CN114954837B CN202210696624.6A CN202210696624A CN114954837B CN 114954837 B CN114954837 B CN 114954837B CN 202210696624 A CN202210696624 A CN 202210696624A CN 114954837 B CN114954837 B CN 114954837B
Authority
CN
China
Prior art keywords
main
panel
ship
frame
engine base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210696624.6A
Other languages
Chinese (zh)
Other versions
CN114954837A (en
Inventor
龚常亮
刘钱
张天鑫
罗敬成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Shipyard International Co Ltd
Original Assignee
Guangzhou Shipyard International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Shipyard International Co Ltd filed Critical Guangzhou Shipyard International Co Ltd
Priority to CN202210696624.6A priority Critical patent/CN114954837B/en
Publication of CN114954837A publication Critical patent/CN114954837A/en
Application granted granted Critical
Publication of CN114954837B publication Critical patent/CN114954837B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/20Building or assembling prefabricated vessel modules or parts other than hull blocks, e.g. engine rooms, rudders, propellers, superstructures, berths, holds or tanks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Gasket Seals (AREA)

Abstract

The invention relates to the technical field of ships, in particular to a method for brushing and matching a ship main engine base panel and a steel gasket and a ship, wherein the method for brushing and matching the ship main engine base panel and the steel gasket comprises the following steps: s1, finishing construction of a main engine base; s2, carrying out plane milling operation on a frame web plate of the main frame; s3, milling a plane on a frame panel of the main frame by taking the frame web as a reference plane; s4, carrying out sectional large-assembly installation on the main machine base; s5, transporting the installed sections of the main machine base to a construction site to be matched with the steel gasket in a brushing mode. The invention can reduce the polishing workload, reduce the labor intensity, ensure smooth matching between the frame panel of the main frame and the steel gasket, ensure smooth installation of the main frame, and further shorten the construction period.

Description

Ship main engine base panel and steel gasket brushing method and ship
Technical Field
The invention relates to the technical field of ships, in particular to a method for brushing and matching a ship main engine base panel and a steel gasket and a ship.
Background
In the process of long-distance large-tonnage transportation, the ship plays a very important role, and provides great convenience for people to travel and logistics transportation away from. Wherein the host is a very important power component on the vessel, the installation of the host on the hull is very important.
In the prior art, a host is installed on a host base, and the host installed in a steel gasket mode is currently configured by directly brushing a panel of the host base and the steel gasket on a construction site. Because of the processing error of the panel of the main machine base, when the main machine base is brushed on site, the work load of site polishing is large, the labor intensity is high, the working period is long, the installation period of the main machine is prolonged, and even the construction period of a ship is influenced.
Therefore, there is a need for a method of fitting a main foundation panel of a watercraft with a steel gasket and a watercraft to solve the above problems.
Disclosure of Invention
The invention aims to provide a method for brushing and matching a main engine base panel of a ship with a steel gasket and the ship, which can reduce the polishing workload, reduce the labor intensity, ensure that the brushing and matching of the main engine base panel and the steel gasket are smoothly carried out, and ensure that a main engine is smoothly installed, thereby shortening the construction period.
To achieve the purpose, the invention adopts the following technical scheme:
a method for matching a ship main engine base panel with a steel gasket comprises the following steps:
s1, finishing construction of a main engine base;
s2, carrying out plane milling operation on a frame web plate of the main frame;
s3, milling a plane on a frame panel of the main frame by taking the frame web as a reference plane;
s4, carrying out sectional large-assembly installation on the main engine base, and carrying out integral and local measurement on the flatness of the engine base panel of the main engine base before and after welding so that the integral flatness of the engine base panel of a single main engine base is less than or equal to 3mm and the flatness of the engine base panels of two main engine bases in the same group is less than or equal to 8mm;
s5, transporting the installed sections of the main machine base to a construction site to be matched with the steel gasket in a brushing mode.
Further, in the step S1, the flatness deviation of the base panel of the main frame is not greater than a first set value.
Further, in the step S1, the transverse bending deviation of the main frame is not greater than a second set value.
Further, in the step S2, the main stand is placed on a reference platform to perform a plane milling operation on the stand web.
Further, the machining allowance of the base web plate is controlled to be 0-8 mm.
Further, in the step S3, after the processing of the base panel is completed, rust-preventive oil is coated on the milled plane surface, and three-proofing cloth is laid for protection.
Further, after the measurement is completed, the base panel is subjected to rust protection and is covered by three-proofing cloth.
Further, in the step S5, the transported hoist hanging bracket cannot be disposed on the main frame.
A ship is built by adopting the method of matching the ship main engine base panel with the steel gasket.
The invention has the beneficial effects that:
according to the method for brushing and matching the main engine seat panel of the ship with the steel gasket, which is provided by the invention, plane milling operation is carried out on the engine seat web of the built main engine seat, then plane milling processing is carried out on the engine seat panel of the main engine seat by taking the engine seat web as a reference plane, sectional large-assembly installation is carried out, and after finishing, the main engine seat panel is lifted to a construction site to be matched with the steel gasket in a brushing manner. The plane milling processing is firstly carried out on the base web plate, and then the plane is used as a reference to carry out the plane milling processing on the base panel of the main base, so that the flatness of the base panel can be ensured to meet the requirement, and the base panel is matched with the steel gasket after the large-section assembly is completed. By processing the frame panel of the main frame in advance, the polishing workload of the frame panel can be reduced, the labor intensity is reduced, smooth matching of the frame panel of the main frame and the steel gasket is ensured, smooth installation of the main frame is ensured, and the construction period is shortened.
According to the ship provided by the invention, the ship main engine base panel and the steel gasket are matched, and the engine base panel of the main engine base is processed in advance, so that the labor intensity can be reduced during on-site matching, smooth matching of the engine base panel of the main engine base and the steel gasket is ensured, and smooth installation of the main engine is ensured, thereby shortening the construction period.
Drawings
FIG. 1 is a flow chart of a method of fitting a marine main foundation panel to a steel gasket according to the present invention.
Detailed Description
The technical scheme of the invention is further described below with reference to the attached drawings and the embodiments. It is to be understood that the specific embodiments described herein are merely illustrative of the invention and are not limiting thereof. It should be further noted that, for convenience of description, only some, but not all of the drawings related to the present invention are shown.
In the description of the present invention, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be either fixed or removable, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present invention will be understood in specific cases by those of ordinary skill in the art.
In the present invention, unless expressly stated or limited otherwise, a first feature "above" or "below" a second feature may include both the first and second features being in direct contact, as well as the first and second features not being in direct contact but being in contact with each other through additional features therebetween. Moreover, a first feature being "above," "over" and "on" a second feature includes the first feature being directly above and obliquely above the second feature, or simply indicating that the first feature is higher in level than the second feature. The first feature being "under", "below" and "beneath" the second feature includes the first feature being directly under and obliquely below the second feature, or simply means that the first feature is less level than the second feature.
In the process of long-distance large-tonnage transportation, the ship plays a very important role, and provides great convenience for people to travel and logistics transportation away from. Wherein the host is a very important power component on the vessel, the installation of the host on the hull is very important.
In the prior art, a host is installed on a host base, and the host installed in a steel gasket mode is currently configured by directly brushing a panel of the host base and the steel gasket on a construction site. Because of the processing error of the panel of the main machine base, when the main machine base is brushed on site, the work load of site polishing is large, the labor intensity is high, the working period is long, the installation period of the main machine is prolonged, and even the construction period of a ship is influenced.
In order to solve the above problems, the polishing workload can be reduced, the labor intensity can be reduced, the smooth polishing of the main frame panel and the steel gasket can be ensured, and the smooth installation of the main frame can be ensured, so that the construction period can be shortened, and the invention provides a method for polishing the main frame panel and the steel gasket of a ship, as shown in fig. 1. The method for brushing and matching the main engine base panel and the steel gasket of the ship comprises the following steps:
s1, finishing construction of a main engine base;
s2, carrying out plane milling operation on a frame web plate of the main frame;
s3, milling a plane of a frame panel of the main frame by taking a frame web as a reference plane;
s4, carrying out sectional large-assembly installation on the main engine base;
s5, transporting the installed sections of the main machine base to a construction site to be matched with the steel gasket in a brushing mode.
The plane milling processing is firstly carried out on the base web plate, and then the plane is used as a reference to carry out the plane milling processing on the base panel of the main base, so that the flatness of the base panel can be ensured to meet the requirement, and after the large-section assembly is completed, the base panel and the steel gasket are matched in a brushing way. By processing the frame panel of the main frame in advance, the polishing workload of the frame panel can be reduced, the labor intensity is reduced, smooth matching of the frame panel of the main frame and the steel gasket is ensured, and smooth installation of the main frame is ensured, so that the construction period is shortened.
Further, in step S1, the flatness deviation of the base panel of the built main foundation is not greater than the first set value. Specifically, in the present embodiment, the first set value is 4mm. The subsequent workload of milling the base panel can be reduced by controlling the flatness of the base panel of the built main base. In other embodiments, the first setting value may be set according to actual needs, and no limitation is made here.
Further, in step S1, the transverse bending deviation of the built main frame is not greater than the second set value. The transverse bending deviation of the main machine base is limited, so that the quality of the main machine base can be ensured to meet the requirements. In this embodiment, the second setting value is 2mm, and in other embodiments, the setting may be performed according to actual needs, and no excessive limitation is made here.
Further, in step S2, the main frame is placed on the reference platform to perform a plane milling operation on the frame web. Through setting up the benchmark platform, can guarantee to mill the plane operation to the frame web and go on smoothly, can guarantee moreover that planar planarization satisfies the requirement. Therefore, when the machine base panel is further processed, the processing flatness can be ensured to meet the requirement.
Further, in this embodiment, the machining allowance of the base web is controlled to be 0-8 mm, and in other embodiments, the setting of the machining allowance of the base web may be performed according to the field requirement and the type of the base web, which is not limited.
Further, in step S3, after finishing the processing of the base panel, the surface of the milled plane is coated with rust-proof oil and laid with three-proofing cloth for protection. Through protecting the surface of the milled plane, the anti-rust oil and the three-proofing cloth can prevent the plane milled by the machine base panel from being oxidized and rusted under the action of air, and simultaneously prevent the milled plane from being scratched. The three-proofing cloth has the effects of fire prevention, water prevention and corrosion prevention, and can effectively protect a milled plane.
Further, in step S4, the flatness of the frame panels of the main frames are measured wholly and locally before and after the welding in the large-section assembly, so that the overall flatness of the frame panels of a single main frame is less than or equal to 3mm, and the flatness of the frame panels of two main frames in the same group is less than or equal to 8mm. The flatness before and after welding is measured, whether the flatness meets the requirements can be determined, and the flatness of the base panel can be processed immediately if the flatness does not meet the requirements, so that the flatness of the base panel and the flatness of two base panels in the same group can meet the requirements before the base panel is lifted to be in a field to be matched with a steel gasket in a brushing mode.
Further, after the measurement is completed, the engine base panel is subjected to rust protection and covered by three-proofing cloth. Similarly, the rust preventive oil and the three-proofing cloth can prevent the plane milled by the machine base panel from being oxidized and rusted under the action of air, and simultaneously prevent the milled plane from being scratched. The three-proofing cloth has the effects of fire prevention, water prevention and corrosion prevention, and can effectively protect a milled plane, so that the flatness of the machine base panel can be ensured to always meet the requirements before the milling. And the damage to the frame panel of the main frame during the sectional sanding and coating can be prevented.
The lifting hanging code is arranged on the main machine seat to cause the deformation of the main machine seat, so that the flatness of the machine seat panel cannot meet the requirement. Thus, further, in step S5, the transported hoist bail cannot be arranged on the main foundation.
By carrying out primary plane milling processing on the engine base panel of the main engine base in advance, the on-site milling work amount of the main engine base in the existing operation mode is greatly reduced, the period required by installing the main engine is shortened, and the effect of shortening the ship building period is indirectly achieved.
The embodiment also provides a ship, which is built by adopting the method for matching the main engine base panel of the ship with the steel gasket, and the engine base panel of the main engine base is processed in advance, so that the labor intensity can be reduced during on-site matching, smooth matching of the engine base panel of the main engine base and the steel gasket is ensured, and smooth installation of the main engine is ensured, thereby shortening the building period.
It is to be understood that the above examples of the present invention are provided for clarity of illustration only and are not limiting of the embodiments of the present invention. Other variations or modifications of the above teachings will be apparent to those of ordinary skill in the art. It is not necessary here nor is it exhaustive of all embodiments. Any modification, equivalent replacement, improvement, etc. which come within the spirit and principles of the invention are desired to be protected by the following claims.

Claims (9)

1. A method for matching a ship main engine base panel with a steel gasket is characterized by comprising the following steps:
s1, finishing construction of a main engine base;
s2, carrying out plane milling operation on a frame web plate of the main frame;
s3, milling a plane on a frame panel of the main frame by taking the frame web as a reference plane;
s4, carrying out sectional large-assembly installation on the main engine base, and carrying out integral and local measurement on the flatness of the engine base panel of the main engine base before and after welding so that the integral flatness of the engine base panel of a single main engine base is less than or equal to 3mm and the flatness of the engine base panels of two main engine bases in the same group is less than or equal to 8mm;
s5, transporting the installed sections of the main machine base to a construction site to be matched with the steel gasket in a brushing mode.
2. The method according to claim 1, wherein in the step S1, the flatness deviation of the base panel of the main foundation is not greater than a first set value.
3. The method according to claim 1, wherein in the step S1, the transverse bending deviation of the main frame is not greater than a second set value.
4. The method according to claim 1, wherein in step S2, the main frame is placed on a reference platform to perform a milling operation on the frame web.
5. The method for matching a ship main frame panel with a steel gasket according to claim 4, wherein the machining allowance of the frame web is controlled to be 0-8 mm.
6. The method for matching the ship main engine base panel with the steel gasket according to claim 1, wherein in the step S3, after the engine base panel is processed, rust-preventive oil is coated on the milled plane surface and three-proofing cloth is laid for protection.
7. The method of fitting a marine main foundation panel and steel gasket according to claim 6, wherein the foundation panel is protected from rust after the measurement is completed and covered with a tri-proof fabric.
8. A method of fitting a main foundation panel of a ship with steel shims according to claim 1, wherein in said step S5, the transported lifting sling cannot be arranged on said main foundation.
9. A ship constructed by the method of fitting the main foundation panel of the ship with the steel gasket according to any one of claims 1 to 8.
CN202210696624.6A 2022-06-20 2022-06-20 Ship main engine base panel and steel gasket brushing method and ship Active CN114954837B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210696624.6A CN114954837B (en) 2022-06-20 2022-06-20 Ship main engine base panel and steel gasket brushing method and ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210696624.6A CN114954837B (en) 2022-06-20 2022-06-20 Ship main engine base panel and steel gasket brushing method and ship

Publications (2)

Publication Number Publication Date
CN114954837A CN114954837A (en) 2022-08-30
CN114954837B true CN114954837B (en) 2023-10-13

Family

ID=82963445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210696624.6A Active CN114954837B (en) 2022-06-20 2022-06-20 Ship main engine base panel and steel gasket brushing method and ship

Country Status (1)

Country Link
CN (1) CN114954837B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0205805A1 (en) * 1985-06-18 1986-12-30 GebràœDer Sulzer Aktiengesellschaft Bearing placed between the ground plate of a piston engine and the cover plate of a ship's foundation
CN103101612A (en) * 2013-01-30 2013-05-15 福建省东南造船厂 Rudder propeller substrate installation method
CN107953067A (en) * 2017-12-26 2018-04-24 沪东中华造船(集团)有限公司 A kind of method for being used to improve the precision of equipment installation for needing brush gasket
CN108189960A (en) * 2017-12-20 2018-06-22 沪东中华造船(集团)有限公司 A kind of base of steering gear installation method
CN208422234U (en) * 2017-12-01 2019-01-22 浙江交通职业技术学院 Marine main engine gasket prepares teaching aid
CN109367693A (en) * 2018-10-25 2019-02-22 上海船舶工艺研究所(中国船舶工业集团公司第十研究所) A kind of large scale equipment pedestal peculiar to vessel without surplus installation method
CN110789685A (en) * 2019-09-25 2020-02-14 沪东中华造船(集团)有限公司 Method for mounting heavy equipment on ship to base

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0205805A1 (en) * 1985-06-18 1986-12-30 GebràœDer Sulzer Aktiengesellschaft Bearing placed between the ground plate of a piston engine and the cover plate of a ship's foundation
CN103101612A (en) * 2013-01-30 2013-05-15 福建省东南造船厂 Rudder propeller substrate installation method
CN208422234U (en) * 2017-12-01 2019-01-22 浙江交通职业技术学院 Marine main engine gasket prepares teaching aid
CN108189960A (en) * 2017-12-20 2018-06-22 沪东中华造船(集团)有限公司 A kind of base of steering gear installation method
CN107953067A (en) * 2017-12-26 2018-04-24 沪东中华造船(集团)有限公司 A kind of method for being used to improve the precision of equipment installation for needing brush gasket
CN109367693A (en) * 2018-10-25 2019-02-22 上海船舶工艺研究所(中国船舶工业集团公司第十研究所) A kind of large scale equipment pedestal peculiar to vessel without surplus installation method
CN110789685A (en) * 2019-09-25 2020-02-14 沪东中华造船(集团)有限公司 Method for mounting heavy equipment on ship to base

Also Published As

Publication number Publication date
CN114954837A (en) 2022-08-30

Similar Documents

Publication Publication Date Title
CN110758674B (en) Method for installing ship anchor winch block section
CN109079438A (en) A kind of steel structure processing technology
CN101723056B (en) Ship multi-beam acoustic equipment mounting process
CN114954837B (en) Ship main engine base panel and steel gasket brushing method and ship
CN110877677A (en) Integrated flat ground manufacturing method for translation type hatch cover system of large-scale ocean bulk cargo ship
CN102849627A (en) Cathode transporting crown block of transfer system for centralized overhaul of electrolytic bath
CN201864454U (en) Lifting appliance of centralized overhauling transportation system of electrolytic cell
CN111015132B (en) Method for machining radial gate by using large-scale numerical control gantry boring and milling machine
CN112498619A (en) Mounting method of pump tower triangular mast of MARK-III type containment system
CN104590487A (en) Large stern roller flange plate high-precision assembling and welding technology for engineering ship
CN103935467A (en) Stern door installation technology
CN111056430A (en) Hoisting method of combined pump tower base of dual-fuel large container ship
KR200439986Y1 (en) Installation structure for cargo hatch cover bearing pad
CN112550637B (en) Ship rudder bearing wharf maintenance and replacement method
CN211109134U (en) Anticorrosive storage tank convenient to change inside lining
CN114102052A (en) Method for welding triangular block on rotating wheel of water turbine
KR20130027703A (en) Jig for setting position of stool on upper deck of container ship and setting method of stool using thereof
CN111017152A (en) Ship repairing method for replacing bottom subsection
JP5781898B2 (en) Installation method of floating pier and floating pier
CN115123463B (en) Temporary sea binding structure of large ship superstructure and sea binding method thereof
CN110342387B (en) Hoisting tool and hoisting method of hydraulic immersed pump
CN113020275A (en) Aluminum foil roller repairing method
CN108441856B (en) Laser alloying method of layer cooling roller
KR100766702B1 (en) Method for the extension of the corrosion life time of ship's water ballast tank
CN214033430U (en) Metal roof of plate culvert

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant