CN114896474A - Safety education content pushing system and method for construction site - Google Patents

Safety education content pushing system and method for construction site Download PDF

Info

Publication number
CN114896474A
CN114896474A CN202210399523.2A CN202210399523A CN114896474A CN 114896474 A CN114896474 A CN 114896474A CN 202210399523 A CN202210399523 A CN 202210399523A CN 114896474 A CN114896474 A CN 114896474A
Authority
CN
China
Prior art keywords
education
pushing
safety
keywords
workers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210399523.2A
Other languages
Chinese (zh)
Inventor
邓欢
周晶
程子轩
施嘉诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Bronze Intelligent Technology Co ltd
Original Assignee
Nanjing Bronze Intelligent Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Bronze Intelligent Technology Co ltd filed Critical Nanjing Bronze Intelligent Technology Co ltd
Priority to CN202210399523.2A priority Critical patent/CN114896474A/en
Publication of CN114896474A publication Critical patent/CN114896474A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/903Querying
    • G06F16/9035Filtering based on additional data, e.g. user or group profiles
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/901Indexing; Data structures therefor; Storage structures
    • G06F16/9027Trees
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/903Querying
    • G06F16/9038Presentation of query results
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/906Clustering; Classification
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/20Education
    • G06Q50/205Education administration or guidance
    • G06Q50/2057Career enhancement or continuing education service

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • Tourism & Hospitality (AREA)
  • Computational Linguistics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Health & Medical Sciences (AREA)
  • Software Systems (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a safety education content pushing system and method for a construction site, and belongs to the technical field of construction site safety education. The method comprises the following steps: the method comprises the steps of listing education materials in a tree structure to generate a safety education library, and creating at least one dimension of identification tags for each education material to obtain an identification tag set; performing real-name authentication and numbering on workers, and creating a work information file about the workers; creating a priority push model, and obtaining push keywords required by workers based on the work information file; mapping the push keywords to an identification tag set, and matching identification tags which have a mapping relation with the push keywords to obtain a temporary tag set; and calling the education materials corresponding to the temporary label sets in the safety education library to obtain education materials to be pushed, and pushing the education materials to be pushed to corresponding workers. The invention achieves the effect of high-efficiency and high-precision education content pushing based on the safety consciousness and safety behavior of workers, greatly reduces the learning time of the workers and can make up part of defects of the workers.

Description

Safety education content pushing system and method for construction site
Technical Field
The invention belongs to the technical field of safety education of construction sites, and particularly relates to a safety education content pushing system and method for construction sites.
Background
Every industry has the safety production regulation suitable for the development of the industry, and primary practitioners in the industry need to be familiar with safety knowledge in the industry and have the safety practical operation capability to ensure the production safety of the industry and the industry, so that the irreversible harm to the industry and the self caused by the incapability of fulfilling safety responsibility is avoided.
The safety training of the construction site is not only related to basic knowledge of safe production, laws and regulations and post responsibilities, but also related to safety awareness of workers and safe operation behaviors.
The construction safety training needs to be carried out in a classified mode, and what training needs to be carried out step by step, so that the condition that workers have qualified safety capability can be operated on duty is ensured. Therefore, a classified safety knowledge content library is established, what training content is needed by workers is evaluated from two aspects of consciousness and behavior, the training content is pertinently judged and searched in the content library, the learning content is pushed to the workers in a combined mode, the learning effect is guaranteed, the learning efficiency is improved, the habitual violation behaviors are eliminated, the accident potential is reduced, and the production safety of a construction site is guaranteed.
Disclosure of Invention
The invention provides a system and a method for pushing safety education contents for a construction site, which aim to solve the technical problems in the background technology.
The invention adopts the following technical scheme: a method for pushing safety education contents for a construction site, comprising at least the following steps:
the method comprises the steps of listing education materials in a tree structure to generate a safety education library, and creating at least one dimension of identification tags for each education material to obtain an identification tag set;
performing real-name authentication and numbering on workers, and creating a work information file about the workers; the work information file at least comprises: the current construction stage comprises work type, year, month and day and real-time assessment information;
creating a priority pushing model, and obtaining pushing keywords required by workers based on the work information file; mapping the push keywords to an identification tag set, and matching identification tags which have a mapping relation with the push keywords to obtain a temporary tag set;
and calling the education materials corresponding to the temporary label sets in the safety education library to obtain education materials to be pushed, and pushing the education materials to be pushed to corresponding workers.
In a further embodiment, the method further comprises the following steps:
and sequencing the pushed keywords by using the priority pushing model, wherein when the education materials to be pushed are pushed, the pushing sequence accords with the sequencing.
In a further embodiment, the educational material comprises at least: basic education materials, education materials related to a construction stage and work education materials based on the construction stage;
the identification tag includes at least: time node labels, construction stage labels and construction stage-based work type labels.
In a further embodiment, the creation process of the priority push model is as follows:
respectively creating a real-time assessment information set A in the work information file r {A 1 ,A 2 ,…,A t-1 ,A t Where t denotes the current construction stage, A t-1 The assessment information of the historical construction stage is represented; a. the t Then the assessment information of the construction stage at that time is represented;
the A is added 1 ,A 2 ,…,A t-1 ,A t Examination standards S corresponding to the respective stages t Comparing, and sequentially calculating weight value omega t By the formula A a =arg min{ω 12 ,…,ω t-1 Screening workers in the historical construction stageA construction stage with low safety awareness or/and poor safety behavior capability exists;
the formula for calculating the weight value is as follows:
Figure BDA0003599128780000021
in the formula, alpha is a credible factor.
Historical keywords are obtained by extraction based on the construction stage with low safety consciousness or/and poor safety behavior capability, real-time keywords are obtained by extraction based on the construction stage at that time, and the historical keywords and the real-time keywords form pushing keywords.
In a further embodiment, the following process is also included:
at least one weight value omega corresponding to a construction stage with low safety consciousness or/and poor safety behavior capability is obtained a And sequencing according to the sequence from small to large to obtain a pushing sequence, and pushing related education materials according to the pushing sequence.
In a further embodiment, the mapping relationship between the pushed keyword and the identification tag is as follows:
defining a push keyword as G ═ G 1 ,G 2 ,…,G n N is the number of the push keywords; generating a corresponding sequence string G based on each of the push keywords m ={N 1 ,N 2 ,…,N m M is the number of the keyword sequence strings;
defining a sequence string for each identification tag as L ═ L 1 ,L 2 ,…,L j J is the number of identification label sequence strings;
respectively calculating index values rho of the sequence strings of the push keywords G And an index value ρ identifying a tag sequence string L
When | ρ GL |∈[0,δ]Then the mapping relationship is satisfied, where δ is a preset threshold.
In a further embodiment, the index value ρ G And an index value ρ L The calculation formula of (a) is as follows:
Figure BDA0003599128780000031
where x is an approximation parameter.
In a further embodiment, the time node tag comprises at least: holidays, spring, summer, autumn, winter, and year and month;
when the construction time of the current construction stage falls within the time node label, the priority pushing model sets the education materials corresponding to the time node label to be in the optimal level and pushes the education materials to corresponding workers;
the weather tag is at least: sudden change of air temperature and meteorological abnormality;
when sudden change of air temperature or abnormal weather exists, the priority pushing model sets the education materials corresponding to the weather tags to be in the optimal level and pushes the education materials to corresponding workers;
and when pushing, the keywords are restricted by construction stage-work type.
A safety education content push system for a construction site, comprising:
a first module configured to list educational materials in a tree structure to generate a secure education library, and create an identification tag of at least one dimension for each educational material to obtain an identification tag set;
a second module configured to perform real name authentication and numbering for a worker, and create a work information file regarding the worker; the work information file at least comprises: the current construction stage-work type, real-time assessment information;
a third module, configured to create a priority push model, and obtain a push keyword required by a worker based on the work information file; mapping the push keywords to an identification tag set, and matching identification tags which have a mapping relation with the push keywords to obtain a temporary tag set;
and the fourth module is used for calling the education materials corresponding to the temporary label set in the safety education library to obtain the education materials to be pushed and pushing the education materials to be pushed to the corresponding workers.
In a further embodiment, further comprising: and the fifth module is used for sequencing the pushed keywords by utilizing the priority pushing model, and when the education materials to be pushed are pushed, the pushing sequence accords with the sequencing.
The invention has the beneficial effects that: the method comprises the steps of pushing learning contents corresponding to a construction stage according to the construction stage where a worker is currently located; meanwhile, according to the assessment standard of workers before, the learning content required by the corresponding construction stage with poor assessment before the workers is pushed by using the priority pushing model; based on the safety awareness and the safety behavior of workers, the efficient and high-precision pushing effect is achieved, the learning time of the workers is greatly reduced, and meanwhile, partial defects of the workers can be overcome.
Meanwhile, the pushing level of the time node is set, and pushing of basic learning content is guaranteed.
Drawings
Fig. 1 is a construction diagram of a safety education library of example 1.
Fig. 2 is a configuration diagram of the work information file of embodiment 1.
Fig. 3 is a flowchart of the operation of example 1.
Detailed Description
The invention is further described with reference to the following examples and the accompanying drawings.
At present, regular and targeted learning by workers has become popular, but in the process of popularization: most workers on site have poor learning ability, so that when they need to learn all the contents, the efficiency is low, and the repulsive psychology of workers is in reverse. And each worker has the work category under the familiar environment, the exclusive psychology of the worker can be further increased when the worker continuously learns the work category under the familiar environment, and the worker is not better than the worker who learns the work category under the more familiar environment, so that the worker can spend time on the work category under the less familiar environment or the work category which is not qualified before evaluation, and the targeted and efficient learning is realized.
For example, the following steps are carried out: when worker a performs a fire operation, the most familiar operating environment is environment a, i.e., he is familiar with the fact that materials cannot be stacked under the fire in environment a, or that non-operators cannot approach the welding apparatus, and therefore, when identifying the behavior of the worker, it is necessary to investigate whether the worker stacks the materials as required, performs an activity within a safe range, in other words, whether the worker is performing an illegal operation or breaking into an prohibited area without permission. If every learning pushes the relevant educational content of the fire work in environment a to him from the start to the end of the project, he will only choose to make an opportunity to get an ingenious way to escape such learning. If the corresponding work category can be pushed to the unfamiliar environment every time of learning, the operation is better than the fire operation in the environment B, so that the enthusiasm of the user in learning is generated, and the learning time is saved for the user.
Example 1
In order to solve the above-described technical problem, the present embodiment discloses a safety education content push method for a construction site, in which different learning plans are specified for each worker. At least comprises the following steps:
as shown in fig. 1, listing education materials in a tree structure to generate a secure education library, and creating an identification tag of at least one dimension for each education material to obtain an identification tag set; in this embodiment, the identification tag at least includes three dimensions, which are a time node tag, a construction stage tag, and a work category tag based on a construction stage. Forms of educational material include: video, ppt, picture, voice, or other forms.
Performing real-name authentication and numbering on workers, and creating a work information file about the workers; the work information file at least comprises: the current construction stage comprises work type, year, month and day and real-time assessment information;
creating a priority pushing model, and obtaining pushing keywords required by workers based on the work information file; mapping the push keywords to an identification tag set, and matching identification tags which have a mapping relation with the push keywords to obtain a temporary tag set;
and calling the education materials corresponding to the temporary label sets in the safety education library to obtain education materials to be pushed, and pushing the education materials to be pushed to corresponding workers.
In a further embodiment, the educational material is basic educational content, stage educational content related to construction stages, and operation educational content related to work categories, which are arranged in parallel. For example, the basic education content is the literacy of workers each worker should have, i.e., the construction site regulations and the like that the worker is required to be familiar with. Such basic education contents are collectively transmitted at a predetermined time. The stage education contents related to the construction stage are education contents related to different stages of piling stage, concrete pouring, guard wall construction and the like. The operation education content related to the work type is a refined content, for example, the protective wall is constructed, and the work type comprises hoisting, overhead operation, welding and the like. Taking piling as an example, the work types of the piling also include welding, but the operation environment of the welding for constructing the protective wall and the welding for piling is different, and workers switch from the previous environment to the new environment, and no matter the workers operate in the same work type or different work types, there will be a certain time of self-adaptation stage, and in the self-adaptation stage, the workers may not be familiar with the environment, so that the problems of lack of safety consciousness or poor behavior ability and the like are caused, and therefore the same education content cannot be used. Therefore, in order to distinguish that the education contents required by the same work type in different construction stages and different construction environments are not the same, the identification tags are refined to construction stage tags and work type tags based on the construction stages when the identification tags are created.
In a further embodiment, the work information files of the workers are certified by real names, that is, one worker has a corresponding work information file, which aims to facilitate management and accurate educational delivery based on the previous performance of the worker.
In this embodiment, the learning content of the worker at the current construction stage needs to be pushed, and meanwhile, according to the previous assessment of the worker, a construction stage where the worker has low safety awareness or/and poor safety behavior capability is selected in a targeted manner for pushing, so in this embodiment, the creation process of the priority pushing model is as follows:
in the work informationRespectively creating real-time assessment information sets A in files r {A 1 ,A 2 ,…,A t-1 ,A t Where t denotes the current construction stage, A t-1 The assessment information of the historical construction stage is represented; a. the t Then representing the assessment information of the construction stage at that time;
the A is added 1 ,A 2 ,…,A t-1 ,A t Respectively corresponding to the assessment criteria S t Comparing, and sequentially calculating weight value omega t By the formula A a =arg min{ω 12 ,…,ω t-1 Screening out a construction stage with low safety awareness or/and poor safety behavior capability of workers in a historical construction stage; the formula for calculating the weight value is as follows:
Figure BDA0003599128780000061
in the formula, alpha is a credible factor.
Historical keywords are obtained by extraction based on the construction stage with low safety consciousness or/and poor safety behavior capability, real-time keywords are obtained by extraction based on the construction stage at that time, and the historical keywords and the real-time keywords form pushing keywords. If the former construction stage of the worker with low safety consciousness or/and poor safety behavior capability is two, the value of a is 2, namely in omega 12 ,…,ω t-1 The last two values are selected. The number of history keywords is 2, so the number of push keywords is 3. The keywords comprise work types and stages corresponding to the work types, and accurate scheduling of education contents is achieved.
However, the following may also occur: the assessment criteria of the construction phase in which the worker is currently located are actually up to standard, compared with the condition that the worker should go to the construction phase before learning, in which the safety consciousness is low or/and the safety behavior capability is poor. Therefore, after the refinement of the pushed keywords is finished, the embodiment further sets to sort the pushed keywords, that is, determine the pushing sequence: obtaining a weight value omega corresponding to a construction stage and a current construction stage in which a person has low safety consciousness or/and poor safety behavior capability in a historical construction stage a From small to largeAnd sequencing in a fixed sequence to obtain a pushing sequence, and pushing related education materials according to the pushing sequence.
For example, the following steps are carried out: and the current construction stage of the worker B is the maintenance of the protective wall, and the examination meets the standard. While his examination in the previous welding phase is not qualified and poor, keywords related to the welding phase are extracted through a priority push model before, but if the push ordering is not performed, it is likely that worker B receives the education contents related to the maintenance of the protective wall first, and when he learns the contents, he loses patience to continue learning the pushed education contents related to the welding phase, a vicious circle is caused. Therefore, the pushing keywords are ranked, and the education content related to the welding stage is pushed in preference to the education content related to the maintenance of the protective wall after ranking.
The above expressions are all the push relations generated for the construction phase, and some education contents are not limited to the construction phase and the work category, and it applies to the whole project, so for such education contents, the priority push model of the embodiment further includes: and when the construction time of the current construction stage falls into the time node label, the priority pushing model sets the education materials corresponding to the time node label to be in the optimal level and pushes the education materials to corresponding workers.
When sudden change of air temperature or abnormal weather exists, the priority pushing model sets the education materials corresponding to the weather tags to be in the optimal level and pushes the education materials to corresponding workers.
In other words, time dimensions, namely holidays, spring, summer, autumn, winter and year, month and year are added when the label is created. Because a construction project is a project that can be completed for an extended period of time, it may span at least 1 year, and during this extended period of time, a holiday, is encountered. Therefore, in order to increase the safety of the construction site during the holiday, education contents such as equipment inspection, construction site power-off and the like need to be pushed before the holiday. Meanwhile, after the rework, the content for the worker to enter the working state as soon as possible needs to be pushed. Or at least one spring, summer, autumn and winter can be met in the longer time, and the attention items of some equipment or some work types on the construction site are different based on the difference of air temperature. Therefore, it is necessary to push related contents to workers when season changes occur.
Similarly, when the weather is about to change suddenly, after the weather early warning is received, related education content needs to be pushed to workers, preparation is made in advance, and the safety of a construction site and equipment and the safety of the workers are protected. For example, when the weather warning is that in the future 6 hours, the weather storm and lightning thunder will occur, the worker is pushed about how to deal with the weather storm and lightning thunder. Or when the weather early warning is that the temperature will be greatly reduced to below zero in the next few days, the worker is pushed how to carry out heat preservation treatment on related equipment and materials and keep warm per se. The weather dimension is also added when creating tags.
It should be noted that the material received by each worker for the same tag may be different because the construction stage and the type of work to which the worker belongs are different. The mapping relationship of the keywords meeting the current construction stage-work type is also needed.
In a further embodiment, the mapping relationship between the push keyword and the identification tag is as follows:
defining a push keyword as G ═ G 1 ,G 2 ,…,G n N is the number of the push keywords; generating a corresponding sequence string G based on each of the push keywords m ={N 1 ,N 2 ,…,N m M is the number of the keyword sequence strings;
defining a sequence string for each identification tag as L ═ L 1 ,L 2 ,…,L j J is the number of identification label sequence strings;
respectively calculating index values rho of the sequence strings of the push keywords G And an index value ρ identifying a tag sequence string L When | ρ GL |∈[0,δ]Then the mapping relationship is satisfied, where δ is a preset threshold.
Figure BDA0003599128780000071
Figure BDA0003599128780000072
Where x is an approximation parameter.
The method comprises the steps of pushing learning contents corresponding to a construction stage according to the construction stage where a worker is currently located; meanwhile, according to the assessment standard of workers before, the learning content required by the corresponding construction stage with poor assessment before the workers is pushed by using the priority pushing model; accomplish high-efficient and the propelling movement effect that the precision is high, greatly reduced workman study time can also compensate workman's partial defect simultaneously.
Example 2
In order to the push method described in embodiment 1, the present embodiment discloses a safety education content push system for a worksite, including:
a first module configured to list educational materials in a tree structure to generate a secure education library, and create an identification tag of at least one dimension for each educational material to obtain an identification tag set;
a second module configured to perform real name authentication and numbering for a worker, and create a work information file regarding the worker; the work information file at least comprises: the current construction stage comprises work type, year, month and day and real-time assessment information;
a third module configured to create a priority push model and obtain a push keyword required by a worker based on the work information file; mapping the push keywords to an identification tag set, and matching identification tags which have a mapping relation with the push keywords to obtain a temporary tag set;
and the fourth module is used for calling the education materials corresponding to the temporary label set in the safety education library to obtain the education materials to be pushed and pushing the education materials to be pushed to the corresponding workers.
Further comprising: and the fifth module is used for sequencing the pushed keywords by utilizing the priority pushing model, and when the education materials to be pushed are pushed, the pushing sequence accords with the sequencing.
Wherein the educational material comprises at least: basic education materials, education materials related to construction stages and work education materials based on the construction stages;
the identification tag includes at least: time node labels, construction stage-based work category labels, and weather labels. The time node label comprises at least: holidays, spring, summer, autumn, winter, and year and month; the weather tag is at least: sudden change in air temperature, weather abnormality.

Claims (10)

1. A method for pushing safety education contents for a construction site, characterized by comprising at least the steps of:
the method comprises the steps of listing education materials in a tree structure to generate a safety education library, and creating at least one dimension of identification tags for each education material to obtain an identification tag set;
performing real-name authentication and numbering on workers, and creating a work information file about the workers; the work information file at least comprises: the current construction stage comprises work type, year, month and day and real-time assessment information;
creating a priority pushing model, and obtaining pushing keywords required by workers based on the work information file; mapping the push keywords to an identification tag set, and matching identification tags which have a mapping relation with the push keywords to obtain a temporary tag set;
and calling the education materials corresponding to the temporary label sets in the safety education library to obtain education materials to be pushed, and pushing the education materials to be pushed to corresponding workers.
2. The method for pushing safety education contents for construction sites according to claim 1, further comprising the steps of:
and sequencing the pushed keywords by using the priority pushing model, wherein the pushing sequence accords with the sequencing when the education materials to be pushed are pushed.
3. The method for pushing safety education contents for construction sites according to claim 1,
the educational material includes at least: basic education materials, education materials related to a construction stage and work education materials based on the construction stage;
the identification tag includes at least: time node labels, construction stage-based work category labels, and weather labels.
4. The method for pushing safety education contents for construction sites according to claim 1, wherein the creation flow of the priority pushing model is as follows:
respectively creating a real-time assessment information set A in the work information file r {A 1 ,A 2 ,…,A t-1 ,A t Where t denotes the current construction stage, A t-1 The assessment information of the historical construction stage is represented; a. the t Then representing the assessment information of the construction stage at that time;
the A is added 1 ,A 2 ,…,A t-1 ,A t Examination standards S corresponding to the respective stages t Comparing, and sequentially calculating weight value omega t By the formula A a =arg min{ω 12 ,…,ω t-1 Screening out construction stages with low safety awareness or/and poor safety behavior capability of workers in historical construction stages;
historical keywords are obtained by extraction based on the construction stage with low safety consciousness or/and poor safety behavior capability, real-time keywords are obtained by extraction based on the construction stage at that time, and the historical keywords and the real-time keywords form pushing keywords.
5. The method for pushing safety education contents for construction sites according to claim 4, further comprising the following steps:
obtaining at least one weight value omega corresponding to the current construction stage in the construction stage with low safety consciousness or/and poor safety behavior capability a And sequencing according to a fixed sequence from small to large to obtain a pushing sequence, and pushing the related education materials according to the pushing sequence.
6. The method for pushing safety education contents for construction sites according to claim 1, wherein the mapping relationship between the pushing keywords and the identification tags is as follows:
defining a push keyword as G ═ G 1 ,G 2 ,…,G n N is the number of the push keywords; generating a corresponding sequence string G based on each of the push keywords m ={N 1 ,N 2 ,…,N m M is the number of the sequence strings of the push keywords;
defining a sequence string for each identification tag as L ═ L 1 ,L 2 ,…,L j J is the number of identification label sequence strings;
respectively calculating index values rho of the push keyword sequence strings G And an index value ρ identifying a tag sequence string L
When | ρ GL |∈[0,δ]Then the mapping relationship is satisfied, where δ is a preset threshold.
7. A safety education content push method for a construction site according to claim 3,
the time node label comprises at least: holidays, spring, summer, autumn, winter, and year and month;
when the construction time of the current construction stage falls within the time node label, the priority pushing model sets the education materials corresponding to the time node label to be in the optimal level and pushes the education materials to corresponding workers;
the weather tag is at least: sudden change of air temperature and meteorological abnormality;
when sudden change of air temperature or abnormal weather exists, the priority pushing model sets the education materials corresponding to the weather tags to be in the optimal level and pushes the education materials to corresponding workers;
and when pushing, the keywords are restricted by the construction stage-work type.
8. A method of pushing safety educational content for a worksite according to claim 1, wherein the educational material is in the form of at least: video, ppt, picture, voice.
9. A safety education content pushing system for a construction site, comprising:
a first module configured to list educational materials in a tree structure to generate a secure education library, and create an identification tag of at least one dimension for each educational material to obtain an identification tag set;
a second module configured to perform real name authentication and numbering for a worker, and create a work information file regarding the worker; the work information file at least comprises: the current construction stage-work type, real-time assessment information;
a third module configured to create a priority push model and obtain a push keyword required by a worker based on the work information file; mapping the push keywords to an identification tag set, and matching identification tags which have a mapping relation with the push keywords to obtain a temporary tag set;
and the fourth module is used for calling the education materials corresponding to the temporary label set in the safety education library to obtain the education materials to be pushed and pushing the education materials to be pushed to the corresponding workers.
10. A safety education content push system for a construction site as claimed in claim 9 further comprising: and the fifth module is used for sequencing the pushed keywords by utilizing the priority pushing model, and when the education materials to be pushed are pushed, the pushing sequence accords with the sequencing.
CN202210399523.2A 2022-04-15 2022-04-15 Safety education content pushing system and method for construction site Pending CN114896474A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210399523.2A CN114896474A (en) 2022-04-15 2022-04-15 Safety education content pushing system and method for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210399523.2A CN114896474A (en) 2022-04-15 2022-04-15 Safety education content pushing system and method for construction site

Publications (1)

Publication Number Publication Date
CN114896474A true CN114896474A (en) 2022-08-12

Family

ID=82717954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210399523.2A Pending CN114896474A (en) 2022-04-15 2022-04-15 Safety education content pushing system and method for construction site

Country Status (1)

Country Link
CN (1) CN114896474A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116561432A (en) * 2023-06-27 2023-08-08 广州钛动科技股份有限公司 Intelligent employee content data recommendation system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116561432A (en) * 2023-06-27 2023-08-08 广州钛动科技股份有限公司 Intelligent employee content data recommendation system
CN116561432B (en) * 2023-06-27 2024-05-03 广州钛动科技股份有限公司 Intelligent employee content data recommendation system

Similar Documents

Publication Publication Date Title
AU2020356806A1 (en) Historical city protection and development cooperative control scheme aided design system
Ulyshen et al. Pyrodiversity promotes pollinator diversity in a fire‐adapted landscape
CN111506574A (en) R tree-based pollutant tracing method and device and related equipment thereof
CN102099803A (en) Method and computer system for automatically answering natural language questions
CN101957845B (en) On-line application system and implementation method thereof
CN113593029A (en) Hydraulic engineering information management system based on big data and three-dimensional technology
CN114896474A (en) Safety education content pushing system and method for construction site
CN110727717A (en) Monitoring method, device, equipment and storage medium for gridding atmospheric pollution intensity
WO2012118906A2 (en) Project management system
CN115204752A (en) Emergency handling scheme generation method, system, device and storage medium
CN115187148B (en) Method, system, device and readable storage medium for studying and judging emergency situation
CN116029411A (en) Smart city area management method and system based on Internet of things
CN111369294B (en) Software cost estimation method and device
CN110006436B (en) Drawing method and device of unmanned aerial vehicle inspection chart of power facility
CN110308244B (en) Air monitoring and early warning method and system of unmanned aerial vehicle and storage medium
CN115392689A (en) Method and device for dynamically detecting safety risk of historic building
CN111966746A (en) Meteorological disaster prevention and reduction flow monitoring system and monitoring method thereof
CN112232722B (en) Building equipment management system based on building information model technology
US20120226618A1 (en) Project management system
US20140143000A1 (en) Project Management System
CN114896442A (en) Power transmission line image data management system and method
CN113282709A (en) Text matching method, device and equipment and computer readable storage medium
CN114154817B (en) Automated enterprise environment risk assessment method and device
Bruzzone Risk forecast as work practice: Between codified and practical knowledge
CN116777696B (en) Legal knowledge automatic learning system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination