CN114876164A - A damaged repair equipment of wall for urban construction - Google Patents

A damaged repair equipment of wall for urban construction Download PDF

Info

Publication number
CN114876164A
CN114876164A CN202210573628.5A CN202210573628A CN114876164A CN 114876164 A CN114876164 A CN 114876164A CN 202210573628 A CN202210573628 A CN 202210573628A CN 114876164 A CN114876164 A CN 114876164A
Authority
CN
China
Prior art keywords
frame
sliding
block
wall
lead screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210573628.5A
Other languages
Chinese (zh)
Other versions
CN114876164B (en
Inventor
来飞磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chizhou Jingxin Human Resources Service Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202210573628.5A priority Critical patent/CN114876164B/en
Priority claimed from CN202210573628.5A external-priority patent/CN114876164B/en
Publication of CN114876164A publication Critical patent/CN114876164A/en
Application granted granted Critical
Publication of CN114876164B publication Critical patent/CN114876164B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/06Implements for applying plaster, insulating material, or the like
    • E04F21/08Mechanical implements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/002Arrangements for cleaning building facades
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions
    • E04G23/0211Arrangements for filling cracks or cavities in building constructions using injection
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/14Plug-in electric vehicles

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention relates to a damage repair device, in particular to a wall surface damage repair device for urban construction. The invention provides a labor-saving wall surface damage repairing device for urban construction. The utility model provides a damaged repair equipment of wall for city construction, includes frame, first sliding block, charging box, gag etc. and the left and right sides of frame all is connected with first sliding block, and the internal connection of frame has the charging box, and the right rear side of charging box revolves the box-like gag that is connected with. Through using electronic slide rail as drive power, can make the shower nozzle spout the emulsion paint on the wall to a brush section of thick bamboo can move right under the effect of electronic slide rail and whitewash the wall, can restore the wall with this automatically, the effectual consumption that has reduced the manpower.

Description

A damaged repair equipment of wall for urban construction
Technical Field
The invention relates to a damage repair device, in particular to a wall surface damage repair device for urban construction.
Background
With the rapid development of the building industry in China, people build countless buildings, and the wall surface of the building is easy to expand with heat and contract with cold when being subjected to temperature and rainwater, so that cracks appear, and the wall surface needs to be repaired when the cracks appear or the wall surface is damaged.
According to patent grant publication No. CN 213597104U's a small scale wall repair equipment for workover, the novel nipple rectifier comprises a cylindrical shel, barrel top fixed mounting has the connecting pipe, barrel one end threaded connection is kept away from to the connecting pipe has the stay tube, rotate on the stay tube and install the running roller, running roller fixed surface cup joints and installs the restoration brush, a plurality of first through-holes have been seted up on the stay tube, a plurality of second through-holes have been seted up on the running roller surface, barrel inner chamber movable mounting has the gag, gag bottom fixed mounting has the push rod, barrel lateral wall fixed mounting has the honeycomb duct, barrel one end is kept away from to the honeycomb duct is fixed with the gaikou, fixed mounting has the valve on the connecting pipe.
Although above-mentioned patent can be under the effect of first stopper, second stopper and limiting plate, effectually prevent to restore the brush and rock to avoid restoring the repair material on brush surface and because the shake is unrestrained to cause the waste, but above-mentioned patent need use a large amount of manpowers when restoreing the wall, needs the handheld above-mentioned patent of staff to restore the wall, can consume a large amount of manpowers like this, brings inconvenience for the staff.
In order to solve the problems in the prior art, it is necessary to design a wall surface damage repairing device for urban construction, so that the effect of saving manpower is achieved.
Disclosure of Invention
In order to overcome the defect that the conventional repair equipment consumes manpower, the technical problem to be solved is as follows: the utility model provides a damaged repair equipment of wall that is used for urban construction who uses manpower sparingly.
The technical scheme of the invention is as follows: the utility model provides a damaged repair equipment of wall for city construction, including the frame, first sliding block, the charging box, the blanking cover, flexible pipe, spout the material mechanism, repair mechanism and moving mechanism, the left and right sides of frame all is connected with first sliding block, the internal connection of frame has the charging box, the right rear side of charging box is closed formula and is connected with the blanking cover soon, the right rear side of charging box is connected with flexible pipe, flexible pipe is located the right side of blanking cover, the bottom of flexible pipe is equipped with spouts the material mechanism, the frame top is equipped with repair mechanism, the rear side that spouts the material mechanism is equipped with moving mechanism.
In one embodiment, the material spraying mechanism comprises an electric sliding rail, a second sliding block and a spray head, the electric sliding rail is installed at the bottom of the frame, the second sliding block is connected to a sliding part of the electric sliding rail, the spray head is installed at the bottom of the second sliding block, and the spray head is communicated with the telescopic pipe.
In one embodiment, the repairing mechanism comprises a guide frame, a sliding frame, a reset spring, a sliding plate, a brush cylinder, a limiting frame, a fixed rod and a first connecting spring, wherein the guide frame is connected to the top of the frame, the sliding frame is connected to the guide frame in a sliding mode, the reset spring is connected between the sliding frame and the guide frame, the reset spring is located inside the guide frame, the sliding plate is connected to the sliding frame in a sliding mode, the first connecting spring is connected between the sliding plate and the sliding frame, the first connecting spring is located inside the sliding frame, the limiting frame is connected to the left side of the top of the guide frame, the limiting frame is located on the left side of the sliding frame, the fixed rod is connected to the rear side of the top of the sliding plate, the fixed rod is in contact with the limiting frame, and the brush cylinder is rotatably connected to the front side of the sliding plate.
In one embodiment, the moving mechanism comprises a third fixed block, a wedge block and a second connecting spring, the third fixed block is connected to the rear side of the second sliding block, the wedge block is connected to the front upper side of the third fixed block in a sliding mode, the second connecting spring is connected between the wedge block and the third fixed block, and the second connecting spring is located inside the wedge block.
In one embodiment, the brush box further comprises a scraping mechanism, the scraping mechanism comprises a first fixing block, a first screw rod, a scraping plate and a nut, the first fixing block is connected to the front right side of the sliding frame, the first screw rod is placed on the right side of the first fixing block, the nut is connected to the upper side of the first screw rod through threads, the nut is in contact with the first fixing block, the scraping plate is connected to the bottom of the first screw rod, and the scraping plate is in contact with the brush box.
In one embodiment, the adjusting mechanism comprises a fixing plate, a second fixing block, a second screw rod and a handle, wherein the fixing plate is connected to one side, away from each other, of each of the two first sliding blocks in a sliding manner in a front-back symmetrical manner, the second fixing block is connected between the two fixing plates on the right side in a vertical symmetrical manner, the second screw rod is connected between the two second fixing blocks in a rotating manner, the second screw rod is in threaded fit with the first sliding block on the right side, and the handle is connected to the bottom of the second screw rod.
In one embodiment, the cleaning device further comprises a removing mechanism, the removing mechanism comprises supporting frames, electric push rods, collecting frames and brush holders, the supporting frames are connected to one sides, close to each other, of the bottoms of the two first sliding blocks, the two supporting frames are located on the inner sides of the two fixing plates on the two sides, the electric push rods are installed on one sides, close to each other, of the bottoms of the two supporting frames, the collecting frames are connected between telescopic rods of the two electric push rods, the brush holders are connected to the tops of the collecting frames in a sliding mode, and the brush holders are connected with the spray heads in a sliding mode.
In one embodiment, the top of the collecting frame is connected with a baffle in a bilateral symmetry mode.
The invention has the following beneficial effects: 1. through using electronic slide rail as drive power, can make the shower nozzle spout the emulsion paint on the wall to a brush section of thick bamboo can move right under the effect of electronic slide rail and whitewash the wall, can restore the wall with this automatically, the effectual consumption that has reduced the manpower.
2. The brushing cylinder moves rightwards to paint the wall surface, and the scraping plate can scrape the latex paint from the brushing cylinder under the action of the scraping plate, so that the redundant latex paint on the brushing cylinder can be automatically treated, and the non-uniformity of the latex paint on the wall surface is avoided.
3. Through using electric slide rail as drive power, can make the brush yoke carry out left right reciprocating motion, the brush yoke can be with irregular and waited for the wall skin fragment that drops down on the wall under brushing to this can clear up the wainscot fragment on the wall, because of the wainscot fragment on the wall influences the effect after the wall is restoreed when avoiding whitewashing the emulsion paint.
Drawings
Fig. 1 is a schematic perspective view of the present invention.
Fig. 2 is a schematic partial perspective view of a first embodiment of the present invention.
Fig. 3 is a second partial perspective view of the present invention.
Fig. 4 is a schematic perspective view of the material spraying mechanism of the present invention.
Fig. 5 is a schematic view of a first partial body structure of the repair mechanism of the present invention.
Fig. 6 is a schematic view of a second partial body structure of the repair mechanism of the present invention.
Fig. 7 is a schematic view of a first partial body structure of the moving mechanism of the present invention.
Fig. 8 is a schematic view of a second partial body structure of the moving mechanism of the present invention.
Fig. 9 is a schematic perspective view of the scraping mechanism of the present invention.
Fig. 10 is a schematic perspective view of an adjusting mechanism according to the present invention.
FIG. 11 is a schematic view of a first partial body configuration of the removal mechanism of the present invention.
FIG. 12 is a schematic view of a second partial body structure of the removal mechanism of the present invention.
Labeled as: 1. the device comprises a frame, 100, a first sliding block, 2, a loading box, 3, a plug cover, 4, a telescopic pipe, 5, a material spraying mechanism, 51, an electric sliding rail, 52, a second sliding block, 53, a spray head, 6, a repairing mechanism, 61, a guide frame, 62, a sliding frame, 63, a return spring, 64, a sliding plate, 65, a brush cylinder, 66, a limiting frame, 67, a fixing rod, 68, a first connecting spring, 7, a moving mechanism, 71, a third fixing block, 72, a wedge-shaped block, 73, a second connecting spring, 8, a scraping mechanism, 81, a first fixing block, 82, a first screw rod, 83, a scraping plate, 84, a nut, 9, an adjusting mechanism, 91, a fixing plate, 92, a second fixing block, 93, a second screw rod, 94, a handle, 10, a removing mechanism, 101, a supporting frame, 102, an electric push rod, 103, a collecting frame, 104, a brush frame, 105 and a baffle.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in further detail with reference to the accompanying drawings in conjunction with the following detailed description. It should be understood that the description is intended to be exemplary only, and is not intended to limit the scope of the present invention. Moreover, in the following description, descriptions of well-known structures and techniques are omitted so as to not unnecessarily obscure the concepts of the present invention.
Example 1
A wall damage repair device for city construction is disclosed, please look at fig. 1-8, and comprises a frame 1, a first sliding block 100, a charging box 2, a plug cover 3, a telescopic pipe 4, a material spraying mechanism 5, a repair mechanism 6 and a moving mechanism 7, wherein the first sliding block 100 is connected to the left side and the right side of the frame 1, the charging box 2 is connected to the inside of the frame 1 through welding, the plug cover 3 is connected to the right rear side of the charging box 2 in a rotating and closing manner, the telescopic pipe 4 is connected to the right rear side of the charging box 2, the material spraying mechanism 5 is arranged at the bottom of the telescopic pipe 4, the repair mechanism 6 is arranged at the top of the frame 1, and the moving mechanism 7 is arranged at the rear side of the material spraying mechanism 5.
Referring to fig. 1 and 4, the spraying mechanism 5 includes an electric sliding rail 51, a second sliding block 52 and a spraying head 53, the electric sliding rail 51 is installed at the bottom of the frame 1, the second sliding block 52 is connected to a sliding member of the electric sliding rail 51, the spraying head 53 is installed at the bottom of the second sliding block 52, and the spraying head 53 is communicated with the telescopic tube 4.
Referring to fig. 1, 5 and 6, the repairing mechanism 6 includes a guiding frame 61, a sliding frame 62, a return spring 63, the sliding plate 64, the brush barrel 65, the limiting frame 66, the fixing rod 67 and the first connecting spring 68, the top of the frame 1 is connected with the guide frame 61 through a bolt, the guide frame 61 is connected with the sliding frame 62 in a sliding mode, the reset spring 63 is connected between the sliding frame 62 and the guide frame 61, the reset spring 63 is located inside the guide frame 61, the sliding frame 62 is connected with the sliding plate 64 in a sliding mode, the first connecting spring 68 is connected between the sliding plate 64 and the sliding frame 62, the first connecting spring 68 is located inside the sliding frame 62, the limiting frame 66 is connected to the left side of the top of the guide frame 61 through welding, the limiting frame 66 is located on the left side of the sliding frame 62, the fixing rod 67 is connected to the rear side of the top of the sliding plate 64 through welding, the fixing rod 67 is in contact with the limiting frame 66, and the brush barrel 65 is connected to the front side of the sliding plate 64 in a rotating mode.
Referring to fig. 7 and 8, the moving mechanism 7 includes a third fixing block 71, a wedge block 72 and a second connecting spring 73, the third fixing block 71 is connected to the rear side of the second sliding block 52, the wedge block 72 is connected to the front upper side of the third fixing block 71 in a sliding manner, the second connecting spring 73 is connected between the wedge block 72 and the third fixing block 71, and the second connecting spring 73 is located inside the wedge block 72.
Firstly, the limiting frame 66 supports the sliding plate 64 through the fixed rod 67, so that the first connecting spring 68 is compressed, when the wall surface needs to be repaired, the device is moved to the front of the wall surface needing to be repaired, then the plug cover 3 is taken down from the charging box 2, latex paint is injected into the charging box 2, when the latex paint in the charging box 2 is enough, the plug cover 3 is covered to the original position, then the spray head 53 is started, the latex paint enters the spray head 53 through the extension tube 4 and is sprayed out from the spray head 53 to the wall surface, next, the electric sliding rail 51 is started, the sliding part of the electric sliding rail 51 drives the spray head 53 to move leftwards through the second sliding block 52, the second sliding block 52 simultaneously drives the third fixed block 71, the wedge-shaped block 72 and the second connecting spring 73 to move leftwards, so that the spray head 53 can spray the latex paint on the wall surface, when the wedge-shaped block 72 moves leftwards to be contacted with the sliding frame 62, the wedge-shaped block 72 is pressed backwards by the sliding frame 62, the second connecting spring 73 is compressed, the spray head 53 is closed, the wedge block 72 is not extruded by the sliding frame 62 any more in the process of moving leftward, the second connecting spring 73 is reset and drives the wedge block 72 to move forward and reset, at this time, the second sliding block 52 moves leftward to the limit of the left stroke of the electric sliding rail 51, the sliding part of the electric sliding rail 51 drives the spray head 53, the third fixed block 71, the wedge block 72 and the second connecting spring 73 to move rightward through the second sliding block 52, the wedge block 72 moves rightward and drives the sliding plate 64, the brush cylinder 65, the fixed rod 67 and the first connecting spring 68 to move rightward through the sliding frame 62, the reset spring 63 is compressed, and the fixed rod 67 is not supported by the limiting frame 66 any more after moving rightward, so that the first connecting spring 68 resets and drives the sliding plate 64, the fixed rod 67 and the brush cylinder 65 to move forward, and the brush cylinder 65 is contacted with the wall surface accordingly, under the action of rightward movement of the brush drum 65, the brush drum 65 rotates and uniformly brushes latex on the wall surface, so that the wall surface can be painted, and the effect of repairing the wall surface is achieved, after the return spring 63 is compressed to the limit, under the action of continuous rightward movement of the wedge block 72, the wedge block 72 can not push the sliding frame 62 to the right, so that the wedge block 72 can be extruded backwards by the sliding frame 62 when moving rightwards, the second connecting spring 73 is compressed, the sliding frame 62 can not be pushed any more in the process of rightward movement of the wedge block 72, the return spring 63 resets and drives the sliding frame 62, the fixing rod 67, the first connecting spring 68 and the brush drum 65 to move leftwards and reset, then the sliding frame 62 can be separated from the wedge block 72 when moving rightwards, so that the second connecting spring 73 resets and drives the wedge block 72 to move forwards and reset, and then the second sliding block 52 can reach the limit of the right stroke of the electric sliding rail 51, at this moment, the electric sliding rail 51 is closed, meanwhile, the fixing rod 67 is extruded backwards by the limiting frame 66 in the process of continuously moving leftwards and resetting, then the fixing rod 67 drives the sliding plate 64 and the brush drum 65 to move backwards, the first connecting spring 68 is compressed, and the brush drum 65 can be separated from the wall surface after moving backwards, so that the wall surface can be repaired through the operation.
Example 2
On the basis of embodiment 1, please look at fig. 1 and 9, the device further comprises a scraping mechanism 8, the scraping mechanism 8 comprises a first fixing block 81, a first screw 82, a scraping plate 83 and a nut 84, the right front side of the sliding frame 62 is connected with the first fixing block 81 through welding, the first screw 82 is placed on the right side of the first fixing block 81, the nut 84 is connected to the upper side of the first screw 82 through threads, the nut 84 is in contact with the first fixing block 81, the bottom of the first screw 82 is connected with the scraping plate 83 through welding, and the scraping plate 83 is in contact with the brush cylinder 65.
In the process that the brushing cylinder 65 moves rightwards to paint the wall surface, the sliding frame 62 drives the first fixed block 81, the first screw rod 82, the scraping plate 83 and the nut 84 to move rightwards together, when the brushing cylinder 65 is painted, emulsion paint can be accumulated on the brushing cylinder 65, then under the action of rotation of the brushing cylinder 65, the brushing cylinder 65 can drive the emulsion paint on the brushing cylinder to rotate together, the emulsion paint can contact with the scraping plate 83 after rotating, so that the emulsion paint can be scraped off from the brushing cylinder 65 by the scraping plate 83, the redundant emulsion paint on the brushing cylinder 65 can be automatically processed, the redundant emulsion paint on the brushing cylinder 65 can be prevented from being painted on the wall surface, the uneven painting of the emulsion paint on the wall surface is avoided, when the scraping plate 83 needs to be cleaned, a worker supports the scraping plate 83, twists the nut 84 from the first screw rod 82, then pulls the scraping plate 83 downwards, and drives the first screw rod 82 to move together, after the first lead screw 82 is separated from the first fixed block 81, the scraper 83 is cleaned, after the cleaning is completed, the first lead screw 82 is placed back on the first fixed block 81, the nut 84 is twisted back on the first lead screw 82, and at this time, the nut 84 can fix the first lead screw 82 and the scraper 83 on the equipment.
Example 3
On the basis of embodiment 2, please look over fig. 1 and fig. 10, the device further includes an adjusting mechanism 9, the adjusting mechanism 9 includes a fixing plate 91, a second fixing block 92, a second screw rod 93 and a handle 94, one side of each of the two first sliding blocks 100 away from each other is connected with the fixing plate 91 in a front-back symmetrical manner, the second fixing block 92 is welded between the two fixing plates 91 on the right side in a vertical symmetrical manner, the second screw rod 93 is connected between the two second fixing blocks 92 in a rotating manner, the second screw rod 93 is in threaded fit with the first sliding block 100 on the right side, and the handle 94 is connected to the bottom of the second screw rod 93 in a welding manner.
When the device is required to be used, firstly, a worker prepares two fixing frames, the fixing frames are installed on the wall surfaces on the left side and the right side of the wall surface to be painted, then the fixing plates 91 on the two sides of the device are respectively installed on the fixing frames on the two sides through bolts, the device can be installed, the worker does not need to continuously lift the device to repair the wall surface, the fixing frames can enable the handle 94 to keep a distance with the wall surface, when the worker is prevented from rotating the handle 94, the handle 94 is blocked by the wall surface, then the worker can repair the wall surface by using the device, when the material spraying mechanism 5 and the repairing mechanism 6 need to be lifted and lowered, the handle 94 is rotated, the handle 94 drives the second screw rod 93 to rotate, under the effect that the second screw rod 93 is in threaded fit with the first right sliding block 100, the second screw rod 93 can drive the frame 1 through the first right sliding block 100, the first left sliding block 100, The charging box 2, the plug cover 3, the extension tube 4, the spraying mechanism 5, the repairing mechanism 6, the moving mechanism 7 and the scraping mechanism 8 move upwards together, when the spraying mechanism 5 and the repairing mechanism 6 are moved upwards to proper positions and the handle 94 is stopped rotating, and the spraying mechanism 5 and the repairing mechanism 6 are required to be moved downwards, the operator rotates the handle 94 in the reverse direction, the handle 94 drives the second screw rod 93 to rotate in the reverse direction, the second screw rod 93 drives the frame 1, the left first sliding block 100, the charging box 2, the plug cover 3, the extension tube 4, the spraying mechanism 5, the repairing mechanism 6, the moving mechanism 7 and the scraping mechanism 8 to move downwards together through the right first sliding block 100, with this can go up and down through above-mentioned operation and spout material mechanism 5 and repair body 6, when need not use this equipment, dismantle the fixed plate 91 of both sides from the mount down, take away this equipment again can.
Example 4
On the basis of embodiment 3, please look over fig. 1, fig. 11 and fig. 12, still including removing mechanism 10, removing mechanism 10 is including support frame 101, electric putter 102, collect frame 103 and brush yoke 104, one side that two first sliding blocks 100 bottoms are close to each other all is connected with support frame 101, two support frames 101 all are located two fixed plate 91 inboards of both sides, electric putter 102 is all installed to one side that two support frame 101 bottoms are close to each other, be connected with between two electric putter's 102 telescopic link and collect frame 103, the top bilateral symmetry formula welding of collecting frame 103 has baffle 105, baffle 105 can prevent to splash at will from the wall skin fragment of brushing down on the wall, the top sliding type of collecting frame 103 is connected with brush yoke 104, brush yoke 104 and shower nozzle 53 sliding connection.
Before spraying latex paint, a worker starts the telescopic rod of the electric push rod 102 to extend, the telescopic rod of the electric push rod 102 drives the collecting frame 103 and the brush holder 104 to move forwards, after the brush holder 104 moves forwards to contact with a wall surface, the electric push rod 102 is closed, the electric slide rail 51 is started, the sliding part of the electric slide rail 51 drives the spray nozzle 53 and the brush holder 104 to move leftwards through the second sliding block 52, after the second sliding block 52 moves leftwards to the limit of the left stroke of the electric slide rail 51, the sliding part of the electric slide rail 51 drives the spray nozzle 53 and the brush holder 104 to move rightwards through the second sliding block 52, after the second sliding block 52 moves rightwards to the limit of the right stroke of the electric slide rail 51, the sliding part of the electric slide rail 51 drives the spray nozzle 53 and the brush holder 104 to move leftwards and rightwards in a reciprocating mode under the action of the electric slide rail 51, and therefore, the brush holder 104 can brush down irregular and quick falling wall surface wall skin fragments on the wall surface, the wall skin fragment can drop to in collecting frame 103, with this wall skin fragment on can clearing up the wall, influence the effect after the wall is restoreed because of the wall skin fragment on the wall when avoiding whitewashing the emulsion paint, wall skin fragment on the wall is all brushed down and second sliding block 52 moves right to the limit of electric slide rail 51 right side stroke after, close electric slide rail 51, restart electric putter 102's telescopic link shrink, electric putter 102's telescopic link drives thereupon and collects frame 103 and brush yoke 104 rearward movement, after brush yoke 104 rearward movement resets, close electric putter 102, it can to carry out subsequent wall restoration work afterwards again, after the wall restoration work is accomplished, the staff is to the wall skin fragment clean up in the collecting frame 103 can.
The above embodiments are merely illustrative of the technical ideas and features of the present invention, and the purpose thereof is to enable those skilled in the art to understand the contents of the present invention and implement the present invention, and not to limit the protection scope of the present invention. All equivalent changes and modifications made according to the spirit of the present invention should be covered within the protection scope of the present invention.

Claims (8)

1. The utility model provides a damaged repair equipment of wall for city construction, including frame (1), first sliding block (100), charging box (2), gag (3) and flexible pipe (4), the left and right sides of frame (1) all is connected with first sliding block (100), the internal connection of frame (1) has charging box (2) that are used for storing the emulsion paint, the right back side of charging box (2) is rotary-type to be connected with gag (3), the right back side of charging box (2) is connected with flexible pipe (4), flexible pipe (4) are located the right side of gag (3), its characterized in that: the wall surface painting device is characterized by further comprising a material spraying mechanism (5), a repairing mechanism (6) and a moving mechanism (7), wherein the material spraying mechanism (5) used for spraying emulsion paint on a wall surface is arranged at the bottom of the telescopic pipe (4), the repairing mechanism (6) used for painting the wall surface is arranged at the top of the frame (1), and the moving mechanism (7) is arranged on the rear side of the material spraying mechanism (5).
2. A wall damage repair apparatus for urban construction according to claim 1, wherein: the material spraying mechanism (5) comprises an electric sliding rail (51), a second sliding block (52) and a spray head (53), the electric sliding rail (51) is installed at the bottom of the frame (1), the second sliding block (52) is connected onto a sliding part of the electric sliding rail (51), the spray head (53) is installed at the bottom of the second sliding block (52), and the spray head (53) is communicated with the telescopic pipe (4).
3. A wall damage repair apparatus for urban construction according to claim 2, wherein: the repairing mechanism (6) comprises a guide frame (61), a sliding frame (62), a reset spring (63), a sliding plate (64), a brush barrel (65), a limiting frame (66), a fixed rod (67) and a first connecting spring (68), wherein the top of the frame (1) is connected with the guide frame (61), the sliding frame (62) is connected with the guide frame (61) in a sliding manner, the reset spring (63) is connected between the sliding frame (62) and the guide frame (61), the reset spring (63) is positioned inside the guide frame (61), the sliding frame (62) is connected with the sliding plate (64) in a sliding manner, the first connecting spring (68) is connected between the sliding plate (64) and the sliding frame (62), the first connecting spring (68) is positioned inside the sliding frame (62), the limiting frame (66) is connected to the left side of the top of the guide frame (61), and the limiting frame (66) is positioned on the left side of the sliding frame (62), the rear side of the top of the sliding plate (64) is connected with a fixed rod (67), the fixed rod (67) is in contact with the limiting frame (66), and the front side of the sliding plate (64) is rotatably connected with a brushing cylinder (65) which can uniformly brush the latex paint on the wall surface.
4. A wall damage repair apparatus for urban construction according to claim 3, wherein: the moving mechanism (7) comprises a third fixing block (71), a wedge block (72) and a second connecting spring (73), the rear side of the second sliding block (52) is connected with the third fixing block (71), the front upper side of the third fixing block (71) is connected with the wedge block (72) used for pushing the sliding frame (62) in a sliding mode, the second connecting spring (73) is connected between the wedge block (72) and the third fixing block (71), and the second connecting spring (73) is located inside the wedge block (72).
5. A wall damage repair apparatus for urban construction according to claim 4, wherein: still including scraping mechanism (8), scraping mechanism (8) is including first fixed block (81), first lead screw (82), scraper blade (83) and nut (84), the right front side of carriage (62) is connected with first fixed block (81), first lead screw (82) have been placed on the right side of first fixed block (81), there are nut (84) the upside of first lead screw (82) through threaded connection, nut (84) and first fixed block (81) contact, the bottom of first lead screw (82) is connected with scraper blade (83), scraper blade (83) and brush section of thick bamboo (65) contact.
6. A wall damage repair apparatus for urban construction according to claim 5, wherein: still including adjustment mechanism (9), adjustment mechanism (9) are including fixed plate (91), second fixed block (92), second lead screw (93) and handle (94), equal front-back symmetry formula sliding connection in one side that two first sliding blocks (100) kept away from each other has fixed plate (91), the up-down symmetry formula is connected with second fixed block (92) between two fixed plates on right side (91), the rotary type is connected with second lead screw (93) between two second fixed blocks (92), first sliding block (100) screw-thread fit on second lead screw (93) and right side, the bottom of second lead screw (93) is connected with handle (94) that are used for making things convenient for the staff to rotate second lead screw (93).
7. A wall damage repair apparatus for urban construction according to claim 6, wherein: still including removing mechanism (10), it is including support frame (101) to remove mechanism (10), electric putter (102), collect frame (103) and brush yoke (104), one side that two first sliding block (100) bottoms are close to each other all is connected with support frame (101), two fixed plate (91) inboards that two support frames (101) all are located both sides, electric putter (102) are all installed to one side that two support frame (101) bottoms are close to each other, be connected with between the telescopic link of two electric putter (102) and collect frame (103), the top sliding type of collecting frame (103) is connected with and is used for brushing away broken brush yoke (104) of wall skin, brush yoke (104) and shower nozzle (53) sliding connection.
8. A wall damage repair apparatus for urban construction according to claim 7, wherein: the top of the collecting frame (103) is connected with a baffle (105) in a bilateral symmetry way.
CN202210573628.5A 2022-05-25 Wall surface damage repairing equipment for urban construction Active CN114876164B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210573628.5A CN114876164B (en) 2022-05-25 Wall surface damage repairing equipment for urban construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210573628.5A CN114876164B (en) 2022-05-25 Wall surface damage repairing equipment for urban construction

Publications (2)

Publication Number Publication Date
CN114876164A true CN114876164A (en) 2022-08-09
CN114876164B CN114876164B (en) 2024-09-27

Family

ID=

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2966197A1 (en) * 2022-09-19 2024-04-18 Arrais Gomez Pablo Construction work device (Machine-translation by Google Translate, not legally binding)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008248472A (en) * 2007-03-08 2008-10-16 Mentec:Kk Automatic asbestos removing device, its use and asbestos removing tool
CN104675091A (en) * 2015-02-27 2015-06-03 王永喜 Full-automatic high-efficiency spray coating machine and spray coating method thereof
CN107355063A (en) * 2017-08-30 2017-11-17 浙江工业大学 A kind of wall painting machine
CN108301607A (en) * 2018-04-17 2018-07-20 湖州高锐科技有限公司 A kind of Multifunctional auto brush wall telephone
CN211548632U (en) * 2020-01-10 2020-09-22 黄伟琴 Indoor wall painting device for building decoration
CN111851956A (en) * 2020-08-05 2020-10-30 福州织步曲科技有限公司 Automatic wall painting equipment for emulsion paint stirring
JP2021030046A (en) * 2019-08-27 2021-03-01 呉剛 Cleaning device of old decoration of indoor wall surface
CN214462232U (en) * 2020-12-21 2021-10-22 慧邦大成科技(海南)有限公司 Full-automatic wall plastering device for building decoration
CN114000683A (en) * 2021-10-25 2022-02-01 广东洋艺建设有限公司 Municipal administration building engineering is with wall body outer wall diffusion formula spraying plastics device
EP3960961A1 (en) * 2019-04-26 2022-03-02 Guangdong Bright Dream Robotics Co., Ltd. Spraying robot, control method, and computer readable storage medium

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008248472A (en) * 2007-03-08 2008-10-16 Mentec:Kk Automatic asbestos removing device, its use and asbestos removing tool
CN104675091A (en) * 2015-02-27 2015-06-03 王永喜 Full-automatic high-efficiency spray coating machine and spray coating method thereof
CN107355063A (en) * 2017-08-30 2017-11-17 浙江工业大学 A kind of wall painting machine
CN108301607A (en) * 2018-04-17 2018-07-20 湖州高锐科技有限公司 A kind of Multifunctional auto brush wall telephone
EP3960961A1 (en) * 2019-04-26 2022-03-02 Guangdong Bright Dream Robotics Co., Ltd. Spraying robot, control method, and computer readable storage medium
JP2021030046A (en) * 2019-08-27 2021-03-01 呉剛 Cleaning device of old decoration of indoor wall surface
CN211548632U (en) * 2020-01-10 2020-09-22 黄伟琴 Indoor wall painting device for building decoration
CN111851956A (en) * 2020-08-05 2020-10-30 福州织步曲科技有限公司 Automatic wall painting equipment for emulsion paint stirring
CN214462232U (en) * 2020-12-21 2021-10-22 慧邦大成科技(海南)有限公司 Full-automatic wall plastering device for building decoration
CN114000683A (en) * 2021-10-25 2022-02-01 广东洋艺建设有限公司 Municipal administration building engineering is with wall body outer wall diffusion formula spraying plastics device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2966197A1 (en) * 2022-09-19 2024-04-18 Arrais Gomez Pablo Construction work device (Machine-translation by Google Translate, not legally binding)

Similar Documents

Publication Publication Date Title
CN214186697U (en) Self-cleaning type glass polishing machine
CN110026375B (en) Device is erased to lathe spare part greasy dirt
CN207857471U (en) A kind of full-automatic ingot casting surface cleaning device
CN116748189A (en) Power supply facility cleaning mechanism
CN111940425A (en) Steel pipe surface cleaning device
CN216380438U (en) Wall prosthetic devices for building decoration
CN117000708B (en) Cylinder barrel cleaning device of oil cylinder
CN212826030U (en) Concrete PC component mould platform surface cleaning machine
CN114876164A (en) A damaged repair equipment of wall for urban construction
CN111842236A (en) Photovoltaic board cleaning device
CN217250882U (en) Silicon rod cleaning equipment
CN215785718U (en) Belt cleaning device is used in non ferrous metal calendering production
CN114472280B (en) Surface cleaning system for photovoltaic panel and cleaning method thereof
CN216537290U (en) Filter cloth inner cleaning device for mud-water separation treatment
CN113058959B (en) Food processing is with beer bottle surface cleaning equipment
CN212453654U (en) Device for cleaning and applying release agent on surface of template
CN211307920U (en) Printing roller cleaning mechanism for printing equipment
CN210546579U (en) Light filter substrate decontamination device
CN112523057A (en) Road and bridge marking device
CN113245254A (en) Be used for coating roll scrubbing device
CN220867485U (en) Pretreatment device for hot dip aluminum zinc processing
CN219909814U (en) Automatic demarcation coating spraying auxiliary device
CN221395763U (en) Portable belt cleaning device
CN218309543U (en) Cleaning device for discharge port of drying machine
CN220126957U (en) Tungsten-molybdenum alloy plate cleaning and drying equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20240830

Address after: 7th Floor, Comprehensive Building, Phase IV, Electronic Information Industry Park, Economic and Technological Development Zone, Chizhou City, Anhui Province, China 247100

Applicant after: Chizhou Jingxin Human Resources Service Co.,Ltd.

Country or region after: China

Address before: 710000 room 1301, building 1, building 7, erfuzhuang community, Weiyang District, Xi'an City, Shaanxi Province

Applicant before: Lai Feilei

Country or region before: China