition results can be analyzed to realize the occurrence of line alarms. The autonomous simulation of faults is beneficial to the subsequent processing of actual line faults as auxiliary data, thereby improving the fault processing data.

102、当检测出接收到模拟分析指令时,根据模拟分析指令确定执行线路故障模拟操作对应的当前进度,并根据当前进度加载对应的目标数据。102. When it is detected that the simulation analysis instruction is received, determine the current progress corresponding to the execution of the line fault simulation operation according to the simulation analysis instruction, and load the corresponding target data according to the current progress.

本发明实施例中,目标数据包括线路发生故障的区域对应的区域线路图以及线路发生故障的区域对应的故障因子,其中,故障因子包括故障开关、故障设备以及故障线路中的至少一种,本发明实施例不做限定。In this embodiment of the present invention, the target data includes an area circuit diagram corresponding to the area where the line is faulty and a fault factor corresponding to the area where the line is faulty, wherein the fault factor includes at least one of a faulty switch, a faulty device, and a faulty line. The embodiments of the invention are not limited.

103、根据目标数据生成模拟线路图。103. Generate an analog circuit diagram according to the target data.

本发明实施例中,模拟线路图包括组成电力传输线路的电力器件对应的器件图模以及电力传输线路对应的线路图模。In the embodiment of the present invention, the analog circuit diagram includes a device diagram corresponding to the power devices constituting the power transmission line and a circuit diagram corresponding to the power transmission line.

本发明实施例中,在根据目标数据生成模拟线路图之前,该基于可连续分步停电模拟的配电故障处理方法还包括以下操作:In the embodiment of the present invention, before generating the simulated circuit diagram according to the target data, the method for processing power distribution faults based on the continuous step-by-step power failure simulation further includes the following operations:

检测是否存在历史模拟数据,历史模拟数据包括前置模拟数据以及留存数据,前置模拟数据为在当前进度之前已完成执行的前置模拟操作对应的数据,留存数据为存储在数据库中的与当前线路故障事件匹配的数据;Detect whether there is historical simulation data. Historical simulation data includes pre-simulation data and retained data. Pre-simulation data is the data corresponding to the pre-simulation operation that has been completed before the current progress, and retained data is stored in the database. Line fault event matching data;

当检测出不存在历史模拟数据时,触发执行上述的根据目标数据生成模拟线路图对应的操作;When it is detected that there is no historical analog data, trigger the execution of the above-mentioned operation corresponding to the generation of the analog circuit diagram according to the target data;

当检测出存在历史模拟数据时,根据目标数据生成模拟线路图,包括:When it is detected that there is historical analog data, an analog circuit diagram is generated according to the target data, including:

调用历史模拟数据,并根据历史模拟数据生成基准态拓扑,基准台拓扑用于构建模拟线路图;The historical simulation data is called, and the reference state topology is generated according to the historical simulation data, and the reference table topology is used to construct the simulation circuit diagram;

根据生成的基准态拓扑以及目标数据生成模拟线路图。Generate a simulated circuit diagram based on the generated reference state topology and target data.

可见,在本发明实施例中,在生成模拟线路图之前,还能智能化检测历史模拟数据,并在检测出历史模拟数据之后智能化生成基准态拓扑从而再生成模拟线路图,有利于提高生成的模拟线路图的准确性,从而提高后续进行模拟操作得到的模拟结果的准确性。It can be seen that in the embodiment of the present invention, before generating the analog circuit diagram, the historical simulation data can be intelligently detected, and after the historical simulation data is detected, the reference state topology can be intelligently generated to regenerate the analog circuit diagram, which is beneficial to improve the generation The accuracy of the simulation circuit diagram, thereby improving the accuracy of the simulation results obtained by subsequent simulation operations.

104、检测是否接收到图模编辑指令。104. Detect whether an image editing instruction is received.

本发明实施例中,当步骤104的检查结果为是时,执行步骤105。In this embodiment of the present invention, when the check result of step 104 is yes, step 105 is executed.

105、当检测出接收到图模编辑指令时,根据图模编辑指令确定目标变更图模。105. When it is detected that the pattern editing instruction is received, determine the target changing pattern according to the pattern editing instruction.

本发明实施例中,图模编辑指令用于对模拟线路图所包括的图模进行状态切换。In this embodiment of the present invention, the pattern editing instruction is used to switch states of patterns included in the analog circuit diagram.

106、根据图模编辑指令,切换目标变更图模对应的图模状态,得到第一切换结果并生成第一切换结果对应的变更记录。106. According to the graphic editing instruction, the switching target changes the graphic state corresponding to the graphic, obtains a first switching result, and generates a change record corresponding to the first switching result.

本发明实施例中,图模状态包括正常运行状态或故障状态,变更记录为切换目标变更图模对应的图模状态后对应生成的记录。In the embodiment of the present invention, the graph mode state includes a normal operation state or a fault state, and the change record is a record correspondingly generated after the switching target changes the graph mode state corresponding to the graph mode.

107、分析第一切换结果,得到故障分析报告。107. Analyze the first switching result to obtain a fault analysis report.

108、判断是否检测到用于结束当前模拟流程的终止指令。108. Determine whether a termination instruction for ending the current simulation process is detected.

本发明实施例中,当步骤108的判断结果为是时,执行步骤109,当步骤108的判断结果为否时,执行步骤104。In this embodiment of the present invention, when the determination result of step 108 is yes, step 109 is performed, and when the determination result of step 108 is no, step 104 is performed.

109、终止当前的模拟流程。109. Terminate the current simulation process.

可见,实施图1所描述的基于可连续分步停电模拟的配电故障处理方法,能够在接收到模拟分析指令后,智能化加载实际线路抢修现场对应的线路和线路故障数据,提高了停复电信息的传递效率;还能够根据图模编辑指令智能化切换图模状态、生成变更记录以及分析得到故障报告,实现了模拟连续停电处理的流程,有利于实际抢修时根据该变更记录以及故障报告进行复电操作的调整,从而提高复电效率以及复电成功率;进一步的,还能够在检测到终止指令时自适应终止当前模拟流程,实现停电模拟的分步模拟、分步研判功能,提高了停电操作的可控性,在一定程度上有利于提高复电成功率以及复电的安全性。It can be seen that the implementation of the power distribution fault processing method based on the continuous step-by-step power failure simulation described in Figure 1 can intelligently load the line and line fault data corresponding to the actual line emergency repair site after receiving the simulation analysis command, which improves the power failure recovery. The transmission efficiency of electrical information; it can also intelligently switch the state of the pattern according to the pattern editing instructions, generate the change record and analyze the fault report, which realizes the process of simulating continuous power failure processing, which is beneficial to the actual emergency repair according to the change record and fault report. Adjust the power recovery operation, thereby improving the power recovery efficiency and the power recovery success rate; further, it can adaptively terminate the current simulation process when a termination command is detected, and realize the step-by-step simulation and step-by-step research and judgment functions of the power failure simulation. It improves the controllability of the power outage operation, and helps to improve the success rate of power restoration and the safety of power restoration to a certain extent.

在一个可选的实施例中,该基于可连续分步停电模拟的配电故障处理装置方法还可以包括以下操作:In an optional embodiment, the method for a power distribution fault processing device based on continuous step-by-step power outage simulation may further include the following operations:

在故障处理人员根据模拟结果执行故障处理操作的过程中,采集实操数据,实操数据包括执行故障处理操作对应修复的故障部件、故障处理操作对应的复电结果、故障处理操作对应的停电原因以及故障处理操作对应的抢修策略中的至少一种;In the process of fault handling personnel performing fault handling operations according to the simulation results, actual operation data is collected, which includes the faulty components repaired corresponding to the fault handling operations, the power restoration results corresponding to the fault handling operations, and the causes of power outages corresponding to the fault handling operations. and at least one of the emergency repair strategies corresponding to the fault handling operation;

当实操数据包括故障部件或复电结果时,根据实操数据更新模拟线路图所包括的图模对应的图模状态,并得到与更新后的图模状态对应的实操仿真结果;When the actual operation data includes the faulty component or the power recovery result, update the pattern state corresponding to the pattern included in the analog circuit diagram according to the actual operation data, and obtain the actual operation simulation result corresponding to the updated pattern state;

根据实操数据,分析实操仿真结果,得到对应的分析结果;According to the actual operation data, analyze the actual operation simulation results, and obtain the corresponding analysis results;

根据分析结果以及实操数据,确定执行故障处理操作时修复故障线路对应的修复策略,修复策略用于后续进行线路故障模拟时作为优化模拟进程的辅助数据。According to the analysis results and actual operation data, the repair strategy corresponding to the repair of the faulty line is determined when the fault handling operation is performed, and the repair strategy is used as auxiliary data for the optimization of the simulation process in the subsequent line fault simulation.

可见,在该可选的实施例中,能够智能化采集实操数据,从而智能化学习故障处理人员进行故障处理的修复策略,作为优化自主模拟故障进行的辅助数据,有利于提高进行故障模拟时得到模拟结果的准确性。It can be seen that in this optional embodiment, actual operation data can be collected intelligently, so as to intelligently learn the repair strategy of fault processing personnel for fault processing, which is used as auxiliary data for optimizing the automatic fault simulation, which is beneficial to improve the time of fault simulation. Get the accuracy of the simulation results.

在该可选的实施例中,进一步的,在得到实操仿真结果对应的分析结果之后,该基于可连续分步停电模拟的配电故障处理方法还可以包括以下操作:In this optional embodiment, further, after obtaining the analysis result corresponding to the actual operation simulation result, the power distribution fault processing method based on the continuous step-by-step power outage simulation may further include the following operations:

检测是否存在信息公知指令,信息公知指令用于将分析结果更新在对应的信息网站,以使用户通过信息网站获知配电故障的实时处理进度;Detecting whether there is an information known instruction, the information known instruction is used to update the analysis result on the corresponding information website, so that the user can know the real-time processing progress of the power distribution fault through the information website;

当检测出存在信息公知指令时,根据该信息公知指令,按照预设数据公告模板处理该分析报告,得到处理结果;When it is detected that there is a known information instruction, according to the known information instruction, the analysis report is processed according to the preset data announcement template, and a processing result is obtained;

将该处理结果上传至上述的信息网站,以提供给用户。The processing result is uploaded to the above-mentioned information website to be provided to the user.

可见,在该可选的实施例中,在得到实操仿真结果对应的分析结果之后,以及检测到信息公知指令时,能够实现自动上传、更新信息网站上的配网故障信息,实现配网故障信息的可视化,提高了配网故障信息的时效性,进而有利于提高用户粘度。It can be seen that in this optional embodiment, after the analysis results corresponding to the actual operation simulation results are obtained, and when the known information instruction is detected, the distribution network fault information on the information website can be automatically uploaded and updated, and the distribution network fault can be realized. The visualization of information improves the timeliness of distribution network fault information, which in turn helps to improve user viscosity.

实施例二Embodiment 2

请参阅图2,图2是本发明实施例公开的另一种基于可连续分步停电模拟的配电故障处理方法的流程示意图。其中,图2所描述的基于可连续分步停电模拟的配电故障处理方法可以应用于基于可连续分步停电模拟的配电故障处理装置中,本发明实施例不做限定。如图2所示,该基于可连续分步停电模拟的配电故障处理方法可以包括以下操作:Please refer to FIG. 2. FIG. 2 is a schematic flowchart of another power distribution fault processing method based on continuous step-by-step power failure simulation disclosed by an embodiment of the present invention. Wherein, the power distribution fault processing method based on continuous step-by-step power failure simulation described in FIG. 2 can be applied to a power distribution fault processing device based on continuous step-by-step power failure simulation, which is not limited in the embodiment of the present invention. As shown in Figure 2, the power distribution fault processing method based on continuous step-by-step power failure simulation can include the following operations:

201、检测是否接收到模拟分析指令。201. Detect whether a simulation analysis command is received.

202、当检测出接收到模拟分析指令时,根据模拟分析指令确定执行线路故障模拟操作对应的当前进度,并根据当前进度加载对应的目标数据。202. When it is detected that the simulation analysis instruction is received, determine the current progress corresponding to the execution of the line fault simulation operation according to the simulation analysis instruction, and load corresponding target data according to the current progress.

203、根据目标数据生成模拟线路图。203. Generate an analog circuit diagram according to the target data.

204、检测是否接收到图模编辑指令。204. Detect whether a pattern editing instruction is received.

205、当检测出接收到图模编辑指令时,根据图模编辑指令确定目标变更图模。205. When it is detected that the pattern editing instruction is received, determine the target changing pattern according to the pattern editing instruction.

206、根据图模编辑指令,切换目标变更图模对应的图模状态,得到第一切换结果并生成第一切换结果对应的变更记录。206. According to the graphic editing instruction, the switching target changes the graphic state corresponding to the graphic, obtains a first switching result, and generates a change record corresponding to the first switching result.

207、分析第一切换结果,得到故障分析报告。207. Analyze the first switching result, and obtain a fault analysis report.

208、判断是否检测到用于结束当前模拟流程的终止指令。208. Determine whether a termination instruction for ending the current simulation process is detected.

本发明实施例中,当步骤208的判断结果为是时,执行步骤209,当步骤208的判断结果为否时,执行步骤204。In this embodiment of the present invention, when the determination result of step 208 is yes, step 209 is performed, and when the determination result of step 208 is no, step 204 is performed.

209、终止当前的模拟流程。209. Terminate the current simulation process.

210、采集所有变更记录以及所有故障分析报告。210. Collect all change records and all failure analysis reports.

211、对所有变更记录执行预设归集操作,得到汇总变更记录。211. Perform a preset collection operation on all change records to obtain a summary change record.

本发明实施例中,汇总变更记录包括每个变更记录对应的单一结果以及由所有单一结果归集得到的汇总结果。In the embodiment of the present invention, the summary change record includes a single result corresponding to each change record and a summary result obtained by collecting all the single results.

212、根据汇总变更记录,对故障分析报告执行归集操作,得到汇总分析报告。212. According to the summary change record, perform a collection operation on the fault analysis report to obtain a summary analysis report.

本发明实施例中,汇总分析报告包括与单一结果对应的单一报告以及与汇总结果对应的子汇总报告。In this embodiment of the present invention, the summary analysis report includes a single report corresponding to a single result and a sub-summary report corresponding to the summary result.

213、根据汇总变更记录以及汇总分析报告,确定执行线路故障模拟操作对应的模拟结果。213. Determine a simulation result corresponding to the execution of the line fault simulation operation according to the summary change record and the summary analysis report.

本发明实施例中,模拟结果用于提供给故障处理人员,以触发故障处理人员根据模拟结果调整后续的故障处理操作,需要说明的是,模拟结果包括模拟停电结果以及模拟复电结果,其中,模拟复电结果为模拟出的线路故障修复后恢复供电对应的结果。In this embodiment of the present invention, the simulation result is provided to the fault handling personnel, so as to trigger the fault handling personnel to adjust the subsequent fault handling operations according to the simulation result. It should be noted that the simulation result includes the simulated power failure result and the simulated power restoration result, wherein, The simulated power restoration result is the result corresponding to the restoration of power supply after the simulated line fault is repaired.

本发明实施例中,针对步骤201-步骤209的其他描述请参阅实施例一中针对步骤101-步骤109的其他具体描述,本发明实施例不再赘述。In this embodiment of the present invention, for other descriptions of steps 201 to 209, please refer to other specific descriptions of steps 101 to 109 in Embodiment 1, which are not repeated in this embodiment of the present invention.

可见,实施图2所描述的基于可连续分步停电模拟的配电故障处理方法,在一次模拟调用中进行多步模拟操作后,能够自动记录、汇总多步操作的各自的操作影响,进一步的,还能汇总多步操作的累积影响,从而形成本次模拟的停复电影响结果,实现了复电操作的可分步模拟功能,降低了因复电操作繁琐复杂导致复电失败时回溯失败原因的难度,同时可分步式复电模拟也在一定程度上提高了复电效率以及复电成功率。It can be seen that, by implementing the power distribution fault processing method described in Fig. 2 based on the continuous step-by-step power failure simulation, after performing multi-step simulation operations in one simulation call, the respective operation effects of the multi-step operations can be automatically recorded and summarized, and further , it can also summarize the cumulative effects of multi-step operations, so as to form the effect of power failure and power restoration in this simulation, realize the step-by-step simulation function of power restoration operations, and reduce the retrospective failure when power restoration fails due to cumbersome and complicated power restoration operations. At the same time, the step-by-step re-electric simulation also improves the re-electric efficiency and the re-electric success rate to a certain extent.

在一个可选的实施例中,上述根据汇总变更记录以及汇总分析报告,确定执行线路故障模拟操作对应的模拟结果之后,方法还包括:In an optional embodiment, after determining the simulation result corresponding to the line fault simulation operation according to the summary change record and the summary analysis report, the method further includes:

检测是否接收到模拟反馈信息,模拟反馈信息为故障处理人员根据模拟结果对当前线路故障进行处理后反馈的信息;Detect whether the analog feedback information is received, and the analog feedback information is the information fed back by the fault handler after processing the current line fault according to the simulation result;

当检测到模拟反馈信息时,根据模拟反馈信息确定反馈类型,反馈类型包括表示模拟结果无误的确证类型或表示模拟结果错误的重溯类型;When the simulation feedback information is detected, the feedback type is determined according to the simulation feedback information, and the feedback type includes the confirmation type indicating that the simulation result is correct or the retrace type indicating that the simulation result is wrong;

当确定出反馈类型为确证类型时,将模拟结果存储至预设数据库中,以用于后续进行线路故障总结时作为分析数据;When it is determined that the feedback type is the confirmation type, the simulation results are stored in the preset database, which can be used as analysis data in the subsequent summary of line faults;

当确定出反馈类型为重溯类型时,根据模拟反馈信息确定需要执行重溯操作的目标变更记录、目标变更记录对应的目标变更操作;When it is determined that the feedback type is the retrospective type, according to the simulated feedback information, determine the target change record that needs to perform the retrospective operation and the target change operation corresponding to the target change record;

根据模拟反馈信息更新目标变更图模,并根据目标变更操作切换更新后的目标变更图模对应的图模状态,得到第二切换结果同时生成与第二切换结果对应的变更记录,以更新目标变更记录;Update the target change graph according to the simulation feedback information, and switch the graph state corresponding to the updated target change graph according to the target change operation, obtain the second switching result and generate a change record corresponding to the second switching result to update the target change Record;

将第一切换结果更新为第二切换结果,并触发执行上述的分析第一切换结果,得到故障分析报告,并重复执行上述的检测是否接收到图模编辑指令对应的操作至检测到用于结束当前模拟流程的终止指令时,终止当前的模拟流程对应的操作。Update the first switching result to the second switching result, and trigger the execution of the above-mentioned analysis of the first switching result, obtain a fault analysis report, and repeat the above-mentioned operation of detecting whether the pattern editing instruction is received until it is detected for ending. When the current simulation process terminates the command, the operation corresponding to the current simulation process is terminated.

可见,在该可选的实施例中,在检测到模拟反馈信息之后,能够智能化确定反馈类型,并确定根据反馈类型执行匹配的操作,提高了针对模拟反馈信息的处理效率;此外,还能够在确定出反馈类型为重溯类型时,也即表明原先的模拟结果出错时,自动确定需要重溯的记录以及操作,并自主对该记录及操作进行重溯,有利于提高重溯效率。It can be seen that, in this optional embodiment, after the analog feedback information is detected, the feedback type can be intelligently determined, and the matching operation can be determined according to the feedback type, which improves the processing efficiency of the analog feedback information; When it is determined that the feedback type is the retrace type, that is, when the original simulation result is wrong, the records and operations that need to be retraced are automatically determined, and the records and operations are retraced independently, which is beneficial to improve the retrace efficiency.

在该可选的实施例中,可选的,模拟反馈信息还包括确证记录,确证记录具体为实际修复线路故障后对应的实际修复结果对应的记录;以及上述将第一切换结果更新为第二切换结果之前,方法还包括:In this optional embodiment, optionally, the analog feedback information further includes a confirmation record, and the confirmation record is specifically a record corresponding to the actual repair result corresponding to the actual repair of the line fault; and the above-mentioned updating the first switching result to the second Before switching results, the method also includes:

判断更新后的目标变更记录是否与确证记录相匹配,当判断出目标变更记录与确证记录相匹配时,触发执行上述的将第一切换结果更新为第二切换结果对应的操作;Judging whether the updated target change record matches the confirmation record, and when judging that the target change record matches the confirmation record, trigger the execution of the above-mentioned operation of updating the first switching result to the corresponding operation of the second switching result;

当判断出目标变更记录与确证记录不匹配时,分析确证记录以及目标变更记录,得到目标变更记录对应的辨证参数,辨证参数包括目标变更记录所记录的操作和/或目标变更记录所记录的结果中导致模拟结果出错的参数;When it is judged that the target change record does not match the confirmation record, analyze the confirmation record and the target change record to obtain the dialectical parameters corresponding to the target change record, and the dialectical parameters include the operation recorded in the target change record and/or the result recorded in the target change record The parameters that cause errors in the simulation results;

将辨证参数以及目标变更记录归集到预设研判记录集中,以用于后续处理与目标变更记录匹配的故障事件时作为数据支撑。The dialectical parameters and target change records are collected into the preset research and judgment record set to be used as data support for subsequent processing of fault events matching the target change records.

可见,在该可选的实施例中,当模拟反馈信息还包括确诊记录时,能够将更新的目标变更记录与确证记录进行匹配验证,进一步验证得到的目标变更记录是否与实际效果相符,提高了得到的目标变更记录的可靠性和准确性。It can be seen that in this optional embodiment, when the simulated feedback information also includes a diagnosis record, the updated target change record and the confirmation record can be matched and verified to further verify whether the obtained target change record is consistent with the actual effect. The reliability and accuracy of the resulting target change records.

实施例三Embodiment 3

请参阅图3,图3是本发明实施例公开的一种基于可连续分步停电模拟的配电故障处理装置的结构示意图。其中,该基于可连续分步停电模拟的配电故障处理装置可以是基于可连续分步停电模拟的配电故障处理终端、基于可连续分步停电模拟的配电故障处理设备、基于可连续分步停电模拟的配电故障处理系统或者基于可连续分步停电模拟的配电故障处理服务器,基于可连续分步停电模拟的配电故障处理服务器可以是本地服务器,也可以是远端服务器,还可以是云服务器(又称云端服务器),当基于可连续分步停电模拟的配电故障处理服务器为非云服务器时,该非云服务器能够与云服务器进行通信连接,本发明实施例不做限定。如图3所示,该基于可连续分步停电模拟的配电故障处理装置可以包括检测模块301、确定模块302、加载模块303、生成模块304、切换模块305、分析模块306以及终止模块307,其中:Please refer to FIG. 3 . FIG. 3 is a schematic structural diagram of a power distribution fault processing device based on continuous step-by-step power failure simulation disclosed in an embodiment of the present invention. Wherein, the power distribution fault processing device based on continuous step-by-step power failure simulation may be a power distribution fault processing terminal based on continuous step-by-step power failure simulation, a distribution fault processing device based on continuous step-by-step power failure simulation, and a power distribution fault processing device based on continuous step-by-step power failure simulation. A power distribution fault processing system based on step-by-step power failure simulation or a power distribution fault processing server based on continuous step-by-step power failure simulation. It can be a cloud server (also known as a cloud server). When the power distribution fault processing server based on continuous step-by-step power failure simulation is a non-cloud server, the non-cloud server can communicate with the cloud server, which is not limited in the embodiment of the present invention. . As shown in FIG. 3 , the power distribution fault processing device based on continuous step-by-step power failure simulation may include a detection module 301, a determination module 302, a loading module 303, a generation module 304, a switching module 305, an analysis module 306, and a termination module 307. in:

检测模块301,用于检测是否接收到模拟分析指令,模拟分析指令用于执行预设线路故障模拟操作。The detection module 301 is used for detecting whether a simulation analysis instruction is received, and the simulation analysis instruction is used for performing a preset line fault simulation operation.

确定模块302,用于当检测出接收到模拟分析指令时,根据模拟分析指令确定执行线路故障模拟操作对应的当前进度。The determining module 302 is configured to, when it is detected that the simulation analysis instruction is received, determine the current progress corresponding to the execution of the line fault simulation operation according to the simulation analysis instruction.

加载模块303,用于根据确定模块302确定出的当前进度加载对应的目标数据,目标数据包括线路发生故障的区域对应的区域线路图以及线路发生故障的区域对应的故障因子,故障因子包括故障开关、故障设备以及故障线路中的至少一种。The loading module 303 is used to load the corresponding target data according to the current progress determined by the determining module 302. The target data includes the regional circuit diagram corresponding to the area where the line is faulty and the fault factor corresponding to the area where the line is faulty, and the fault factor includes the fault switch. , at least one of faulty equipment and faulty lines.

生成模块304,用于根据加载模块303加载的目标数据生成模拟线路图,模拟线路图包括组成电力传输线路的电力器件对应的器件图模以及电力传输线路对应的线路图模。The generating module 304 is configured to generate an analog circuit diagram according to the target data loaded by the loading module 303 , and the analog circuit diagram includes a device diagram corresponding to the power devices constituting the power transmission line and a circuit diagram corresponding to the power transmission line.

检测模块301,还用于检测是否接收到图模编辑指令。The detection module 301 is further configured to detect whether a pattern editing instruction is received.

确定模块302,还用于当检测模块301检测出接收到图模编辑指令时,根据图模编辑指令确定目标变更图模,图模编辑指令用于对模拟线路图所包括的图模进行状态切换。The determination module 302 is further configured to determine the target change pattern according to the pattern editing instruction when the detection module 301 detects that the pattern editing instruction is received, and the pattern editing instruction is used to switch the state of the pattern included in the analog circuit diagram .

切换模块305,用于根据检测模块301检测出的图模编辑指令,切换目标变更图模对应的图模状态,得到第一切换结果。The switching module 305 is configured to switch the graphics mode state corresponding to the target change graphics mode according to the graphics mode editing instruction detected by the detection module 301, and obtain the first switching result.

生成模块304,还用于生成第一切换结果对应的变更记录,图模状态包括正常运行状态或故障状态,变更记录为切换目标变更图模对应的图模状态后对应生成的记录。The generating module 304 is further configured to generate a change record corresponding to the first switching result, the graph state includes a normal operation state or a fault state, and the change record is a record correspondingly generated after the switching target changes the graph state corresponding to the graph model.

分析模块306,用于分析生成模块304生成的第一切换结果,得到故障分析报告,并触发检测模块301重复执行上述的检测是否接收到图模编辑指令对应的操作,其中,故障分析报告用于提供给故障处理人员,以触发故障处理人员根据故障分析报告进行故障处理。The analysis module 306 is configured to analyze the first switching result generated by the generation module 304, obtain a fault analysis report, and trigger the detection module 301 to repeatedly perform the above-mentioned operation of detecting whether the pattern editing instruction is received, wherein the fault analysis report is used for Provide it to the fault handler to trigger the fault handler to perform fault processing according to the fault analysis report.

终止模块307,用于在检测模块301重复执行上述的检测是否接收到图模编辑指令对应的操作的过程中,当检测到用于结束当前模拟流程的终止指令时,终止当前的模拟流程。The termination module 307 is used for terminating the current simulation process when the detection module 301 repeatedly performs the above-mentioned operation of detecting whether the operation corresponding to the pattern editing instruction is received, when a termination instruction for ending the current simulation process is detected.

可见,实施图3所描述的基于可连续分步停电模拟的配电故障处理装置,能够在接收到模拟分析指令后,智能化加载实际线路抢修现场对应的线路和线路故障数据,提高了停复电信息的传递效率;还能够根据图模编辑指令智能化切换图模状态、生成变更记录以及分析得到故障报告,实现了模拟连续停电处理的流程,有利于实际抢修根据该变更记录以及故障报告进行复电操作的调整,从而提高复电效率以及复电成功率;进一步的,还能够在检测到终止指令时自适应终止当前模拟流程,实现停电模拟的分步模拟、分步研判功能,提高了停电操作的可控性,在一定程度上有利于提高复电成功率以及复电的安全性。It can be seen that the implementation of the power distribution fault processing device based on the continuous step-by-step power failure simulation described in Fig. 3 can intelligently load the line and line fault data corresponding to the actual line emergency repair site after receiving the simulation analysis command, which improves the power failure recovery. The transmission efficiency of electrical information; it can also intelligently switch the state of the pattern according to the pattern editing instructions, generate the change record and analyze the fault report, which realizes the process of simulating continuous power failure processing, which is beneficial to the actual emergency repair according to the change record and fault report. Adjustment of power recovery operation, thereby improving power recovery efficiency and success rate of power recovery; further, it can self-adaptively terminate the current simulation process when a termination command is detected, and realize the step-by-step simulation and step-by-step research and judgment functions of power failure simulation, which improves the The controllability of power failure operation is beneficial to improve the success rate of power recovery and the safety of power recovery to a certain extent.

在一个可选的实施例中,如图4所示,该基于可连续分步停电模拟的配电故障处理装置还包括第一采集模块308、归集模块309,其中:In an optional embodiment, as shown in FIG. 4 , the apparatus for processing power distribution faults based on continuous step-by-step power failure simulation further includes a first collection module 308 and a collection module 309, wherein:

第一采集模块308,用在终止模块307终止当前的模拟流程之后,采集所有变更记录以及所有故障分析报告。The first collection module 308 is used to collect all change records and all fault analysis reports after the termination module 307 terminates the current simulation process.

归集模块309,用于对第一采集模块308采集到的所有变更记录执行预设归集操作,得到汇总变更记录,汇总变更记录包括每个变更记录对应的单一结果以及由所有单一结果归集得到的汇总结果。The collection module 309 is configured to perform a preset collection operation on all the change records collected by the first collection module 308 to obtain a summary change record, and the summary change record includes a single result corresponding to each change record and a collection of all single results. The aggregated results obtained.

归集模块309,还用于根据汇总变更记录,对故障分析报告执行归集操作,得到汇总分析报告,其中,汇总分析报告包括与单一结果对应的单一报告以及与汇总结果对应的子汇总报告。The collection module 309 is further configured to perform a collection operation on the fault analysis report according to the summary change record to obtain a summary analysis report, wherein the summary analysis report includes a single report corresponding to a single result and a sub-summary report corresponding to the summary result.

确定模块302,还用于根据归集模块309归集出的汇总变更记录以及汇总分析报告,确定执行线路故障模拟操作对应的模拟结果,模拟结果用于提供给故障处理人员,以触发故障处理人员根据模拟结果调整后续的故障处理操作,模拟结果包括模拟停电结果以及模拟复电结果,其中模拟复电结果为模拟出的线路故障修复后恢复供电对应的结果。The determination module 302 is further configured to determine the simulation result corresponding to the line fault simulation operation according to the summary change records and the summary analysis report collected by the collection module 309, and the simulation result is used to provide the fault processing personnel to trigger the fault processing personnel. The subsequent fault handling operations are adjusted according to the simulation results. The simulation results include the simulated power outage results and the simulated power restoration results, where the simulated power restoration results are the results corresponding to the restoration of power supply after the simulated line fault is repaired.

可见,实施图4所描述的基于可连续分步停电模拟的配电故障处理装置,在一次模拟调用中进行多步模拟操作后,能够自动记录、汇总多步操作的各自的操作影响,进一步的,还能汇总多步操作的累积影响,从而形成本次模拟的停复电影响结果,实现了复电操作的可分步模拟功能,降低了因复电操作繁琐复杂导致复电失败时回溯失败原因的难度,同时可分步式复电模拟也在一定程度上提高了复电效率以及复电成功率。It can be seen that, implementing the power distribution fault processing device described in Fig. 4 based on the continuous step-by-step power failure simulation, after performing multi-step simulation operations in one simulation call, it can automatically record and summarize the respective operation effects of the multi-step operations, and further , it can also summarize the cumulative effects of multi-step operations, so as to form the effect of power failure and power restoration in this simulation, realize the step-by-step simulation function of power restoration operations, and reduce the retrospective failure when power restoration fails due to cumbersome and complicated power restoration operations. At the same time, the step-by-step re-electric simulation also improves the re-electric efficiency and the re-electric success rate to a certain extent.

在另一个可选的实施例中,检测模块301,还用于确定模块302根据汇总变更记录以及汇总分析报告,确定执行线路故障模拟操作对应的模拟结果之后,检测是否接收到模拟反馈信息,模拟反馈信息为故障处理人员根据模拟结果对当前线路故障进行处理后反馈的信息。In another optional embodiment, the detection module 301 is further configured to detect whether the simulation feedback information is received after the determination module 302 determines the simulation result corresponding to the line fault simulation operation according to the summary change record and the summary analysis report, and simulates The feedback information is the information fed back by the fault handler after processing the current line fault according to the simulation result.

确定模块302,还用于当检测模块301检测到模拟反馈信息时,根据模拟反馈信息确定反馈类型,反馈类型包括表示模拟结果无误的确证类型或表示模拟结果错误的重溯类型。The determination module 302 is further configured to determine the feedback type according to the simulation feedback information when the detection module 301 detects the simulation feedback information, and the feedback type includes a confirmation type indicating that the simulation result is correct or a retrace type indicating that the simulation result is wrong.

且如图4所示,该基于可连续分步停电模拟的配电故障处理装置还包括存储模块310、第一更新模块311,其中:And as shown in FIG. 4 , the power distribution fault processing device based on continuous step-by-step power failure simulation further includes a storage module 310 and a first update module 311, wherein:

存储模块310,用于当确定模块302确定出反馈类型为确证类型时,将模拟结果存储至预设数据库中,以用于后续进行线路故障总结时作为分析数据。The storage module 310 is configured to store the simulation result in a preset database when the determination module 302 determines that the feedback type is a confirmation type, so as to be used as analysis data in subsequent line fault summaries.

确定模块302,还用于当确定出反馈类型为重溯类型时,根据模拟反馈信息确定需要执行重溯操作的目标变更记录、目标变更记录对应的目标变更操作。The determining module 302 is further configured to, when it is determined that the feedback type is the retrace type, determine the target change record that needs to perform the retrace operation and the target change operation corresponding to the target change record according to the simulated feedback information.

第一更新模块311,用于根据检测模块301检测出的模拟反馈信息更新确定模块302确定出的目标变更图模。The first update module 311 is configured to update the target change pattern determined by the determination module 302 according to the analog feedback information detected by the detection module 301 .

切换模块305,还用于根据确定模块302确定出的目标变更操作切换第一更新模块311更新后的目标变更图模对应的图模状态,得到第二切换结果。The switching module 305 is further configured to switch the pattern state corresponding to the target changing pattern updated by the first updating module 311 according to the target changing operation determined by the determining module 302 to obtain a second switching result.

生成模块304,还用于生成与第二切换结果对应的变更记录,以更新目标变更记录。The generating module 304 is further configured to generate a change record corresponding to the second switching result, so as to update the target change record.

第一更新模块311,还用于将第一切换结果更新为第二切换结果,并触发分析模块306执行上述的分析第一切换结果,得到故障分析报告,并重复执行上述的检测是否接收到图模编辑指令对应的操作至检测到用于结束当前模拟流程的终止指令时,触发终止模块307终止当前的模拟流程对应的操作。The first update module 311 is also used to update the first switching result to the second switching result, and trigger the analysis module 306 to perform the above-mentioned analysis of the first switching result, obtain a fault analysis report, and repeatedly perform the above-mentioned detection to see if the graph is received. From the operation corresponding to the modulo editing instruction, when the termination instruction for ending the current simulation process is detected, the termination module 307 is triggered to terminate the operation corresponding to the current simulation process.

可见,实施图4所描述的基于可连续分步停电模拟的配电故障处理装置,在检测到模拟反馈信息之后,能够智能化确定反馈类型,并确定根据反馈类型执行匹配的操作,提高了针对模拟反馈信息的处理效率;此外,还能够在确定出反馈类型为重溯类型时,也即表明原先的模拟结果出错时,自动确定需要重溯的记录以及操作,并自主对该记录及操作进行重溯,有利于提高重溯效率。It can be seen that, by implementing the power distribution fault processing device based on the continuous step-by-step power failure simulation described in FIG. 4, after detecting the analog feedback information, it can intelligently determine the feedback type, and determine to perform matching operations according to the feedback type, which improves the ability to deal with it. Simulate the processing efficiency of feedback information; in addition, when it is determined that the feedback type is the retrace type, that is, when the original simulation result is wrong, it can automatically determine the records and operations that need to be retraced, and independently carry out the records and operations. Retracing is conducive to improving the efficiency of retracing.

在又一个可选的实施例中,模拟反馈信息还包括确证记录,确证记录具体为实际修复线路故障后对应的实际修复结果对应的记录;如图4所示,该基于可连续分步停电模拟的配电故障处理装置还包括判断模块312,其中:In yet another optional embodiment, the simulation feedback information further includes a confirmation record, and the confirmation record is specifically a record corresponding to the actual repair result corresponding to the actual repair of the line fault; as shown in FIG. The power distribution fault processing device further includes a judgment module 312, wherein:

判断模块312,用于在第一更新模块311将第一切换结果更新为第二切换结果之前,判断更新后的目标变更记录是否与确证记录相匹配,当判断出目标变更记录与确证记录相匹配时,触发第一更新模块311执行上述的将第一切换结果更新为第二切换结果对应的操作。The judgment module 312 is used to judge whether the updated target change record matches the confirmation record before the first update module 311 updates the first switching result to the second switching result, and when it is judged that the target change record matches the confirmation record is triggered, the first updating module 311 is triggered to perform the above-mentioned operation corresponding to updating the first switching result to the second switching result.

分析模块306,还用于当判断模块312判断出目标变更记录与确证记录不匹配时,分析确证记录以及目标变更记录,得到目标变更记录对应的辨证参数,辨证参数包括目标变更记录所记录的操作和/或目标变更记录所记录的结果中导致模拟结果出错的参数。The analysis module 306 is further configured to analyze the confirmation record and the target change record when the judgment module 312 judges that the target change record does not match the confirmation record, and obtain the dialectical parameters corresponding to the target change record, and the dialectical parameters include the operations recorded in the target change record and/or the parameters in the results recorded in the target change log that caused the simulation results to be wrong.

归集模块309,还用于将分析模块306得到的辨证参数以及生成模块304更新后的目标变更记录归集到预设研判记录集中,以用于后续处理与目标变更记录匹配的故障事件时作为数据支撑。The collection module 309 is also used to collect the dialectical parameters obtained by the analysis module 306 and the target change records updated by the generation module 304 into a preset research and judgment record set, which is used for subsequent processing of fault events that match the target change records. data support.

可见,实施图4所描述的基于可连续分步停电模拟的配电故障处理装置,当模拟反馈信息还包括确诊记录时,能够将更新的目标变更记录与确证记录进行匹配验证,进一步验证得到的目标变更记录是否与实际效果相符,提高了得到的目标变更记录的可靠性和准确性。It can be seen that, by implementing the power distribution fault processing device based on the continuous step-by-step power outage simulation described in FIG. 4, when the simulated feedback information also includes the confirmation record, the updated target change record and the confirmation record can be matched and verified, and the obtained result can be further verified. Whether the target change record is consistent with the actual effect improves the reliability and accuracy of the obtained target change record.

在另一个可选的实施例中,检测模块301,还用于检测是否接收到模拟分析指令之前,检测是否存在配电故障的报障信息,报障信息包括中压开关跳闸对应的故障信息。In another optional embodiment, the detection module 301 is further configured to detect whether there is fault report information of a power distribution fault before receiving the simulation analysis command, where the fault report information includes fault information corresponding to the trip of the medium voltage switch.

确定模块302,还用于当检测模块301检测到报障信息时,根据报障信息,确定跳闸馈线的目标参数,目标参数包括跳闸馈线所在环网组运行态的中压拓扑连接关系。The determination module 302 is further configured to determine the target parameters of the trip feeder according to the fault report information when the detection module 301 detects the fault report information, and the target parameters include the medium voltage topology connection relationship of the ring network group where the trip feeder is located.

如图4所示,该基于可连续分步停电模拟的配电故障处理装置还包括叠加模块313,其中:As shown in FIG. 4 , the power distribution fault processing device based on continuous step-by-step power failure simulation further includes a superposition module 313, wherein:

叠加模块313,用于根据确定模块302确定出的目标参数以及预设停电模拟分析算法,在当前模拟进程中叠加与报障信息对应的开关跳闸动作,得到模拟叠加结果。The superposition module 313 is configured to superimpose the switch tripping action corresponding to the fault report information in the current simulation process according to the target parameters determined by the determination module 302 and the preset power failure simulation analysis algorithm to obtain a simulation superposition result.

分析模块306,还用于根据停电模拟分析算法,分析叠加模块313得到的模拟叠加结果,得到跳闸馈线对应的故障模拟数据,故障模拟数据包括跳闸馈线对应的跳闸开关,跳闸开关发生故障后所影响的模拟故障区域,以及故障模拟数据用于后续生成发生线路故障的模拟线路图时作为加载数据。The analysis module 306 is further configured to analyze the simulation superposition result obtained by the superposition module 313 according to the power failure simulation analysis algorithm, and obtain the fault simulation data corresponding to the tripped feeder. The simulated fault area, and the fault simulation data are used as the loading data when the simulated circuit diagram of the line fault occurs subsequently.

可见,实施图4所描述的基于可连续分步停电模拟的配电故障处理装置,能够智能化处理检测到的报障信息,得到目标参数,提高了报障信息的处理效率;还能够自动叠加开关跳闸动作并分析模拟叠加结果,实现出现线路报障时的自主模拟,有利于后续进行实际线路故障处理时作为辅助数据,从而提高故障处理数据。It can be seen that the implementation of the power distribution fault processing device based on the continuous step-by-step power failure simulation described in Fig. 4 can intelligently process the detected fault report information, obtain the target parameters, and improve the processing efficiency of the fault report information; it can also automatically superimpose The switch tripping action and analysis of the simulation superposition results can realize the autonomous simulation when a line fault occurs, which is conducive to the subsequent processing of actual line faults as auxiliary data, thereby improving the fault processing data.

在该可选的实施例中,进一步可选的,检测模块301,还用于生成模块304根据目标数据生成模拟线路图之前,检测是否存在历史模拟数据,历史模拟数据包括前置模拟数据以及留存数据,前置模拟数据为在当前进度之前已完成执行的前置模拟操作对应的数据,留存数据为存储在数据库中的与当前线路故障事件匹配的数据;当检测出不存在历史模拟数据时,触发生成模块304执行上述的根据目标数据生成模拟线路图对应的操作。In this optional embodiment, further optionally, the detection module 301 is further configured to detect whether there is historical simulation data before the generation module 304 generates the simulation circuit diagram according to the target data, and the historical simulation data includes pre-simulation data and retained Data, the pre-simulation data is the data corresponding to the pre-simulation operation that has been completed before the current progress, and the retained data is the data stored in the database that matches the current line fault event; when it is detected that there is no historical simulation data, The trigger generation module 304 performs the above-mentioned operations corresponding to generating the analog circuit diagram according to the target data.

生成模块304根据目标数据生成模拟线路图的方式具体包括:The manner in which the generation module 304 generates the analog circuit diagram according to the target data specifically includes:

当检测出存在历史模拟数据时,调用历史模拟数据,并根据历史模拟数据生成基准态拓扑,基准台拓扑用于构建模拟线路图;When the existence of historical simulation data is detected, the historical simulation data is called, and the reference state topology is generated according to the historical simulation data, and the reference table topology is used to construct the simulation circuit diagram;

根据生成的基准态拓扑以及目标数据生成模拟线路图。Generate a simulated circuit diagram based on the generated reference state topology and target data.

可见,实施图4所描述的基于可连续分步停电模拟的配电故障处理装置,在生成模拟线路图之前,还能智能化检测历史模拟数据,并在检测出历史模拟数据之后智能化生成基准态拓扑从而再生成模拟线路图,有利于提高生成的模拟线路图的准确性,从而提高后续进行模拟操作得到的模拟结果的准确性。It can be seen that the implementation of the power distribution fault processing device based on the continuous step-by-step power failure simulation described in Figure 4 can intelligently detect historical simulation data before generating the simulation circuit diagram, and intelligently generate benchmarks after detecting the historical simulation data. The state topology is regenerated to generate an analog circuit diagram, which is beneficial to improve the accuracy of the generated analog circuit diagram, thereby improving the accuracy of the simulation results obtained by subsequent simulation operations.

在又一个可选的实施例中,如图4所示,该基于可连续分步停电模拟的配电故障处理装置还包括第二采集模块314、第二更新模块315,其中:In yet another optional embodiment, as shown in FIG. 4 , the apparatus for processing power distribution faults based on continuous step-by-step power failure simulation further includes a second acquisition module 314 and a second update module 315, wherein:

第二采集模块314,用于在故障处理人员根据模拟结果执行故障处理操作的过程中,采集实操数据,实操数据包括执行故障处理操作对应修复的故障部件、故障处理操作对应的复电结果、故障处理操作对应的停电原因以及故障处理操作对应的抢修策略中的至少一种。The second collection module 314 is configured to collect actual operation data during the process of the fault handling personnel performing the fault handling operation according to the simulation result, the actual operation data including the repaired faulty components corresponding to the fault handling operation and the power restoration result corresponding to the fault handling operation , at least one of the power failure cause corresponding to the fault handling operation and the emergency repair strategy corresponding to the fault handling operation.

第二更新模块315,用于当实操数据包括故障部件或复电结果时,根据实操数据更新模拟线路图所包括的图模对应的图模状态,并得到与更新后的图模状态对应的实操仿真结果。The second update module 315 is configured to update the pattern state corresponding to the pattern included in the analog circuit diagram according to the actual operation data when the actual operation data includes the faulty component or the power recovery result, and obtain the pattern corresponding to the updated pattern state. practical simulation results.

分析模块306,还用于根据第二采集模块314采集到的实操数据,分析第二更新模块315得到的实操仿真结果,得到对应的分析结果。The analysis module 306 is further configured to analyze the actual operation simulation result obtained by the second update module 315 according to the actual operation data collected by the second collection module 314 to obtain corresponding analysis results.

确定模块302,还用于根据分析模块306得到的分析结果以及第二采集模块314采集到实操数据,确定执行故障处理操作时修复故障线路对应的修复策略,修复策略用于后续进行线路故障模拟时作为优化模拟进程的辅助数据。The determination module 302 is further configured to determine a repair strategy corresponding to repairing the faulty line when the fault handling operation is performed according to the analysis result obtained by the analysis module 306 and the actual operation data collected by the second collection module 314, and the repair strategy is used for subsequent line fault simulation. as auxiliary data for optimizing the simulation process.

可见,实施图4所描述的基于可连续分步停电模拟的配电故障处理装置,能够智能化采集实操数据,从而智能化学习故障处理人员进行故障处理的修复策略,作为优化自主模拟故障进行的辅助数据,有利于提高进行故障模拟时得到模拟结果的准确性。It can be seen that the implementation of the power distribution fault processing device based on the continuous step-by-step power failure simulation described in Figure 4 can intelligently collect practical data, so as to intelligently learn the repair strategy of fault processing personnel for fault processing, as the optimization of autonomous simulation fault processing. The auxiliary data is beneficial to improve the accuracy of the simulation results when the fault simulation is carried out.

实施例四Embodiment 4

请参阅图5,图5是本发明实施例公开的又一种基于可连续分步停电模拟的配电故障处理装置的结构示意图。如图5所示,该基于可连续分步停电模拟的配电故障处理装置可以包括:Please refer to FIG. 5. FIG. 5 is a schematic structural diagram of another power distribution fault processing device based on continuous step-by-step power failure simulation disclosed by an embodiment of the present invention. As shown in Figure 5, the power distribution fault processing device based on continuous step-by-step power failure simulation may include:

存储有可执行程序代码的存储器401;a memory 401 storing executable program code;

与存储器401耦合的处理器402;a processor 402 coupled to the memory 401;

处理器402调用存储器401中存储的可执行程序代码,执行本发明实施例一或本发明实施例二所描述的基于可连续分步停电模拟的配电故障处理方法中的步骤。The processor 402 invokes the executable program code stored in the memory 401 to execute the steps in the power distribution fault processing method based on the continuous step-by-step power failure simulation described in the first embodiment of the present invention or the second embodiment of the present invention.

实施例五Embodiment 5

本发明实施例公开了一种计算机存储介质,该计算机存储介质存储有计算机指令,该计算机指令被调用时,用于执行本发明实施例一或本发明实施例二所描述的基于可连续分步停电模拟的配电故障处理方法中的步骤。An embodiment of the present invention discloses a computer storage medium. The computer storage medium stores a computer instruction. When the computer instruction is invoked, it is used to execute the continuous step-based continuous step-by-step method described in the first embodiment of the present invention or the second embodiment of the present invention. Steps in a power distribution fault handling method for outage simulation.

实施例六Embodiment 6

本发明实施例公开了一种计算机程序产品,该计算机程序产品包括存储了计算机程序的非瞬时性计算机存储介质,且该计算机程序可操作来使计算机执行实施例一或实施例二中所描述的基于可连续分步停电模拟的配电故障处理方法中的步骤。An embodiment of the present invention discloses a computer program product, the computer program product includes a non-transitory computer storage medium storing a computer program, and the computer program is operable to cause a computer to execute the first or second embodiment described in the embodiment Steps in a distribution fault handling method based on continuous step-by-step outage simulation.

以上所描述的装置实施例仅是示意性的,其中所述作为分离部件说明的模块可以是或者也可以不是物理上分开的,作为模块显示的部件可以是或者也可以不是物理模块,即可以位于一个地方,或者也可以分布到多个网络模块上。可以根据实际的需要选择其中的部分或者全部模块来实现本实施例方案的目的。本领域普通技术人员在不付出创造性的劳动的情况下,即可以理解并实施。The device embodiments described above are only illustrative, wherein the modules described as separate components may or may not be physically separated, and the components shown as modules may or may not be physical modules, that is, they may be located in One place, or it can be distributed over multiple network modules. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution in this embodiment. Those of ordinary skill in the art can understand and implement it without creative effort.

通过以上的实施例的具体描述,本领域的技术人员可以清楚地了解到各实施方式可借助软件加必需的通用硬件平台的方式来实现,当然也可以通过硬件。基于这样的理解,上述技术方案本质上或者说对现有技术做出贡献的部分可以以软件产品的形式体现出来,该计算机软件产品可以存储在计算机存储介质中,存储介质包括只读存储器(Read-OnlyMemory,ROM)、随机存储器(Random Access Memory,RAM)、可编程只读存储器(Programmable Read-only Memory,PROM)、可擦除可编程只读存储器(ErasableProgrammable Read Only Memory,EPROM)、一次可编程只读存储器(One-timeProgrammable Read-Only Memory,OTPROM)、电子抹除式可复写只读存储器(Electrically-Erasable Programmable Read-Only Memory,EEPROM)、只读光盘(CompactDisc Read-Only Memory,CD-ROM)或其他光盘存储器、磁盘存储器、磁带存储器、或者能够用于携带或存储数据的计算机可读的任何其他介质。From the specific description of the above embodiments, those skilled in the art can clearly understand that each implementation manner can be implemented by means of software plus a necessary general hardware platform, and certainly can also be implemented by means of hardware. Based on this understanding, the above-mentioned technical solutions can be embodied in the form of software products in essence or that make contributions to the prior art. The computer software products can be stored in a computer storage medium, and the storage medium includes a read-only memory (Read -Only Memory, ROM), random access memory (Random Access Memory, RAM), Programmable Read-only Memory (PROM), Erasable Programmable Read Only Memory (EPROM), one-time programmable read-only memory (PROM) Programmable Read-Only Memory (One-time Programmable Read-Only Memory, OTPROM), Electronically-Erasable Programmable Read-Only Memory (EEPROM), CompactDisc Read-Only Memory (CD- ROM) or other optical disk storage, magnetic disk storage, tape storage, or any other computer-readable medium that can be used to carry or store data.

最后应说明的是:本发明实施例公开的一种基于可连续分步停电模拟的配电故障处理方法及装置所揭露的仅为本发明较佳实施例而已,仅用于说明本发明的技术方案,而非对其限制;尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解;其依然可以对前述各项实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或替换,并不使相应的技术方案的本质脱离本发明各项实施例技术方案的精神和范围。Finally, it should be noted that the method and device for processing power distribution faults based on continuous and step-by-step power failure simulation disclosed in the embodiments of the present invention are only preferred embodiments of the present invention, and are only used to illustrate the technology of the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that it is still possible to modify the technical solutions described in the foregoing embodiments, or to modify the technical solutions described in the foregoing embodiments. Some technical features are equivalently replaced; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims (10)

1.一种基于可连续分步停电模拟的配电故障处理方法,其特征在于,所述方法包括:1. A power distribution fault processing method based on continuous step-by-step power failure simulation, characterized in that the method comprises: 检测是否接收到模拟分析指令,所述模拟分析指令用于执行预设线路故障模拟操作;Detecting whether a simulation analysis command is received, the simulation analysis command is used to perform a preset line fault simulation operation; 当检测出接收到所述模拟分析指令时,根据所述模拟分析指令确定执行所述线路故障模拟操作对应的当前进度,并根据所述当前进度加载对应的目标数据,所述目标数据包括线路发生故障的区域对应的区域线路图以及线路发生故障的区域对应的故障因子,所述故障因子包括故障开关、故障设备以及故障线路中的至少一种;When it is detected that the simulation analysis instruction is received, the current progress corresponding to the line fault simulation operation is determined according to the simulation analysis instruction, and the corresponding target data is loaded according to the current progress, and the target data includes the line occurrence The area circuit diagram corresponding to the faulty area and the fault factor corresponding to the area where the line is faulty, the fault factor includes at least one of the faulty switch, the faulty device and the faulty line; 根据所述目标数据生成模拟线路图,所述模拟线路图包括组成电力传输线路的电力器件对应的器件图模以及电力传输线路对应的线路图模;Generate an analog circuit diagram according to the target data, where the analog circuit diagram includes a device pattern pattern corresponding to the power devices constituting the power transmission line and a circuit pattern pattern corresponding to the power transmission line; 检测是否接收到图模编辑指令,当检测出接收到所述图模编辑指令时,根据所述图模编辑指令确定目标变更图模,所述图模编辑指令用于对所述模拟线路图所包括的图模进行状态切换;Detect whether a pattern editing instruction is received, and when it is detected that the pattern editing instruction is received, determine the target change pattern according to the pattern editing instruction, and the pattern editing instruction is used to modify all parts of the analog circuit diagram. Included patterns for state switching; 根据所述图模编辑指令,切换所述目标变更图模对应的图模状态,得到第一切换结果并生成所述第一切换结果对应的变更记录,所述图模状态包括正常运行状态或故障状态,所述变更记录为切换所述目标变更图模对应的图模状态后对应生成的记录;According to the pattern editing instruction, the pattern state corresponding to the target change pattern is switched, a first switching result is obtained, and a change record corresponding to the first switching result is generated, and the pattern state includes a normal operation state or a fault state, the change record is a record correspondingly generated after switching the pattern state corresponding to the target change pattern; 分析所述第一切换结果,得到故障分析报告,并重复执行所述的检测是否接收到图模编辑指令对应的操作至检测到用于结束当前模拟流程的终止指令时,终止当前的模拟流程,其中,所述故障分析报告用于提供给故障处理人员,以触发所述故障处理人员根据所述故障分析报告进行故障处理。Analyzing the first switching result, obtaining a fault analysis report, and repeating the detection of whether an operation corresponding to the pattern editing instruction is received until a termination instruction for ending the current simulation process is detected, the current simulation process is terminated, Wherein, the fault analysis report is used to provide the fault processing personnel to trigger the fault processing personnel to perform fault processing according to the fault analysis report. 2.根据权利要求1所述的基于可连续分步停电模拟的配电故障处理方法,其特征在于,所述终止当前的模拟流程之后,所述方法还包括:2 . The method for processing power distribution faults based on continuous step-by-step power outage simulation according to claim 1 , wherein after terminating the current simulation process, the method further comprises: 3 . 采集所有所述变更记录以及所有所述故障分析报告;collect all said change records and all said failure analysis reports; 对所有所述变更记录执行预设归集操作,得到汇总变更记录,所述汇总变更记录包括每个所述变更记录对应的单一结果以及由所有所述单一结果归集得到的汇总结果;Performing a preset collection operation on all the change records to obtain a summary change record, where the summary change record includes a single result corresponding to each of the change records and a summary result obtained by collecting all the single results; 根据所述汇总变更记录,对所述故障分析报告执行所述归集操作,得到汇总分析报告,其中,所述汇总分析报告包括与所述单一结果对应的单一报告以及与所述汇总结果对应的子汇总报告;According to the summary change record, the collection operation is performed on the fault analysis report to obtain a summary analysis report, wherein the summary analysis report includes a single report corresponding to the single result and a summary report corresponding to the summary result. sub-aggregate reports; 根据所述汇总变更记录以及所述汇总分析报告,确定执行所述线路故障模拟操作对应的模拟结果,所述模拟结果用于提供给故障处理人员,以触发所述故障处理人员根据所述模拟结果调整后续的故障处理操作,所述模拟结果包括模拟停电结果以及模拟复电结果,其中所述模拟复电结果为模拟出的线路故障修复后恢复供电对应的结果。According to the summary change record and the summary analysis report, determine the simulation result corresponding to the execution of the line fault simulation operation, and the simulation result is used to provide the fault handling personnel to trigger the fault handling personnel according to the simulation result. The subsequent fault handling operations are adjusted, and the simulation results include a simulated power outage result and a simulated power restoration result, wherein the simulated power restoration result is a result corresponding to the restoration of power supply after the simulated line fault is repaired. 3.根据权利要求2所述的基于可连续分步停电模拟的配电故障处理方法,其特征在于,所述根据所述汇总变更记录以及所述汇总分析报告,确定执行所述线路故障模拟操作对应的模拟结果之后,所述方法还包括:3 . The power distribution fault processing method based on continuous step-by-step power failure simulation according to claim 2 , wherein, according to the summary change record and the summary analysis report, it is determined to execute the line fault simulation operation. 4 . After the corresponding simulation results, the method further includes: 检测是否接收到模拟反馈信息,所述模拟反馈信息为所述故障处理人员根据所述模拟结果对当前线路故障进行处理后反馈的信息;Detecting whether simulation feedback information is received, where the simulation feedback information is the information fed back by the fault handler after processing the current line fault according to the simulation result; 当检测到所述模拟反馈信息时,根据所述模拟反馈信息确定反馈类型,所述反馈类型包括表示所述模拟结果无误的确证类型或表示所述模拟结果错误的重溯类型;When the simulation feedback information is detected, a feedback type is determined according to the simulation feedback information, and the feedback type includes a confirmation type indicating that the simulation result is correct or a retrace type indicating that the simulation result is wrong; 当确定出所述反馈类型为所述确证类型时,将所述模拟结果存储至预设数据库中,以用于后续进行线路故障总结时作为分析数据;When it is determined that the feedback type is the confirmation type, the simulation result is stored in a preset database, which is used as analysis data in subsequent line fault summaries; 当确定出所述反馈类型为所述重溯类型时,根据所述模拟反馈信息确定需要执行重溯操作的目标变更记录、所述目标变更记录对应的目标变更操作;When it is determined that the feedback type is the retrace type, determining the target change record that needs to perform the retrace operation and the target change operation corresponding to the target change record according to the simulated feedback information; 根据所述模拟反馈信息更新所述目标变更图模,并根据所述目标变更操作切换更新后的所述目标变更图模对应的图模状态,得到第二切换结果同时生成与所述第二切换结果对应的变更记录,以更新所述目标变更记录;The target changing graph is updated according to the simulation feedback information, and the graph state corresponding to the updated target changing graph is switched according to the target changing operation, and a second switching result is obtained and the second switching result is generated at the same time. a change record corresponding to the result to update the target change record; 将所述第一切换结果更新为所述第二切换结果,并触发执行所述的分析所述第一切换结果,得到故障分析报告,并重复执行所述的检测是否接收到图模编辑指令对应的操作至检测到用于结束当前模拟流程的终止指令时,终止当前的模拟流程对应的操作。Update the first switching result to the second switching result, and trigger the execution of the analysis of the first switching result, obtain a fault analysis report, and repeat the detection of whether the corresponding pattern editing instruction is received. The operation corresponding to the current simulation process is terminated when a termination instruction for terminating the current simulation process is detected. 4.根据权利要求3所述的基于可连续分步停电模拟的配电故障处理方法,其特征在于,所述模拟反馈信息还包括确证记录,所述确证记录具体为实际修复线路故障后对应的实际修复结果对应的记录;以及所述将所述第一切换结果更新为所述第二切换结果之前,所述方法还包括:4. The power distribution fault processing method based on continuous step-by-step power outage simulation according to claim 3, wherein the simulation feedback information further comprises a confirmation record, and the confirmation record is specifically a corresponding record after the line fault is actually repaired. the record corresponding to the actual repair result; and before updating the first handover result to the second handover result, the method further includes: 判断更新后的所述目标变更记录是否与所述确证记录相匹配,当判断出所述目标变更记录与所述确证记录相匹配时,触发执行所述的将所述第一切换结果更新为所述第二切换结果对应的操作;It is judged whether the updated target change record matches the confirmation record, and when it is judged that the target change record matches the confirmation record, triggering the execution of the update of the first switching result to the confirmation record. Describe the operation corresponding to the second switching result; 当判断出所述目标变更记录与所述确证记录不匹配时,分析所述确证记录以及所述目标变更记录,得到所述目标变更记录对应的辨证参数,所述辨证参数包括所述目标变更记录所记录的操作和/或所述目标变更记录所记录的结果中导致所述模拟结果出错的参数;When it is determined that the target change record does not match the corroboration record, analyze the corroboration record and the target change record to obtain dialectical parameters corresponding to the target change record, where the dialectical parameters include the target change record Parameters in the recorded operations and/or the results recorded in the target change record that caused the simulation results to be erroneous; 将所述辨证参数以及所述目标变更记录归集到预设研判记录集中,以用于后续处理与所述目标变更记录匹配的故障事件时作为数据支撑。The dialectical parameters and the target change record are collected into a preset research and judgment record set to be used as data support for subsequent processing of fault events matching the target change record. 5.根据权利要求1-4任一项所述的基于可连续分步停电模拟的配电故障处理方法,其特征在于,所述检测是否接收到模拟分析指令之前,所述方法还包括:5. The power distribution fault processing method based on continuous step-by-step power outage simulation according to any one of claims 1-4, wherein, before the detecting whether a simulation analysis instruction is received, the method further comprises: 检测是否存在配电故障的报障信息,所述报障信息包括中压开关跳闸对应的故障信息;Detecting whether there is fault reporting information of a power distribution fault, where the fault reporting information includes fault information corresponding to the tripping of the medium voltage switch; 当检测到所述报障信息时,根据所述报障信息,确定跳闸馈线的目标参数,所述目标参数包括所述跳闸馈线所在环网组运行态的中压拓扑连接关系;When the fault report information is detected, according to the fault report information, the target parameter of the tripping feeder is determined, and the target parameter includes the medium voltage topology connection relationship in the operating state of the ring network group where the tripping feeder is located; 根据所述目标参数以及预设停电模拟分析算法,在当前模拟进程中叠加与所述报障信息对应的开关跳闸动作,得到模拟叠加结果;According to the target parameter and the preset power failure simulation analysis algorithm, superimpose the switch tripping action corresponding to the fault report information in the current simulation process to obtain the simulation superposition result; 根据所述停电模拟分析算法,分析所述模拟叠加结果,得到所述跳闸馈线对应的故障模拟数据,所述故障模拟数据包括所述跳闸馈线对应的跳闸开关,所述跳闸开关发生故障后所影响的模拟故障区域,以及所述故障模拟数据用于后续生成发生线路故障的模拟线路图时作为加载数据。According to the power failure simulation analysis algorithm, the simulation superposition result is analyzed, and the fault simulation data corresponding to the trip feeder is obtained, and the fault simulation data includes the trip switch corresponding to the trip feeder. The simulated fault area, and the fault simulation data is used as loading data when the simulated circuit diagram of the line fault occurs subsequently. 6.根据权利要求5所述的基于可连续分步停电模拟的配电故障处理方法,其特征在于,所述根据所述目标数据生成模拟线路图之前,所述方法还包括:6 . The method for processing power distribution faults based on continuous step-by-step power outage simulation according to claim 5 , wherein before generating a simulated circuit diagram according to the target data, the method further comprises: 7 . 检测是否存在历史模拟数据,所述历史模拟数据包括前置模拟数据以及留存数据,所述前置模拟数据为在所述当前进度之前已完成执行的前置模拟操作对应的数据,所述留存数据为存储在数据库中的与当前线路故障事件匹配的数据;Detecting whether there is historical simulation data, the historical simulation data includes pre-simulation data and retained data, the pre-simulation data is the data corresponding to the pre-simulation operation that has been completed before the current progress, and the retained data For the data stored in the database that matches the current line fault event; 当检测出不存在所述历史模拟数据时,触发执行所述的根据所述目标数据生成模拟线路图对应的操作;When it is detected that the historical simulation data does not exist, trigger the execution of the operation corresponding to the generation of the simulation circuit diagram according to the target data; 当检测出存在所述历史模拟数据时,所述根据所述目标数据生成模拟线路图,包括:When it is detected that the historical simulation data exists, the generating a simulation circuit diagram according to the target data includes: 调用所述历史模拟数据,并根据所述历史模拟数据生成基准态拓扑,所述基准台拓扑用于构建模拟线路图;Calling the historical simulation data, and generating a reference state topology according to the historical simulation data, and the reference platform topology is used to construct a simulation circuit diagram; 根据生成的所述基准态拓扑以及所述目标数据生成模拟线路图。A simulated circuit diagram is generated according to the generated reference state topology and the target data. 7.根据权利要求1-6任一项所述的基于可连续分步停电模拟的配电故障处理方法,其特征在于,所述方法还包括:7. The power distribution fault processing method based on continuous step-by-step power failure simulation according to any one of claims 1-6, wherein the method further comprises: 在所述故障处理人员根据所述模拟结果执行故障处理操作的过程中,采集实操数据,所述实操数据包括执行所述故障处理操作对应修复的故障部件、所述故障处理操作对应的复电结果、所述故障处理操作对应的停电原因以及所述故障处理操作对应的抢修策略中的至少一种;In the process that the fault handling personnel performs the fault handling operation according to the simulation result, collects actual operation data, the actual operation data includes the faulty component repaired corresponding to the execution of the fault handling operation, and the complex corresponding to the fault handling operation. at least one of a power outage result, a power outage cause corresponding to the fault handling operation, and a rush repair strategy corresponding to the fault handling operation; 当所述实操数据包括所述故障部件或所述复电结果时,根据所述实操数据更新所述模拟线路图所包括的图模对应的图模状态,并得到与更新后的所述图模状态对应的实操仿真结果;When the actual operation data includes the faulty component or the power recovery result, update the pattern state corresponding to the pattern included in the analog circuit diagram according to the actual operation data, and obtain the updated state of the pattern The actual operation simulation results corresponding to the graphical mode state; 根据所述实操数据,分析所述实操仿真结果,得到对应的分析结果;According to the actual operation data, analyze the actual operation simulation result, and obtain the corresponding analysis result; 根据所述分析结果以及所述实操数据,确定执行所述故障处理操作时修复故障线路对应的修复策略,所述修复策略用于后续进行线路故障模拟时作为优化模拟进程的辅助数据。According to the analysis result and the actual operation data, a repair strategy corresponding to repairing the faulty line when the fault handling operation is performed is determined, and the repair strategy is used as auxiliary data for optimizing the simulation process in subsequent line fault simulation. 8.一种基于可连续分步停电模拟的配电故障处理装置,其特征在于,所述装置包括:8. A power distribution fault processing device based on continuous step-by-step power failure simulation, characterized in that the device comprises: 检测模块,用于检测是否接收到模拟分析指令,所述模拟分析指令用于执行预设线路故障模拟操作;a detection module, configured to detect whether a simulation analysis command is received, the simulation analysis command is used to perform a preset line fault simulation operation; 确定模块,用于当检测出接收到所述模拟分析指令时,根据所述模拟分析指令确定执行所述线路故障模拟操作对应的当前进度;a determining module, configured to determine the current progress corresponding to the line fault simulation operation according to the simulation analysis instruction when it is detected that the simulation analysis instruction is received; 加载模块,用于根据所述当前进度加载对应的目标数据,所述目标数据包括线路发生故障的区域对应的区域线路图以及线路发生故障的区域对应的故障因子,所述故障因子包括故障开关、故障设备以及故障线路中的至少一种;The loading module is used to load corresponding target data according to the current progress, the target data includes the area circuit diagram corresponding to the area where the line is faulty and the fault factor corresponding to the area where the line is faulty, and the fault factor includes the fault switch, at least one of faulty equipment and faulty lines; 生成模块,用于根据所述目标数据生成模拟线路图,所述模拟线路图包括组成电力传输线路的电力器件对应的器件图模以及电力传输线路对应的线路图模;a generating module, configured to generate an analog circuit diagram according to the target data, where the analog circuit diagram includes a device diagram corresponding to the power devices constituting the power transmission line and a circuit diagram corresponding to the power transmission line; 所述检测模块,还用于检测是否接收到图模编辑指令;The detection module is also used to detect whether a pattern editing instruction is received; 所述确定模块,还用于当所述检测模块检测出接收到所述图模编辑指令时,根据所述图模编辑指令确定目标变更图模,所述图模编辑指令用于对所述模拟线路图所包括的图模进行状态切换;The determining module is further configured to, when the detection module detects that the graphic pattern editing instruction is received, determine the target change graphic pattern according to the graphic pattern editing instruction, and the graphic pattern editing instruction is used for the simulation The patterns included in the circuit diagram perform state switching; 切换模块,用于根据所述图模编辑指令,切换所述目标变更图模对应的图模状态,得到第一切换结果;a switching module, configured to switch the graphics mode state corresponding to the target change graphics mode according to the graphics mode editing instruction to obtain a first switching result; 所述生成模块,还用于生成所述第一切换结果对应的变更记录,所述图模状态包括正常运行状态或故障状态,所述变更记录为切换所述目标变更图模对应的图模状态后对应生成的记录;The generating module is further configured to generate a change record corresponding to the first switching result, the pattern state includes a normal operation state or a fault state, and the change record is to switch the pattern state corresponding to the target change pattern Then the corresponding generated records; 分析模块,用于分析所述第一切换结果,得到故障分析报告,并触发所述检测模块重复执行所述的检测是否接收到图模编辑指令对应的操作,其中,所述故障分析报告用于提供给故障处理人员,以触发所述故障处理人员根据所述故障分析报告进行故障处理;An analysis module, configured to analyze the first switching result, obtain a fault analysis report, and trigger the detection module to repeatedly perform the operation corresponding to the detection of whether a pattern editing instruction is received, wherein the fault analysis report is used for Provide it to the fault handling personnel to trigger the fault handling personnel to perform fault processing according to the fault analysis report; 终止模块,用于当检测到用于结束当前模拟流程的终止指令时,终止当前的模拟流程。The termination module is used for terminating the current simulation process when a termination instruction for terminating the current simulation process is detected. 9.一种基于可连续分步停电模拟的配电故障处理装置,其特征在于,所述装置包括:9. A power distribution fault processing device based on continuous step-by-step power failure simulation, characterized in that the device comprises: 存储有可执行程序代码的存储器;a memory in which executable program code is stored; 与所述存储器耦合的处理器;a processor coupled to the memory; 所述处理器调用所述存储器中存储的所述可执行程序代码,执行如权利要求1-7任一项所述的基于可连续分步停电模拟的配电故障处理方法。The processor invokes the executable program code stored in the memory to execute the power distribution fault processing method based on continuous step-by-step power failure simulation according to any one of claims 1-7. 10.一种计算机存储介质,其特征在于,所述计算机存储介质存储有计算机指令,所述计算机指令被调用时,用于执行如权利要求1-7任一项所述的基于可连续分步停电模拟的配电故障处理方法。10. A computer storage medium, characterized in that, the computer storage medium stores computer instructions, and when the computer instructions are invoked, they are used to execute the continuous step-by-step method according to any one of claims 1-7. Power distribution fault handling method for power failure simulation.
CN202210527282.5A 2022-05-16 2022-05-16 Power distribution fault processing method and device based on continuous step-by-step power failure simulation Pending CN115065047A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210527282.5A CN115065047A (en) 2022-05-16 2022-05-16 Power distribution fault processing method and device based on continuous step-by-step power failure simulation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210527282.5A CN115065047A (en) 2022-05-16 2022-05-16 Power distribution fault processing method and device based on continuous step-by-step power failure simulation

Publications (1)

Publication Number Publication Date
CN115065047A true CN115065047A (en) 2022-09-16

Family

ID=83198101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210527282.5A Pending CN115065047A (en) 2022-05-16 2022-05-16 Power distribution fault processing method and device based on continuous step-by-step power failure simulation

Country Status (1)

Country Link
CN (1) CN115065047A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017198237A1 (en) * 2016-05-18 2017-11-23 中国电力科学研究院 Power distribution network multi-time scale digital-analogue hybrid simulation system, method, and storage medium
KR102218268B1 (en) * 2020-07-10 2021-02-22 유니테크(주) Substation Automation Operating Device Equipped with Automatic Generation of Failure Judgment and Failure Recovery Scenarios
CN112668735A (en) * 2020-12-23 2021-04-16 广东电网有限责任公司电力科学研究院 Line first-aid repair operation identification method and device without work ticket
CN113054746A (en) * 2021-04-08 2021-06-29 南方电网科学研究院有限责任公司 Relay protection master station online monitoring function fault filing module testing system and method
WO2022055731A1 (en) * 2020-09-14 2022-03-17 Siemens Corporation Power distribution system reconfigurations for multiple contingencies
CN114421617A (en) * 2022-01-08 2022-04-29 南京通衡信息科技有限公司 Medium-voltage fault research and judgment method based on distribution network operation monitoring data

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017198237A1 (en) * 2016-05-18 2017-11-23 中国电力科学研究院 Power distribution network multi-time scale digital-analogue hybrid simulation system, method, and storage medium
KR102218268B1 (en) * 2020-07-10 2021-02-22 유니테크(주) Substation Automation Operating Device Equipped with Automatic Generation of Failure Judgment and Failure Recovery Scenarios
WO2022055731A1 (en) * 2020-09-14 2022-03-17 Siemens Corporation Power distribution system reconfigurations for multiple contingencies
CN112668735A (en) * 2020-12-23 2021-04-16 广东电网有限责任公司电力科学研究院 Line first-aid repair operation identification method and device without work ticket
CN113054746A (en) * 2021-04-08 2021-06-29 南方电网科学研究院有限责任公司 Relay protection master station online monitoring function fault filing module testing system and method
CN114421617A (en) * 2022-01-08 2022-04-29 南京通衡信息科技有限公司 Medium-voltage fault research and judgment method based on distribution network operation monitoring data

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
麦卓成;: "配变终端在配网故障定位分析快速复电中的设计与应用", 南方能源建设, no. 1, 30 December 2015 (2015-12-30) *

Similar Documents

Publication Publication Date Title
CN101888318B (en) A kind of system and method for testing performance index of communication system
WO2018209945A1 (en) Active power distribution network feeder automation system test method
JP5351653B2 (en) Power system monitoring and control system training device
CN110166483B (en) Power grid fault and network attack identification method, device and equipment
CN112540266A (en) Distribution network feeder automation field test system
CN104391228B (en) feeder automation function detecting system and method
CN110399671A (en) Setting calculation method, device and terminal of relay protection device of power grid
CN110209515A (en) A kind of reliability estimation method, device, equipment and storage medium
CN102508053B (en) Area backup automatic switch testing system based on digital simulation technology
CN109149534B (en) Method for rapidly diagnosing topological fault of power grid model based on DTS virtual switch
CN103457955B (en) The migration data verification method of electric power scheduling automatization system
CN116775224B (en) One-key sequential control testing system and testing method
CN115065047A (en) Power distribution fault processing method and device based on continuous step-by-step power failure simulation
CN111953657B (en) A sequence-data joint-driven identification method for CPS network attack in distribution network
CN110021933B (en) Reliability evaluation method of control function of power information system considering component failure
CN116540029B (en) Active power distribution network fault section positioning method and device based on node distortion correction
CN115983519B (en) Digital operation and maintenance method and system for power distribution network and readable storage medium
CN113541093B (en) Intelligent distributed feeder automation function test method for power distribution terminal
CN111208386A (en) Power distribution network fault rapid positioning method adaptive to topology change and information error
CN108418699B (en) Communication point-to-point system and method for substation automation equipment
CN212723744U (en) Interface device for connecting valve base control equipment and digital simulation platform
CN113484684A (en) Power distribution network multiple fault diagnosis system and method under non-sound fault information
CN114694869A (en) Nuclear power station instrument control system transformation risk control method, electronic equipment and storage medium
CN114154950A (en) Protection after-event evaluation method based on power grid accident handling
CN113640601A (en) Post analysis system and method for fault research and judgment of distribution network

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned

Effective date of abandoning: 20241206

AD01 Patent right deemed abandoned