CN114618889A - Bar hot rolling production method capable of avoiding steel punching accident of No. 17 rolling mill - Google Patents

Bar hot rolling production method capable of avoiding steel punching accident of No. 17 rolling mill Download PDF

Info

Publication number
CN114618889A
CN114618889A CN202210289986.3A CN202210289986A CN114618889A CN 114618889 A CN114618889 A CN 114618889A CN 202210289986 A CN202210289986 A CN 202210289986A CN 114618889 A CN114618889 A CN 114618889A
Authority
CN
China
Prior art keywords
steel
water
rolling mill
accident
rolling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210289986.3A
Other languages
Chinese (zh)
Other versions
CN114618889B (en
Inventor
吴俊�
郭翔
王国祚
游建
熊波
聂宗琦
谢智玲
付钢
陈鑫
唐杰家
任广雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shougang Shuicheng Iron and Steel Group Co Ltd
Original Assignee
Shougang Shuicheng Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shougang Shuicheng Iron and Steel Group Co Ltd filed Critical Shougang Shuicheng Iron and Steel Group Co Ltd
Priority to CN202210289986.3A priority Critical patent/CN114618889B/en
Publication of CN114618889A publication Critical patent/CN114618889A/en
Application granted granted Critical
Publication of CN114618889B publication Critical patent/CN114618889B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B33/00Safety devices not otherwise provided for; Breaker blocks; Devices for freeing jammed rolls for handling cobbles; Overload safety devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B15/00Arrangements for performing additional metal-working operations specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B15/0007Cutting or shearing the product
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B28/00Maintaining rolls or rolling equipment in effective condition
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/74Temperature control, e.g. by cooling or heating the rolls or the product
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B38/00Methods or devices for measuring, detecting or monitoring specially adapted for metal-rolling mills, e.g. position detection, inspection of the product
    • B21B38/006Methods or devices for measuring, detecting or monitoring specially adapted for metal-rolling mills, e.g. position detection, inspection of the product for measuring temperature
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/02Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
    • B21B45/0203Cooling
    • B21B45/0209Cooling devices, e.g. using gaseous coolants

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Metal Rolling (AREA)

Abstract

The invention relates to the technical field of steel rolling long material production, in particular to a bar hot rolling production method capable of avoiding a steel punching accident of a No. 17 rolling mill, and the bar hot rolling production method can effectively avoid the steel punching accident of the No. 17 rolling mill. The water penetrating device is used for a continuous rolling bar hot rolling production line, a water penetrating device for cooling steel is arranged between a No. 16 rolling mill and a No. 17 rolling mill of the hot rolling production line, and a No. 3 shear is arranged between the water penetrating device and the No. 17 rolling mill; the No. 3 shear is used for shearing a steel head which is about to enter a No. 17 rolling mill after passing through the water penetrating device; the water passing device outputs steel from the No. 16 rolling mill through water cooling treatment and then passes through the water passing running groove to enter steel of the No. 17 rolling mill, and the steel is not subjected to water cooling treatment or the water cooling treatment time is reduced in the process that the steel passes through the water passing device.

Description

Bar hot rolling production method capable of avoiding steel punching accident of No. 17 rolling mill
Technical Field
The invention relates to the technical field of steel rolling long material production, in particular to a bar hot rolling production method capable of avoiding a steel punching accident of a No. 17 rolling mill.
Background
Two bar lines of the department of Steel Rolling division are a full continuous rolling bar hot rolling production line, the annual design capacity is 80 ten thousand tons, and the main production product is a building bar (steel) with the diameter of 18-25 MM. The production capacity is increased year by year after the production is built in 2006, the production capacity of a rolling line reaches 100 ten thousand tons in 2019, the load exceeds the design production capacity by 25 percent, and equipment accidents are frequently generated by overload of equipment in a middle and a finish rolling area of a main rolling line. In March 2020, equipment failure rate reduction upgrading and transformation are performed to reduce the accident rate.
The steel head at the outlet of the 16 # rolling mill passes through a 38-meter long water-penetrating running groove to the inlet of the 17 # rolling mill for multiple times of steel punching since 5-month upgrading and transformation in 2020, and the steel punching reason is verified by the process: the steel temperature of the steel head is too low, so that the hardness of the steel head is relatively high, and the steel head slips when entering a No. 17 rolling mill roller and cannot smoothly enter a rack roller, so that steel punching is caused.
Disclosure of Invention
The invention aims to: the bar hot rolling production method can avoid the steel punching accident of the No. 17 rolling mill, and can effectively avoid the steel punching accident at the No. 17 rolling mill position.
In order to achieve the purpose, the invention adopts the following technical scheme:
a bar hot rolling production method capable of avoiding a No. 17 rolling mill punching steel accident is used for a continuous rolling bar hot rolling production line, a water penetrating device for cooling steel is arranged between a No. 16 rolling mill and a No. 17 rolling mill of the hot rolling production line, and a No. 3 shear is arranged between the water penetrating device and the No. 17 rolling mill;
the No. 3 shear is used for shearing a steel head which is about to enter a No. 17 rolling mill after passing through the water penetrating device; the water passing device outputs steel from the No. 16 rolling mill through water cooling treatment and then passes through the water passing running groove to enter steel of the No. 17 rolling mill, and the steel is not subjected to water cooling treatment or the water cooling treatment time is reduced in the process that the steel passes through the water passing device.
On the basis of the above scheme and as a preferable scheme of the scheme: the water installation includes that it runs the groove to wear to concatenate the water that constitutes in proper order by a plurality of water coolers, it runs the groove to be provided with to wear the water tank cage cover to wear the water, be unified for wearing the direct parallel connection water supply of hydrophone inlet tube through high pressure water main pipe, and set up solitary switching valve for every water inlet tube of wearing, a plurality of switching valve that will wear the water to run the groove divide into a plurality of groups in proper order, a plurality of adjacent switching valve are a set of, when the steel head when wearing the water to run the groove, the switching valve group of steel head position is every group or at least a set of closure so that the steel head is not handled by the water cooling or reduces water cooling treatment time.
On the basis of the above scheme and as a preferable scheme of the scheme: and a steel head passing identification detection device is arranged between the water passing tank and the No. 16 rolling mill, and the position of the steel head in the water passing device is calculated and judged according to the steel head identification time and the steel head moving speed.
On the basis of the above scheme and as a preferable scheme of the scheme: the steel head detection device is provided with the support cover including being used for the fixed mount pad of installation on the mount pad, support the cover rear side be provided with mount pad fixed connection's the mouth of blowing, it is provided with hot metal detector to blow on one side of the rear side of chewing, pass from 16 rolling mill output steel and support the cover and blow off through blowing and blow out behind the surperficial dregs of high-pressure draught through hot metal detector and get into and wear the water installation, hot metal detector is used for detecting and discerning the steel head.
On the basis of the above scheme and as a preferable scheme of the scheme: the supporting sleeve is provided with a horn-shaped guiding part at the end close to the No. 16 rolling mill.
On the basis of the above scheme and as a preferable scheme of the scheme: the rear part of the No. 3 shear is provided with a breaking shear device, and when a steel punching accident occurs, the breaking shear executes a breaking shear instruction.
On the basis of the above scheme and as a preferable scheme of the scheme: and when the breaking and shearing instruction works, the water passing device stops water cooling treatment on the steel output from the No. 16 rolling mill.
The invention has the beneficial effects that:
the bar hot rolling production method can avoid the steel punching accident of the No. 17 rolling mill, and the bar head of the steel output by the No. 16 rolling mill can smoothly enter the No. 17 rolling mill through the technology related to the method, so that the steel punching accident is effectively avoided.
Drawings
FIG. 1 is a schematic diagram of a bar hot rolling production system capable of avoiding a steel punching accident of a No. 17 rolling mill according to the present invention;
fig. 2 is a schematic structural view of a part of the water penetrating device of the invention.
Detailed Description
The technical solutions in the embodiments of the present invention are clearly and completely described below with reference to the accompanying drawings, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
As shown in fig. 1, the rod hot rolling production system capable of avoiding the steel punching accident of the number 17 rolling mill according to the present invention is shown, and is analyzed by investigation: the water penetration grooves with the length of 38 meters are arranged between the outlet of the No. 16 rolling mill and the inlet of the No. 17 rolling mill (the water penetration grooves are added for the rolled steel which needs to be cooled in order to ensure the metallic phase requirement), the water penetration pressure requirement of the cooling water at the normal temperature state reaches 2.5-2.7MP, and the rolled finished product can not ensure the metallic phase quality when the pressure requirement is lower than the pressure requirement. As the steel head firstly comes out from the outlet of the No. 16 machine and is washed by water pressure through the water running groove with the length of 38 meters, when the steel head reaches the inlet of the No. 17 machine, the temperature is too low, the hardness is too high to smoothly enter the inlet of the No. 17 machine, and the steel impact accident is caused when steel is piled at the inlet.
Through field investigation:
the acquisition personnel measure the steel temperature of the steel head entering the inlet of the stand at the inlet of the No. 17 machine for 100 times, find that 17 times can not enter the inlet of the stand, and measure the temperature of the steel head to be lower than 870 ℃, namely 870 ℃ is the temperature low point of the low-temperature steel head where steel punching occurs, and is the highest temperature to be ensured for ensuring that the steel is qualified in rolling (namely the steel temperature can not exceed 870 ℃). Therefore, the scheme needs to control the temperature of the steel head to be more than 870 ℃ so as to ensure that the steel head can enter the inlet of the No. 17 rolling mill.
Therefore, the bar hot rolling production method capable of avoiding the steel punching accident of the No. 17 rolling mill is provided, and is used for a continuous rolling bar hot rolling production line by combining with a figure 1 and a figure 2, a water penetrating device for cooling steel is arranged between a No. 16 rolling mill and a No. 17 rolling mill of the hot rolling production line, a No. 3 shear is arranged between the water penetrating device and the No. 17 rolling mill, and the No. 3 shear is used for shearing a steel head which is about to enter the No. 17 rolling mill after passing through the water penetrating device; the steel that the device that wears is through passing through the water race groove in order to get into 17 # rolling mills after the water cooling treatment is exported from 16 # rolling mills, the steel makes the steel head not by water cooling treatment or reduces water cooling treatment time in the device process that wears.
Furthermore, the water passing device comprises a water passing running groove 2 formed by sequentially connecting a plurality of water passing coolers 1 in series, the water passing running groove is provided with a water passing tank cage, as shown in figure 1, water passing device water inlet pipes 3 are directly connected in parallel to supply water through a high-pressure water main pipe, referring to a partial structural schematic diagram of the water passing device shown in figure 2, an individual switch valve 4 is arranged for each water passing device water inlet pipe 3, the switch valves 4 of the water passing running groove are sequentially divided into a plurality of groups, a plurality of adjacent switch valves are in one group, and when a steel head passes through the water passing running groove, each group or at least one group of the switch valve groups at the position of the steel head is closed so that the steel head is not subjected to water cooling treatment or the water cooling treatment time is reduced.
The current field setting is that the total length of a water-through running groove of a water-through device is 36 meters, the water-through running groove comprises a plurality of water-through coolers 1, the water-through coolers 1 are correspondingly divided into 3 groups by using switch valves 4, the water supply pressure is controlled by a cooling main station, the pressure is 25-27KP, and the temperature of steel output by a No. 16 rolling mill is rapidly reduced from 930 ℃ to 870 ℃ below the water-through distance of 38 meters before the steel enters a No. 17 rolling mill, so that the temperature meeting the steel rolling requirement reaches the inlet of the No. 17 rolling mill. The cage cover of wearing the water tank can play the effect of certain isolation operational environment and vapor, can slow down the quick diffusion of vapor, improves the working space environment, plays the safety isolation guard action simultaneously.
And a steel head identification device 5 is arranged between the water passing tank and the No. 16 rolling mill, and the position of the steel head in the water passing device is calculated and judged according to the steel head identification time and the steel head moving speed. Further, steel head detection device is provided with the support cover including being used for the fixed mount pad of installation on the mount pad, support the cover rear side be provided with mount pad fixed connection's the mouth of blowing, it is provided with hot metal detector to blow on one side of the back side of chewing, pass support cover and blow off through the mouth of blowing blowout high-pressure draught from 16 steel of rolling mill output after the surperficial dregs through hot metal detector and get into and wear the water installation, hot metal detector is used for detecting and discerning the steel head. In order to facilitate the passing of the steel head, the end of the support sleeve close to the No. 16 rolling mill is provided with a horn-shaped guide part.
Furthermore, a breaking and shearing device is installed at the rear part of the No. 3 shear, and when a steel punching accident occurs, the breaking and shearing device executes a breaking and shearing instruction.
Further, the water passing device stops water cooling treatment on the steel output from the No. 16 rolling mill when the breaking and shearing instruction works.
The No. 3 shears are used for shearing a steel head which comes out from an outlet of a No. 16 rolling mill and passes through 3 groups of water-through coolers, so that the steel head is free from defects such as blooming head and the like, the temperature is not lower than 870 ℃ so as to smoothly enter an inlet of a No. 17 machine frame, and the breaking shears are used for starting a breaking and steel shearing function when a steel punching accident occurs and the like. Through field verification, the temperature of the steel head is stabilized above 900 ℃ before entering a No. 17 rolling mill.
The control method is characterized in that a switch valve is controlled by a PLC (programmable logic controller) unit, the PLC unit is connected with a breaking and shearing device at the rear part of a No. 3 shear so as to send a breaking and shearing signal to the breaking and shearing device to execute a breaking and shearing instruction, a monitoring device close to a No. 16 rolling mill is connected with the PLC unit so as to feed back a detection result to the PLC unit, an operating unit capable of manually executing and controlling the PLC unit is led to be operated, the whole-line control operation is facilitated, and meanwhile, a safety monitoring worker can quickly execute the breaking and shearing signal through the operating unit when recognizing a steel punching accident.
And calculating and programming a PLC control system to execute a valve opening and closing action command when the steel head passes through by matching the speed of the production line through the detection device. It is worth noting that the switch valves are grouped, rather than being individually controlled one by one, compared with the switch valves being individually controlled one by one, the grouping has the advantages of saving the output interface of the PLC, reducing the memory of the PLC program, and improving the stability of the system while ensuring the use effect.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (7)

1. A bar hot rolling production method capable of avoiding a No. 17 rolling mill punching steel accident is used for a continuous rolling bar hot rolling production line, a water penetrating device for cooling steel is arranged between a No. 16 rolling mill and a No. 17 rolling mill of the hot rolling production line, and a No. 3 shear is arranged between the water penetrating device and the No. 17 rolling mill;
the method is characterized in that: the No. 3 shear is used for shearing a steel head which is about to enter a No. 17 rolling mill after passing through the water penetrating device; the water passing device outputs steel from the No. 16 rolling mill through water cooling treatment and then passes through the water passing running groove to enter steel of the No. 17 rolling mill, and the steel is not subjected to water cooling treatment or the water cooling treatment time is reduced in the process that the steel passes through the water passing device.
2. The bar hot rolling production method capable of avoiding the steel punching accident of the No. 17 rolling mill according to claim 1, wherein the steel punching accident comprises the following steps: the water installation includes that it runs the groove to wear to concatenate the water that constitutes in proper order by a plurality of water coolers, it runs the groove to be provided with to wear the water tank cage cover to wear the water, be unified for wearing the direct parallel connection water supply of hydrophone inlet tube through high pressure water main pipe, and set up solitary switching valve for every water inlet tube of wearing, a plurality of switching valve that will wear the water to run the groove divide into a plurality of groups in proper order, a plurality of adjacent switching valve are a set of, when the steel head when wearing the water to run the groove, the switching valve group of steel head position is every group or at least a set of closure so that the steel head is not handled by the water cooling or reduces water cooling treatment time.
3. The bar hot rolling production method capable of avoiding the steel punching accident of the No. 17 rolling mill according to claim 2, characterized in that: and a steel head passing identification detection device is arranged between the water passing tank and the No. 16 rolling mill, and the position of the steel head in the water passing device is calculated and judged according to the steel head identification time and the steel head moving speed.
4. A bar hot rolling production method capable of avoiding a punching steel accident of a No. 17 rolling mill according to claim 3, characterized in that: the steel head detection device is provided with the support cover including being used for the fixed mount pad of installation on the mount pad, support the cover rear side be provided with mount pad fixed connection's the mouth of blowing, it is provided with hot metal detector to blow on one side of the rear side of chewing, pass from 16 rolling mill output steel and support the cover and blow off through blowing and blow out behind the surperficial dregs of high-pressure draught through hot metal detector and get into and wear the water installation, hot metal detector is used for detecting and discerning the steel head.
5. A bar hot rolling production method capable of avoiding a punching steel accident of a No. 17 rolling mill according to claim 4, characterized in that: the supporting sleeve is provided with a horn-shaped guiding part at the end close to the No. 16 rolling mill.
6. The bar hot rolling production method capable of avoiding the steel punching accident of the No. 17 rolling mill according to claim 1, characterized in that: the rear part of the No. 3 shear is provided with a breaking shear device, and when a steel punching accident occurs, the breaking shear executes a breaking shear instruction.
7. A bar hot rolling production method capable of avoiding a punching steel accident of a No. 17 rolling mill according to claim 6, characterized in that: and when the breaking and shearing instruction works, the water passing device stops water cooling treatment on the steel output from the No. 16 rolling mill.
CN202210289986.3A 2022-03-23 2022-03-23 Bar hot rolling production method capable of avoiding 17 # rolling mill steel punching accident Active CN114618889B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210289986.3A CN114618889B (en) 2022-03-23 2022-03-23 Bar hot rolling production method capable of avoiding 17 # rolling mill steel punching accident

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210289986.3A CN114618889B (en) 2022-03-23 2022-03-23 Bar hot rolling production method capable of avoiding 17 # rolling mill steel punching accident

Publications (2)

Publication Number Publication Date
CN114618889A true CN114618889A (en) 2022-06-14
CN114618889B CN114618889B (en) 2024-04-16

Family

ID=81903622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210289986.3A Active CN114618889B (en) 2022-03-23 2022-03-23 Bar hot rolling production method capable of avoiding 17 # rolling mill steel punching accident

Country Status (1)

Country Link
CN (1) CN114618889B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114505355A (en) * 2022-03-23 2022-05-17 首钢水城钢铁(集团)有限责任公司 Steel head detection system for controlling temperature of steel head at water penetration section

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06122015A (en) * 1992-10-13 1994-05-06 Nippon Steel Corp Method for water cooling steel bar/wire rod
JP2007160316A (en) * 2005-12-09 2007-06-28 Kobe Steel Ltd Method for controlling water cooling of rolled material
CN201532585U (en) * 2009-11-24 2010-07-21 青岛钢铁控股集团有限责任公司 Temperature control system for easily cut steel
CN202894123U (en) * 2012-10-27 2013-04-24 广东韶钢松山股份有限公司 Chopping shear steel discharging device
CN103551403A (en) * 2013-10-29 2014-02-05 中冶建筑研究总院有限公司 Controlled rolling and controlled cooling system for bars
CN103551404A (en) * 2013-11-07 2014-02-05 山西太钢不锈钢股份有限公司 Production method of stainless deformed bar
CN203725524U (en) * 2014-02-24 2014-07-23 天津市博控机电科技有限公司 Ultra-high-speed roll steel bar production line
CN204397050U (en) * 2014-12-01 2015-06-17 方大特钢科技股份有限公司 Flying shear crop accuracy control system
CN205200161U (en) * 2015-11-26 2016-05-04 山东石横特钢集团有限公司 Rod water cooling attacks water installation in retaliation
CN107377632A (en) * 2017-08-11 2017-11-24 张家港联峰钢铁研究所有限公司 It is a kind of to reduce reinforcing bar size poor temperature control system and operating method end to end

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06122015A (en) * 1992-10-13 1994-05-06 Nippon Steel Corp Method for water cooling steel bar/wire rod
JP2007160316A (en) * 2005-12-09 2007-06-28 Kobe Steel Ltd Method for controlling water cooling of rolled material
CN201532585U (en) * 2009-11-24 2010-07-21 青岛钢铁控股集团有限责任公司 Temperature control system for easily cut steel
CN202894123U (en) * 2012-10-27 2013-04-24 广东韶钢松山股份有限公司 Chopping shear steel discharging device
CN103551403A (en) * 2013-10-29 2014-02-05 中冶建筑研究总院有限公司 Controlled rolling and controlled cooling system for bars
CN103551404A (en) * 2013-11-07 2014-02-05 山西太钢不锈钢股份有限公司 Production method of stainless deformed bar
CN203725524U (en) * 2014-02-24 2014-07-23 天津市博控机电科技有限公司 Ultra-high-speed roll steel bar production line
CN204397050U (en) * 2014-12-01 2015-06-17 方大特钢科技股份有限公司 Flying shear crop accuracy control system
CN205200161U (en) * 2015-11-26 2016-05-04 山东石横特钢集团有限公司 Rod water cooling attacks water installation in retaliation
CN107377632A (en) * 2017-08-11 2017-11-24 张家港联峰钢铁研究所有限公司 It is a kind of to reduce reinforcing bar size poor temperature control system and operating method end to end

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114505355A (en) * 2022-03-23 2022-05-17 首钢水城钢铁(集团)有限责任公司 Steel head detection system for controlling temperature of steel head at water penetration section

Also Published As

Publication number Publication date
CN114618889B (en) 2024-04-16

Similar Documents

Publication Publication Date Title
CN110280602A (en) Intelligent steel rolling rolling assessment system and processing method extremely
CN114618889A (en) Bar hot rolling production method capable of avoiding steel punching accident of No. 17 rolling mill
CN104923567B (en) Method for identifying and monitoring slippage of engagement of strip head into frame during finish rolling of hot rolled strip
CN101912885B (en) Section mill with rolled piece end bending monitoring device and monitoring method thereof
CN102699144A (en) Method for straightening seriously warped steel plate
CN112077150B (en) Control method for effectively reducing waste cutting of long material production line
CN213826406U (en) High-speed bar production line
CN110871221B (en) Method and device for preventing coiler from steel scrap
CN217647163U (en) Bar wire rod steel rolling production line prevent running steel system
CN106269929A (en) A kind of control method preventing wire rod afterbody from remaining in Laying head and control system
CN110586647A (en) Non-intermittent rolling method for rough rolling R1 rolling mill
CN107470360B (en) A kind of think gauge stainless steel strip devices for taking-up and method for coiling
CN108787761B (en) Method for preventing strip drawing of continuous rolling mill
CN112058915B (en) Method for controlling production rhythm of rolling mill
CN212525464U (en) Water cooling air seal device
CN114618887A (en) Steel punching accident monitoring device
CN110180889B (en) Track rolling production line and track rolling process applying same
CN103272858A (en) Thermal insulation method and insulation cover equipment for hot-rolled slabs
CN201565476U (en) Water cooling rolling guide at pinch roll outlet
CN101653787A (en) High-speed wire double production line swinging wire separation device
CN215238197U (en) Control device for shearing length of two rolled pieces by flying shear
CN221909088U (en) Detection and alarm device for adjacent steel spacing of steel rolling production line
CN216324202U (en) Novel high-wear-resistance bar and wire collecting guide groove device
CN219664732U (en) Switchable through water cooling flying shear system
CN203635641U (en) Water penetration cooling line of controlled rolling and controlled cooling equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant