CN114974028B - Whole process engineering cost progress management device - Google Patents

Whole process engineering cost progress management device Download PDF

Info

Publication number
CN114974028B
CN114974028B CN202210688003.3A CN202210688003A CN114974028B CN 114974028 B CN114974028 B CN 114974028B CN 202210688003 A CN202210688003 A CN 202210688003A CN 114974028 B CN114974028 B CN 114974028B
Authority
CN
China
Prior art keywords
mounting
plate
tube
frame
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210688003.3A
Other languages
Chinese (zh)
Other versions
CN114974028A (en
Inventor
朱曼露
陈伟男
陈伟强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202210688003.3A priority Critical patent/CN114974028B/en
Publication of CN114974028A publication Critical patent/CN114974028A/en
Application granted granted Critical
Publication of CN114974028B publication Critical patent/CN114974028B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F15/00Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like
    • G09F15/0006Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like planar structures comprising one or more panels
    • G09F15/0025Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like planar structures comprising one or more panels display surface tensioning means
    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47BTABLES; DESKS; OFFICE FURNITURE; CABINETS; DRAWERS; GENERAL DETAILS OF FURNITURE
    • A47B63/00Cabinets, racks or shelf units, specially adapted for storing books, documents, forms, or the like
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F11/00Indicating arrangements for variable information in which the complete information is permanently attached to a movable support which brings it to the display position
    • G09F11/02Indicating arrangements for variable information in which the complete information is permanently attached to a movable support which brings it to the display position the display elements being secured to rotating members, e.g. drums, spindles
    • G09F11/08Indicating arrangements for variable information in which the complete information is permanently attached to a movable support which brings it to the display position the display elements being secured to rotating members, e.g. drums, spindles the elements being flexible sheets
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F15/00Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like
    • G09F15/0006Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like planar structures comprising one or more panels
    • G09F15/0012Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like planar structures comprising one or more panels frames therefor
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F15/00Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like
    • G09F15/02Bills, posters, or the like therefor

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Automatic Assembly (AREA)
  • General Factory Administration (AREA)

Abstract

The invention relates to a management device, in particular to a whole process engineering cost progress management device. The invention provides a whole process engineering cost progress management device which not only can facilitate operators to follow up cost information, but also can store important cost lists and data. The invention provides a whole process engineering cost progress management device, which comprises a support frame, a box body, a hinged plate, a baffle plate, a mounting frame and the like; the upper side of support frame is connected with the box that the material is metal material, and the lower part slip of box runs through has three push-and-pull frame that evenly sets up from left to right interval, and the upside rotation of push-and-pull frame is equipped with the guide rail board that is used for the direction. The progress of the construction cost can be conveniently known according to the position of the second pressing plate in the third installation pipe, so that the work of the construction cost progress management is conveniently managed, and the data is stored through the storage box, so that the operation personnel can conveniently take out the data when needed.

Description

Whole process engineering cost progress management device
Technical Field
The invention relates to a management device, in particular to a whole process engineering cost progress management device.
Background
The construction cost refers to the sum of construction costs for completing the prediction or actual expenditure of a construction, and the accuracy of the construction cost directly relates to whether the project can be normally performed. The related supervisory personnel are required for the construction cost statistics work to supervise and manage the work of the construction cost statistics staff, the mode is complicated, timeliness of supervision and management cannot be guaranteed, and supervision and management efficiency is low, so that human resources are wasted, and a special progress management device is required to assist in progress management.
For example, a construction cost progress management device disclosed in patent grant publication number CN214123434U and bulletin day 20210903 comprises a support column, a display board is arranged on the support column, and progress paper for recording construction cost progress is arranged on the display board. The project cost progress management device can assist an operator to manage the progress of the project cost, but is simple in structure, single in function, incapable of facilitating the operator to follow up the cost information, troublesome in progress management, incapable of storing important cost lists and data and limited.
According to the defects in the prior art, the whole process engineering cost progress management device which can overcome the defects in the prior art, is convenient for operators to follow up the cost information and can store important cost lists and data is designed.
Disclosure of Invention
The invention aims to overcome the defects that the prior art is simple in structure and single in function, the operation personnel cannot conveniently follow up the cost information, trouble is brought to progress management, and important cost lists and data cannot be stored, and limitation is caused.
In order to solve the technical problems, the invention provides a whole process engineering cost progress management device which comprises a supporting frame, a box body, hinge plates, baffles, a mounting frame, guide rail plates, a push-pull frame, a follow-up mechanism, a storage mechanism and a zero clearing mechanism, wherein the upper side of the supporting frame is connected with the box body made of metal, three push-pull frames uniformly arranged at intervals from left to right are penetrated through the lower part of the box body in a sliding mode, the guide rail plates used for guiding are rotatably arranged on the upper side of the push-pull frame, the front side of the guide rail plates are connected with mounting frames used for displaying cost information, the front lower part of the box body is penetrated through the baffles which are used for protecting the mounting frames and made of metal in a sliding mode, the front upper part of the box body is rotatably provided with the hinge plates which are magnetic and absorb the baffles, the follow-up mechanism used for following the cost progress and the storage mechanism used for storing a list and data are arranged on the follow-up mechanism, and the zero clearing mechanism used for clearing the progress is arranged on the follow-up mechanism.
Preferably, the follow-up mechanism comprises a first mounting tube, a first reset spring, a piston block, a conveying tube, the check valve, the second mounting tube, a second reset spring, the shutoff piece, the third mounting tube, second clamp plate and first elastic component, the anterior upside of mounting frame is connected with the third mounting tube of material for transparent material, the left portion inboard slidingtype of third mounting tube is equipped with the second clamp plate, be connected with between the right side of second clamp plate and the right side inboard of third mounting tube and be used for the reset and lie in the inside first elastic component of third mounting tube, first elastic component is rubber spring, the last middle part of mounting frame runs through there is first mounting tube, the anterior slidingtype of first mounting tube is equipped with the piston block, be connected with around the first reset spring of establishing in the piston block outside between piston block and the first mounting tube, the check valve is installed at the rear portion of first mounting tube, the rear upside of first mounting tube and the left portion rear side of third mounting tube all communicate there is the conveying tube, communicate between two conveying tubes and have the second mounting tube, the inside is connected with the shutoff tube through the second mounting tube and is used for the conveying tube to contact with the shutoff tube.
Preferably, the storage mechanism comprises a storage box, racks and spur gears, wherein the upper side of the guide rail plate is provided with two storage boxes which are used for storing lists and data and are arranged in a front-back symmetrical mode, the inner bottom side of the box body is connected with the racks, and the upper part of the push-pull frame is rotatably sleeved with the spur gears which are meshed with the racks and are connected with the guide rail plate.
Preferably, the zero clearing mechanism comprises a first pressing plate, a third reset spring, a plug rod and wedge blocks, the plug rod is penetrated in a non-contact mode at the left part of the third installation tube, the first pressing plate is connected to the left side of the plug rod, the third reset spring wound on the outer side of the plug rod is connected between the first pressing plate and the third installation tube, and three wedge blocks used for extruding the plug rod and contacting with the plug rod are uniformly connected to the rear side of the hinge plate from left to right at intervals.
Preferably, the device further comprises a warning mechanism for striking prompts, the warning mechanism comprises an indication block and flexible cloth, the left side of the second pressing plate is connected with the indication block with red color, and the flexible cloth with green color and surrounding the first elastic piece is connected between the right side of the second pressing plate and the right inner side of the third mounting tube.
Preferably, the device further comprises a clamping mechanism for clamping data, two groups of clamping mechanisms which are arranged in an up-down symmetrical mode are arranged on the mounting frame, one group of clamping mechanisms comprises guide rods, second elastic pieces and clamping plates, two guide rods which are used for guiding and are arranged in a left-right symmetrical mode are connected to the front side of the mounting frame, clamping plates for clamping the data are sleeved between the middle parts of the two symmetrical guide rods in a sliding mode, and two second elastic pieces which are wound on the outer sides of the guide rods are connected between the clamping plates and the mounting frame.
Preferably, the device further comprises a mounting mechanism for mounting the article, the mounting mechanism comprises a mounting plate, guide pipes and pull ropes, the left side and the right side of the front lower portion of the box body are respectively connected with the guide pipes for guiding, the mounting plate for mounting the article is rotatably arranged in the front middle of the box body, and the pull ropes penetrating through the guide pipes in a sliding mode are connected between the baffle and the mounting plate.
Preferably, the box body also comprises a torsion spring, and a torsion spring for resetting is connected between the mounting plate and the box body.
On the basis of overcoming the defects of the prior art, the invention can also achieve the following beneficial effects:
1. the progress of the construction cost can be conveniently known according to the position of the second pressing plate in the third installation pipe, so that the work of the construction cost progress management is conveniently managed, and the data is stored through the storage box, so that the operation personnel can conveniently take out the data when needed.
2. When the device is closed, the wedge block can reversely rotate to extrude the first pressing plate, the first pressing plate can drive the inserted link to move rightwards to avoid blocking the third installation pipe, and gas in the third installation pipe can be discharged from a gap between the third installation pipe and the inserted link immediately, so that the next record can be conveniently prepared.
3. The second clamp plate moves to the right and can extrude flexible cloth shrink and drive the instruction piece and move to the right, because the instruction piece colour is red, and flexible cloth colour is green, consequently can make the supervisor more convenient and clearly know the progress of engineering cost through the colour difference of instruction piece and flexible cloth.
4. The clamping plate moves backwards through the reset effect of the second elastic piece to clamp the information sheet on the installation frame, so that an operator is not required to paste the engineering cost information sheet on the front side of the installation frame, and the information sheet is convenient to replace by the operator.
5. The information table or the notification table is stuck on the mounting board, when the device is opened, the mounting board can drive the information table or the notification table stuck on the mounting board to rotate ninety degrees through the pull rope, so that a manager can acquire information conveniently, and the synchronism of the device is improved.
Drawings
Fig. 1 is a schematic perspective view of the present invention.
Fig. 2 is a schematic perspective view of a first part of the present invention.
Fig. 3 is a cross-sectional view of a second partial perspective structure of the present invention.
Fig. 4 is a perspective view of a first part of the follow-up mechanism of the present invention.
Fig. 5 is a sectional view of a second partial perspective of the follow-up mechanism of the present invention.
Fig. 6 is a schematic partial perspective view of the storage mechanism of the present invention.
Fig. 7 is a schematic perspective view of a third portion of the present invention.
FIG. 8 is a partial perspective cross-sectional view of the clearing mechanism of the present invention.
Fig. 9 is a partial perspective sectional view of the clearing mechanism and the following mechanism of the present invention.
Fig. 10 is a schematic view of a partial perspective structure of the following mechanism and the warning mechanism of the present invention.
Fig. 11 is a perspective view of a third part of the follow-up mechanism of the present invention.
Fig. 12 is a schematic perspective view of a first portion of the mounting mechanism of the present invention.
Fig. 13 is a schematic perspective view of a second portion of the mounting mechanism of the present invention.
The marks in the drawings are: 1-supporting frame, 2-box, 21-hinged plate, 22-baffle, 3-mounting frame, 31-guide rail plate, 32-push-pull frame, 4-follow-up mechanism, 41-first mounting tube, 42-first return spring, 43-piston block, 44-conveying tube, 45-check valve, 46-second mounting tube, 47-second return spring, 48-blocking block, 410-third mounting tube, 71-second pressing plate, 73-first elastic member, 5-storage mechanism, 51-storage box, 52-rack, 53-spur gear, 6-clear mechanism, 61-first pressing plate, 62-third return spring, 63-inserting rod, 64-wedge block, 7-warning mechanism, 49-indicating block, 72-flexible cloth, 8-clamping mechanism, 81-guide rod, 82-second elastic member, 83-clamping plate, 9-mounting mechanism, 91-mounting plate, 93-guide tube, 94-pull rope, 92-torsion spring.
Detailed Description
The invention is further described below with reference to the drawings and examples.
Example 1
The utility model provides a whole process engineering cost progress management device, as shown in fig. 1-6, including support frame 1, box 2, hinged plate 21, baffle 22, installing frame 3, guide rail plate 31, push-pull frame 32, follow-up mechanism 4, storage mechanism 5 and clear mechanism 6, the upside bolt of support frame 1 has the box 2 of material for the metal material, the lower part slip of box 2 has run through three push-pull frame 32 that evenly set up from left to right interval, the upside rotation of push-pull frame 32 is equipped with the guide rail plate 31 that is used for the direction, the front side bolt of guide rail plate 31 has installing frame 3 that is used for showing cost information, the preceding lower part slip of box 2 has run through and is used for protecting installing frame 3 and the baffle 22 of material for the metal material, the preceding upper portion rotation of box 2 is equipped with the baffle 22's of taking magnetism and magnetic absorption, be provided with the follow-up mechanism 4 that is used for following the cost progress and the storage mechanism 5 that is used for storing list and data on the follow-up mechanism 4, be provided with the clear mechanism 6 that is used for the progress to clear.
As shown in fig. 5, fig. 9, fig. 10 and fig. 11, the follow-up mechanism 4 comprises a first mounting tube 41, a first return spring 42, a piston block 43, a conveying tube 44, a one-way valve 45, a second mounting tube 46, a second return spring 47, a blocking block 48, a third mounting tube 410, a second pressing plate 71 and a first elastic member 73, wherein a third mounting tube 410 made of transparent materials is bolted to the upper front side of the mounting frame 3, the second pressing plate 71 is slidably arranged on the inner side of the left part of the third mounting tube 410, a first elastic member 73 for resetting and positioned in the third mounting tube 410 is connected between the right side of the second pressing plate 71 and the inner side of the right side of the third mounting tube 410, the first elastic member 73 is a rubber spring, the first mounting tube 41 penetrates through the upper middle part of the mounting frame 3, the first mounting tube 43 is slidably arranged on the front part of the first mounting tube 41, the first mounting tube 43 is connected with the first return spring 42 wound on the outer side of the piston block 43, the rear part of the first mounting tube 41 is connected with the first elastic member 44 through a screw, the rear part of the first mounting tube 41 is connected with the second mounting tube 44 through the first elastic member 44, and the second elastic member 44 is connected with the second mounting tube 44 through the first elastic member 44.
As shown in fig. 5 and 6, the storage mechanism 5 includes a storage box 51, a rack 52 and a spur gear 53, the upper side of the guide rail plate 31 is slidably provided with two storage boxes 51 for storing lists and data and arranged symmetrically in front-back, the rack 52 is bolted to the inner bottom side of the box 2, and the spur gear 53 engaged with the rack 52 and connected with the guide rail plate 31 is connected to the upper portion of the push-pull frame 32 in a key connection manner.
As shown in fig. 7 to 10, the zero clearing mechanism 6 includes a first pressing plate 61, a third return spring 62, an insert rod 63 and a wedge block 64, the insert rod 63 is penetrated in a non-contact manner at the left part of the third mounting tube 410, the first pressing plate 61 is welded at the left side of the insert rod 63, the third return spring 62 wound on the outer side of the insert rod 63 is connected between the first pressing plate 61 and the third mounting tube 410, and three wedge blocks 64 for pressing the insert rod 63 and contacting the insert rod 63 are uniformly connected at intervals from left to right at the rear side of the hinge plate 21.
An operator can apply the corresponding technical scheme in the device to the technology of the engineering cost progress management device according to specific conditions, initially, the hinge plate 21 magnetically adsorbs the baffle 22, the wedge-shaped block 64 extrudes the first pressing plate 61, the third reset spring 62 is in a compressed state, the device is in a retracted state, when the operator needs to use the device to assist in carrying out engineering cost progress management operation, firstly, the operator needs to open the device, namely, the operator rotates the hinge plate 21 upwards, the baffle 22 can be loosened during rotation of the hinge plate 21, the baffle 22 moves downwards under the action of self gravity immediately, the hinge plate 21 continues to rotate and is magnetically adsorbed on the box 2, so that the device is opened, the hinge plate 21 at the moment can shield rainwater, the rainwater is prevented from dripping into the box 2, unnecessary troubles are prevented from being caused to the operator, the hinged plate 21 can drive the wedge block 64 to rotate and loosen the first pressing plate 61 in the rotating process, the third reset spring 62 resets, the first pressing plate 61 can drive the inserting rod 63 to move leftwards under the reset action of the third reset spring 62, the inserting rod 63 can be clamped into the left inner side of the third installation tube 410 in the leftwards moving process so as to block the third installation tube 410, after the device is opened, an operator pastes the engineering cost information table on the front side of the installation frame 3, so that the manager can know engineering cost information conveniently, the three installation frames 3 are arranged, the manager can know different engineering cost information conveniently at the same time, when the operator needs to record the engineering cost progress, the operator presses the piston block 43 backwards, the first reset spring 42 compresses, the internal pressure of the first installation tube 41 increases, the initial one-way valve 45 is in a closed state, the air in the first installation tube 41 flows into the conveying tube 44, the pressure in the conveying tube 44 is increased, the blocking block 48 is forced to move leftwards, the second return spring 47 is compressed, the first blocking block 48 blocks the conveying tube 44, the blocking block 48 moves leftwards to release the conveying tube 44, the air flows into the third installation tube 410 through the second installation tube 46 and the conveying tube 44, the third installation tube 410 is blocked by the inserting rod 63, the pressure in the third installation tube 410 is increased, the second pressing plate 71 is forced to move rightwards, the first elastic piece 73 is compressed, then a manager can conveniently know the progress of construction cost according to the position of the second pressing plate 71 in the third installation tube 410, so that the management of the progress of construction cost is convenient, the manager releases the piston block 43, the first return spring 42 is reset, the piston block 43 moves forwards to be reset under the reset action of the first return spring 42, the check valve 45 is opened, the outside air flows into the first mounting tube 41 through the check valve 45, the pressure inside the first mounting tube 41 and the conveying tube 44 is restored, the second return spring 47 is reset, the blocking block 48 moves rightwards under the action of the second return spring 47 to block the conveying tube 44 again, thereby avoiding air leakage, the operator presses the piston block 43 backwards again, the second pressing plate 71 moves rightwards immediately again under force, thus the recording operation of the engineering cost progress can be carried out in a reciprocating way, the operator pulls the push-pull frame 32 forwards, the push-pull frame 32 drives the guide rail plate 31 to move forwards, the guide rail plate 31 drives all parts arranged on the guide rail plate to move forwards, the push-pull frame 32 drives the spur gear 53 to move forwards to be meshed with the rack 52, the spur gear 53 drives the guide rail plate 31 to rotate for hundred eighty degrees, the guide rail plate 31 drives all parts arranged on the storage box 51 to rotate by one hundred eighty degrees, the storage box 51 rotates by one hundred eighty degrees, after the storage box 51 rotates by one hundred eighty degrees, an operator pulls the two symmetrical storage boxes 51 in the directions away from each other again to enable the storage box 51 to be unfolded, after the storage box 51 is unfolded, the operator puts data into the storage box 51 and pushes the two symmetrical storage boxes 51 in the directions close to each other again to enable the storage box 51 to be folded, then the operator pushes the push-pull frame 32 backwards, the push-pull frame 32 drives the spur gear 53 and the guide rail plate 31 to move backwards, the spur gear 53 moves backwards and is meshed with the gear again, so that the storage box 51 moves backwards to reset and rotates by one hundred eighty degrees to reset, the data is stored through the storage box 51, the data can be conveniently fetched and used by the operator when needed, finally, when the device is not needed, an operator reversely rotates the hinge plate 21 to separate the hinge plate 21 from the box body 2, the reverse rotation of the hinge plate 21 drives the wedge-shaped block 64 to reversely rotate, the wedge-shaped block 64 can press the first pressing plate 61 to move rightwards in the reverse rotation process, the third reset spring 62 compresses, the first pressing plate 61 moves rightwards to drive the inserting rod 63 to move rightwards so as not to block the third mounting tube 410, air in the third mounting tube 410 is discharged from a gap between the third mounting tube 410 and the inserting rod 63, the first elastic piece 73 is reset, the second pressing plate 71 moves leftwards under the reset action of the first elastic piece 73, so that the recorded progress is cleared, after the hinge plate 21 reversely rotates and resets, the operator pulls the baffle 22 upwards again to enable the baffle 22 to be in contact with the hinge plate 21, the hinge plate 21 can magnetically adsorb the baffle 22 again, and the device is closed, the use of the device is ended.
Example 2
On the basis of embodiment 1, as shown in fig. 9 and 10, the alarm device 7 for eye-catching prompt is further included, the alarm device 7 includes an indication block 49 and a flexible cloth 72, the indication block 49 with red color is bolted to the left side of the second pressing plate 71, and the flexible cloth 72 with green color surrounding the first elastic member 73 is connected between the right side of the second pressing plate 71 and the right inner side of the third mounting tube 410.
The second pressing plate 71 moves rightwards to press the flexible cloth 72 to shrink and drive the indicating block 49 to move rightwards, and because the color of the indicating block 49 is red and the color of the flexible cloth 72 is green, a manager can know the progress of construction cost more conveniently and clearly through the color difference between the indicating block 49 and the flexible cloth 72, and then the second pressing plate 71 moves leftwards to reset to pull the flexible cloth 72 to be unfolded and drive the indicating block 49 to move leftwards to reset.
Example 3
On the basis of embodiment 2, as shown in fig. 1 and 4, the device further comprises a clamping mechanism 8 for clamping data, two groups of clamping mechanisms 8 which are arranged in an up-down symmetrical mode are arranged on the mounting frame 3, one group of clamping mechanisms 8 comprises a guide rod 81, a second elastic piece 82 and a clamping plate 83, two guide rods 81 which are used for guiding and are arranged in a bilateral symmetry mode are bolted on the front side of the mounting frame 3, a clamping plate 83 for clamping data is sleeved between the middle parts of the two symmetrical guide rods 81 in a sliding mode, and two second elastic pieces 82 which are wound on the outer sides of the guide rods 81 are connected between the clamping plate 83 and the mounting frame 3.
The operator pulls splint 83 forward, and second elastic component 82 stretches, then places engineering cost information table in the clearance between splint 83 and installing frame 3, unclamps splint 83 afterwards, and second elastic component 82 resets, and splint 83 can be moved backward under the effect that second elastic component 82 resets and block the information table on installing frame 3 to this need not the operator again with engineering cost information table paste the front side at installing frame 3, the convenience operator replaces the information table.
Example 4
On the basis of embodiment 3, as shown in fig. 1, 12 and 13, the device further comprises a mounting mechanism 9 for mounting articles, the mounting mechanism 9 comprises a mounting plate 91, a guide pipe 93 and a pull rope 94, the guide pipe 93 for guiding is welded on the left side and the right side of the front lower portion of the box body 2, the mounting plate 91 for mounting articles is rotatably arranged in the front middle portion of the box body 2, and the pull rope 94 penetrating through the guide pipe 93 in a sliding mode is connected between the baffle 22 and the mounting plate 91.
As shown in fig. 13, a torsion spring 92 is further included, and a torsion spring 92 for restoring is connected between the mounting plate 91 and the case 2.
The operator pastes information table or notice table on mounting panel 91, when opening this device, baffle 22 moves down and can pull mounting panel 91 rotatory ninety degrees through stay cord 94, torsional spring 92 deformation, mounting panel 91 can drive the information table or the rotatory ninety degrees of notice table that paste on it to this is convenient for obtain information in the supervisor, has also improved the synchronism of this device simultaneously, and baffle 22 moves up and can loosen stay cord 94 afterwards, and torsional spring 92 resets, and mounting panel 91 can reverse rotation reset under the effect that torsional spring 92 reset, so pack up mounting panel 91.
The foregoing examples have shown only the preferred embodiments of the invention, which are described in more detail and are not to be construed as limiting the scope of the invention. It should be noted that modifications, improvements and substitutions can be made by those skilled in the art without departing from the spirit of the invention, which are all within the scope of the invention. Accordingly, the scope of protection of the present invention is to be determined by the appended claims.

Claims (5)

1. The utility model provides a whole process engineering cost progress management device, including support frame (1), box (2), hinged plate (21), baffle (22), installing frame (3), guide rail board (31) and push-pull frame (32), the upside of support frame (1) is connected with box (2), three push-pull frame (32) are run through to the lower part slidingtype of box (2), the upside rotation of push-pull frame (32) is equipped with guide rail board (31) that are used for the direction, the front side of guide rail board (31) is connected with installing frame (3) that are used for showing cost information, baffle (22) that are used for protecting installing frame (3) are run through to the front lower part slidingtype of box (2), the front upper portion rotation of box (2) is equipped with hinged plate (21), characterized in that still includes follow-up mechanism (4), storage mechanism (5) and clear mechanism (6), be provided with follow-up mechanism (4) that are used for following the cost progress and be used for storing list and data on follow-up mechanism (4);
the follow-up mechanism (4) comprises a first mounting tube (41), a first reset spring (42), a piston block (43), a conveying tube (44), a one-way valve (45), a second mounting tube (46), a second reset spring (47), a blocking block (48), a third mounting tube (410), a second pressing plate (71) and a first elastic piece (73), wherein the upper side of the front part of the mounting frame (3) is connected with the third mounting tube (410) made of transparent materials, the inner side of the left part of the third mounting tube (410) is slidably provided with the second pressing plate (71), a first elastic piece (73) used for resetting is connected between the right side of the second pressing plate (71) and the right inner side of the third mounting tube (410), the first mounting tube (41) penetrates through the upper middle part of the mounting frame (3), the front part of the first mounting tube (41) is slidably provided with the piston block (43), the first reset spring (42) is connected between the piston block (43) and the first mounting tube (41), the rear part of the first mounting tube (41) is provided with the one-way valve (45), the left side of the second mounting tube (410) is communicated with the conveying tube (44) between the two upper sides of the first mounting tube (41), a blocking block (48) for blocking the conveying pipe (44) and contacting the conveying pipe (44) on the first mounting pipe (41) is connected to the inside of the second mounting pipe (46) through a second reset spring (47);
the storage mechanism (5) comprises a storage box (51), racks (52) and a straight gear (53), wherein the upper side of the guide rail plate (31) is slidably provided with two storage boxes (51) for storing lists and data, the racks (52) are connected to the inner bottom side of the box body (2), and the upper part of the push-pull frame (32) is rotatably sleeved with the straight gear (53) which is meshed with the racks (52) and is connected with the guide rail plate (31);
the zero clearing mechanism (6) comprises a first pressing plate (61), a third reset spring (62), an inserting rod (63) and a wedge block (64), wherein the inserting rod (63) is penetrated through the left part of the third installation tube (410) in a non-contact mode, the first pressing plate (61) is connected to the left side of the inserting rod (63), the third reset spring (62) is connected between the first pressing plate (61) and the third installation tube (410), and the wedge block (64) used for extruding the inserting rod (63) is connected to the rear side of the hinge plate (21).
2. The whole process engineering cost progress management device according to claim 1, further comprising a warning mechanism (7) for highlighting, wherein the warning mechanism (7) comprises an indication block (49) and a flexible cloth (72), the indication block (49) is connected to the left side of the second pressing plate (71), and the flexible cloth (72) is connected between the right side of the second pressing plate (71) and the right inner side of the third installation tube (410).
3. The whole process engineering cost progress management device according to claim 2, further comprising a clamping mechanism (8) for clamping data, wherein two groups of clamping mechanisms (8) which are arranged in an up-down symmetrical mode are arranged on the mounting frame (3), a group of clamping mechanisms (8) comprises a guide rod (81), a second elastic piece (82) and a clamping plate (83), the front side of the mounting frame (3) is connected with the guide rod (81) for guiding, the middle part of the guide rod (81) is sleeved with the clamping plate (83) for clamping the data in a sliding mode, and the second elastic piece (82) is connected between the clamping plate (83) and the mounting frame (3).
4. A whole process engineering cost progress management device according to claim 3, further comprising a mounting mechanism (9) for mounting articles, wherein the mounting mechanism (9) comprises a mounting plate (91), guide pipes (93) and pull ropes (94), the left side and the right side of the front lower part of the box body (2) are respectively connected with the guide pipes (93) for guiding, the mounting plate (91) for mounting articles is rotatably arranged in the front middle part of the box body (2), and the pull ropes (94) penetrating through the guide pipes (93) in a sliding mode are connected between the baffle plate (22) and the mounting plate (91).
5. The whole process engineering cost progress management device according to claim 4, further comprising a torsion spring (92), wherein the torsion spring (92) for resetting is connected between the mounting plate (91) and the box body (2).
CN202210688003.3A 2022-06-17 2022-06-17 Whole process engineering cost progress management device Active CN114974028B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210688003.3A CN114974028B (en) 2022-06-17 2022-06-17 Whole process engineering cost progress management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210688003.3A CN114974028B (en) 2022-06-17 2022-06-17 Whole process engineering cost progress management device

Publications (2)

Publication Number Publication Date
CN114974028A CN114974028A (en) 2022-08-30
CN114974028B true CN114974028B (en) 2024-03-22

Family

ID=82963746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210688003.3A Active CN114974028B (en) 2022-06-17 2022-06-17 Whole process engineering cost progress management device

Country Status (1)

Country Link
CN (1) CN114974028B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08329145A (en) * 1995-06-06 1996-12-13 Hitachi Ltd Schedule managing device
JP2001306123A (en) * 2000-04-21 2001-11-02 Honda Motor Co Ltd Planning system for carrying in parts for knock-down production to shipping base
CN111552388A (en) * 2020-05-06 2020-08-18 重庆中宏建设监理有限公司 Engineering cost progress management system
CN111933054A (en) * 2020-07-10 2020-11-13 厦门城市职业学院(厦门市广播电视大学) Scientific research project management progress tracking display board
CN212032601U (en) * 2020-05-28 2020-11-27 上海上咨工程造价咨询有限公司 Engineering cost progress management device
CN112201143A (en) * 2020-11-02 2021-01-08 龚小钧 Progress management system for construction cost
CN213370909U (en) * 2020-09-27 2021-06-08 郭洪童 Building construction cost progress management device
CN113101622A (en) * 2021-05-21 2021-07-13 常州机电职业技术学院 Multifunctional tennis racket storage rack
CN216311282U (en) * 2021-11-19 2022-04-15 周延光 Engineering cost progress management device
CN216348805U (en) * 2021-10-25 2022-04-19 广西建设职业技术学院 Multifunctional building engineering detection device
CN216562401U (en) * 2021-11-19 2022-05-17 广州市创筑工程造价咨询有限公司 Investment progress display device for engineering cost

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8897915B2 (en) * 2008-03-03 2014-11-25 SureTint Technologies, LLC Inventory security management for a hair dye storage system
WO2013015839A1 (en) * 2011-07-26 2013-01-31 Accudial Pharmaceutical, Inc. Progress tracking aid labeling for medication containers

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08329145A (en) * 1995-06-06 1996-12-13 Hitachi Ltd Schedule managing device
JP2001306123A (en) * 2000-04-21 2001-11-02 Honda Motor Co Ltd Planning system for carrying in parts for knock-down production to shipping base
CN111552388A (en) * 2020-05-06 2020-08-18 重庆中宏建设监理有限公司 Engineering cost progress management system
CN212032601U (en) * 2020-05-28 2020-11-27 上海上咨工程造价咨询有限公司 Engineering cost progress management device
CN111933054A (en) * 2020-07-10 2020-11-13 厦门城市职业学院(厦门市广播电视大学) Scientific research project management progress tracking display board
CN213370909U (en) * 2020-09-27 2021-06-08 郭洪童 Building construction cost progress management device
CN112201143A (en) * 2020-11-02 2021-01-08 龚小钧 Progress management system for construction cost
CN113101622A (en) * 2021-05-21 2021-07-13 常州机电职业技术学院 Multifunctional tennis racket storage rack
CN216348805U (en) * 2021-10-25 2022-04-19 广西建设职业技术学院 Multifunctional building engineering detection device
CN216311282U (en) * 2021-11-19 2022-04-15 周延光 Engineering cost progress management device
CN216562401U (en) * 2021-11-19 2022-05-17 广州市创筑工程造价咨询有限公司 Investment progress display device for engineering cost

Also Published As

Publication number Publication date
CN114974028A (en) 2022-08-30

Similar Documents

Publication Publication Date Title
CN114718371A (en) Fireproof cinerary casket storage rack capable of being taken out in emergency
CN114974028B (en) Whole process engineering cost progress management device
CN114165144B (en) High-sealing peeping window
CN211616952U (en) Automatic printing machine with parallel screen printing plates
CN215987958U (en) Liquid crystal module with convenient dismouting function
CN215557953U (en) Reduce production off-the-shelf hose reel
CN114379850B (en) Aluminum alloy touch pad pasting positioner
CN218458509U (en) Cabinet type heptafluoropropane gas fire extinguishing device
CN216468855U (en) Salt bag snatchs mechanism
CN221092105U (en) Container with openable top
CN213689574U (en) Natural gas station yard leak source detection device
CN215699308U (en) Auxiliary device for welding plates
CN219594213U (en) Bag taking machine with bag opening mechanism
CN116817101A (en) Auxiliary support for monitoring water quality of sewer
CN115503332B (en) Printing device for medicine packaging
CN214895057U (en) Liquid chromatograph calibrating installation
CN217919147U (en) Sampling box for environmental monitoring
CN215674111U (en) Novel water delivery pipeline
CN219954661U (en) Natural gas pipeline plugging device
CN221350987U (en) Rubber tube sizing material stretching detection device
CN220891379U (en) Pipeline butt joint device for fire engineering
CN221155208U (en) Fire-fighting device for high-rise building
CN218516182U (en) Pressure filter is used in processing of acid particle first blue or green
CN220530541U (en) Novel intelligent fire engine's multi-functional box
CN218861199U (en) Cutting table of composite fiber filter screen

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant