CN114620588A CN202210231104.8A CN202210231104A CN114620588A CN 114620588 A CN114620588 A CN 114620588A CN 202210231104 A CN202210231104 A CN 202210231104A CN 114620588 A CN114620588 A CN 114620588A
Authority
CN
China
Prior art keywords
glass curtain
curtain wall
wall
fixed
adsorption
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210231104.8A
Other languages
Chinese (zh)
Inventor
方海涛
叶婷
赵钢锋
罗勇强
鲍振飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Classic Building Decoration Co ltd
Original Assignee
Zhejiang Classic Building Decoration Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Classic Building Decoration Co ltd filed Critical Zhejiang Classic Building Decoration Co ltd
Priority to CN202210231104.8A priority Critical patent/CN114620588A/en
Publication of CN114620588A publication Critical patent/CN114620588A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/02Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by suction means
    • B66C1/0218Safety measures, e.g. sensors, duplicate functions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/02Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by suction means
    • B66C1/0237Multiple lifting units; More than one suction area
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/02Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by suction means
    • B66C1/0256Operating and control devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/16Applications of indicating, registering, or weighing devices

Abstract

The invention discloses a glass curtain wall hoisting construction method and equipment thereof, relating to the technical field of glass curtain wall hoisting construction; in order to improve the lifting conveying effect; the lifting appliance comprises a lifting frame and a plurality of adsorption fixing components, wherein the adsorption fixing components are detachably arranged on the lifting frame; the adsorption fixing component comprises: the adsorption cylinder is arranged on the hanging bracket; the piston slides on the inner wall of the adsorption cylinder in a sealing manner; the method comprises the following steps: according to actual conditions, will adsorb fixed subassembly and install in the fixing base that corresponds to fix absorption fixed subassembly through the fastening knob. According to the invention, by arranging the adsorption fixing component and other structures, the glass curtain wall plate can be attached to one side of the annular sucker, the adjusting screw rod is screwed by rotating the handle, and the piston is driven to slide in the adsorption cylinder, so that the distance between the piston and the glass curtain wall plate is increased, and the annular sucker is used for reliably adsorbing and fixing the glass curtain wall plate.

Description

Glass curtain wall hoisting construction method and equipment thereof
Technical Field
The invention relates to the technical field of glass curtain wall hoisting construction, in particular to a glass curtain wall hoisting construction method and equipment.
Background
Glass curtain wall is that can have certain displacement ability, not share the outer protective structure or the decorative structure of building that the major structure receives by the supporting structure system relatively major structure, in eminence glass curtain wall construction, often need carry the hoist and mount of glass curtain wall plate to the assigned position, then install glass curtain wall plate. Current glass curtain wall lifting device, chinese patent that application number is CN202011041278.5 discloses a high-rise building glass curtain wall hoist and mount system, including hoist and mount case and the latch closure of fixed connection in four corners of hoist and mount case, the inside left end of hoist and mount case is provided with clamping device, and clamping device's top is provided with dismounting device, and the left end of hoist and mount case is provided with fixing device. Although the glass curtain wall hoisting system in the above patent can satisfy certain construction requirements, adopt the tight mode of clamp to fix the glass curtain wall plate during hoist and mount, cause the damage of glass curtain wall plate very easily, and the dismouting is comparatively inconvenient, consequently, still remains to be improved.
Disclosure of Invention
The invention aims to solve the defects in the prior art and provides a glass curtain wall hoisting construction method and equipment.
In order to achieve the purpose, the invention adopts the following technical scheme:
the glass curtain wall hoisting construction equipment comprises a hoisting device, wherein the hoisting device comprises a hoisting frame and a plurality of adsorption fixing assemblies, and the adsorption fixing assemblies are detachably arranged on the hoisting frame; the adsorption fixing component comprises:
the adsorption cylinder is arranged on the hanging bracket;
the piston slides on the inner wall of the adsorption cylinder in a sealing way, and a metal seat is fixed on the inner wall of one side of the piston;
the adjusting screw rod is connected to the inner wall of one end of the adsorption cylinder through threads, one end of the adjusting screw rod is provided with a rotating head, the rotating head is rotatably connected to the inner wall of the metal seat, and a rotating handle is fixed to the side wall of the other end of the adjusting screw rod;
the annular sucking disc is fixed on the circumferential outer wall at one end of the adsorption cylinder;
and the pressure detection assembly is arranged in the adsorption cylinder and is positioned between the piston and the annular sucking disc.
Preferably: the lifting appliance device further comprises a lifting rod and a lifting ring, wherein the lifting rod is arranged on the outer wall of the top of the lifting frame, and the lifting ring is arranged at the top end of the lifting rod.
Further: the adsorption cylinder bottom is provided with the breather valve, and the breather valve includes:
the valve shell is fixed on the outer wall of the bottom of the adsorption cylinder;
the valve plug is connected with the inner wall of the valve shell in a sealing and sliding manner;
the valve casing top, the valve casing top is provided with the lug, lug inner wall sliding connection has the guide bar, the guide bar bottom mounting is in the valve casing top through first spring mobilizable installation in the valve casing top, and the through-hole has been seted up to fly leaf top outer wall, fly leaf both sides outer wall, and the lug inner wall sliding connection has the guide bar, and the guide bar bottom mounting is in the valve casing top.
Further preferred is: the outer wall of one side of the hanging bracket is provided with a fixing seat which is uniformly distributed, the adsorption cylinder is detachably installed in the fixing seat, and the top of the fixing seat is connected with a fastening knob which is used for fixing the adsorption cylinder through threads.
As a preferable aspect of the present invention: the pressure detection assembly comprises a pressure sensor, a control unit, an indicator light and a power supply unit; the pressure sensor, the control unit and the indicator lamp are electrically connected through a signal line, and the indicator lamp is fixed at the top of the adsorption cylinder.
Further preferred as the invention: glass curtain wall hoist and mount construction equipment still includes the receiving device who uses with the cooperation of hoist device, receiving device includes:
a base;
the L-shaped bearing frame is arranged on the base;
the flexible pad is fixed on the L-shaped bearing frame;
the ejector pin, the ejector pin is fixed in L type through the support and accepts the frame and keep away from the one side outer wall of adjustable fender, and ejector pin top diameter reduces gradually, the position and the size adaptation of ejector pin and valve casing.
As a still further scheme of the invention: a movable baffle is arranged on one side of the L-shaped bearing frame, rotating shafts are fixed on two sides of the movable baffle, and the rotating shafts are arranged on the inner walls of two sides of the L-shaped bearing frame through spring springs; the flexible pad is positioned between the L-shaped bearing frame and the movable baffle.
On the basis of the scheme: valve casing both sides are provided with the locking subassembly, the locking subassembly includes:
the mounting seat is arranged on the outer wall of the valve shell;
the limiting rack is slidably mounted in the mounting seat, limiting teeth are arranged at two ends of the limiting rack, the limiting teeth are positioned on the inner side of the valve shell, the two limiting teeth are of a triangular structure, and inclined edges of the two limiting teeth are arranged on one side away from the valve plug;
the central rod is fixed on the inner walls of the two sides of the mounting seat, and the limiting frame is connected to the outer wall of the central rod in a sliding manner;
one end of the second spring is fixed on the outer wall of one side, away from the valve shell, of the limiting frame, and the other end of the second spring is fixed on the inner wall of one side of the mounting seat.
On the basis of the foregoing scheme, it is preferable that: the base includes:
a base;
the sliding rail is fixed to the top of the base, a sliding block matched with the sliding rail is fixed to the bottom of the L-shaped bearing frame, and the L-shaped bearing frame is connected into the sliding rail in a sliding mode through the sliding block.
A glass curtain wall hoisting construction method comprises the following steps:
s1: according to the actual situation, the adsorption fixing component is arranged in the corresponding fixing seat, and is fixed through a fastening knob;
s2: attaching a glass curtain wall plate to be hoisted to one side of the annular sucking disc;
s3: the adjusting screw is screwed by rotating the handle, so that the piston is driven to slide in the adsorption cylinder, and the annular sucking disc is used for reliably adsorbing and fixing the glass curtain wall plate;
s4: connecting a lifting ring through a crane, and lifting the lifting appliance device to a specified place;
s5: the guide valve shell is aligned with the ejector rod and then is put down, so that the ejector rod is inserted into the valve shell;
s6: the valve plug is pushed upwards into the adsorption cylinder by utilizing the ejector rod, so that gas enters the adsorption cylinder, and the glass curtain wall plate falls down and is supported by the flexible cushion;
s7: and the constructor takes down the glass curtain wall plate and carries out installation and construction.
The invention has the beneficial effects that:
1. according to the invention, by arranging the adsorption fixing component and other structures, the glass curtain wall plate can be attached to one side of the annular sucker, the adjusting screw rod is screwed by the rotating handle, and the piston is driven to slide in the adsorption cylinder, so that the distance between the piston and the glass curtain wall plate is increased, the annular sucker is used for reliably adsorbing and fixing the glass curtain wall plate, and the metal seat is rotationally connected with the rotating head, so that the sliding and autorotation of the adjusting screw rod are avoided, and the fixing effect is improved.
2. Through setting up the breather valve, can with the mode that promotes the valve plug, with the valve plug squeeze into under the direction of guide bar in adsorbing the section of thick bamboo, and then switch on the breather valve for the glass curtain wall plate can be pulled down easily.
3. Through setting up the pressure measurement subassembly, can utilize pressure sensor real-time detection to adsorb the interior pressure of a section of thick bamboo when adsorbing the glass curtain wall plate to carry out state feedback through the pilot lamp, do benefit to the user and judge, thereby control the adsorption force in suitable value, promoted the reliability.
4. Through setting up receiving device, can when hoist and mount assigned position, guide valve casing aligns with the ejector pin, and then transfers, makes in the ejector pin inserts the valve casing to in upwards pushing into the absorption section of thick bamboo with the valve plug, make in gaseous entering into the absorption section of thick bamboo, thereby make the glass curtain wall plate fall down, and accept by the flexile cushion, saved the manpower, promoted the construction convenience.
5. Through the arrangement of the locking assembly, the limiting teeth can extend into the valve shell by utilizing the elasticity of the second spring, so that the valve plug is limited, and the sealing effect of the valve plug is guaranteed; when the ejector pin inserted, can extrude the spacing tooth of bottom to both sides to make the spacing tooth at top remove in step to the mount pad, and then remove the spacing effect to the valve plug, along with the ejector pin continues to insert, can advance the valve plug to the interior top of adsorbing a section of thick bamboo, the valve plug is pushed up and is gone into the back of adsorbing in the section of thick bamboo, and the breather valve switches on, and external gas can get into, and the glass curtain wall plate can be pulled down.
Drawings
FIG. 1 is a schematic structural view of a hanger device and a receiving device of glass curtain wall hoisting construction equipment provided by the invention;
FIG. 2 is a schematic structural diagram of a lifting appliance device of glass curtain wall lifting construction equipment provided by the invention;
FIG. 3 is a schematic structural view of the back of a lifting appliance device of glass curtain wall lifting construction equipment provided by the invention;
FIG. 4 is a schematic structural view of a cross section of an adsorption fixing assembly of a glass curtain wall hoisting construction device provided by the invention;
FIG. 5 is a schematic sectional structural view of a mounting seat and a vent valve of a glass curtain wall hoisting construction device provided by the invention;
FIG. 6 is an enlarged view taken at A in FIG. 5;
fig. 7 is a schematic structural view of the glass curtain wall hoisting construction equipment provided by the invention, wherein the L-shaped bearing frame and the sliding rail are detached.
In the figure: 1 hanger, 2 suspender, 3 rings, 4 adsorption fixing components, 5 annular suckers, 6L-shaped carrying frame, 7 movable baffle, 8 bases, 9 sliding rails, 10 mandrils, 11 adsorption cylinders, 12 indicating lamps, 13 valve casings, 14 mounting seats, 15 fastening knobs, 16 fixing seats, 17 adjusting screws, 18 rotating handles, 19 metal seats, 20 pistons, 21 guide rods, 22 movable plates, 23 rotating heads, 24 central rods, 25 second springs, 26 limiting frames, 27 limiting teeth, 28 valve plugs, 29 first springs, 30 connecting rods, 31 protruding blocks, 32 through holes, 33 rotating shafts, 34 flexible pads and 35 sliders.
Detailed Description
The technical solution of the present patent will be further described in detail with reference to the following embodiments.
Reference will now be made in detail to embodiments of the present patent, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present patent and are not to be construed as limiting the present patent.
In the description of this patent, it is to be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientations and positional relationships indicated in the drawings for the convenience of describing the patent and for the simplicity of description, and are not intended to indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are not to be considered limiting of the patent.
In the description of this patent, it is noted that unless otherwise specifically stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can include, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by those of ordinary skill in the art as appropriate.
Example 1:
a glass curtain wall hoisting construction device is shown in figures 1-7 and comprises a lifting appliance device, wherein the lifting appliance device comprises a lifting frame 1 and a plurality of adsorption fixing components 4, and the adsorption fixing components 4 are detachably arranged on the lifting frame 1; the adsorption fixing component 4 comprises:
the adsorption cylinder 11, the adsorption cylinder 11 is mounted on the hanger 1;
the piston 20, the piston 20 is sealed and slipped on the inner wall of the adsorption cylinder 11, the inner wall of one side of the piston 20 is adhered with the metal base 19;
the adjusting screw 17 is connected to the inner wall of one end of the adsorption cylinder 11 through threads, a rotating head 23 is integrally arranged at one end of the adjusting screw 17, the rotating head 23 is rotatably connected to the inner wall of the metal seat 19, and a rotating handle 18 is welded on the side wall of the other end of the adjusting screw 17;
the annular sucking disc 5 is adhered to the circumferential outer wall of one end of the adsorption cylinder 11;
the pressure detection assembly is arranged in the adsorption cylinder 11 and is positioned between the piston 20 and the annular sucker 5;
through setting up and adsorbing fixed subassembly 4 isotructures, can attach glass curtain wall plate in 5 one sides of annular sucking disc, revolve wrong adjusting screw 17 through rotating handle 18, and then drive piston 20 and slide in adsorbing a section of thick bamboo 11, make the interval increase of piston 20 and glass curtain wall plate, thereby utilize annular sucking disc 5 to carry out reliable absorption fixedly to glass curtain wall plate, because metal base 19 rotates with rotating head 23 and is connected, avoided adjusting screw 17 rotation of skidding, fixed effect has been promoted.
The hoisting is convenient; as shown in fig. 1, the lifting device further comprises a hanging rod 2 and a hanging ring 3, wherein the hanging rod 2 is integrally arranged on the outer wall of the top of the hanging bracket 1, and the hanging ring 3 is integrally arranged at the top end of the hanging rod 2.
The glass curtain wall plate is convenient to disassemble; as shown in fig. 4-6, the bottom of the adsorption cylinder 11 is provided with a vent valve, which includes:
a valve casing 13, wherein the valve casing 13 is welded on the outer wall of the bottom of the adsorption cylinder 11;
the valve plug 28, the valve plug 28 is connected to the inner wall of the valve housing 13 in a sealing and sliding manner;
the movable plate 22 is movably mounted at the top of the valve housing 13 through a first spring 29, the bottom of the movable plate 22 is connected to the top of the valve plug 28 through a connecting rod 30, a through hole 32 is formed in the outer wall of the top of the movable plate 22, the outer walls of two sides of the movable plate 22 are integrally provided with a bump 31, the inner wall of the bump 31 is slidably connected with a guide rod 21, and the bottom end of the guide rod 21 is fixed at the top end of the valve housing 13;
through setting up the breather valve, can be with the mode that promotes valve plug 28, with valve plug 28 in the section of thick bamboo 11 is adsorbed in squeezing into under the direction of guide bar 21, and then switch on the breather valve for the glass curtain wall plate can be dismantled easily.
In order to adjust the installation position of the adsorption fixing component 4 according to requirements; as shown in fig. 1-3, a fixing seat 16 uniformly distributed is integrally arranged on an outer wall of one side of the hanger 1, the adsorption cylinder 11 is detachably mounted in the fixing seat 16, and a fastening knob 15 for fixing the adsorption cylinder 11 is connected to the top of the fixing seat 16 through a thread.
To facilitate judgment of the adsorption force of the adsorption fixing component 4; as shown in fig. 2, the pressure detection assembly includes a pressure sensor, a control unit, an indicator lamp 12, and a power supply unit; the pressure sensor, the control unit and the indicator light 12 are electrically connected through a signal line, and the indicator light 12 is fixed at the top of the adsorption cylinder 11; through setting up the pressure measurement subassembly, can utilize pressure sensor real-time detection to adsorb 11 interior pressures of section of thick bamboo when adsorbing the glass curtain wall plate to carry out state feedback through pilot lamp 12, do benefit to the user and judge, thereby control the adsorption force in suitable value, promoted the reliability.
In order to be convenient for bearing the glass curtain wall plate block hoisted to the designated position; as shown in fig. 1 and 7, the glass curtain wall hoisting construction equipment further comprises a receiving device used in cooperation with the lifting device, and the receiving device comprises:
a base;
the L-shaped bearing frame 6 is arranged on the base;
the flexible pad 34 is fixed on the L-shaped bearing frame 6 and used for playing a role in buffering when bearing the glass curtain wall plate;
the ejector rod 10 is fixed on the outer wall of one side of the L-shaped bearing frame 6, which is far away from the movable baffle 7, through a support, the diameter of the top of the ejector rod 10 is gradually reduced, and the ejector rod 10 is matched with the position and the size of the valve shell 13.
Wherein; a movable baffle 7 is arranged on one side of the L-shaped bearing frame 6, rotating shafts 33 are fixed on two sides of the movable baffle 7, and the rotating shafts 33 are arranged on the inner walls of two sides of the L-shaped bearing frame 6 through spring springs; the flexible pad 34 is located between the L-shaped receiving frame 6 and the flapper 7.
Through setting up receiving device, can be when hoist and mount assigned position, guide valve casing 13 aligns with ejector pin 10, and then transfers, makes in ejector pin 10 inserts valve casing 13 to in upwards pushing into an absorption section of thick bamboo 11 with valve plug 28, make gas enter into in the absorption section of thick bamboo 11, thereby make the glass curtain wall plate fall down, and accept by flexible pad 34, saved the manpower, promoted the construction convenience.
In order to improve reliability; as shown in fig. 4 to 6, the valve housing 13 is provided at both sides with locking assemblies including:
the mounting seat 14 is integrally arranged on the outer wall of the valve shell 13;
the limiting frame 26 is slidably mounted in the mounting seat 14, limiting teeth 27 are integrally arranged at two ends of the limiting frame 26, the limiting teeth 27 are positioned on the inner side of the valve shell 13, the two limiting teeth 27 are in a triangular structure, and inclined edges of the two limiting teeth 27 are arranged on one side far away from the valve plug 28;
the central rod 24 is fixed on the inner walls of the two sides of the mounting seat 14, and the limiting frame 26 is connected to the outer wall of the central rod 24 in a sliding manner;
one end of the second spring 25 is fixed on the outer wall of one side of the limiting frame 26 far away from the valve shell 13, and the other end of the second spring 25 is fixed on the inner wall of one side of the mounting seat 14;
by arranging the locking assembly, the limit teeth 27 can extend into the valve shell 13 by utilizing the elasticity of the second spring 25, so that the valve plug 28 is limited, and the sealing effect of the valve plug 28 is guaranteed; when ejector pin 10 inserts, can extrude to both sides with the spacing tooth 27 of bottom to make the spacing tooth 27 at top remove in step to the mount pad 14, and then remove the spacing effect to valve plug 28, insert along with ejector pin 10 continues, can advance valve plug 28 to adsorbing a section of thick bamboo 11 interior top, valve plug 28 by the back in the absorption section of thick bamboo 11 of top, the breather valve switches on, and external gas can get into, and the glass curtain wall plate can be pulled down.
The construction is convenient; as shown in fig. 7, the base includes:
a base 8;
slide rail 9, slide rail 9 are fixed in 8 tops of base, 6 bottoms in the L type is accepted and is fixed with the slider 35 with the slide rail 9 adaptation, and the L type is accepted and is put up 6 through slider 35 sliding connection in slide rail 9.
Example 2:
a glass curtain wall hoisting construction method comprises the following steps:
s1: according to the actual situation, the adsorption fixing component 4 is installed in the corresponding fixing seat 16, and the adsorption fixing component 4 is fixed through the fastening knob 15;
s2: attaching a glass curtain wall plate to be hoisted to one side of the annular sucking disc 5;
s3: the adjusting screw 17 is screwed through the rotating handle 18, so that the piston 20 is driven to slide in the adsorption cylinder 11, and the annular sucking disc 5 is used for reliably adsorbing and fixing the glass curtain wall plate;
s4: connecting a lifting ring 3 through a crane, and lifting the lifting appliance device to a specified place;
s5: the guide valve shell 13 is aligned with the top rod 10 and then is put down, so that the top rod 10 is inserted into the valve shell 13;
s6: the valve plug 28 is pushed upwards into the adsorption cylinder 11 by utilizing the ejector rod 10, so that gas enters the adsorption cylinder 11, and the glass curtain wall plate falls down and is received by the flexible pad 34;
s7: and the constructor takes down the glass curtain wall plate and carries out installation and construction.
The above description is for the purpose of describing the preferred embodiments of the present invention, and is not intended to be the only embodiments of the present invention, and the scope of the present invention is not limited thereto, and any person skilled in the art can comprehend the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention, which are equivalent, or changed, within the technical scope of the present invention and the common general knowledge of the prior art.

Claims (10)

1. The glass curtain wall hoisting construction equipment comprises a hoisting device and is characterized in that the hoisting device comprises a hoisting frame (1) and a plurality of adsorption fixing components (4), wherein the adsorption fixing components (4) are detachably arranged on the hoisting frame (1); the adsorption fixing component (4) comprises:
the adsorption cylinder (11), the adsorption cylinder (11) is installed on the hanger (1);
the piston (20), the piston (20) is sealed and slipped on the inner wall of the adsorption cylinder (11), the inner wall of one side of the piston (20) is fixed with a metal seat (19);
the adjusting screw rod (17) is connected to the inner wall of one end of the adsorption cylinder (11) through threads, a rotating head (23) is arranged at one end of the adjusting screw rod (17), the rotating head (23) is rotatably connected to the inner wall of the metal seat (19), and a rotating handle (18) is fixed to the side wall of the other end of the adjusting screw rod (17);
the annular sucking disc (5), the annular sucking disc (5) is fixed on the circumference outer wall of one end of the adsorption cylinder (11);
the pressure detection assembly is arranged in the adsorption cylinder (11), and is positioned between the piston (20) and the annular sucker (5).
2. The glass curtain wall hoisting construction equipment according to claim 1, wherein the lifting device further comprises a hanging rod (2) and a hanging ring (3), the hanging rod (2) is arranged on the outer wall of the top of the hanging bracket (1), and the hanging ring (3) is arranged at the top end of the hanging rod (2).
3. The glass curtain wall hoisting construction equipment as claimed in claim 1, wherein the bottom of the adsorption cylinder (11) is provided with a vent valve, and the vent valve comprises:
the valve shell (13), the valve shell (13) is fixed on the outer wall of the bottom of the adsorption cylinder (11);
the valve plug (28), the valve plug (28) is connected with the inner wall of the valve shell (13) in a sealing and sliding way;
the movable plate (22) is movably installed at the top of the valve casing (13) through a first spring (29), the bottom of the movable plate (22) is connected to the top of the valve plug (28) through a connecting rod (30), the outer wall of the top of the movable plate (22) is provided with a through hole (32), the outer walls of two sides of the movable plate (22) are provided with a bump (31), the inner wall of the bump (31) is slidably connected with a guide rod (21), and the bottom end of the guide rod (21) is fixed to the top end of the valve casing (13).
4. The glass curtain wall hoisting construction equipment according to claim 3, wherein the outer wall of one side of the hanger (1) is provided with uniformly distributed fixing seats (16), the adsorption cylinder (11) is detachably mounted in the fixing seats (16), and the top of the fixing seat (16) is connected with a fastening knob (15) for fixing the adsorption cylinder (11) through threads.
5. The glass curtain wall hoisting construction equipment as claimed in claim 1, wherein the pressure detection assembly comprises a pressure sensor, a control unit, an indicator lamp (12) and a power supply unit; the pressure sensor, the control unit and the indicator light (12) are electrically connected through a signal wire, and the indicator light (12) is fixed at the top of the adsorption cylinder (11).
6. The glass curtain wall hoisting construction equipment according to any one of claims 3 to 5, wherein the glass curtain wall hoisting construction equipment further comprises a receiving device used in cooperation with the lifting device, and the receiving device comprises:
a base;
the L-shaped bearing frame (6), the L-shaped bearing frame (6) is arranged on the base;
the flexible pad (34), the flexible pad (34) is fixed on the L-shaped bearing frame (6);
the push rod (10), push rod (10) are fixed in L type through the support and accept frame (6) and keep away from the one side outer wall of adjustable fender (7), and push rod (10) top diameter reduces gradually, and position and size adaptation of push rod (10) and valve casing (13).
7. The glass curtain wall hoisting construction equipment according to claim 6, wherein a movable baffle (7) is arranged on one side of the L-shaped bearing frame (6), rotating shafts (33) are fixed on two sides of the movable baffle (7), and the rotating shafts (33) are arranged on inner walls of two sides of the L-shaped bearing frame (6) through spring springs; the flexible pad (34) is positioned between the L-shaped bearing frame (6) and the movable baffle (7).
8. The glass curtain wall lifting construction equipment as claimed in claim 6, wherein the valve casing (13) is provided with locking assemblies at both sides thereof, the locking assemblies comprising:
the mounting seat (14), the mounting seat (14) is set up in the outer wall of the valve casing (13);
the limiting rack (26) is slidably mounted in the mounting seat (14), limiting teeth (27) are arranged at two ends of the limiting rack (26), the limiting teeth (27) are positioned on the inner side of the valve shell (13), the two limiting teeth (27) are in a triangular structure, and oblique sides of the two limiting teeth (27) are arranged on one side far away from the valve plug (28);
the central rod (24), the central rod (24) is fixed on the inner walls of the two sides of the mounting seat (14), and the limiting frame (26) is connected to the outer wall of the central rod (24) in a sliding manner;
one end of the second spring (25) is fixed on the outer wall of one side, away from the valve shell (13), of the limiting frame (26), and the other end of the second spring (25) is fixed on the inner wall of one side of the mounting seat (14).
9. The glass curtain wall hoisting construction equipment as claimed in claim 6, wherein the base comprises:
a base (8);
slide rail (9), slide rail (9) are fixed in base (8) top, L type is accepted frame (6) bottom and is fixed with slider (35) with slide rail (9) adaptation, and L type is accepted frame (6) and is passed through slider (35) sliding connection in slide rail (9).
10. A glass curtain wall hoisting construction method is characterized by comprising the following steps:
s1: according to the actual situation, the adsorption fixing component (4) is arranged in the corresponding fixed seat (16), and the adsorption fixing component (4) is fixed through a fastening knob (15);
s2: attaching a glass curtain wall plate to be hoisted to one side of the annular sucking disc (5);
s3: the adjusting screw (17) is screwed by rotating the handle (18), so that the piston (20) is driven to slide in the adsorption cylinder (11), and the annular sucking disc (5) is utilized to reliably adsorb and fix the glass curtain wall plate;
s4: the hoisting ring (3) is connected through a crane, and the hoisting device is hoisted to a specified place;
s5: the guide valve shell (13) is aligned with the ejector rod (10) and then is put down, so that the ejector rod (10) is inserted into the valve shell (13);
s6: the valve plug (28) is pushed upwards into the adsorption cylinder (11) by utilizing the ejector rod (10), so that gas enters the adsorption cylinder (11), and a glass curtain wall plate falls down and is supported by the flexible pad (34);
s7: and the constructor takes down the glass curtain wall plate and carries out installation and construction.
CN202210231104.8A 2022-03-10 2022-03-10 Glass curtain wall hoisting construction method and equipment thereof Pending CN114620588A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210231104.8A CN114620588A (en) 2022-03-10 2022-03-10 Glass curtain wall hoisting construction method and equipment thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210231104.8A CN114620588A (en) 2022-03-10 2022-03-10 Glass curtain wall hoisting construction method and equipment thereof

Publications (1)

Publication Number Publication Date
CN114620588A true CN114620588A (en) 2022-06-14

Family

ID=81900350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210231104.8A Pending CN114620588A (en) 2022-03-10 2022-03-10 Glass curtain wall hoisting construction method and equipment thereof

Country Status (1)

Country Link
CN (1) CN114620588A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115419279A (en) * 2022-08-19 2022-12-02 广东恒保安防科技有限公司 Building curtain wall installation device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115419279A (en) * 2022-08-19 2022-12-02 广东恒保安防科技有限公司 Building curtain wall installation device

Similar Documents

Publication Publication Date Title
CN114620588A (en) Glass curtain wall hoisting construction method and equipment thereof
CN210800884U (en) Wall-hanging full-angle light-emitting hoistway lamp
CN215747674U (en) Multi-vehicle-type automatic vehicle body chassis bolt tightening detection equipment
CN115773404A (en) A pipeline gallows is synthesized to heavy construction
CN112483805A (en) Public regional computer display show fixed knot construct
CN212076204U (en) Crane overturn-preventing device for crane installation
CN114070422B (en) Electromagnetic interference preventing device for information network security equipment
CN204717930U (en) Air-conditioner mounting rack
CN214705146U (en) Model show base is used in department of neurology teaching
CN116620999B (en) Electric permanent magnet sucker convenient to fix and use method
CN220691526U (en) Signal lamp mounting rack
CN215625272U (en) Glass sucking disc frame of convenient operation
CN212960600U (en) Real-time safety monitoring device for mine ventilation system
CN218004199U (en) Explosion-proof workshop emergency call loudspeaker
CN218629418U (en) Dust content detection device
CN212406161U (en) Glass curtain wall installation device for building construction
CN219283016U (en) Fire detector with multiple mounting modes
CN214434689U (en) Air pressure adjusting type foot arch cushion
CN219606252U (en) Pipeline support structure
CN215111471U (en) LED nixie tube and nixie tube support stable structure
CN218768364U (en) Alarm device for monitoring natural gas concentration
CN115382692B (en) Intelligent spraying equipment and method for metal chair
CN211399222U (en) Installation device for outdoor monitoring equipment
CN216014444U (en) Smoke sensor
CN214905174U (en) Hanging cabinet assembling and mounting structure of metal stainless steel cabinet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination