CN114991202B - Quick anchoring and attaching construction method for van foundation - Google Patents

Quick anchoring and attaching construction method for van foundation Download PDF

Info

Publication number
CN114991202B
CN114991202B CN202210814609.7A CN202210814609A CN114991202B CN 114991202 B CN114991202 B CN 114991202B CN 202210814609 A CN202210814609 A CN 202210814609A CN 114991202 B CN114991202 B CN 114991202B
Authority
CN
China
Prior art keywords
rod
anchoring
foundation
hole
van
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210814609.7A
Other languages
Chinese (zh)
Other versions
CN114991202A (en
Inventor
王耀
徐洪广
张晓辉
郑辉
赵永华
杨挺杰
施文茂
李蕊
黄霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Strait Construction and Development Co Ltd
Original Assignee
CSCEC Strait Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSCEC Strait Construction and Development Co Ltd filed Critical CSCEC Strait Construction and Development Co Ltd
Priority to CN202210814609.7A priority Critical patent/CN114991202B/en
Publication of CN114991202A publication Critical patent/CN114991202A/en
Application granted granted Critical
Publication of CN114991202B publication Critical patent/CN114991202B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/50Anchored foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to the technical field of building construction, and discloses a rapid anchoring and attaching construction method for a van foundation, which comprises the following steps of: determining the anchoring position of the foundation on the construction ground and marking; selecting the number of the quick anchor assemblies and the number of the quick connection assemblies according to the number of the marks; vertically driving an anchor rod in the rapid anchor assembly into a marked position on the construction ground by using an external drilling machine; inserting the supporting cylinders in the quick connecting assembly into the tops of the anchoring rods, respectively connecting the two ends of the connecting rods into the limiting gaps and the limiting grooves on the adjacent supporting cylinders, connecting the connecting rods with the supporting cylinders by using the connecting pieces, and connecting the supporting cylinders with the anchoring rods; measuring the levelness of the connecting rod, and adjusting the penetration height of the anchoring rod into the construction ground by using the rod piece according to the measuring result; the invention has the characteristics of shortening the construction time, improving the site construction efficiency and protecting the external environment.

Description

Quick anchoring and attaching construction method for van foundation
Technical Field
The invention relates to the technical field of building construction, in particular to a rapid anchoring and attaching construction method for a van foundation.
Background
With the continuous development and progress of society, the time value effect becomes more obvious, and high-efficiency work becomes more and more important in a limited time.
At present, in the fields of intelligent construction, rapid construction and low-carbon construction space, too much manpower and material resources are often consumed for obtaining a stable foundation, and at present, the foundation construction mode of the traditional van building is as follows: the ground is required to be leveled firstly so that the ground flatness reaches a certain standard, then foundation anchoring elements are driven into the leveled ground, then the heights of the foundation anchoring elements reserved on the ground are measured and compared, and the lengths of the foundation anchoring elements penetrating into the ground are properly adjusted so that the heights of all the foundation anchoring elements reserved on the ground are consistent, so that foundation points can be located on the same horizontal plane.
However, when emergency conditions are met, such as epidemic situations or other natural disasters, hundreds of temporary emergency cabins are required to be built temporarily and rapidly, the construction method of the foundation of the conventional cabin building has the problem that the construction time is long because of the ground leveling and other works, the emergency needs are difficult to meet, meanwhile, the leveling construction is required to easily damage the original vegetation environment on the construction ground, and the environment-friendly idea of China is not met.
Disclosure of Invention
In view of the above, the invention provides a rapid anchoring and attaching construction method for a van foundation.
In order to solve the technical problems, the technical scheme of the invention is as follows: the invention provides a rapid anchoring component for a foundation of a van room, which comprises an anchoring rod, wherein the anchoring rod is in a circular tubular structure, the bottom of the anchoring rod is provided with an anchor head in a conical shape, the tip end of the anchor head is vertically downwards arranged, the rod wall of the anchoring rod is provided with an anchor blade in a spiral shape, the rod wall of the anchoring rod is provided with a first through hole penetrating through the anchoring rod, the first through hole is arranged above the anchor blade, the rod wall of the anchoring rod is also provided with a second through hole penetrating through the anchoring rod, the second through hole is arranged above the first through hole, the rod wall of the anchoring rod is also provided with a bearing plate in a circular shape, and the bearing plate is arranged at the position of the rod wall of the anchoring rod between the anchor blade and the first through hole.
Further, the first connecting hole which is communicated with the anchoring rod is further formed in the rod wall of the anchoring rod, the first connecting hole is formed in the upper portion of the second through hole, and the first connecting hole is used for being connected with an external drilling machine.
The rapid connection assembly for the foundation of the van room comprises a supporting cylinder, wherein a limiting plate which is arranged in a circular shape is arranged at the top of the supporting cylinder, a plurality of limiting notches are arranged on the outer side of the limiting plate along the circumferential direction, limiting grooves which are communicated with the limiting notches are formed in the bottoms of all the limiting notches, and first mounting holes which are communicated with the limiting grooves are formed in the groove walls of all the limiting grooves; the shape of the notch of the limit groove is adapted to the shape of the limit notch; all the spacing groove is kept away from the tip that supports the section of thick bamboo side and all is open structure setting, and all the spacing groove is pressed close to the tip that supports the section of thick bamboo side and all is the enclosed construction setting, coupling assembling still includes the connecting rod, and the connecting rod can be movably pegged graft and is gone into spacing breach and spacing inslot, and the connecting rod wall is pressed close to its both ends position department and has all been offered the second mounting hole the same with first mounting hole aperture, and the position setting of both sides second mounting hole satisfies when the corresponding side tip access spacing breach and the spacing inslot at the connecting rod, corresponds side second mounting hole and is coaxial setting with first mounting hole.
Further, the second connecting hole which is communicated with the supporting cylinder is further formed in the cylinder wall of the supporting cylinder, the aperture of the second connecting hole is matched with that of the first connecting hole, and the second connecting hole is coaxial with the first connecting hole after the supporting cylinder is inserted into the anchoring rod.
The invention provides a rapid anchoring and attaching construction method for a foundation of a van room, which comprises the following steps of using the rapid anchoring assembly and using the rapid connecting assembly:
step S1: determining the foundation anchoring position on the construction ground according to the structure of the van house building to be built, and making an adaptive mark;
step S2: selecting the quick anchor assembly and the quick connection assembly according to the number of marks, wherein the number of the quick anchor assembly and the number of the quick connection assembly are the same as the number of marks;
step S3: the driving end of the external drilling machine is inserted into the anchoring rod from the top of the anchoring rod, the external drilling machine is connected with the anchoring rod by penetrating the connecting piece into the first connecting hole, and then the external drilling machine is used for vertically driving the anchoring rod into a marked position on the construction ground;
step S4: inserting the supporting cylinders into the tops of the anchoring rods, inserting one supporting cylinder into one anchoring rod, respectively connecting the two ends of the connecting rod into a limiting notch and a limiting groove on the adjacent supporting cylinder, connecting the end of the connecting rod with the corresponding side supporting cylinder by inserting connecting pieces into the corresponding first mounting holes and the second mounting holes, and finally connecting the supporting cylinder with the corresponding anchoring rod by inserting connecting pieces into the first connecting holes and the second connecting holes;
step S5: the levelness of the connecting rod is measured by using the levelness meter to judge whether the adjacent quick anchor assemblies are on the same horizontal plane or not, if the quick anchor assemblies are on the same horizontal plane, foundation anchoring construction is completed, if the quick anchor assemblies are not on the same horizontal plane, a rod piece can be penetrated into the first through hole or the second through hole, then the rod piece is rotated to drive the anchor rod to rotate, the height of the anchor rod penetrating into the construction ground is adjusted, and the quick anchor assemblies are stopped after being on the same horizontal plane.
Furthermore, the connecting piece is a bolt and a nut, and the rod piece is a round rod with the pipe diameter matched with the first through hole or the second through hole.
Compared with the prior art, the invention has the advantages that:
according to the rapid anchoring and attaching construction method for the foundation of the van room, the rapid anchoring components can be directly driven into construction ground, then the supporting cylinders in the rapid connecting components are connected to the anchoring rods in the rapid anchoring components, the adjacent supporting cylinders are connected through the connecting rods, the levelness of the connecting rods is measured through the level meter, whether the adjacent rapid anchoring components are on the same horizontal plane or not is judged, if the adjacent rapid anchoring components are not on the same horizontal plane, the height of the anchoring rods penetrating into the construction ground can be adjusted by penetrating the rod pieces into the first through holes or the second through holes, compared with the prior art, leveling work is not needed to be carried out on the construction ground, the levelness of the foundation of the building is well determined according to the construction method, and the rapid anchoring and attaching construction method has the advantages of shortening construction time, improving site construction efficiency and protecting external environment.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are needed for the description of the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic view of a quick anchor assembly of the present invention;
FIG. 2 is a schematic view of a support cylinder according to the present invention;
FIG. 3 is a schematic view of the structure of the connecting rod of the present invention;
FIG. 4 is a schematic view of the structure of the connection of the support cylinder with the anchor rod and the connecting rod in the present invention;
fig. 5 is a schematic view of the actual construction of the present invention.
Reference numerals: 1. an anchor rod; 2. an anchor head; 3. anchor leaves; 4. a first through hole; 5. a second through hole; 6. a pressure bearing plate; 7. a first connection hole; 8. a support cylinder; 9. a limiting plate; 10. limiting notch; 11. a limit groove; 12. a first mounting hole; 13. a second connection hole; 14. a connecting rod; 15. a second mounting hole; 16. and (5) constructing the ground.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Examples: referring to fig. 1 to 5, the present embodiment provides a rapid anchoring and attaching construction method for a foundation of a cabin, which includes using a rapid anchoring assembly for the foundation of the cabin;
the rapid anchoring component for the foundation of the van room comprises an anchoring rod 1, wherein the anchoring rod 1 is in a circular tubular structure, an anchor head 2 in a conical shape is arranged at the bottom of the anchoring rod 1, the tip end of the anchor head 2 is vertically arranged downwards, an anchor blade 3 in a spiral shape is arranged on the rod wall of the anchoring rod 1, the anchor head 2 plays a role in breaking earth, and the anchor blade 3 can transmit soil outwards along with rotation when the anchoring rod 1 rotates, so that the anchoring rod 1 can be conveniently inserted into a soil layer from top to bottom;
the first through hole 4 which is arranged to be communicated with the anchor rod 1 is arranged on the rod wall of the anchor rod 1, the first through hole 4 is arranged above the anchor blade 3, the second through hole 5 which is arranged to be communicated with the anchor rod 1 is also arranged on the rod wall of the anchor rod 1, the second through hole 5 is arranged above the first through hole 4, the arrangement of the first through hole 4 and the second through hole 5 is used for enabling a user to penetrate a rod piece which is suitable for the first through hole 4 or the second through hole 5 into the first through hole 4 or the second through hole 5, and then the anchor rod 1 is enabled to follow by rotating the rod piece;
the rod wall of the anchoring rod 1 is also provided with a bearing plate 6 which is arranged in a circular shape, the bearing plate 6 is arranged at the rod wall position of the anchoring rod 1 between the anchor blade 3 and the first through hole 4, the bearing plate 6 can compact soil when the anchoring rod 1 enters the soil layer so as to ensure the compactibility of the anchoring rod 1 in the soil layer, and meanwhile, in order to ensure the compaction effect of the bearing plate 6, in the embodiment, the bearing plate 6 and the anchoring rod 1 are coaxially arranged so as to uniformly compact the soil;
the wall of the anchoring rod 1 is also provided with a first connecting hole 7 which is communicated with the anchoring rod 1, the first connecting hole 7 is arranged above the second through hole 5, and the first connecting hole 7 is used for being connected with an external drilling machine.
The rapid connection assembly for the foundation of the van room comprises a supporting cylinder 8 and a connecting rod 14, wherein the bottom of the supporting cylinder 8 can be inserted into the top of an anchoring rod 1 in the rapid anchoring assembly, and the bottom of the supporting cylinder 8 cannot extend to the position of a second through hole 5 when the supporting cylinder 8 is inserted into the anchoring rod 1 so as to avoid affecting the insertion of the rod into the second through hole 5; the top of the supporting cylinder 8 is provided with a limiting plate 9 which is arranged in a circular shape, a plurality of limiting notches 10 are arranged on the outer side of the limiting plate 9 along the circumferential direction, and the limiting notches 10 are uniformly distributed in a ring shape on the limiting plate 9 by taking the central line of the lower limiting plate 9 as the array center; the bottoms of all the limit gaps 10 are provided with limit grooves 11 which are communicated with the limit gaps 10, the bottom of one limit gap 10 is provided with one limit groove 11, the shape of the notch of the limit groove 11 is matched with that of the limit gap 10, meanwhile, the ends of all the limit grooves 11 far away from the support cylinder 8 are all in an open structure, the ends of all the limit grooves 11 close to the support cylinder 8 are all in a closed structure, so that the follow-up use is met, and the walls of all the limit grooves 11 are provided with first mounting holes 12 which are communicated with the limit grooves 11;
the connecting rod 14 is the notch shape adaptation of cross-section structure and spacing breach 10 and spacing groove 11, connecting rod 14 can the activity peg graft spacing breach 10 and spacing groove 11 in, connecting rod 14 pole wall press close to its both ends position department all offer with first mounting hole 12 second mounting hole 15 that the aperture is the same, the position setting of both sides second mounting hole 15 satisfies when connecting rod 14's corresponding side tip inserts spacing breach 10 and spacing groove 11, corresponding side second mounting hole 15 is coaxial setting with first mounting hole 12, so that accessible is to first mounting hole 12 and second mounting hole 15 at this moment can connect connecting rod 14's tip in corresponding side spacing groove 11, thereby make connecting rod 14 can be in the same place with support section of thick bamboo 8.
The second connecting hole which is communicated with the supporting cylinder 8 is formed in the cylinder wall of the supporting cylinder 8, the aperture of the second connecting hole is matched with that of the first connecting hole 7, and the second connecting hole is coaxial with the first connecting hole 7 after the supporting cylinder 8 is inserted into the anchoring rod 1, so that the supporting cylinder 8 can be connected with the anchoring rod 1 through connecting pieces which are inserted into the first connecting hole 7 and the second connecting hole.
The method also comprises the following steps:
step S1: the position of foundation anchoring is determined on the construction ground 16 according to the structure of the van building to be built, and the adaptive mark is made, and as the foundation structure of the common van building is a rectangular structure, in the embodiment, the foundation of the van building is selected to be a rectangular structure, and the made mark is distributed in a rectangular shape;
step S2: the quick anchor assemblies and the quick connecting assemblies are selected according to the number of marks, the number of the quick anchor assemblies and the number of the quick connecting assemblies are the same as the number of the marks, meanwhile, in order to meet the structure of a foundation, the distribution of the limit gaps 10 and the limit grooves 11 in the quick connecting assemblies on the supporting cylinder 8 are required to be selected and customized according to the structure of the foundation, if the structure of the foundation of a van room is triangular, the number of the limit gaps 10 and the limit grooves 11 on the supporting cylinder 8 is 3, namely, the limit gaps and the limit grooves are distributed in a triangular shape, so that the limit gaps 10 and the limit grooves can be connected with the adjacent supporting cylinder 8 through connecting rods 14 to form a triangular structure in the subsequent construction; in the embodiment, the number of the limiting notches 10 and the limiting grooves 11 on the supporting cylinder 8 is 4 so as to adapt to the foundation of the van room building with a rectangular structure;
step S3: installing a quick anchoring assembly, inserting a driving end of an external drilling machine into an anchoring rod 1 from the top of the anchoring rod 1, connecting the external drilling machine with the anchoring rod 1 by penetrating a connecting piece into a first connecting hole 7, wherein the connecting piece is a bolt and a nut, connecting the external drilling machine with the anchoring rod 1 by penetrating a bolt with the corresponding specification into the driving end of the first connecting hole 7 and the external drilling machine and then locking corresponding nuts into two ends of the bolt, and then vertically driving the anchoring rod 1 into a marked position on a construction ground 16 by using the external drilling machine, wherein the driving depth of the anchoring rod 1 is selected according to actual conditions, if the concave-convex degree of the ground is large, the driving depth is required to be adjusted according to the marked position, and if the concave-convex degree of the ground is small, the anchoring rod 1 can be driven into a bearing plate 6 until the bottom surface of the bearing plate 6 contacts with the top surface of the construction ground 16;
step S4: after all the anchor rods 1 are driven into corresponding marked positions, an external drilling machine is detached from the anchor rods 1, then the supporting cylinders 8 are inserted into the tops of the anchor rods 1, one anchor rod 1 is inserted into one supporting cylinder 8, then two ends of the connecting rod 14 are respectively connected into a limiting notch 10 and a limiting groove 11 on the adjacent supporting cylinder 8, connecting pieces are respectively connected into corresponding first mounting holes 12 and second mounting holes 15 to connect the ends of the connecting rod 14 with corresponding side supporting cylinders 8, namely, bolts with corresponding specifications are penetrated into the first mounting holes 12 and the second mounting holes 15, nuts are locked into the two end parts of the bolts to connect the ends of the connecting rod 14 with corresponding limiting grooves 11, finally connecting pieces are inserted into the first connecting holes 7 and the second connecting holes to connect the supporting cylinders 8 with corresponding anchor rods 1, namely, bolts with corresponding specifications are penetrated into the first connecting holes 7 and the second connecting holes, nuts are locked into the two end parts of the bolts to connect the supporting cylinders 8 with corresponding anchor rods 1;
step S5: judging whether the quick anchoring components are on the same horizontal plane or not so as to ensure the levelness of the foundation of the van building, measuring the levelness of the connecting rod 14 by using a level meter to judge whether the adjacent quick anchoring components are on the same horizontal plane or not, if so, finishing foundation anchoring construction, if not, penetrating a rod into the first through hole 4 or the second through hole 5, and then driving the anchoring rod 1 to rotate by rotating the rod, and adjusting the penetrating height of the anchoring rod 1 into the construction ground 16 until the adjacent quick anchoring components are stopped after being on the same horizontal plane, wherein the foundation anchoring construction is finished; in this embodiment, the rod may be a round rod with a pipe diameter corresponding to the first through hole 4 or the second through hole 5, and the length of the rod should be such that both ends of the rod may be outside the anchoring rod 1 after penetrating into the first through hole 4 or the second through hole 5, so that a user can rotate the anchoring rod 1 through the rod.
In the description of the present invention, it should be understood that the terms "coaxial," "bottom," "one end," "top," "middle," "another end," "upper," "one side," "top," "inner," "front," "center," "two ends," etc. indicate orientations or positional relationships based on the orientation or positional relationships shown in the drawings, are merely for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present invention.
In the present invention, unless explicitly specified and limited otherwise, the terms "mounted," "configured," "connected," "secured," "screwed," and the like are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; either directly or indirectly through intermediaries, or in communication with each other or in interaction with each other, unless explicitly defined otherwise, the meaning of the terms described above in this application will be understood by those of ordinary skill in the art in view of the specific circumstances.
The foregoing is only exemplary of the invention, and many other embodiments of the invention are possible, and all modifications and variations of the invention are intended to fall within the scope of the invention as defined by the appended claims.

Claims (4)

1. The utility model provides a van foundation quick anchor subassembly which characterized in that: the drilling machine comprises an anchor rod (1), wherein the anchor rod (1) is arranged in a circular tubular structure, an anchor head (2) which is arranged in a conical shape is arranged at the bottom of the anchor rod (1), a bearing plate (6) which is arranged in a circular shape is arranged on the rod wall of the anchor rod (1), a first through hole (4) which is arranged through the anchor rod (1) is arranged on the rod wall of the anchor rod (1), a second through hole (5) which is arranged through the anchor rod (1) is also arranged on the rod wall of the anchor rod (1), a first connecting hole (7) which is arranged through the anchor rod (1) is also arranged on the rod wall of the anchor rod (1), a bearing plate (6) which is arranged in a circular shape is also arranged on the rod wall of the anchor rod (1) between the anchor rod (3) and the first through hole (4), and a first connecting hole (7) which is arranged through the anchor rod (1) is also arranged on the rod wall of the anchor rod (1), and the first connecting hole (7) is used for connecting with an external drilling machine; the rapid connection assembly for the foundation of the van room comprises a supporting cylinder (8), wherein the bottom of the supporting cylinder (8) can be inserted into the top of an anchor rod (1) in the rapid anchoring assembly for the foundation of the van room, the top of the supporting cylinder (8) is provided with a limiting plate (9) which is arranged in a circular shape, a plurality of limiting gaps (10) are arranged on the outer side of the limiting plate (9) along the circumferential direction, the bottoms of all the limiting gaps (10) are provided with limiting grooves (11) which are communicated with the limiting gaps (10), and the shape of the notch of the limiting groove (11) is matched with that of the limiting gap (10); the rapid connection assembly for the foundation of the van room further comprises a connecting rod (14), wherein the connecting rod (14) can be movably inserted into the limiting notch (10) and the limiting groove (11), second mounting holes (15) with the same aperture as the first mounting holes (12) are formed in positions, close to two ends, of the connecting rod wall of the connecting rod (14), and the second mounting holes (15) on two sides are coaxially arranged with the first mounting holes (12) when the corresponding side end parts of the connecting rod (14) are connected into the limiting notch (10) and the limiting groove (11); all the limiting grooves (11) are arranged in an open structure at the end part far away from the supporting cylinder (8), all the limiting grooves (11) are arranged close to the end part near the supporting cylinder (8) in a closed structure, and all the first mounting holes (12) penetrating through the limiting grooves (11) are formed in the groove walls of the limiting grooves (11).
2. A rapid anchoring assembly for a foundation of a van room according to claim 1, wherein: the second connecting hole which is communicated with the supporting cylinder (8) is further formed in the cylinder wall of the supporting cylinder (8), the aperture of the second connecting hole is matched with that of the first connecting hole (7), and the second connecting hole is coaxial with the first connecting hole (7) after the supporting cylinder (8) is inserted into the anchoring rod (1).
3. A rapid anchoring and attaching construction method for a van foundation is characterized by comprising the following steps: a rapid anchoring assembly for a foundation of a cabin foundation comprising the use of any one of claims 1 to 2, further comprising the steps of:
step S1: determining the foundation anchoring position on the construction ground (16) according to the structure of the van room building to be built, and making an adaptive mark;
step S2: the rapid anchoring components of the foundation of the van and the rapid connecting components of the foundation of the van are selected according to the number of marks, and the number of the rapid anchoring components of the foundation of the van and the rapid connecting components of the foundation of the van is the same as the number of marks;
step S3: the driving end of the external drilling machine is inserted into the anchoring rod (1) from the top of the anchoring rod (1), the external drilling machine is connected with the anchoring rod (1) by penetrating a connecting piece into the first connecting hole (7), and then the external drilling machine is used for vertically driving the anchoring rod (1) into a marked position on the construction ground (16);
step S4: inserting the supporting cylinders (8) into the tops of the anchoring rods (1), inserting one supporting cylinder (8) into one anchoring rod (1), respectively connecting two ends of the connecting rod (14) into a limiting notch (10) and a limiting groove (11) on the adjacent supporting cylinder (8), connecting the end part of the connecting rod (14) with the corresponding side supporting cylinder (8) by connecting a connecting piece into a corresponding first mounting hole (12) and a corresponding second mounting hole (15), and finally connecting the supporting cylinder (8) with the corresponding anchoring rod (1) by connecting the connecting piece into the first connecting hole (7) and the second connecting hole;
step S5: the levelness of the connecting rod (14) is measured by using a level meter to judge whether the adjacent rapid anchoring component of the van foundation is on the same horizontal plane, if so, the foundation anchoring construction is completed, if not, the rod can be penetrated into the first through hole (4) or the second through hole (5), then the rod is rotated to drive the anchoring rod (1) to rotate, and the height of the anchoring rod (1) penetrating into the construction ground (16) is adjusted until the adjacent rapid anchoring component of the van foundation is on the same horizontal plane.
4. The rapid anchoring and attaching construction method for the foundation of the van room according to claim 3, wherein the rapid anchoring and attaching construction method comprises the following steps: the connecting piece is a bolt and a nut, and the rod piece is a round rod with the pipe diameter matched with the first through hole (4) or the second through hole (5).
CN202210814609.7A 2022-07-12 2022-07-12 Quick anchoring and attaching construction method for van foundation Active CN114991202B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210814609.7A CN114991202B (en) 2022-07-12 2022-07-12 Quick anchoring and attaching construction method for van foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210814609.7A CN114991202B (en) 2022-07-12 2022-07-12 Quick anchoring and attaching construction method for van foundation

Publications (2)

Publication Number Publication Date
CN114991202A CN114991202A (en) 2022-09-02
CN114991202B true CN114991202B (en) 2023-12-22

Family

ID=83019234

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210814609.7A Active CN114991202B (en) 2022-07-12 2022-07-12 Quick anchoring and attaching construction method for van foundation

Country Status (1)

Country Link
CN (1) CN114991202B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5644889A (en) * 1994-08-05 1997-07-08 Dur-O-Wal, Inc. Remedial wall anchor system
CN101173514A (en) * 2006-11-03 2008-05-07 孙新安 Wheeled helical-digging drilling rig
CN102493554A (en) * 2011-12-13 2012-06-13 北京城建中南土木工程集团有限公司 Abutting joint device of steel lattice column, and construction method of same
CN205530396U (en) * 2016-02-04 2016-08-31 江苏城工建设科技有限公司 Tubular pile is irritated tensile of adhesive strength between core and tubular pile wall and is pulled out test device
CN109162274A (en) * 2018-10-26 2019-01-08 中冶建工集团有限公司 The shuttering supporting testing stand and its application method of artificial digging pile
CN110485437A (en) * 2019-07-25 2019-11-22 天一建设发展有限公司 Roadbed side slope entirety green safeguard structure and its construction method
CN211621573U (en) * 2020-01-03 2020-10-02 天津市昌林钢构模板有限公司 Pre-buried steel sheet of support convenient to use
CN112854286A (en) * 2020-10-15 2021-05-28 上海皇广光电科技有限公司 Slope type ground quick-mounting street lamp and mounting method thereof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5644889A (en) * 1994-08-05 1997-07-08 Dur-O-Wal, Inc. Remedial wall anchor system
CN101173514A (en) * 2006-11-03 2008-05-07 孙新安 Wheeled helical-digging drilling rig
CN102493554A (en) * 2011-12-13 2012-06-13 北京城建中南土木工程集团有限公司 Abutting joint device of steel lattice column, and construction method of same
CN205530396U (en) * 2016-02-04 2016-08-31 江苏城工建设科技有限公司 Tubular pile is irritated tensile of adhesive strength between core and tubular pile wall and is pulled out test device
CN109162274A (en) * 2018-10-26 2019-01-08 中冶建工集团有限公司 The shuttering supporting testing stand and its application method of artificial digging pile
CN110485437A (en) * 2019-07-25 2019-11-22 天一建设发展有限公司 Roadbed side slope entirety green safeguard structure and its construction method
CN211621573U (en) * 2020-01-03 2020-10-02 天津市昌林钢构模板有限公司 Pre-buried steel sheet of support convenient to use
CN112854286A (en) * 2020-10-15 2021-05-28 上海皇广光电科技有限公司 Slope type ground quick-mounting street lamp and mounting method thereof

Also Published As

Publication number Publication date
CN114991202A (en) 2022-09-02

Similar Documents

Publication Publication Date Title
US6557312B2 (en) Prefabricated-building tower foundation
CN114991202B (en) Quick anchoring and attaching construction method for van foundation
CN220620228U (en) Underground base of foundation pit monitoring and sedimentation observation equipment
CN209741936U (en) Pile group fixing device for pile foundation model test
CN213954885U (en) A strutting arrangement for be used for building site survey and drawing
CN210509057U (en) Pile foundation drill bit for construction machinery
CN211232094U (en) Novel foundation bolt
CN115162399B (en) Quick anchoring and attaching structure device for foundation
CN218622629U (en) Photovoltaic canopy column foot installation structure capable of quickly adjusting height difference
CN219862912U (en) Novel antidetonation soil matter foundation pile
CN216516147U (en) Low-rise assembled light steel structure house
CN217652435U (en) Windproof and anti-seismic assembled house
JPS63223218A (en) Driving work of pile
CN217556919U (en) Pile planting and guiding device for composite pile
CN220150315U (en) Concrete pipe pile deflection preventing device for building engineering construction
CN214494918U (en) Bucket wheel machine track rag bolt installation positioner
CN221072644U (en) Deep anchor pile supporting system
CN216146685U (en) Energy-concerving and environment-protective type afforestation construction equipment
CN221627124U (en) Building foundation pile
CN219260986U (en) Building pile with anti-seismic function
CN210948482U (en) Soil drilling machine for geotechnical engineering
CN115125952B (en) Device for installing spiral anchor foundation of transmission line iron tower and construction method
CN215801627U (en) Prefabricated pile tip positioner
CN219772945U (en) Bored pile and steel-pipe pile combined pile foundation structure
CN220598461U (en) Inclined pile vertical anchor rod supporting structure for foundation pit supporting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant