Intelligent construction site management method, system, device and medium Download PDF

Info

Publication number
CN114882629A
CN114882629A CN202210268545.5A CN202210268545A CN114882629A CN 114882629 A CN114882629 A CN 114882629A CN 202210268545 A CN202210268545 A CN 202210268545A CN 114882629 A CN114882629 A CN 114882629A
Authority
CN
China
Prior art keywords
image
target object
site
hollow cavity
gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210268545.5A
Other languages
Chinese (zh)
Other versions
CN114882629B (en
Inventor
陈龙
程婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ccce Construction Engineering Co ltd
Original Assignee
Ccce Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ccce Construction Engineering Co ltd filed Critical Ccce Construction Engineering Co ltd
Priority to CN202210268545.5A priority Critical patent/CN114882629B/en
Publication of CN114882629A publication Critical patent/CN114882629A/en
Application granted granted Critical
Publication of CN114882629B publication Critical patent/CN114882629B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C9/00Individual registration on entry or exit
    • G07C9/30Individual registration on entry or exit not involving the use of a pass
    • G07C9/32Individual registration on entry or exit not involving the use of a pass in combination with an identity check
    • G07C9/37Individual registration on entry or exit not involving the use of a pass in combination with an identity check using biometric data, e.g. fingerprints, iris scans or voice recognition
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Human Computer Interaction (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Time Recorders, Dirve Recorders, Access Control (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present application relates to the field of engineering management, and in particular, to a method, a system, a device, and a medium for intelligent site management. The method comprises the following steps: acquiring a face image of a target object; the method comprises the steps that an image database is preset, and facial reference images of field workers of a construction site are stored in the image database; presetting an image comparison rule, and comparing the facial image with the facial reference image according to the image comparison rule to judge whether the target object is the site worker of the construction site, if so, releasing; if not, judging whether the target object has an appointment with the site staff, if so, acquiring appointment information and verifying and confirming the appointment information, and releasing after the verification and confirmation is passed. This application has the effect of using manpower sparingly and cost.

Description

Intelligent construction site management method, system, device and medium
Technical Field
The present application relates to the field of engineering management technologies, and in particular, to a method, a system, a device, and a medium for intelligent site management.
Background
Along with the rapid development of economy and the positive promotion of novel urbanization construction, the quantity and the scale of construction sites all over the country are continuously enlarged, and the intelligent construction sites implant more high-tech technologies such as artificial wisdom, sensing technology, virtual reality and the like into various objects such as buildings, machinery, personnel wearing facilities, site access gates and the like, are generally interconnected to form the internet of things and then are integrated with the internet to realize the integration of engineering management system personnel and engineering construction sites. Due to the complexity of the staff on the construction site, whether the staff is on the construction site or not can be mistakenly entered into the construction site, and further the normal construction can be disturbed.
In the related art, in order to avoid that non-site workers enter a site of a construction site, a gatekeeper is generally arranged at an entrance and an exit of the site of the construction site, and the personnel are controlled to enter the site of the construction site through the gatekeeper, however, the inventor thinks that the arrangement of a specially-assigned person for keeping the entrance and the exit of the site of the construction site wastes manpower and cost.
Disclosure of Invention
In order to save labor and cost, the application provides an intelligent construction site management method, system, device and medium.
In a first aspect, the application provides an intelligent construction site management method, which adopts the following technical scheme:
an intelligent worksite management method, comprising:
acquiring a face image of a target object;
the method comprises the steps that an image database is preset, and facial reference images of field workers of a construction site are stored in the image database;
presetting an image comparison rule, and comparing the facial image with the facial reference image according to the image comparison rule to judge whether the target object is the site worker of the construction site, if so, releasing;
if not, judging whether the target object has an appointment with the site staff, if so, acquiring appointment information and verifying and confirming the appointment information, and releasing after the verification and confirmation is passed.
By adopting the technical scheme, the facial image of the target object is obtained, the facial image of the target object is compared with the stored facial reference image of the site staff according to the preset comparison rule, whether the target object is the site staff is further judged, if yes, the facial reference image is released, if not, whether the target object has an appointment with the site staff is further judged, if yes, the appointment information is obtained, the appointment information is checked and confirmed, and the facial reference image is released after the audit confirmation is passed; compared with the related technology, the door guard is used for managing and controlling, and labor and cost are saved.
Optionally, the acquiring the face image of the target object specifically includes:
acquiring a facial image of the target object by using an entrance guard of the construction site, wherein the entrance guard comprises a blocking device, a face recognition device and a driving device, and the face recognition device and the driving device are arranged on the blocking device;
the blocking device comprises a blocking wall, a movable frame connected with the blocking wall and a connecting cylinder connected with the blocking wall, wherein a hollow cavity is arranged in the blocking wall and is communicated with the connecting cylinder;
the face recognition device comprises an image collector, a reservation information acquirer and a central processing unit, wherein the image collector and the reservation information acquirer are respectively arranged on a blocking wall, and are respectively in communication connection with the central processing unit;
the driving device comprises a first controller, a first driving piece, a first gear and a first toothed bar, the first controller is respectively electrically connected with the central processing unit and the first driving piece, one end of the first driving piece is arranged on the connecting cylinder, the other end of the first driving piece penetrates through the side wall of the connecting cylinder and is connected with the first gear, one end of the first toothed bar stretches into the connecting cylinder and is meshed with the first gear, and the other end of the first toothed bar is connected with the moving frame.
Through adopting above-mentioned technical scheme, acquire the facial image of target object through image collector, and the facial image that will acquire sends central processing unit, central processing unit judges whether this target object is the site work personnel of building site, if, central processing unit sends control command to first controller, rotate with the first gear of control driving piece drive, first gear rotates and drives first ratch and slides along the connecting cylinder inner wall, first ratch slides and slides in order to drive and remove the slip of frame, and then realize opening of entrance guard, otherwise, after the target object got into the site of building site, the processor sends control command to first controller again, slide with the drive of control first driving piece removes the frame, and then realize closing of entrance guard.
Optionally, a first opening is formed in the blocking wall, the first opening is communicated with the hollow cavity, a first adjusting device used for adjusting the position of the image collector is arranged in the hollow cavity, the first adjusting device comprises a connecting rod, a second gear, a third gear and a second toothed bar, the two ends of the connecting rod are connected to the inner wall of the hollow cavity in a rotating mode, the second gear is arranged at one end of the connecting rod and meshed with the first toothed bar, the third gear is arranged at the other end of the connecting rod and meshed with the second toothed bar, one end of the second toothed bar is arranged in the hollow cavity in a sliding mode, and the other end of the second toothed bar penetrates through the first opening to be connected with the image collector.
Through adopting above-mentioned technical scheme, first ratch slides and drives second gear revolve, and second gear revolve and drive the connecting rod and rotate, and the connecting rod rotates and drives third gear revolve, and third gear revolve drives the second ratch and slides in cavity and first opening, and the first opening is stretched out or retract to the image collector that just third ratch slides and drives, and then makes things convenient for image collector's storage and placing.
Optionally, the sliding grooves are formed in the edges of two opposite sides of the first opening, the first adjusting device further comprises a hinged arm and a sliding plate, the sliding plate is arranged in the sliding grooves in a sliding mode, one end of the hinged arm is hinged to the second gear rod, and the other end of the hinged arm is hinged to the sliding plate.
Through adopting above-mentioned technical scheme, second rack bar slides drive articulated arm and drives the slide and slide along the spout, and then can the first opening of shutoff through the slide, can prevent that external dust from falling into the cavity through first opening in, also can guarantee image collector's cleanliness simultaneously.
Optionally, a first limiting piece, a second limiting piece and a buffer spring are arranged on the second rack rod, and the buffer spring is arranged between the first limiting piece and the second limiting piece.
Through adopting above-mentioned technical scheme, through set up first spacing piece and the spacing piece of second on the second rack bar to buffer spring sets up between first spacing piece and the spacing piece of second, and then when the second rack bar slides, can play the buffering effect to the second rack bar through buffer spring.
Optionally, a second opening is formed in the blocking wall, the second opening is communicated with the hollow cavity, a second adjusting device used for adjusting the position of the reservation information acquirer is arranged in the hollow cavity, the second adjusting device comprises a second controller and a second driving piece, the second driving piece is arranged in the hollow cavity, and one end of the second driving piece penetrates through the second opening to be connected with the reservation information acquirer.
By adopting the technical scheme, when the central processing unit judges that the target object is not a site worker, the central processing unit sends a control instruction to the second controller, the second controller controls the second driving piece to drive the reservation information acquirer to extend out of the second opening, so that the target object fills the reservation information in the reservation information acquirer, after filling is completed, the reservation information is sent to the central processing unit, and the central processing unit sends the control instruction to the second controller to control the second driving piece to drive the reservation information acquirer to retract into the second opening, so that the reservation information is conveniently acquired.
Optionally, still be provided with the make-and-break device in the cavity, the make-and-break device includes electric connection post and electric connection seat, the one end and the second gear lever of electric connection post are connected, and the other end is provided with the contact, electric connection post passes through wire and image collector electric connection, the electric connection seat sets up on the inner wall of cavity, set up the contact groove with contact electric connection on the electric connection seat, the electric connection seat passes through wire and power electric connection.
Through adopting above-mentioned technical scheme, the second rack bar slip drives the electricity spliced pole and removes, is provided with the contact on the electricity spliced pole, has seted up the contact groove on the electricity connection seat, when the contact contacts with the contact groove to supply power to image collector, when the contact breaks away from with the contact groove, with stopping supplying power to image collector, thereby can save image collector's energy consumption.
Second aspect, the application provides an wisdom building site management system adopts following technical scheme:
an intelligent worksite management system, comprising:
an acquisition module for acquiring a face image of a target object;
the database module is used for storing facial reference images of workers on a construction site;
the first judgment module is used for presetting an image comparison rule, comparing the facial image with the facial reference image according to the image comparison rule to judge whether the target object is the site worker of the construction site, and if so, releasing the target object;
and the second judgment module is used for judging whether the target object has an appointment with the site staff of the construction site under the condition that the first judgment module judges that the target object does not have the appointment, if so, acquiring the appointment information, auditing and confirming the appointment information, and releasing the target object after the auditing and confirming are passed.
By adopting the technical scheme, the facial image of the target object is obtained through the obtaining module and is sent to the first judging module, the first judging module calls the facial reference image of the site staff stored in the database module, the obtained facial image is compared and judged with the facial reference image to determine whether the target object is the site staff, if yes, the target object is released, if not, the second judging module judges whether the target object has an appointment with the site staff, if yes, the appointment information is obtained, the appointment information is checked and confirmed, and the target object is released after the audit confirmation is passed; compared with the related technology, the door guard is used for managing and controlling, and labor and cost are saved.
In a third aspect, the present application provides a computer apparatus, which adopts the following technical solution:
a computer apparatus comprising a memory, a processor and a computer program stored in the memory and capable of running on the processor, when loaded with the computer program, performing the method of the first aspect.
By adopting the technical scheme, the computer program is generated based on the method of the first aspect and is stored in the memory so as to be loaded and executed by the processor, and therefore, the intelligent terminal is manufactured according to the memory and the processor, and the use of a user is facilitated.
In a fourth aspect, the present application provides a computer-readable storage medium, which adopts the following technical solutions:
a computer-readable storage medium having stored thereon a computer program which, when loaded by a processor, performs the method of the first aspect.
By adopting the technical scheme, the computer program is generated based on the method of the first aspect and is stored in the computer readable storage medium so as to be loaded and executed by the processor, and the computer program can be conveniently read and stored through the computer readable storage medium.
Drawings
FIG. 1 is a flow chart of a method of intelligent worksite management according to the present application.
Fig. 2 is the overall structure schematic diagram of the entrance guard of this application.
Fig. 3 is a schematic cross-sectional view of the access control structure of the present application along the direction B-B.
Fig. 4 is a signal transmission frame diagram of the first driving member and the second driving member of the present application.
Fig. 5 is a schematic cross-sectional view of the access control structure of the present application along the C-C direction.
Fig. 6 is an enlarged view of a portion a in fig. 3.
Fig. 7 is a partial structure schematic view of the access control structure of the present application.
FIG. 8 is a block diagram of the intelligent worksite management system of the present application.
Description of reference numerals:
1. a blocking device; 11. a barrier wall; 111. a hollow cavity; 112. a first opening; 113. a chute; 114. a second opening; 12. a movable frame; 13. a connecting cylinder; 2. a face recognition device; 21. an image collector; 22. a reservation information acquirer; 23. a central processing unit; 3. a drive device; 31. a first controller; 32. a first driving member; 33. a first gear; 34. a first rack bar; 4. a first adjusting device; 41. a connecting rod; 42. a second gear; 43. a third gear; 44. a second rack bar; 441. a first limiting sheet; 442. a second limiting sheet; 443. a buffer spring; 45. an articulated arm; 46. a slide plate; 5. a second adjustment device; 51. a second controller; 52. a second driving member; 6. switching on and off the electric device; 61. an electrical connection post; 611. a contact; 62. an electrical connection socket; 621. a contact slot; 71. an acquisition module; 72. a database module; 73. a first judgment module; 74. and a second judgment module.
Detailed Description
In order to make the objects, technical solutions and advantages of the present application more apparent, the present application is further described in detail below with reference to fig. 1-8 and the embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the present application and are not intended to limit the present application.
Generally speaking, the entrance guard can be set up at the entrance and exit of the site of the building site to make things convenient for the entrance guard to manage and control the personnel who pass in and out of the site of the building site.
The embodiment of the application discloses an intelligent construction site management method, and with reference to fig. 1, the method comprises the following steps:
s1: a face image of a target object is acquired.
Specifically, in this step, a face image of a person to enter the worksite is collected using an entrance guard provided at the worksite.
In this embodiment, referring to fig. 2, the access control device includes a blocking device 1, a face recognition device 2 and a driving device 3, specifically, the blocking device 1 is used for blocking non-worksite workers from entering a worksite at will, and the face recognition device 2 and the driving device 3 are respectively installed on the blocking device 1, and further, face information of the workers waiting to enter the worksite can be collected through the face recognition device 2, and the driving device 3 drives the blocking device 1 to open and close.
More specifically, referring to fig. 2 and 3, the blocking device 1 includes a blocking wall 11, a movable frame 12 and a connecting cylinder 13, wherein a hollow cavity 111 is disposed in the blocking wall 11, one side of the movable frame 12 is connected to the blocking wall 11, the other side is slidable, one end of the connecting cylinder 13 is connected to the blocking wall 11, and the connecting cylinder 13 is in a communication state with the hollow cavity 111.
More specifically, referring to fig. 2 and 4, the face recognition device 2 includes an image collector 21, a reservation information acquirer 22, and a central processor 23, wherein the image collector 21 and the reservation information acquirer 22 are respectively installed on the barrier wall 11, and the image collector 21 and the reservation information acquirer 22 are respectively in communication connection with the central processor 23, the image collector 21 in this embodiment may employ a face image acquisition board (e.g., an acquisition board with a camera), the reservation information acquirer 22 in this embodiment may employ a reservation information filling board (e.g., Ipad), that is, the face image acquisition board transmits a face image to the central processor 23 after acquiring the face image, and transmits the reservation information to the central processor 23 after the reservation information filling board fills the reservation information.
More specifically, referring to fig. 4 and 5, the driving device 3 includes a first controller 31, a first driving member 32, a first gear 33 and a first rack bar 34, wherein the first controller 31 is electrically connected to the central processor 23 and the first driving member 32, the connecting cylinder 13 is provided with a through hole, one end of the first driving member 32 is mounted on the connecting cylinder 13, and the other end of the first driving member 32 passes through the through hole and is connected to the first gear 33, the first driving member 32 in this embodiment is provided as a motor, the first rack bar 34 is provided with a plurality of tooth sockets, one end of the first rack bar 34 is connected to the movable frame 12, and the other end of the first rack bar 34 extends into the connecting cylinder 13 and is engaged with the first gear 33, that is, the motor rotates to drive the first gear 33 to rotate, the first gear 33 rotates to drive the first rack bar 34 to slide along the inner wall of the connecting cylinder 13, and the first rack bar 34 does not deviate from the inner wall of the connecting cylinder 13, the first rack bar 34 will drive the movable frame 12 to slide, thereby controlling the opening and closing of the entrance guard.
Referring to fig. 6, a first opening 112 is formed in the blocking wall 11, the first opening 112 is communicated with the hollow cavity 111, and two opposite side edges of the first opening 112 are provided with sliding grooves 113, in this embodiment, a first adjusting device 4 is disposed in the hollow cavity 111, and the first adjusting device 4 is used for adjusting the position of the face image collecting plate.
Specifically, referring to fig. 6 and 7, the first adjusting device 4 includes a connecting rod 41, a second gear 42, a third gear 43, a second gear 44, an articulated arm 45, and a slide plate 46, wherein, the opposite ends of the connecting rod 41 are rotatably connected to the inner wall of the hollow cavity 111, respectively, the second gear 42 is mounted at one end of the connecting rod 41, the second gear 42 is engaged with the first rack 34, the third gear 43 is mounted at the other end of the connecting rod 41, and a tooth groove is provided on the second rack bar 44, the third gear 43 is engaged with the second rack bar 44, one end of the second rack bar 44 is slidably disposed in the hollow cavity 111, the other end of the hinge arm 45 passes through the first opening 112 to be connected with the face image acquisition board, the sliding plate 46 is slidably disposed in the sliding slot 113, one end of the hinge arm 45 is hinged to the second rack 44, and the other end of the hinge arm is hinged to the sliding plate 46, in this embodiment, two sliding plates 46 are provided, and two hinge arms 45 are also provided; furthermore, the first rack bar 34 slides to drive the second gear 42 to rotate, the second gear 42 rotates to drive the connecting rod 41 to rotate, the connecting rod 41 rotates to drive the third gear 43 to rotate, the third gear 43 rotates to drive the second rack bar 44 to slide along the inner wall of the hollow cavity 111, and the second rack bar 44 does not deviate from the inner wall of the hollow cavity 111, thereby driving the face image collecting plate to extend out or retract into the first opening 112, when the second rack bar 44 drives the face image collecting plate to retract towards the first opening 112, the hinge arm 45 drives the two sliding plates 46 to approach each other along the sliding grooves 113, so as to block the first opening 112 through the sliding plates 46, otherwise, when the second rack bar 44 drives the face image collecting plate to extend towards the first opening 112, the hinge arm 45 drives the two sliding plates 46 to move away from each other along the sliding grooves 113, so as to open the first opening 112, by arranging the sliding plates 46 to block the first opening 112, dust can be prevented from entering the hollow cavity 111 through the first opening 112, the cleanliness of the face image acquisition board can be ensured.
That is, when the first rack bar 34 drives the movable frame 12 to open, the second rack bar 44 drives the face image capture plate to retract into the first opening 112, and the hinge arm 45 drives the two sliding plates 46 to block the first opening, so as to prevent the movable frame 12 from blowing dust into the first opening 112 when opening; conversely, when the first rack 34 drives the mobile frame 12 to close, the second rack 44 drives the hinge arm 45 to drive the slide plate 46 to open the first opening 112, and the second rack 44 also drives the facial image capture plate to extend out of the first opening 112 to capture facial images of personnel to enter the worksite.
Specifically, referring to fig. 7, in the embodiment, the first position-limiting piece 441 and the second position-limiting piece 442 are respectively installed on the second rack 44, and a section of the second rack 44 located between the first position-limiting piece 441 and the second position-limiting piece 442 is sleeved with a buffer spring 443, so that when the second rack 44 slides in the hollow cavity 111, the second rack 44 can be buffered by the buffer spring 443.
Referring to fig. 2 and 3, the blocking wall 11 is further provided with a second opening 114, the second opening 114 is communicated with the hollow cavity 111, a second adjusting device 5 is disposed in the hollow cavity 111, and the second adjusting device 5 is used for adjusting the position of the reservation information filling board.
Specifically, referring to fig. 3 and 4, the second adjusting device 5 includes a second controller 51 and a second driving element 52, wherein the second controller 51 is electrically connected to the central processor 23 and the second driving element 52, the second driving element 52 is installed in the hollow cavity 111, and one end of the second driving element passes through the second opening 114 and is connected to the reservation information filling board, in this embodiment, the second driving element 52 may adopt an air cylinder; furthermore, when the central processing unit 23 determines that the site personnel to enter the construction site is not site personnel, the central processing unit 23 sends a control instruction to the second controller 51 to control the cylinder to drive the reservation information filling board to extend out of the second opening 114, so that the site personnel to enter the construction site fills out the reservation information on the reservation information filling board, and after the completion of the filling, the reservation information is sent to the central processing unit 23, and the central processing unit 23 sends a control instruction to the second controller 51 to control the cylinder to drive the reservation information filling board to retract into the second opening 114.
Referring to fig. 6 and 7, the hollow cavity 111 is further provided with the power on/off device 6, the power on/off device 6 includes an electrical connection post 61 and an electrical connection seat 62, specifically, the electrical connection post 61 in this embodiment is an L-shaped rod, one end of the electrical connection post 61 is connected to the second rack 44, the other end is provided with a contact 611, the electrical connection post 61 is electrically connected to the face image acquisition board through a wire, the electrical connection seat 62 is mounted on the inner wall of the hollow cavity 111, and the electrical connection seat 62 is provided with a contact slot 621, the electrical connection seat 62 is electrically connected to the power supply through a wire, further, when the contact 611 is inserted into the contact slot 621, the face image acquisition board is connected, otherwise, when the contact 611 is separated from the contact slot 621, the face image acquisition board is powered off, that is, when the second rack 44 drives the face image acquisition board to extend out of the first opening 112, the contact 611 is in contact with the contact slot 621, in order to supply power to the face image acquisition board, when second ratch 44 drives the face image acquisition board and retracts into first opening 112, contact 611 breaks away from with contact groove 621 to cut off the power supply to the face image acquisition board, saved the energy consumption.
The implementation principle is as follows: the motor drives the first gear 33 to drive the first rack bar 34 to slide towards the inside of the connecting cylinder 13, so that the first rack bar 34 drives the moving frame 12 to slide to open the door, meanwhile, the first rack bar 34 drives the second gear 42 to rotate, the second gear 42 rotates to drive the connecting rod 41 to rotate, the connecting rod 41 rotates to drive the third gear 43 to rotate, the third gear 43 rotates to drive the second rack bar 44 to slide towards the inside of the hollow cavity 111, so that the face image acquisition plate is driven to move towards the inside of the first opening 112, so that the face image acquisition plate is retracted into the first opening 112, the second rack bar 44 drives the hinge arm 45 to drive the two sliding plates 46 to slide along the sliding groove 113 in the direction approaching each other to block the first opening 112, and the second rack bar 44 slides to drive the electric connecting column 61 to separate from the electric connecting seat 62, so as to cut off power supply to the face image acquisition plate; on the contrary, the motor drives the first gear 33 to drive the first rack 34 to slide towards the outside of the connecting cylinder 13, and then the first rack 34 drives the moving frame 12 to slide, so as to close the door lock, and at the same time, the first rack 34 drives the second gear 42 to rotate, the second gear 42 rotates to drive the connecting rod 41 to rotate, the connecting rod 41 rotates to drive the third gear 43 to rotate, the third gear 43 rotates to drive the second rack 44 to slide towards the outside of the hollow cavity 111, and then the driving hinge arm 45 drives the two sliding plates 46 to slide along the sliding grooves 113 towards the direction away from each other, so as to open the first opening 112, and the second rack 44 slides to drive the face image collecting plate to move towards the outside of the first opening 112, so as to stretch the face image collecting plate out of the first opening 112, and at the same time, the second rack 44 slides to drive the electric connecting column 61 to contact with the electric connecting seat 62, so as to supply power to the face image collecting plate.
S2: an image database is preset, and facial reference images of field workers on a construction site are stored in the image database.
Specifically, in this step, the image database is preset in the central processing unit 23, and further, facial reference information of the workers on the site of the construction site is stored through the image database.
S3: presetting an image comparison rule, and comparing the face image with the face reference image according to the image comparison rule to judge whether the target object is a site worker, if so, releasing.
Specifically, in this step, the central processing unit 23 further presets an image comparison rule, the preset image comparison rule can be set by adopting a conventional technology, the face image collected by the face image collecting plate is sent to the central processing unit 23, and then the central processing unit 23 compares the collected face image with the stored face reference image according to the preset image comparison rule, so as to judge whether the site personnel to enter the construction site is site personnel, and if so, the access control is controlled to be opened.
S4: if not, judging whether the target object has an appointment with a site worker, if so, acquiring appointment information and verifying and confirming the appointment information, and if so, releasing the target object after the verification and confirmation is passed.
Specifically, in this step, when the person to enter the worksite is not a worksite worker and has an appointment with the worksite worker, the person to enter the worksite is guided to fill out appointment information on an appointment information filling board, the filled-in appointment information includes information such as name of an appointment person, contact way of the appointment person, appointment date, name of the contact person, contact way, visiting affair, etc., after the completion of the filling, the appointment information filling board sends the filled-in appointment information to the central processing unit 23, the central processing unit 23 is in communication connection with an external mobile terminal through a wireless communication module, the wireless communication module is only used by the worksite worker, and further, the central processing unit 23 sends the filled-in appointment information to the external mobile terminal of the worksite worker in the form of a short message due to the contact way of the appointment information, the site staff of the construction site edits the confirmation short message if the appointment information is checked, and feeds the confirmation short message back to the central processing unit 23, so that the entrance guard is controlled to be opened.
The implementation principle of the intelligent construction site management method provided by the embodiment of the application is as follows: the method comprises the steps that a face image of a person to enter a construction site is obtained through a face image acquisition board of an entrance guard, the collected face image is sent to a central processing unit 23, an image database and an image comparison rule are preset in the central processing unit 23, a face reference image of the person on the construction site is stored in the image database, the central processing unit 23 is used for comparing and judging whether the person to enter the construction site is the person on the construction site or not, if yes, a control instruction is sent to a first controller 31 to control a motor to open a movable frame 12 so as to enable the person to enter the construction site, and after the person enters the construction site, the central processing unit 23 sends the control instruction to the first controller 31 again to control the motor to close the movable frame 12; if not, the central processor 23 sends a control instruction to the second controller 51 to drive the reservation information filling board to extend out of the second opening 114 through the air cylinder, so that a person waiting to enter the site fills out reservation information on the reservation information filling board, the filled reservation information is sent to the central processor 23, the reservation information is further sent to an external terminal through the central processor 23 for auditing and confirmation, after the auditing and confirmation, the external terminal feeds back a confirmation signal to the central processor 23, the central processor 23 sends a control instruction to the first controller 31 to control the motor to open the movable frame 12, so that the person enters the site, and after the person enters the site, the central processor 23 sends a control instruction to the first controller 31 to control the motor to close the movable frame 12.
The embodiment of the application discloses wisdom building site management system refers to 8, and this system includes: the system comprises an acquisition module 71, a database module 72, a first judgment module 73 and a second judgment module 74, wherein the first judgment module 73 is respectively in communication connection with the acquisition module 71, the database module 72 and the second judgment module 74, the acquisition module 71 is used for acquiring a face image of a person to enter a worksite and sending the acquired face image to the first judgment module 73, the database module 72 is used for storing a facial reference image of a worksite worker, the first judgment module 73 is used for presetting an image comparison rule and comparing the acquired face image with the facial reference image according to the image comparison rule to judge whether the person to enter the worksite is the worksite worker or not, if yes, the person to enter the worksite is released, and the second judgment module 74 is used for judging whether the person to enter the worksite has an appointment with the worksite worker or not under the condition that the first judgment module 73 judges whether the person to enter the worksite is the worksite, if so, acquiring the reservation information, and checking and confirming the reservation information, and releasing after the checking and confirming is passed.
The embodiment of the application discloses a computer device, which comprises a memory, a processor and a computer program which is stored in the memory and can run on the processor, wherein when the processor loads the computer program, the intelligent construction site management method of the embodiment is executed.
The computer device may be a desktop computer, a notebook computer, or a cloud server, and the computer device includes but is not limited to a processor and a memory, for example, the computer device may further include an input/output device, a network access device, a bus, and the like.
The processor may be a Central Processing Unit (CPU), and of course, according to an actual use situation, other general processors, Digital Signal Processors (DSPs), Application Specific Integrated Circuits (ASICs), Field Programmable Gate Arrays (FPGAs) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, and the like may also be used, and the general processor may be a microprocessor or any conventional processor, and the present application does not limit the present invention.
The memory may be an internal storage unit of the computer apparatus, for example, a hard disk or a memory of the computer apparatus, or an external storage device of the computer apparatus, for example, a plug-in hard disk, a smart card (SMC), a secure digital card (SD) or a flash memory card (FC) equipped on the computer apparatus, and the memory may also be a combination of the internal storage unit of the computer apparatus and the external storage device, and the memory is used for storing a computer program and other programs and data required by the computer apparatus, and the memory may also be used for temporarily storing data that has been output or will be output, which is not limited in this application.
The intelligent construction site management method of the embodiment is stored in the memory of the computer device through the computer device, and is loaded and executed on the processor of the computer device, so that the intelligent construction site management method is convenient for a user to use.
The embodiment of the application discloses a computer-readable storage medium, and a computer program is stored in the computer-readable storage medium, wherein when the computer program is loaded by a processor, the intelligent construction site management method of the embodiment is executed.
The computer program may be stored in a computer readable medium, the computer program includes computer program code, the computer program code may be in a source code form, an object code form, an executable file or some intermediate form, and the like, the computer readable medium includes any entity or device capable of carrying the computer program code, a recording medium, a usb disk, a removable hard disk, a magnetic disk, an optical disk, a computer memory, a Read Only Memory (ROM), a Random Access Memory (RAM), an electrical carrier signal, a telecommunication signal, a software distribution medium, and the like, and the computer readable medium includes but is not limited to the above components.
The intelligent construction site management method of the embodiment is edited into a computer program through the computer readable storage medium, and the computer program is stored in the computer readable storage medium, and is loaded and executed on the processor, so that the intelligent construction site management method is convenient to store and apply.
The foregoing is a preferred embodiment of the present application and is not intended to limit the scope of the present application in any way, and any features disclosed in this specification (including the abstract and drawings) may be replaced by alternative features serving equivalent or similar purposes, unless expressly stated otherwise. That is, unless expressly stated otherwise, each feature is only an example of a generic series of equivalent or similar features.

Claims (10)

1. An intelligent worksite management method, comprising:
acquiring a face image of a target object;
the method comprises the steps that an image database is preset, and facial reference images of field workers of a construction site are stored in the image database;
presetting an image comparison rule, and comparing the facial image with the facial reference image according to the image comparison rule to judge whether the target object is the site worker of the construction site, if so, releasing;
if not, judging whether the target object has an appointment with the site staff, if so, acquiring appointment information and verifying and confirming the appointment information, and releasing after the verification and confirmation is passed.
2. The intelligent worksite management method according to claim 1, wherein said obtaining a facial image of a target object specifically comprises:
acquiring a facial image of the target object by using the entrance guard of the construction site, wherein the entrance guard comprises a blocking device (1), and a face recognition device (2) and a driving device (3) which are arranged on the blocking device (1);
the blocking device (1) comprises a blocking wall (11), a moving frame (12) connected with the blocking wall (11) and a connecting cylinder (13) connected with the blocking wall (11), wherein a hollow cavity (111) is arranged in the blocking wall (11), and the hollow cavity (111) is communicated with the connecting cylinder (13);
the face recognition device (2) comprises an image collector (21), a reservation information acquirer (22) and a central processing unit (23), wherein the image collector (21) and the reservation information acquirer (22) are respectively arranged on the blocking wall (11), and the image collector (21) and the reservation information acquirer (22) are respectively in communication connection with the central processing unit (23);
drive arrangement (3) include first controller (31), first driving piece (32), first gear (33) and first ratch (34), first controller (31) respectively with central processing unit (23) and first driving piece (32) electric connection, the one end of first driving piece (32) sets up on connecting cylinder (13), and the other end passes the lateral wall of connecting cylinder (13) and is connected with first gear (33), the one end of first ratch (34) stretches into in connecting cylinder (13) and meshes with first gear (33), and the other end is connected with removal frame (12).
3. The intelligent construction site management method according to claim 2, wherein a first opening (112) is formed in the blocking wall (11), the first opening (112) is communicated with the hollow cavity (111), a first adjusting device (4) for adjusting the position of the image collector (21) is arranged in the hollow cavity (111), the first adjusting device (4) comprises a connecting rod (41), a second gear (42), a third gear (43) and a second rack (44), two ends of the connecting rod (41) are rotatably connected to the inner wall of the hollow cavity (111), the second gear (42) is arranged at one end of the connecting rod (41) and meshed with the first rack (34), the third gear (43) is arranged at the other end of the connecting rod (41) and meshed with the second rack (44), one end of the second rack (44) is slidably arranged in the hollow cavity (111), the other end passes through the first opening (1122) and is connected with the image collector (21).
4. The intelligent construction method according to claim 3, wherein the first opening (112) has a sliding slot (113) formed at opposite edges thereof, the first adjusting device (4) further comprises a hinge arm (45) and a sliding plate (46), the sliding plate (46) is slidably disposed in the sliding slot (113), one end of the hinge arm (45) is hinged to the second rack bar (44), and the other end of the hinge arm is hinged to the sliding plate (46).
5. The intelligent site construction method according to claim 3, wherein the second rack bar (44) is provided with a first stopper (441), a second stopper (442) and a buffer spring (443), and the buffer spring (443) is disposed between the first stopper (441) and the second stopper (442).
6. The intelligent worksite management method according to claim 2, wherein the blocking wall (11) is provided with a second opening (114), the second opening (114) is communicated with the hollow cavity (111), a second adjusting device (5) for adjusting the position of the reservation information acquirer (22) is arranged in the hollow cavity (111), the second adjusting device (5) comprises a second controller (51) and a second driving member (52), the second driving member (52) is arranged in the hollow cavity (111) and one end of the second driving member passes through the second opening (114) to be connected with the reservation information acquirer (22).
7. The intelligent construction site management method according to claim 3, wherein a power on/off device (6) is further arranged in the hollow cavity (111), the power on/off device (6) comprises an electric connecting column (61) and an electric connecting seat (62), one end of the electric connecting column (61) is connected with the second gear rod (44), the other end of the electric connecting column is provided with a contact (611), the electric connecting column (61) is electrically connected with the image collector (21) through a conducting wire, the electric connecting seat (62) is arranged on the inner wall of the hollow cavity (111), a contact groove (621) electrically connected with the contact (611) is formed in the electric connecting seat (62), and the electric connecting seat (62) is electrically connected with a power supply through a conducting wire.
8. An intelligent worksite management system, comprising:
an acquisition module (71) for acquiring a face image of a target object;
a database module (72) for storing facial reference images of worksite workers;
the first judgment module (73) is used for presetting an image comparison rule, comparing the face image with the face reference image according to the image comparison rule, and judging whether the target object is the site worker or not, if yes, releasing;
and the second judgment module (74) is used for judging whether the target object has an appointment with the site staff or not under the condition that the first judgment module (73) judges whether the target object has the appointment with the site staff, if so, acquiring appointment information and checking and confirming the appointment information, and the target object is released after the checking and confirming are passed.
9. A computer arrangement comprising a memory, a processor and a computer program stored in the memory and being executable on the processor, wherein the processor, when loaded with the computer program, performs the method of any one of claims 1 to 7.
10. A computer-readable storage medium, in which a computer program is stored which, when being loaded by a processor, is adapted to carry out the method of any one of claims 1 to 7.
CN202210268545.5A 2022-03-18 2022-03-18 Intelligent building site management method, system, device and medium Active CN114882629B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210268545.5A CN114882629B (en) 2022-03-18 2022-03-18 Intelligent building site management method, system, device and medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210268545.5A CN114882629B (en) 2022-03-18 2022-03-18 Intelligent building site management method, system, device and medium

Publications (2)

Publication Number Publication Date
CN114882629A true CN114882629A (en) 2022-08-09
CN114882629B CN114882629B (en) 2024-07-05

Family

ID=82666518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210268545.5A Active CN114882629B (en) 2022-03-18 2022-03-18 Intelligent building site management method, system, device and medium

Country Status (1)

Country Link
CN (1) CN114882629B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004312513A (en) * 2003-04-09 2004-11-04 Casio Comput Co Ltd Entrance management system and program
CN108197779A (en) * 2017-12-15 2018-06-22 四川省大益科技有限公司 Build service management
CN109034535A (en) * 2018-06-21 2018-12-18 中国化学工程第六建设有限公司 Construction site wisdom monitoring method, system and computer readable storage medium
CN110177254A (en) * 2019-05-28 2019-08-27 北京建工路桥集团有限公司 A kind of wisdom building site system for managing video and its control method
CN112258718A (en) * 2020-09-27 2021-01-22 中国建设银行股份有限公司 Human body temperature measurement and personnel identification method and system
CN112651069A (en) * 2020-12-05 2021-04-13 重庆源道建筑规划设计有限公司 Intelligent construction site management and control method, system and device based on BIM and storage medium
CN112878871A (en) * 2021-01-26 2021-06-01 青岛科技大学 Take automatic entrance guard's device of seventy percent discount of auto-lock
CN213872090U (en) * 2020-11-30 2021-08-03 成都市卓思德禄智能科技有限公司 Face recognition machine is with adjusting removal frame
CN214886499U (en) * 2021-01-26 2021-11-26 青岛科技大学 Automatic access control device of seventy percent discount
CN215814260U (en) * 2021-09-15 2022-02-11 衡阳市快易泊智能科技有限公司 Wisdom building site is with face recognition device

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004312513A (en) * 2003-04-09 2004-11-04 Casio Comput Co Ltd Entrance management system and program
CN108197779A (en) * 2017-12-15 2018-06-22 四川省大益科技有限公司 Build service management
CN109034535A (en) * 2018-06-21 2018-12-18 中国化学工程第六建设有限公司 Construction site wisdom monitoring method, system and computer readable storage medium
CN110177254A (en) * 2019-05-28 2019-08-27 北京建工路桥集团有限公司 A kind of wisdom building site system for managing video and its control method
CN112258718A (en) * 2020-09-27 2021-01-22 中国建设银行股份有限公司 Human body temperature measurement and personnel identification method and system
CN213872090U (en) * 2020-11-30 2021-08-03 成都市卓思德禄智能科技有限公司 Face recognition machine is with adjusting removal frame
CN112651069A (en) * 2020-12-05 2021-04-13 重庆源道建筑规划设计有限公司 Intelligent construction site management and control method, system and device based on BIM and storage medium
CN112878871A (en) * 2021-01-26 2021-06-01 青岛科技大学 Take automatic entrance guard's device of seventy percent discount of auto-lock
CN214886499U (en) * 2021-01-26 2021-11-26 青岛科技大学 Automatic access control device of seventy percent discount
CN215814260U (en) * 2021-09-15 2022-02-11 衡阳市快易泊智能科技有限公司 Wisdom building site is with face recognition device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
柳宫丞;: "有关人脸识别技术在智慧楼宇中的应用分析", 数码世界, no. 04 *
高磊;: "汇点滴数据 创建筑未来――工汇智慧工地智能管理云平台小记", 建筑, no. 15 *

Also Published As

Publication number Publication date
CN114882629B (en) 2024-07-05

Similar Documents

Publication Publication Date Title
CN114882629A (en) Intelligent construction site management method, system, device and medium
CN207051991U (en) A kind of subway gauze gate inhibition concentrates authoring system
CN111243146A (en) Face recognition visitor system for reservation
CN112837460A (en) Unattended intelligent access control system and personnel access management method
CN207938119U (en) A kind of fully-automatic intelligent equipment that the shared lease realization in house is moved in
CN207233067U (en) Private building's hotelization application from family automatic checking system
CN205620810U (en) Automatic robot that retrieves 3D glasses is provided in ticket checking
CN105719508A (en) Intelligent parking lot management system
CN109358376A (en) A kind of detector gate based on block chain technology
CN213545370U (en) Entrance guard monitoring device based on Internet of things
CN113240849B (en) Intelligent channel gate linkage control system based on terminal operation
CN210529549U (en) Intelligence parking area system auto-induction pole
CN209746643U (en) biological intelligent gate
CN221094942U (en) Embedded authentication gate
CN216517502U (en) Gate side-hung door device and gate
CN216361966U (en) Intelligent face recognition conference management device
CN213338849U (en) Novel multi-functional intelligent face identification floodgate machine
CN219353402U (en) Automatic positioning cabinet
CN205176965U (en) Archives intelligence burglar alarm snapshot system device
EP2189411A1 (en) Riser device
CN213844241U (en) Member identification device for smart venue
TWI764451B (en) Management system for filing vehicle information of parking garage
CN219642287U (en) Photographing attendance device for access gate
CN214670806U (en) Automatic door device based on face recognition control
CN220064868U (en) Face access control equipment with protective structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant