CN114726002A - Virtual control-based multi-generator-set output control method and system - Google Patents

Virtual control-based multi-generator-set output control method and system Download PDF

Info

Publication number
CN114726002A
CN114726002A CN202210643808.6A CN202210643808A CN114726002A CN 114726002 A CN114726002 A CN 114726002A CN 202210643808 A CN202210643808 A CN 202210643808A CN 114726002 A CN114726002 A CN 114726002A
Authority
CN
China
Prior art keywords
generator set
output
generator
parameter value
load parameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210643808.6A
Other languages
Chinese (zh)
Other versions
CN114726002B (en
Inventor
王标
唐蜜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Motor Factory Group Changrui Co ltd
Original Assignee
Changsha Motor Factory Group Changrui Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Motor Factory Group Changrui Co ltd filed Critical Changsha Motor Factory Group Changrui Co ltd
Priority to CN202210643808.6A priority Critical patent/CN114726002B/en
Publication of CN114726002A publication Critical patent/CN114726002A/en
Application granted granted Critical
Publication of CN114726002B publication Critical patent/CN114726002B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/466Scheduling the operation of the generators, e.g. connecting or disconnecting generators to meet a given demand
    • H02J3/472For selectively connecting the AC sources in a particular order, e.g. sequential, alternating or subsets of sources
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Human Computer Interaction (AREA)
  • Control Of Eletrric Generators (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a method and a system for controlling output of a plurality of generator sets based on virtual control, wherein the method comprises the following steps: obtaining current running state information and self environment information of a plurality of generator sets; marking the corresponding running state information and the self environment information, and uploading the formed marking information to a remote controller; obtaining a current output load parameter value of a microgrid consisting of a plurality of generator sets; performing operation simulation processing on the plurality of generator sets based on the marking information to obtain operation simulation results of the plurality of generator sets; and adjusting and controlling the power output value of the corresponding generator set based on the operation simulation results of the plurality of generator sets and the current output load parameter value. In the embodiment of the invention, the multiple generator sets are adjusted and controlled in a micro-grid consisting of the multiple generator sets according to the actually required output load parameter values, so that the operation efficiency and the operation safety of the multiple generator sets are ensured.

Description

Virtual control-based multi-generator-set output control method and system
Technical Field
The invention relates to the technical field of power control, in particular to a method and a system for controlling output of a plurality of generator sets based on virtual control.
Background
In some temporary application scenes in large fields, stable power supply cannot be provided due to the imperfection of a power system, and in order to solve the requirement, a small micro-grid is generally formed by installing a plurality of generator sets within a certain range to supply power so as to solve the current power consumption requirement; however, in a temporary application scenario, there is a certain instability in power demand, which may result in poor power stability, and at the same time, the operating efficiency and the operating safety of the generator set forming the microgrid cannot be improved.
Disclosure of Invention
The invention aims to overcome the defects of the prior art, and provides a method and a system for controlling the output of a plurality of generator sets based on virtual control, so that the plurality of generator sets are adjusted and controlled in a micro-grid consisting of the plurality of generator sets according to actually required output load parameter values, and the operating efficiency and the operating safety of the plurality of generator sets are ensured.
In order to solve the technical problem, an embodiment of the present invention provides a method for controlling output of multiple generator sets based on virtual control, where the method includes:
obtaining current operation state information and self environment information of a plurality of generator sets, wherein the self environment information is fault information influencing the operation of the generator sets;
the generator sets mark the corresponding running state information and the self environment information, and upload the formed mark information to a remote controller based on a gateway node;
the remote controller obtains a current output load parameter value of a micro-grid consisting of the plurality of generator sets;
performing operation simulation processing on a plurality of generator sets on the remote controller based on the marking information to obtain operation simulation results of the plurality of generator sets;
and adjusting and controlling the power output value of the corresponding generator set based on the operation simulation results of the plurality of generator sets and the current output load parameter value.
Optionally, the running state information includes running speed data, running temperature data, continuous running time, and generator output load parameter values; the generator output load parameter values comprise generator set output load voltage, generator set output load current, generator set output load power and generator set output load frequency;
the self environmental information comprises environmental temperature data and environmental humidity data of the position of the generator set.
Optionally, the marking, by the multiple generator sets, the corresponding running state information and the environmental information of the generator sets includes:
and the generator sets mark the corresponding running state information and the self environment information according to the distribution ID of each corresponding generator set.
Optionally, the obtaining, by the remote controller, a current output load parameter value of a microgrid composed of the plurality of generator sets includes:
and the micro-grid is formed based on the grid connection of the generator sets, and the remote controller acquires data based on a sensor arranged at an output load end of the micro-grid to obtain a current output load parameter value of the output load end of the micro-grid.
Optionally, before performing the operation simulation process on the plurality of generator sets on the remote controller based on the tag information, the method further includes:
the remote controller analyzes the mark information and judges whether each generator set in the plurality of generator sets has corresponding self-environment information or not based on the analyzed mark information;
if the distribution ID does not exist, obtaining the distribution ID of the generator set without corresponding self environment information, and performing matching positioning processing on the remote controller by using the distribution ID to obtain the positioning position of the distribution ID;
and matching the adjacent generator set with the nearest positioning position in the remote controller, and taking the self environmental information corresponding to the adjacent generator set as the self environmental information of the generator set without the self environmental information.
Optionally, the performing, on the remote controller, operation simulation processing on a plurality of generator sets based on the tag information includes:
the remote controller inputs the mark information into a digital twin model built in the remote controller to carry out twin simulation processing on each generator set in the plurality of generator sets.
Optionally, the digital twin model is a model constructed in the remote controller in a digital twin network based on the operational technical parameters of each of the plurality of generator sets; the operation technical parameters comprise the type of the generator set, the rated voltage of the generator set, the rated current of the generator set, the rated frequency of the generator set, the rated rotating speed of the generator set, the voltage adjusting range, the voltage adjusting rate, the frequency adjusting rate, the voltage stabilizing time of sudden load change and the current stabilizing time of sudden load change.
Optionally, the plurality of generator set operation simulation results include an operation health degree simulation result of each of the plurality of generator sets and a simulated output load parameter value of each of the generator sets.
Optionally, the adjusting and controlling the power output value of the corresponding generator set based on the multiple generator set operation simulation results and the current output load parameter value includes:
based on the operation health degree simulation result of each generator set in the plurality of generator set operation simulation results, sequencing the health degree from high to low;
judging whether the output total load parameter value of the multiple generator sets at the same time when the load parameter value is optimally output is larger than the current output load parameter value;
if the output of the corresponding generator set is larger than the current output load parameter value, adjusting the output of the corresponding generator set to the optimal output load parameter value from high to low according to the sequencing result to carry out output work, adjusting the next generator set to the actually required output load parameter value to carry out output work until the output total load parameter value when the next generator set is adjusted to the optimal output load parameter value is larger than the current output load parameter value, and controlling the generator set which is sequenced later than the actually required output load parameter value to pause work;
if the current load value is equal to the optimal load value, adjusting and controlling the multiple generator sets to output at the optimal load parameter value;
if the output of the corresponding generator set is smaller than the preset output load parameter value, the output of the corresponding generator set is adjusted to be the rated output load parameter value for output work from high to low according to the sequencing result, and until the output total load parameter value when the next generator set is adjusted to be the rated output load parameter value is larger than the current output load parameter value, the next generator set is adjusted to be the actually needed output load parameter value for output work, and the rest generator sets are controlled to output work according to the optimal output load parameter value.
In addition, an embodiment of the present invention further provides a system for controlling output of multiple generator sets based on virtual control, where the system includes:
a plurality of generator sets: the system comprises a monitoring module, a control module and a monitoring module, wherein the monitoring module is used for acquiring current running state information and self environment information, and the self environment information is fault information influencing the running of a generator set; marking the corresponding running state information and the self environment information, and uploading the formed marking information to a remote controller based on a gateway node;
the remote controller: the current output load parameter value of the micro-grid composed of the plurality of generator sets is obtained; performing operation simulation processing on a plurality of generator sets on the remote controller based on the marking information to obtain operation simulation results of the plurality of generator sets; and adjusting and controlling the power output value of the corresponding generator set based on the operation simulation results of the plurality of generator sets and the current output load parameter value.
In the embodiment of the invention, the current operation state information and the self environment information of the multiple generator sets are acquired, the operation simulation processing is carried out on the remote controller according to the current operation state information and the self environment information to obtain the operation simulation results of the multiple generator sets, and then the power output value of the corresponding generator set is adjusted and controlled according to the operation simulation results of the multiple generator sets and the current output load parameter value, so that the multiple generator sets can be adjusted and controlled in a micro-grid consisting of the multiple generator sets according to the actually required output load parameter value, and the operation efficiency and the operation safety of the multiple generator sets are ensured.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the prior art descriptions will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
FIG. 1 is a schematic flow chart of a method for controlling output of multiple generator sets based on virtual control according to an embodiment of the present invention;
fig. 2 is a schematic structural composition diagram of a multiple generator set output control system based on virtual control in an embodiment of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example one
Referring to fig. 1, fig. 1 is a schematic flow chart of a method for controlling output of multiple generator sets based on virtual control according to an embodiment of the present invention.
As shown in fig. 1, a method for controlling output of multiple generator sets based on virtual control includes:
s11: obtaining current operation state information and self environment information of a plurality of generator sets, wherein the self environment information is fault information influencing the operation of the generator sets;
in the specific implementation process of the invention, the running state information comprises running speed data, running temperature data, continuous running time and a generator output load parameter value; the generator output load parameter values comprise generator set output load voltage, generator set output load current, generator set output load power and generator set output load frequency; the self environmental information comprises environmental temperature data and environmental humidity data of the position of the generator set.
Specifically, corresponding data acquisition is carried out through a corresponding sensor arranged on each of the multiple generator sets, so that current operation state information and self environment information corresponding to each of the multiple generator sets can be obtained, and the self environment information is fault information influencing the operation of the generator sets; the running state information comprises running speed data, running temperature data, continuous running time and a generator output load parameter value; the generator output load parameter values comprise generator set output load voltage, generator set output load current, generator set output load power and generator set output load frequency; the self environmental information comprises environmental temperature data and environmental humidity data of the position of the generator set.
S12: the generator sets mark the corresponding running state information and the self environment information, and upload the formed mark information to a remote controller based on a gateway node;
in the specific implementation process of the present invention, the marking of the corresponding operating state information and the environmental information of the generator sets by the plurality of generator sets includes: and the generator sets mark the corresponding running state information and the self environment information according to the distribution ID of each corresponding generator set.
Specifically, firstly, each generator set in the multiple generator sets is assigned with an assignment ID, the assignment ID has uniqueness, then the assignment ID is used for marking the operation state information and the self environment information collected by the corresponding generator set to form marking information, then the marking information is subjected to data compression processing, and finally the marking information is uploaded to the remote controllers connected with the multiple generator sets through gateway nodes.
S13: the remote controller obtains a current output load parameter value of a micro-grid consisting of the plurality of generator sets;
in a specific implementation process of the present invention, the obtaining, by the remote controller, a current output load parameter value of a microgrid composed of the plurality of generator sets includes: and the micro-grid is formed based on the grid connection of the generator sets, and the remote controller acquires data based on a sensor arranged at an output load end of the micro-grid to obtain a current output load parameter value of the output load end of the micro-grid.
Specifically, a micro-grid is formed by means of grid connection of a plurality of generator sets, data collection is carried out through a sensor arranged at a load output end of the micro-grid, a current output load parameter value of an output load end of the micro-grid can be obtained, then the current output load parameter value is uploaded to a remote controller, and therefore the remote controller can obtain the current output load parameter value.
S14: performing operation simulation processing on a plurality of generator sets on the remote controller based on the marking information to obtain operation simulation results of the plurality of generator sets;
in a specific implementation process of the present invention, before performing simulation processing on a plurality of generator sets on the remote controller based on the tag information, the method further includes: the remote controller analyzes the mark information and judges whether each generator set in the plurality of generator sets has corresponding self-environment information or not based on the analyzed mark information; if the distribution ID does not exist, obtaining the distribution ID of the generator set without corresponding self environment information, and performing matching positioning processing on the remote controller by using the distribution ID to obtain the positioning position of the distribution ID; and matching the adjacent generator set with the nearest positioning position in the remote controller, and taking the self environmental information corresponding to the adjacent generator set as the self environmental information of the generator set without the self environmental information.
Further, the performing, on the remote controller, an operation simulation process on a plurality of generator sets based on the tag information includes: the remote controller inputs the mark information into a digital twin model built in the remote controller to carry out twin simulation processing on each of the plurality of generator sets.
Further, the digital twin model is a model constructed in the remote controller in a digital twin network based on operational technical parameters of each of the plurality of generator sets; the operation technical parameters comprise the type of the generator set, the rated voltage of the generator set, the rated current of the generator set, the rated frequency of the generator set, the rated rotating speed of the generator set, the voltage adjusting range, the voltage adjusting rate, the frequency adjusting rate, the voltage stabilizing time of sudden load change and the current stabilizing time of sudden load change.
Specifically, after the remote controller receives the tag information, the tag information needs to be analyzed, and corresponding running state information and self environment information in the tag information are obtained; then judging whether each generator set in the plurality of generator sets has corresponding self-environment information or not through the analyzed mark information; if the distribution ID does not exist, acquiring the distribution ID of the generator set without corresponding self environment information, performing matching positioning processing on the remote controller by using the distribution ID, and then acquiring the positioning position of the distribution ID; and finally, matching out the adjacent generator set with the nearest positioning position in the remote controller, and taking the self-environment information corresponding to the adjacent generator set as the self-environment information of the generator set without the self-environment information.
Inputting the mark information into a digital twin model built in the remote controller to carry out twin simulation processing on each generator set in the plurality of generator sets, so as to obtain the operation simulation results of the plurality of generator sets; wherein the digital twin model is a model constructed in a digital twin network in the remote controller based on operational technical parameters of each of the plurality of generator sets; the operation technical parameters comprise parameters such as the type of the generator set, the rated voltage of the generator set, the rated current of the generator set, the rated frequency of the generator set, the rated rotating speed of the generator set, the voltage adjusting range, the voltage adjusting rate, the frequency adjusting rate, the voltage stabilizing time of sudden load change, the current stabilizing time of sudden load change and the like.
S15: and adjusting and controlling the power output value of the corresponding generator set based on the operation simulation results of the plurality of generator sets and the current output load parameter value.
In a specific implementation process of the present invention, the simulation results of the multiple generator sets include simulation results of the operation health degree of each of the multiple generator sets and a simulation output load parameter value of each of the multiple generator sets.
Specifically, the adjusting and controlling process of the power output value of the corresponding generator set based on the simulation results of the operation of the plurality of generator sets and the current output load parameter value includes: performing sorting processing of the health degree from high to low based on the operation health degree simulation result of each generator set in the plurality of generator set operation simulation results; judging whether the output total load parameter value of the multiple generator sets at the same time when the load parameter value is optimally output is larger than the current output load parameter value; if the output of the corresponding generator set is larger than the current output load parameter value, adjusting the output of the corresponding generator set to the optimal output load parameter value from high to low according to the sequencing result to carry out output work, adjusting the next generator set to the actually required output load parameter value to carry out output work until the output total load parameter value when the next generator set is adjusted to the optimal output load parameter value is larger than the current output load parameter value, and controlling the generator set which is sequenced later than the actually required output load parameter value to pause work; if the current load value is equal to the optimal load value, adjusting and controlling the multiple generator sets to output at the optimal load parameter value; if the output of the corresponding generator set is smaller than the preset output load parameter value, the output of the corresponding generator set is adjusted to be the rated output load parameter value for output work from high to low according to the sequencing result, and until the output total load parameter value when the next generator set is adjusted to be the rated output load parameter value is larger than the current output load parameter value, the next generator set is adjusted to be the actually needed output load parameter value for output work, and the rest generator sets are controlled to output work according to the optimal output load parameter value.
Specifically, the plurality of generator set operation simulation results include an operation health degree simulation result of each of the plurality of generator sets and a simulated output load parameter value of each of the generator sets.
When the power output value of the corresponding generator set is adjusted and controlled, firstly, the health degree is sequenced from high to low according to the operation health degree simulation result of each generator set in the operation simulation results of the plurality of generator sets, so that corresponding sequencing results are obtained, and then whether the output total load parameter value of the plurality of generator sets when the load parameter values are output optimally at the same time is larger than the current output load parameter value is judged; if the output value of the generator set is larger than the preset output load parameter value, the output of the corresponding generator set is required to be adjusted to the optimal output load parameter value from high to low according to the sequencing result for output work, until the output total load parameter value when the next generator set is adjusted to the optimal output load parameter value is judged to be larger than the current output load parameter value, the next generator set is adjusted to the actual load parameter value required to be output for output work, whether the corresponding generator set exists subsequently or not is identified, and if the corresponding generator set exists, the subsequent generator set stops output work.
And when the output load value is equal to the preset output load value, adjusting the multiple generator sets to output with the optimal output load parameter value.
And when the output value is smaller than the preset output load parameter value, adjusting the output of the corresponding generator set to the rated output load parameter value for output work from high to low according to the sequencing result until the output total load parameter value when the next generator set is adjusted to the rated output load parameter value is larger than the current output load parameter value, adjusting the next generator set to the actually required output load parameter value for output work, and controlling the rest generator sets to output work according to the optimal output load parameter value.
In the embodiment of the invention, the current operation state information and the self environment information of the multiple generator sets are acquired, the operation simulation processing is carried out on the remote controller according to the current operation state information and the self environment information to obtain the operation simulation results of the multiple generator sets, and then the power output value of the corresponding generator set is adjusted and controlled according to the operation simulation results of the multiple generator sets and the current output load parameter value, so that the multiple generator sets can be adjusted and controlled in a micro-grid consisting of the multiple generator sets according to the actually required output load parameter value, and the operation efficiency and the operation safety of the multiple generator sets are ensured.
Example two
Referring to fig. 2, fig. 2 is a schematic structural composition diagram of a multiple generator set output control system based on virtual control according to an embodiment of the present invention.
As shown in fig. 2, a multiple genset output control system based on virtual control, the system comprising:
a plurality of generator sets 21: the system comprises a monitoring module, a control module and a monitoring module, wherein the monitoring module is used for acquiring current running state information and self environment information, and the self environment information is fault information influencing the running of a generator set; marking the corresponding running state information and the self environment information, and uploading the formed marking information to a remote controller based on a gateway node;
in the specific implementation process of the invention, the running state information comprises running speed data, running temperature data, continuous running time and a generator output load parameter value; the generator output load parameter values comprise generator set output load voltage, generator set output load current, generator set output load power and generator set output load frequency; the self environmental information comprises environmental temperature data and environmental humidity data of the position of the generator set.
Specifically, corresponding data acquisition is carried out through a corresponding sensor arranged on each of the multiple generator sets, so that current operation state information and self environment information corresponding to each of the multiple generator sets can be obtained, and the self environment information is fault information influencing the operation of the generator sets; the running state information comprises running speed data, running temperature data, continuous running time and a generator output load parameter value; the generator output load parameter values comprise generator set output load voltage, generator set output load current, generator set output load power and generator set output load frequency; the self environmental information comprises environmental temperature data and environmental humidity data of the position of the generator set.
In the specific implementation process of the present invention, the marking of the corresponding operating state information and the environmental information of the generator sets by the plurality of generator sets includes: and the generator sets mark the corresponding running state information and the self environment information according to the distribution ID of each corresponding generator set.
Specifically, firstly, each generator set in the multiple generator sets is assigned with an assignment ID, the assignment ID has uniqueness, then the assignment ID is used for marking the operation state information and the self environment information collected by the corresponding generator set to form marking information, then the marking information is subjected to data compression processing, and finally the marking information is uploaded to the remote controllers connected with the multiple generator sets through gateway nodes.
The remote controller 22: the current output load parameter value of the micro-grid composed of the plurality of generator sets is obtained; performing operation simulation processing on a plurality of generator sets on the remote controller based on the marking information to obtain operation simulation results of the plurality of generator sets; and adjusting and controlling the power output value of the corresponding generator set based on the operation simulation results of the plurality of generator sets and the current output load parameter value.
In a specific implementation process of the present invention, the obtaining, by the remote controller, a current output load parameter value of a microgrid composed of the plurality of generator sets includes: and the micro-grid is formed based on the grid connection of the generator sets, and the remote controller acquires data based on a sensor arranged at an output load end of the micro-grid to obtain a current output load parameter value of the output load end of the micro-grid.
Specifically, a micro-grid is formed by means of grid connection of a plurality of generator sets, data collection is carried out through a sensor arranged at a load output end of the micro-grid, a current output load parameter value of an output load end of the micro-grid can be obtained, then the current output load parameter value is uploaded to a remote controller, and therefore the remote controller can obtain the current output load parameter value.
In a specific implementation process of the present invention, before performing simulation processing on a plurality of generator sets on the remote controller based on the tag information, the method further includes: the remote controller analyzes the mark information and judges whether each generator set in the plurality of generator sets has corresponding self-environment information or not based on the analyzed mark information; if the distribution ID does not exist, obtaining the distribution ID of the generator set without corresponding self environment information, and performing matching positioning processing on the remote controller by using the distribution ID to obtain the positioning position of the distribution ID; and matching the adjacent generator set with the nearest positioning position in the remote controller, and taking the self environmental information corresponding to the adjacent generator set as the self environmental information of the generator set without the self environmental information.
Further, the performing, on the remote controller, an operation simulation process on a plurality of generator sets based on the tag information includes: the remote controller inputs the mark information into a digital twin model built in the remote controller to carry out twin simulation processing on each generator set in the plurality of generator sets.
Further, the digital twin model is a model constructed in the remote controller in a digital twin network based on operational technical parameters of each of the plurality of generator sets; the operation technical parameters comprise the type of the generator set, the rated voltage of the generator set, the rated current of the generator set, the rated frequency of the generator set, the rated rotating speed of the generator set, the voltage adjusting range, the voltage adjusting rate, the frequency adjusting rate, the voltage stabilizing time of sudden load change and the current stabilizing time of sudden load change.
Specifically, after the remote controller receives the tag information, the tag information needs to be analyzed, and corresponding running state information and self environment information in the tag information are obtained; then judging whether each generator set in the plurality of generator sets has corresponding self-environment information or not through the analyzed mark information; if the distribution ID does not exist, acquiring the distribution ID of the generator set without corresponding self environment information, performing matching positioning processing on the remote controller by using the distribution ID, and then acquiring the positioning position of the distribution ID; and finally, matching out the adjacent generator set with the nearest positioning position in the remote controller, and taking the self-environment information corresponding to the adjacent generator set as the self-environment information of the generator set without the self-environment information.
Inputting the mark information into a digital twin model built in the remote controller to carry out twin simulation processing on each generator set in the plurality of generator sets, so as to obtain the operation simulation results of the plurality of generator sets; wherein the digital twin model is a model constructed in a digital twin network in the remote controller based on operational technical parameters of each of the plurality of generator sets; the operation technical parameters comprise parameters such as the type of the generator set, the rated voltage of the generator set, the rated current of the generator set, the rated frequency of the generator set, the rated rotating speed of the generator set, the voltage adjusting range, the voltage adjusting rate, the frequency adjusting rate, the voltage stabilizing time of sudden load change, the current stabilizing time of sudden load change and the like.
In a specific implementation process of the present invention, the simulation results of the multiple generator sets include simulation results of the operation health degree of each of the multiple generator sets and a simulation output load parameter value of each of the multiple generator sets.
Specifically, the adjusting and controlling process of the power output value of the corresponding generator set based on the simulation results of the operation of the plurality of generator sets and the current output load parameter value includes: performing sorting processing of the health degree from high to low based on the operation health degree simulation result of each generator set in the plurality of generator set operation simulation results; judging whether the output total load parameter value of the multiple generator sets at the same time when the load parameter value is optimally output is larger than the current output load parameter value; if the output of the corresponding generator set is larger than the current output load parameter value, adjusting the output of the corresponding generator set to the optimal output load parameter value from high to low according to the sequencing result to carry out output work, adjusting the next generator set to the actually required output load parameter value to carry out output work until the output total load parameter value when the next generator set is adjusted to the optimal output load parameter value is larger than the current output load parameter value, and controlling the generator set which is sequenced later than the actually required output load parameter value to pause work; if the current load value is equal to the optimal load value, adjusting and controlling the multiple generator sets to output at the optimal load parameter value; if the output of the corresponding generator set is smaller than the preset output load parameter value, the output of the corresponding generator set is adjusted to be the rated output load parameter value for output work from high to low according to the sequencing result, and until the output total load parameter value when the next generator set is adjusted to be the rated output load parameter value is larger than the current output load parameter value, the next generator set is adjusted to be the actually needed output load parameter value for output work, and the rest generator sets are controlled to output work according to the optimal output load parameter value.
Specifically, the plurality of generator set operation simulation results include an operation health degree simulation result of each of the plurality of generator sets and a simulated output load parameter value of each of the generator sets.
When the power output value of the corresponding generator set is adjusted and controlled, firstly, the health degree is sequenced from high to low according to the operation health degree simulation result of each generator set in the operation simulation results of the plurality of generator sets, so that corresponding sequencing results are obtained, and then whether the output total load parameter value of the plurality of generator sets when the load parameter values are output optimally at the same time is larger than the current output load parameter value is judged; if the output value of the generator set is larger than the preset output load parameter value, the output of the corresponding generator set is required to be adjusted to the optimal output load parameter value from high to low according to the sequencing result for output work, until the output total load parameter value when the next generator set is adjusted to the optimal output load parameter value is judged to be larger than the current output load parameter value, the next generator set is adjusted to the actual load parameter value required to be output for output work, whether the corresponding generator set exists subsequently or not is identified, and if the corresponding generator set exists, the subsequent generator set stops output work.
And when the output load value is equal to the preset output load value, adjusting the multiple generator sets to output with the optimal output load parameter value.
And when the output value is smaller than the preset output load parameter value, adjusting the output of the corresponding generator set to the rated output load parameter value for output work from high to low according to the sequencing result until the output total load parameter value when the next generator set is adjusted to the rated output load parameter value is larger than the current output load parameter value, adjusting the next generator set to the actually required output load parameter value for output work, and controlling the rest generator sets to output work according to the optimal output load parameter value.
In the embodiment of the invention, the current operation state information and the self environment information of the multiple generator sets are acquired, the operation simulation processing is carried out on the remote controller according to the current operation state information and the self environment information to obtain the operation simulation results of the multiple generator sets, and then the power output value of the corresponding generator set is adjusted and controlled according to the operation simulation results of the multiple generator sets and the current output load parameter value, so that the multiple generator sets can be adjusted and controlled in a micro-grid consisting of the multiple generator sets according to the actually required output load parameter value, and the operation efficiency and the operation safety of the multiple generator sets are ensured.
Those skilled in the art will appreciate that all or part of the steps in the methods of the above embodiments may be implemented by associated hardware instructed by a program, which may be stored in a computer-readable storage medium, and the storage medium may include: read Only Memory (ROM), Random Access Memory (RAM), magnetic or optical disks, and the like.
In addition, the method and the system for controlling the output of multiple generator sets based on virtual control provided by the embodiment of the invention are described in detail, a specific embodiment is adopted herein to explain the principle and the implementation manner of the invention, and the description of the embodiment is only used for helping to understand the method and the core idea of the invention; meanwhile, for a person skilled in the art, according to the idea of the present invention, there may be variations in the specific embodiments and the application scope, and in summary, the content of the present specification should not be construed as a limitation to the present invention.

Claims (10)

1. A method for controlling output of a plurality of generator sets based on virtual control is characterized by comprising the following steps:
obtaining current operation state information and self environment information of a plurality of generator sets, wherein the self environment information is fault information influencing the operation of the generator sets;
the generator sets mark the corresponding running state information and the self environment information, and upload the formed marking information to a remote controller based on a gateway node;
the remote controller obtains a current output load parameter value of a micro-grid consisting of the plurality of generator sets;
performing operation simulation processing on a plurality of generator sets on the remote controller based on the marking information to obtain operation simulation results of the plurality of generator sets;
and adjusting and controlling the power output value of the corresponding generator set based on the multiple generator set operation simulation results and the current output load parameter value.
2. The multiple generator set output control method of claim 1, wherein the operating state information includes operating speed data, operating temperature data, duration of operation, generator output load parameter values; the generator output load parameter values comprise generator set output load voltage, generator set output load current, generator set output load power and generator set output load frequency;
the self environmental information comprises environmental temperature data and environmental humidity data of the position of the generator set.
3. The multiple generator set output control method of claim 1, wherein the multiple generator sets flag the corresponding operating status information and their own environmental information, including:
and the plurality of generator sets mark the corresponding running state information and the self environment information according to the distribution ID of each corresponding generator set.
4. The multiple generator set output control method of claim 1, wherein the obtaining, by the remote controller, the current output load parameter value of a microgrid composed of the multiple generator sets comprises:
and the micro-grid is formed based on the grid connection of the generator sets, and the remote controller acquires data based on a sensor arranged at an output load end of the micro-grid to obtain a current output load parameter value of the output load end of the micro-grid.
5. The method of multiple generator set output control of claim 1, wherein prior to performing an operational simulation process on a plurality of generator sets on the remote controller based on the indicia information, further comprising:
the remote controller analyzes the mark information and judges whether each generator set in the plurality of generator sets has corresponding self-environment information or not based on the analyzed mark information;
if the distribution ID does not exist, obtaining the distribution ID of the generator set without corresponding self environment information, and performing matching positioning processing on the remote controller by using the distribution ID to obtain the positioning position of the distribution ID;
and matching the adjacent generator set with the nearest positioning position in the remote controller, and taking the self environmental information corresponding to the adjacent generator set as the self environmental information of the generator set without the self environmental information.
6. The method of claim 1, wherein said performing an operational simulation process on a plurality of generator sets on the remote controller based on the signature information comprises:
the remote controller inputs the mark information into a digital twin model built in the remote controller to carry out twin simulation processing on each generator set in the plurality of generator sets.
7. The multiple genset output control method of claim 6 wherein the digital twin model is a model constructed in the remote controller as a digital twin network based on operational technology parameters of each of the plurality of gensets; the operation technical parameters comprise the type of the generator set, the rated voltage of the generator set, the rated current of the generator set, the rated frequency of the generator set, the rated rotating speed of the generator set, the voltage adjusting range, the voltage adjusting rate, the frequency adjusting rate, the voltage stabilizing time of sudden load change and the current stabilizing time of sudden load change.
8. The multiple generator set output control method of claim 1, wherein the multiple generator set operation simulation results comprise an operation health simulation result for each of the multiple generator sets and a simulated output load parameter value for each generator set.
9. The method of claim 8, wherein performing the power output value adjustment control process for the corresponding generator set based on the plurality of generator set operation simulation results and the current output load parameter value comprises:
performing sorting processing of the health degree from high to low based on the operation health degree simulation result of each generator set in the plurality of generator set operation simulation results;
judging whether the output total load parameter value of a plurality of generator sets when the output load parameter value is optimal at the same time is larger than the current output load parameter value;
if the output of the corresponding generator set is larger than the current output load parameter value, adjusting the output of the corresponding generator set to the optimal output load parameter value from high to low according to the sequencing result to carry out output work, adjusting the next generator set to the actually required output load parameter value to carry out output work until the output total load parameter value when the next generator set is adjusted to the optimal output load parameter value is larger than the current output load parameter value, and controlling the generator set which is sequenced later than the actually required output load parameter value to pause work;
if the current load value is equal to the optimal load value, adjusting and controlling the multiple generator sets to output at the optimal load parameter value;
if the output of the corresponding generator set is smaller than the preset output load parameter value, the output of the corresponding generator set is adjusted to be the rated output load parameter value for output work from high to low according to the sequencing result, and until the output total load parameter value when the next generator set is adjusted to be the rated output load parameter value is larger than the current output load parameter value, the next generator set is adjusted to be the actually needed output load parameter value for output work, and the rest generator sets are controlled to output work according to the optimal output load parameter value.
10. A multiple generator set output control system based on virtual control, the system comprising:
a plurality of generator sets: the system comprises a monitoring module, a control module and a monitoring module, wherein the monitoring module is used for acquiring current running state information and self environment information, and the self environment information is fault information influencing the running of a generator set; marking the corresponding running state information and the self environment information, and uploading the formed marking information to a remote controller based on a gateway node;
the remote controller: the current output load parameter value of the micro-grid composed of the plurality of generator sets is obtained; performing operation simulation processing on a plurality of generator sets on the remote controller based on the marking information to obtain operation simulation results of the plurality of generator sets; and adjusting and controlling the power output value of the corresponding generator set based on the operation simulation results of the plurality of generator sets and the current output load parameter value.
CN202210643808.6A 2022-06-09 2022-06-09 Virtual control-based multi-generator-set output control method and system Active CN114726002B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210643808.6A CN114726002B (en) 2022-06-09 2022-06-09 Virtual control-based multi-generator-set output control method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210643808.6A CN114726002B (en) 2022-06-09 2022-06-09 Virtual control-based multi-generator-set output control method and system

Publications (2)

Publication Number Publication Date
CN114726002A true CN114726002A (en) 2022-07-08
CN114726002B CN114726002B (en) 2022-08-23

Family

ID=82232381

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210643808.6A Active CN114726002B (en) 2022-06-09 2022-06-09 Virtual control-based multi-generator-set output control method and system

Country Status (1)

Country Link
CN (1) CN114726002B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116683457A (en) * 2023-03-10 2023-09-01 广东电网有限责任公司佛山供电局 Intelligent power supply method and device for transformer areas based on multiple distribution transformers

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130214602A1 (en) * 2012-02-20 2013-08-22 Engineered Electric Company Method and system for generator control
US20200303925A1 (en) * 2019-03-20 2020-09-24 Caterpillar Inc. System And Method For Diverse Multi-Source Energy Management
CN114374233A (en) * 2022-03-22 2022-04-19 长沙电机厂集团长瑞有限公司 Method and system for adjusting micro-grid power output based on virtual generator

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130214602A1 (en) * 2012-02-20 2013-08-22 Engineered Electric Company Method and system for generator control
US20200303925A1 (en) * 2019-03-20 2020-09-24 Caterpillar Inc. System And Method For Diverse Multi-Source Energy Management
CN114374233A (en) * 2022-03-22 2022-04-19 长沙电机厂集团长瑞有限公司 Method and system for adjusting micro-grid power output based on virtual generator

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘雪波: "变频调速电机节能应用分析", 《大众用电》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116683457A (en) * 2023-03-10 2023-09-01 广东电网有限责任公司佛山供电局 Intelligent power supply method and device for transformer areas based on multiple distribution transformers
CN116683457B (en) * 2023-03-10 2024-03-29 广东电网有限责任公司佛山供电局 Intelligent power supply method and device for transformer areas based on multiple distribution transformers

Also Published As

Publication number Publication date
CN114726002B (en) 2022-08-23

Similar Documents

Publication Publication Date Title
CN113708974A (en) Edge cloud network system based on self-adaptive networking and cooperation method
CN114726002B (en) Virtual control-based multi-generator-set output control method and system
CN107317353B (en) Voltage control method and system for distribution network containing distributed photovoltaic power generation
CN107357985A (en) A kind of check scheme on distribution main website feeder line topological model
CN110912923B (en) Self-adaptation method, self-adaptation unit and system for communication protocol of power distribution internet of things
CN113515057A (en) System for industrial control scene simulation and corresponding method, device and medium
CN115017787A (en) Wind power plant voltage ride through characteristic equivalent modeling method and system based on intelligent algorithm
CN110021929A (en) A kind of high-speed switch type fault current limiter electro-magnetic transient time-domain-simulation modeling method
CN108616142A (en) A kind of governor head opens limit combination curve self-adaptation control method with load
CN108875103A (en) A kind of powernet analogue system and method
Kou et al. Developing generic dynamic models for the 2030 eastern interconnection grid
KR102318452B1 (en) Methods for on-line power system inertia monitoring and frequency simulation and apparatuses thereof
CN111969596A (en) Load self-adaptive correction response method of electrical-grade load frequency control system
CN113570473B (en) Equipment fault monitoring method, device, computer equipment and storage medium
CN116360294A (en) Simulation method and device based on active power distribution network
CN110867855B (en) Voltage prediction method based on load active power and frequency response
Odgaard On usage of pareto curves to select wind turbine controller tunings to the wind turbulence level
EP3216106B1 (en) Method for enriching data in measurement data records of a low-voltage network
CN113839416A (en) Wind power maximum access proportion determining method and device based on frequency response model
Fan et al. Sampling-based event-triggered control for distributed generators
US20190081478A1 (en) Method for monitoring and controlling an electrical network
Palaniappan et al. Implementation of Machine Learning-based DER Local Control Schemes on Measurement Devices for Counteracting Communication Failures
Riebesel et al. Optimised operational management of distribution grids by utilising flexibilities through automation of electrical assets using a multi-agent-system approach
CN117394369B (en) Uninterrupted power supply-to-power supply regulation and control system based on multidimensional data
CN118137414A (en) Line tripping fixed value determining method, determining device and electronic equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant