CN114672641A - Dressing and smelting combined process for refractory dip-dyed copper-nickel oxide ore - Google Patents

Dressing and smelting combined process for refractory dip-dyed copper-nickel oxide ore Download PDF

Info

Publication number
CN114672641A
CN114672641A CN202210395442.5A CN202210395442A CN114672641A CN 114672641 A CN114672641 A CN 114672641A CN 202210395442 A CN202210395442 A CN 202210395442A CN 114672641 A CN114672641 A CN 114672641A
Authority
CN
China
Prior art keywords
copper
nickel
ore
solution
dyed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210395442.5A
Other languages
Chinese (zh)
Inventor
柏亚林
郭艳华
杨俊龙
刘坤
李健民
何海涛
高承岗
魏波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Research Institute of Mining and Metallurgy
Original Assignee
Northwest Research Institute of Mining and Metallurgy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest Research Institute of Mining and Metallurgy filed Critical Northwest Research Institute of Mining and Metallurgy
Priority to CN202210395442.5A priority Critical patent/CN114672641A/en
Publication of CN114672641A publication Critical patent/CN114672641A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B15/00Obtaining copper
    • C22B15/0063Hydrometallurgy
    • C22B15/0065Leaching or slurrying
    • C22B15/0067Leaching or slurrying with acids or salts thereof
    • C22B15/0071Leaching or slurrying with acids or salts thereof containing sulfur
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B1/00Preliminary treatment of ores or scrap
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B15/00Obtaining copper
    • C22B15/0063Hydrometallurgy
    • C22B15/0084Treating solutions
    • C22B15/0089Treating solutions by chemical methods
    • C22B15/0091Treating solutions by chemical methods by cementation
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B23/00Obtaining nickel or cobalt
    • C22B23/04Obtaining nickel or cobalt by wet processes
    • C22B23/0407Leaching processes
    • C22B23/0415Leaching processes with acids or salt solutions except ammonium salts solutions
    • C22B23/043Sulfurated acids or salts thereof
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B23/00Obtaining nickel or cobalt
    • C22B23/04Obtaining nickel or cobalt by wet processes
    • C22B23/0453Treatment or purification of solutions, e.g. obtained by leaching
    • C22B23/0461Treatment or purification of solutions, e.g. obtained by leaching by chemical methods
    • C22B23/0469Treatment or purification of solutions, e.g. obtained by leaching by chemical methods by chemical substitution, e.g. by cementation

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

The invention relates to a dressing and smelting combined process for refractory dip-dyed copper-nickel oxide ores, which comprises the following steps: firstly, grinding ore: grinding the dip-dyed copper-nickel oxide ore to obtain ore with the grinding fineness of less than 0.074mm and the content of 20-40%; secondly, pool leaching: adding water into the obtained ore, then adding sulfuric acid until the ore is immersed, standing and soaking for 25-30 days to obtain a copper-nickel leaching solution; thirdly, replacing copper by iron powder in the copper-nickel leaching solution: adding excessive iron powder into the copper-nickel leaching solution to replace copper, and filtering and washing to obtain copper sponge and copper replacement solution respectively; fourth, oxidizing and precipitating iron in the copper replacement liquid: adding an oxidant into the copper replacement liquid, and heating the copper replacement liquid after the oxidation is completed; then adding calcium carbonate powder, keeping the temperature for 2 hours, washing and filtering to respectively obtain iron filter residue and nickel-containing pregnant solution; fifthly, depositing nickel from the nickel-containing pregnant solution: adding sodium hydrosulfide or sodium sulfide into the nickel-containing pregnant solution, washing and filtering to respectively obtain nickel sulfide and residual liquid. The invention is simple, low in cost and convenient for industrial popularization and application.

Description

Dressing and smelting combined process for refractory dip-dyed copper-nickel oxide ore
Technical Field
The invention relates to the technical field of mineral processing, in particular to a dressing and smelting combined process of refractory dip-dyed copper-nickel oxide ores.
Background
The dip-dyed copper-nickel oxide ore belongs to the industrial type of super-basic rock weathered shell copper-nickel ore, and has high copper and nickel oxidation rate. The gangue minerals are altered minerals such as serpentine, talc, tremolite, chlorite, sericite, carbonate, celadon and the like, and the gangue minerals are severely weathered, contain large mud, have large influence on the recovery of copper and nickel and belong to more difficultly selected ores.
At present, the documents for recycling copper-nickel oxide ores at home and abroad are few, and the conventional flotation is difficult to recycle copper and nickel; the stirring, heating and acid leaching conditions are harsh, the production cost is high, and the requirement on equipment is high; and heap leaching and column leaching of ore have large mud and poor permeability, which is difficult to realize.
Disclosure of Invention
The invention aims to solve the technical problem of providing a simple and low-cost combined process for selecting and smelting refractory dip-dyed copper-nickel oxide ores.
In order to solve the problems, the invention provides a dressing and smelting combined process of refractory dip-dyed copper-nickel oxide ore, which comprises the following steps:
firstly, grinding ore:
grinding the dip-dyed copper nickel oxide ore, wherein the grinding concentration is 50% -60%, and the ore with the grinding fineness of less than 0.074mm and the content of 20% -40% is obtained;
secondly, pool leaching:
adding water into the ore obtained in the step, then adding sulfuric acid with the concentration of 30-40 g/L until the ore is immersed, standing and soaking for 25-30 days to obtain a copper-nickel leaching solution with the copper leaching rate of 81-83% and the nickel leaching rate of 59-61%;
thirdly, replacing copper by iron powder in the copper-nickel leaching solution:
adding excessive iron powder into the copper-nickel leaching solution at the temperature of 50-60 ℃ to replace copper, and filtering and washing to obtain copper sponge and copper replacement solution respectively;
fourth, oxidizing and precipitating iron in the copper replacement liquid:
adding an oxidant into the copper replacement solution according to the dosage of 15-17 g/L to perform Fe2+Oxidizing for 30-45 min; heating the copper replacement solution to 40-50 ℃ after complete oxidation to enable Fe3+Precipitating; then adding calcium carbonate powder according to the using amount of 40-45 g/L, keeping the heating time for 2 hours to obtain a precipitate A, and washing and filtering the precipitate A to respectively obtain iron filter residue and nickel-containing pregnant solution;
fifthly, depositing nickel from the nickel-containing pregnant solution:
and adding sodium hydrosulfide or sodium sulfide into the nickel-containing pregnant solution to obtain a precipitate B, and washing and filtering the precipitate B to respectively obtain nickel sulfide and residual liquid.
The method comprises the steps of enabling copper grade in the dip-dyed copper oxide nickel ore to be 0.89-1.1%, enabling nickel grade to be 0.55-0.7%, enabling the oxidation rate of copper to be 72-75% and enabling the oxidation rate of nickel to be 95-98%.
The method comprises the step of mixing the water and the ore in a mass ratio of 4-5: 1-0.5.
The ratio of the copper-nickel leaching solution to the iron powder in the step three is 1L: 6-9 g.
And (3) replacing in the step (iii) for 35-40 min.
The ratio of the nickel-containing pregnant solution to sodium hydrosulfide or sodium sulfide in the step fifthly is 1L: 5-6 g.
The precipitation temperature in the step fifthly is 60-70 ℃, and the precipitation time is 40-50 min.
Compared with the prior art, the invention has the following advantages:
1. the invention aims at the characteristics of large mud content and high oxidation rate of the dip-dyed copper-nickel oxide ore, and adopts tank leaching to recover copper and nickel.
2. Because the fineness has larger influence on the tank leaching, the too fine permeability is poor, and the too coarse leaching rate is lower, the invention adopts ore with the ore grinding fineness of less than 0.074mm and the content of 20-40% to perform the tank leaching, thereby obtaining higher leaching rates of copper and nickel.
3. The invention controls the dosage of the oxidant to be 15-17 g/L, the oxidation time to be 30-45 min, and Fe3+The precipitation temperature is 40-50 ℃, the dosage of the calcium carbonate powder is 40-45 g/L, and the heating time is 2h, so that the loss of nickel in the iron removal operation is reduced.
4. The invention adopts a combined process of rough grinding, tank leaching, iron powder replacement, copper-iron oxidation, precipitation and nickel precipitation, realizes the recovery of copper and nickel, and realizes the separation of copper and nickel, and simultaneously has the advantages of simpler process conditions, less investment, low cost, low requirement on equipment, easier realization in production and convenient industrial popularization and application.
Drawings
The following describes embodiments of the present invention in further detail with reference to the accompanying drawings.
FIG. 1 is a flow chart of the present invention.
Detailed Description
As shown in figure 1, the dressing and smelting combined process of the refractory dip-dyed copper-nickel oxide ore comprises the following steps:
the method comprises the steps of grinding:
and grinding the dip-dyed copper-nickel oxide ore by adopting a wet ball mill, wherein the grinding concentration is 50-60%, and the ore with the grinding fineness of less than 0.074mm and the content of 20-40% is obtained. In the dip-dyed copper oxide nickel ore, the copper grade is 0.89-1.1%, the nickel grade is 0.55-0.7%, the oxidation rate of copper is 72-75%, and the oxidation rate of nickel is 95-98%.
Secondly, pool leaching:
firstly adding water into the obtained ore to enable the liquid-solid ratio of the ore to be 4-5: 1-0.5, then adding sulfuric acid with the concentration of 30-40 g/L until the ore is immersed, standing and soaking for 25-30 days, and obtaining a copper-nickel leaching solution with the copper leaching rate of 81-83% and the nickel leaching rate of 59-61%.
Thirdly, replacing copper by iron powder in the copper-nickel leaching solution:
adding excessive iron powder into a copper-nickel leaching solution at the temperature of 50-60 ℃ according to the using amount of 6-9 g/L for replacing copper, wherein the replacing time is 35-40 min, and filtering and washing to respectively obtain sponge copper and a copper replacing solution; wherein the replacement rate of copper is more than 97 percent, and the grade of the generated sponge copper is more than 92 percent.
Fourth, iron in the copper replacement liquid is oxidized and precipitated:
since the copper replacement liquid contains Ni2+、Fe2+ 、Fe3+And so on, adding an oxidizing agent in an amount of 15 to 17 g/L to the copper replacement solution to carry out Fe2+Oxidizing for 30-45 min; when Fe is contained in the copper replacement liquid2+Fully oxidized into Fe3+Heating the copper displacement solution to 40-50 deg.C to make Fe3+Precipitating; and then adding calcium carbonate powder according to the using amount of 40-45 g/L, keeping the temperature for 2 hours to obtain a precipitate A, and washing and filtering the precipitate A to obtain iron filter residue and nickel-containing pregnant solution respectively.
Fifthly, depositing nickel from the nickel-containing pregnant solution:
adding sodium hydrosulfide or sodium sulfide into the nickel-containing pregnant solution according to the dosage of 5-6 g/L, precipitating at 60-70 ℃ for 40-50 min, obtaining a precipitate B after nickel is fully precipitated, and washing and filtering the precipitate B to respectively obtain nickel sulfide and residual liquid. Wherein the precipitation rate of nickel is more than 86 percent, and the grade of the generated nickel sulfide is more than 24 percent.
Example 1 Sinkiang Yiwu certain copper oxide nickel ore contains 0.89% copper and 0.55% nickel. The research of the process mineralogy proves that the ore belongs to dip-dyed copper oxide nickel ore, the ore is seriously weathered, the mud content is large, and the ore is difficult to select.
A dressing and smelting combined process for refractory dip-dyed copper-nickel oxide ores comprises the following steps:
firstly, grinding ore:
and (3) grinding the dip-dyed copper-nickel oxide ore by adopting a wet ball mill, wherein the grinding concentration is 55%, and the ore with the grinding fineness of less than 0.074mm and the content of 25% is obtained.
Secondly, pool leaching:
firstly adding water into the ore obtained in the step (A) to enable the liquid-solid ratio of the ore to be 4:1, then adding 35g/L sulfuric acid into a container until the ore is immersed, standing and soaking for 25 days to obtain a copper-nickel leaching solution with the copper leaching rate of 81.27% and the nickel leaching rate of 59.59%.
Thirdly, replacing copper by iron powder in the copper-nickel leaching solution:
adding excessive iron powder into 3L of copper-nickel leaching solution at 50 ℃ to replace copper, wherein the using amount of the iron powder is 6g/L, the replacement time is 35min, and filtering and washing to respectively obtain sponge copper and copper replacement solution. Wherein the substitution rate of copper is 97.35 percent, and the grade of the produced sponge copper is 92.05 percent.
Fourth, oxidizing and precipitating iron in the copper replacement liquid:
since the copper replacement liquid contains Ni2+、Fe2+ 、Fe3+And so on, adding an oxidant hydrogen peroxide into the copper replacement liquid according to the dosage of 15g/L to carry out Fe2+Oxidizing for 30 min; when Fe is contained in the copper replacement liquid2+Fully oxidized into Fe3+Heating the copper replacement solution to 50 ℃ to cause Fe3+Precipitating; then adding calcium carbonate powder according to the dosage of 40g/L, keeping the temperature for 2h to obtain a precipitate A, and washing and filtering the precipitate A by water to respectively obtain iron filter residue and nickel-containing pregnant solution.
Fifthly, depositing nickel from the nickel-containing pregnant solution:
adding 5g/L sodium hydrosulfide into 1L of nickel-containing pregnant solution, precipitating at 60 deg.C for 40min to obtain precipitate B after nickel is fully precipitated, washing the precipitate B with water, and filtering to obtain nickel sulfide and residual liquid. Wherein the precipitation rate of nickel is 86.78%, and the grade of the generated nickel sulfide is 24.32%.
Example 2 a certain nickel oxide ore in Yunnanjiang contains 0.68% of copper and 0.83% of nickel. The research of process mineralogy proves that the ore belongs to dip-dyed copper oxide nickel ore, and the ore is difficult to select.
A dressing and smelting combined process for refractory dip-dyed copper-nickel oxide ores comprises the following steps:
firstly, grinding ore:
and (3) grinding the dip-dyed copper-nickel oxide ore by adopting a wet ball mill, wherein the grinding concentration is 58%, and the ore with the grinding fineness of less than 0.074mm and the content of 40% is obtained.
Secondly, pool leaching:
firstly adding water into the obtained ore to enable the liquid-solid ratio of the ore to be 10:1, then adding 30g/L sulfuric acid into a container until the ore is immersed, standing and soaking for 30 days to obtain a copper-nickel leaching solution with the copper leaching rate of 82.65% and the nickel leaching rate of 60.54%.
Thirdly, replacing copper by iron powder in the copper-nickel leaching solution:
adding excessive iron powder into 3L of copper-nickel leaching solution at 60 ℃ to replace copper, wherein the using amount of the iron powder is 8g/L, the replacement time is 40min, and filtering and washing to respectively obtain sponge copper and copper replacement solution. Wherein the replacement rate of copper is 98.12%, and the grade of the produced sponge copper is 93.14%.
Fourth, oxidizing and precipitating iron in the copper replacement liquid:
since the copper replacement liquid contains Ni2+、Fe2+ 、Fe3+And so on, adding an oxidant hydrogen peroxide into the copper replacement solution according to the dosage of 16 g/L to carry out Fe2+Oxidizing for 40 min; when Fe is contained in the copper replacement liquid2+Fully oxidized into Fe3+Heating the copper replacement solution to 45 ℃ to cause Fe3+Precipitating; then adding calcium carbonate powder according to the dosage of 44g/L, keeping the temperature for 2h to obtain a precipitate A, and washing and filtering the precipitate A by water to respectively obtain iron filter residue and nickel-containing pregnant solution.
Fifthly, depositing nickel from the nickel-containing pregnant solution:
adding 5.5g/L sodium hydrosulfide or sodium sulfide into 1L of nickel-containing pregnant solution, precipitating at 65 ℃ for 45min, fully precipitating nickel to obtain precipitate B, washing the precipitate B with water, and filtering to obtain nickel sulfide and residual liquid respectively. Wherein the precipitation rate of nickel is 87.15 percent, and the grade of the generated nickel sulfide is 25.64 percent.
Example 3 a certain foreign copper-nickel oxide ore contains 1.12% copper and 0.89% nickel. The research of the process mineralogy proves that the ore belongs to a dip-dyed copper nickel oxide ore, the industrial type belongs to super-basic rock weathered shell type copper-nickel ore, and the ore is difficult to separate.
A dressing and smelting combined process for refractory dip-dyed copper-nickel oxide ores comprises the following steps:
firstly, grinding ore:
and (3) grinding the dip-dyed copper-nickel oxide ore by adopting a wet ball mill, wherein the grinding concentration is 60%, and the ore with the grinding fineness of less than 0.074mm and the content of 20% is obtained.
Secondly, pool leaching:
firstly adding water into the obtained ore to ensure that the liquid-solid ratio is 6:1, then adding 40g/L sulfuric acid into a container until the ore is immersed, standing and soaking for 28 days to obtain a copper-nickel leaching solution with the copper leaching rate of 81.27% and the nickel leaching rate of 59.59%.
Thirdly, replacing copper by iron powder in the copper-nickel leaching solution:
adding excessive iron powder into 3L of copper-nickel leaching solution at 60 ℃ to replace copper, wherein the using amount of the iron powder is 9g/L, the replacement time is 40min, and filtering and washing to obtain sponge copper and copper replacement solution respectively. Wherein the replacement rate of copper is 97.44 percent, and the grade of the generated sponge copper is 92.34 percent.
Fourth, oxidizing and precipitating iron in the copper replacement liquid:
since the copper replacement liquid contains Ni2+、Fe2+ 、Fe3+And so on, adding an oxidant hydrogen peroxide into the copper replacement liquid according to the dosage of 17 g/L to carry out Fe2+Oxidizing for 45 min; when Fe is contained in the copper replacement liquid2+Fully oxidized into Fe3+Heating the copper replacement solution to 40 ℃ to cause Fe3+Precipitating; then adding calcium carbonate powder according to the using amount of 45g/L, keeping the heating time for 2 hours to obtain a precipitate A, and washing and filtering the precipitate A by water to respectively obtain iron filter residue and nickel-containing pregnant solution.
Fifthly, depositing nickel from the nickel-containing pregnant solution:
adding 6g/L of sodium hydrosulfide or sodium sulfide into 1L of nickel-containing pregnant solution, precipitating at 70 ℃ for 50 min, fully precipitating nickel to obtain precipitate B, washing the precipitate B with water, and filtering to respectively obtain nickel sulfide and residual liquid. Wherein the precipitation rate of nickel is 87.15 percent, and the grade of the generated nickel sulfide is 26.54 percent.

Claims (7)

1. A dressing and smelting combined process for refractory dip-dyed copper-nickel oxide ores comprises the following steps:
the method comprises the steps of grinding:
grinding the dip-dyed copper nickel oxide ore, wherein the grinding concentration is 50% -60%, and the ore with the grinding fineness of less than 0.074mm and the content of 20% -40% is obtained;
secondly, pool leaching:
adding water into the ore obtained in the step, then adding sulfuric acid with the concentration of 30-40 g/L until the ore is immersed, standing and soaking for 25-30 days to obtain a copper-nickel leaching solution with the copper leaching rate of 81-83% and the nickel leaching rate of 59-61%;
thirdly, replacing copper by iron powder in the copper-nickel leaching solution:
adding excessive iron powder into the copper-nickel leaching solution at the temperature of 50-60 ℃ to replace copper, and filtering and washing to obtain copper sponge and copper replacement solution respectively;
fourth, oxidizing and precipitating iron in the copper replacement liquid:
adding an oxidant into the copper replacement solution according to the dosage of 15-17 g/L to perform Fe2+Oxidizing for 30-45 min; heating the copper replacement solution to 40-50 ℃ after complete oxidation to enable Fe3+Precipitating; then adding calcium carbonate powder according to the using amount of 40-45 g/L, keeping the heating time for 2 hours to obtain a precipitate A, and washing and filtering the precipitate A to respectively obtain iron filter residue and nickel-containing pregnant solution;
fifthly, depositing nickel from the nickel-containing pregnant solution:
and adding sodium hydrosulfide or sodium sulfide into the nickel-containing pregnant solution to obtain a precipitate B, and washing and filtering the precipitate B to respectively obtain nickel sulfide and residual liquid.
2. The combined process for dressing and smelting refractory dip-dyed copper-nickel oxide ore according to claim 1, wherein: the method comprises the steps of enabling copper grade in the dip-dyed copper oxide nickel ore to be 0.89-1.1%, enabling nickel grade to be 0.55-0.7%, enabling the oxidation rate of copper to be 72-75% and enabling the oxidation rate of nickel to be 95-98%.
3. The combined process for dressing and smelting refractory dip-dyed copper-nickel oxide ore according to claim 1, wherein the combined process comprises the following steps: the method comprises the following steps that the mass ratio of the reclaimed water to the ore is 4-5: 1-0.5.
4. The combined process for dressing and smelting refractory dip-dyed copper-nickel oxide ore according to claim 1, wherein the combined process comprises the following steps: the ratio of the copper-nickel leaching solution to the iron powder in the step three is 1L: 6-9 g.
5. The combined process for dressing and smelting refractory dip-dyed copper-nickel oxide ore according to claim 1, wherein: and step three, replacing time is 35-40 min.
6. The combined process for dressing and smelting refractory dip-dyed copper-nickel oxide ore according to claim 1, wherein: the ratio of the nickel-containing noble metal liquid to sodium hydrosulfide or sodium sulfide in the step I is 1L: 5-6 g.
7. The combined process for dressing and smelting refractory dip-dyed copper-nickel oxide ore according to claim 1, wherein the combined process comprises the following steps: the precipitation temperature in the step fifthly is 60-70 ℃, and the precipitation time is 40-50 min.
CN202210395442.5A 2022-04-15 2022-04-15 Dressing and smelting combined process for refractory dip-dyed copper-nickel oxide ore Pending CN114672641A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210395442.5A CN114672641A (en) 2022-04-15 2022-04-15 Dressing and smelting combined process for refractory dip-dyed copper-nickel oxide ore

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210395442.5A CN114672641A (en) 2022-04-15 2022-04-15 Dressing and smelting combined process for refractory dip-dyed copper-nickel oxide ore

Publications (1)

Publication Number Publication Date
CN114672641A true CN114672641A (en) 2022-06-28

Family

ID=82078962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210395442.5A Pending CN114672641A (en) 2022-04-15 2022-04-15 Dressing and smelting combined process for refractory dip-dyed copper-nickel oxide ore

Country Status (1)

Country Link
CN (1) CN114672641A (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0598366A (en) * 1991-05-20 1993-04-20 Nisshin Steel Co Ltd Treatment of garnierite
JPH05125464A (en) * 1991-10-17 1993-05-21 Nisshin Steel Co Ltd Treatment of magnesia nickel silicate ore
CN1858274A (en) * 2006-06-02 2006-11-08 云南锡业集团有限责任公司 New treating method for nickel oxide ore
CN101328538A (en) * 2008-08-04 2008-12-24 云南嘉明科技实业有限公司 Method for extracting copper, cobalt and nickel from cupric oxide cobalt ore
CN102423728A (en) * 2011-11-24 2012-04-25 昆明理工大学 Flotation method for copper-containing nickel sulfide ore
WO2013027603A1 (en) * 2011-08-22 2013-02-28 住友金属鉱山株式会社 Nickel recovery loss reduction method, hydrometallurgical method for nickel oxidized ore, and sulfuration treatment system
CN103146911A (en) * 2013-03-27 2013-06-12 西南科技大学 Beneficiation method for treating combined copper oxide ore and recovering associated valuable metals
CN103555938A (en) * 2013-10-29 2014-02-05 昆明理工大学 Dressing and smelting method for high-silt content copper oxide ores
CN106222430A (en) * 2016-08-04 2016-12-14 西北矿冶研究院 Method for recovering copper and cobalt from copper-cobalt slag by wet metallurgy
CN109321746A (en) * 2018-12-03 2019-02-12 北京矿冶科技集团有限公司 A method of nickel is extracted by copper nickel Whote-wet method
CN111411224A (en) * 2020-05-15 2020-07-14 广东省资源综合利用研究所 Beneficiation method for comprehensively recovering and combining silver and copper from low-grade manganese-containing ore
CN113403486A (en) * 2021-06-18 2021-09-17 国家电投集团黄河上游水电开发有限责任公司 Process for removing iron from nickel sulfide concentrate leachate by goethite method
CN113403477A (en) * 2021-06-18 2021-09-17 国家电投集团黄河上游水电开发有限责任公司 Comprehensive utilization method of nickel sulfide concentrate

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0598366A (en) * 1991-05-20 1993-04-20 Nisshin Steel Co Ltd Treatment of garnierite
JPH05125464A (en) * 1991-10-17 1993-05-21 Nisshin Steel Co Ltd Treatment of magnesia nickel silicate ore
CN1858274A (en) * 2006-06-02 2006-11-08 云南锡业集团有限责任公司 New treating method for nickel oxide ore
CN101328538A (en) * 2008-08-04 2008-12-24 云南嘉明科技实业有限公司 Method for extracting copper, cobalt and nickel from cupric oxide cobalt ore
WO2013027603A1 (en) * 2011-08-22 2013-02-28 住友金属鉱山株式会社 Nickel recovery loss reduction method, hydrometallurgical method for nickel oxidized ore, and sulfuration treatment system
CN102423728A (en) * 2011-11-24 2012-04-25 昆明理工大学 Flotation method for copper-containing nickel sulfide ore
CN103146911A (en) * 2013-03-27 2013-06-12 西南科技大学 Beneficiation method for treating combined copper oxide ore and recovering associated valuable metals
CN103555938A (en) * 2013-10-29 2014-02-05 昆明理工大学 Dressing and smelting method for high-silt content copper oxide ores
CN106222430A (en) * 2016-08-04 2016-12-14 西北矿冶研究院 Method for recovering copper and cobalt from copper-cobalt slag by wet metallurgy
CN109321746A (en) * 2018-12-03 2019-02-12 北京矿冶科技集团有限公司 A method of nickel is extracted by copper nickel Whote-wet method
CN111411224A (en) * 2020-05-15 2020-07-14 广东省资源综合利用研究所 Beneficiation method for comprehensively recovering and combining silver and copper from low-grade manganese-containing ore
CN113403486A (en) * 2021-06-18 2021-09-17 国家电投集团黄河上游水电开发有限责任公司 Process for removing iron from nickel sulfide concentrate leachate by goethite method
CN113403477A (en) * 2021-06-18 2021-09-17 国家电投集团黄河上游水电开发有限责任公司 Comprehensive utilization method of nickel sulfide concentrate

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
梁溢强;宋涛;谢峰;吕超;: "湖北某难选氧化铜矿选冶联合试验研究", 矿业研究与开发, no. 03, 25 March 2019 (2019-03-25) *
谭欣;赵杰;王中明;: "难选铜镍氧化矿选矿试验研究", 有色金属(选矿部分), no. 1, 30 November 2013 (2013-11-30) *

Similar Documents

Publication Publication Date Title
CN101225476B (en) Process for reclaiming copper from lead copper matte
CN102994747B (en) Technology for recovering metallic copper from high-lead copper matte
CN102051478B (en) Wet process for treating lead copper matte
CN102586627B (en) Method for recovering bismuth from bismuth slag
CN110184482B (en) Germanium-containing zinc hypoxide powder leaching process
CN102859012B (en) The method of process nickel-bearing raw material
CN104726717B (en) Method for recovering cobalt from inverse antimony purified cobalt residue
CN107447107B (en) A kind of method that wealth and rank antimony control current potential is separated and recovered from base metal
CN102757022B (en) Technology for extracting tellurium product and valuable metal from lead anode slime
CN110106353B (en) Short-process leaching method for zinc smelting
CN108588425A (en) A kind of processing method of cobalt metallurgy of nickel waste water slag
CN111225988B (en) Oxygen pressure leaching method of copper sulfide concentrate and copper smelting method
CN111235404A (en) Impurity removal method for producing cobalt hydroxide from copper raffinate
CN104004907A (en) Method for separating copper from lead matte and comprehensively utilizing lead matte
CN100552059C (en) The method of direct leaching indium in the indium ore deposit
CN1237641A (en) Technological process for extracting Ni, Cu, Co and Mg from nickel sulfide preparation concentrate and making nickelferrite
CN113416856A (en) Method for selectively extracting cobalt and nickel from nickel sulfide concentrate
CN109913647B (en) Wet processing method for recovering copper and zinc in bismuth middling
CN110540252A (en) method for preparing battery-grade cobalt sulfate and high-purity germanium dioxide from white alloy
CN115029562B (en) Method for separating copper and germanium in zinc hydrometallurgy process
CN114672641A (en) Dressing and smelting combined process for refractory dip-dyed copper-nickel oxide ore
CN109777953B (en) Low-grade oxidation and copper sulfide ore environment-friendly recovery process
KR101543901B1 (en) Method for recovering nickel from nickel ore
CN112458306A (en) Method for reducing zinc content of flotation silver concentrate in zinc hydrometallurgy process
CN105018726A (en) Treatment method for lead and zinc paragenic ore

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination