CN114678855B - Power supply control method, system and device of power transmission line monitoring equipment - Google Patents

Power supply control method, system and device of power transmission line monitoring equipment Download PDF

Info

Publication number
CN114678855B
CN114678855B CN202210346940.0A CN202210346940A CN114678855B CN 114678855 B CN114678855 B CN 114678855B CN 202210346940 A CN202210346940 A CN 202210346940A CN 114678855 B CN114678855 B CN 114678855B
Authority
CN
China
Prior art keywords
power supply
power
monitoring device
preset
power consumption
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210346940.0A
Other languages
Chinese (zh)
Other versions
CN114678855A (en
Inventor
周道平
彭娅利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Kyne Technology Co ltd
Original Assignee
Shenzhen Kyne Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Kyne Technology Co ltd filed Critical Shenzhen Kyne Technology Co ltd
Priority to CN202210346940.0A priority Critical patent/CN114678855B/en
Publication of CN114678855A publication Critical patent/CN114678855A/en
Application granted granted Critical
Publication of CN114678855B publication Critical patent/CN114678855B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J1/00Circuit arrangements for dc mains or dc distribution networks
    • H02J1/08Three-wire systems; Systems having more than three wires
    • H02J1/084Three-wire systems; Systems having more than three wires for selectively connecting the load or loads to one or several among a plurality of power lines or power sources
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00004Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the power network being locally controlled

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention relates to a power supply control method, a system and a device of monitoring equipment of a power transmission line, belonging to the technical field of power supply, wherein the power supply control method comprises the steps of obtaining power consumption data of each monitoring equipment, and calculating power consumption of each monitoring equipment according to the power consumption data; generating power supply priority of each monitoring device according to the power consumption of each monitoring device based on a first preset mapping table; the first preset mapping table comprises corresponding relations between a plurality of groups of power consumption intervals and power supply priorities; acquiring the current residual electric quantity of the solar cell for supplying power to each monitoring device; determining the current power supply priority according to the current residual electric quantity based on a second preset mapping table, and supplying power to the monitoring equipment with the corresponding power supply priority according to the current power supply priority; the second preset mapping table comprises a corresponding relation between a plurality of groups of remaining power intervals and power supply priorities. The invention has the effect of conveniently carrying out unified management on the power supply.

Description

Power supply control method, system and device of power transmission line monitoring equipment
Technical Field
The invention relates to the technical field of power supply sources, in particular to a power supply control method, a power supply control system and a power supply control device of power transmission line monitoring equipment.
Background
The power transmission line is a line used for transmitting high-voltage electricity generated by a generator and transformed by a transformer, and is divided into an overhead power transmission line and a cable line. With the rapid development of social economy, the requirements of various industries on the power supply reliability are higher and higher, and the operating environment of a transmission line channel and the operating state of a tower body become important factors influencing the power supply reliability. At present, on-line monitoring equipment of a power transmission line and a transformer substation is supplied by a whole set of equipment which is formed by integrating suppliers, and each of the on-line monitoring equipment is an independent and complete power supply system for supplying power to the monitoring equipment.
In the process of implementing the application, the inventor finds that at least the following problems exist in the technology: a plurality of monitoring facilities of common transmission line equally divide and do not adopt independent power supply to supply power, and when partly monitoring facilities electric quantity was not enough, the monitoring facilities that the electric quantity was sufficient can't provide electric power support to the monitoring facilities that the electric quantity was not enough to inconvenient power supply to a plurality of monitoring facilities carries out unified management.
Disclosure of Invention
In order to facilitate the unified management of power supplies of a plurality of monitoring devices, the invention provides a power supply control method, a power supply control system and a power supply control device of power transmission line monitoring devices.
In a first aspect, the present invention provides a power supply control method for a power transmission line monitoring device, which adopts the following technical scheme:
a power supply control method of power transmission line monitoring equipment comprises the following steps:
acquiring power consumption data of each monitoring device, and calculating power consumption of each monitoring device according to the power consumption data;
generating power supply priority of each monitoring device according to the power consumption of each monitoring device based on a first preset mapping table; the first preset mapping table comprises a plurality of groups of corresponding relations between power consumption intervals and power supply priorities;
obtaining the current residual capacity of the solar cell supplying power to each monitoring device;
determining a current power supply priority according to the current residual electric quantity based on a second preset mapping table, and supplying power to monitoring equipment with corresponding power supply priority according to the current power supply priority; the second preset mapping table comprises a corresponding relation between a plurality of groups of remaining power intervals and power supply priorities.
By adopting the technical scheme, in the process that the power supply supplies power to the monitoring equipment, the power consumption data of each monitoring equipment is detected, the power consumption of each monitoring equipment is obtained according to the power consumption data, and meanwhile, the residual power of the solar battery, namely the current residual power, is detected in real time; dividing each monitoring device into a plurality of power supply priorities according to the power consumption of each monitoring device based on a first preset mapping table, and supplying power to the devices in each power supply priority according to the difference of the current residual power of the solar battery based on a second preset mapping table; according to the method, the monitoring devices in one or more power supply priorities are selected to be powered according to the current residual capacity of the solar battery, so that the power is preferentially supplied to part of the monitoring devices when the residual capacity of the solar battery is insufficient, and the unified management of the power supplies of the monitoring devices is realized.
Optionally, the power consumption data includes power consumption voltage, power consumption current and preset power consumption duration, and the specific step of calculating the power consumption of each monitoring device according to the power consumption data includes,
according to the power consumption voltage, the power consumption current and the preset power consumption duration, the power consumption is obtained as follows:
electricity consumption = electricity voltage/electricity current/preset electricity consumption time.
Through adopting above-mentioned technical scheme, it is long when the power consumption voltage, power consumption electric current and the predetermined power consumption through each monitoring facilities, easily calculate the interior power consumption of length when predetermineeing the power consumption, and power consumption voltage and power consumption electric current information all measure comparatively easily to be convenient for make statistics of each monitoring facilities in the interior power consumption of length when predetermineeing the power consumption.
Optionally, after the step of generating the power supply priority of each monitoring device, the method further includes:
sending the first preset mapping table to a management terminal; the management terminal is used for adjusting the first preset mapping table and monitoring equipment in each power supply priority, and the adjustment of the first preset mapping table comprises adjustment of an interval range of a power consumption interval.
By adopting the technical scheme, the interval range of the power consumption interval is adjusted, so that the power supply priority can be more reasonably divided according to the actual condition; through the adjustment of the monitoring equipment in the power supply priority, the power supply priority can be further adjusted by a manager according to the importance degree of the monitoring equipment, so that the power supply time can be properly prolonged and the power supply to important monitoring equipment is reserved when the residual electric quantity of the solar battery is insufficient.
Optionally, the power supply control method further includes:
judging whether the current residual electric quantity is lower than a preset electric quantity early warning value or not, if so, generating an electric quantity early warning signal and sending the electric quantity early warning signal to a management terminal; the management terminal is used for receiving the electric quantity early warning signal and controlling each monitoring device to reduce the monitoring frequency.
By adopting the technical scheme, when the electric quantity of the solar battery is lower than a preset electric quantity early warning value, the electric quantity early warning signal is sent to the management terminal, and a manager can easily obtain a signal that the electric quantity of the solar battery is insufficient through the management terminal in time, so that the manager can adjust the monitoring frequency of each monitoring device according to actual conditions, the power consumption of each monitoring device can be reduced, and the service time of the residual electric quantity of the solar battery can be prolonged.
Optionally, after the step of generating the electric quantity early warning signal, the method further includes:
acquiring illumination intensity data in a preset time period;
and judging whether the illumination intensity data is lower than a preset illumination intensity threshold value, if so, sending a charging prompt signal to a management terminal.
By adopting the technical scheme, after the electric quantity of the solar battery is lower than the preset electric quantity early warning value, the illumination intensity data in the preset time period are obtained, if the illumination intensity data are lower than the preset illumination intensity threshold value, the condition that the illumination used for charging of the solar battery in the current time period is insufficient is indicated, at the moment, the residual electric quantity of the solar battery is low and possibly caused by insufficient illumination, and a charging prompt signal is sent to the management terminal, so that a manager can perform manual charging according to the actual condition.
Optionally, after the step of generating the electric quantity warning signal, the method further includes:
acquiring the power consumption of each monitoring device according to the power consumption data of each monitoring device;
and respectively judging whether the power consumption of each monitoring device is greater than a preset power threshold of the corresponding monitoring device, and if so, sending an abnormal signal of the monitoring device to a management terminal.
By adopting the technical scheme, after the electric quantity of the solar battery is lower than the preset electric quantity early warning value, the electric power of each monitoring device is calculated through the electric power data of each monitoring device, whether the electric power of the monitoring device is higher than the preset power threshold value of the monitoring device is judged, if yes, the monitoring device is possibly in the abnormal discharging condition, the low residual electric quantity of the solar battery is possibly caused by the abnormal increase of the electric power of the monitoring device, and the abnormal signal of the monitoring device is sent to the management terminal, so that a manager overhauls the monitoring device according to the actual condition.
Optionally, after the step of obtaining the power consumption data of each monitoring device, the method further includes:
and obtaining power utilization statistical information of each monitoring device according to the power utilization data of each monitoring device in a preset time period, and sending the power utilization statistical information to a management terminal.
Through adopting above-mentioned technical scheme, with each monitoring facilities's power consumption data transmission to management terminal, the administrator of being convenient for in time knows each monitoring facilities's power consumption condition to the administrator of being convenient for masters each monitoring facilities's operating condition according to the power consumption condition, is convenient for carry out unified management to each monitoring facilities.
In a second aspect, the present invention provides a power supply control system for a power transmission line monitoring device, which adopts the following technical scheme:
a power supply control system of a power transmission line monitoring device includes: the first processing module is used for acquiring power consumption data of each monitoring device, obtaining power consumption of each monitoring device according to the power consumption data, and generating power supply priority of each monitoring device according to the power consumption of each monitoring device on the basis of a first preset mapping table; the first preset mapping table comprises a corresponding relation between a plurality of groups of power consumption intervals and power supply priorities;
the second processing module is used for acquiring the current residual electric quantity of the solar battery for supplying power to each monitoring device, determining the current power supply priority according to the current residual electric quantity based on a second preset mapping table, and supplying power to the monitoring device with the corresponding power supply priority according to the current power supply priority; the second preset mapping table comprises a corresponding relation between a plurality of groups of remaining power intervals and power supply priorities; and (c) a second step of,
and the storage module is used for storing the first preset mapping table and the second preset mapping table.
By adopting the technical scheme, in the process that the solar cell supplies power to each monitoring device, the first processing module is used for acquiring the power consumption data of each monitoring device, and the power supply priority of each monitoring device is generated according to the power consumption of each monitoring device on the basis of the first preset mapping table; the residual electric quantity of the solar cell is detected by the second processing module, and the current power supply priority is determined according to the current residual electric quantity based on the second preset mapping table, namely, the monitoring equipment in different power supply priorities is powered when the residual electric quantity of the solar cell is in different stages, so that the effect of selectively and preferentially powering part of the monitoring equipment when the electric quantity of the solar cell is insufficient is achieved.
In a third aspect, the present invention provides a power supply control device for a power transmission line monitoring device, which adopts the following technical scheme:
a power supply control device of power transmission line monitoring equipment comprises: the memory is used for storing a program instruction, a first preset mapping table and a second preset mapping table; the first preset mapping table comprises corresponding relations of a plurality of groups of power consumption intervals and power supply priorities, and the second preset mapping table comprises corresponding relations of a plurality of groups of residual power intervals and power supply priorities; and the number of the first and second groups,
and the control processor is used for calling and executing the program instructions in the memory, and executing the method steps of any one of the power supply control methods of the power transmission line monitoring equipment in the first aspect.
In a fourth aspect, the present invention provides a computer-readable storage medium, which adopts the following technical solutions:
a computer readable storage medium storing a computer program that can be loaded by a processor and execute the method as in the first aspect.
In summary, the invention has the following beneficial technical effects: the method comprises the steps that a solar cell is adopted to uniformly supply power to each monitoring device, in the power supply process, power consumption data of each monitoring device are detected, power consumption of each monitoring device is obtained through power consumption data calculation, and power supply priority is divided according to the power consumption; the residual electric quantity of the solar battery is detected, and power is supplied to the monitoring equipment corresponding to each power supply priority according to the residual electric quantity, so that when the electric quantity of the solar battery is insufficient, power can be supplied to part of the monitoring equipment according to the power supply priority, and unified management of power supply to the monitoring equipment is facilitated.
Drawings
Fig. 1 is a first flowchart of a power supply control method according to an embodiment of the present disclosure.
Fig. 2 is a second flowchart of a power supply control method according to an embodiment of the present application.
Fig. 3 is a third flowchart of a power supply control method according to an embodiment of the present application.
Fig. 4 is a fourth flowchart illustrating a power supply control method according to an embodiment of the present application.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in further detail with reference to fig. 1-4 and the following embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and do not limit the invention.
At present, monitoring equipment of a power transmission line and a transformer substation is required to be provided with a set of independent and complete power supply system, so that the construction difficulty is high, the maintenance cost is high, the fault probability is high, the use of high-quality and high-power devices is limited, the problems of repeated resource construction and excessive occupation of tower body resources of a tower are also existed, the installation cost is increased when the monitoring equipment is installed, and the stability of each power supply system is not easy to guarantee, so that the normal operation of the monitoring equipment is easily influenced due to faults; meanwhile, the monitoring equipment on the power transmission line usually adopts a solar power supply mode, and under the condition of insufficient electric quantity, the power supply of each monitoring equipment cannot be managed in a unified mode.
The embodiment of the invention discloses a power supply control method of power transmission line monitoring equipment.
Referring to fig. 1, a power supply control method for a power transmission line monitoring device includes:
step S101, acquiring power consumption data of each monitoring device, and calculating power consumption of each monitoring device according to the power consumption data;
the power utilization data comprise power utilization voltage, power utilization current and preset power utilization time;
step S102, generating power supply priority of each monitoring device according to power consumption of each monitoring device based on a first preset mapping table; the first preset mapping table comprises a corresponding relation between a plurality of groups of power consumption intervals and power supply priorities;
step S103, acquiring the current residual electric quantity of the solar battery for supplying power to each monitoring device;
in the embodiment, the solar cell is powered by a photovoltaic panel and adopts a 600 to 800Ah @12V colloid battery;
and step S104, determining the current power supply priority according to the current residual power based on a second preset mapping table, and supplying power to the monitoring equipment with the corresponding power supply priority according to the current power supply priority, wherein the second preset mapping table comprises a corresponding relation between a plurality of groups of residual power intervals and the power supply priority.
And acquiring the electricity utilization data of each monitoring device and the current residual electricity quantity of the solar battery through the current collector and the voltage collector.
In the above embodiment, in the process that the power supply supplies power to the monitoring devices, the power consumption data of each monitoring device is detected, the power consumption of each monitoring device within the preset power consumption duration is obtained according to the power consumption data, and meanwhile, the residual power of the solar cell, that is, the current residual power, is detected in real time; dividing each monitoring device into a plurality of power supply priorities according to the power consumption of each monitoring device within the preset power consumption duration based on a first preset mapping table; based on the second preset mapping table, the current power supply priority is determined according to the current residual capacity of the solar battery, so that when the residual capacity of the solar battery is insufficient, power is preferentially supplied to part of monitoring devices, and the unified management of power supplies of a plurality of monitoring devices is realized.
For example, monitoring equipment with the electricity consumption less than 0.1 kilowatt hour in the preset electricity consumption duration may be used as a first power supply priority, monitoring equipment with the electricity consumption more than or equal to 0.1 kilowatt hour and less than 0.5 kilowatt hour in the preset electricity consumption duration may be used as a second power supply priority, and monitoring equipment with the electricity consumption more than or equal to 0.5 kilowatt hour in the preset electricity consumption duration may be used as a third power supply priority; the priority of the monitoring equipment from the first power supply priority to the monitoring equipment from the third power supply priority is decreased; for example, when the remaining capacity of the solar cell is greater than or equal to thirty percent of the total capacity of the solar cell, the solar cell simultaneously supplies power to all the monitoring devices within the first power supply priority, the second power supply priority and the third power supply priority; when the residual electric quantity of the solar cell is more than or equal to twenty percent of the total capacity of the solar cell and less than thirty percent of the total capacity of the solar cell, the solar cell simultaneously supplies power to all monitoring equipment in the first power supply priority and the second power supply priority; and when the residual capacity of the solar battery is less than twenty percent of the total capacity of the solar battery, only the monitoring equipment in the first power supply priority level is powered.
As an implementation manner of power consumption calculation, the specific step of calculating the power consumption of each monitoring device according to the power consumption data includes that the power consumption is obtained according to the power consumption voltage, the power consumption current and the preset power consumption duration: electricity consumption = electricity voltage and electricity current and preset electricity consumption duration; the preset power-on time can be determined according to actual conditions, for example, the preset power-on duration can be set to be 24 hours, namely, the power consumption of each monitoring device in one day is calculated;
referring to fig. 1, as a further embodiment of the power supply control method, after the step of generating the power supply priority of each monitoring device, the method further includes:
sending a first preset mapping table to a management terminal; the management terminal is used for adjusting the first preset mapping table and monitoring equipment in each power supply priority, and the adjustment of the first preset mapping table comprises adjustment of an interval range of a power consumption interval;
the management terminal may be a computer terminal in a monitoring room, or may be an intelligent mobile terminal of a manager, such as a mobile phone, a tablet, and the like.
In the above embodiment, the management terminal receives the first preset mapping table, and the manager adjusts the interval range of the power consumption interval of the first preset mapping table through the management terminal according to the actual situation, where the adjustment at least includes adjustment of the interval of the power consumption interval and adjustment of the endpoint of the power consumption interval, so as to facilitate more reasonable power supply priority division according to power consumption adjustment of each monitoring device; meanwhile, the management terminal is also used for adjusting the power supply priority of each monitoring device, and a manager can freely adjust the power supply priority of the monitoring device according to the importance degree of the monitoring device;
for example, important equipment which has a higher power consumption in a preset power consumption duration and is used as a monitoring key point can be adjusted to a first power supply priority so as to preferentially ensure the power supply of the important equipment; or the monitoring equipment which has lower power consumption within the preset power consumption duration and is not taken as a monitoring key point is adjusted to a third priority level, so that the power consumption is reduced and the energy is saved under the condition of insufficient power supply of the solar battery; the effect of preferentially ensuring the power supply of important monitoring equipment when the electric quantity of the solar cell is insufficient is achieved.
Referring to fig. 2, as a further embodiment of the control method, it is determined whether the current remaining power is lower than a preset power warning value, if so, a power warning signal is generated, and the power warning signal is sent to a management terminal; the management terminal is used for receiving the electric quantity early warning signal and controlling each monitoring device to reduce the monitoring frequency;
in the embodiment, when the electric quantity of the solar battery is lower than the preset electric quantity early warning value, the electric quantity early warning signal is sent to the management terminal, and a manager can easily and timely obtain a signal that the electric quantity of the solar battery is insufficient through the management terminal so as to complete subsequent related work, and meanwhile, the manager can adjust the monitoring frequency of each monitoring device according to actual conditions;
for example, the time interval for reporting the monitoring data by the microclimate sensor and the icing tension sensor is once in 10 minutes, when a manager receives an electric quantity early warning signal, the time interval for reporting the monitoring data by the microclimate sensor and the icing tension sensor can be remotely adjusted to once in half an hour through the management terminal, so that the power consumption of part of monitoring equipment is reduced, and the service life of the residual electric quantity of the solar cell is prolonged; and when the residual electric quantity of the solar battery is greater than or equal to the preset electric quantity early warning value, canceling the warning of the electric quantity early warning signal.
In addition, the preset electric quantity early warning value can be determined according to actual conditions and historical experience, but when the residual electric quantity of the preset electric quantity early warning value is higher than the highest residual electric quantity of the power supply priority, for example, the preset electric quantity early warning value can be set to be forty percent of the residual electric quantity of the solar battery, the power supply priority can perform partial power supply when the residual electric quantity is lower than thirty percent, namely, an electric quantity early warning signal is sent to the management terminal, and the residual electric quantity is not supplemented, namely, the residual electric quantity is supplied to a part of monitoring equipment according to the priority of the power supply priority.
Referring to fig. 3, as a further embodiment of the power supply control method, after the step of generating the electric quantity early warning signal, the method further includes:
acquiring illumination intensity data in a preset time period;
and judging whether the illumination intensity data is lower than a preset illumination intensity threshold value, if so, sending a charging prompt signal to the management terminal.
The method for acquiring the illumination intensity data can be to call the illumination intensity data of the meteorological platform or integrate the illumination intensity data of the meteorological platform through monitoring data of related equipment such as a microclimate sensor in monitoring equipment; the preset time is a period of time after the electric quantity early warning signal is generated, for example, the illumination intensity data within one hour after the electric quantity early warning signal is generated can be obtained.
In the above embodiment, after the electric quantity of the solar battery is lower than the preset electric quantity early warning value, the illumination intensity data in the preset time period is acquired, and if the illumination intensity data is lower than the preset illumination intensity threshold value, it is indicated that the illumination used by the solar battery for charging in the current time period is insufficient, and at this time, the remaining electric quantity of the solar battery is low and may be caused by insufficient illumination, and a charging prompt signal is sent to the management terminal, so that a manager can perform manual charging according to actual conditions. It is noted that the illumination intensity data should be collected as an average illumination intensity over a period of time, rather than illumination intensity data at one point in time.
As a further scheme of sending the charging prompt signal, after the step of acquiring the light intensity data within the preset time period,
acquiring current time information, and judging whether the current time is in the day or at night according to the current time information;
wherein, the time from the local sunrise time to the local sunset time is the day, and the time from the local sunset time to the local sunrise time is the night;
if the current time is in the daytime, judging whether the illumination intensity data is lower than a preset illumination intensity threshold value, and if so, sending a charging prompt signal;
and if the current time is at night, acquiring weather forecast information after sunrise, judging whether enough illumination intensity is available for charging the solar battery after sunrise or not according to the weather forecast information after sunrise, if so, not sending a charging prompt signal, and if not, sending the charging prompt signal.
And if the weather forecast information after sunrise is sunny, judging that enough illumination intensity exists after sunrise, and if the weather forecast information after sunrise is cloudy or rainy, judging that enough illumination intensity does not exist after sunrise.
In the above embodiment, if the current time is daytime, but an electric quantity early warning signal is generated and the illumination intensity data in the preset time period is lower than the illumination intensity threshold, it indicates that the insufficient electric quantity of the solar cell is insufficient due to insufficient illumination intensity caused by factors such as weather; if the current time is night, the obtained illumination intensity is lower than an illumination intensity threshold value, then the judgment of the weather forecast after sunrise is carried out, if enough illumination intensity is predicted to charge the solar battery after sunrise, a charging prompt signal is not sent first, and if not enough illumination intensity is predicted to charge the solar battery after sunrise, a charging prompt signal is sent; the solar battery cannot be charged at night, namely the solar battery is in a discharging process at night, the situation that the electric quantity of the solar battery is lower than an electric quantity early warning value can be caused at the moment, if enough illumination is provided for charging the solar battery after sunrise, manual supplementary charging is not needed, and a charging prompt signal is not needed to be sent at the moment; and when the illumination intensity data in the daytime is lower than the illumination intensity threshold value, or when the sunlight is judged to be insufficient at night, namely, the solar battery is charged by insufficient illumination, the manual supplementary charging is needed at the moment, namely, a charging prompt signal is sent.
For example, an electric quantity early warning signal is sent at 3 o 'clock (night) in the morning, and illumination intensity data is acquired, since the current time is at night, the illumination intensity data is certainly smaller than an illumination intensity threshold value under normal conditions, assuming that the local sunrise time is 7 o' clock, weather forecast information after 7 o 'clock is acquired, if the result is clear, enough illumination is available to charge the solar cell after 7 o' clock, and in this case, a charging prompt signal is not needed to be sent; if the solar battery is in cloudy days or rainy days after 7 o 'clock, the solar battery is not charged with enough illumination intensity after 7 o' clock, and at the moment, a charging prompt signal needs to be sent to prompt manual supplementary charging, so that the situation that the monitoring equipment cannot normally operate due to the defects is avoided to a certain extent.
Referring to fig. 4, as a further embodiment of the control method, after the step of generating the electric quantity warning signal, the method further includes:
acquiring the power consumption of each monitoring device according to the power consumption data of each monitoring device; the power consumption can be calculated by the following formula: power consumption = present power consumption voltage vs present power consumption current;
respectively judging whether the power consumption of each monitoring device is greater than a preset power threshold of the corresponding monitoring device, if so, sending an abnormal signal of the monitoring device to a management terminal; the preset power threshold is the rated power of each monitoring device.
In the above embodiment, after the electric quantity of the solar battery is lower than the preset electric quantity early warning value, the electric power of each monitoring device is calculated according to the electric power data of each monitoring device, and then whether the electric power of the monitoring device is higher than the preset power threshold of the monitoring device is judged, if so, the monitoring device is possibly in an abnormal discharging condition, at the moment, the residual electric quantity of the solar battery is low and is possibly caused by the abnormal increase of the electric power of the monitoring device, and an abnormal signal of the monitoring device is sent to the management terminal, so that a manager can overhaul the monitoring device according to the actual condition.
As a further embodiment of the control method, after the step of acquiring the power consumption data of each monitoring device, the method further includes:
according to the power consumption data of each monitoring device in a preset time period, power consumption statistical information of each monitoring device is obtained and sent to a management terminal; the power utilization statistical information comprises historical power utilization data of each monitoring device in a preset time period.
In the above embodiment, all send each monitoring devices 'real-time power consumption data and historical power consumption data to management terminal, be convenient for the administrator in time to know each monitoring devices' power consumption condition, thereby be convenient for the administrator to master each monitoring devices 'operating condition according to the power consumption condition, and simultaneously, through looking over each monitoring devices' historical power consumption data, be convenient for monitor all monitoring devices power consumption total amount, be convenient for carry out unified management to monitoring devices, for example, when needs are changed or newly-increased monitoring devices, according to current monitoring devices power consumption total amount, solar cell's capacity and solar cell's a plurality of angles such as charging power are taken into comprehensive consideration, be convenient for supply power to monitoring devices, also be convenient for in time discover information such as solar cell total capacity is not enough, thereby in time change solar cell.
The invention also discloses a power supply control system of the power transmission line monitoring equipment.
A power supply control system of power transmission line monitoring equipment comprises a first processing module, a second processing module and a power supply control module, wherein the first processing module is used for acquiring power consumption data of each monitoring equipment, obtaining power consumption of each monitoring equipment according to the power consumption data, and generating power supply priority of each monitoring equipment according to the power consumption of each monitoring equipment based on a first preset mapping table; the first preset mapping table comprises corresponding relations between a plurality of groups of power consumption intervals and power supply priorities;
the second processing module is used for acquiring the current residual electric quantity of the solar battery for supplying power to each monitoring device, determining the current power supply priority according to the current residual electric quantity based on a second preset mapping table, and supplying power to the monitoring device with the corresponding power supply priority according to the current power supply priority; the second preset mapping table comprises a corresponding relation between a plurality of groups of remaining power intervals and power supply priorities; and the number of the first and second groups,
and the storage module is used for storing the first preset mapping table and the second preset mapping table.
In the above embodiment, in the process of supplying power to each monitoring device by the solar cell, the first processing module is used to obtain power consumption data of each monitoring device, and based on the first preset mapping table, the power supply priority of each monitoring device is generated according to the power consumption of each monitoring device; the residual electric quantity of the solar battery is detected by the second processing module, and the current power supply priority is determined according to the current residual electric quantity based on the second preset mapping table, namely, the power is supplied to the monitoring equipment in different power supply priorities when the residual electric quantity of the solar battery is in different stages, so that the effect of selectively and preferentially supplying power to a part of the monitoring equipment when the electric quantity of the solar battery is insufficient is realized.
As a further embodiment of the power supply control system, the power supply control system further includes,
the third processing module is used for receiving the current residual electric quantity information and judging whether the current residual electric quantity is lower than a preset electric quantity early warning value or not, if so, generating an electric quantity early warning signal and generating the electric quantity early warning signal to the management terminal, wherein the management terminal is used for receiving the electric quantity early warning signal and controlling each monitoring device to reduce the monitoring frequency;
the fourth processing module is used for acquiring the illumination intensity data in a preset time period, judging whether the illumination intensity data is lower than a preset illumination intensity threshold value or not, and if so, sending a charging prompt signal to the management terminal;
and the fifth processing module is used for acquiring the power consumption of each monitoring device, respectively judging whether the power consumption of each monitoring device is greater than a preset power threshold of the corresponding monitoring device, and if so, sending an abnormal signal of the monitoring device to the management terminal.
And the sixth processing module is used for obtaining the electricity utilization statistical information of each monitoring device according to the electricity utilization data of each monitoring device in the preset time period and sending the electricity utilization statistical information to the management terminal.
It should be noted that the processing module may have various specific implementation forms, the processing module may be a central processing unit or an image processor, and the processing module may also be a single-core processor or a multi-core processor.
In addition, the power supply control system of the embodiment of the present invention can implement any one of the above power supply control methods, and the specific working process of the power supply control system may refer to the corresponding process in the above method embodiment.
The invention also discloses a power supply control device of the power transmission line monitoring equipment.
A power supply control device of power transmission line monitoring equipment comprises a memory, a first mapping table and a second mapping table, wherein the memory is used for storing a program instruction, the first mapping table and the second mapping table; the first preset mapping table comprises a plurality of groups of corresponding relations between power consumption intervals and power supply priorities, and the second preset mapping table comprises a plurality of groups of corresponding relations between residual power intervals and power supply priorities; and the number of the first and second groups,
and the control processor is used for calling and executing the program instructions in the memory and executing the method steps of any one of the power supply control methods of the power transmission line monitoring equipment.
The control processor is in wired connection with the monitoring devices through an RS485 bus or a CAN bus and is used for receiving monitoring data sent by the monitoring devices and adjusting monitoring frequency of the monitoring devices; the control processor is in wireless communication connection with the management terminal through the gateway of the internet of things, and is used for sending a first preset mapping table, a charging prompt signal, an abnormal monitoring device signal, power utilization statistical information and the like to the management terminal and receiving a monitoring frequency adjusting command and a first preset mapping table adjusting command sent by the management terminal, so that the management terminal is used for adjusting the interval range corresponding to each power supply priority according to actual conditions and adjusting the monitoring devices in each power supply priority according to the importance degree of the monitoring devices, and power is preferentially supplied to the important monitoring devices.
It should be noted that the solar cell provides dc power to each monitoring device of the power transmission line through the dc power supply interface, the solar cell is provided with the MPPT controller and the photovoltaic panel, the photovoltaic panel and the MPPT controller are disposed on the tower of the power transmission line, the photovoltaic panel is configured to convert light energy into electric energy and charge the solar cell, and the MPPT controller enables the photovoltaic panel to charge the solar cell with the maximum output power
In addition, solar cell and power supply control device set up in the block terminal and the block terminal adopts the mode of burying to bury in the underground that is close to the pole, and solar cell passes through direct current bus to each monitoring facilities power supply of installing on the pole, has reduced external environment to solar cell's interference, and when needs maintain relevant accessory, need not to climb up the pole by the workman and maintain, greatly increased the security.
In this application, each monitoring facilities all adopts unified solar cell to supply power, and is more convenient when new monitoring facilities are changed in the installation, need not additionally to carry out independent power supply's installation again to the speed of newly-built monitoring facilities installation deployment has been accelerated, also is convenient for carry out unified power supply and overhauls, has improved fortune maintenance efficiency, has reduced the input cost.
The invention also discloses a computer readable storage medium, which adopts the following technical scheme:
a computer readable storage medium storing a computer program that can be loaded by a processor and executes a method as any one of the above-described power supply control methods of a power transmission line monitoring apparatus.
Wherein the computer readable storage medium may be any tangible medium that can contain, or store a program for use by or in connection with an instruction execution system, apparatus, or device; program code embodied on a computer readable medium may be transmitted using any appropriate medium, including but not limited to wireless, wireline, optical fiber cable, RF, etc., or any suitable combination of the foregoing.
It should be noted that, in the foregoing embodiments, descriptions of the respective embodiments have respective emphasis, and reference may be made to relevant descriptions of other embodiments for parts that are not described in detail in a certain embodiment.
The foregoing is a preferred embodiment of the invention and is not intended to limit the scope of the invention in any way, and any features disclosed in this specification (including the abstract and drawings) may be replaced by alternative features serving equivalent or similar purposes, unless expressly stated otherwise. That is, unless expressly stated otherwise, each feature is only an example of a generic series of equivalent or similar features.

Claims (9)

1. A power supply control method of power transmission line monitoring equipment is characterized by comprising the following steps:
acquiring power consumption data of each monitoring device, and calculating power consumption of each monitoring device according to the power consumption data;
generating power supply priority of each monitoring device according to the power consumption of each monitoring device based on a first preset mapping table; the first preset mapping table comprises a plurality of groups of corresponding relations between power consumption intervals and power supply priorities;
obtaining the current residual capacity of the solar cell supplying power to each monitoring device;
determining a current power supply priority according to the current residual electric quantity based on a second preset mapping table, and supplying power to the monitoring equipment with the corresponding power supply priority according to the current power supply priority; the second preset mapping table comprises a corresponding relation between a plurality of groups of remaining power intervals and power supply priorities;
judging whether the current residual electric quantity is lower than a preset electric quantity early warning value or not, and if so, generating an electric quantity early warning signal;
acquiring illumination intensity data in a preset time period;
judging whether the illumination intensity data is lower than a preset illumination intensity threshold value or not, if so, sending a charging prompt signal to a management terminal; the preset time refers to the average illumination intensity of illumination intensity data acquired within a period of time after the electric quantity early warning signal is generated;
judging whether the illumination intensity data is lower than a preset illumination intensity threshold value, if so, sending a charging prompt signal to a management terminal specifically comprises:
acquiring current time information, and judging whether the current time is in the day or at night according to the current time information;
if the current time is in the daytime, judging whether the illumination intensity data is lower than a preset illumination intensity threshold value, and if so, sending a charging prompt signal;
and if the current time is at night, acquiring weather forecast information after sunrise, judging whether enough illumination intensity is available for charging the solar battery after sunrise or not according to the weather forecast information after sunrise, if so, not sending a charging prompt signal, and if not, sending the charging prompt signal.
2. The power supply control method of the power transmission line monitoring equipment according to claim 1, characterized in that: the electricity consumption data comprises electricity consumption voltage, electricity consumption current and preset electricity consumption duration, the specific steps of calculating the electricity consumption of each monitoring device according to the electricity consumption data comprise,
according to the power consumption voltage, the power consumption current and the preset power consumption duration, the power consumption is obtained as follows:
electricity consumption = electricity voltage/electricity current/preset electricity consumption time.
3. The power supply control method of the power transmission line monitoring equipment according to claim 1, characterized in that: the method further comprises the following steps after the step of generating the power supply priority of each monitoring device:
sending the first preset mapping table to a management terminal; the management terminal is used for adjusting the first preset mapping table and monitoring equipment in each power supply priority, and the adjustment of the first preset mapping table comprises adjustment of an interval range of a power consumption interval.
4. The power supply control method of the power transmission line monitoring device according to claim 1, further comprising:
sending an electric quantity early warning signal to a management terminal; the management terminal is used for receiving the electric quantity early warning signal and controlling each monitoring device to reduce the monitoring frequency.
5. The power supply control method of the power transmission line monitoring equipment according to claim 4, further comprising, after the step of generating the electric quantity early warning signal:
acquiring the power consumption of each monitoring device according to the power consumption data of each monitoring device;
and respectively judging whether the power consumption of each monitoring device is greater than a preset power threshold of the corresponding monitoring device, and if so, sending an abnormal signal of the monitoring device to a management terminal.
6. The power supply control method of the power transmission line monitoring equipment according to claim 1, further comprising, after the step of obtaining the power consumption data of each monitoring equipment:
and obtaining the electricity utilization statistical information of each monitoring device according to the electricity utilization data of each monitoring device in a preset time period, and sending the electricity utilization statistical information to a management terminal.
7. A power supply control system of transmission line monitoring equipment, characterized in that, control system includes:
the first processing module is used for acquiring power consumption data of each monitoring device, obtaining power consumption of each monitoring device according to the power consumption data, and generating power supply priority of each monitoring device according to the power consumption of each monitoring device on the basis of a first preset mapping table; the first preset mapping table comprises a corresponding relation between a plurality of groups of power consumption intervals and power supply priorities;
the second processing module is used for acquiring the current residual electric quantity of the solar battery for supplying power to each monitoring device, determining the current power supply priority according to the current residual electric quantity based on a second preset mapping table, and supplying power to the monitoring device with the corresponding power supply priority according to the current power supply priority; the second preset mapping table comprises a corresponding relation between a plurality of groups of remaining power intervals and power supply priorities;
the third processing module is used for receiving the current residual electric quantity information and judging whether the current residual electric quantity is lower than a preset electric quantity early warning value or not, if so, generating an electric quantity early warning signal and generating the electric quantity early warning signal to the management terminal, wherein the management terminal is used for receiving the electric quantity early warning signal and controlling each monitoring device to reduce the monitoring frequency;
the fourth processing module is used for acquiring the illumination intensity data in a preset time period, judging whether the illumination intensity data is lower than a preset illumination intensity threshold value or not, and if so, sending a charging prompt signal to the management terminal; judging whether the illumination intensity data is lower than a preset illumination intensity threshold value, if so, sending a charging prompt signal to a management terminal specifically comprises: acquiring current time information, and judging whether the current time is in the day or at night according to the current time information; if the current time is in the daytime, judging whether the illumination intensity data is lower than a preset illumination intensity threshold value, and if so, sending a charging prompt signal; if the current time is at night, weather forecast information after sunrise is obtained, whether enough illumination intensity is available for charging the solar cell after sunrise is judged according to the weather forecast information after sunrise, if yes, a charging prompt signal is not sent, and if not, the charging prompt signal is sent;
and the storage module is used for storing the first preset mapping table and the second preset mapping table.
8. A power supply control device of transmission line monitoring equipment, characterized in that, the controlling means includes:
the memory is used for storing a program instruction, a first preset mapping table and a second preset mapping table; the first preset mapping table comprises a plurality of groups of corresponding relations between power consumption intervals and power supply priorities, and the second preset mapping table comprises a plurality of groups of corresponding relations between residual power intervals and power supply priorities; and (c) a second step of,
a control processor for invoking and executing program instructions in said memory for performing the method steps of any of claims 1 to 6.
9. A computer-readable storage medium characterized by: a computer program which can be loaded by a processor and which executes the method according to any of claims 1 to 6.
CN202210346940.0A 2022-04-01 2022-04-01 Power supply control method, system and device of power transmission line monitoring equipment Active CN114678855B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210346940.0A CN114678855B (en) 2022-04-01 2022-04-01 Power supply control method, system and device of power transmission line monitoring equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210346940.0A CN114678855B (en) 2022-04-01 2022-04-01 Power supply control method, system and device of power transmission line monitoring equipment

Publications (2)

Publication Number Publication Date
CN114678855A CN114678855A (en) 2022-06-28
CN114678855B true CN114678855B (en) 2023-03-28

Family

ID=82076705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210346940.0A Active CN114678855B (en) 2022-04-01 2022-04-01 Power supply control method, system and device of power transmission line monitoring equipment

Country Status (1)

Country Link
CN (1) CN114678855B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115983501B (en) * 2023-03-17 2023-06-27 河北冠益荣信科技有限公司 Portable energy storage device monitoring system and method based on big data
CN117200459B (en) * 2023-11-06 2024-02-27 深圳海辰储能科技有限公司 Information interaction processing method and related device of energy storage system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103997127B (en) * 2014-06-10 2016-02-17 山东建筑大学 A kind of Integrated Energy management system of high voltage transmission line Link Monitor Equipment and method
CN109409727A (en) * 2018-10-19 2019-03-01 珠海格力电器股份有限公司 Electric quantity distribution method and device
CN111864910A (en) * 2020-08-17 2020-10-30 安徽南瑞继远电网技术有限公司 Power transmission line multi-source data fusion device with load priority control function and control method thereof

Also Published As

Publication number Publication date
CN114678855A (en) 2022-06-28

Similar Documents

Publication Publication Date Title
CN114678855B (en) Power supply control method, system and device of power transmission line monitoring equipment
US10193343B2 (en) Method for managing power of energy storage system connected with renewable energy
CN102902245B (en) Intelligent monitoring system of photovoltaic power station
JP6664680B1 (en) Power control device, power control method, bidirectional inverter, and power control system
AU2010285341B2 (en) Power regulating system for solar power station
KR102088532B1 (en) Energy management system and enetgy management method thereof and energy operation system
CN116187702A (en) Source network and charge storage collaborative interaction optimization scheduling system
CN112332524A (en) Direct-current micro-grid system of light storage type charging station
CN115378015A (en) Method, system, device and medium for controlling operation of microgrid
CN104281984A (en) Power supply method for microgrid economical operation
CN111181195B (en) Light storage micro-grid system and self-starting method thereof
CN116454983B (en) Wind-solar-energy-storage combined optimal control management method, system and equipment
CN117060475A (en) Control method of new energy charging station and related equipment
CN110854934A (en) Electric power peak shifting charging control system
CN111769590A (en) Energy storage-based distributed photovoltaic microgrid coordination control method
KR102030838B1 (en) System and method of controlling for integrated interconnection of distributed generation and grid
CN106132043A (en) Solar street light energy balance method based on wireless monitor cloud platform
WO2015185890A1 (en) Adaptive battery management system
JP5992748B2 (en) Solar power generation system and power supply system
CN110768274B (en) Power control method and device for isolated microgrid
CN104009489A (en) Micro-grid management system and management method thereof
CN115102187A (en) Island microgrid management system and energy management method thereof
JP2013042575A (en) Power generation amount predictor, server, and power generating system
CN112600243B (en) Hybrid power grid power generation device
CN210183357U (en) Distributed photovoltaic power plant monitoring system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A power supply control method, system, and device for transmission line monitoring equipment

Granted publication date: 20230328

Pledgee: Shenzhen small and medium sized small loan Co.,Ltd.

Pledgor: SHENZHEN KYNE TECHNOLOGY CO.,LTD.

Registration number: Y2024980007627