CN114372675A - Wisdom building site supervision cloud platform system - Google Patents
Wisdom building site supervision cloud platform system Download PDFInfo
- Publication number
- CN114372675A CN114372675A CN202111521066.1A CN202111521066A CN114372675A CN 114372675 A CN114372675 A CN 114372675A CN 202111521066 A CN202111521066 A CN 202111521066A CN 114372675 A CN114372675 A CN 114372675A
- Authority
- CN
- China
- Prior art keywords
- unit
- work order
- information
- platform system
- cloud platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/27—Replication, distribution or synchronisation of data between databases or within a distributed database system; Distributed database system architectures therefor
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/30—Authentication, i.e. establishing the identity or authorisation of security principals
- G06F21/31—User authentication
- G06F21/32—User authentication using biometric data, e.g. fingerprints, iris scans or voiceprints
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- Economics (AREA)
- General Business, Economics & Management (AREA)
- Databases & Information Systems (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Marketing (AREA)
- Data Mining & Analysis (AREA)
- Computer Security & Cryptography (AREA)
- Tourism & Hospitality (AREA)
- General Engineering & Computer Science (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Computing Systems (AREA)
- Computer Hardware Design (AREA)
- Software Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a smart building site supervision cloud platform system which comprises an application layer, a display layer and a control layer, wherein the application layer, the display layer and the control layer are integrated in a control center, and the application layer comprises an attendance management unit, a man-vehicle information statistic unit, an engineering management unit, an environment monitoring unit, a potential safety hazard early warning unit, a safety event warning unit and an epidemic situation risk management and control unit, is used for statistic calculation of various kinds of information and collects the information to the control center; the display layer comprises an output display unit for visually displaying the information result processed by the application layer; this system can carry out the epidemic prevention management and control to building site field personnel, avoids appearing the condition that the epidemic situation spreads the diffusion, and this platform system can supervise the whole of engineering, reports an emergency and asks for help or increased vigilance the harm source and the abnormal conditions that appear, has strengthened the safety control of building site, guarantees that engineering construction can go on smoothly.
Description
Technical Field
The invention relates to a construction site management system, in particular to an intelligent construction site supervision cloud platform system.
Background
Along with the rapid development of economic society, engineering construction is carried out all over the country, and on the site of a construction site, a large number of construction operators are in frequent contact, especially in epidemic prevention period, the physical conditions of the construction operators need to be concerned constantly, the occurrence of gathering infection is avoided, meanwhile, the site is a dangerous operation site, potential safety hazards exist at any time, and personal injury and property loss can be caused once safety accidents occur.
The existing construction sites are managed in an extensive mode, the construction sites are not scientifically and effectively supervised and managed, safety production accidents occur frequently, and high attention needs to be paid to construction site safety by engineering construction units.
Disclosure of Invention
The invention aims to provide an intelligent building site supervision cloud platform system to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme:
a smart building site supervision cloud platform system comprises an application layer, a display layer and a control layer which are integrated in a control center, wherein the application layer comprises an attendance management unit, a man-vehicle information statistic unit, an engineering management unit, an environment monitoring unit, a potential safety hazard early warning unit, a safety event warning unit and an epidemic situation risk management and control unit, is used for statistic calculation of various kinds of information and is collected to the control center; the display layer comprises an output display unit for visually displaying the information result processed by the application layer; the control layer comprises a query unit and an authority distribution unit, wherein the query unit is used for directionally acquiring information according to input conditions, and the authority distribution unit is used for distributing query and modification authorities for users.
Attendance management unit for carry out attendance management to the operation personnel, the attendance adopts face voiceprint machine to carry out personnel's information identification and attendance record, and attendance management unit includes three submodule piece: the personnel information display module is used for recording, inquiring and displaying personnel information; the equipment attribute management module is used for recording, inquiring and displaying attendance equipment; the history recording module is used for saving, calling and inquiring the history records of personnel and equipment;
and the man-vehicle system counting unit is used for displaying the number of entrants/vehicles entering the construction site on the same day, the number of exits/vehicles, the total number of epidemic prevention inspectors/vehicles and the number of early warning behaviors.
The project management unit is used for displaying project overview conditions and comprises the following components: the construction method comprises the following steps of (1) engineering name, construction unit, construction period and construction process content; and the construction process shows the actual completion condition of the construction through the time progress bar, and is matched with a multi-angle video real-time monitoring picture and a building 3D model to show the detailed condition of the completion of the project.
The environmental monitoring unit is used for showing building site field operation environmental conditions, includes: temperature, humidity, wind speed, PM2.5, PM10, and decibel values for noise; the environment monitoring unit is provided with a sign installed on a construction site, and data on the intelligent construction site supervision cloud platform system is synchronous with data on the large sign.
The work order management unit is used for the operation management of engineering, includes: work order application, work order query, work order audit, work order editing, work order cancellation, work order quality inspection and work order report forms;
the potential safety hazard early warning unit is used for displaying details of the abnormal events occurring in the construction site according to the event line in a rolling mode and popping up processing results aiming at the abnormal events.
The epidemic situation risk control unit is used for displaying epidemic prevention related details.
Compared with the prior art, the invention has the beneficial effects that: 1. the system can be used for carrying out epidemic prevention management and control on site personnel in a construction site, and the situation of spreading and spreading of epidemic situations is avoided.
2. The platform system can supervise the whole engineering, alarm the occurring hazard source and abnormal conditions, strengthen the safety management of a construction site and ensure that engineering construction can be smoothly carried out.
Drawings
Fig. 1 is an overall frame diagram of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1, in an embodiment of the present invention, an intelligent building site supervision cloud platform system includes an application layer, a display layer, and a control layer integrated in a control center, where the application layer includes an attendance management unit, a human-vehicle information statistics unit, an engineering management unit, an environment monitoring unit, a potential safety hazard early warning unit, a safety event warning unit, and an epidemic situation risk management and control unit, and is used for performing statistics calculation on various types of information and summarizing the information to the control center; the display layer comprises an output display unit for visually displaying the information result processed by the application layer; the control layer comprises a query unit and an authority distribution unit, wherein the query unit is used for directionally acquiring information according to input conditions, and the authority distribution unit is used for distributing query and modification authorities for users.
Attendance management unit for carry out attendance management to the operation personnel, the attendance adopts face voiceprint machine to carry out personnel's information identification and attendance record, and attendance management unit includes three submodule piece: the personnel information display module is used for recording, inquiring and displaying personnel information; the equipment attribute management module is used for recording, inquiring and displaying attendance equipment; the history recording module is used for saving, calling and inquiring the history records of personnel and equipment;
when the management is carried out through the display layer and the control layer, the three sub-modules are respectively as follows:
the staff information display module clicks the attendance management unit on the home page, enters a secondary interface, clicks a staff information button, displays the information conditions of all staff, can set different authorities for each staff and supports the deletion of the staff; keywords are input into the frames of the employee information and the employee number, and the employees can be searched;
the equipment attribute management module enters a secondary interface, clicks an equipment attribute button, displays the information conditions of all the human face voiceprint machines, can set different authorities for each human face voiceprint equipment and supports the functions of editing, deleting and restarting; and keywords are input into the frames of the machine name and the state, so that accurate searching can be performed. Clicking an authority button of the human face voiceprint machine, popping up an authority modification interface, and enabling a user to perform voiceprint authority adding operation and delete the authority;
the history recording module enters a secondary interface, clicks a history recording button, displays the records of each time the person identifies through the human face voiceprint machine, inputs keywords in the frames of the machine serial number and the name and can search each identification record by selecting a time period; derivation of the identification record may also be supported.
And the man-vehicle system counting unit is used for displaying the number of entrants/vehicles entering the construction site on the same day, the number of exits/vehicles, the total number of epidemic prevention inspectors/vehicles and the number of early warning behaviors.
The project management unit is used for displaying project overview conditions and comprises the following components: the construction method comprises the following steps of (1) engineering name, construction unit, construction period and construction process content; and the construction process shows the actual completion condition of the construction through the time progress bar, and is matched with a multi-angle video real-time monitoring picture and a building 3D model to show the detailed condition of the completion of the project.
The environmental monitoring unit is used for showing building site field operation environmental conditions, includes: temperature, humidity, wind speed, PM2.5, PM10, and decibel values for noise; the environment monitoring unit is provided with a sign installed on a construction site, and data on the intelligent construction site supervision cloud platform system is synchronous with data on the large sign.
The work order management unit is used for the operation management of engineering, includes: work order application, work order query, work order audit, work order editing, work order cancellation, work order quality inspection and work order report forms;
as will be described in more detail below,
applying for a work order: the work order is divided into a general work order and a special work order, the application of the special work order needs to be based on the general work order, and the application content of the work order comprises: work order type, applicant information, operation information, manufacturer information, approval information, etc., wherein the operation type of the special work order includes fire, high place, hanging, etc.,
and (4) work order query: multidimensional query can be carried out on the work order information, and the method comprises the following steps: work order number, work order type, work order status dimension, applicant dimension, work time, etc.,
and (4) checking the work order: after the work order application is submitted, the system needs to push the work order to be audited to a work order list interface of a corresponding auditor and inform a relevant unit principal of carrying out work order audit; returning to the applicant if the work order fails to be approved, re-editing and re-submitting the application or closing the work order which fails to be approved by the applicant; the approved work orders enter a work order data pool,
editing the work order: the work orders which are submitted and not examined can be edited again and submitted again; the worksheets that fail the audit support re-edit resubmission,
and (4) canceling the work order: the work order cancellation is supported if the work order passes the non-audit,
and (4) checking the quality of the work order: the work order is arrived at the deadline or completed in advance, the quality inspection personnel can check the corresponding work order, the work order after the quality inspection represents that the work order is completed,
work order report function: and carrying out multi-dimensional statistics on work order system data from time, work order types, operation types, carrier merchants, areas, work order states and the like.
The potential safety hazard early warning unit is used for displaying details of the abnormal events occurring in the construction site according to the event line in a rolling mode and popping up processing results aiming at the abnormal events.
The epidemic situation risk control unit is used for displaying epidemic prevention related details.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.
Claims (9)
1. An intelligent building site supervision cloud platform system is characterized by comprising an application layer, a display layer and a control layer which are integrated in a control center,
the application layer comprises an attendance management unit, a man-vehicle information statistical unit, an engineering management unit, an environment monitoring unit, a potential safety hazard early warning unit, a safety event warning unit and an epidemic situation risk management and control unit, is used for statistical calculation of various kinds of information and summarizes the information to a control center;
the display layer comprises an output display unit for visually displaying the information result processed by the application layer;
the control layer comprises a query unit and an authority distribution unit, wherein the query unit is used for directionally acquiring information according to input conditions, and the authority distribution unit is used for distributing query and modification authorities for users.
2. The intelligent building site supervision cloud platform system according to claim 1, wherein the attendance management unit is used for performing attendance management on the operating personnel, the attendance is performed by adopting a human face voiceprint machine to perform personnel information identification and attendance recording,
the attendance management unit comprises three submodules: the personnel information display module is used for recording, inquiring and displaying personnel information; the equipment attribute management module is used for recording, inquiring and displaying attendance equipment; and the history recording module is used for saving and calling and inquiring the history records of the personnel and the equipment.
3. The intelligent building site supervision cloud platform system according to claim 1, wherein the man-car system counting unit is configured to display the number of entrants/cars entering the building site on the current day, the number of exits/cars, the number of epidemic prevention inspectors/cars, and the number of early warning actions.
4. The intelligent worksite supervision cloud platform system according to claim 1, wherein the project management unit is configured to display project profile conditions, and comprises: the construction method comprises the following steps of (1) engineering name, construction unit, construction period and construction process content;
and the construction process shows the actual completion condition of the construction through the time progress bar, and is matched with a multi-angle video real-time monitoring picture and a building 3D model to show the detailed condition of the completion of the project.
5. The intelligent worksite supervision cloud platform system according to claim 1, wherein the environment monitoring unit is used for displaying worksite field operation environment conditions, and comprises: temperature, humidity, wind speed, PM2.5, PM10, and decibel values for noise; the environment monitoring unit is provided with a sign installed on a construction site, and data on the intelligent construction site supervision cloud platform system is synchronous with data on the large sign.
6. The intelligent building site supervision cloud platform system according to claim 1, wherein the work order management unit is used for operation management of engineering, and comprises: work order application, work order query, work order audit, work order editing, work order cancellation, work order quality inspection and work order report.
7. The intelligent worksite supervision cloud platform system according to claim 6, wherein the application content of the work order comprises: the work order type, the applicant information, the operation information, the manufacturer information and the signing and checking information, and the operation type of the special work order comprises fire, high altitude and hanging;
the contents of the work order query include: work order number, work order type, work order state dimension, applicant dimension and operation time;
the work order report contents comprise time, work order types, operation types, carrier merchants, areas and work order states.
8. The intelligent building site supervision cloud platform system according to claim 1, wherein the safety hazard early warning unit is configured to display details of an abnormal event occurring on the building site according to an event line in a rolling manner, and pop up a processing result for the abnormal event.
9. The intelligent building site supervision cloud platform system according to claim 1, wherein the epidemic risk management and control unit is used for displaying epidemic prevention related details.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111521066.1A CN114372675A (en) | 2021-12-13 | 2021-12-13 | Wisdom building site supervision cloud platform system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111521066.1A CN114372675A (en) | 2021-12-13 | 2021-12-13 | Wisdom building site supervision cloud platform system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114372675A true CN114372675A (en) | 2022-04-19 |
Family
ID=81139698
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111521066.1A Pending CN114372675A (en) | 2021-12-13 | 2021-12-13 | Wisdom building site supervision cloud platform system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114372675A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115731670A (en) * | 2022-11-15 | 2023-03-03 | 广州一洲信息技术有限公司 | Safety alarm method, device and monitoring system for construction site |
-
2021
- 2021-12-13 CN CN202111521066.1A patent/CN114372675A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115731670A (en) * | 2022-11-15 | 2023-03-03 | 广州一洲信息技术有限公司 | Safety alarm method, device and monitoring system for construction site |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110505102B (en) | Power information communication fusion monitoring and service standardization management platform system and method | |
CN113534760A (en) | Manufacturing industry factory management system based on digital twin platform | |
CN111797139A (en) | Restricted space operation safety supervision platform and supervision method | |
CN110652684A (en) | Electric fire safety integrated management system | |
CN115130807A (en) | Intelligent supervision method for pharmaceutical production safety | |
CN113469544A (en) | Risk control method and system for safety operation | |
CN114137302A (en) | Monitoring system for whole verification process of electric energy metering device | |
CN114372675A (en) | Wisdom building site supervision cloud platform system | |
CN116859800A (en) | Production workshop safety monitoring system and method based on complex event stream | |
CN116993051A (en) | Intelligent engineering supervision platform based on big data | |
CN111985776A (en) | Cloud-based labor supervision system and supervision method thereof | |
CN112688929B (en) | Sharing system based on Internet threat information | |
CN117787885A (en) | Enterprise safety production management method and system | |
KR20060058186A (en) | Information technology risk management system and method the same | |
CN112132526A (en) | Wisdom factory management system | |
CN116859804A (en) | Safety situation monitoring and early warning system for ship manufacturing workshop | |
CN117149559A (en) | Auditing method and system based on operation log information of power network equipment | |
CN113869758A (en) | Intelligent two-ticket management and operation site risk early warning system | |
Fang et al. | Design and Development of Industrial Safety APPs | |
CN112085341A (en) | Master station system suitable for risk management and control of overall process of power production operation | |
CN116846686B (en) | Industrial Internet security situation awareness cooperative linkage system based on data analysis | |
CN117456447A (en) | Intelligent management system and method for fire operation of power plant | |
Xu et al. | High Quality and Efficiency Operation and Maintenance | |
Yixuan | Design of intelligent operation and maintenance applet using Wechat platform | |
CN118627903A (en) | Graded management and control system and method for preventing foreign matters of overhaul work orders |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |