CN114575345A - Secondary hole cleaning device and method for drilled pile - Google Patents

Secondary hole cleaning device and method for drilled pile Download PDF

Info

Publication number
CN114575345A
CN114575345A CN202210265276.7A CN202210265276A CN114575345A CN 114575345 A CN114575345 A CN 114575345A CN 202210265276 A CN202210265276 A CN 202210265276A CN 114575345 A CN114575345 A CN 114575345A
Authority
CN
China
Prior art keywords
guide pipe
slurry
hole
hole cleaning
cleaning device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210265276.7A
Other languages
Chinese (zh)
Inventor
董继红
余志威
张燕
曹世运
孙立国
魏琪
刘涛
潘林
张杭
吴海健
王延铎
储涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
2nd Engineering Co Ltd of MBEC
Original Assignee
2nd Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 2nd Engineering Co Ltd of MBEC filed Critical 2nd Engineering Co Ltd of MBEC
Priority to CN202210265276.7A priority Critical patent/CN114575345A/en
Publication of CN114575345A publication Critical patent/CN114575345A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/08Removing obstacles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Earth Drilling (AREA)

Abstract

The invention provides a secondary hole cleaning device for a bored pile, which comprises: a plurality of submersible pumps; the top parts of the plurality of submersible pumps are all connected with the first vertical guide pipe, the bottom parts of the submersible pumps are provided with the second vertical guide pipe, and the middle parts of the plurality of submersible pumps are all connected with the transverse guide pipe; and a plurality of slurry outlet holes are formed in the transverse guide pipe. The invention also discloses a hole cleaning method based on the secondary hole cleaning device for the bored pile. The drilling slag cleaning device can clean the drilling slag between the reinforcement cage and the hole wall, improves the quality of secondary hole cleaning, and improves the hole cleaning efficiency because the plurality of submersible pumps can clean holes in a water jetting mode at the same time.

Description

Secondary hole cleaning device and method for drilled pile
Technical Field
The invention relates to the technical field of secondary hole cleaning of bored piles, in particular to a secondary hole cleaning device and a secondary hole cleaning method for bored piles.
Background
At present, a plurality of large bridges at home and abroad adopt large-diameter drilled piles. The secondary hole cleaning of the drilled pile is to clean sediments at the bottom of the hole so as to reduce the bearing capacity of the single pile of the drilled pile. The secondary clear hole of present major diameter bored pile generally adopts the gas lift reverse circulation method, and efficiency is lower, and to major diameter bored pile, the drilling sediment between unable fine clearance steel reinforcement cage and the pore wall.
Disclosure of Invention
Aiming at the prior art, the invention provides a secondary hole cleaning device and method for a bored pile, and aims to improve the efficiency and quality of secondary hole cleaning of the bored pile.
The invention provides a secondary hole cleaning device and a secondary hole cleaning method for a bored pile, which comprise the following steps of: a plurality of submersible pumps; the top parts of the plurality of submersible pumps are all connected with the first vertical guide pipe, the bottom parts of the submersible pumps are provided with the second vertical guide pipe, and the middle parts of the plurality of submersible pumps are all connected with the transverse guide pipe; and a plurality of slurry outlet holes are formed in the transverse guide pipe.
Preferably, the submersible pump is provided in two.
Preferably, 16 evenly distributed slurry outlets are arranged on the transverse conduit.
The invention also discloses a hole cleaning method based on the secondary hole cleaning device for the bored pile, which comprises the following steps of:
s1, after the steel reinforcement cage is installed, putting the submersible pump into the drilled pile, and lengthening the upper end of the submersible pump by a first vertical guide pipe;
s2, when the first vertical guide pipe penetrates through a covering layer of the drilled pile and enters a rock stratum, the power supply is switched on, and the submersible pump starts to work;
s3, pumping the slurry in the drilled pile into a submersible pump, pressurizing the slurry, uniformly ejecting the slurry through slurry outlet holes arranged on a transverse guide pipe, and cleaning the drilling slag between the reinforcement cage and the hole wall and at the hole bottom;
and S4, pumping the slurry carrying the drilling slag out of the drilled pile through the second vertical conduit under the action of the submersible pump until the sediment at the bottom of the hole meets the specification requirement.
Compared with the prior art, the invention has the beneficial effects that: the drilling slag cleaning device can clean the drilling slag between the reinforcement cage and the hole wall, improves the quality of secondary hole cleaning, and improves the hole cleaning efficiency because the plurality of submersible pumps can clean holes in a water jetting mode at the same time.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
Wherein, 1, a submersible pump; 2. a first vertical conduit; 3. a second vertical conduit; 4. a transverse conduit; 5. and (6) slurry outlet.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the invention easy to understand, the invention is further explained below by combining the specific drawings.
Examples
A secondary hole cleaning device and method for a bored pile are disclosed, as shown in FIG. 1, and comprise: two immersible pumps 1, two immersible pumps 1's top all is connected with first vertical pipe 2, and two immersible pumps 1's bottom respectively is equipped with second vertical pipe 3, and two immersible pumps 1's middle part all is connected with horizontal pipe 4, is equipped with 16 evenly distributed's grout outlet 5 on the horizontal pipe 4.
The hole cleaning method of the embodiment comprises the following steps:
s1, after the steel reinforcement cage is installed, placing two submersible pumps 1 into the drilled pile, wherein the upper ends of the two submersible pumps are lengthened by a first vertical conduit 2;
s2, when the first vertical conduit 2 penetrates through the drilled pile covering layer and enters a rock stratum, the power supply is switched on, and the submersible pump 1 starts to work;
s3, pumping the slurry in the drilled pile into the submersible pump 1, pressurizing the slurry, uniformly ejecting the slurry through slurry outlet holes 5 arranged on the transverse guide pipe 4, and cleaning the drilling slag between the reinforcement cage and the hole wall and at the hole bottom; the flow direction of the slurry is shown by the arrow direction in fig. 1;
and S4, pumping the slurry carrying the drilling slag out of the drilled pile through the second vertical conduit 3 under the action of the submersible pump 1 until the sediment at the bottom of the hole meets the specification requirement.
This embodiment can wash the brill sediment between steel reinforcement cage and the pore wall, improves the quality in the clear hole of secondary, and two immersible pumps can clear the hole through the mode of penetrating water simultaneously, have improved the efficiency in clear hole.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all equivalent structures made by using the contents of the present specification and the drawings can be directly or indirectly applied to other related technical fields, and are within the scope of the present invention.

Claims (4)

1. The utility model provides a clear hole device of bored pile secondary which characterized in that includes: a plurality of submersible pumps; the top parts of the plurality of submersible pumps are all connected with the first vertical guide pipe, the bottom parts of the submersible pumps are provided with the second vertical guide pipe, and the middle parts of the plurality of submersible pumps are all connected with the transverse guide pipe; and a plurality of slurry outlet holes are formed in the transverse guide pipe.
2. A secondary hole cleaning device for bored piles according to claim 1, wherein two submersible pumps are provided.
3. A secondary hole cleaning device for a bored pile according to claim 1, wherein the lateral duct is provided with 16 evenly distributed slurry outlets.
4. A hole cleaning method based on the secondary hole cleaning device for the bored pile as claimed in any one of claims 1 to 3, comprising the steps of:
s1, after the steel reinforcement cage is installed, putting the submersible pump into the drilled pile, and lengthening the upper end of the submersible pump by a first vertical guide pipe;
s2, when the first vertical guide pipe penetrates through a covering layer of the drilled pile and enters a rock stratum, the power supply is switched on, and the submersible pump starts to work;
s3, pumping the slurry in the drilled pile into a submersible pump, pressurizing the slurry, uniformly ejecting the slurry through slurry outlet holes arranged on a transverse guide pipe, and cleaning the drilling slag between the reinforcement cage and the hole wall and at the hole bottom;
and S4, pumping the slurry carrying the drilling slag out of the drilled pile through the second vertical conduit under the action of the submersible pump until the sediment at the bottom of the hole meets the specification requirement.
CN202210265276.7A 2022-03-17 2022-03-17 Secondary hole cleaning device and method for drilled pile Pending CN114575345A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210265276.7A CN114575345A (en) 2022-03-17 2022-03-17 Secondary hole cleaning device and method for drilled pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210265276.7A CN114575345A (en) 2022-03-17 2022-03-17 Secondary hole cleaning device and method for drilled pile

Publications (1)

Publication Number Publication Date
CN114575345A true CN114575345A (en) 2022-06-03

Family

ID=81780856

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210265276.7A Pending CN114575345A (en) 2022-03-17 2022-03-17 Secondary hole cleaning device and method for drilled pile

Country Status (1)

Country Link
CN (1) CN114575345A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103696417A (en) * 2013-12-20 2014-04-02 中国一冶集团有限公司 Secondary hole cleaning device and method of bottom of cast-in-situ bored pile
CN206034445U (en) * 2016-08-25 2017-03-22 开普天(上海)国际贸易有限公司 Mud sprays formula mud treatment of sedimentary dreg device
CN107975030A (en) * 2017-11-15 2018-05-01 黎泽芝 Refractory gunning equipment for cast-in-situ bored pile secondary pile hole cleaning

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103696417A (en) * 2013-12-20 2014-04-02 中国一冶集团有限公司 Secondary hole cleaning device and method of bottom of cast-in-situ bored pile
CN206034445U (en) * 2016-08-25 2017-03-22 开普天(上海)国际贸易有限公司 Mud sprays formula mud treatment of sedimentary dreg device
CN107975030A (en) * 2017-11-15 2018-05-01 黎泽芝 Refractory gunning equipment for cast-in-situ bored pile secondary pile hole cleaning

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
雷斌;叶坤;陈朝亮;: "潜水电泵+泥浆净化器二次清孔技术在大直径超深冲孔灌注桩施工中的应用", 施工技术, no. 21, pages 89 - 91 *

Similar Documents

Publication Publication Date Title
CN201605577U (en) Borehole cleaning device for mechanical-boring cast-in-place pile
CN106869113A (en) A kind of circulating high pressure water clears up the device and method of pile tube stake holes
CN110438998A (en) A kind of outer bored grouting raising has become the structure and method of pile bearing capacity
CN105501396B (en) Negative pressure bucket anchor, installation method and floatation type marine wind electric field with hangnail
CN111576423A (en) Pile foundation sediment cleaning device and method
CN201747329U (en) Sand cleaning tool of large-inclination and large-well diameter absorption well
CN212428665U (en) Bridge hole pile sand-rich sediment pump drainage device
CN212956518U (en) Formula of heeling side slope drainage stock
CN103556972A (en) Self-installed ocean floor drilling template and installation method thereof
CN212642569U (en) Double-rope impact hammer and reverse circulation deslagging grooving machine
CN212656251U (en) Positive circulation slurry hole cleaning system for underwater pile foundation percussion drill construction
CN114575345A (en) Secondary hole cleaning device and method for drilled pile
CN112065310A (en) Bridge hole pile sand-rich sediment pumping device and using method
CN112281828A (en) Novel composite pile structure and construction method
CN213709495U (en) Pile end water jetting auxiliary pile sinking and post grouting device
CN213709494U (en) Tubular pile internal water jet gas lift reverse circulation advanced leading hole pile sinking construction device
CN214783895U (en) Soil anchor rod supporting structure
CN112267547B (en) Slope siphon drainage system and method for hydraulic engineering
CN214089873U (en) Gas lift reverse circulation hole cleaning equipment
CN204570662U (en) The built-in ejector type precipitation system of cyclic water tank
CN202194125U (en) Slurry circulation system adopting guard barrels connected in series
CN206693955U (en) The drilling slurry circulatory system
CN206570796U (en) A kind of circulating high pressure water clears up the device of pile tube stake holes
CN221169504U (en) Drilling two clear pump suction reverse circulation device
CN205895309U (en) Prevention of seepage water system for pitshaft driving

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination