CN115045334A - Temporary water and electricity management device and temporary water and electricity management method - Google Patents

Temporary water and electricity management device and temporary water and electricity management method Download PDF

Info

Publication number
CN115045334A
CN115045334A CN202210513010.XA CN202210513010A CN115045334A CN 115045334 A CN115045334 A CN 115045334A CN 202210513010 A CN202210513010 A CN 202210513010A CN 115045334 A CN115045334 A CN 115045334A
Authority
CN
China
Prior art keywords
water
pipe gallery
temporary
cable
management device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210513010.XA
Other languages
Chinese (zh)
Other versions
CN115045334B (en
Inventor
刘君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Huaye Group Co Ltd
Original Assignee
China Huaye Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Huaye Group Co Ltd filed Critical China Huaye Group Co Ltd
Priority to CN202210513010.XA priority Critical patent/CN115045334B/en
Publication of CN115045334A publication Critical patent/CN115045334A/en
Application granted granted Critical
Publication of CN115045334B publication Critical patent/CN115045334B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs
    • H02G3/0437Channels
    • H02G3/045Channels provided with perforations or slots permitting introduction or exit of wires
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/30Installations of cables or lines on walls, floors or ceilings
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Public Health (AREA)
  • Health & Medical Sciences (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Water Supply & Treatment (AREA)
  • Hydrology & Water Resources (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Installation Of Indoor Wiring (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The invention provides a temporary water and electricity management device and a temporary water and electricity management method, wherein the temporary water and electricity management device comprises a water centralized management device, a support connecting device and a cable management device; the water centralized management device comprises a pipe gallery base placing groove, a pipe gallery base arranged inside the pipe gallery base placing groove, a water supply pipe gallery and a water storage pipe gallery arranged on the pipe gallery base; a first inserting structure is arranged at the top of one end of the pipe gallery base; a second plug-in structure which is in plug-in connection with the first plug-in structure is arranged at the bottom of the supporting and connecting device, and a cable arrangement space is arranged on the top surface of the supporting and connecting device; the cable management device comprises a cable groove arranged in a cable arrangement space, a drainage groove is arranged at the bottom of the cable groove, and a drainage port of the drainage groove corresponds to a water collecting port of the water storage pipe gallery up and down. The invention can solve the problems that cable pipelines, water and drainage which are required in the construction process can not be used in a transition way, and the problems of resource waste and the like caused by the need of independent design at present.

Description

Temporary water and electricity management device and temporary water and electricity management method
Technical Field
The invention relates to the technical field of construction and production, in particular to a temporary water and electricity management device and a temporary water and electricity management method.
Background
In the engineering construction process, the links of living, working, production and the like of personnel are involved, various pipelines are often buried in the ground according to the needs to meet the construction needs, the daily maintenance of the various buried pipelines is quite inconvenient, and the various pipelines are often damaged or abandoned when being used in a transition place, so that great waste is caused; to the drainage problem of water supply and sewage, all need set up installation water supply and drainage system alone, extravagant manpower to water supply and drainage system after the construction completion also can't be utilized once more, cause the wasting of resources once more.
Disclosure of Invention
In view of the above problems, the present invention aims to provide a temporary water and electricity management device and a temporary water and electricity management method, so as to solve the problems that cable pipelines, water and drainage which are required in the construction process cannot be diverted, a separate design is required, and resources are wasted.
The invention provides a temporary water and electricity management device, which comprises a water centralized management device, a support connecting device and a cable management device, wherein the water centralized management device is connected with the support connecting device through a water pipe; the water centralized management device comprises a pipe rack base placing groove arranged on the ground, a pipe rack base arranged inside the pipe rack base placing groove, a water supply pipe rack arranged on the pipe rack base and a water storage pipe rack arranged on the pipe rack base; a first inserting structure is arranged at the top of one end of the pipe gallery base; a second plug-in structure which is in plug-in connection with the first plug-in structure is arranged at the bottom of the supporting and connecting device, and a cable arrangement space is arranged on the top surface of the supporting and connecting device; cable management device is including setting up the cable groove in space is arranged to the cable the bottom in cable groove is provided with water drainage tank, water drainage tank's outlet with water storage piping lane's water catch port corresponds from top to bottom cable groove top is provided with cable groove fender cover, the below of cable groove fender cover's one end with support connecting device's top is through dismantling connection structure and connect.
In addition, the preferred scheme is, the retaining pipe gallery includes holds sewage pipe gallery and holds rainwater pipe gallery.
In addition, the preferred scheme is, water supply piping lane with hold between the sewage piping lane with hold sewage piping lane with all through grafting recess and grafting lug plug-in connection between the rainwater piping lane.
In addition, the preferable scheme is that an anticorrosive material layer is arranged on the inner side wall of the sewage storage pipe gallery.
In addition, the preferable scheme is that the first inserting structure is an inserting rod arranged on the pipe rack base; the second plug structure is a plug hole arranged at the bottom of the support connecting device; the insertion rod is inserted in the insertion hole.
In addition, it is preferable that the number of the cable grooves is at least two.
In addition, preferably, a blocking cover rod inserting port is arranged at the top end of the supporting and connecting device; the cable groove blocking cover comprises a blocking cover rod and a blocking cover arranged at one end of the blocking cover rod; the blocking cover rod is inserted in the blocking cover rod insertion port.
Furthermore, it is preferable that the support connection means is a bracket.
In addition, the preferred scheme is in the top of water supply pipe gallery with the retaining pipe gallery all is provided with the well lid.
The invention provides a temporary water and electricity management method, which adopts the temporary water and electricity management device to perform centralized management on water and cables in a temporary living area and comprises the following steps:
s1, excavating a pipe gallery base placing groove on the ground of a position to be installed in the temporary living area, and hoisting and placing the pipe gallery base into the pipe gallery base placing groove;
s2, inserting and fixing the bottom of the supporting and connecting device on the first inserting structure of the pipe gallery base through the second inserting structure, and installing the water supply pipe gallery and the water storage pipe gallery on the pipe gallery base;
s3, installing the cable groove and the cable groove blocking cover at the top of the supporting and connecting device, and enabling the water discharge port of the water discharge groove and the water collection port of the water storage pipe gallery to be arranged vertically and correspondingly.
According to the temporary water and electricity management device and the temporary water and electricity management method, the centralized water management device and the cable management device are integrated and assembled through the supporting and connecting device, and the cable groove and the water supply pipe gallery replace the conventional method for burying pipelines, so that material waste and overhaul are avoided; the water storage pipe gallery is convenient for treating water, rainwater and the like, and a drainage system does not need to be designed independently; the whole device is connected in an inserting manner, is convenient to disassemble and assemble, is suitable for various temporary office and living places, can be repeatedly used in transition, is quick and portable, saves cost and improves the space utilization rate.
To the accomplishment of the foregoing and related ends, one or more aspects of the invention comprise the features hereinafter fully described. The following description and the annexed drawings set forth in detail certain illustrative aspects of the invention. These aspects are indicative, however, of but a few of the various ways in which the principles of the invention may be employed. Further, the present invention is intended to include all such aspects and their equivalents.
Drawings
Other objects and results of the present invention will become more apparent and more readily appreciated as the same becomes better understood by reference to the following description taken in conjunction with the accompanying drawings. In the drawings:
fig. 1 is a schematic elevation structure of a water and electricity temporary management apparatus according to an embodiment of the present invention;
fig. 2 is a process flow diagram of a method of temporary management of hydropower according to an embodiment of the invention.
In the drawing, 11-pipe gallery base placement groove, 12-pipe gallery base, 121-plug rod, 13-water supply pipe gallery, 14-sewage storage pipe gallery, 15-rainwater storage pipe gallery, 2-support connecting device, 21-plug hole, 22-shield rod plug interface, 31-cable groove, 32-drainage groove, 33-shield rod, 34-shield, 4-ground, 5-well lid.
The same reference numbers in all figures indicate similar or corresponding features or functions.
Detailed Description
In the following description, for purposes of explanation, numerous specific details are set forth in order to provide a thorough understanding of one or more embodiments. It may be evident, however, that such embodiment(s) may be practiced without these specific details.
Aiming at the problems that cable pipelines, water utilization and drainage which are required in the construction process cannot be transferred to a field for use, the independent design is needed, the resource waste is caused and the like, the temporary hydroelectric management device and the temporary hydroelectric management method are provided.
Specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
In order to explain the temporary management apparatus of hydropower provided by the present invention, fig. 1 shows an elevation structure of the temporary management apparatus of hydropower according to an embodiment of the present invention; fig. 2 shows a process flow of a method for temporary management of hydropower according to an embodiment of the invention.
As shown in fig. 1 and fig. 2 together, the invention provides a temporary water and electricity management device, which comprises a water centralized management device, a support connecting device 2 and a cable management device; wherein, the first and the second end of the pipe are connected with each other,
the water centralized management device comprises a pipe gallery base placing groove 11 arranged on the ground 4, a pipe gallery base 12 arranged inside the pipe gallery base placing groove 11, a water supply pipe gallery 13 arranged on the pipe gallery base 12 and a water storage pipe gallery arranged on the pipe gallery base 12; a first inserting structure is arranged at the top of one end of the pipe gallery base 12; a second plug-in structure which is in plug-in connection with the first plug-in structure is arranged at the bottom of the support connecting device 2, and a cable arrangement space is arranged on the top surface of the support connecting device 2; the cable management device comprises a cable groove 31 arranged in a cable arrangement space, a drainage groove 32 is arranged at the bottom of the cable groove 31, a drainage port of the drainage groove 32 vertically corresponds to a water collection port of the water storage pipe gallery, a cable groove blocking cover is arranged above the cable groove 31, and the lower portion of one end of the cable groove blocking cover is connected with the top end of the supporting and connecting device 2 through a detachable connecting structure.
Wherein, the material of piping lane base 12, water supply piping lane 13 and retaining pipe gallery can select light, durable steel material also can adopt metal material such as aluminium, and piping lane base 12 is used for the fixed water supply piping lane 13 and the retaining pipe gallery of placing and supports connecting device 2. The water supply pipe gallery 13 is used for protecting a water supply pipeline; the water storage pipe gallery is used for collecting water.
The water centralized management device and the cable management device are integrated and assembled through the supporting and connecting device 2, and the existing pipeline burying method is replaced by the cable groove 31 and the water supply pipe gallery 13, so that material waste and maintenance are avoided; the water storage pipe gallery is convenient for treating water, rainwater and the like, and a drainage system does not need to be designed independently; the whole device is connected in an inserting manner, is convenient to disassemble and assemble, is suitable for various temporary office and living places, can be repeatedly used in transition, is quick and portable, saves cost and improves the space utilization rate.
As a preferred aspect of the present invention, the water storage pipe lane includes a sewage storage pipe lane 14 and a rainwater storage pipe lane 15. Different pipe gallery effects are different, and the effect of playing is also different, and its shape and big or small volume can be designed according to the in-service use needs, for example, it is littleer to hold rainwater pipe gallery 15 than the volume and the volume that hold sewage pipe gallery 14, is fit for setting up in the position that is close to the outside, and mainly used collects the rainwater, and the outlet of water drainage tank 32 can correspond also can with the mouth that catchments of holding sewage pipe gallery 14 from top to bottom with the mouth position that catchments of holding rainwater pipe gallery 15.
As a preferable scheme of the present invention, the water supply pipe rack 13 and the sewage storage pipe rack 14 and the rainwater storage pipe rack 15 are connected by inserting through the inserting grooves and the inserting projections. Can be through recess and grafting lug grafting fixed connection between the different piping lane, make its position more fixed, for example, be provided with the grafting recess on the lateral wall of water supply piping lane 13, close in the outside of storing sewage piping lane 14 be provided with grafting recess assorted grafting lug, realize both plug-in connections, and on the same way, also accessible grafting recess and grafting lug plug-in connection between storing sewage piping lane 14 and storing rainwater piping lane 15.
The pipe gallery base 12 comprises a plurality of sections of single bases which are connected with each other through socket joints, and the number of the single bases can be determined as required.
As a preferable aspect of the present invention, an anticorrosive material layer is provided on the inner sidewall of the sewage storage pipe rack 14. The corrosion of the anti-corrosive material layer by sewage is prevented, and the anti-corrosive material layer is made of epoxy resin material or phenolic resin material.
As a preferred aspect of the present invention, the first insertion structure is an insertion rod 121 disposed on the pipe rack base 12; the second plug structure is a plug hole 21 arranged at the bottom of the support connecting device 2; the insertion rod 121 is inserted into the insertion hole 21. The plugging rod 121 and the plugging hole 21 are convenient for mutual plugging connection. Alternatively, the support connection device 2 may be provided with a plug-in hole at the base 12 of the pipe rack and a plug-in rod at the bottom.
As a preferred aspect of the present invention, the number of the cable grooves 31 is at least two. The quantity of cable groove 31 can be confirmed as required, is convenient for arrange the cable in order, avoids cable intertwine and bury the damaged scheduling problem that the in-process was demolishd after the maintenance of being not convenient for that causes and the completion underground.
As a preferred embodiment of the present invention, a shielding rod insertion opening 22 is provided at the top end of the support connection device 2; the cable trough shield comprises a shield rod 33 and a shield 34 arranged at one end of the shield rod 33; the shield rod 33 is inserted into the shield rod insertion port 22. The shield 34 is used for shielding the cable from the sun and rain, and is convenient to be plugged at the top end of the support connecting device 2 through the shield rod 33.
In a preferred embodiment of the present invention, the support and connection device 2 is a bracket. The bracket is an existing material which is easily obtained on a construction site, and can be replaced by other structures.
In a preferred embodiment of the present invention, the manhole covers 5 are provided at the top ends of the water supply pipe gallery 13 and the water storage pipe gallery. The manhole cover is convenient for the maintenance of the interior of the pipe gallery.
The invention provides a temporary water and electricity management method, which adopts the temporary water and electricity management device to perform centralized management on water and cables in a temporary living area, and comprises the following steps:
s1, excavating a pipe gallery base placing groove 11 on the ground 4 of the position to be installed in the temporary living area, and hoisting and placing the pipe gallery base 12 into the pipe gallery base placing groove 11;
s2, inserting and fixing the bottom of the support connecting device 2 on the first inserting structure of the pipe gallery base 12 through the second inserting structure, and installing the water supply pipe gallery 13 and the water storage pipe gallery on the pipe gallery base 12;
s3, installing the cable trough 31 and the cable trough blocking cover on the top of the support connecting device 2, and enabling the water discharge port of the water discharge trough 32 to be arranged corresponding to the water collection port of the water storage pipe gallery up and down.
The working principle of the temporary water and electricity management device provided by the embodiment of the invention is as follows: digging a pipe gallery base placing groove 11 at a position where a pipe gallery needs to be arranged as a placing space of a pipe gallery base 12, and hoisting the pipe gallery base 12 into place section by section; inserting the bracket into the insertion rod of the pipe gallery base 12; the water supply pipe gallery 13 and the water storage pipe gallery are respectively and sequentially hung and placed on the pipe gallery base, and the well cover 5 is arranged at a certain distance so as to be convenient for inspection and maintenance; finally, the cable groove 31 is integrally inserted into the convex part of the plane of the bracket, and the cable groove shield is integrally inserted into the shield rod insertion port 22 of the bracket, so that the cable is protected; adopt the socket joint interface between 12 sections of water supply piping lane 13, retaining piping lane, piping lane base and the festival, the interface position adopt general waterproof means to handle can. Can simply assemble into a job site water and electricity temporary management device fast, simultaneously, because its simple structure, light in weight assembles soon, succinctly pleasing to the eye, the maintenance inspection work of each pipeline of being convenient for to greatly improve space utilization.
According to the temporary water and electricity management device and the temporary water and electricity management method, the centralized water management device and the cable management device are integrated and assembled through the supporting and connecting device, and the cable groove and the water supply pipe gallery replace the conventional method for burying pipelines, so that material waste and overhaul are avoided; the water storage pipe gallery is convenient for treating water, rainwater and the like, and a drainage system does not need to be designed independently; the whole device is connected in an inserting manner, is convenient to disassemble and assemble, is suitable for various temporary office and living places, can be repeatedly used in transition, is quick and portable, saves cost and improves the space utilization rate.
The temporary management apparatus of hydropower and the temporary management method of hydropower proposed according to the present invention are described above by way of example with reference to the accompanying drawings. However, it will be appreciated by those skilled in the art that various modifications may be made to the temporary hydropower management apparatus and the temporary hydropower management method of the present invention described above without departing from the present invention. Therefore, the scope of the present invention should be determined by the contents of the appended claims.

Claims (10)

1. A temporary water and electricity management device is characterized by comprising a water centralized management device, a support connecting device and a cable management device; wherein the content of the first and second substances,
the water centralized management device comprises a pipe rack base placing groove arranged on the ground, a pipe rack base arranged inside the pipe rack base placing groove, a water supply pipe rack arranged on the pipe rack base and a water storage pipe rack arranged on the pipe rack base; a first inserting structure is arranged at the top of one end of the pipe gallery base;
a second plug-in structure which is in plug-in connection with the first plug-in structure is arranged at the bottom of the supporting and connecting device, and a cable arrangement space is arranged on the top surface of the supporting and connecting device;
the cable management device is including setting up the cable groove in cable arrangement space the bottom in cable groove is provided with water drainage tank, water drainage tank's outlet with the mouth that catchments of retaining pipe gallery corresponds from top to bottom the cable groove top is provided with cable groove fender cover, the below of the one end of cable groove fender cover with support connecting device's top is through detachable connection structure connection.
2. The temporary hydropower management device according to claim 1,
the water storage pipe rack comprises a sewage storage pipe rack and a rainwater storage pipe rack.
3. The temporary hydropower management device according to claim 2,
water supply piping lane with hold between the sewage piping lane with hold all through grafting recess and grafting lug plug-in connection between the rainwater piping lane.
4. The temporary hydropower management device according to claim 2,
and an anticorrosive material layer is arranged on the inner side wall of the sewage storage pipe gallery.
5. The temporary hydropower management device according to claim 1,
the first inserting structure is an inserting rod arranged on the pipe gallery base;
the second plug structure is a plug hole arranged at the bottom of the support connecting device;
the insertion rod is inserted in the insertion hole.
6. The hydroelectric temporary management apparatus of claim 1,
the number of the cable grooves is at least two.
7. The temporary hydropower management device according to claim 1,
a blocking cover rod inserting port is arranged at the top end of the supporting and connecting device;
the cable groove blocking cover comprises a blocking cover rod and a blocking cover arranged at one end of the blocking cover rod;
the blocking cover rod is inserted in the blocking cover rod insertion port.
8. The temporary hydropower management device according to claim 1,
the support connecting device is a bracket.
9. The temporary hydropower management device according to claim 1,
the water supply pipe gallery with the top of retaining pipe gallery all is provided with the well lid.
10. A temporary management method of water and electricity, characterized in that the temporary living area is centrally managed for water and electric cables by using the temporary management apparatus of water and electricity as claimed in any one of claims 1 to 9, comprising the steps of:
s1, excavating a pipe gallery base placing groove on the ground of a position to be installed in the temporary living area, and hoisting and placing the pipe gallery base into the pipe gallery base placing groove;
s2, inserting and fixing the bottom of the supporting and connecting device on the first inserting structure of the pipe gallery base through the second inserting structure, and installing the water supply pipe gallery and the water storage pipe gallery on the pipe gallery base;
s3, installing the cable trough and the cable trough baffle cover at the top of the supporting and connecting device, and enabling the water discharge port of the water discharge trough and the water collection port of the water storage pipe gallery to be arranged up and down correspondingly.
CN202210513010.XA 2022-05-12 2022-05-12 Hydropower temporary management device and hydropower temporary management method Active CN115045334B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210513010.XA CN115045334B (en) 2022-05-12 2022-05-12 Hydropower temporary management device and hydropower temporary management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210513010.XA CN115045334B (en) 2022-05-12 2022-05-12 Hydropower temporary management device and hydropower temporary management method

Publications (2)

Publication Number Publication Date
CN115045334A true CN115045334A (en) 2022-09-13
CN115045334B CN115045334B (en) 2023-10-03

Family

ID=83157637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210513010.XA Active CN115045334B (en) 2022-05-12 2022-05-12 Hydropower temporary management device and hydropower temporary management method

Country Status (1)

Country Link
CN (1) CN115045334B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB336414A (en) * 1929-10-07 1930-10-16 Ambrose Wootton Cross A new or improved combined system of providing and ventilating sewers, conduits and subways in roads
CN107769141A (en) * 2017-12-05 2018-03-06 福建省电力勘测设计院 Overhead type comprehensive wiring piping lane
CN209788819U (en) * 2019-03-13 2019-12-17 重庆胜天线缆有限公司 Cable case convenient to dismouting
CN111371039A (en) * 2020-04-14 2020-07-03 北京天恒建设集团有限公司 Cable erecting device for building electromechanical installation
CN213358678U (en) * 2020-09-04 2021-06-04 张猛 Construction site is with interim water and electricity and drainage utility tunnel
CN215452464U (en) * 2021-08-23 2022-01-07 德州市公路事业发展中心武城分中心 Temporary cable supporting device for road construction
CN215630124U (en) * 2021-08-24 2022-01-25 陈燕平 Urban rainwater pipe gallery

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB336414A (en) * 1929-10-07 1930-10-16 Ambrose Wootton Cross A new or improved combined system of providing and ventilating sewers, conduits and subways in roads
CN107769141A (en) * 2017-12-05 2018-03-06 福建省电力勘测设计院 Overhead type comprehensive wiring piping lane
CN209788819U (en) * 2019-03-13 2019-12-17 重庆胜天线缆有限公司 Cable case convenient to dismouting
CN111371039A (en) * 2020-04-14 2020-07-03 北京天恒建设集团有限公司 Cable erecting device for building electromechanical installation
CN213358678U (en) * 2020-09-04 2021-06-04 张猛 Construction site is with interim water and electricity and drainage utility tunnel
CN215452464U (en) * 2021-08-23 2022-01-07 德州市公路事业发展中心武城分中心 Temporary cable supporting device for road construction
CN215630124U (en) * 2021-08-24 2022-01-25 陈燕平 Urban rainwater pipe gallery

Also Published As

Publication number Publication date
CN115045334B (en) 2023-10-03

Similar Documents

Publication Publication Date Title
CN208717954U (en) A kind of integrated pipe canal applied to city section water power route arrangement
CN115045334A (en) Temporary water and electricity management device and temporary water and electricity management method
CN105888529B (en) A kind of catch pit port cat ladder
CN207603166U (en) A kind of circular cross-section assembly concrete cable duct
CN106869236B (en) Horizontal storage tank for sponge urban rainwater collection system and construction method of horizontal storage tank
CN216665850U (en) Natural gas processing plant
CN110924445B (en) Municipal construction is with inspection shaft device that can prevent stifled
CN209509021U (en) Underground pipe gallery
CN206340930U (en) It is grounded magazine
CN210273218U (en) Outdoor information cabinet with rain leakage prevention function
CN210237785U (en) Anode ground bed
CN217351132U (en) Integral steel septic tank that can have enough to meet need
CN210177538U (en) Cable type pipe gallery with bottom plate with cantilever plate
CN220013737U (en) Basement foundation pit drainage system
CN213937392U (en) Cable trench structure
CN210658211U (en) A hydrophobic means for hydraulic engineering
CN204783042U (en) Tunnel structure that has adverse slope near water
CN219080473U (en) Wall-mounted rainwater collecting device
CN210459492U (en) Assembled finished product sump pit
CN211849595U (en) Prefabricated integrated assembled ground source inspection well
CN215630152U (en) Drainage pipeline mouth well lid mounting structure for municipal works
CN210349513U (en) Isolation transformer box with water seepage detection device
CN214695749U (en) Long-distance dredging inspection well
CN220172791U (en) Wiring groove for communication cable
CN210684773U (en) Cross connection pivot cabin of comprehensive pipe gallery

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant