CN114473404B - Method for quickly disassembling and assembling steel wire adhesive tape hopper of bucket elevator - Google Patents

Method for quickly disassembling and assembling steel wire adhesive tape hopper of bucket elevator Download PDF

Info

Publication number
CN114473404B
CN114473404B CN202011251558.9A CN202011251558A CN114473404B CN 114473404 B CN114473404 B CN 114473404B CN 202011251558 A CN202011251558 A CN 202011251558A CN 114473404 B CN114473404 B CN 114473404B
Authority
CN
China
Prior art keywords
steel wire
adhesive tape
bucket elevator
hoppers
cutting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011251558.9A
Other languages
Chinese (zh)
Other versions
CN114473404A (en
Inventor
杜盼盼
古宏渊
张德兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taigang Stainless Steel Co Ltd
Original Assignee
Shanxi Taigang Stainless Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taigang Stainless Steel Co Ltd filed Critical Shanxi Taigang Stainless Steel Co Ltd
Priority to CN202011251558.9A priority Critical patent/CN114473404B/en
Publication of CN114473404A publication Critical patent/CN114473404A/en
Application granted granted Critical
Publication of CN114473404B publication Critical patent/CN114473404B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The invention relates to a replacement method. A method for quickly disassembling and assembling a steel wire adhesive tape hopper of a bucket elevator. Step one: cutting the side surface shell of the lower layer of the bucket elevator head wheel upwards from the ground, manufacturing a clamp by using channel steel, and clamping the position of a steel wire adhesive tape in the middle of the bucket by the clamp; step two: firstly, dismantling 3-5 hoppers at the lower layer cutting holes of the bucket elevator head wheel, and then dismantling 3-5 hoppers at the lower layer of the bucket elevator head wheel and the cutting holes on the opposite sides of the tail wheel correspondingly; step three: dismantling the fixture, reinstalling the fixture at the position of the steel wire adhesive tape at the upper edge of the cutting opening, and respectively dismantling 3-5 hoppers at the lower layer of the head pulley and the cutting hole of the tail pulley; step four: continuously repeating the third step until the dismantling is completed; step five: the installation sequence is opposite to the dismantling sequence, the fixture is dismantled, and 3-5 hoppers are respectively installed at the lower layer of the head wheel and the cutting holes of the tail wheel; step six: and continuously repeating the fifth step until the installation is completed. The method omits the eccentric time adjustment of the steel wire adhesive tape during disassembly and assembly, and can save the operation time by more than 48 hours.

Description

Method for quickly disassembling and assembling steel wire adhesive tape hopper of bucket elevator
Technical Field
The invention relates to a replacement method.
Background
The powder finished product warehouse is usually conveyed by a steel wire adhesive tape bucket elevator, and the steel wire adhesive tape is easily broken, torn and dropped due to the influence of the on-site working condition, so that the production line is forced to stop and continuous production cannot be realized. In the process of replacing the steel wire adhesive tape, the bucket with the hopper is required to be dismantled and installed, and the bucket elevator with the hopper elevator installation height of 51.5 meters, a 12-layer frame and 295 hoppers is taken as an example, the normal replacement mode is that cutting holes are formed in the lower layer of the bucket elevator frame, the hoppers are evenly dismantled on two sides, intervals exist between the single-side dismantling hoppers, after the steel wire adhesive tape is rotated and eccentric adjustment is carried out, the number of the dismantling hoppers is 50-60 each time, 6 whole circles of adjustment are needed for complete dismantling, the same mode is adopted for installation, and 6 times of adjustment are needed. And the combined site is narrow in field and limited in storage space, and about 5 days are required for disassembling and assembling the steel wire adhesive tape hopper of the bucket elevator each time.
Disclosure of Invention
The invention aims to solve the problems and provides a method for quickly disassembling and assembling a steel wire adhesive tape hopper of a bucket elevator.
The purpose of the invention is realized in the following way: a method for quickly disassembling and assembling a steel wire adhesive tape hopper of a bucket elevator comprises the following steps:
step one: the side surface shell of the lower layer of the bucket elevator head wheel is cut upwards from the ground, a clamp is made of channel steel, the clamp clamps the position of the steel wire adhesive tape in the middle of the hopper, two ends of the clamp are erected at the bucket elevator shell of the lower edge of the cutting hole, and rotation caused by weight unbalance of two sides of the steel wire adhesive tape is prevented.
Step two: firstly, dismantling 3-5 hoppers at the lower layer cutting holes of the bucket elevator head wheel, and keeping the speed reducer under a reversing force; and then respectively dismantling 3-5 hoppers at the lower layer of the head wheel and the cutting holes on the opposite sides of the tail wheel of the bucket elevator, so as to keep the stress balance on the two sides.
Step three: and (3) dismantling the fixture, reinstalling the fixture at the position of the steel wire adhesive tape at the upper edge of the cutting opening, rotating the bucket elevator to slowly rotate the steel wire adhesive tape at a positive speed, and rotating until the fixture stops from the upper edge of the cutting hole to the lower edge, and respectively dismantling 3-5 hoppers at the lower layer of the head wheel and the cutting hole of the tail wheel.
Step four: continuously repeating the third step, and continuously dismantling the hoppers from the lower layer of the head pulley and the opposite angles of the cutting holes of the tail pulley until dismantling is completed.
Step five: and (3) dismantling the clamp in the reverse of the dismantling sequence, reinstalling the clamp at the position of the steel wire adhesive tape at the upper edge of the cutting opening, rotating the bucket elevator to slowly drive the steel wire adhesive tape to rotate at a positive speed until the clamp stops from the upper edge of the cutting hole to the lower edge, and respectively installing 3-5 hoppers at the lower layer of the head wheel and the cutting hole of the tail wheel.
Step six: continuously repeating the step five, and continuously installing hoppers from the opposite angles of the cutting holes of the head wheel and the tail wheel until the installation is completed.
Further, the clamping device is formed by connecting the bottoms of the two channel steel channels together through bolts.
The method ensures that the stress on two sides of the steel wire adhesive tape is balanced, the steel wire adhesive tape is in a static state when the hopper is dismounted, continuous and orderly dismounting and mounting can be realized, the conditions of rotation and unordered dismounting of the steel wire adhesive tape caused by uneven stress on two sides of the steel wire adhesive tape when the hopper is dismounted before are avoided, and the safety coefficient of overhaul is increased while the efficiency is improved. The method omits the eccentric time adjustment of the steel wire adhesive tape during disassembly and assembly, and can save the operation time by more than 48 hours.
Drawings
The invention is further described below with reference to the accompanying drawings.
FIG. 1 is a schematic diagram of the frame structure of the bucket elevator of the present invention.
Fig. 2 is a schematic view of the structure of the steel wire adhesive tape in the bucket elevator of the invention.
Wherein: 1. an upper working platform and a lower working platform.
Detailed Description
The invention aims to improve the dismantling and installing efficiency of a hopper and reduce the forced downtime of a production line.
The bucket elevator is a whole set of system, wherein the steel wire adhesive tape is conveying equipment, the hoppers are fixedly arranged on the steel wire adhesive tape by bolts, and the two hoppers are uniformly spaced by 150mm. The fixture is that two channel-section steel are buckled together in opposite directions, punches on the channel-section steel, passes two channel-section steel and steel wire sticky tape with the bolt to fastening clamp steel wire sticky tape. The bucket elevator is a shell surrounded by four external surfaces, and the cutting holes are 1.2 x 1.5m square holes and are positioned on the shell on the conveying surface and the two side surfaces of the steel wire adhesive tape.
A speed reducer with a non-return function (MC 3RLHF and a speed ratio 48.9626 in the invention) is purchased, the maximum reverse torque is 34.2KN.m, a motor of the bucket elevator is connected with the speed reducer through a hydraulic coupler to drive a roller, the inner side of a steel wire adhesive tape covers the roller, the steel wire adhesive tape is driven to run through friction, the reverse force is 34.2KN.m, the capacity of the steel wire adhesive tape is matched with the design load of the whole equipment, the arrangement cannot be adjusted, and the speed reducer only uses a clamp to clamp the position of the steel wire adhesive tape in the middle of a hopper at the cutting hole of a platform at the next layer of the head pulley, so that the hopper is prevented from rotating in the reverse direction.
The forward rotation side of the bucket elevator head wheel firstly removes 3-5 hoppers, the speed reducer keeps receiving a reverse force, and the hoppers are synchronously removed at the position of the diagonal cutting holes of the platform at the lower layer of the head wheel and the tail wheel, so that the hoppers are removed in sequence. When the material is returned to the material hopper, 3 to 5 material hoppers are firstly arranged in the reverse direction of the tail wheel, then diagonal operation is carried out at the cutting holes of the head wheel and the tail wheel, and the material hoppers are arranged in sequence.
Examples:
The bucket elevator steel wire adhesive tape replacement method is used in the replacement process of the bucket elevator steel wire adhesive tape in the ultrafine powder operation area of the Taisteel processing plant, and the efficiency is obviously improved by using the improved hopper disassembly and assembly method.
The operation process comprises the following steps:
(1) The side shell of the bucket elevator at the lower layer of the head pulley is cut upwards from the ground (slightly higher than the operation height of an operator by extending hands, about 2.5-3 meters), a fixture of 1.5 meters is manufactured by using channel steel (the fixture consists of a pair of H100 channel steel back to back, bolts are penetrated at two ends), the middle steel wire adhesive tape position of the hopper is clamped, and the two ends are erected at the bucket elevator shell at the lower edge of a cutting hole, so that the rotation caused by weight unbalance at two sides of the steel wire adhesive tape is prevented.
(2) Firstly, 3-5 hoppers are removed from the lower layer cutting holes of the head wheel, bolts fixed on the steel wire belt conveyor are removed from the hoppers, and then the hoppers are taken away. The speed reducer remains subjected to a reversing force.
(3) And 3-5 hoppers are removed at the positions of the lower layer of the head wheel and the cutting holes on the opposite sides of the tail wheel, so that the stress balance of the two sides is kept. (in the figure, the upper round cake is a head wheel, the lower round cake is a tail wheel, the lower layer of the head wheel is an upper left steel wire tape conveying surface (the left side of a reference numeral 1), and the opposite side of the tail wheel is a lower right steel wire tape conveying surface (the right side of a reference numeral 2)).
(4) And (3) removing the clamp, reinstalling the clamp at the position of the steel wire adhesive tape at the upper edge of the cutting opening, rotating the bucket elevator to slowly drive the steel wire adhesive tape to rotate at a positive uniform speed until the clamp stops from the upper edge of the cutting hole to the lower edge, and respectively removing 3-5 hoppers at the lower layer of the head wheel and the cutting hole of the tail wheel.
(5) Continuously repeating the step (3), and continuously dismantling the hoppers from the lower layer of the head pulley and the opposite angles of the cutting holes of the tail pulley until the dismantling is completed.
(6) And (3) dismantling the clamp in the reverse of the dismantling sequence, reinstalling the clamp at the position of the steel wire adhesive tape at the upper edge of the cutting opening, rotating the bucket elevator to slowly drive the steel wire adhesive tape to rotate at a positive speed until the clamp stops from the upper edge of the cutting hole to the lower edge, and respectively installing 3-5 hoppers at the lower layer of the head wheel and the cutting hole of the tail wheel.
(7) Continuously repeating the step (6), and continuously installing hoppers from the opposite angles of the cutting holes of the head wheel and the tail wheel until the installation is completed.
The invention is suitable for the elevator with the hopper and is characterized by safety, simplicity, convenience and rapidness. By adopting the invention, the hopper disassembly and assembly efficiency is greatly improved, the time is saved, and the safety and reliability are realized.
The above embodiments are merely examples of the present invention, but the present invention is not limited to the above embodiments, and any changes or modifications within the scope of the present invention are intended to be included in the scope of the present invention.

Claims (1)

1. A method for quickly disassembling and assembling a steel wire adhesive tape hopper of a bucket elevator is characterized by comprising the following steps of: the method comprises the following steps:
step one: cutting the side surface shell of the lower layer of the bucket elevator head wheel upwards from the ground, manufacturing a clamp by using channel steel, clamping the position of a steel wire adhesive tape in the middle of a hopper by the clamp, and erecting two ends of the clamp at the bucket elevator shell at the lower edge of a cutting hole to prevent rotation caused by weight unbalance of two sides of the steel wire adhesive tape;
step two: firstly, dismantling 3-5 hoppers at the lower layer cutting holes of the bucket elevator head wheel, and keeping the speed reducer under a reversing force; then respectively dismantling 3-5 hoppers at the lower layer of the head wheel and the cutting holes on the opposite sides of the tail wheel of the bucket elevator, and keeping the stress balance on the two sides;
Step three: the fixture is removed and reinstalled at the position of the steel wire adhesive tape at the upper edge of the cutting opening, the bucket elevator is rotated to slowly rotate at a constant speed in the forward direction until the fixture stops moving from the upper edge of the cutting hole to the lower edge, and 3-5 hoppers at the lower layer of the head wheel and the cutting hole of the tail wheel are removed respectively;
step four: continuously repeating the third step, and continuously dismantling the hoppers from the lower layer of the head pulley and the opposite angles of the cutting holes of the tail pulley until dismantling is completed;
step five: the installation sequence is opposite to the dismantling sequence, the clamp is dismantled and reinstalled at the position of the steel wire adhesive tape at the upper edge of the cutting opening, the bucket elevator is rotated to slowly drive the steel wire adhesive tape to rotate at a constant speed in the forward direction until the clamp stops from the upper edge of the cutting hole to the lower edge, and 3-5 hoppers at the lower layer of the head wheel and the cutting hole of the tail wheel are respectively installed;
Step six: continuously repeating the step five, and continuously installing hoppers from the opposite angles of the cutting holes of the head wheel and the tail wheel until the installation is completed;
the clamping device is characterized in that the bottoms of the two channel steel grooves are connected together through bolts.
CN202011251558.9A 2020-11-11 2020-11-11 Method for quickly disassembling and assembling steel wire adhesive tape hopper of bucket elevator Active CN114473404B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011251558.9A CN114473404B (en) 2020-11-11 2020-11-11 Method for quickly disassembling and assembling steel wire adhesive tape hopper of bucket elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011251558.9A CN114473404B (en) 2020-11-11 2020-11-11 Method for quickly disassembling and assembling steel wire adhesive tape hopper of bucket elevator

Publications (2)

Publication Number Publication Date
CN114473404A CN114473404A (en) 2022-05-13
CN114473404B true CN114473404B (en) 2024-04-19

Family

ID=81491015

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011251558.9A Active CN114473404B (en) 2020-11-11 2020-11-11 Method for quickly disassembling and assembling steel wire adhesive tape hopper of bucket elevator

Country Status (1)

Country Link
CN (1) CN114473404B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040072087A (en) * 2003-02-08 2004-08-18 주식회사 더불어 사는집 Transportable terminal for carrying bulk
JP2005008317A (en) * 2003-06-17 2005-01-13 Taihei Kogyo Co Ltd Belt replacing method of belt conveyor
CN101643173A (en) * 2009-08-07 2010-02-10 常熟市新虞电器有限责任公司 Coal lifting and coal unloading mechanism of mine skip
CN102020164A (en) * 2009-09-21 2011-04-20 王俊生 Self-unloading method for bucket elevator, and elevator
CN102042031A (en) * 2010-10-30 2011-05-04 枣庄矿业(集团)有限责任公司蒋庄煤矿 Process for replacing adhesive tape for adhesive tape transporter of coal mine main shaft loading chamber
CN103009037A (en) * 2012-12-14 2013-04-03 太原理工大学 Replacing device and replacing method for belt conveyor rubber belt
CN104760799A (en) * 2015-02-03 2015-07-08 安徽芜湖海螺建筑安装工程有限责任公司 Method for replacing feeding rubber belt bucket elevator and rubber belt of bucket elevator in cement clinker production line

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040072087A (en) * 2003-02-08 2004-08-18 주식회사 더불어 사는집 Transportable terminal for carrying bulk
JP2005008317A (en) * 2003-06-17 2005-01-13 Taihei Kogyo Co Ltd Belt replacing method of belt conveyor
CN101643173A (en) * 2009-08-07 2010-02-10 常熟市新虞电器有限责任公司 Coal lifting and coal unloading mechanism of mine skip
CN102020164A (en) * 2009-09-21 2011-04-20 王俊生 Self-unloading method for bucket elevator, and elevator
CN102042031A (en) * 2010-10-30 2011-05-04 枣庄矿业(集团)有限责任公司蒋庄煤矿 Process for replacing adhesive tape for adhesive tape transporter of coal mine main shaft loading chamber
CN103009037A (en) * 2012-12-14 2013-04-03 太原理工大学 Replacing device and replacing method for belt conveyor rubber belt
CN104760799A (en) * 2015-02-03 2015-07-08 安徽芜湖海螺建筑安装工程有限责任公司 Method for replacing feeding rubber belt bucket elevator and rubber belt of bucket elevator in cement clinker production line

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
N-GTD800钢丝胶带提升机钢丝胶带快速更换;曹清贤;;水泥(12);第44-45页 *
大型链板式斗提机斗链的快速更换方法;史江琳;;磷肥与复肥(02);第54-55页 *
钢丝胶带提升机更换钢丝胶带的方法;许文强;建材与装饰;20150630;第131页 *

Also Published As

Publication number Publication date
CN114473404A (en) 2022-05-13

Similar Documents

Publication Publication Date Title
CN114473404B (en) Method for quickly disassembling and assembling steel wire adhesive tape hopper of bucket elevator
CN111807146B (en) Reinforcing steel bar winding machine
CN114046988B (en) Double-station toothed belt durability test device and method
CN111674827B (en) Stepping type conveying device and method for carrier roller of inclined angle belt conveyor
CN215206865U (en) Bottom template loading equipment
CN211937326U (en) Movable jaw crusher
CN217349623U (en) Building construction overhanging type mobile blanking platform
CN209189217U (en) A kind of industrial chemicals screening plant
CN202765714U (en) Chain conveyer
CN2206275Y (en) Steel rope adhesive tape elevator
CN112224962A (en) Glass fiber mesh fabric impregnation, drying and conveying system
CN215754657U (en) Quick assembling and disassembling structure for active and passive rollers of belt conveyor
CN218882767U (en) High-torsion mandrel with installation limiting structure
CN218911144U (en) Beam penetrating device for prestressed steel beams of bridge
CN220195491U (en) Balancing device of heavy screening machine
CN216303040U (en) Novel lifting appliance capable of simultaneously lifting multiple components for steel structure lifting
CN220469394U (en) Mechanical climbing formwork device
CN214570406U (en) Grain lifting machine
CN211539043U (en) Flattening equipment for constructional engineering
CN2836954Y (en) Inner guard ring forming and manufacturing device for steel strap package
CN216234438U (en) Conveying device
CN214143314U (en) Non-adhesive steel strand reeving machine
CN219566561U (en) Friction carrier roller of mine belt conveyor
CN218433378U (en) Material transmission band with rotation type adjusting structure
CN220181863U (en) Stator conveyor belt

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant