CN114811187B - A dry working cabin for subsea riser replacement - Google Patents

A dry working cabin for subsea riser replacement Download PDF

Info

Publication number
CN114811187B
CN114811187B CN202210434343.3A CN202210434343A CN114811187B CN 114811187 B CN114811187 B CN 114811187B CN 202210434343 A CN202210434343 A CN 202210434343A CN 114811187 B CN114811187 B CN 114811187B
Authority
CN
China
Prior art keywords
cabin
pipe
riser
plate
gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210434343.3A
Other languages
Chinese (zh)
Other versions
CN114811187A (en
Inventor
艾明刚
李民强
胡震亮
杨光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Haisheng Ocean Engineering Group Co ltd
Original Assignee
Shandong Haisheng Ocean Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Haisheng Ocean Engineering Group Co ltd filed Critical Shandong Haisheng Ocean Engineering Group Co ltd
Priority to CN202210434343.3A priority Critical patent/CN114811187B/en
Publication of CN114811187A publication Critical patent/CN114811187A/en
Application granted granted Critical
Publication of CN114811187B publication Critical patent/CN114811187B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/26Repairing or joining pipes on or under water

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

本发明公开了一种海管立管更换干式工作舱,涉及海管立管更换技术领域,包括原海管立管、新海管立管、外舱、内舱、固定机构、移动机构、旋转机构、平衡机构,外舱分为左、右两个空间,中间通过推拉门隔开,外舱右侧空间固定安装内舱,外舱左侧空间上下两端设有安装板,安装板上设有夹紧组件,用于夹紧原海管立管,安装板上设有用于切断后的原海管立管移动的移动机构,外舱右侧空间转动安装齿环,齿环有多个弧形槽,弧形槽至少有一个空槽,弧形槽可卡紧切断的原海管立管或新海管立管,外舱右侧下端设有用于辅助海管立管更换干式工作舱升降和平衡的平衡机构,本发明具有集成化程度高、功能丰富、操作简单的特点。

Figure 202210434343

The invention discloses a dry working cabin for replacing a subsea pipe riser, which relates to the technical field of subsea pipe riser replacement, and includes an original subsea pipe riser, a new subsea pipe riser, an outer cabin, an inner cabin, a fixed mechanism, a moving mechanism, a rotary Mechanism, balance mechanism, the outer cabin is divided into two spaces, left and right, the middle is separated by a sliding door, the space on the right side of the outer cabin is fixedly installed with the inner cabin, and the upper and lower ends of the left space of the outer cabin are provided with mounting plates, which are provided with There is a clamping component for clamping the original sea pipe riser, the mounting plate is provided with a moving mechanism for moving the cut original sea pipe riser, the space on the right side of the outer cabin is rotated to install a toothed ring, and the toothed ring has multiple arcs The curved groove has at least one empty groove. The curved groove can clamp the original subsea pipe riser or new subsea pipe riser that has been cut off. The lower end of the right side of the outer cabin is provided with a dry working cabin lift for assisting the replacement of the subsea pipe riser. and balanced balancing mechanism, the invention has the characteristics of high integration degree, rich functions and simple operation.

Figure 202210434343

Description

一种海管立管更换干式工作舱A sea pipe standpipe replacement dry working cabin

技术领域technical field

本发明涉及海管立管更换技术领域,特别涉及一种海管立管更换干式工作舱。The invention relates to the technical field of replacement of sea pipe standpipes, in particular to a dry working cabin for replacement of sea pipe standpipes.

背景技术Background technique

连接海底和海面上浮体间的管道又称海管立管,主要作用是输送石油或者天然气等,海管立管的维修按照损伤位置不同分为水上维修更换技术和水下维修更换技术,水上维修更换部分多采用常规的方法进行更换,对于水下部分的海管立管多采用人工利用潜水设备或空气潜水技术进行海管立管更换,常常因海管立管重量较大,造成更换困难,不能实现批量更换,导致水下更换海管立管工作难以进行,公开号为CN206206777U的中国专利公开了一种海上平台原油立管维修更换装置,包括装置本体和原油立管,原油立管上固定设有滑轨,装置本体的内侧通过滑轮与滑轨活动连接,装置本体顶部和底部与原油立管之间均固定设有起到密封作用的橡胶圈,装置本体内固定设有人员自由活动的维修舱、存储舱和控制舱,装置本体的顶端和底端均固定设有螺旋桨,该装置通过在海管立管上安装滑轨,利用滑轮与滑轨活动连接,将原有的单个潜水维修设备变为与原油立管为一体的潜水维修设备,但在海管立管外侧安装滑轨成本较大,不易实施,且需要人工进行更换,自动化程度低,因此,本发明提供一种海管立管更换干式工作舱。The pipeline connecting the seabed and the floating body on the sea is also called the sea pipe riser. Its main function is to transport oil or natural gas. The replacement part is mostly replaced by conventional methods. For the underwater part of the sea pipe riser, the sea pipe riser is replaced by manual use of diving equipment or air diving technology, which is often difficult to replace due to the heavy weight of the sea pipe riser. Batch replacement cannot be realized, which makes it difficult to replace the sea pipe riser underwater. The Chinese patent with the publication number CN206206777U discloses a crude oil riser maintenance and replacement device on an offshore platform, including a device body and a crude oil riser. The crude oil riser is fixed on the There are slide rails, and the inner side of the device body is movably connected with the slide rails through pulleys. Rubber rings are fixed between the top and bottom of the device body and the crude oil standpipe, and there are fixed holes for personnel to move freely inside the device body. Maintenance cabin, storage cabin and control cabin, the top and bottom of the device body are fixed with propellers, the device installs slide rails on the riser of the sea tube, and uses pulleys to flexibly connect with the slide rails, and the original single diving maintenance The equipment becomes a diving maintenance equipment integrated with the crude oil riser, but the cost of installing slide rails outside the riser of the sea pipe is relatively high, it is not easy to implement, and manual replacement is required, and the degree of automation is low. Therefore, the present invention provides a The riser replaces the dry working chamber.

发明内容Contents of the invention

本发明要解决的技术问题是:提供一种海管立管更换干式工作舱。The technical problem to be solved by the present invention is to provide a sea pipe riser replacement dry working cabin.

针对上述技术问题,本发明提供的技术方案为:一种海管立管更换干式工作舱,包括原海管立管、新海管立管、外舱、内舱、固定机构、移动机构、旋转机构、平衡机构,所述的新海管立管两端为可伸缩的双层结构;所述的外舱左侧转动安装开合板,外舱分为左、右两个空间,中间通过推拉门隔开,外舱右侧空间固定安装内舱,外舱左侧空间下端设有水泵,用于将海水抽出;所述的开合板可将原海管立管卡在外舱左侧空间内,外舱左侧空间上下两端设有安装板,安装板上设有夹紧组件,用于夹紧原海管立管,外舱右侧空间转动安装齿环,齿环有多个弧形槽,弧形槽至少有一个空槽,所述的弧形槽可卡紧切断的原海管立管或新海管立管,外舱右侧下端设有用于辅助海管立管更换干式工作舱升降和平衡的平衡机构。Aiming at the above-mentioned technical problems, the technical solution provided by the present invention is: a kind of sea pipe riser replacement dry working cabin, including the original sea pipe riser, new sea pipe riser, outer cabin, inner cabin, fixing mechanism, moving mechanism, rotating Mechanism and balance mechanism, the two ends of the riser of the new sea pipe are retractable double-layer structures; Open, the space on the right side of the outer cabin is fixedly installed with the inner cabin, and the lower end of the space on the left side of the outer cabin is provided with a water pump for pumping out seawater; There are mounting plates at the upper and lower ends of the space on the left side. Clamping components are provided on the mounting plate for clamping the original sea pipe riser. The space on the right side of the outer cabin is rotated to install the gear ring. The gear ring has multiple arc-shaped grooves. There is at least one empty slot in the shaped groove. The original sea pipe riser or new sea pipe riser can be clamped and cut off by the arc groove. Balanced balancing mechanism.

所述的安装板上固定安装固定板、气缸支架,固定板分为两层,固定板下层转动安装下齿轮,固定板上层转动安装上齿轮,上齿轮固定安装下中间管第一端,下中间管有三条边,相邻的两条边垂直,下齿轮固定安装控制轴第一端,控制轴第二端通过传动组件和下内管相连接,下中间管内部转动安装下内管,下中间管第二端滑动安装上中间管,上中间管内部转动安装上内管,上内管和下内管滑动连接,上内管上端固定安装电锯Ⅰ,下内管上固定安装电锯Ⅱ,电锯Ⅰ、电锯Ⅱ用于将原海管立管切断,上中间管外侧固定安装上外管,下中间管外侧固定安装下外管,上外管上设有上夹爪,下外管上设有下夹爪,上夹爪、下夹爪通过控制器控制开合,上外管和下外管滑动连接。The fixed plate and the cylinder bracket are fixedly installed on the mounting plate. The fixed plate is divided into two layers. The lower layer of the fixed plate rotates to install the lower gear, and the upper layer of the fixed plate rotates to install the upper gear. The tube has three sides, two adjacent sides are vertical, the lower gear is fixedly installed on the first end of the control shaft, the second end of the control shaft is connected with the lower inner tube through the transmission assembly, the lower inner tube is installed by rotating inside the lower middle tube, and the lower middle tube is installed The second end of the pipe is slidably installed on the upper middle pipe, the upper middle pipe is rotated inside to install the upper inner pipe, the upper inner pipe and the lower inner pipe are slidably connected, the upper end of the upper inner pipe is fixedly installed with electric saw Ⅰ, and the upper end of the lower inner pipe is fixedly installed with electric saw II. Chainsaw Ⅰ and chainsaw Ⅱ are used to cut off the original sea pipe riser. The upper outer pipe is fixedly installed on the outside of the upper middle pipe, and the lower outer pipe is fixedly installed on the outer side of the lower middle pipe. The upper part is provided with the lower jaw, the upper jaw and the lower jaw are opened and closed through the control of the controller, and the upper outer tube and the lower outer tube are slidably connected.

进一步地,所述的气缸支架上固定安装气缸,气缸伸缩杆固定安装移动电机,移动电机输出轴同轴转动控制齿轮,当气缸伸长时,控制齿轮和下齿轮相啮合,当气缸压缩时,控制齿轮和上齿轮相啮合,用于切断后的海管立管移动提供动力。Further, the cylinder is fixedly installed on the cylinder bracket, and the mobile motor is fixedly installed on the telescopic rod of the cylinder, and the output shaft of the mobile motor rotates the control gear coaxially. When the cylinder is extended, the control gear and the lower gear are meshed. When the cylinder is compressed, The control gear and the upper gear are meshed to provide power for the movement of the riser of the sea pipe after cutting.

进一步地,所述的齿环和传动齿轮相啮合,外舱右侧空间固定安装防水板,内舱的下表面固定安装防水板,防水板上转动安装传动齿轮,防水板上固定安装旋转电机,旋转电机转轴上固定安装不完全齿轮,不完全齿轮有齿部分和齿环相啮合,用于齿环间歇性转动。Further, the gear ring is meshed with the transmission gear, the waterproof plate is fixedly installed in the space on the right side of the outer compartment, the waterproof plate is fixedly installed on the lower surface of the inner compartment, the transmission gear is installed on the waterproof plate for rotation, and the rotating motor is fixedly installed on the waterproof plate. The incomplete gear is fixedly installed on the rotating shaft of the rotary motor, and the toothed part of the incomplete gear meshes with the gear ring for intermittent rotation of the gear ring.

进一步地,所述的内舱内部固定安装四个卡座,卡座上固定安装伸缩板,伸缩板中心位置转动安装控制杆,所述的外舱的右侧空间下表面固定安装压重块,控制杆外侧设有压水板、压重块,外舱右侧下端设有多个通水孔,通过改变浮力的大小控制升降。Further, four card holders are fixedly installed inside the inner cabin, a telescopic plate is fixedly installed on the card holder, a control rod is installed at the center of the telescopic plate, and a ballast is fixedly installed on the lower surface of the space on the right side of the outer cabin, The outer side of the control rod is provided with a pressure water plate and a weight block, and the lower end of the right side of the outer cabin is provided with a plurality of water holes, and the lifting is controlled by changing the size of the buoyancy.

进一步地,所述的压重块底部设有涡状槽,压重块下端转动安装圆环,圆环上固定安装连接杆第一端,连接杆第二端固定安装连接头,压重块内转动安装连接头,连接杆上滑动安装平衡块,平衡块上端设在所述的涡状槽内,控制杆下端设有卡键,圆环设有卡槽,所述的卡键长度和圆环长度相同,防止海中暗涌,保持平衡。Further, the bottom of the weight block is provided with a vortex groove, the lower end of the weight block is rotated and installed with a ring, the first end of the connecting rod is fixedly installed on the ring, and the second end of the connecting rod is fixedly installed with a connector. The connecting head is rotated and installed, and the balance weight is slid on the connecting rod. The upper end of the balance weight is set in the vortex groove, the lower end of the control rod is provided with a key, and the ring is provided with a slot. The length of the key and the ring The length is the same to prevent undercurrents in the sea and maintain balance.

进一步地,所述的控制杆设有两段方向相反的螺纹,两段螺纹之间设有光杆,内舱右侧内部下端滑动安装压水板,当压水板和上段螺纹相连接时,压水板向上移动,当压水板和下段螺纹相连接时,压水板向下移动,所述的卡键长度小于所述的光杆长度,所述的卡键和圆环相连接时,压水板和所述的光杆接触,用于辅助工作舱的平衡和升降。Further, the control rod is provided with two threads in opposite directions, a polished rod is arranged between the two threads, and a water pressure plate is slidably installed at the lower end on the right side of the inner cabin. When the water pressure plate is connected to the upper thread, the water pressure plate is The water plate moves upwards. When the water pressure plate is connected with the lower thread, the water pressure plate moves downward. The length of the key is less than the length of the polished rod. When the key is connected with the ring, the water pressure The plate is in contact with the polished rod for assisting the balance and lifting of the working cabin.

进一步地,所述的内舱上端设有门,内舱对应所述的推拉门处设有观察口,所述的观察口上方设有控制器,工人通过控制器更换海管立管,内舱内部设有用于工人所需的必备物品,外舱右侧设有驱动工作舱前进的螺旋桨,外舱右侧设有吊耳,外舱左侧设有通气孔一,内舱底部设有通气孔二,内舱内设置气体增压机,气体增加机中设有放气泵和吸气泵,放气泵和吸气泵两端分别通过三通阀连接阀门A或阀门B,阀门A通过软管穿过内舱连接所述的通气孔一,阀门B通过软管连接所述的通气孔二,用于方便海管立管更换干式工作舱的上升和下降,使工人在干燥的环境下进行工作。Further, the upper end of the inner cabin is provided with a door, and the inner cabin is provided with an observation port corresponding to the sliding door, and a controller is provided above the observation port, and the worker replaces the riser of the sea pipe through the controller, and the inner cabin The interior is equipped with necessary items for workers. The right side of the outer cabin is equipped with a propeller that drives the working cabin forward. Air hole 2, a gas booster is installed in the inner cabin, and the gas booster is equipped with an air discharge pump and an air suction pump. The two ends of the air discharge pump and the air suction pump are respectively connected to valve A or valve B through a three-way valve. Pass through the inner cabin to connect the vent hole 1, and the valve B is connected to the vent hole 2 through a hose, which is used to facilitate the rise and fall of the sea pipe standpipe to replace the dry working cabin, so that the workers can carry out the work in a dry environment. Work.

进一步地,所述的外舱左侧和开合板上下两端设有圆弧通孔,所述的圆弧通孔外侧设有橡胶圈,所述的推拉门上下两侧固定安装安装板,所述的安装板左端设有水平的长槽,安装板右端设有垂直的滑槽,所述的滑槽上反向滑动夹紧板Ⅰ、夹紧板Ⅱ,用于夹紧原海管立管。Further, the left side of the outer cabin and the upper and lower ends of the opening and closing plate are provided with circular arc through holes, the outer side of the circular arc through hole is provided with rubber rings, and the upper and lower sides of the sliding door are fixedly installed with mounting plates. The left end of the mounting plate is provided with a horizontal long groove, and the right end of the mounting plate is provided with a vertical chute, and the clamping plate Ⅰ and clamping plate Ⅱ are reversely slid on the chute to clamp the original sea pipe riser. .

本发明与现有技术相比的有益效果是:(1)本发明设置的移动机构和旋转机构相配合,实现自动化更换海管立管,移动机构内设置外管、中间管、内管将原海管立管的切断后移动至外舱右侧空间,结合旋转机构间歇转动将新海管立管转出,新海管立管两端设置为可伸缩的双层结构,通过气缸将新海管立管伸长,卡在原海管立管切断处,实现批量快速更换海管立管;(2)本发明设置外舱和内舱,双层工作舱可以更好的抵抗海中的压力,外舱通过推拉门隔离成两个封闭的空间,避免海水进入,工人在内舱通过控制器控制更换海管立管,保证更换过程中的安全性和舱内干燥环境;(3)本发明在外舱右侧空间下方设置平衡机构,利用平衡块沿压重块底部涡状槽移动,保证海管立管更换干式工作舱的平衡性,抵抗海中暗涌,防止倾斜,同时控制外舱右侧下端排水量,改变浮力,辅助海管立管更换干式工作舱的上升和下降的高度。Compared with the prior art, the present invention has the beneficial effects as follows: (1) The moving mechanism and the rotating mechanism provided in the present invention cooperate to realize the automatic replacement of the sea pipe standpipe, and the outer pipe, the middle pipe and the inner pipe are arranged in the moving mechanism to replace the original After the sea pipe riser is cut off, it moves to the space on the right side of the outer cabin, and the new sea pipe riser is rotated out in combination with the intermittent rotation of the rotating mechanism. Elongated, stuck at the cut-off place of the original sea pipe riser, realizing rapid replacement of the sea pipe riser in batches; (2) The present invention has an outer cabin and an inner cabin, and the double-layer working cabin can better resist the pressure in the sea, and the outer cabin can be pushed and pulled The door is separated into two closed spaces to avoid the entry of seawater. The workers in the inner cabin control the replacement of the sea pipe standpipe through the controller to ensure the safety during the replacement process and the dry environment in the cabin; (3) the present invention is located in the space on the right side of the outer cabin A balance mechanism is set at the bottom, and the balance block is used to move along the vortex groove at the bottom of the weight block to ensure the balance of the sea pipe standpipe replacing the dry working cabin, resist the undercurrent in the sea, prevent tilting, and control the displacement at the lower end of the outer cabin at the same time to change Buoyancy, auxiliary sea pipe riser replaces the height of ascent and descent of the dry working compartment.

附图说明Description of drawings

图1为本发明整体结构示意图。Figure 1 is a schematic diagram of the overall structure of the present invention.

图2为本发明固定机构结构示意图(后视角度)。Fig. 2 is a schematic diagram of the structure of the fixing mechanism of the present invention (back view angle).

图3为本发明固定机构结构示意图(前视角度)。Fig. 3 is a schematic diagram of the structure of the fixing mechanism of the present invention (front view angle).

图4为本发明夹紧组件结构示意图。Fig. 4 is a schematic structural diagram of the clamping assembly of the present invention.

图5为本发明移动机构结构第一示意图。Fig. 5 is the first schematic diagram of the structure of the moving mechanism of the present invention.

图6为本发明移动机构结构第二示意图。Fig. 6 is a second schematic diagram of the structure of the moving mechanism of the present invention.

图7为本发明旋转机构结构示意图。Fig. 7 is a structural schematic diagram of the rotating mechanism of the present invention.

图8为本发明平衡机构结构第一示意图。Fig. 8 is the first schematic diagram of the structure of the balance mechanism of the present invention.

图9为本发明平衡机构结构第二示意图。Fig. 9 is a second schematic diagram of the structure of the balance mechanism of the present invention.

图10为本发明气体增加机连接管路示意图。Fig. 10 is a schematic diagram of the connecting pipeline of the gas booster of the present invention.

附图标号:1-外舱;2-内舱;3-固定机构;4-移动机构;5-旋转机构;6-平衡机构;7-原海管立管;8-新海管立管;301-开合电机;302-开合电机支架;303-开合轴;304-开合板;305-安装板;306-夹紧组件;3061-夹紧电机;3062-齿轮;3063-丝杠;3064-夹紧板Ⅰ;3065-夹紧板Ⅱ;3066-导向杆;3067-导向杆支架;3068-丝杠支架;401-气缸;402-移动电机;403-控制齿轮;404-气缸支架;405-固定板;406-下齿轮;407-上齿轮;408-下中间管;409-上中间管;410-上外管;411-下外管;412-上夹爪;413-下夹爪;414-上撑板;415-下撑板;416-气缸Ⅰ;417-气缸Ⅱ;418-电锯Ⅰ;419-电锯Ⅱ;420-上内管;421-下内管;422-左带轮;423-传送带;424-右带轮;425-控制轴;501-防水板;502-旋转电机;503-不完全齿轮;504-齿环;505-传动齿轮;601-卡座;602-伸缩板;603-伸缩气缸;604-平衡电机;605-主动齿轮;606-从动齿轮;607-控制杆;608-压水板;609-压重块;610-圆环;611-连接杆;612-连接头;613-平衡块。Reference numerals: 1-outer cabin; 2-inner cabin; 3-fixed mechanism; 4-moving mechanism; 5-rotating mechanism; 6-balance mechanism; 7-original sea pipe riser; 8-new sea pipe riser; -opening and closing motor; 302-opening and closing motor bracket; 303-opening and closing shaft; 304-opening and closing plate; 305-installation plate; 306-clamping assembly; - clamping plate Ⅰ; 3065- clamping plate Ⅱ; 3066- guide rod; 3067- guide rod bracket; 3068- lead screw bracket; 401- cylinder; 402- mobile motor; 403- control gear; - fixed plate; 406 - lower gear; 407 - upper gear; 408 - lower middle tube; 409 - upper middle tube; 410 - upper outer tube; 411 - lower outer tube; 412 - upper jaw; 413 - lower jaw; 414-upper support plate; 415-lower support plate; 416-cylinder Ⅰ; 417-cylinder Ⅱ; 418-chainsaw Ⅰ; 419-chainsaw Ⅱ; 420-upper inner tube; Wheel; 423-conveyor belt; 424-right pulley; 425-control shaft; 501-waterproof plate; 502-rotary motor; 503-incomplete gear; 504-gear ring; Telescopic plate; 603- telescopic cylinder; 604- balance motor; 605- driving gear; 606- driven gear; 607- control rod; ; 612-connector; 613-balance weight.

具体实施方式Detailed ways

下面结合附图并通过具体实施方式来进一步说明本发明的技术方案。The technical solutions of the present invention will be further described below in conjunction with the accompanying drawings and through specific implementation methods.

其中,附图仅用于示例性说明,表示的仅是示意图,而非实物图,不能理解为对本专利的限制;为了更好地说明本发明的实施例,附图某些部件会有省略、放大或缩小,并不代表实际产品的尺寸;对本领域技术人员来说,附图中某些公知结构及其说明可能省略是可以理解的。Wherein, the accompanying drawings are only for illustrative purposes, showing only schematic diagrams, rather than physical drawings, and should not be construed as limitations on this patent; in order to better illustrate the embodiments of the present invention, some parts of the accompanying drawings will be omitted, Enlargement or reduction does not represent the size of the actual product; for those skilled in the art, it is understandable that certain known structures and their descriptions in the drawings may be omitted.

实施例:如图1-图10所示的一种海管立管更换干式工作舱,包括外舱1、内舱2、固定机构3、移动机构4、旋转机构5、平衡机构6、原海管立管7、新海管立管8,外舱1左侧转动安装开合板304,外舱1分为左、右两个空间,中间通过推拉门隔开,外舱1左侧设有通气孔一,外舱1右侧空间固定安装内舱2,内舱2的上端设有用于工人进入的门,内舱2对应外舱1推拉门处设有观察口,用于观察更换海管立管工作,观察口的上方设有控制器,工人通过控制器更换海管立管,内舱2底部设有通气孔二,内舱2内部设有用于工人工作所需的必备物品,外舱1的右侧设有驱动工作舱前进的螺旋桨,外舱1的右侧设有吊耳,用于起吊海管立管干式工作舱,外舱1左侧空间下端设有水泵,用于将外舱1左侧空间的海水抽出,内舱2内设置气体增压机,气体增加机中设有放气泵和吸气泵,放气泵和吸气泵两端分别通过三通阀连接阀门A或阀门B,阀门A通过软管穿过内舱2连接通气孔一,阀门B通过软管连接通气孔二。Embodiment: A kind of sea pipe riser replacement dry-type working cabin as shown in Fig. 1-Fig. The sea pipe riser 7, the new sea pipe riser 8, the left side of the outer cabin 1 is rotated and the opening and closing plate 304 is installed, the outer cabin 1 is divided into two spaces, left and right, separated by a sliding door in the middle, and the left side of the outer cabin 1 is provided with a passageway. Air hole 1, the inner cabin 2 is fixedly installed in the space on the right side of the outer cabin 1, the upper end of the inner cabin 2 is provided with a door for workers to enter, and the inner cabin 2 is provided with an observation port corresponding to the sliding door of the outer cabin 1, which is used to observe and replace the sea tube stand There is a controller above the observation port, through which workers can replace the riser of the sea pipe. There is a vent hole 2 at the bottom of the inner cabin 2. Inside the inner cabin 2, there are necessary items for workers to work. The outer cabin The right side of the outer cabin 1 is provided with a propeller to drive the working cabin forward, the right side of the outer cabin 1 is provided with lifting lugs for lifting the dry working cabin of the sea pipe riser, and the lower end of the space on the left side of the outer cabin 1 is provided with a water pump for The seawater in the space on the left side of the outer cabin 1 is pumped out, and a gas booster is installed in the inner cabin 2. The gas booster is equipped with a deflation pump and a suction pump, and the two ends of the deflation pump and the suction pump are respectively connected to valve A or Valve B and valve A pass through the inner cabin 2 to connect to the vent hole 1 through a flexible pipe, and valve B connects to the vent hole 2 through a flexible pipe.

外舱1左侧上端固定安装开合电机支架302,开合电机支架302下端固定安装开合电机301,开合电机301输出轴同轴转动开合轴303,外舱1左侧转动安装开合轴303,开合板304后侧固定安装开合轴303,外舱1的左侧和开合板304上下两端设有圆弧通孔,圆弧通孔外侧设有橡胶圈,用于适应不同直径的海管立管,外舱1左侧空间内设有上下两个安装板305,安装板305右侧固定安装外舱1推拉门上下两侧,安装板305左端水平方向设有长槽,便于原海管立管7的进入,安装板305上右端设有垂直方向的滑槽,安装板305上设有夹紧组件306,用于夹紧原海管立管7。The opening and closing motor bracket 302 is fixedly installed on the upper left side of the outer cabin 1, and the opening and closing motor 301 is fixedly installed on the lower end of the opening and closing motor bracket 302. The shaft 303 and the rear side of the opening and closing plate 304 are fixedly installed with the opening and closing shaft 303. The left side of the outer cabin 1 and the upper and lower ends of the opening and closing plate 304 are provided with arc through holes, and the outside of the arc through holes is provided with rubber rings for adapting to different diameters. Two mounting plates 305 up and down are arranged in the space on the left side of the outer cabin 1, the upper and lower sides of the sliding door of the outer cabin 1 are fixedly installed on the right side of the mounting plate 305, and the left end of the mounting plate 305 is horizontally provided with a long groove for easy When the original sea pipe riser 7 enters, the upper right end of the mounting plate 305 is provided with a vertical chute, and the mounting plate 305 is provided with a clamping assembly 306 for clamping the original sea pipe riser 7 .

夹紧组件306包括滑动安装在安装板305滑槽上的夹紧板Ⅰ3064、夹紧板Ⅱ3065,夹紧板Ⅰ3064和夹紧板Ⅱ3065用于将原海管立管7夹紧,安装板305上固定安装夹紧电机3061,夹紧电机3061输出轴同轴转动安装齿轮3062,齿轮3062和丝杠3063固定连接,丝杠3063两侧螺纹相反,安装板305上固定安装导向杆支架3067、丝杠支架3068,导向杆支架3067上固定安装导向杆3066,丝杠支架3068上转动安装丝杠3063,夹紧板Ⅰ3064和导向杆3066滑动连接,夹紧板Ⅰ3064和丝杠3063螺纹连接,夹紧板Ⅱ3065和导向杆3066滑动连接,夹紧板Ⅱ3065和丝杠3063螺纹连接。The clamping assembly 306 includes the clamping plate I3064 and the clamping plate II3065 which are slidably installed on the chute of the mounting plate 305. The clamping plate I3064 and the clamping plate II3065 are used to clamp the original sea pipe riser 7. Clamping motor 3061 is fixedly installed, and the output shaft of clamping motor 3061 rotates coaxially. Gear 3062 is installed, and gear 3062 is fixedly connected with leading screw 3063. The threads on both sides of leading screw 3063 are opposite, and guide rod bracket 3067 and leading screw are fixedly installed on the mounting plate 305. Bracket 3068, guide rod 3066 is fixedly installed on guide rod bracket 3067, lead screw 3063 is rotated on screw bracket 3068, clamping plate I 3064 is slidingly connected with guide rod 3066, clamping plate I 3064 is threadedly connected with lead screw 3063, clamping plate II 3065 is in sliding connection with the guide rod 3066, and the clamping plate II 3065 is in screw connection with the lead screw 3063.

下端安装板305上固定安装气缸支架404、固定板405,气缸支架404上固定安装气缸401、气缸401伸缩杆固定安装移动电机402,移动电机402转轴上固定安装控制齿轮403,固定板405分为两层,固定板405下层转动安装下齿轮406,固定板405上层转动安装上齿轮407,上齿轮407固定安装下中间管408第一端,下齿轮406固定安装控制轴425第一端,当气缸401伸长时,控制齿轮403和下齿轮406相啮合,当气缸401压缩时,控制齿轮403和上齿轮407相啮合,控制轴425设在下中间管408的内侧。Cylinder support 404 and fixed plate 405 are fixedly installed on the lower end mounting plate 305, cylinder 401 is fixedly installed on the cylinder support 404, and the telescoping rod of cylinder 401 is fixedly installed with mobile motor 402, and control gear 403 is fixedly installed on the rotating shaft of mobile motor 402, and fixed plate 405 is divided into Two layers, the lower layer of the fixed plate 405 is rotatably installed with the lower gear 406, the upper layer of the fixed plate 405 is rotatably installed with the upper gear 407, the upper gear 407 is fixedly installed with the first end of the lower middle pipe 408, and the lower gear 406 is fixedly installed with the first end of the control shaft 425, when the cylinder When 401 is stretched, the control gear 403 is engaged with the lower gear 406, and when the cylinder 401 is compressed, the control gear 403 is engaged with the upper gear 407, and the control shaft 425 is arranged on the inner side of the lower intermediate pipe 408.

下中间管408第二端和上中间管409滑动连接,上中间管409外侧固定安装上外管410,下中间管408第二端外侧固定安装下外管411,下中间管408有三条边,相邻的两条边垂直,上外管410上端设有上夹爪412,下外管411下端设有下夹爪413,上夹爪412、下夹爪413通过控制器控制开合,用于夹紧原海管立管7或新海管立管8,上外管410上固定安装上撑板414,下外管411上固定安装下撑板415,气缸Ⅰ416、气缸Ⅱ417固定连接,气缸Ⅰ416伸缩杆固定安装上撑板414,气缸Ⅱ417伸缩杆固定安装下撑板415,气缸Ⅰ416、气缸Ⅱ417用于控制上外管410、下外管411的伸缩,上中间管409内部转动安装上内管420,下中间管408内部转动安装下内管421,上内管420上端设有电锯Ⅰ418,下内管421下端设有电锯Ⅱ419,电锯Ⅰ418、电锯Ⅱ419用于将原海管立管7切断,气缸Ⅱ417、电锯Ⅰ418之间距离小于外舱1推拉门的高度,保证切断后的原海管立管7可以进入外舱1的右侧空间,下内管421下端固定安装左带轮422,控制轴425第二端固定安装右带轮424,传送带423设在左带轮422、右带轮424的外侧。The second end of the lower middle pipe 408 is slidingly connected to the upper middle pipe 409. The upper outer pipe 410 is fixedly installed outside the upper middle pipe 409, and the lower outer pipe 411 is fixedly installed outside the second end of the lower middle pipe 408. The lower middle pipe 408 has three sides. The two adjacent sides are vertical, the upper end of the upper outer tube 410 is provided with an upper jaw 412, and the lower end of the lower outer tube 411 is provided with a lower jaw 413, and the upper jaw 412 and the lower jaw 413 are opened and closed through the control of the controller. Clamp the original sea pipe standpipe 7 or the new sea pipe standpipe 8, fix the upper support plate 414 on the upper outer pipe 410, fix the lower support plate 415 on the lower outer pipe 411, fixedly connect the cylinder I 416, cylinder II 417, and expand the cylinder I 416 The upper support plate 414 is fixedly installed on the rod, and the lower support plate 415 is fixedly installed on the telescopic rod of the cylinder II417. The cylinder I416 and II417 are used to control the expansion and contraction of the upper outer tube 410 and the lower outer tube 411. , the lower middle tube 408 is rotated to install the lower inner tube 421, the upper end of the upper inner tube 420 is provided with a chainsaw I418, the lower end of the lower inner tube 421 is provided with a chainsaw II419, and the chainsaw I418 and the chainsaw II419 are used to turn the original sea pipe standpipe 7 Cut off, the distance between the cylinder II 417 and the chainsaw I 418 is less than the height of the sliding door of the outer cabin 1, to ensure that the original sea pipe standpipe 7 after cutting can enter the right space of the outer cabin 1, and the lower end of the lower inner pipe 421 is fixedly installed with the left belt The wheel 422 and the second end of the control shaft 425 are fixedly installed with the right pulley 424 , and the conveyor belt 423 is located on the outside of the left pulley 422 and the right pulley 424 .

外舱1右侧空间内部转动安装齿环504,齿环504上设有多个弧形槽,弧形槽可以卡住新海管立管8或切断的原海管立管7,弧形槽至少有一个空槽,便于存放切断的原海管立管7,内舱2的下表面固定安装防水板501,通过防水板501将外舱1右侧空间隔成上下两个空间,防水板501上固定安装旋转电机502,旋转电机502转轴上固定安装不完全齿轮503,不完全齿轮503有齿部分和齿环504相啮合,防水板501上转动安装两个传动齿轮505,传动齿轮505和齿环504相啮合,新海管立管8上下两端为双层可伸缩结构,连接处为密封条,保证密封性。The space on the right side of the outer cabin 1 rotates and installs the toothed ring 504, and the toothed ring 504 is provided with a plurality of arc grooves, which can hold the new sea pipe riser 8 or the cut original sea pipe riser 7, and the arc grooves are at least There is an empty slot, which is convenient for storing the cut-off original sea pipe standpipe 7. The lower surface of the inner cabin 2 is fixedly installed with a waterproof board 501, and the space on the right side of the outer cabin 1 is separated into two spaces up and down by the waterproof board 501. The rotating motor 502 is fixedly installed, and the incomplete gear 503 is fixedly installed on the rotating shaft of the rotating motor 502. The toothed part of the incomplete gear 503 meshes with the gear ring 504. Two transmission gears 505, the transmission gear 505 and the gear ring are installed on the waterproof plate 501 for rotation. 504 are meshed, the upper and lower ends of the new sea pipe riser 8 are double-layer retractable structures, and the joints are sealed to ensure airtightness.

内舱2的内部固定安装四个卡座601,便于工作人员休息,卡座601上固定安装伸缩板602,伸缩板602中心位置转动安装控制杆607上端,内舱2上固定安装伸缩气缸603,伸缩气缸603伸缩杆固定安装伸缩板602,伸缩板602上固定安装平衡电机604,平衡电机604转轴上固定安装主动齿轮605,主动齿轮605和从动齿轮606相啮合,控制杆607上固定安装从动齿轮606,外舱1右侧空间下端设有多个通水孔,控制杆607上设有两段螺纹,两段螺纹方向相反,两端螺纹之间有光杆部分,控制杆607外侧设有压水板608,外舱1右侧空间下端通过花键滑动安装压水板608,当控制杆607上段螺纹和压水板608连接时,压水板608向上移动,当控制杆607下段螺纹和压水板608连接时,压水板608向下移动,当控制杆607中间光杆部分和压水板608连接时,压水板608不移动。Four decks 601 are fixedly installed in the interior of the inner cabin 2, which is convenient for the staff to have a rest. The telescopic plate 602 is fixedly installed on the deck 601, and the center position of the telescopic plate 602 is rotated to install the upper end of the control rod 607, and the telescopic cylinder 603 is fixedly installed on the inner cabin 2. Telescopic cylinder 603 telescopic rod fixedly installs telescopic plate 602, fixedly installs balance motor 604 on the telescopic plate 602, fixedly installs driving gear 605 on the balance motor 604 rotating shaft, driving gear 605 and driven gear 606 are meshed, and is fixedly installed on the control rod 607 from Moving gear 606, the lower end of the space on the right side of the outer cabin 1 is provided with a plurality of water holes, and the control rod 607 is provided with two sections of thread, and the direction of the two sections of threads is opposite. Press water plate 608, and the lower end of the space on the right side of outer cabin 1 slides and installs press water plate 608 through splines. When the thread on the upper section of the control rod 607 is connected to the water press plate 608, the water press plate 608 moves upward. When the thread on the lower section of the control rod 607 and When the water pressure plate 608 is connected, the water pressure plate 608 moves downward, and when the polished rod part in the middle of the control rod 607 is connected with the water pressure plate 608, the water pressure plate 608 does not move.

外舱1右侧空间下表面固定安装压重块609,控制杆607下端设有压重块609,压重块609下端设有涡状槽,压重块609下端转动安装圆环610,圆环610固定安装连接杆611第一端,连接杆611第二固定安装连接头612,压重块609内转动安装连接头612,连接杆611上滑动安装平衡块613,平衡块613上端设在压重块609涡状槽内,控制杆607下端设有卡键,圆环610设有卡槽,卡键长度和圆环610长度相同,卡键长度小于控制杆607螺纹中间光杆长度,当卡键和圆环610相连接时,压水板608和光杆接触,通过改变平衡块613位置控制压重块609的重量,避免在海中晃动。A ballast 609 is fixedly installed on the lower surface of the space on the right side of the outer cabin 1, and the lower end of the control rod 607 is provided with a ballast 609. 610 is fixedly installed with the first end of the connecting rod 611, the second fixedly installed connecting head 612 of the connecting rod 611, the connecting head 612 is rotated and installed in the weight block 609, the balancing weight 613 is slidably installed on the connecting rod 611, and the upper end of the balancing weight 613 is arranged on the weighted weight In the vortex groove of the block 609, the lower end of the control rod 607 is provided with a card key, and the ring 610 is provided with a card groove. The length of the card key is the same as that of the ring 610. When the rings 610 are connected, the pressure water plate 608 is in contact with the polished rod, and the weight of the pressure weight 609 is controlled by changing the position of the balance weight 613 to avoid shaking in the sea.

本发明公开的一种海管立管更换干式工作舱的工作原理为:当需要更换海管立管时,工人进入内舱2中,通过控制器控制海管立管干式工作舱,通过钢索连接外舱1上吊耳,将外舱1放入海中,零件连接处设有密封条,避免外舱1中进水,涉及到的电机为防水电机,通过平衡电机604控制控制杆607,控制杆607上端螺纹和压水板608相连接,平衡电机604通过齿轮传动带动控制杆607转动,带动压水板608上移,同时通过阀门B和吸气泵,控制压水板608和防水板501之间的压强,海水从外舱1通水孔进入,加重外舱1的重量,便于外舱1下沉至海中合适位置,当遇到海中暗涌时,外舱1开始晃动,控制杆607下端和圆环610相连接,带动平衡块613改变位置,改变外舱1的负重,进而减少晃动,通过开合电机301控制开合板304转动,将原海管立管7卡在外舱1的左侧空间和开合板304之间,通过夹紧电机3061转动,带动齿轮3062转动,带动丝杠3063转动,带动夹紧板Ⅰ3064、夹紧板Ⅱ3065将原海管立管7夹紧,打开外舱1左侧空间的水泵,将海水抽出,同时通过控制阀门A和放气泵,控制外舱1左侧空间的压强,打开外舱1中间的推拉门,此时齿环504上空弧形槽正对原海管立管7,上夹爪412、下夹爪413将原海管立管7夹紧,伸长气缸401,移动电机402带动控制齿轮403转动,带动下齿轮406转动,带动控制轴425转动,通过带传动带动下内管421转动,带动上内管420转动,带动电锯Ⅰ418、电锯Ⅱ419转动,电锯Ⅰ418、电锯Ⅱ419将原海管立管7切断,压缩气缸401,移动电机402通过控制齿轮403带动上齿轮407转动,带动下中间管408转动,带动上中间管409转动,带动上外管410、下外管411转动,通过上夹爪412、下夹爪413将切断后的原海管立管7移动至齿环504空弧形槽内,启动旋转电机502带动不完全齿轮503转动,带动齿环504转动,将新海管立管8正对原海管立管7,上夹爪412、下夹爪413将新海管立管8两端夹紧,通过移动电机402反向转动将新海管立管8移动至原海管立管7处,伸长气缸Ⅰ416、气缸Ⅱ417,带动新海管立管8两端伸长,由于新海管立管8的两端为双层可伸缩结构,新海管立管8卡入原海管立管7的内外端,完成单次更换,当所有海管立管更换完成后,通过伸缩气缸603控制控制杆607,控制杆607下端螺纹和压水板608相连接,平衡电机604带动压水板608向下运动,同时通过阀门B和放气泵,控制压水板608和防水板501之间的压强,减少外舱1内海水,增加外舱1上升的浮力。The working principle of a sea pipe riser replacement dry-type working cabin disclosed by the present invention is as follows: when the sea pipe riser needs to be replaced, the worker enters the inner cabin 2, controls the sea pipe riser dry-type working cabin through the controller, and passes The steel cable is connected to the upper lug of the outer cabin 1, and the outer cabin 1 is put into the sea. A sealing strip is provided at the joint of the parts to prevent water from entering the outer cabin 1. The motor involved is a waterproof motor, and the control rod 607 is controlled by the balance motor 604. The thread on the upper end of the control rod 607 is connected with the pressure water plate 608, and the balance motor 604 drives the control rod 607 to rotate through the gear transmission, driving the water pressure plate 608 to move up, and at the same time, through the valve B and the suction pump, the water pressure plate 608 and the waterproof plate are controlled The pressure between 50 and 1, the sea water enters from the water hole of the outer cabin 1, which increases the weight of the outer cabin 1, so that the outer cabin 1 can sink to a suitable position in the sea. The lower end of 607 is connected with the ring 610, which drives the balance weight 613 to change the position, changes the load of the outer cabin 1, and then reduces the shaking. The opening and closing plate 304 is controlled by the opening and closing motor 301 to rotate, and the original sea pipe standpipe 7 is stuck in the outer cabin 1. Between the space on the left side and the opening and closing plate 304, the rotation of the clamping motor 3061 drives the rotation of the gear 3062 and the rotation of the lead screw 3063, and drives the clamping plate I 3064 and the clamping plate II 3065 to clamp the original sea pipe standpipe 7 and open the outer shell. The water pump in the space on the left side of the cabin 1 pumps out the sea water, and at the same time controls the pressure in the space on the left side of the outer cabin 1 through the control valve A and the deflation pump, and opens the sliding door in the middle of the outer cabin 1. At this time, the arc groove in the space above the gear ring 504 is For the original sea pipe riser 7, the upper jaw 412 and the lower jaw 413 clamp the original sea pipe riser 7, the cylinder 401 is extended, the moving motor 402 drives the control gear 403 to rotate, drives the lower gear 406 to rotate, and drives the control shaft Rotate at 425, drive the lower inner tube 421 to rotate through the belt drive, drive the upper inner tube 420 to rotate, drive the chainsaw I418, the chainsaw II419 to rotate, the chainsaw I418, the chainsaw II419 cut off the original sea pipe standpipe 7, and compress the cylinder 401, The mobile motor 402 drives the upper gear 407 to rotate through the control gear 403, drives the lower middle pipe 408 to rotate, drives the upper middle pipe 409 to rotate, and drives the upper outer pipe 410 and the lower outer pipe 411 to rotate, and the upper jaw 412 and the lower jaw 413 will The original sea pipe standpipe 7 after cutting is moved into the hollow arc groove of the gear ring 504, the rotating motor 502 is started to drive the incomplete gear 503 to rotate, and the gear ring 504 is driven to rotate, and the new sea pipe riser 8 is facing the original sea pipe riser 7. The upper jaw 412 and the lower jaw 413 clamp the two ends of the new sea pipe riser 8, and the new sea pipe riser 8 is moved to the original sea pipe riser 7 through the reverse rotation of the moving motor 402, and the cylinder I 416, Cylinder Ⅱ 417 drives the extension of both ends of the new sea pipe riser 8. Since the two ends of the new sea pipe riser 8 are double-layer retractable structures, the new sea pipe riser 8 snaps into the inner and outer ends of the original sea pipe riser 7 to complete a single Replacement, when all sea pipe standpipes are replaced, control the control rod 607 through the telescopic cylinder 603, and the lower end thread of the control rod 607 is connected with the pressure water plate 608 Then, the balance motor 604 drives the pressure water plate 608 to move downward, and at the same time, through the valve B and the deflation pump, the pressure between the pressure water plate 608 and the waterproof plate 501 is controlled to reduce the seawater in the outer cabin 1 and increase the buoyancy of the outer cabin 1. .

本发明不局限上述具体实施方式,所属技术领域的技术人员从上述构思出发,不经过创造性的劳动,做出的种种变换,均落在本发明的保护范围之内。The present invention is not limited to the above-mentioned specific implementation manners, and various transformations made by those skilled in the art starting from the above-mentioned concepts without creative work all fall within the protection scope of the present invention.

Claims (8)

1. The utility model provides a dry-type work cabin is changed to sea pipe riser, includes former sea pipe riser (7), new sea pipe riser (8), its characterized in that: the marine riser comprises an outer cabin (1), an inner cabin (2), a fixing mechanism (3), a moving mechanism (4), a rotating mechanism (5) and a balancing mechanism (6), wherein two ends of a new marine riser (8) are of telescopic double-layer structures; an opening plate (304) is rotatably arranged on the left side of the outer cabin (1), the outer cabin (1) is divided into a left space and a right space, the middle space is separated by a sliding door, an inner cabin (2) is fixedly arranged in the right space of the outer cabin (1), and a water pump is arranged at the lower end of the left space of the outer cabin (1) and used for pumping out seawater; the split plate (304) can clamp an original marine pipe riser (7) in the space on the left side of the outer cabin (1), mounting plates (305) are arranged at the upper end and the lower end of the space on the left side of the outer cabin (1), a clamping assembly (306) is arranged on each mounting plate (305) and used for clamping the original marine pipe riser (7), a toothed ring (504) is rotatably mounted in the space on the right side of the outer cabin (1), the toothed ring (504) is provided with a plurality of arc-shaped grooves, at least one hollow groove is formed in each arc-shaped groove, the arc-shaped grooves can clamp the cut original marine pipe riser (7) or a new marine pipe riser (8), and a balance mechanism (6) used for assisting the lifting and balancing of a dry-type marine pipe riser replacing working cabin is arranged at the lower end on the right side of the outer cabin (1);
a fixed plate (405) and a cylinder bracket (404) are fixedly arranged on the mounting plate (305), the fixed plate (405) is divided into two layers, a lower gear (406) is rotatably arranged on the lower layer of the fixed plate (405), an upper gear (407) is rotatably arranged on the upper layer of the fixed plate (405), a first end of a lower middle pipe (408) is fixedly arranged on the upper gear (407), the lower middle pipe (408) is provided with three edges, two adjacent edges are vertical, a first end of a control shaft (425) is fixedly arranged on the lower gear (406), a second end of the control shaft (425) is connected with a lower inner pipe (421) through a transmission assembly, the lower inner pipe (421) is rotatably arranged in the lower middle pipe (408), an upper middle pipe (409) is slidably arranged at the second end of a lower middle pipe (408), an upper inner pipe (420) is rotatably arranged in the upper middle pipe (409), the upper inner pipe (420) is slidably connected with a lower inner pipe (421), an electric saw I (418) is fixedly arranged at the upper end of the upper inner pipe (420), an electric saw II (419) is fixedly arranged on the lower inner pipe (421), the electric saw I (418) and the electric saw II (419) are used for cutting off an original marine pipe riser (7), an upper outer pipe (410) is fixedly arranged on the outer side of the upper middle pipe (409), a lower outer pipe (411) is fixedly arranged on the outer side of the lower middle pipe (408), an upper clamping jaw (412) is arranged on the upper outer pipe (410), and a lower clamping jaw (413) is arranged on the lower outer pipe (411), the upper clamping jaw (412) and the lower clamping jaw (413) are controlled to open and close through a controller, and the upper outer pipe (410) is connected with the lower outer pipe (411) in a sliding mode.
2. The dry-working vessel for sea riser replacement according to claim 1, wherein: the air cylinder bracket (404) is fixedly provided with an air cylinder (401), an expansion rod of the air cylinder (401) is fixedly provided with a moving motor (402), an output shaft of the moving motor (402) coaxially rotates a control gear (403), when the air cylinder (401) expands, the control gear (403) is meshed with a lower gear (406), and when the air cylinder (401) compresses, the control gear (403) is meshed with an upper gear (407).
3. The dry-working vessel for sea riser replacement according to claim 2, wherein: the novel water-proof cabin is characterized in that the toothed ring (504) is meshed with the transmission gear (505), the waterproof plate (501) is fixedly installed in the right space of the outer cabin (1), the waterproof plate (501) is fixedly installed on the lower surface of the inner cabin (2), the transmission gear (505) is rotatably installed on the waterproof plate (501), the rotating motor (502) is fixedly installed on the waterproof plate (501), the incomplete gear (503) is fixedly installed on the rotating shaft of the rotating motor (502), and the toothed part of the incomplete gear (503) is meshed with the toothed ring (504).
4. The dry-working vessel for sea riser replacement according to claim 3, wherein: four cassette (601) of inside fixed mounting of interior cabin (2), fixed mounting expansion plate (602) on cassette (601), expansion plate (602) central point puts and rotates installation control lever (607), fixed surface installs ballast weight (609) under the right side space of outer cabin (1), and the control lever (607) outside is equipped with pressurized-water plate (608), ballast weight (609), and outer cabin (1) right side lower extreme is equipped with a plurality of limbers.
5. The dry-working vessel for sea riser replacement according to claim 4, wherein: the utility model discloses a ballast block, including ballast block (609), connecting rod (611) and connecting rod (611), ballast block (609) bottom be equipped with the vortex groove, ballast block (609) lower extreme rotation installation ring (610), the first end of fixed mounting connecting rod (611) is gone up in ring (610), connecting rod (611) second end fixed mounting connector (612), rotation installation connector (612) in ballast block (609), slidable mounting balancing piece (613) on connecting rod (611), establish balancing piece (613) upper end the vortex inslot, control lever (607) lower extreme is equipped with the card key, ring (610) are equipped with the draw-in groove, card key length and ring (610) length the same.
6. The dry-working vessel for sea riser replacement according to claim 5, wherein: the control rod (607) is provided with two sections of threads in opposite directions, a polished rod is arranged between the two sections of threads, the lower end of the inner part of the right side of the inner cabin (2) is provided with a water pressing plate (608) in a sliding mode, when the water pressing plate (608) is connected with the upper section of threads, the water pressing plate (608) moves upwards, when the water pressing plate (608) is connected with the lower section of threads, the water pressing plate (608) moves downwards, the length of the clamping key is smaller than that of the polished rod, and when the clamping key is connected with the circular ring (610), the water pressing plate (608) is in contact with the polished rod.
7. A dry-working sea-pipe riser replacement module according to any one of claims 1-6, wherein: inner chamber (2) upper end be equipped with the door, inner chamber (2) correspond push-and-pull door department be equipped with the viewing aperture, viewing aperture top be equipped with the controller, the workman changes the sea pipe riser through the controller, inner chamber (2) inside is equipped with and is used for the required indispensable article of workman, outer chamber (1) right side is equipped with the screw that the drive work cabin gos forward, outer chamber (1) right side is equipped with the lug, outer chamber (1) left side is equipped with air vent one, inner chamber (2) bottom is equipped with air vent two, sets up gaseous booster compressor in inner chamber (2), is equipped with pump and aspirator pump in the gaseous increase machine, and valve A or valve B are connected through three-way valve connection valve A or valve B respectively at air vent pump and aspirator pump both ends, valve A passes inner chamber (2) through the hose and connects air vent one, valve B passes through the hose connection air vent two.
8. The dry-working vessel for marine riser replacement according to claim 7, wherein: outer cabin (1) left side and open-close board (304) about both ends be equipped with the circular arc through-hole, the circular arc through-hole outside be equipped with the rubber circle, push-and-pull door about both sides fixed mounting panel (305), mounting panel (305) left end be equipped with the horizontally elongated slot, mounting panel (305) right-hand member is equipped with the vertically spout, the spout on reverse slip clamp plate I (3064), clamp plate II (3065) for press from both sides tight former sea pipe riser (7).
CN202210434343.3A 2022-04-24 2022-04-24 A dry working cabin for subsea riser replacement Active CN114811187B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210434343.3A CN114811187B (en) 2022-04-24 2022-04-24 A dry working cabin for subsea riser replacement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210434343.3A CN114811187B (en) 2022-04-24 2022-04-24 A dry working cabin for subsea riser replacement

Publications (2)

Publication Number Publication Date
CN114811187A CN114811187A (en) 2022-07-29
CN114811187B true CN114811187B (en) 2022-11-01

Family

ID=82507079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210434343.3A Active CN114811187B (en) 2022-04-24 2022-04-24 A dry working cabin for subsea riser replacement

Country Status (1)

Country Link
CN (1) CN114811187B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115371615B (en) * 2022-10-21 2023-02-03 山东省鲁南地质工程勘察院(山东省地质矿产勘查开发局第二地质大队) Intelligent measuring equipment for coal mining subsidence area depth

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001021681A (en) * 1999-07-07 2001-01-26 Toshiba Corp Maintenance device for jet pump
JP2001091327A (en) * 1999-09-27 2001-04-06 Keiyo Gas Kk Meter stand replacement device and replacement method
CN203273003U (en) * 2013-02-27 2013-11-06 中国海洋石油总公司 Maintenance and replacement device for crude oil vertical pipe of offshore platform
CN105019418A (en) * 2015-07-29 2015-11-04 深圳海油工程水下技术有限公司 Dry cabin for maintaining underwater joint of jacket and mounting method of dry cabin
WO2018217100A1 (en) * 2017-05-24 2018-11-29 Kongsberg Ferrotech As Maintenance and repair device
CN112958836A (en) * 2021-02-20 2021-06-15 哈尔滨工程大学 Underwater detachable modular diamond wire saw

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2553271B (en) * 2016-07-19 2019-03-13 Kongsberg Ferrotech As Pipeline maintenance and inspection vehicle

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001021681A (en) * 1999-07-07 2001-01-26 Toshiba Corp Maintenance device for jet pump
JP2001091327A (en) * 1999-09-27 2001-04-06 Keiyo Gas Kk Meter stand replacement device and replacement method
CN203273003U (en) * 2013-02-27 2013-11-06 中国海洋石油总公司 Maintenance and replacement device for crude oil vertical pipe of offshore platform
CN105019418A (en) * 2015-07-29 2015-11-04 深圳海油工程水下技术有限公司 Dry cabin for maintaining underwater joint of jacket and mounting method of dry cabin
WO2018217100A1 (en) * 2017-05-24 2018-11-29 Kongsberg Ferrotech As Maintenance and repair device
CN112958836A (en) * 2021-02-20 2021-06-15 哈尔滨工程大学 Underwater detachable modular diamond wire saw

Also Published As

Publication number Publication date
CN114811187A (en) 2022-07-29

Similar Documents

Publication Publication Date Title
EP2403749B1 (en) Service space for a retractable propulsion device or corresponding
CN114811187B (en) A dry working cabin for subsea riser replacement
WO2022104784A1 (en) Apparatus for mounting marine platform
KR20150094679A (en) Method for disassembling and/or assembling an underwater section of a retractable thruster unit
CN117325995B (en) Buoy and method for observing water body profile
CN110341895B (en) Unmanned buoy recovery device
CN113979333B (en) Shipborne self-balancing water crane for rescue of large-scale water plane and method
CN111114716A (en) Underwater robot traction mechanism
CN102092330A (en) Overhead remote drainage emergency car
CN115128095A (en) Automatic detection method for bridge cracks
CN119058900A (en) A scientific research vessel scientific research instrument deployment and recovery device and method
US3236489A (en) Power operated screw jacks
CN110206488A (en) A kind of mobile model deep earth sampling drilling machine
CN114228941B (en) Improved auxiliary device for mounting ship stern shaft tube
CN112098015B (en) Tunnel segment seam waterproof test device
CN212290269U (en) an underwater robot
CN105927172B (en) A kind of workover automatization operation system
CN210483534U (en) Movable deep sea sampling drilling machine
CN115195963B (en) A submersible body emergency flotation experimental device and working method
CN212927767U (en) Submerged working device capable of working obliquely
CN217100405U (en) Retractable keel structure of unmanned sailing boat
CN214031427U (en) Turbine hoisting equipment for ship machining
CN219525007U (en) Manhole cover sealing ring
CN220957356U (en) Pipeline hydrostatic test plugging device
CN223116581U (en) Underwater construction equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Ai Minggang

Inventor before: Ai Minggang

Inventor before: Li Minqiang

Inventor before: Hu Zhenliang

Inventor before: Yang Guang