CN114351749A - Pile plate type road base pipe pile top connecting mechanism and construction method thereof - Google Patents

Pile plate type road base pipe pile top connecting mechanism and construction method thereof Download PDF

Info

Publication number
CN114351749A
CN114351749A CN202210084694.6A CN202210084694A CN114351749A CN 114351749 A CN114351749 A CN 114351749A CN 202210084694 A CN202210084694 A CN 202210084694A CN 114351749 A CN114351749 A CN 114351749A
Authority
CN
China
Prior art keywords
pile
fixedly connected
plate
pile body
movable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210084694.6A
Other languages
Chinese (zh)
Other versions
CN114351749B (en
Inventor
付书生
徐磊
高海岗
刘向前
沈维成
陈严
刘晓晗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Road and Bridge Engineering Co Ltd
Original Assignee
Anhui Road and Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Road and Bridge Engineering Co Ltd filed Critical Anhui Road and Bridge Engineering Co Ltd
Priority to CN202210084694.6A priority Critical patent/CN114351749B/en
Publication of CN114351749A publication Critical patent/CN114351749A/en
Application granted granted Critical
Publication of CN114351749B publication Critical patent/CN114351749B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • E01B2/006Deep foundation of tracks

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a pile plate type road base pipe pile top connecting mechanism and a construction method thereof, the connecting mechanism comprises a pipe pile body, wherein an annular groove is formed in the outer side edge of the pipe pile body, an annular ring is sleeved on the outer side edge of the pipe pile body, sliding blocks are fixedly connected to the left side and the right side of an inner cavity of the annular ring, the sliding blocks are movably connected to the inner cavity of the annular groove, two cross rods are fixedly connected to the left side and the right side of the annular ring, one ends of the cross rods, which are far away from the pipe pile body, are fixedly connected with a disc, swing plates are arranged at the positions, which are close to the bottom end, of the left side and the right side of the pipe pile body, the ground drives the swing plates to swing through mutual matching among structures of the pipe pile body, the swing plates drive the baffle plates to push, the baffle plates drive flexible inserted rods to move, and the inserted rods are inserted into the ground, limiting the tubular pile body.

Description

Pile plate type road base pipe pile top connecting mechanism and construction method thereof
Technical Field
The invention relates to the technical field of roadbed construction, in particular to a pile plate type roadbed pipe pile top connecting mechanism and a construction method thereof.
Background
With the development of reform and open and economic construction, a large number of pretensioned prestressed concrete pipe piles are applied to railway systems, and are expanded to the fields of industry and civil buildings, municipal administration, metallurgy, ports, highways and the like.
However there are some problems in current pile sheet formula way parent tube pile top coupling mechanism in use, current coupling mechanism in use can not carry out quick spacing to the pile sheet, when the weather is comparatively cold, the pile sheet surface produces the deformation easily, thereby the work efficiency of device has been reduced, simultaneously after the tubular pile inserted ground, spacing effect to the tubular pile is not enough, the tubular pile produces the displacement easily, and often need measure the length of device at the job site, current measurement is not convenient for hide the tape measure, the efficiency of accomodating of device has been reduced.
Disclosure of Invention
In order to achieve the purpose, the invention provides the following technical scheme: a pile plate type road base pipe pile top connecting mechanism and a construction method thereof comprise a pipe pile body, wherein a ring groove is formed in the edge of the outer side of the pipe pile body, a ring is sleeved on the edge of the outer side of the pipe pile body, sliders are fixedly connected to the left side and the right side of the ring inner cavity, the sliders are movably connected to the ring inner cavity, two cross rods are fixedly connected to the left side and the right side of the ring inner cavity, a disc is fixedly connected to one end, away from the pipe pile body, of each cross rod, a swing plate is arranged at the position, close to the bottom end, of the left side and the right side of the pipe pile body, a first hinge is arranged at one side, close to the pipe pile body, of the bottom of the swing plate, the swing plate is movably connected with the edge of the outer side of the pipe pile body through the first hinge, a groove is formed in one side, close to the pipe pile body, of the top of the swing plate, a through hole is formed in the inner cavity of the through hole, an inserted rod is fixedly connected with a baffle plate at one end, close to the pipe pile body, the pipe pile comprises a pipe pile body and is characterized in that one side, far away from the pipe pile body, of a baffle is close to the top and the bottom and is fixedly connected with a movable spring, one end of the movable spring is fixedly connected to one side of a groove, the top of the pipe pile body is provided with an adjusting mechanism, and the top of the pipe pile body is provided with a limiting mechanism.
Preferably, the swing mechanism comprises two movable plates at the top end of the tubular pile body, an arc-shaped groove is formed in one side, corresponding to the movable plates, of the inner cavity of the arc-shaped groove, blind holes are formed in the front side and the rear side of the inner cavity of the arc-shaped groove, limiting springs are fixedly connected to the blind holes, bolts penetrate through the top of the movable plates near the front side and the rear side, round pipes are sleeved on the outer edges of the transverse rods, vertical rods are fixedly connected to the tops of the round pipes, fixed plates are fixedly connected to the tops of the vertical rods, connecting cylinders are fixedly connected to the tops of the fixed plates, fixing rings are fixedly connected to the tops of the connecting cylinders, threaded holes are formed in the inner cavities of the connecting cylinders and the fixing rings, grooves are formed in one sides, close to the tubular pile body, of the bottoms of the movable plates, connecting rods are inserted into the inner cavities of the grooves, rubber scales are sleeved on the outer edges of the connecting rods, limiting rings are fixedly connected to one ends, far away from the connecting rods, of the rubber scales, the equal fixedly connected with trapezoidal piece of fly leaf, the equal fixedly connected with L shaped plate of both sides department around the tubular pile body left and right sides is close to, one side that the tubular pile body was kept away from to the L shaped plate all is located the fly leaf bottom.
Preferably, the limiting mechanism comprises a pile plate body at the top end of the pipe pile body, movable cylinders are arranged at the positions, close to the left side and the right side, of the top of the pile plate body, threaded rods are arranged in inner cavities of the movable cylinders in a penetrating manner, the bottom ends of the threaded rods penetrate through the bottom of the movable cylinders and are inserted into the top of the pile plate body, the bottom ends of the threaded rods are meshed with the top of the pile plate body, vertical grooves are formed in the positions, close to the left side and the right side, of the bottom ends of the movable cylinders, and are mutually penetrated with the inner cavity of the pile plate body, the left side, the right side and the rear side of the inner cavity of the pile plate body are fixedly connected with two supporting plates, a rotating plate is hinged between the two supporting plates, a moving groove is formed in one side, far away from the center of the pile plate body, of the bottom of the rotating plate, a moving block is movably connected with the inner cavity of the moving block, a connecting block is fixedly connected with a connecting block, and a moving rod is hinged with the inner cavity of the connecting block, three activity groove has been seted up to pile sheet body inner chamber bottom, the movable rod outside edge is close to that bottom department articulates there is the stopper, stopper bottom fixedly connected with movable block, movable block swing joint is at adjacent activity inslot chamber, the spherical groove has all been seted up to pile sheet body left and right sides and rear side, the equal swing joint of spherical groove inner chamber has the storage ball, store the equal fixedly connected with L shape pole in one side that the pile sheet body center department was kept away from to the ball, the equal fixedly connected with solar panel of one end of storing the ball is kept away from to L shape pole, store the equal fixedly connected with control tube in one side that the L shape pole was kept away from to the ball, the equal fixedly connected with conveyer pipe in control tube top and bottom, the one end fixed connection that the control tube was kept away from to the conveyer pipe is at pile sheet body inner chamber lateral wall.
Preferably, the opening has been seted up to pile board body bottom, the fixed cover of pile board body bottom fixedly connected with, the edge cover outside the fixed cover is equipped with the connecting cover, connecting cover top fixed connection is in pile board body bottom.
Preferably, the U-shaped plate is arranged on one side, far away from the movable plate, of the top end of the bolt, a second hinge is arranged at the bottom of the U-shaped plate, the U-shaped plate is movably connected with the top end of the bolt through the second hinge, a connecting groove is formed in the top of the U-shaped plate, a movable column is movably connected to the inner cavity of the connecting groove, and a limiting semicircular plate is fixedly connected to the top of the movable column.
Preferably, the logical groove has all been seted up to one side that tubular pile body center department was kept away from to the fly leaf, it has the spheroid to lead to the equal swing joint of groove inner chamber, the equal fixedly connected with rope in one side that the tubular pile body was kept away from to the spheroid, the equal fixedly connected with go-between of one end that the tubular pile body was kept away from to the rope.
Preferably, two couples of stake board body top fixedly connected with, stake board body top center department is close to rear side department fixedly connected with connecting pipe, the connecting pipe sets up for lining up each other with stake board body inner chamber.
Preferably, the bottom of the swing plate is fixedly connected with a connecting spring, and the bottom end of the connecting spring is fixedly connected to one side of the tubular pile body.
A pile plate type road base pipe pile top connecting mechanism and a construction method thereof comprise the following steps:
s1: in the using process, an operator inserts the tubular pile body into the ground, when the swinging plate contacts the ground, the swinging plate is turned over, the swinging plate drives the inserting rod to move through the baffle plate, and the inserting rod is inserted into the ground layer, so that the tubular pile body is limited;
s2: placing a movable plate at the top end of a tubular pile body, then driving the tubular pile body to move by a crane through a hook, driving a trapezoidal block to move by the tubular pile body through a connecting cover, and driving the movable plate to move by the trapezoidal block;
s3: the pile plate body drives the bolt to move through the U-shaped plate, and the bolt drives the connecting cylinder to move, so that the movable plate is limited;
s4: at the moment, the tape is exposed, the limiting ring is pulled, the limiting ring drives the tape to move, and the tape measures the tubular pile body;
s5: concrete is poured into the movable cylinder, the threaded rod limits the position of the movable cylinder, the concrete enters the pile plate body, and the concrete enters the tubular pile body through the fixed cover;
s6: when the sun appears, solar panel absorbs the heat of sunshine and stores, and the heat storage is inside storing the ball, and when weather was colder, it was inside to store the ball and carry the pile board body with the heat through regulating tube and conveyer pipe to prevent that the pile board body from producing the deformation.
Compared with the prior art, the invention has the beneficial effects that:
according to the invention, through the mutual matching of the tubular pile body, the swinging plate, the baffle plate, the movable spring, the inserting rod and other structures, after the tubular pile body is contacted with the ground, the ground drives the swinging plate to swing, the swinging plate drives the baffle plate to push, and the baffle plate drives the flexible inserting rod to move, so that the inserting rod is inserted into the stratum to limit the tubular pile body;
through the mutual matching among the structures such as the movable plate, the limiting spring, the circular ring and the tape measure, when the pile plate body moves downwards, the pile plate body drives the movable plate to move through the trapezoidal block, the movable plate drives the vertical rod to move through the bolt, the tape measure is exposed at the moment, the limiting ring is pulled, the device can be measured, meanwhile, the pile plate body drives the U-shaped plate to turn over, and the U-shaped plate limits the pile plate body and the movable cylinder through the limiting semicircular plate;
through the stake body, the rotor plate, solar panel, mutually support between the isostructure of a movable section of thick bamboo, can realize that a movable section of thick bamboo carries on spacingly through the threaded rod, will mix earth and pour into the stake body from a movable section of thick bamboo inside, the rotor plate carries on spacingly through the movable rod, can block storing the ball, mix earth and enter into the tubular pile body through fixed cover inside, solar panel absorbs the sunshine heat, when weather is cold, carry the stake body inside with the heat, thereby prevent the deformation that the stake body leads to because of weather is cold.
Drawings
FIG. 1 is a front cross-sectional view of the present invention;
FIG. 2 is a front view of the present invention;
FIG. 3 is a diagram illustrating the operation of the present invention;
FIG. 4 is a left side cross-sectional view of a U-shaped plate of the present invention;
FIG. 5 is an enlarged view taken at A in FIG. 1;
FIG. 6 is an enlarged view of FIG. 1 at B;
FIG. 7 is an enlarged view at C of FIG. 1;
FIG. 8 is an enlarged view of FIG. 1 at D;
FIG. 9 is an enlarged view at E in FIG. 4;
FIG. 10 is a flow chart of the present invention.
Reference numbers in the figures: 1. a tubular pile body; 2. a circular ring; 3. a slider; 4. a cross bar; 5. a disc; 6. a swing plate; 7. inserting a rod; 8. a connecting spring; 9. a vertical rod; 10. a circular tube; 11. a fixing plate; 12. a connecting cylinder; 13. a fixing ring; 14. a limiting spring; 15. an L-shaped plate; 16. a sphere; 17. a movable plate; 18. a connecting ring; 19. a rope; 20. a bolt; 21. a connecting cover; 22. a trapezoidal block; 23. a movable block; 24. a connecting pipe; 25. a fixed cover; 26. hooking; 27. a threaded rod; 28. a movable barrel; 29. a pile plate body; 30. measuring tape; 31. a connecting rod; 32. a limiting ring; 33. a rotating plate; 34. a moving block; 35. connecting blocks; 36. a movable rod; 37. a limiting block; 38. a movable spring; 39. a baffle plate; 40. an L-shaped rod; 41. a solar panel; 42. an adjusting tube; 43. storing the balls; 44. a U-shaped plate; 45. a limit semicircular plate; 46. a movable post; 47. a delivery pipe.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the first embodiment: referring to fig. 1-10, the present invention provides a technical solution: a pile plate type road base pipe pile top connecting mechanism and a construction method thereof comprise a pipe pile body 1, wherein an annular groove is formed in the outer side edge of the pipe pile body 1, an annular ring 2 is sleeved on the outer side edge of the pipe pile body 1, sliders 3 are fixedly connected to the left side and the right side of the inner cavity of the annular ring 2, the sliders 3 are movably connected to the inner cavity of the annular groove, two cross rods 4 are fixedly connected to the left side and the right side of the annular ring 2, a disc 5 is fixedly connected to one end of each cross rod 4 far away from the pipe pile body 1, swing plates 6 are arranged at the left side and the right side of the pipe pile body 1 near the bottom end, a first hinge is arranged at one side of the bottom of each swing plate 6 near the pipe pile body 1, the swing plates 6 are movably connected with the outer side edge of the pipe pile body 1 through first hinges, grooves are formed in one sides of the tops of the swing plates 6 near the pipe pile body 1, through holes are formed in the inner cavities of the swing plates 6, insertion rods 7 are provided with insertion rods 7, one ends near the pipe pile body 1 are fixedly connected with baffle plates 39, one side, far away from the tubular pile body 1, of the baffle 39 is fixedly connected with movable springs 38 close to the top and the bottom, one ends of the movable springs 38 are fixedly connected to one side of the groove, the top of the tubular pile body 1 is provided with an adjusting mechanism, the top of the tubular pile body 1 is provided with a limiting mechanism, the bottom of the swing plate 6 is fixedly connected with connecting springs 8, the bottom ends of the connecting springs 8 are fixedly connected to one side of the tubular pile body 1, after the tubular pile body 1 is contacted with the ground, the ground drives the swing plate 6 to swing, the swing plate 6 drives the baffle 39 to push, the baffle 39 drives the flexible insertion rods 7 to move, so that the insertion rods 7 are inserted into the ground, and the tubular pile body 1 is limited;
the swinging mechanism comprises two movable plates 17 at the top end of a tubular pile body 1, arc-shaped grooves are formed in one sides of the movable plates 17 corresponding to the arc-shaped grooves, blind holes are formed in the front side and the rear side of an inner cavity of each arc-shaped groove, limiting springs 14 are fixedly connected to the adjacent inner cavities of the blind holes, bolts 20 are arranged at positions, close to the front side and the rear side, of the top of each movable plate 17 in a penetrating manner, circular pipes 10 are sleeved on the outer edges of cross rods 4, vertical rods 9 are fixedly connected to the tops of the circular pipes 10, fixed plates 11 are fixedly connected to the tops of the vertical rods 9, connecting cylinders 12 are fixedly connected to the tops of the fixed plates 11, fixing rings 13 are fixedly connected to the tops of the connecting cylinders 12, threaded holes are formed in the inner cavities of the fixing rings 13, grooves are formed in one sides, close to the bottom of the movable plates 17, of the tubular pile body 1, connecting rods 31 are inserted into the inner cavities of the grooves, rubber rulers 30 are sleeved on the outer edges of the connecting rods 31, and limiting rings 32 are fixedly connected to one ends, far away from the rubber rulers 30, the movable plates 17 are fixedly connected with trapezoidal blocks 22, the left and right sides of the tubular pile body 1 near the front and rear sides are fixedly connected with L-shaped plates 15, one sides of the L-shaped plates 15 far away from the tubular pile body 1 are located at the bottom of the movable plates 17, one sides of the tops of the bolts 20 far away from the movable plates 17 are provided with U-shaped plates 44, the bottoms of the U-shaped plates 44 are provided with second hinges, the U-shaped plates 44 are movably connected with the tops of the bolts 20 through the second hinges, connecting grooves are formed in the tops of the U-shaped plates 44, inner cavities of the connecting grooves are movably connected with movable columns 46, the tops of the movable columns 46 are fixedly connected with limiting semicircular plates 45, through grooves are formed in one sides of the movable plates 17 far away from the center of the tubular pile body 1, the inner cavities of the through grooves are movably connected with spheres 16, one sides of the spheres 16 far away from the tubular pile body 1 are fixedly connected with ropes 19, and one ends of the ropes 19 far away from the tubular pile body 1 are fixedly connected with connecting rings 18, when the pile plate body 29 moves downwards, the pile plate body 29 drives the movable plate 17 to move through the trapezoidal blocks 22, the movable plate 17 drives the vertical rod 9 to move through the bolt 20, the tape 30 is exposed at the moment, the limiting ring 32 is pulled, the device can be measured, meanwhile, the pile plate body 29 drives the U-shaped plate 44 to turn over, and the U-shaped plate 44 limits the pile plate body 29 and the movable cylinder 28 through the limiting semicircular plate 45.
The second embodiment: referring to fig. 1-10, the limiting mechanism includes a pile plate body 29 at the top of the tubular pile body 1, movable cylinders 28 are provided at the top of the pile plate body 29 near the left and right sides, threaded rods 27 are provided in the inner cavities of the movable cylinders 28, the bottom ends of the threaded rods 27 are provided in the bottom of the movable cylinders 28 and inserted into the top of the pile plate body 29, the bottom ends of the threaded rods 27 are engaged with the top of the pile plate body 29, vertical grooves are provided at the bottom of the movable cylinders 28 near the left and right sides, the vertical grooves are provided in the inner cavity of the pile plate body 29 and communicated with the inner cavity of the pile plate body 29, two support plates are fixedly connected to the left and right sides and the rear side of the inner cavity of the pile plate body 29, a rotating plate 33 is hinged between the two support plates, a moving groove is provided at one side of the bottom of the rotating plate 33 far from the center of the pile plate body 29, a moving block 34 is movably connected to the inner cavity of the moving groove, a connecting block 35 is fixedly connected to the bottom of the moving block 34, and a moving rod 36 is hinged to the inner cavity of the connecting block 35, three movable grooves are formed in the bottom of an inner cavity of the pile plate body 29, a limiting block 37 is hinged to the position, close to the bottom end, of the outer edge of the movable rod 36, a movable block 23 is fixedly connected to the bottom of the limiting block 37, the movable block 23 is movably connected to the adjacent inner cavities of the movable grooves, spherical grooves are formed in the left side, the right side and the rear side of the pile plate body 29, storage balls 43 are movably connected to the inner cavities of the spherical grooves, an L-shaped rod 40 is fixedly connected to one side, away from the center of the pile plate body 29, of each storage ball 43, a solar panel 41 is fixedly connected to one end, away from the storage ball 43, of each L-shaped rod 40 of each L-shaped rod 43, an adjusting pipe 42 is fixedly connected to the top and the bottom of each adjusting pipe 42, one end, away from the adjusting pipe 42, of each conveying pipe 47 is fixedly connected to the side wall of the inner cavity of the pile plate body 29, an opening is formed in the bottom of the pile plate body 29, and a fixed cover 25 is fixedly connected to the bottom of the pile plate body 29, the edge cover in the outside of fixed cover 25 is equipped with connection cover 21, connection cover 21 top fixed connection is in pile plate body 29 bottom, two couples 26 of pile plate body 29 top fixedly connected with, pile plate body 29 top center department is close to rear side department fixedly connected with connecting pipe 24, connecting pipe 24 sets up for lining up each other with pile plate body 29 inner chamber, movable cylinder 28 carries on spacingly through threaded rod 27, will mix earth and pour into pile plate body 29 inside from movable cylinder 28, rotor plate 33 carries on spacingly through movable rod 36, can block storage ball 43, mix earth and enter into tubular pile body 1 inside through fixed cover 25, solar panel 41 absorbs the sunshine heat, when weather is cold, carry pile plate body 29 inside with the heat, thereby prevent the deformation that pile plate body 29 leads to because of the cold weather.
A pile plate type road base pipe pile top connecting mechanism and a construction method thereof comprise the following steps:
s1: in the using process, an operator inserts the tubular pile body 1 into the ground, when the swinging plate 6 contacts the ground, the swinging plate 6 is turned over, the swinging plate 6 drives the inserting rod 7 to move through the baffle 39, and the inserting rod 7 is inserted into the ground layer, so that the tubular pile body 1 is limited;
s2: the movable plate 17 is placed at the top end of the tubular pile body 1, then the crane drives the pile plate body 29 to move through the hook 26, the pile plate body 29 drives the trapezoidal blocks 22 to move through the connecting cover 21, and the trapezoidal blocks 22 drive the movable plate 17 to move;
s3: the pile plate body 29 drives the bolt 20 to move through the U-shaped plate 44, and the bolt 20 drives the connecting cylinder 12 to move, so that the movable plate 17 is limited;
s4: at this time, the tape 30 is exposed, the limiting ring 32 is pulled, the limiting ring 32 drives the tape 30 to move, and the tape 30 measures the pipe pile body 1;
s5: concrete is poured into the movable barrel 28, the threaded rod 27 limits the movable barrel 28, the concrete enters the pile plate body 29, and the concrete enters the tubular pile body 1 through the fixed cover 25;
s6: when the sun is present, the solar panel 41 absorbs and stores the heat of the sunlight, the heat is stored in the storage ball 43, and when the weather is cold, the storage ball 43 transmits the heat to the interior of the pile plate body 29 through the adjusting pipe 42 and the transmission pipe 47, so that the pile plate body 29 is prevented from being deformed.
The working principle is as follows: in the using process, an operator inserts the bottom end of the tubular pile body 1 into a pit dug on the ground, when the tubular pile body 1 contacts the ground, the swinging plate 6 is also overturned along with contacting the ground, the swinging plate 6 drives the connecting spring 8 to stretch, the swinging plate 6 drives the baffle 39 to swing, the baffle 39 moves through the side wall of the tubular pile body 1 and the movable spring 38, the baffle 39 drives the inserted rod 7 to move, the inserted rod 7 is made of ABS (acrylonitrile butadiene styrene) and can be used for randomly adjusting the shape of the inserted rod 7, the inserted rod 7 is inserted into the ground layer so as to limit the position of the tubular pile body 1, the movable plate 17 is placed at the top of the tubular pile body 1, the bottom end of the bolt 20 is positioned in the fixing ring 13 at the moment, the L-shaped plate 15 can support the movable plate 17, then the crane moves the tubular pile body 29 to the top of the movable plate 17 through the hook 26, the tubular pile body 29 drives the trapezoidal block 22 to move through the fixing cover 25, the trapezoidal block 22 drives the movable plate 17 to move towards two sides, the movable plate 17 drives the limiting spring 14 to stretch, the pile plate body 29 drives the U-shaped plate 44 to turn, the U-shaped plate 44 drives the limiting semicircular plate 45 to turn, when the limiting semicircular plate 45 is sleeved on the outer edge of the movable cylinder 28, the limiting semicircular plate 45 drives the movable column 46 to move, so that when the movable plate 17 moves, the limiting semicircular plate 45 can always limit the movable cylinder 28, the bolt 20 moves downwards through the pile plate body 29, the bolt 20 enters the fixed ring 13 and the connecting cylinder 12, the connecting cylinder 12 drives the fixed plate 11 to move, the fixed plate 11 drives the vertical rod 9 to move, the vertical rod 9 drives the circular tube 10 to move, then the limiting ring 32 can be pulled, the limiting ring 32 drives the tape 30 to stretch, the tape 30 can measure the device, and then mixed soil is poured into the pile plate body 29 through the movable cylinder 28, concrete strikes rotor 33 top, rotor 33 drives movable block 34 and removes, movable block 34 drives movable rod 36 through connecting block 35 and swings, movable rod 36 drives movable block 23 through stopper 37 and removes, thereby movable rod 36 supports rotor 33, can prevent that concrete from contacting storage ball 43, concrete enters into tubular pile body 1 inside through fixed cover 25, solar panel 41 can absorb the sunshine heat, and store inside storage ball 43, when the weather is cold, it is inside to store ball 43 and carry tubular pile body 29 with the heat through regulating tube 42 and conveyer pipe 47, thereby prevent that tubular pile body 29 from the deformation that leads to because of the weather is cold.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. The utility model provides a pile plank formula way parent tube pile top coupling mechanism and construction method thereof, includes tubular pile body (1), its characterized in that: the ring channel is arranged on the outer side edge of the tubular pile body (1), the ring (2) is sleeved on the outer side edge of the tubular pile body (1), the sliders (3) are fixedly connected to the left side and the right side of the inner cavity of the ring (2), the sliders (3) are movably connected to the inner cavity of the ring channel, the two cross rods (4) are fixedly connected to the left side and the right side of the inner cavity of the ring (2), the disc (5) is fixedly connected to one end of each cross rod (4) far away from the tubular pile body (1), the swing plates (6) are arranged at positions, close to the bottom ends, of the left side and the right side of the tubular pile body (1), first hinges are arranged on one sides, close to the tubular pile body (1), of the bottom of each swing plate (6), the swing plates (6) are movably connected with the outer side edge of the tubular pile body (1) through the first hinges, and grooves are formed in one sides, close to the tubular pile body (1), of the top of the swing plates (6), the through-hole has been seted up to swing board (6) inner chamber, the through-hole inner chamber has inserted bar (7), the equal fixedly connected with baffle (39) of one end that inserted bar (7) are close to tubular pile body (1), one side that tubular pile body (1) was kept away from in baffle (39) is close to top and the equal fixedly connected with activity spring (38) of bottom department, activity spring (38) one end fixed connection is in fluting one side, tubular pile body (1) top has adjustment mechanism, there is stop gear at tubular pile body (1) top.
2. The pile-plate type road base pipe pile top connecting mechanism and the construction method thereof according to claim 1, wherein: the swing mechanism comprises two movable plates (17) arranged at the top end of the tubular pile body (1), arc-shaped grooves are formed in one corresponding sides of the movable plates (17), blind holes are formed in the front side and the rear side of an inner cavity of the arc-shaped grooves, adjacent blind holes are fixedly connected with limiting springs (14) together, bolts (20) are arranged at the positions, close to the front side and the rear side, of the tops of the movable plates (17) in a penetrating mode, round pipes (10) are sleeved on the outer edges of the cross rods (4), vertical rods (9) are fixedly connected with the tops of the round pipes (10), fixed plates (11) are fixedly connected with the tops of the vertical rods (9), connecting cylinders (12) are fixedly connected with the tops of the fixed plates (11), fixing rings (13) are fixedly connected with the tops of the connecting cylinders (12), threaded holes are formed in the inner cavities of the connecting cylinders (12) and the fixing rings (13) together, and grooves are formed in one sides, close to the bottoms of the movable plates (17), of the tubular pile body (1), the groove inner cavity is all spliced with connecting rod (31), the edge cover in the outside of connecting rod (31) is equipped with tape measure (30), the equal fixedly connected with spacing ring (32) of one end that connecting rod (31) were kept away from in tape measure (30), the equal fixedly connected with trapezoidal piece (22) of fly leaf (17), the equal fixedly connected with L shaped plate (15) of both sides department around being close to in tubular pile body (1) the left and right sides, one side that tubular pile body (1) was kept away from in L shaped plate (15) all is located fly leaf (17) bottom.
3. The pile-plate type road base pipe pile top connecting mechanism and the construction method thereof according to claim 1, wherein: the limiting mechanism comprises a pile plate body (29) at the top end of the tubular pile body (1), movable cylinders (28) are arranged at the positions, close to the left side and the right side, of the top of the pile plate body (29), threaded rods (27) are arranged in the inner cavities of the movable cylinders (28) in a penetrating mode, the bottoms of the threaded rods (27) are arranged in the bottom of the movable cylinders (28) in a penetrating mode and are connected to the top of the pile plate body (29) in an inserting mode, the bottom ends of the threaded rods (27) are mutually meshed with the top of the pile plate body (29), vertical grooves are formed in the positions, close to the left side and the right side, of the bottom of each movable cylinder (28) and are arranged in a penetrating mode, two supporting plates are fixedly connected to the left side and the right side of the inner cavity of the pile plate body (29) and two supporting plates are hinged between the supporting plates together, moving grooves are formed in one side, far away from the center of the pile plate body (29), of the bottom of each rotating plate (33), the inner cavities of the moving grooves are movably connected with moving blocks (34), the bottom of each moving block (34) is fixedly connected with a connecting block (35), the inner cavity of each connecting block (35) is hinged with a moving rod (36), the bottom of the inner cavity of each pile plate body (29) is provided with three moving grooves, the outer edge of each moving rod (36) is hinged with a limiting block (37) close to the bottom end, the bottom of each limiting block (37) is fixedly connected with a moving block (23), each moving block (23) is movably connected with the inner cavity of the adjacent moving groove, the left side, the right side and the rear side of each pile plate body (29) are respectively provided with a spherical groove, the inner cavity of each spherical groove is movably connected with a storage ball (43), one side, far away from the center of each pile plate body (29), of each storage ball (43) is fixedly connected with an L-shaped rod (40), and one end, far away from each storage ball (43), of each L-shaped rod (40) is fixedly connected with a solar panel (41), store ball (43) and keep away from equal fixedly connected with control tube (42) in one side of L shape pole (40), control tube (42) top and the equal fixedly connected with conveyer pipe (47) in bottom, the one end fixed connection that control tube (42) were kept away from in conveyer pipe (47) is at pile board body (29) inner chamber lateral wall.
4. The pile-plate type road base pipe pile top connecting mechanism and the construction method thereof according to claim 1, wherein: the opening has been seted up to stake board body (29) bottom, fixed cover (25) of stake board body (29) bottom fixedly connected with, fixed cover (25) outside edge cover is equipped with connection cover (21), connection cover (21) top fixed connection is in stake board body (29) bottom.
5. The pile-plate type road base pipe pile top connecting mechanism and the construction method thereof according to claim 1, wherein: one side that fly leaf (17) were kept away from on bolt (20) top all has U template (44), U template (44) bottom all is equipped with and is equipped with the second hinge, U template (44) are through second hinge and bolt (20) top swing joint, the spread groove has all been seted up at U template (44) top, the equal swing joint in spread groove inner chamber has movable post (46), spacing semicircle board (45) of the equal fixedly connected with in activity post (46) top.
6. The pile-plate type road base pipe pile top connecting mechanism and the construction method thereof according to claim 1, wherein: lead to groove has all been seted up to one side that tubular pile body (1) center department was kept away from in fly leaf (17), lead to the equal swing joint of groove inner chamber and have spheroid (16), the equal fixedly connected with rope (19) in one side that tubular pile body (1) was kept away from in spheroid (16), the equal fixedly connected with go-between (18) of one end that tubular pile body (1) was kept away from in rope (19).
7. The pile-plate type road base pipe pile top connecting mechanism and the construction method thereof according to claim 1, wherein: two couples (26) of stake board body (29) top fixedly connected with, stake board body (29) top center department is close to rear side department fixedly connected with connecting pipe (24), connecting pipe (24) and stake board body (29) inner chamber are for link up the setting each other.
8. The pile-plate type road base pipe pile top connecting mechanism and the construction method thereof according to claim 1, wherein: the equal fixedly connected with connecting spring (8) in swing board (6) bottom, connecting spring (8) bottom fixed connection is in tubular pile body (1) one side.
9. The pile plate type road base pipe pile top connecting mechanism and the construction method thereof according to any one of claims 1 to 8, characterized by comprising the following steps:
s1: in the using process, an operator inserts the tubular pile body (1) into the ground, when the swinging plate (6) contacts the ground, the swinging plate (6) is turned over, the swinging plate (6) drives the inserting rod (7) to move through the baffle (39), and the inserting rod (7) is inserted into the ground, so that the tubular pile body (1) is limited;
s2: the movable plate (17) is placed at the top end of the tubular pile body (1), then the crane drives the pile plate body (29) to move through the hook (26), the pile plate body (29) drives the trapezoidal block (22) to move through the connecting cover (21), and the trapezoidal block (22) drives the movable plate (17) to move;
s3: the pile plate body (29) drives the bolt (20) to move through the U-shaped plate (44), and the bolt (20) drives the connecting cylinder (12) to move, so that the movable plate (17) is limited;
s4: at the moment, the tape (30) is exposed, the limiting ring (32) is pulled, the limiting ring (32) drives the tape (30) to move, and the tape (30) measures the pipe pile body (1);
s5: concrete is poured into the movable cylinder (28), the threaded rod (27) limits the movable cylinder (28), the concrete enters the pile plate body (29), and the concrete enters the tubular pile body (1) through the fixed cover (25);
s6: when the sun appears, the solar panel (41) absorbs and stores the heat of the sun, the heat is stored in the storage ball (43), and when the weather is cold, the storage ball (43) conveys the heat to the interior of the pile plate body (29) through the adjusting pipe (42) and the conveying pipe (47), so that the pile plate body (29) is prevented from deforming.
CN202210084694.6A 2022-01-25 2022-01-25 Pile plate type roadbed pipe pile top connecting mechanism and construction method thereof Active CN114351749B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210084694.6A CN114351749B (en) 2022-01-25 2022-01-25 Pile plate type roadbed pipe pile top connecting mechanism and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210084694.6A CN114351749B (en) 2022-01-25 2022-01-25 Pile plate type roadbed pipe pile top connecting mechanism and construction method thereof

Publications (2)

Publication Number Publication Date
CN114351749A true CN114351749A (en) 2022-04-15
CN114351749B CN114351749B (en) 2023-10-31

Family

ID=81094154

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210084694.6A Active CN114351749B (en) 2022-01-25 2022-01-25 Pile plate type roadbed pipe pile top connecting mechanism and construction method thereof

Country Status (1)

Country Link
CN (1) CN114351749B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114808587A (en) * 2022-05-20 2022-07-29 安徽省公路桥梁工程有限公司 Adjustable pile plate type roadbed leveling layer and using method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101223667B1 (en) * 2012-08-30 2013-01-17 콘비젼스 주식회사 Irrigation channel using pre-cast concrete panel and constructing method thereof
CN110438982A (en) * 2019-08-12 2019-11-12 中国建筑第二工程局有限公司 A kind of pile end board and tubular pole connection method
CN210561528U (en) * 2019-07-11 2020-05-19 衡水铭科新材料科技有限公司 Pile sheet formula road bed connecting elements that leakproofness is good
CN210561481U (en) * 2019-07-11 2020-05-19 衡水铭科新材料科技有限公司 High-strength pile-plate type roadbed connecting component
DE202021102174U1 (en) * 2021-02-01 2021-04-29 Nantong Taisheng Blue Island Offshore Co., Ltd. High-strength, wind-resistant platform pile foundation for offshore wind farms
CN113216729A (en) * 2021-05-20 2021-08-06 肖磊 Transmission line iron tower connecting piece convenient to construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101223667B1 (en) * 2012-08-30 2013-01-17 콘비젼스 주식회사 Irrigation channel using pre-cast concrete panel and constructing method thereof
CN210561528U (en) * 2019-07-11 2020-05-19 衡水铭科新材料科技有限公司 Pile sheet formula road bed connecting elements that leakproofness is good
CN210561481U (en) * 2019-07-11 2020-05-19 衡水铭科新材料科技有限公司 High-strength pile-plate type roadbed connecting component
CN110438982A (en) * 2019-08-12 2019-11-12 中国建筑第二工程局有限公司 A kind of pile end board and tubular pole connection method
DE202021102174U1 (en) * 2021-02-01 2021-04-29 Nantong Taisheng Blue Island Offshore Co., Ltd. High-strength, wind-resistant platform pile foundation for offshore wind farms
CN113216729A (en) * 2021-05-20 2021-08-06 肖磊 Transmission line iron tower connecting piece convenient to construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114808587A (en) * 2022-05-20 2022-07-29 安徽省公路桥梁工程有限公司 Adjustable pile plate type roadbed leveling layer and using method thereof

Also Published As

Publication number Publication date
CN114351749B (en) 2023-10-31

Similar Documents

Publication Publication Date Title
CN107178083B (en) Pile driver for civil engineering
CN114351749A (en) Pile plate type road base pipe pile top connecting mechanism and construction method thereof
CN113356202A (en) Construction device for sinking tubular pile
CN204556429U (en) A kind of soil cutting resistance measurement test unit
CN207348072U (en) A kind of reusable, fast assembling-disassembling foundation trench excavates supporting structure
CN210917393U (en) Foundation pit supporting structure
CN211646386U (en) Constructional engineering pile device
CN203476354U (en) Underground excavation engineering major structure
CN209841546U (en) Pipe jacking experiment box
CN215801670U (en) High-strength inclined support pile structure for foundation pit design
CN215888222U (en) Civil aviation airport is high slope support umbrella ground tackle for engineering
CN113005931B (en) Durable type assembled UHPC shed tunnel structure in plateau
CN205088682U (en) Tubular pile locating rack
CN212052851U (en) Foundation reinforcing structure for ancient building foundation in soft soil area
CN110106891B (en) Anchor net cable-profile steel support coupling supporting structure
CN210049301U (en) Excavating gear for building engineering
CN209040174U (en) The fixed device of pile body of indoor pile-soil model test
CN112281681A (en) Pile driver for bridging and using method thereof
CN113738141B (en) Safety protection device for small-section deep foundation pit
CN221030242U (en) Building engineering side slope reinforcing apparatus
CN215857677U (en) Anchor eye slip casting water shutoff device
CN219365655U (en) Safety device is used in civil engineering construction
CN205171569U (en) Pile foundation analogue test device
CN219240555U (en) Device for installing inclined filling pile reinforcement cage and concrete filling
CN220888638U (en) Auxiliary platform for PHC pipe pile construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant