CN114488986A - Terminal pressing capacity monitoring method, system, equipment and storage medium - Google Patents

Terminal pressing capacity monitoring method, system, equipment and storage medium Download PDF

Info

Publication number
CN114488986A
CN114488986A CN202210110002.0A CN202210110002A CN114488986A CN 114488986 A CN114488986 A CN 114488986A CN 202210110002 A CN202210110002 A CN 202210110002A CN 114488986 A CN114488986 A CN 114488986A
Authority
CN
China
Prior art keywords
monitoring
terminal
pressing action
terminal machine
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210110002.0A
Other languages
Chinese (zh)
Other versions
CN114488986B (en
Inventor
邓建强
曾衍仁
黄启荣
卢志平
潘玲玲
宋晓光
杨婷
蒋新明
高东豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Yilong Electronic Technology Co ltd
Original Assignee
Guangzhou Yilong Electronic Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Yilong Electronic Technology Co ltd filed Critical Guangzhou Yilong Electronic Technology Co ltd
Priority to CN202210110002.0A priority Critical patent/CN114488986B/en
Publication of CN114488986A publication Critical patent/CN114488986A/en
Application granted granted Critical
Publication of CN114488986B publication Critical patent/CN114488986B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/4185Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by the network communication
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/31From computer integrated manufacturing till monitoring
    • G05B2219/31088Network communication between supervisor and cell, machine group
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • General Factory Administration (AREA)

Abstract

The application discloses a method, a system, equipment and a storage medium for monitoring the productivity of terminal pressing, wherein the method comprises the following steps: when the monitoring node monitors one pressing action of the terminal machine, determining the first duration of the last pressing action of the terminal machine from the current pressing action; when the first time length is smaller than or equal to a preset threshold value, accumulating the pressing action of the time into the productivity data of the current time period, and continuously monitoring the pressing action of the terminal machine; when the first time length is larger than a preset threshold value, finishing the measurement of the productivity data in the previous time period according to the time point of the last pressing action, and sending the productivity data in the previous time period to the main node for saving; the main node corresponds to a plurality of monitoring nodes. The method can complete the accurate measurement of the productivity, and has high measurement accuracy and strong anti-interference capability; and the capacity monitoring of the terminal machine in a regionalization manner can be realized, and the terminal machine can adapt to complicated and changeable production environments. The wire harness processing method and the wire harness processing device can be widely applied to the technical field of wire harness processing.

Description

Terminal pressing capacity monitoring method, system, equipment and storage medium
Technical Field
The application relates to the technical field of wire harness processing, in particular to a method, a system, equipment and a storage medium for monitoring the pressing capacity of a terminal.
Background
In the field of wire harness processing technology, the production and manufacture of terminals is an important task. With the development of related equipment and technologies, most enterprises have realized automatic or semi-automatic production, the yield of terminals is very huge, and if the measurement is collected and measured manually, the workload is large and the accuracy is not high. In the related art, the terminal yield is often determined according to the time period between the start and the shutdown of the production equipment, and by combining the yield efficiency of the production equipment.
However, in actual conditions, the terminal production equipment is not necessarily operated when being turned on, the above-mentioned total yield method cannot truly reflect the use condition of the equipment and the product yield condition, the obtained terminal yield data is inaccurate, and it is difficult to provide effective data support for the production management of enterprises.
In summary, the problems of the related art need to be solved.
Disclosure of Invention
The present application aims to solve at least one of the technical problems in the related art to some extent.
Therefore, an object of the embodiments of the present application is to provide a method, a system, a device and a storage medium for monitoring the productivity of terminal pressing.
In order to achieve the technical purpose, the technical scheme adopted by the embodiment of the application comprises the following steps:
in one aspect, an embodiment of the present application provides a method for monitoring a terminal pressing capacity, including the following steps:
when the monitoring node monitors one pressing action of the terminal machine, determining a first duration of the last pressing action of the terminal machine from the current pressing action;
when the first time length is smaller than or equal to a preset threshold value, accumulating the pressing action of this time into the productivity data of the current time period, and continuously monitoring the pressing action of the terminal machine;
when the first time length is larger than a preset threshold value, finishing the measurement of the capacity data of the last time period according to the time point of the last pressing action, and sending the capacity data of the last time period to a main node for storage; the master node corresponds to a plurality of monitoring nodes.
In addition, the method for monitoring the terminal pressing productivity according to the above embodiment of the present application may further have the following additional technical features:
further, in one embodiment of the present application, the monitoring node is provided with an infrared reflection sensor corresponding to a terminal machine pressing punch, or the monitoring node is provided with a vibration sensor for monitoring a pressing action of the terminal machine;
the monitoring of a pressing action of the terminal machine comprises:
acquiring a pulse signal detected by the infrared reflection sensor or the vibration sensor when the terminal machine is pressed through a monitoring node;
and determining one pressing action of the terminal machine according to the pulse signal.
Further, in an embodiment of the present application, the sending the capacity data of the current time period to a master node for saving includes:
the method comprises the steps that a main node sends data request signals to a plurality of monitoring nodes according to a preset time interval;
when a data request signal sent by the main node is received, the monitoring node sends the capacity data recorded in each time period to the main node;
and the main node receives and stores the capacity data.
Further, in one embodiment of the present application, the method further comprises:
when the monitoring node monitors one-time pressing action of the terminal machine, updating the working state of the terminal machine corresponding to the monitoring node to be in work;
and when the monitoring node does not monitor the pressing action of the terminal machine within the time period of the preset threshold value, updating the working state of the terminal machine corresponding to the monitoring node into idle state.
Further, in one embodiment of the present application, the method further comprises:
and when the power supply of the terminal machine is electrified, starting a monitoring node corresponding to the terminal machine to monitor the capacity of the terminal machine.
Further, in one embodiment of the present application, the method further comprises:
and when the first time length is larger than a preset threshold value, starting the measurement of the productivity data in the current time period according to the time point of the pressing action at this time.
Further, in one embodiment of the present application, the method further comprises:
according to a preset time period, summarizing and calculating the capacity data corresponding to each terminal machine, and determining the working time and the idle time of each terminal machine in a statistical time period;
and determining the utilization rate of the terminal machines in the statistical time period according to the working time length and the idle time length corresponding to each terminal machine.
In another aspect, an embodiment of the present application provides a system for monitoring terminal pressing capacity, including:
the monitoring unit is used for determining the first duration of the last pressing action of the terminal machine from the current pressing action when the monitoring node monitors the one-time pressing action of the terminal machine;
the first processing unit is used for accumulating the pressing action of the time into the productivity data of the current time period and continuously monitoring the pressing action of the terminal machine when the first time length is less than or equal to a preset threshold value;
the second processing unit is used for finishing the metering of the productivity data of the previous time period according to the time point of the last pressing action when the first time length is larger than a preset threshold value, and sending the productivity data of the previous time period to the main node for saving; the master node corresponds to a plurality of monitoring nodes.
In another aspect, an embodiment of the present application provides a computer device, including:
at least one processor;
at least one memory for storing at least one program;
when the at least one program is executed by the at least one processor, the at least one processor is enabled to implement the method for monitoring terminal-pressed capacity.
In another aspect, an embodiment of the present invention further provides a computer-readable storage medium, in which a processor-executable program is stored, and the processor-executable program is executed by a processor to implement the method for monitoring the terminal-pressed capacity.
Advantages and benefits of the present application will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the present application:
the embodiment of the application discloses a method for monitoring the pressing capacity of a terminal, which comprises the following steps: when the monitoring node monitors one pressing action of the terminal machine, determining a first duration of the last pressing action of the terminal machine from the current pressing action; when the first time length is smaller than or equal to a preset threshold value, accumulating the pressing action of this time into the productivity data of the current time period, and continuously monitoring the pressing action of the terminal machine; when the first time length is larger than a preset threshold value, finishing the measurement of the capacity data of the last time period according to the time point of the last pressing action, and sending the capacity data of the last time period to a main node for storage; the master node corresponds to a plurality of monitoring nodes. The method can complete the accurate measurement of the productivity, and has high measurement accuracy and strong anti-interference capability; moreover, the method is based on the cooperative work of the main node and the plurality of monitoring nodes, the regional capacity monitoring of the terminal machine can be realized, the method can adapt to complex and changeable production environments, the whole process does not need human participation, and the labor resources are saved.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings of the embodiments of the present application or the related technical solutions in the prior art are described below, it should be understood that the drawings in the following description are only for convenience and clarity of describing some embodiments of the technical solutions of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic environment diagram illustrating an embodiment of a method for monitoring terminal-pressed capacity according to the present disclosure;
fig. 2 is a schematic flowchart illustrating a method for monitoring terminal-pressed productivity according to an embodiment of the present disclosure;
fig. 3 is a schematic structural diagram of a computer device provided in an embodiment of the present application.
Detailed Description
The present application is further described with reference to the following figures and specific examples. The described embodiments should not be considered as limiting the present application, and all other embodiments obtained by a person skilled in the art without making any inventive step are within the scope of protection of the present application.
In the following description, reference is made to "some embodiments" which describe a subset of all possible embodiments, but it is understood that "some embodiments" may be the same subset or different subsets of all possible embodiments, and may be combined with each other without conflict.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs. The terminology used herein is for the purpose of describing embodiments of the present application only and is not intended to be limiting of the application.
In the field of wire harness processing technology, the production and manufacture of terminals is an important task. With the development of related equipment and technologies, most enterprises have realized automatic or semi-automatic production, the yield of terminals is very huge, and if the measurement is collected and measured manually, the workload is large and the accuracy is not high. In the related art, the terminal yield is often determined according to the time period between the start and the shutdown of the production equipment, and by combining the yield efficiency of the production equipment.
However, in actual conditions, the terminal production equipment is not necessarily operated when being turned on, the above-mentioned total yield method cannot truly reflect the use condition of the equipment and the product yield condition, the obtained terminal yield data is inaccurate, and it is difficult to provide effective data support for the production management of enterprises.
In view of this, the present disclosure provides a method for monitoring terminal pressing capacity, which can count the terminal yield through an infrared reflective sensor, and complete accurate measurement of capacity by determining whether a terminal machine performs a pressing operation, and has high measurement accuracy and high interference resistance. Moreover, the method is based on the cooperative work of the main node and the plurality of monitoring nodes, the regional capacity monitoring of the terminal machine can be realized, the method can adapt to complex and changeable production environments, the whole process does not need human participation, and the labor resources are saved.
Fig. 1 is a schematic environment diagram illustrating an implementation environment of a method for monitoring throughput with pressed terminals according to an embodiment of the present disclosure. Referring to fig. 1, the software and hardware main body of the implementation environment mainly includes an operation terminal, a background server, a main node, and a monitoring node. The operation terminal is in communication connection with the background server, the background server is in communication connection with the main node, and the main node is in communication connection with the monitoring node. The terminal-pressed capacity monitoring method is executed based on interaction among the background server, the master node, and the monitoring node, and may be specifically selected according to an actual application situation, which is not specifically limited in this embodiment.
In the embodiment of the application, the monitoring node is arranged at each terminal machine and used for monitoring the capacity data of the single terminal machine. In some embodiments, each monitoring node may include a single chip, a clock module, a storage module, a power module, a communication module, a productivity acquisition module, and a touch screen module. The capacity acquisition module can adopt an infrared reflection sensor or a vibration sensor and can be used for acquiring capacity data. The clock module can record time, and the start time and the end time of each section of capacity data are conveniently determined. The storage module is used for locally storing basic information such as productivity data, wireless communication addresses, corresponding terminal machine numbers and communication frequency bands at the monitoring node. The communication module is used for communicating with the main node. The touch screen module is an input device for setting a communication address, a terminal machine number, a communication frequency band and the like. The power supply module is used for supplying power to other modules.
In the embodiment of the application, the main node is used for communicating with the plurality of monitoring nodes, acquiring the capacity data acquired by each monitoring node, and further uploading the data to the background server. Referring to fig. 1, it should be noted that in the embodiment of the present application, since the number of terminal machines in a production line may be many, for convenience of regional management, a master node may be disposed between a plurality of terminal machines to monitor the capacity of the terminal machines in a region, for example, one master node may be responsible for monitoring M terminal machines, where M is greater than or equal to 1, for example, the master node 1 in fig. 1 corresponds to monitoring nodes 11, 12. Moreover, a plurality of host nodes may also be set in one system, for example, N host nodes may be set, where N is greater than or equal to 1, and each host node may be sequentially recorded as host node 1, host node 2. Of course, it should be noted that the number of the monitored terminal machines may be different or the same for different master nodes in the present application.
Similarly, each master node may include a single chip, a storage module, a power module, a communication module, a network module, and a touch screen module. The master node and the corresponding monitoring nodes can be connected in a star networking mode, and the master module is connected with the monitoring nodes through the communication module. The main node sends data of all monitoring nodes corresponding to the main node to the background server through the network module, the touch screen module is an input module, information such as a background communication ip address, a communication port and a communication frequency band of the communication module can be input through the input module, and the information is stored in the storage module. The power module can provide power for the singlechip and the like.
The operation terminal can be in communication connection with the server, so that the capacity data of the terminal mold received by the background server can be obtained and displayed to a user. In some embodiments, the operation terminal of the present application may include, but is not limited to, any one or more of a smart watch, a smart phone, a computer, a Personal Digital Assistant (PDA), and a smart voice interaction device. The background server may be an independent physical server, a server cluster or a distributed system formed by a plurality of physical servers, or a cloud server providing basic cloud computing services such as a cloud service, a cloud database, cloud computing, a cloud function, cloud storage, a Network service, cloud communication, a middleware service, a domain name service, a security service, a CDN (Content Delivery Network), a big data and artificial intelligence platform. The operation terminal and the background server may establish a communication connection through a wireless Network or a wired Network, the wireless Network or the wired Network uses a standard communication technology and/or protocol, the Network may be set as the internet, and may also be any other Network, for example, but not limited to, any combination of a Local Area Network (LAN), a Metropolitan Area Network (MAN), a Wide Area Network (WAN), a mobile, wired, or wireless Network, a private Network, or a virtual private Network. Of course, it should be added that the implementation environment in fig. 1 is only used to illustrate the implementation of the monitoring method of the present application, and is not meant to limit the implementation environment of the present application.
Referring to fig. 2, fig. 2 is a flowchart illustrating a method for monitoring terminal-pressed capacity according to an embodiment of the present disclosure, wherein the method for monitoring terminal-pressed capacity can be configured to be executed in the foregoing implementation environment. Referring to fig. 2, the method for monitoring the terminal pressing productivity includes, but is not limited to:
step 110, when the monitoring node monitors one pressing action of the terminal machine, determining a first duration of the last pressing action of the terminal machine from the current pressing action;
in the embodiment of the application, the monitoring nodes are used for monitoring and counting the pressing action of the terminal machine, and one monitoring node is responsible for monitoring one terminal machine. Specifically, in the process of pressing the terminal by the terminal machine, the pressing device can move up and down, and the pressing is generally completed one time from top to bottom. Of course, it can be understood that, since the terminal machine starts to operate after being powered on, in order to reduce the overall energy consumption of the system, in the embodiment of the present application, the power condition of the terminal machine may be monitored, and when the power of the terminal machine is powered on, the monitoring node corresponding to the terminal machine is started again to monitor the capacity of the terminal machine.
In some embodiments, the monitoring node may be provided with an infrared reflection sensor corresponding to the terminal device, and the infrared reflection sensor may determine whether there is an obstacle in front by using the principle of infrared reflection. In the embodiment of the application, the infrared reflection sensor can face to a pressing device of the terminal machine, and when the pressing device is pressed downwards, the infrared rays of the infrared reflection sensor are blocked to be reflected back; when the hold-down device is lifted up, the infrared rays of the infrared reflection sensor pass through the gap between the terminal and the hold-down device, and the reflection amount is low. Therefore, the pressing action of the terminal machine can be judged by collecting the pulse signal detected by the infrared reflection sensor, and when two pulse signal peaks occur, the pressing action is completed once in the period. In some embodiments, a vibration sensor may also be provided at the monitoring node, which may monitor a vibration signal generated by the terminal machine when pressed, and similarly, the signal may also be received in the form of pulses. For a vibration sensor, the peak of each pulse signal corresponds to the completion of a pressing action.
In the embodiment of the application, when the monitoring node monitors one pressing action of the terminal machine, the first duration of the previous pressing action from the current pressing action can be inquired firstly. Since the capacity data of the terminal machine may need to be recorded for different periods of time, and the terminal machine is likely not to be in an operating state for a period of time, if only the number of pressed terminals is measured, the capacity data for a period of time may not be well reflected. Therefore, in the embodiment of the present application, the operation state of the terminal mold is also recognized by the time interval between the pressing actions, and the time period of the operation is divided. Specifically, a time difference between the two pressing actions of the current pressing action and the last pressing action may be calculated and recorded as a first time length, and if the first time length is longer, it is indicated that the terminal machine is newly in the working state by the current pressing action, otherwise, if the first time length is shorter, it may be determined that the terminal machine is in the continuous working state.
Step 120, when the first duration is smaller than or equal to a preset threshold, accumulating the pressing action of this time into the productivity data of the current time period, and continuously monitoring the pressing action of the terminal machine;
in this step, as described above, if the first time period is short, it can be determined that the terminal machine is in a state of continuous operation. Therefore, in the embodiment of the present application, a preset threshold may be set for a period of time, for example, 6 seconds, and when the first time length is less than or equal to the preset threshold, it is determined that the terminal machine is in a continuous operation state at this time, so that the pressing action of this time may be accumulated in the capacity data in the current time period, and then the pressing action of the terminal machine is continuously monitored.
Step 130, when the first time length is larger than a preset threshold value, finishing the measurement of the capacity data of the previous time period according to the time point of the last pressing action, and sending the capacity data of the previous time period to a main node for saving; the master node corresponds to a plurality of monitoring nodes.
In this step, when the first duration is greater than the preset threshold, it is described that the pressing action of this time is a newly opened one-time process. Therefore, the last pressing action belongs to the last pressing action of the previous period, so that the metering of the capacity data of the previous period can be finished according to the time point of the last pressing action, and the metering of the capacity data of the current period can be started according to the time point of the current pressing action. The data which has been metered in the last time period can be sent to the main node for saving.
It can be understood that, in this application embodiment, the monitoring node can count the output of terminal through infrared reflection sensor, and whether accurate measurement of productivity has been accomplished to the action of pressing through judging the terminal machine, and measurement accuracy is high, and the interference killing feature is strong. Moreover, the method in the application is based on the cooperative work of the main node and the plurality of monitoring nodes, the regional capacity monitoring of the terminal machine can be realized, the method can adapt to complex and changeable production environments, the whole process does not need manpower participation, and labor resources are saved.
In some embodiments, when the monitoring node sends the capacity data to the master node, the master node may send a data request signal to a plurality of monitoring nodes corresponding to the monitoring node at a predetermined time interval, so that, after receiving the data request signal sent by the master node, the monitoring node may send the capacity data recorded at each time interval to the master node; the master node may receive the capacity data and store or further send to the background server. Therefore, the data can be transmitted and received more orderly, and the efficiency of data processing is improved.
In some embodiments, the working state information of the terminal machine may also be updated according to the monitoring of the pressing action of the terminal machine, for example, when the monitoring node monitors one pressing action of the terminal machine, the working state of the terminal machine corresponding to the monitoring node may be updated to be in operation; when the monitoring node does not monitor the pressing action of the terminal machine within the time period of the preset threshold value, the working state of the terminal machine corresponding to the monitoring node can be updated to be idle.
In some embodiments, the productivity data corresponding to each terminal machine may be summarized and calculated according to a preset time period. For example, according to a cycle of one day, one week or one month, the capacity data of the terminal unit in all time periods in the cycle can be summarized and calculated to obtain the capacity data in the corresponding cycle for storage, and a display interface and a report exporting function can be provided. And moreover, the working time and the idle time of each terminal machine in the statistical time interval can be determined through data integration, so that the utilization rate of the terminal machines in the statistical time interval can be determined, and the capacity condition of each terminal machine can be conveniently and more carefully analyzed and monitored.
Therefore, based on the capacity monitoring method provided by the embodiment of the application, a user can acquire real-time data, time-segment data and event data of the capacity of the terminal machine from the background server through the operation terminal. The real-time data can comprise the running state of the terminal machine, the real-time capacity of the current day and other data; the time interval data can comprise the starting time and the ending time of the terminal machine, the capacity quantity of each time interval and other data; the event data may include a power-on event, a power-off event, a fault event, etc. of the terminal machine.
In an embodiment of the present application, a system for monitoring terminal pressing capacity is further provided, including:
the monitoring unit is used for determining the first duration of the last pressing action of the terminal machine from the current pressing action when the monitoring node monitors the one-time pressing action of the terminal machine;
the first processing unit is used for accumulating the pressing action of the time into the productivity data of the current time period and continuously monitoring the pressing action of the terminal machine when the first time length is less than or equal to a preset threshold value;
the second processing unit is used for finishing the metering of the productivity data of the previous time period according to the time point of the last pressing action when the first time length is larger than a preset threshold value, and sending the productivity data of the previous time period to the main node for saving; the main node corresponds to a plurality of monitoring nodes.
It can be understood that the contents of the embodiment of the terminal-pressed productivity monitoring method shown in fig. 2 are all applicable to the embodiment of the terminal-pressed productivity monitoring system, the functions implemented by the embodiment of the terminal-pressed productivity monitoring system are the same as those of the embodiment of the terminal-pressed productivity monitoring method shown in fig. 2, and the beneficial effects achieved by the embodiment of the terminal-pressed productivity monitoring method shown in fig. 2 are also the same as those achieved by the embodiment of the terminal-pressed productivity monitoring method shown in fig. 2.
Referring to fig. 3, an embodiment of the present application further discloses a computer device, including:
at least one processor 301;
at least one memory 302 for storing at least one program;
when the at least one program is executed by the at least one processor 301, the at least one processor 301 implements the embodiment of the method for monitoring throughput with pressed terminals as shown in fig. 2.
It is understood that the contents of the embodiment of the method for monitoring the terminal-pressed productivity shown in fig. 2 are all applicable to the embodiment of the computer device, the functions implemented by the embodiment of the computer device are the same as those of the embodiment of the method for monitoring the terminal-pressed productivity shown in fig. 2, and the beneficial effects achieved by the embodiment of the method for monitoring the terminal-pressed productivity shown in fig. 2 are also the same as those achieved by the embodiment of the method for monitoring the terminal-pressed productivity shown in fig. 2.
The embodiment of the application also discloses a computer readable storage medium, wherein a program executable by a processor is stored, and the program executable by the processor is used for realizing the embodiment of the terminal pressing capacity monitoring method shown in FIG. 2 when being executed by the processor.
It is understood that the contents of the embodiment of the method for monitoring terminal pressed productivity as shown in fig. 2 are all applicable to the embodiment of the computer readable storage medium, the embodiment of the computer readable storage medium realizes the same functions as the embodiment of the method for monitoring terminal pressed productivity as shown in fig. 2, and achieves the same advantages as the embodiment of the method for monitoring terminal pressed productivity as shown in fig. 2.
In alternative embodiments, the functions/acts noted in the block diagrams may occur out of the order noted in the operational illustrations. For example, two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality/acts involved. Furthermore, the embodiments presented and described in the flowcharts of the present application are provided by way of example in order to provide a more thorough understanding of the technology. The disclosed methods are not limited to the operations and logic flows presented herein. Alternative embodiments are contemplated in which the order of various operations is changed and in which sub-operations described as part of larger operations are performed independently.
Furthermore, although the present application is described in the context of functional modules, it should be understood that, unless otherwise stated to the contrary, one or more of the functions and/or features may be integrated in a single physical device and/or software module, or one or more functions and/or features may be implemented in separate physical devices or software modules. It will also be appreciated that a detailed discussion regarding the actual implementation of each module is not necessary for an understanding of the present application. Rather, the actual implementation of the various functional modules in the apparatus disclosed herein will be understood within the ordinary skill of an engineer, given the nature, function, and internal relationship of the modules. Accordingly, those skilled in the art can, using ordinary skill, practice the present application as set forth in the claims without undue experimentation. It is also to be understood that the specific concepts disclosed are merely illustrative of and not intended to limit the scope of the application, which is defined by the appended claims and their full scope of equivalents.
The functions, if implemented in the form of software functional units and sold or used as a stand-alone product, may be stored in a computer readable storage medium. Based on such understanding, the technical solution of the present application or portions thereof that substantially contribute to the prior art may be embodied in the form of a software product stored in a storage medium and including instructions for causing a computer device (which may be a personal computer, a server, or a network device) to execute all or part of the steps of the method according to the embodiments of the present application. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk, or an optical disk, and various media capable of storing program codes.
The logic and/or steps represented in the flowcharts or otherwise described herein, e.g., an ordered listing of executable instructions that can be considered to implement logical functions, can be embodied in any computer-readable medium for use by or in connection with an instruction execution system, apparatus, or device, such as a computer-based system, processor-containing system, or other system that can fetch the instructions from the instruction execution system, apparatus, or device and execute the instructions. For the purposes of this description, a "computer-readable medium" can be any means that can contain, store, communicate, propagate, or transport the program for use by or in connection with the instruction execution system, apparatus, or device.
More specific examples (a non-exhaustive list) of the computer-readable medium would include the following: an electrical connection (electronic device) having one or more wires, a portable computer diskette (magnetic device), a Random Access Memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disc read-only memory (CDROM). Additionally, the computer-readable medium could even be paper or another suitable medium upon which the program is printed, as the program can be electronically captured, via for instance optical scanning of the paper or other medium, then compiled, interpreted or otherwise processed in a suitable manner if necessary, and then stored in a computer memory.
It should be understood that portions of the present application may be implemented in hardware, software, firmware, or a combination thereof. In the above embodiments, the various steps or methods may be implemented in software or firmware stored in memory and executed by a suitable instruction execution system. For example, if implemented in hardware, as in another embodiment, any one or combination of the following techniques, which are known in the art, may be used: a discrete logic circuit having a logic gate circuit for implementing a logic function on a data signal, an application specific integrated circuit having an appropriate combinational logic gate circuit, a Programmable Gate Array (PGA), a Field Programmable Gate Array (FPGA), or the like.
In the foregoing description of the specification, reference to the description of "one embodiment/example," "another embodiment/example," or "certain embodiments/examples," etc., means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the application. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
While embodiments of the present application have been shown and described, it will be understood by those of ordinary skill in the art that: numerous changes, modifications, substitutions and variations can be made to the embodiments without departing from the principles and spirit of the application, the scope of which is defined by the claims and their equivalents.
While the present application has been described with reference to the preferred embodiments, it will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims
In the description herein, references to the description of the term "one embodiment," "another embodiment," or "certain embodiments," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the application. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
While embodiments of the present application have been shown and described, it will be understood by those of ordinary skill in the art that: numerous changes, modifications, substitutions and alterations can be made to the embodiments without departing from the principles and spirit of the application, the scope of which is defined by the claims and their equivalents.

Claims (10)

1. A method for monitoring terminal pressing productivity, comprising:
when the monitoring node monitors one pressing action of the terminal machine, determining a first duration of the last pressing action of the terminal machine from the current pressing action;
when the first time length is smaller than or equal to a preset threshold value, accumulating the pressing action of this time into the productivity data of the current time period, and continuously monitoring the pressing action of the terminal machine;
when the first time length is larger than a preset threshold value, finishing the measurement of the capacity data of the last time period according to the time point of the last pressing action, and sending the capacity data of the last time period to a main node for storage; the master node corresponds to a plurality of monitoring nodes.
2. The method for monitoring the terminal pressing capacity according to claim 1, wherein the monitoring node is provided with an infrared reflection sensor corresponding to a terminal press punch or a vibration sensor for monitoring the pressing action of the terminal press;
the monitoring of a pressing action of the terminal machine comprises:
acquiring a pulse signal detected by the infrared reflection sensor or the vibration sensor when the terminal machine is pressed through a monitoring node;
and determining one pressing action of the terminal machine according to the pulse signal.
3. The method for monitoring the terminal-pressed capacity according to claim 1, wherein the sending the capacity data of the current time period to a master node for saving comprises:
the method comprises the steps that a main node sends data request signals to a plurality of monitoring nodes according to a preset time interval;
after receiving a data request signal sent by the main node, the monitoring node sends the capacity data recorded in each time period to the main node;
and the main node receives and stores the capacity data.
4. The method of claim 1, further comprising:
when the monitoring node monitors one-time pressing action of the terminal machine, updating the working state of the terminal machine corresponding to the monitoring node to be in work;
and when the monitoring node does not monitor the pressing action of the terminal machine within the time period of the preset threshold value, updating the working state of the terminal machine corresponding to the monitoring node into idle state.
5. The method for monitoring the terminal pressing productivity according to any one of claims 1 to 4, further comprising:
and when the power supply of the terminal machine is electrified, starting a monitoring node corresponding to the terminal machine to monitor the capacity of the terminal machine.
6. The method of claim 5, further comprising:
and when the first time length is larger than a preset threshold value, starting the measurement of the productivity data in the current time period according to the time point of the pressing action at this time.
7. The method of claim 1, further comprising:
according to a preset time period, summarizing and calculating the capacity data corresponding to each terminal machine, and determining the working time and the idle time of each terminal machine in a statistical time period;
and determining the utilization rate of the terminal machines in the statistical time period according to the working time length and the idle time length corresponding to each terminal machine.
8. A terminal pressing capacity monitoring system, comprising:
the monitoring unit is used for determining the first duration of the last pressing action of the terminal machine from the current pressing action when the monitoring node monitors the one-time pressing action of the terminal machine;
the first processing unit is used for accumulating the pressing action of the time into the productivity data of the current time period and continuously monitoring the pressing action of the terminal machine when the first time length is less than or equal to a preset threshold value;
the second processing unit is used for finishing the metering of the productivity data of the previous time period according to the time point of the last pressing action when the first time length is larger than a preset threshold value, and sending the productivity data of the previous time period to the main node for saving; the master node corresponds to a plurality of monitoring nodes.
9. A computer device, comprising:
at least one processor;
at least one memory for storing at least one program;
when the at least one program is executed by the at least one processor, the at least one processor is enabled to implement the terminal-pressing capacity monitoring method according to any one of claims 1 to 7.
10. A computer-readable storage medium in which a program executable by a processor is stored, characterized in that: the processor-executable program when executed by a processor is for implementing the method for monitoring terminal pressing capacity according to any one of claims 1 to 7.
CN202210110002.0A 2022-01-29 2022-01-29 Method, system, equipment and storage medium for monitoring productivity of terminal pressing Active CN114488986B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210110002.0A CN114488986B (en) 2022-01-29 2022-01-29 Method, system, equipment and storage medium for monitoring productivity of terminal pressing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210110002.0A CN114488986B (en) 2022-01-29 2022-01-29 Method, system, equipment and storage medium for monitoring productivity of terminal pressing

Publications (2)

Publication Number Publication Date
CN114488986A true CN114488986A (en) 2022-05-13
CN114488986B CN114488986B (en) 2023-07-25

Family

ID=81478793

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210110002.0A Active CN114488986B (en) 2022-01-29 2022-01-29 Method, system, equipment and storage medium for monitoring productivity of terminal pressing

Country Status (1)

Country Link
CN (1) CN114488986B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116558695A (en) * 2023-07-06 2023-08-08 深圳市汇众智慧科技有限公司 Terminal machine crimping force monitoring method, device and equipment based on voltage signals

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB900850A (en) * 1957-11-29 1962-07-11 Labgear Ltd Improvements in electronic counting arrangements
US5184179A (en) * 1988-05-17 1993-02-02 Monitel Products Corp. Photocopy monitoring system and method for monitoring copiers
US5477463A (en) * 1993-03-09 1995-12-19 Sumitomo Wiring Systems, Ltd. Apparatus and method for making electric wire for harness
JPH08222046A (en) * 1995-02-14 1996-08-30 Sumitomo Wiring Syst Ltd Wire harness manufacturing device
JP2000088922A (en) * 1998-09-11 2000-03-31 Nec Corp Inspection apparatus for semiconductor integrated- circuit device
KR200272445Y1 (en) * 2002-01-18 2002-04-15 경신공업 주식회사 A Device For Counting The Number Of Wire Harness Terminal Applicator
US6658312B1 (en) * 1998-05-29 2003-12-02 Yazaki Corporation Wire harness manufacturing apparatus and method
US20040200059A1 (en) * 2003-04-10 2004-10-14 Sumitomo Wiring Systems, Ltd. Automated production system for wiring harness and terminal crimping apparatus
US6854066B1 (en) * 2001-05-29 2005-02-08 Palm, Inc. Method and system to avoid battery sag by detecting momentary fluctuation in a periodic terminal voltage measurement and excluding the measurement from updated average terminal voltage
JP2013254575A (en) * 2012-06-05 2013-12-19 Yazaki Corp Manufacturing device and manufacturing method for wire harness
CN105204464A (en) * 2015-09-18 2015-12-30 深圳市志海和科技有限公司 System and method for online managing pressing quality of wiring harness
US20160233638A1 (en) * 2013-11-12 2016-08-11 Yazaki Corporation Wire harness production system and wire harness production method
CN208015051U (en) * 2018-01-29 2018-10-26 东莞市锐升电线电缆有限公司 A kind of automatic pressing device of cable terminal
CN209056745U (en) * 2018-12-06 2019-07-02 惠州市起宇电子股份有限公司 A kind of label auxiliary device for terminal machine
CN210007087U (en) * 2019-07-11 2020-01-31 东莞市立海隆机械设备有限公司 Pressing mechanism of full-automatic terminal machine
CN111291434A (en) * 2020-01-20 2020-06-16 海马汽车有限公司 Wire harness length analysis method and device and electronic equipment
US20210304579A1 (en) * 2020-03-25 2021-09-30 Seiko Epson Corporation Industrial plant monitoring system

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB900850A (en) * 1957-11-29 1962-07-11 Labgear Ltd Improvements in electronic counting arrangements
US5184179A (en) * 1988-05-17 1993-02-02 Monitel Products Corp. Photocopy monitoring system and method for monitoring copiers
US5477463A (en) * 1993-03-09 1995-12-19 Sumitomo Wiring Systems, Ltd. Apparatus and method for making electric wire for harness
JPH08222046A (en) * 1995-02-14 1996-08-30 Sumitomo Wiring Syst Ltd Wire harness manufacturing device
US6658312B1 (en) * 1998-05-29 2003-12-02 Yazaki Corporation Wire harness manufacturing apparatus and method
JP2000088922A (en) * 1998-09-11 2000-03-31 Nec Corp Inspection apparatus for semiconductor integrated- circuit device
US6854066B1 (en) * 2001-05-29 2005-02-08 Palm, Inc. Method and system to avoid battery sag by detecting momentary fluctuation in a periodic terminal voltage measurement and excluding the measurement from updated average terminal voltage
KR200272445Y1 (en) * 2002-01-18 2002-04-15 경신공업 주식회사 A Device For Counting The Number Of Wire Harness Terminal Applicator
US20040200059A1 (en) * 2003-04-10 2004-10-14 Sumitomo Wiring Systems, Ltd. Automated production system for wiring harness and terminal crimping apparatus
JP2013254575A (en) * 2012-06-05 2013-12-19 Yazaki Corp Manufacturing device and manufacturing method for wire harness
US20160233638A1 (en) * 2013-11-12 2016-08-11 Yazaki Corporation Wire harness production system and wire harness production method
CN105204464A (en) * 2015-09-18 2015-12-30 深圳市志海和科技有限公司 System and method for online managing pressing quality of wiring harness
CN208015051U (en) * 2018-01-29 2018-10-26 东莞市锐升电线电缆有限公司 A kind of automatic pressing device of cable terminal
CN209056745U (en) * 2018-12-06 2019-07-02 惠州市起宇电子股份有限公司 A kind of label auxiliary device for terminal machine
CN210007087U (en) * 2019-07-11 2020-01-31 东莞市立海隆机械设备有限公司 Pressing mechanism of full-automatic terminal machine
CN111291434A (en) * 2020-01-20 2020-06-16 海马汽车有限公司 Wire harness length analysis method and device and electronic equipment
US20210304579A1 (en) * 2020-03-25 2021-09-30 Seiko Epson Corporation Industrial plant monitoring system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116558695A (en) * 2023-07-06 2023-08-08 深圳市汇众智慧科技有限公司 Terminal machine crimping force monitoring method, device and equipment based on voltage signals
CN116558695B (en) * 2023-07-06 2023-09-19 深圳市汇众智慧科技有限公司 Terminal machine crimping force monitoring method, device and equipment based on voltage signals

Also Published As

Publication number Publication date
CN114488986B (en) 2023-07-25

Similar Documents

Publication Publication Date Title
CN107480015B (en) Load testing method, device and system, storage medium and pressure testing server
CN107341033A (en) A kind of data statistical approach, device, electronic equipment and storage medium
CN108345524A (en) Method for monitoring application program and Application Monitoring device
CN107105446A (en) Charging accounting method, apparatus and system
CN108733531B (en) GPU performance monitoring system based on cloud computing
CN101621400A (en) History performance data collection method and performance data collecting system
CN114488986B (en) Method, system, equipment and storage medium for monitoring productivity of terminal pressing
CN114223189B (en) Time length statistics method, device, electronic equipment and computer readable medium
CN102711139A (en) Data flow counting method and terminal
CN110928681A (en) Data processing method and device, storage medium and electronic device
CN103678522A (en) Method for acquiring and converting data of metering system of intelligent transformer substation
CN106447242B (en) Electricity consumption service handling time limit management method and device
CN111192123A (en) Account checking system based on hybrid cloud computing platform and account checking method thereof
CN111200864A (en) Data processing method, device, equipment and storage medium
CN114385378A (en) Active data processing method and device for Internet of things equipment and storage medium
CN105139122A (en) Program operation time duration statistics method and system
CN110298001B (en) Method and device for acquiring log data packet and computer readable storage medium
CN111263120A (en) Video equipment online time counting method and device based on stream calculation and terminal
CN114279512A (en) Low-power-consumption communication method and device for intelligent water meter
CN114782073A (en) Point management method and device based on doll machine and doll machine
CN107705154A (en) Electricity statistical method, system, Cloud Server, household electrical appliances and readable storage medium storing program for executing
CN112147962A (en) Communication system and communication method between intelligent casting system and equipment
CN107038170B (en) Method and device for recommending application program
CN104077195A (en) State detection method, state detection device and terminal
CN113254094B (en) ZYNQ-based data acquisition control display method, device and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant