CN114974012A - Project progress management device for building engineering project management - Google Patents

Project progress management device for building engineering project management Download PDF

Info

Publication number
CN114974012A
CN114974012A CN202210554743.8A CN202210554743A CN114974012A CN 114974012 A CN114974012 A CN 114974012A CN 202210554743 A CN202210554743 A CN 202210554743A CN 114974012 A CN114974012 A CN 114974012A
Authority
CN
China
Prior art keywords
fixed
project
group
gear
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210554743.8A
Other languages
Chinese (zh)
Other versions
CN114974012B (en
Inventor
黄利义
罗文娟
胡静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Tongxin Engineering Project Management Co ltd
Original Assignee
Zhejiang Tongxin Engineering Project Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Tongxin Engineering Project Management Co ltd filed Critical Zhejiang Tongxin Engineering Project Management Co ltd
Priority to CN202210554743.8A priority Critical patent/CN114974012B/en
Publication of CN114974012A publication Critical patent/CN114974012A/en
Application granted granted Critical
Publication of CN114974012B publication Critical patent/CN114974012B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F11/00Indicating arrangements for variable information in which the complete information is permanently attached to a movable support which brings it to the display position
    • G09F11/02Indicating arrangements for variable information in which the complete information is permanently attached to a movable support which brings it to the display position the display elements being secured to rotating members, e.g. drums, spindles
    • G09F11/10Electrical control therefor
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F11/00Indicating arrangements for variable information in which the complete information is permanently attached to a movable support which brings it to the display position
    • G09F11/02Indicating arrangements for variable information in which the complete information is permanently attached to a movable support which brings it to the display position the display elements being secured to rotating members, e.g. drums, spindles
    • G09F11/08Indicating arrangements for variable information in which the complete information is permanently attached to a movable support which brings it to the display position the display elements being secured to rotating members, e.g. drums, spindles the elements being flexible sheets
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Devices For Indicating Variable Information By Combining Individual Elements (AREA)
  • Casings For Electric Apparatus (AREA)

Abstract

The invention relates to the technical field of construction progress management devices, in particular to a project progress management device for building engineering project management, which comprises a fixed seat, wherein the top of the fixed seat is provided with a group of fixed boxes, the top of each fixed box is provided with a group of rain baffles, the top of each rain baffle is provided with a group of photovoltaic power generation plates, the fixed boxes are internally provided with a plurality of groups of automatic replacement components, one group of automatic fixed components are arranged beside each group of automatic replacement components, and the outer walls of the fixed boxes are provided with a group of waterproof components. And the staff can manage the project progress conveniently.

Description

Project progress management device for building engineering project management
Technical Field
The invention relates to the technical field of building construction progress management devices, in particular to a project progress management device for building engineering project management.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and auxiliary facilities thereof and the installation activities of lines, pipelines and equipment matched with the building constructions, the building constructions refer to the engineering which is formed by a top cover, a beam column, a wall, a foundation and can form an internal space and meets the requirements of people on production, living, learning and public activities, in order to visually display construction target values and progress conditions, a project progress management and display device can be generally used, and the construction progress is conveniently controlled and managed;
however, current project progress management device needs the staff to carry out artifical the replacement to the schedule, because the change of project construction progress is very fast, adopts the mode of artifical replacement schedule, can produce the replacement of schedule and the untimely phenomenon of renewal, and then leads to the staff can't carry out accurate management to the progress of project, still can influence the time limit for a project when serious.
Therefore, there is a need for a project schedule management apparatus for managing a construction project that can solve the above problems.
Disclosure of Invention
In order to solve the problems in the prior art, the invention provides a project progress management device for building engineering project management.
The technical scheme adopted by the invention to achieve the aim is as follows: the project progress management device for the building engineering project management comprises a fixed seat, wherein a group of fixed boxes are arranged at the top of the fixed seat, a group of rain baffles are arranged at the top of the fixed boxes, a group of photovoltaic power generation panels are arranged at the top of the rain baffles, a plurality of groups of automatic replacement assemblies are arranged in the fixed boxes, a group of automatic fixed assemblies are arranged beside each group of automatic replacement assemblies, and a group of waterproof assemblies are arranged on the outer wall of each fixed box;
wherein, every group automatic replacement subassembly is all including show case, wireless printer, support frame, first transport running roller, second transport running roller, drive disk assembly and driver part, show case fixed connection be in on the inner wall of fixed case, wireless printer sets up the top of show case, the support frame sets up the show case top is close to one side of wireless printer, first transport running roller and second are carried the running roller and are all rotated and connect on the support frame.
Preferably, each group of automatic replacement assemblies further comprises an upper arc-shaped guide frame and a conveying plate, the conveying plate is arranged at the top of the display box and is directly opposite to the output end of the wireless printer, and the upper arc-shaped guide frame is arranged beside the supporting frame.
Preferably, the drive part is including biax motor and hold-in range, biax motor sets up on the inner wall of fixed case, an output of biax motor passes through the hold-in range with first transport running roller transmission is connected.
Preferably, the transmission part comprises a first gear, a second gear and a connecting gear, the first gear is sleeved on the first conveying roller, the second gear is sleeved on the second conveying roller, the connecting gear is rotatably connected to the side wall of the display box, the first gear is meshed with the connecting gear, and the connecting gear is meshed with the second gear.
Preferably, every group the automatic fixed subassembly all includes threaded rod, spacing, linkage subassembly and two sets of rectangle sliding frame, every group two sets of sliding tray, every group have all been seted up on the outer wall of show case two sets of sliding trays, every group the rectangle sliding tray all with a set of sliding tray sliding fit on the horizontal direction, it is two sets of through a set of connecting plate fixed connection between the rectangle sliding tray, spacing sets up on the bottom inner wall of show case, the threaded rod rotates to be connected on the spacing, the threaded rod with connecting plate threaded connection.
Preferably, the linkage part is including ratchet, pawl, rotor plate, axis of rotation, mount, first bevel gear and second bevel gear, the ratchet cover is established biaxial motor is kept away from on the output shaft of hold-in range, mount fixed connection is in on the inner wall of show box, the axis of rotation rotates to be connected on the mount, the rotor plate sets up the axis of rotation is close to one side of ratchet, the pawl sets up on the rotor plate, the pawl cooperatees with ratchet structure, first bevel gear sets up one side of rotor plate is kept away from to the axis of rotation, second bevel gear sets up on the threaded rod, first bevel gear with second bevel gear meshing.
Preferably, the waterproof assembly comprises a glass panel and two groups of hydraulic support rods, the glass panel is rotatably connected to one side of the fixed box, one end of each group of hydraulic support rods is hinged to the inner wall of the fixed box, and the other end of each group of hydraulic support rods is hinged to the glass panel.
Preferably, the inside of fixed case is provided with a set of show shelf, be provided with the multiunit thumb pin on the show shelf, be provided with the multiunit light on the top inner wall of fixed case.
Preferably, the bottom of each group of the display box is provided with a group of lower arc guide frames, and a group of trays are arranged below each group of the display box.
The invention has the beneficial effects that:
firstly, under the action of the automatic replacement assembly, a new schedule can be automatically replaced for an old schedule, workers do not need to replace the schedule manually all the time, the technical problem that manual replacement and updating of the schedule are not timely is solved, specifically, the wireless printer can automatically print the new schedule, at the moment, the double-shaft motor rotates clockwise, the first conveying roller and the second conveying roller can drive the new schedule to move towards the upper arc guide frame, the new schedule starts to vertically move downwards through the guiding action of the upper arc guide frame, the new schedule is located on the display frame, the old schedule falls into the tray for storage under the guiding action of the lower arc guide frame, and therefore automatic replacement of the old schedule is completed.
Secondly, under the action of the automatic fixing component, after the schedule is replaced, the schedule can be fixed on the display box for a worker to watch, so that the worker can manage the project schedule conveniently, specifically, when a new schedule is conveyed to the position of the display box by the automatic replacing component, the double-shaft motor starts to rotate anticlockwise in a small range, the rotating shaft is driven to rotate through the transmission action of the ratchet wheel and the pawl, the rotating shaft drives the threaded rod to rotate through the action of the first conical gear and the second conical gear, and then the two groups of rectangular sliding frames are driven to move towards the direction of the schedule, so that the schedule is firmly fixed.
Thirdly, the solar photovoltaic power generation device can store electric energy generated by the sun through the photovoltaic power generation panel, supplies power to the whole device, and is more energy-saving and environment-friendly.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic side view of a portion of the present invention;
FIG. 3 is an enlarged view taken at A in FIG. 2;
FIG. 4 is a schematic structural view of an automatic replacement assembly according to the present invention;
FIG. 5 is an enlarged view of FIG. 4 at B;
FIG. 6 is an enlarged view at C of FIG. 4;
FIG. 7 is a schematic view of the structure of the transmission member of the present invention;
FIG. 8 is a schematic structural view of the automatic fastening assembly of the present invention;
fig. 9 is an enlarged view of fig. 8 at D.
Reference numerals are as follows: 1. a fixed seat; 2. a stationary box; 3. a photovoltaic power generation panel; 4. a glass panel; 5. a tray; 6. a wireless printer; 7. a hydraulic stay bar; 8. an illuminating lamp; 9. a display shelf; 10. drawing pins; 11. a display box; 12. a rectangular sliding frame; 13. a connecting gear; 14. a synchronous belt; 15. a dual-axis motor; 16. a first conveying roller; 17. a second conveying roller; 18. a support frame; 19. an upper arc guide frame; 20. a lower arc guide frame; 21. a conveying plate; 22. a first gear; 23. a second gear; 24. a connecting plate; 25. a limiting frame; 26. a ratchet wheel; 27. a pawl; 28. a rotating plate; 29. a rotating shaft; 30. a first bevel gear; 31. a second bevel gear; 32. a threaded rod; 33. a rain shield; 34. a fixed mount; 35. a sliding groove.
Detailed Description
In order to make the aforementioned objects, features and advantages of the present invention comprehensible, embodiments accompanied with figures are described in detail below. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein.
As shown in fig. 1, the invention provides a project progress management device for building engineering project management, which comprises a fixed seat 1, wherein a set of fixed boxes 2 is arranged at the top of the fixed seat 1, a set of rain baffles 33 is arranged at the top of the fixed boxes 2, a set of photovoltaic power generation panels 3 is arranged at the top of the rain baffles 33, a plurality of sets of automatic replacement assemblies are arranged inside the fixed boxes 2, a set of automatic fixing assemblies is arranged beside each set of automatic replacement assemblies, and a set of waterproof assemblies is arranged on the outer wall of the fixed boxes 2.
As shown in fig. 1 to 9, each set of automatic replacement components includes a display box 11, a wireless printer 6, a support frame 18, a first conveying roller 16, a second conveying roller 17, a transmission component and a driving component, the display box 11 is fixedly connected to the inner wall of the fixed box 2, the wireless printer 6 is arranged at the top of the display box 11, the support frame 18 is arranged at one side of the top of the display box 11 close to the wireless printer 6, and the first conveying roller 16 and the second conveying roller 17 are rotatably connected to the support frame 18; wireless printer 6 can be according to project construction progress, print the schedule in real time, automatic replacement subassembly can be automatically with the automatic old schedule of replacing of new schedule, do not need the staff to carry out artifical replacement to the schedule constantly, solve artifical replacement and the untimely technical problem of update to the schedule, after the schedule replacement finishes, automatic fixed subassembly can be fixed the schedule on show case 11, for the staff watches, the staff of being convenient for manages the project progress, photovoltaic power generation board 3 can store the electric energy that the sun sent, supply power for whole device.
Each group of automatic replacement assemblies further comprises an upper arc guide frame 19 and a conveying plate 21, the conveying plate 21 is arranged at the top of the display box 11, the conveying plate 21 faces the output end of the wireless printer 6, the upper arc guide frame 19 is arranged beside the supporting frame 18, the driving part comprises a double-shaft motor 15 and a synchronous belt 14, the double-shaft motor 15 is arranged on the inner wall of the fixed box 2, and one output end of the double-shaft motor 15 is in transmission connection with the first conveying roller 16 through the synchronous belt 14.
The transmission component comprises a first gear 22, a second gear 23 and a connecting gear 13, the first gear 22 is sleeved on the first conveying roller 16, the second gear 23 is sleeved on the second conveying roller 17, the connecting gear 13 is rotatably connected to the side wall of the display box 11, the first gear 22 is meshed with the connecting gear 13, and the connecting gear 13 is meshed with the second gear 23; when the project schedule is updated, the wireless printer 6 will automatically print out a new schedule, at this time, the dual-shaft motor 15 rotates clockwise, the synchronous belt 14 drives the first conveying roller 16 to rotate clockwise, the first conveying roller 16 continues to drive the second conveying roller 17 to rotate clockwise through the connecting gear 13, the first conveying roller 16 and the second conveying roller 17 drive the new schedule to move towards the upper arc guide frame 19, the new schedule starts to move vertically downwards under the guiding action of the upper arc guide frame 19, so that the new schedule is located on the display frame 9, the old schedule falls into the tray 5 to be stored under the guiding action of the lower arc guide frame 20, thereby completing the automatic replacement of the old schedule, and at this time, the ratchet 26 and the pawl 27 will drive the rectangular sliding frame 12 to move towards the side far away from the schedule due to the friction force, do not touch the schedule.
Every group automatic fixed subassembly all includes threaded rod 32, spacing 25, linkage subassembly and two sets of rectangle sliding frame 12, two sets of sliding tray 35 have all been seted up on the outer wall of every group display box 11, every group rectangle sliding frame 12 all with a set of sliding tray 35 sliding fit on the horizontal direction, through a set of connecting plate 24 fixed connection between two sets of rectangle sliding frame 12, spacing 25 sets up on the bottom inner wall of display box 11, threaded rod 32 rotates to be connected on spacing 25, threaded rod 32 and connecting plate 24 threaded connection.
The linkage component comprises a ratchet 26, a pawl 27, a rotating plate 28, a rotating shaft 29, a fixed frame 34, a first bevel gear 30 and a second bevel gear 31, the ratchet 26 is sleeved on an output shaft of the double-shaft motor 15 far away from the synchronous belt 14, the fixed frame 34 is fixedly connected to the inner wall of the display box 11 body, the rotating shaft 29 is rotatably connected to the fixed frame 34, the rotating plate 28 is arranged on one side, close to the ratchet 26, of the rotating shaft 29, the pawl 27 is arranged on the rotating plate 28, the pawl 27 is structurally matched with the ratchet 26, the first bevel gear 30 is arranged on one side, far away from the rotating plate 28, of the rotating shaft 29, the second bevel gear 31 is arranged on a threaded rod 32, and the first bevel gear 30 is meshed with the second bevel gear 31; when a new schedule is conveyed to the position of the display box 11 by the automatic replacement component, the dual-shaft motor 15 starts to rotate counterclockwise in a small range, and then the rotation shaft 29 is driven to rotate through the transmission action of the ratchet 26 and the pawl 27, the rotation shaft 29 continues to drive the threaded rod 32 to rotate through the action of the first bevel gear 30 and the second bevel gear 31, and then the two sets of rectangular sliding frames 12 are driven to move towards the schedule, so that the schedule is firmly fixed.
The waterproof assembly comprises a glass panel 4 and two groups of hydraulic support rods 7, the glass panel 4 is rotatably connected to one side of the fixed box 2, one end of each group of hydraulic support rods 7 is hinged to the inner wall of the fixed box 2, and the other end of each group of hydraulic support rods 7 is hinged to the glass panel 4; the glass panel 4 can effectively block rainwater, prevents that the schedule from being wetted.
A group of display frames 9 are arranged inside the fixed box 2, a plurality of groups of drawing pins 10 are arranged on the display frames 9, and a plurality of groups of illuminating lamps 8 are arranged on the inner wall of the top of the fixed box 2; the show shelf 9 is used for posting up the general design table of project, and the staff of being convenient for compares the project schedule with the general design table of project, and light 8 can provide the illuminating effect night.
The bottom of each group of display boxes 11 is provided with a group of lower arc-shaped guide frames 20, and a group of trays 5 is arranged below each group of display boxes 11; the tray 5 is used for collecting and storing old schedules.
The working principle is as follows: wireless printer 6 can be according to project construction progress, print the schedule in real time, automatic replacement subassembly can be automatically with the automatic old schedule of replacing of new schedule, do not need the staff to carry out artifical replacement to the schedule constantly, the artifical replacement and the untimely technical problem of update to the schedule of having solved, after the schedule replacement finishes, automatic fixed subassembly can be fixed the schedule on show case 11, for the staff watches, the staff of being convenient for manages the project progress, photovoltaic power generation board 3 can store the electric energy that the sun sent, supply power for whole device.
When the project schedule is updated, the wireless printer 6 will automatically print out a new schedule, at this time, the dual-shaft motor 15 rotates clockwise, the synchronous belt 14 drives the first conveying roller 16 to rotate clockwise, the first conveying roller 16 continues to drive the second conveying roller 17 to rotate clockwise through the connecting gear 13, the first conveying roller 16 and the second conveying roller 17 drive the new schedule to move towards the upper arc guide frame 19, the new schedule starts to move vertically downwards under the guiding action of the upper arc guide frame 19, so that the new schedule is located on the display frame 9, the old schedule falls into the tray 5 to be stored under the guiding action of the lower arc guide frame 20, thereby completing the automatic replacement of the old schedule, and at this time, the ratchet 26 and the pawl 27 will drive the rectangular sliding frame 12 to move towards the side far away from the schedule due to the friction force, do not touch the schedule.
When a new schedule is conveyed to the position of the display box 11 by the automatic replacing component, the dual-shaft motor 15 starts to rotate counterclockwise by a small amplitude, and then the rotation shaft 29 is driven to rotate by the transmission action of the ratchet 26 and the pawl 27, the rotation shaft 29 continues to drive the threaded rod 32 to rotate by the action of the first bevel gear 30 and the second bevel gear 31, and then the two sets of rectangular sliding frames 12 are driven to move towards the direction of the schedule, so as to firmly fix the schedule.
The above examples only represent one embodiment of the present invention, and the description thereof is more specific and detailed, but not to be construed as limiting the scope of the invention. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the inventive concept, which falls within the scope of the present invention. Therefore, the protection scope of the present patent shall be subject to the appended claims.

Claims (9)

1. The project progress management device for the building engineering project management comprises a fixed seat (1) and is characterized in that a group of fixed boxes (2) is arranged at the tops of the fixed seats (1), a group of rain baffles (33) are arranged at the tops of the fixed boxes (2), a group of photovoltaic power generation panels (3) is arranged at the tops of the rain baffles (33), a plurality of groups of automatic replacement assemblies are arranged inside the fixed boxes (2), a group of automatic fixed assemblies are arranged beside each group of automatic replacement assemblies, and a group of waterproof assemblies are arranged on the outer walls of the fixed boxes (2);
wherein, every group automatic replacement subassembly all includes show case (11), wireless printer (6), support frame (18), first transport running roller (16), second transport running roller (17), drive disk assembly and driver part, show case (11) fixed connection be in on the inner wall of fixed case (2), wireless printer (6) set up the top of show case (11), support frame (18) set up show case (11) top is close to one side of wireless printer (6), first transport running roller (16) and second transport running roller (17) are all rotated and are connected on support frame (18).
2. The project schedule management apparatus for building engineering project management according to claim 1, wherein each set of said automatic replacement components further comprises an upper arc guide (19) and a conveying plate (21), said conveying plate (21) is disposed on the top of said display box (11), said conveying plate (21) is disposed right opposite to the output end of said wireless printer (6), said upper arc guide (19) is disposed beside said supporting frame (18).
3. The project schedule management device for the construction project management according to claim 2, wherein the driving member comprises a double-shaft motor (15) and a synchronous belt (14), the double-shaft motor (15) is disposed on the inner wall of the fixed box (2), and one output end of the double-shaft motor (15) is in transmission connection with the first conveying roller (16) through the synchronous belt (14).
4. The project schedule management device for the construction project management of claim 1, wherein the transmission component comprises a first gear (22), a second gear (23) and a connecting gear (13), the first gear (22) is sleeved on the first conveying roller (16), the second gear (23) is sleeved on the second conveying roller (17), the connecting gear (13) is rotatably connected to the side wall of the display box (11), the first gear (22) is engaged with the connecting gear (13), and the connecting gear (13) is engaged with the second gear (23).
5. The project progress management device for the building engineering project management according to claim 3, wherein each set of the automatic fixing components comprises a threaded rod (32), a limiting frame (25), a linkage component and two sets of rectangular sliding frames (12), two sets of sliding grooves (35) are formed in the outer wall of the display box (11), each set of the rectangular sliding frames (12) are in sliding fit with one set of sliding grooves (35) in the horizontal direction, the two sets of the rectangular sliding frames (12) are fixedly connected through one set of connecting plates (24), the limiting frame (25) is arranged on the inner wall of the bottom of the display box (11), the threaded rod (32) is rotatably connected to the limiting frame (25), and the threaded rod (32) is in threaded connection with the connecting plates (24).
6. The project schedule management device for the construction project management according to claim 5, wherein the linkage component comprises a ratchet wheel (26), a pawl (27), a rotating plate (28), a rotating shaft (29), a fixed frame (34), a first bevel gear (30) and a second bevel gear (31), the ratchet wheel (26) is sleeved on an output shaft of the double-shaft motor (15) far away from the synchronous belt (14), the fixed frame (34) is fixedly connected to the inner wall of the display box (11), the rotating shaft (29) is rotatably connected to the fixed frame (34), the rotating plate (28) is arranged on one side of the rotating shaft (29) close to the ratchet wheel (26), the pawl (27) is arranged on the rotating plate (28), the pawl (27) is structurally matched with the ratchet wheel (26), the first bevel gear (30) is arranged on one side of the rotating shaft (29) far away from the rotating plate (28), the second bevel gear (31) is provided on the threaded rod (32), and the first bevel gear (30) is meshed with the second bevel gear (31).
7. The project schedule management device for the construction project management of claim 1, wherein the waterproof assembly comprises a glass panel (4) and two sets of hydraulic support rods (7), the glass panel (4) is rotatably connected to one side of the fixed box (2), one end of each set of hydraulic support rods (7) is hinged to the inner wall of the fixed box (2), and the other end of each set of hydraulic support rods (7) is hinged to the glass panel (4).
8. The project schedule management device for the construction project management according to claim 1, characterized in that a set of display shelves (9) is provided inside the fixed box (2), a plurality of sets of drawing pins (10) are provided on the display shelves (9), and a plurality of sets of illuminating lamps (8) are provided on the top inner wall of the fixed box (2).
9. The project schedule management apparatus for building engineering project management according to claim 1, wherein a set of lower arc-shaped guide frames (20) is provided at the bottom of each set of the display boxes (11), and a set of trays (5) is provided below each set of the display boxes (11).
CN202210554743.8A 2022-05-20 2022-05-20 Project progress management device for building project management Active CN114974012B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210554743.8A CN114974012B (en) 2022-05-20 2022-05-20 Project progress management device for building project management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210554743.8A CN114974012B (en) 2022-05-20 2022-05-20 Project progress management device for building project management

Publications (2)

Publication Number Publication Date
CN114974012A true CN114974012A (en) 2022-08-30
CN114974012B CN114974012B (en) 2023-10-10

Family

ID=82984321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210554743.8A Active CN114974012B (en) 2022-05-20 2022-05-20 Project progress management device for building project management

Country Status (1)

Country Link
CN (1) CN114974012B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05303339A (en) * 1992-04-28 1993-11-16 Oki Electric Ind Co Ltd Large-screen display device
WO2001088887A1 (en) * 2000-05-17 2001-11-22 Heidelberg Digital L.L.C. Flexible job delivery for job preparation
KR200391560Y1 (en) * 2004-12-20 2005-08-08 강태융 Back Lighting Display for Show-window
CN101075331A (en) * 2006-05-17 2007-11-21 富士施乐株式会社 Electronic advertisement management apparatus, electronic advertisement client apparatus, computer readable medium, and electronic advertisement system
CN109016987A (en) * 2018-10-15 2018-12-18 长沙宁湖机械设备有限公司 A kind of automatic page turner
CN209096271U (en) * 2018-09-25 2019-07-12 厦门盈趣科技股份有限公司 A kind of erasable thermal printing apparatus, printer and display card
CN112297648A (en) * 2019-07-26 2021-02-02 上海潍特利网络科技有限公司 Self-service film and medical image report output all-in-one
CN214127826U (en) * 2020-11-21 2021-09-07 广西科技大学 Multi-functional industrial and artistic article display device
WO2021196199A1 (en) * 2020-04-03 2021-10-07 唐山哈船科技有限公司 Illegal vessel tracking system and method
CN214377394U (en) * 2021-03-27 2021-10-08 严佳娜 Construction progress display device for construction management of building engineering

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05303339A (en) * 1992-04-28 1993-11-16 Oki Electric Ind Co Ltd Large-screen display device
WO2001088887A1 (en) * 2000-05-17 2001-11-22 Heidelberg Digital L.L.C. Flexible job delivery for job preparation
KR200391560Y1 (en) * 2004-12-20 2005-08-08 강태융 Back Lighting Display for Show-window
CN101075331A (en) * 2006-05-17 2007-11-21 富士施乐株式会社 Electronic advertisement management apparatus, electronic advertisement client apparatus, computer readable medium, and electronic advertisement system
CN209096271U (en) * 2018-09-25 2019-07-12 厦门盈趣科技股份有限公司 A kind of erasable thermal printing apparatus, printer and display card
CN109016987A (en) * 2018-10-15 2018-12-18 长沙宁湖机械设备有限公司 A kind of automatic page turner
CN112297648A (en) * 2019-07-26 2021-02-02 上海潍特利网络科技有限公司 Self-service film and medical image report output all-in-one
WO2021196199A1 (en) * 2020-04-03 2021-10-07 唐山哈船科技有限公司 Illegal vessel tracking system and method
CN214127826U (en) * 2020-11-21 2021-09-07 广西科技大学 Multi-functional industrial and artistic article display device
CN214377394U (en) * 2021-03-27 2021-10-08 严佳娜 Construction progress display device for construction management of building engineering

Also Published As

Publication number Publication date
CN114974012B (en) 2023-10-10

Similar Documents

Publication Publication Date Title
CN112879858B (en) New energy street lamp with quick mounting structure
CN114974012A (en) Project progress management device for building engineering project management
CN110500545A (en) A kind of heavy duty detergent solar street light with function for expelling pests
CN112593498A (en) Warning device for electric power construction with accomodate and place function
CN215773898U (en) Energy inversion feedback device for rail transit electric power system
CN208508843U (en) A kind of cleanable solar photovoltaic assembly
CN208256226U (en) A kind of LED advisement lamp case
CN112735217B (en) Robot comprehensive simulation teaching platform
CN209859572U (en) Community health education publicity column
CN213293550U (en) Economical solar garbage can
CN209688701U (en) It is a kind of with billboard and the height-adjustable solar street light of billboard
CN212967016U (en) Energy-saving advertisement publishing device with high information content
CN216814019U (en) Environment-friendly lighting facility for construction of green building
CN218133451U (en) Be used for clean mechanism of solar street lamp photovoltaic board surface
CN216679532U (en) Rural domestic waste handles with sealed fermenting installation
CN210611463U (en) Operation panel for accounting and bookkeeping
CN218447161U (en) Publicity board with from power generation function
CN210724665U (en) Photovoltaic board convenient to adjust
CN215604129U (en) File access device for engineering file management system
CN211551457U (en) Landscape lamp capable of rotating in garden environment
CN219287420U (en) Novel photovoltaic solar panel
CN217150972U (en) Photovoltaic solar panel and roofing integration structure
CN219284462U (en) Outdoor noise monitoring device
CN217240645U (en) Photovoltaic module fixing frame and photovoltaic module fixing system
CN216353180U (en) Signboard with lighting effect

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant