CN114339802B - Capacity evaluation-based frequency-back method and device and computing equipment - Google Patents

Capacity evaluation-based frequency-back method and device and computing equipment Download PDF

Info

Publication number
CN114339802B
CN114339802B CN202011041653.6A CN202011041653A CN114339802B CN 114339802 B CN114339802 B CN 114339802B CN 202011041653 A CN202011041653 A CN 202011041653A CN 114339802 B CN114339802 B CN 114339802B
Authority
CN
China
Prior art keywords
sector
layer network
cell
flow
self
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011041653.6A
Other languages
Chinese (zh)
Other versions
CN114339802A (en
Inventor
张琳
袁牛涛
郭永明
李卓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mobile Communications Group Co Ltd
China Mobile Group Hebei Co Ltd
Original Assignee
China Mobile Communications Group Co Ltd
China Mobile Group Hebei Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Communications Group Co Ltd, China Mobile Group Hebei Co Ltd filed Critical China Mobile Communications Group Co Ltd
Priority to CN202011041653.6A priority Critical patent/CN114339802B/en
Publication of CN114339802A publication Critical patent/CN114339802A/en
Application granted granted Critical
Publication of CN114339802B publication Critical patent/CN114339802B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Abstract

The embodiment of the invention relates to the technical field of wireless communication, and discloses a frequency-returning method, a device and computing equipment based on capacity evaluation, wherein the method comprises the following steps: acquiring index data and network management configuration data, and calculating a first sector topological structure of the multi-layer network according to the network management configuration data; acquiring a first limit flow of a multi-layer network sector and a self-busy time flow of the multi-layer network sector according to the index data and the sector topological structure; calculating a multi-layer network sector flow allowance by taking the difference between the first limit flow and the self-busy time flow of the multi-layer network sector; and D frequency band frequency rejection and capacity supplement are carried out according to the sector flow allowance of the multi-layer network. By means of the method, the device and the system for judging whether the sector needs to be supplemented can rapidly and accurately judge whether the sector needs to be supplemented, equipment resources and labor cost are effectively saved, supplement scale can be effectively reduced, construction period is shortened, influence on an LTE network is reduced, and practicability is high.

Description

Capacity evaluation-based frequency-back method and device and computing equipment
Technical Field
The embodiment of the invention relates to the technical field of wireless communication, in particular to a frequency-back method and device based on capacity evaluation and computing equipment.
Background
With the issuing of 5G commercial license plates to telecom operators by the letter department, 5G base station construction is started in each metropolitan area of China, and D frequency bands 2575-2635 MHz used currently are required to be reshuffled to 2615-2675 MHz in China according to the frequency use requirement of the letter department, so that D1 and D2 frequency point resources are required to be vacated.
The scheme of D frequency band vacation at present is to supplement the D frequency point cell of the retirement frequency with FDD1800 or 3DMIMO cell, and the specific scheme is as follows: for a single-layer network D frequency band cell, FDD1800 is directly used for replacement; for D frequency band cells in the multi-layer network, if FDD1800 is not used in the same sector, the D frequency band cells are directly replaced by the FDD1800, and if the used FDD1800 is replaced by the D frequency band cells by 3 DMIMO.
The existing D frequency band frequency-withdrawal scheme can directly and simply replace all D frequency band cells, and equipment resources and labor are wasted. The sector-level traffic is not analyzed under the multi-layer network configuration, whether other cells in the same sector have the capacity to absorb the traffic after the D-band cell is disconnected is not accurately evaluated, and FDD1800 or 3DMIMO equipment is not needed to be supplemented for the multi-layer network sector having the capacity to absorb the traffic. D frequency band cell equipment is replaced in a large quantity and large in scale, so that the construction period time is prolonged, the overall D frequency band network-quitting progress is not facilitated, the long-time influence on the existing LTE network is caused, and the use perception of a user is not facilitated. Meanwhile, whether capacity supplement after frequency withdrawal of the D frequency band can meet customer perception requirements is not evaluated, which can cause high load of partial cells; for the high-load cell existing before the frequency withdrawal of the D frequency band, the problem of customer perception is solved by combining the frequency withdrawal capacity supplement of the D frequency band in one time, so that the old problem in the capacity aspect after the frequency withdrawal of the D frequency band is not solved, and the new problem appears.
Disclosure of Invention
In view of the above, embodiments of the present invention provide a method, an apparatus, and a computing device for frequency back based on capacity estimation, which overcome or at least partially solve the above problems.
According to an aspect of the embodiment of the present invention, there is provided a method for frequency back-off based on capacity estimation, the method including: acquiring index data and network management configuration data, and calculating a first sector topological structure of the multi-layer network according to the network management configuration data; acquiring a first limit flow of a multi-layer network sector and a self-busy time flow of the multi-layer network sector according to the index data and the first sector topological structure; calculating a multi-layer network sector flow allowance by taking the difference between the first limit flow and the self-busy time flow of the multi-layer network sector; and D frequency band frequency rejection and capacity supplement are carried out according to the sector flow allowance of the multi-layer network.
In an optional manner, the acquiring the multi-layer network sector limit traffic and the multi-layer network sector self-busy traffic according to the index data and the first sector topology includes: acquiring a second limit flow of each cell according to the index data; and calculating the first limit flow of the multi-layer network sector after the D-band cell is disconnected according to the second limit flow of each cell and the first sector topological structure.
In an optional manner, the index data at least includes a cell traffic, a physical resource block utilization rate, and a user perceived rate, and the obtaining the second limit traffic of each cell according to the index data includes: determining a perception rate inflection point according to the physical resource block utilization rate and the user perception rate; and obtaining the cell flow corresponding to the sensing rate inflection point to obtain the second limit flow of the cell.
In an optional manner, the calculating the first limit traffic of the multi-layer network sector after the D-band cell is dropped according to the second limit traffic of each cell and the first sector topology includes: in the multi-layer network sector containing the D frequency band cell, calculating a second sector topological structure of the D frequency band cell after the network is removed according to the first sector topological structure; and summing the second limit flow of each cell according to the second sector topological structure after the D-band cell is disconnected, and obtaining the first limit flow of the multi-layer network sector after the D-band cell is disconnected.
In an optional manner, the acquiring the self-busy traffic of the multi-layer network sector according to the index data and the first sector topology structure includes: extracting the self-busy hour traffic of cells which are continuous for one month, and finding out the maximum self-busy hour traffic of the cells; summing the maximum self-busy hour traffic of each cell according to the first sector topological structure to obtain the self-busy hour traffic of the sector; and multiplying the self-busy traffic of the sector with a preset coefficient for the sector containing the vip cell to obtain the final self-busy traffic of the multi-layer network sector.
In an optional manner, the D-band frequency-back and capacity-supplementing according to the multi-layer network sector traffic margin includes: if the flow allowance of the multi-layer network sector is larger than 0, determining that the multi-layer network sector after the D frequency band frequency withdrawal does not need capacity supplement; and if the flow allowance of the multi-layer network sector is not more than 0, supplementing FDD1800 or 3DMIMO to the multi-layer network sector after the frequency band is removed according to the capacity supplementing rule.
In an optional manner, the supplementing FDD1800 or 3D mimo to the multi-layer network sector after D-band frequency hopping according to the capacity supplementing rule includes: if the multi-layer network sector after the D frequency band frequency withdrawal does not have the FDD1800, the FDD1800 is preferentially supplemented; if the multi-layer network sector after the D frequency band frequency withdrawal has FDD1800, 3DMIMO is supplemented.
According to another aspect of the embodiment of the present invention, there is provided a frequency-back device based on capacity estimation, the device including: the data acquisition unit is used for acquiring index data and network management configuration data and calculating a first sector topological structure of the multi-layer network according to the network management configuration data; the flow calculation unit is used for acquiring the first limit flow of the multi-layer network sector and the self-busy time flow of the multi-layer network sector according to the index data and the sector topological structure; the allowance obtaining unit is used for calculating the multi-layer network sector flow allowance by taking the difference between the first limit flow and the self-busy time flow of the multi-layer network sector; and the frequency-removing unit is used for carrying out D frequency-removing and capacity supplementing according to the sector flow allowance of the multi-layer network.
According to another aspect of an embodiment of the present invention, there is provided a computing device including: the device comprises a processor, a memory, a communication interface and a communication bus, wherein the processor, the memory and the communication interface complete communication with each other through the communication bus;
the memory is used for storing at least one executable instruction, and the executable instruction causes the processor to execute the steps of the frequency de-clocking method based on capacity assessment.
According to yet another aspect of the embodiments of the present invention, there is provided a computer storage medium having stored therein at least one executable instruction for causing the processor to perform the steps of the above-described capacity-estimation-based frequency back-off method.
According to the embodiment of the invention, the first sector topological structure of the multi-layer network is calculated according to the network management configuration data by collecting index data and the network management configuration data; acquiring a first limit flow of a multi-layer network sector and a self-busy time flow of the multi-layer network sector according to the index data and the sector topological structure; calculating a multi-layer network sector flow allowance by taking the difference between the first limit flow and the self-busy time flow of the multi-layer network sector; d frequency band frequency rejection and capacity supplement are carried out according to the multi-layer network sector flow allowance, whether sectors need to be supplemented or not can be rapidly and accurately judged, equipment resources and labor cost are effectively saved, supplement scale can be effectively reduced, construction period is shortened, influence on an LTE network is reduced, and practicability is high.
The foregoing description is only an overview of the technical solutions of the embodiments of the present invention, and may be implemented according to the content of the specification, so that the technical means of the embodiments of the present invention can be more clearly understood, and the following specific embodiments of the present invention are given for clarity and understanding.
Drawings
Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The drawings are only for purposes of illustrating the preferred embodiments and are not to be construed as limiting the invention. Also, like reference numerals are used to designate like parts throughout the figures. In the drawings:
fig. 1 is a schematic flow chart of a frequency back-off method based on capacity estimation according to an embodiment of the present invention;
fig. 2 shows a schematic diagram of obtaining a perceived rate inflection point of a frequency back-off method based on capacity estimation according to an embodiment of the present invention;
fig. 3 is a schematic diagram of a capacity augmentation rule of a frequency-back method based on capacity estimation according to an embodiment of the present invention;
fig. 4 is a schematic diagram illustrating another frequency back-off method based on capacity estimation according to an embodiment of the present invention;
Fig. 5 shows a schematic structural diagram of a frequency-back device based on capacity estimation according to an embodiment of the present invention;
FIG. 6 illustrates a schematic diagram of a computing device provided by an embodiment of the present invention.
Detailed Description
Exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present invention are shown in the drawings, it should be understood that the present invention may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the invention to those skilled in the art.
Fig. 1 shows a flow chart of a frequency back-off method based on capacity estimation according to an embodiment of the present invention. The frequency-back method based on capacity evaluation is applied to an operator server side, and as shown in fig. 1, the frequency-back method based on capacity evaluation comprises the following steps:
step S11: and acquiring index data and network management configuration data, and calculating a first sector topological structure of the multi-layer network according to the network management configuration data.
Specifically, as shown in table 1, indexes including cell traffic, utilization rate of physical resource blocks (physical resource block, PRB), user perception rate and the like are extracted from an index acquisition platform, and the acquisition time period is a continuous one-month-hour index. The afternoon experience rate in table 1 is the user perceived rate.
TABLE 1 index data
In the embodiment of the invention, network management configuration data, namely cell configuration data, is collected from the network management, wherein the cell configuration data comprises cell names, frequency points, bandwidths and the like, and the cell topology structure in the multilayer network is extracted from the network management. Table 2 is cell configuration data collected in network management of each manufacturer, including data such as base station name, cell name, base station number, sector number (id), working frequency band, coverage scenario, bandwidth, etc.
Table 2 network management configuration data
Further, a first sector topology of the multi-layer network is calculated according to the collected cell configuration data, and table 3 is an example of the obtained first sector topology. Specifically, according to cell configuration data, cell compositions including D frequency band cells of different physical sectors of each base station are counted to form a first sector topological structure.
Table 3 first sector topology
Step S12: and acquiring the first limit flow of the multi-layer network sector and the self-busy time flow of the multi-layer network sector according to the index data and the sector topological structure.
In the embodiment of the invention, the second limit flow of each cell is obtained according to the index data. The index data at least comprises cell flow, physical resource block utilization rate and user perception rate, and a perception rate inflection point is determined according to the physical resource block utilization rate and the user perception rate; and obtaining the cell flow corresponding to the sensing rate inflection point to obtain the second limit flow of the cell. Specifically, according to the traffic of the cell, the PRB utilization rate and the user perception rate, the corresponding cell PRB utilization rate is found under the premise that the influence of the user perception rate is not obvious, then the corresponding limit traffic is found, the frequency division and the bandwidth division are carried out, and the limit traffic of various cells is counted. As shown in fig. 2, taking the perceived rate inflection point and the corresponding flow calculation under the 15M bandwidth of the FDD1800 cell as an example, it can be seen from fig. 2 that the perceived rate decreases most rapidly when the PRB utilization is 50%, so that 50% of the PRB utilization is the perceived rate inflection point, and it can be seen from table look-up 4 that the flow corresponding to the perceived rate inflection point is 4.03GB, so that the limit flow of the FDD1800 cell is 4.03GB, and this is the second limit flow.
Table 4 second example table of current limit acquisition for cells
And respectively calculating the cell limit flow corresponding to other frequency band and bandwidth cells by using the same method to obtain the second limit flow of each frequency band cell shown in table 5.
Table 5 second level current limit for each band cell
Frequency band Perception rate inflection point limit flow GB
D-20 4.09
F-10 2.23
F-20 3.58
A-15 3.64
FDD900-5 1.5
FDD900-10 1.96
FDD1800-15 4.03
FDD1800-20 4.65
In the embodiment of the invention, after the second limit flow of each frequency band cell is obtained, the first limit flow of the multi-layer network sector after the D frequency band cell is disconnected is calculated according to the second limit flow of each cell and the first sector topological structure. Specifically, in a multi-layer network sector containing a D frequency band cell, calculating a second sector topological structure of the D frequency band cell after the network is removed according to the first sector topological structure; and summing the second limit flow of each cell according to the second sector topological structure after the D-band cell is disconnected, and obtaining the first limit flow of the multi-layer network sector after the D-band cell is disconnected. The second sector topology is a sector topology obtained by subtracting the D band cell from the first sector topology. And summing the second limit flow of each cell of the sector according to the second sector topological structure to obtain the first limit flow of the subtracted multilayer network sector.
The following are illustrated: the method comprises the steps of setting a sector number 14384_2 of a 2-sector under an SJQID0515-HLHD base station, wherein the topology structure of a first sector of the sector is 1D+1F+1FDD1800+1FDD900+0A, and the topology structure of a second sector of the corresponding D-band cell after the cell is off-line is 1F+1FDD1800+1FDD900+0A. From the second limiting flows of the frequency band cells shown in table 5, the first limiting flow=3.58 (F-20) +4.03 (FDD 1800-15) +1.5 (FDD 900-15) =9.11 GB of the multi-layer network sector after the D frequency band cell is disconnected is calculated.
In the embodiment of the invention, the self-busy hour traffic of the multi-layer network sector is also obtained according to the index data and the network management configuration data. Extracting the self-busy hour traffic of cells which are continuous for one month, and finding out the maximum self-busy hour traffic of the cells; summing the maximum self-busy hour traffic of each cell according to the first sector topological structure to obtain the self-busy hour traffic of the sector; for the sector containing the senior member (very important person, vip) cell, multiplying the self-busy hour traffic of the sector by a preset coefficient to obtain the final self-busy hour traffic of the multi-layer network sector. Specifically, the most busy traffic of each cell is found in the continuous 1 month-level traffic, the sector-level self-busy traffic is calculated according to the addition of the most busy traffic of each cell in the first sector topology of the multi-layer network, and for the sector containing vip cells, the sector self-busy traffic is multiplied by a preset coefficient. The preset coefficient in the embodiment of the present invention is preferably 1.2.
The following illustrates multi-layer network sector self-busy traffic calculation: physical sector 23489-0 contains a total of 5 cells, each of which is screened for self-busy traffic for 1 month in succession, see table 6 below.
TABLE 6 self-busy hour traffic for each cell for 1 month in succession
As can be seen from table 6, the self-busy traffic of sector 23489-0 is the sum of the self-busy traffic of the 5 cells: 0.58+3.29+7.12+1.33+0.89=13.21 GB. Since the FDD1800 cell in the sector belongs to the vip cell, the sector needs to be multiplied by a preset coefficient of 1.2 to obtain the self-busy traffic of the multi-layer network sector finally: 13.21 x 1.2=15.85 GB.
Step S13: and calculating the traffic allowance of the multi-layer network sector by taking the difference between the first limit traffic and the self-busy traffic of the multi-layer network sector.
In the embodiment of the present invention, the multi-layer network sector traffic margin=the first limit traffic of the multi-layer network sector-the multi-layer network sector self-busy traffic. If the self-busy traffic of the multi-layer network sector is denoted by a and the limit traffic of the multi-layer network sector is denoted by B, it is known from step S12 that for the multi-layer network sector including the vip base station of the vip cell, the first limit traffic is 1.2A and the corresponding multi-layer network sector traffic margin is B-1.2A. For the multi-layer network sector of the common base station, the first limit flow is A, and the corresponding multi-layer network sector flow allowance is B-A.
Step S14: and D frequency band frequency rejection and capacity supplement are carried out according to the sector flow allowance of the multi-layer network.
In the embodiment of the invention, the capacity supplement scheme is determined according to the multi-layer network sector flow allowance and the D-band cell detail list. If the traffic margin of the multi-layer network sector is larger than 0, the multi-layer network sector is capable of absorbing the user traffic and guaranteeing the user perception after the D cell is disconnected, and the multi-layer network sector after the D frequency band is disconnected is determined not to need capacity supplement. If the traffic allowance of the multi-layer network sector is not more than 0, indicating that the multi-layer network sector has insufficient capacity to absorb the user traffic after the D cell is disconnected, supplementing the multi-layer network sector after the D frequency band is disconnected with FDD1800 or 3DMIMO according to the capacity supplementing rule. Specifically, if the multi-layer network sector after the D-band frequency-withdrawal does not have the FDD1800, the FDD1800 is preferentially supplemented; if the multi-layer network sector after the D frequency band frequency withdrawal has FDD1800, 3DMIMO is supplemented.
More detailed capacity augmentation rules are shown in fig. 3, where a represents the self-busy traffic of the multi-layer network sector, B represents the limit traffic of the multi-layer network sector, and for the multi-layer network sector including the vip base station of the vip cell, if the multi-layer network sector traffic margin B-1.2a >0, the multi-layer network sector has the capability of absorbing user traffic and guaranteeing user perception after the D cell is off-line, and the direct D frequency band is ended after the off-line, without capacity augmentation. If B-1.2A is less than or equal to 0, the multi-layer network sector has insufficient capacity to absorb user traffic after the D cell is disconnected, and capacity supplement is needed. When capacity is supplemented, if the multi-layer network sector after the D frequency band frequency withdrawal has FDD1800, the 3DMIMO is reversely opened, namely the 3DMIMO is supplemented. If the multi-layer network sector after the D frequency band frequency withdrawal does not have the FDD1800, the newly built FDD1800 performs capacity supplement. After the addition of the FDD1800, the added multi-layer network sector flow allowance is further judged, and B+F-1.2A is calculated, wherein F represents the added capacity of the FDD 1800. If B+F-1.2A >0, the multi-layer network sector after capacity supplementation has the capability of absorbing user traffic and guaranteeing user perception after the D cell is disconnected, capacity supplementation is completed, and the method is ended. If B+F-1.2A is less than or equal to 0, the multi-layer network sector after capacity supplementation still has insufficient capacity to absorb user traffic after the D cell is disconnected, and the capacity supplementation needs to be continued, and at the moment, 3DMIMO is reversely opened, namely 3DMIMO is supplemented.
For the multi-layer network sector of the common base station without the vip cell, if the flow allowance B-A of the multi-layer network sector is more than 0, the multi-layer network sector has the capability of absorbing the user flow after the D cell is disconnected and guaranteeing the user perception, and the direct D frequency band is terminated after the frequency disconnection, and capacity supplement is not needed. If B-A is less than or equal to 0, the multi-layer network sector has insufficient capacity to absorb user traffic after the D cell is disconnected, and capacity supplement is needed. When capacity is supplemented, if the multi-layer network sector after the D frequency band frequency withdrawal has FDD1800, the 3DMIMO is reversely opened, namely the 3DMIMO is supplemented. If the multi-layer network sector after the D frequency band frequency withdrawal does not have the FDD1800, the newly built FDD1800 performs capacity supplement. After the addition of the FDD1800, the added multi-layer network sector flow allowance is further judged, and B+F-A is calculated, wherein F represents the added capacity of the FDD 1800. If B+F-A text> 0, the sector of the multi-layer network after capacity supplement has the capability of absorbing user traffic and guaranteeing user perception after the D cell leaves the network, the capacity supplement is finished. If B+F-A is less than or equal to 0, the multi-layer network sector after capacity supplement still has insufficient capacity to absorb user traffic after the D cell is disconnected, and the capacity supplement needs to be continued, and at the moment, 3DMIMO is reversely opened, namely 3DMIMO is supplemented. Thus, the frequency band-D cell frequency-withdrawal and capacity supplement are completed.
The complete frequency-back method based on capacity assessment in the embodiment of the invention is shown in fig. 4, and index data such as cell flow, PRB utilization rate, user perception rate and the like are acquired from an index acquisition platform, wherein the acquisition time period is continuous one month and hour index. Meanwhile, cell configuration data are collected from the network manager, and multi-layer network cell topology is counted according to the collected cell configuration, wherein the multi-layer network cell topology is the first sector topology structure.
And carrying out cell limit flow calculation according to the flow index and the cell configuration: according to the cell flow, the PRB utilization rate and the user perception rate, the corresponding cell PRB utilization rate is found under the premise that the influence of the user perception rate is not obvious, then the corresponding limit flow is found, the frequency division and the bandwidth division are carried out, the limit flow of each cell is counted, and the second limit flow of the cell is obtained.
And calculating the multi-layer network limit flow according to the cell limit flow and the multi-layer cell topology: and in all the multi-layer network sectors containing D, calculating the topology of the multi-layer network sectors after the D is subtracted, namely a second sector topology structure, according to the topology of the multi-layer network cells, and calculating the flow limit of the multi-layer network sectors after the D is subtracted, namely the first limit flow of the multi-layer network sectors after the D frequency band cells are removed from the network by utilizing the calculated cell limit flow.
And calculating the traffic of the sector in the self busy hour according to the traffic index and the multi-layer network sector topology: extracting the self-busy hour traffic of cells for one month continuously, finding out the self-busy hour maximum traffic of the cells, summing the self-busy hour maximum traffic of the cells according to a second sector topological structure, calculating the self-busy hour traffic of the sectors, multiplying the self-busy hour maximum traffic of the cells by 1.2 coefficients on the basis of the important vip sector traffic by taking the guarantee requirements of users of partial vip cells and key scene cells into consideration, and taking the guarantee requirements as the final value of the self-busy hour traffic of the vip sectors.
Calculating sector flow allowance according to the multi-layer network limit flow and the sector self-busy hour flow: and subtracting the self-busy traffic of the sector by using the calculated multi-layer network limit traffic after the D is subtracted, wherein the difference is the traffic allowance of the multi-layer network sector, and the parameter indicates how much traffic can still be absorbed by the sector after the D cell leaves the network and does not influence the perception of the user.
Determining a capacity supplement scheme according to the sector flow allowance and the D-band cell detail list: if the sector traffic margin is positive, the sector has the capability of absorbing the user traffic and guaranteeing the user perception after the D cell is disconnected, so that the FDD1800 or 3DMIMO does not need to be supplemented. If the sector traffic margin is negative, it indicates that the sector has insufficient capacity to absorb user traffic after the D cell is off-line, and it is necessary to supplement FDD1800 or 3DMIMO. The priority of supplementing the new cell is to supplement FDD1800 preferentially if FDD1800 is not used and supplement 3d mimo if FDD1800 is used in the topology of the multi-layer network sector. The more detailed capacity augmentation rules are referred to in fig. 3 above and will not be described in detail here.
The embodiment of the invention is used for 4G frequency withdrawal in 5G construction based on capacity evaluation, calculates the limit flow empirical value of the multi-layer network sector by calculating the empirical value of the limit flow of the cells in different frequency bands without influencing the user perception, compares the empirical value with the actual maximum flow of the current network sector, and calculates whether the sector has enough capacity to absorb the flow of the cell in the D frequency band, thereby making a more accurate capacity supplement scheme, achieving the purposes of reasonably utilizing the current network resource and realizing cost reduction and efficiency enhancement. Through the sector-level flow capacity and user perception guarantee which are comprehensively considered. The FDD1800 or 3D mimo device is not supplemented by a multi-layer network sector capable of absorbing D-band cell traffic. The method effectively saves equipment resources and labor cost, can effectively reduce supplement scale, shortens construction period and reduces influence on an LTE network. The method for calculating the cell limit flow and the method for calculating the sector flow allowance can rapidly and accurately judge whether the sector needs to be supplemented or not, and has strong practicability.
According to the embodiment of the invention, the first sector topological structure of the multi-layer network is calculated according to the network management configuration data by collecting index data and the network management configuration data; acquiring a first limit flow of a multi-layer network sector and a self-busy time flow of the multi-layer network sector according to the index data and the sector topological structure; calculating a multi-layer network sector flow allowance by taking the difference between the first limit flow and the self-busy time flow of the multi-layer network sector; d frequency band frequency rejection and capacity supplement are carried out according to the multi-layer network sector flow allowance, whether sectors need to be supplemented or not can be rapidly and accurately judged, equipment resources and labor cost are effectively saved, supplement scale can be effectively reduced, construction period is shortened, influence on an LTE network is reduced, and practicability is high.
Fig. 5 shows a schematic structural diagram of a frequency-back device based on capacity estimation according to an embodiment of the present invention. As shown in fig. 5, the capacity estimation-based frequency offset apparatus includes: a data acquisition unit 501, a flow calculation unit 502, a margin acquisition unit 503, and a frequency cancellation unit 504. Wherein:
the data acquisition unit 501 is configured to acquire index data and network management configuration data, and calculate a first sector topology structure of the multi-layer network according to the network management configuration data; the flow calculating unit 502 is configured to obtain a first limit flow of the multi-layer network sector and a self-busy hour flow of the multi-layer network sector according to the index data and the sector topology structure; the margin obtaining unit 503 is configured to calculate a multi-layer network sector flow margin by taking a difference between the first limit flow and the self-busy time flow of the multi-layer network sector; the frequency-back unit 504 is configured to perform D-band frequency-back and capacity augmentation according to the multi-layer network sector flow allowance.
In an alternative way, the flow calculation unit 502 is configured to: acquiring a second limit flow of each cell according to the index data; and calculating the first limit flow of the multi-layer network sector after the D-band cell is disconnected according to the second limit flow of each cell and the first sector topological structure.
In an alternative way, the flow calculation unit 502 is configured to: determining a perception rate inflection point according to the physical resource block utilization rate and the user perception rate; and obtaining the cell flow corresponding to the sensing rate inflection point to obtain the second limit flow of the cell.
In an alternative way, the flow calculation unit 502 is configured to: in the multi-layer network sector containing the D frequency band cell, calculating a second sector topological structure of the D frequency band cell after the network is removed according to the first sector topological structure; and summing the second limit flow of each cell according to the second sector topological structure after the D-band cell is disconnected, and obtaining the first limit flow of the multi-layer network sector after the D-band cell is disconnected.
In an alternative way, the flow calculation unit 502 is configured to: extracting the self-busy hour traffic of cells which are continuous for one month, and finding out the maximum self-busy hour traffic of the cells; summing the maximum self-busy hour traffic of each cell according to the first sector topological structure to obtain the self-busy hour traffic of the sector; and multiplying the self-busy traffic of the sector with a preset coefficient for the sector containing the vip cell to obtain the final self-busy traffic of the multi-layer network sector.
In an alternative manner, the frequency-de-multiplexing unit 504 is configured to: if the flow allowance of the multi-layer network sector is larger than 0, determining that the multi-layer network sector after the D frequency band frequency withdrawal does not need capacity supplement; and if the flow allowance of the multi-layer network sector is not more than 0, supplementing FDD1800 or 3DMIMO to the multi-layer network sector after the frequency band is removed according to the capacity supplementing rule.
In an alternative manner, the frequency-de-multiplexing unit 504 is configured to: if the multi-layer network sector after the D frequency band frequency withdrawal does not have the FDD1800, the FDD1800 is preferentially supplemented; if the multi-layer network sector after the D frequency band frequency withdrawal has FDD1800, 3DMIMO is supplemented.
According to the embodiment of the invention, the first sector topological structure of the multi-layer network is calculated according to the network management configuration data by collecting index data and the network management configuration data; acquiring a first limit flow of a multi-layer network sector and a self-busy time flow of the multi-layer network sector according to the index data and the sector topological structure; calculating a multi-layer network sector flow allowance by taking the difference between the first limit flow and the self-busy time flow of the multi-layer network sector; d frequency band frequency rejection and capacity supplement are carried out according to the multi-layer network sector flow allowance, whether sectors need to be supplemented or not can be rapidly and accurately judged, equipment resources and labor cost are effectively saved, supplement scale can be effectively reduced, construction period is shortened, influence on an LTE network is reduced, and practicability is high.
Embodiments of the present invention provide a non-volatile computer storage medium storing at least one executable instruction that may perform the capacity estimation-based frequency back-off method in any of the above method embodiments.
The executable instructions may be particularly useful for causing a processor to:
acquiring index data and network management configuration data, and calculating a first sector topological structure of the multi-layer network according to the network management configuration data;
acquiring a first limit flow of a multi-layer network sector and a self-busy time flow of the multi-layer network sector according to the index data and the first sector topological structure;
calculating a multi-layer network sector flow allowance by taking the difference between the first limit flow and the self-busy time flow of the multi-layer network sector;
and D frequency band frequency rejection and capacity supplement are carried out according to the sector flow allowance of the multi-layer network.
In one alternative, the executable instructions cause the processor to:
acquiring a second limit flow of each cell according to the index data;
and calculating the first limit flow of the multi-layer network sector after the D-band cell is disconnected according to the second limit flow of each cell and the first sector topological structure.
In one alternative, the executable instructions cause the processor to:
determining a perception rate inflection point according to the physical resource block utilization rate and the user perception rate;
and obtaining the cell flow corresponding to the sensing rate inflection point to obtain the second limit flow of the cell.
In one alternative, the executable instructions cause the processor to:
in the multi-layer network sector containing the D frequency band cell, calculating a second sector topological structure of the D frequency band cell after the network is removed according to the first sector topological structure;
and summing the second limit flow of each cell according to the second sector topological structure after the D-band cell is disconnected, and obtaining the first limit flow of the multi-layer network sector after the D-band cell is disconnected.
In one alternative, the executable instructions cause the processor to:
extracting the self-busy hour traffic of cells which are continuous for one month, and finding out the maximum self-busy hour traffic of the cells;
summing the maximum self-busy hour traffic of each cell according to the first sector topological structure to obtain the self-busy hour traffic of the sector;
and multiplying the self-busy traffic of the sector with a preset coefficient for the sector containing the vip cell to obtain the final self-busy traffic of the multi-layer network sector.
In one alternative, the executable instructions cause the processor to:
if the flow allowance of the multi-layer network sector is larger than 0, determining that the multi-layer network sector after the D frequency band frequency withdrawal does not need capacity supplement;
and if the flow allowance of the multi-layer network sector is not more than 0, supplementing FDD1800 or 3DMIMO to the multi-layer network sector after the frequency band is removed according to the capacity supplementing rule.
In one alternative, the executable instructions cause the processor to:
if the multi-layer network sector after the D frequency band frequency withdrawal does not have the FDD1800, the FDD1800 is preferentially supplemented;
if the multi-layer network sector after the D frequency band frequency withdrawal has FDD1800, 3DMIMO is supplemented.
According to the embodiment of the invention, the first sector topological structure of the multi-layer network is calculated according to the network management configuration data by collecting index data and the network management configuration data; acquiring a first limit flow of a multi-layer network sector and a self-busy time flow of the multi-layer network sector according to the index data and the sector topological structure; calculating a multi-layer network sector flow allowance by taking the difference between the first limit flow and the self-busy time flow of the multi-layer network sector; d frequency band frequency rejection and capacity supplement are carried out according to the multi-layer network sector flow allowance, whether sectors need to be supplemented or not can be rapidly and accurately judged, equipment resources and labor cost are effectively saved, supplement scale can be effectively reduced, construction period is shortened, influence on an LTE network is reduced, and practicability is high.
An embodiment of the present invention provides a computer program product comprising a computer program stored on a computer storage medium, the computer program comprising program instructions which, when executed by a computer, cause the computer to perform a method for capacity assessment based frequency back in any of the method embodiments described above.
The executable instructions may be particularly useful for causing a processor to:
acquiring index data and network management configuration data, and calculating a first sector topological structure of the multi-layer network according to the network management configuration data;
acquiring a first limit flow of a multi-layer network sector and a self-busy time flow of the multi-layer network sector according to the index data and the first sector topological structure;
calculating a multi-layer network sector flow allowance by taking the difference between the first limit flow and the self-busy time flow of the multi-layer network sector;
and D frequency band frequency rejection and capacity supplement are carried out according to the sector flow allowance of the multi-layer network.
In one alternative, the executable instructions cause the processor to:
acquiring a second limit flow of each cell according to the index data;
and calculating the first limit flow of the multi-layer network sector after the D-band cell is disconnected according to the second limit flow of each cell and the first sector topological structure.
In one alternative, the executable instructions cause the processor to:
determining a perception rate inflection point according to the physical resource block utilization rate and the user perception rate;
and obtaining the cell flow corresponding to the sensing rate inflection point to obtain the second limit flow of the cell.
In one alternative, the executable instructions cause the processor to:
in the multi-layer network sector containing the D frequency band cell, calculating a second sector topological structure of the D frequency band cell after the network is removed according to the first sector topological structure;
and summing the second limit flow of each cell according to the second sector topological structure after the D-band cell is disconnected, and obtaining the first limit flow of the multi-layer network sector after the D-band cell is disconnected.
In one alternative, the executable instructions cause the processor to:
extracting the self-busy hour traffic of cells which are continuous for one month, and finding out the maximum self-busy hour traffic of the cells;
summing the maximum self-busy hour traffic of each cell according to the first sector topological structure to obtain the self-busy hour traffic of the sector;
and multiplying the self-busy traffic of the sector with a preset coefficient for the sector containing the vip cell to obtain the final self-busy traffic of the multi-layer network sector.
In one alternative, the executable instructions cause the processor to:
if the flow allowance of the multi-layer network sector is larger than 0, determining that the multi-layer network sector after the D frequency band frequency withdrawal does not need capacity supplement;
and if the flow allowance of the multi-layer network sector is not more than 0, supplementing FDD1800 or 3DMIMO to the multi-layer network sector after the frequency band is removed according to the capacity supplementing rule.
In one alternative, the executable instructions cause the processor to:
if the multi-layer network sector after the D frequency band frequency withdrawal does not have the FDD1800, the FDD1800 is preferentially supplemented;
if the multi-layer network sector after the D frequency band frequency withdrawal has FDD1800, 3DMIMO is supplemented.
According to the embodiment of the invention, the first sector topological structure of the multi-layer network is calculated according to the network management configuration data by collecting index data and the network management configuration data; acquiring a first limit flow of a multi-layer network sector and a self-busy time flow of the multi-layer network sector according to the index data and the sector topological structure; calculating a multi-layer network sector flow allowance by taking the difference between the first limit flow and the self-busy time flow of the multi-layer network sector; d frequency band frequency rejection and capacity supplement are carried out according to the multi-layer network sector flow allowance, whether sectors need to be supplemented or not can be rapidly and accurately judged, equipment resources and labor cost are effectively saved, supplement scale can be effectively reduced, construction period is shortened, influence on an LTE network is reduced, and practicability is high.
FIG. 6 is a schematic diagram of a computing device according to an embodiment of the present invention, and the embodiment of the present invention is not limited to the specific implementation of the device.
As shown in fig. 6, the computing device may include: a processor 602, a communication interface (Communications Interface), a memory 606, and a communication bus 608.
Wherein: processor 602, communication interface 604, and memory 606 perform communication with each other via communication bus 608. Communication interface 604 is used to communicate with network elements of other devices, such as clients or other servers. The processor 602 is configured to execute the program 610, and may specifically perform relevant steps in the foregoing embodiment of the frequency back method based on capacity estimation.
In particular, program 610 may include program code including computer-operating instructions.
The processor 602 may be a central processing unit CPU, or a specific integrated circuit ASIC (Application Specific Integrated Circuit), or one or more integrated circuits configured to implement embodiments of the present invention. The device includes one or each processor, which may be the same type of processor, such as one or each CPU; but may also be different types of processors such as one or each CPU and one or each ASIC.
A memory 606 for storing a program 610. The memory 606 may comprise high-speed RAM memory or may further comprise non-volatile memory (non-volatile memory), such as at least one disk memory.
The program 610 may be specifically operable to cause the processor 602 to:
acquiring index data and network management configuration data, and calculating a first sector topological structure of the multi-layer network according to the network management configuration data;
acquiring a first limit flow of a multi-layer network sector and a self-busy time flow of the multi-layer network sector according to the index data and the first sector topological structure;
calculating a multi-layer network sector flow allowance by taking the difference between the first limit flow and the self-busy time flow of the multi-layer network sector;
and D frequency band frequency rejection and capacity supplement are carried out according to the sector flow allowance of the multi-layer network.
In an alternative, the program 610 causes the processor to:
acquiring a second limit flow of each cell according to the index data;
and calculating the first limit flow of the multi-layer network sector after the D-band cell is disconnected according to the second limit flow of each cell and the first sector topological structure.
In an alternative, the program 610 causes the processor to:
Determining a perception rate inflection point according to the physical resource block utilization rate and the user perception rate;
and obtaining the cell flow corresponding to the sensing rate inflection point to obtain the second limit flow of the cell.
In an alternative, the program 610 causes the processor to:
in the multi-layer network sector containing the D frequency band cell, calculating a second sector topological structure of the D frequency band cell after the network is removed according to the first sector topological structure;
and summing the second limit flow of each cell according to the second sector topological structure after the D-band cell is disconnected, and obtaining the first limit flow of the multi-layer network sector after the D-band cell is disconnected.
In an alternative, the program 610 causes the processor to:
extracting the self-busy hour traffic of cells which are continuous for one month, and finding out the maximum self-busy hour traffic of the cells;
summing the maximum self-busy hour traffic of each cell according to the first sector topological structure to obtain the self-busy hour traffic of the sector;
and multiplying the self-busy traffic of the sector with a preset coefficient for the sector containing the vip cell to obtain the final self-busy traffic of the multi-layer network sector.
In an alternative, the program 610 causes the processor to:
if the flow allowance of the multi-layer network sector is larger than 0, determining that the multi-layer network sector after the D frequency band frequency withdrawal does not need capacity supplement;
and if the flow allowance of the multi-layer network sector is not more than 0, supplementing FDD1800 or 3DMIMO to the multi-layer network sector after the frequency band is removed according to the capacity supplementing rule.
In an alternative, the program 610 causes the processor to:
if the multi-layer network sector after the D frequency band frequency withdrawal does not have the FDD1800, the FDD1800 is preferentially supplemented;
if the multi-layer network sector after the D frequency band frequency withdrawal has FDD1800, 3DMIMO is supplemented.
According to the embodiment of the invention, the first sector topological structure of the multi-layer network is calculated according to the network management configuration data by collecting index data and the network management configuration data; acquiring a first limit flow of a multi-layer network sector and a self-busy time flow of the multi-layer network sector according to the index data and the sector topological structure; calculating a multi-layer network sector flow allowance by taking the difference between the first limit flow and the self-busy time flow of the multi-layer network sector; d frequency band frequency rejection and capacity supplement are carried out according to the multi-layer network sector flow allowance, whether sectors need to be supplemented or not can be rapidly and accurately judged, equipment resources and labor cost are effectively saved, supplement scale can be effectively reduced, construction period is shortened, influence on an LTE network is reduced, and practicability is high.
The algorithms or displays presented herein are not inherently related to any particular computer, virtual system, or other apparatus. Various general-purpose systems may also be used with the teachings herein. The required structure for a construction of such a system is apparent from the description above. In addition, embodiments of the present invention are not directed to any particular programming language. It will be appreciated that the teachings of the present invention described herein may be implemented in a variety of programming languages, and the above description of specific languages is provided for disclosure of enablement and best mode of the present invention.
In the description provided herein, numerous specific details are set forth. However, it is understood that embodiments of the invention may be practiced without these specific details. In some instances, well-known methods, structures and techniques have not been shown in detail in order not to obscure an understanding of this description.
Similarly, it should be appreciated that in the above description of exemplary embodiments of the invention, various features of the embodiments of the invention are sometimes grouped together in a single embodiment, figure, or description thereof for the purpose of streamlining the disclosure and aiding in the understanding of one or more of the various inventive aspects. However, the disclosed method should not be construed as reflecting the intention that: i.e., the claimed invention requires more features than are expressly recited in each claim.
Those skilled in the art will appreciate that the modules in the apparatus of the embodiments may be adaptively changed and disposed in one or more apparatuses different from the embodiments. The modules or units or components of the embodiments may be combined into one module or unit or component and, furthermore, they may be divided into a plurality of sub-modules or sub-units or sub-components. Any combination of all features disclosed in this specification (including any accompanying claims, abstract and drawings), and all of the processes or units of any method or apparatus so disclosed, may be used in combination, except insofar as at least some of such features and/or processes or units are mutually exclusive. Each feature disclosed in this specification (including any accompanying claims, abstract and drawings), may be replaced by alternative features serving the same, equivalent or similar purpose, unless expressly stated otherwise.
It should be noted that the above-mentioned embodiments illustrate rather than limit the invention, and that those skilled in the art will be able to design alternative embodiments without departing from the scope of the appended claims. In the claims, any reference signs placed between parentheses shall not be construed as limiting the claim. The word "comprising" does not exclude the presence of elements or steps not listed in a claim. The word "a" or "an" preceding an element does not exclude the presence of a plurality of such elements. The invention may be implemented by means of hardware comprising several distinct elements, and by means of a suitably programmed computer. In the unit claims enumerating several means, several of these means may be embodied by one and the same item of hardware. The use of the words first, second, third, etc. do not denote any order. These words may be interpreted as names. The steps in the above embodiments should not be construed as limiting the order of execution unless specifically stated.

Claims (5)

1. A method for frequency de-emphasis based on capacity assessment, the method comprising:
acquiring index data and network management configuration data, and calculating a first sector topological structure of the multi-layer network according to the network management configuration data;
acquiring a first limit traffic of the multi-layer network sector and a self-busy traffic of the multi-layer network sector according to the index data and the first sector topology, including: acquiring a second limit flow of each cell according to the index data; calculating the first limit flow of the multi-layer network sector after the D frequency band cell is disconnected according to the second limit flow of each cell and the first sector topological structure; the index data at least comprises cell flow, physical resource block utilization rate and user perception rate;
the obtaining the second limit flow of each cell according to the index data comprises the following steps: determining a perception rate inflection point according to the physical resource block utilization rate and the user perception rate; acquiring the cell flow corresponding to the perceived rate inflection point to obtain the second limit flow of the cell;
the calculating the first limit flow of the multi-layer network sector after the D-band cell is disconnected according to the second limit flow of each cell and the first sector topology structure comprises: in the multi-layer network sector containing the D frequency band cell, calculating a second sector topological structure of the D frequency band cell after the network is removed according to the first sector topological structure; summing the second limit flow of each cell according to a second sector topological structure after the D-band cell is disconnected, and obtaining the first limit flow of the multi-layer network sector after the D-band cell is disconnected;
The obtaining the self-busy traffic of the multi-layer network sector according to the index data and the first sector topology structure includes: extracting the self-busy hour traffic of cells which are continuous for one month, and finding out the maximum self-busy hour traffic of the cells; summing the maximum self-busy hour traffic of each cell according to the first sector topological structure to obtain the self-busy hour traffic of the sector; for the sector containing the vip cell, multiplying the self-busy hour traffic of the sector by a preset coefficient to obtain the final self-busy hour traffic of the multi-layer network sector;
calculating a multi-layer network sector flow allowance by taking the difference between the first limit flow and the self-busy time flow of the multi-layer network sector;
d frequency band frequency rejection and capacity supplement are carried out according to the multi-layer network sector flow allowance, and the method comprises the following steps: if the flow allowance of the multi-layer network sector is larger than 0, determining that the multi-layer network sector after the D frequency band frequency withdrawal does not need capacity supplement; and if the flow allowance of the multi-layer network sector is not more than 0, supplementing FDD1800 or 3DMIMO to the multi-layer network sector after the frequency band is removed according to the capacity supplementing rule.
2. The method of claim 1, wherein the supplementing the FDD1800 or 3D mimo to the D-band de-muti-layer network sector according to the capacity supplementing rule comprises:
If the multi-layer network sector after the D frequency band frequency withdrawal does not have the FDD1800, the FDD1800 is preferentially supplemented;
if the multi-layer network sector after the D frequency band frequency withdrawal has FDD1800, 3DMIMO is supplemented.
3. A capacity estimation-based frequency de-emphasis apparatus, the apparatus comprising:
the data acquisition unit is used for acquiring index data and network management configuration data and calculating a first sector topological structure of the multi-layer network according to the network management configuration data;
the flow calculating unit is configured to obtain, according to the index data and the sector topology structure, a first limit flow of a multi-layer network sector and a self-busy time flow of the multi-layer network sector, and includes: acquiring a second limit flow of each cell according to the index data; calculating the first limit flow of the multi-layer network sector after the D frequency band cell is disconnected according to the second limit flow of each cell and the first sector topological structure; the index data at least comprises cell flow, physical resource block utilization rate and user perception rate;
the obtaining the second limit flow of each cell according to the index data comprises the following steps: determining a perception rate inflection point according to the physical resource block utilization rate and the user perception rate; acquiring the cell flow corresponding to the perceived rate inflection point to obtain the second limit flow of the cell;
The calculating the first limit flow of the multi-layer network sector after the D-band cell is disconnected according to the second limit flow of each cell and the first sector topology structure comprises: in the multi-layer network sector containing the D frequency band cell, calculating a second sector topological structure of the D frequency band cell after the network is removed according to the first sector topological structure; summing the second limit flow of each cell according to a second sector topological structure after the D-band cell is disconnected, and obtaining the first limit flow of the multi-layer network sector after the D-band cell is disconnected;
the obtaining the self-busy traffic of the multi-layer network sector according to the index data and the first sector topology structure includes: extracting the self-busy hour traffic of cells which are continuous for one month, and finding out the maximum self-busy hour traffic of the cells; summing the maximum self-busy hour traffic of each cell according to the first sector topological structure to obtain the self-busy hour traffic of the sector; for the sector containing the vip cell, multiplying the self-busy hour traffic of the sector by a preset coefficient to obtain the final self-busy hour traffic of the multi-layer network sector;
the allowance obtaining unit is used for calculating the multi-layer network sector flow allowance by taking the difference between the first limit flow and the self-busy time flow of the multi-layer network sector;
The frequency-removing unit is used for carrying out D frequency-removing and capacity supplementing according to the sector flow allowance of the multi-layer network, and comprises the following steps: if the flow allowance of the multi-layer network sector is larger than 0, determining that the multi-layer network sector after the D frequency band frequency withdrawal does not need capacity supplement; and if the flow allowance of the multi-layer network sector is not more than 0, supplementing FDD1800 or 3DMIMO to the multi-layer network sector after the frequency band is removed according to the capacity supplementing rule.
4. A computing device, comprising: the device comprises a processor, a memory, a communication interface and a communication bus, wherein the processor, the memory and the communication interface complete communication with each other through the communication bus;
the memory is configured to store at least one executable instruction that causes the processor to perform the steps of the capacity assessment based frequency back method according to any one of claims 1-2.
5. A computer storage medium, characterized in that at least one executable instruction is stored in the storage medium, the executable instruction causing a processor to perform the steps of the capacity estimation based frequency back method according to any one of claims 1-2.
CN202011041653.6A 2020-09-28 2020-09-28 Capacity evaluation-based frequency-back method and device and computing equipment Active CN114339802B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011041653.6A CN114339802B (en) 2020-09-28 2020-09-28 Capacity evaluation-based frequency-back method and device and computing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011041653.6A CN114339802B (en) 2020-09-28 2020-09-28 Capacity evaluation-based frequency-back method and device and computing equipment

Publications (2)

Publication Number Publication Date
CN114339802A CN114339802A (en) 2022-04-12
CN114339802B true CN114339802B (en) 2023-09-05

Family

ID=81011374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011041653.6A Active CN114339802B (en) 2020-09-28 2020-09-28 Capacity evaluation-based frequency-back method and device and computing equipment

Country Status (1)

Country Link
CN (1) CN114339802B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105828388A (en) * 2015-01-05 2016-08-03 中国移动通信集团浙江有限公司 Network frequency processing method and network frequency processing device
CN107295527A (en) * 2016-03-31 2017-10-24 中国电信股份有限公司 Co-channel interference protection band division methods, apparatus and system
CN108738024A (en) * 2017-04-18 2018-11-02 中国移动通信有限公司研究院 A kind of method, apparatus and network for realizing that frequency spectrum is backsetted
WO2019072402A1 (en) * 2017-10-13 2019-04-18 Huawei Technologies Co., Ltd. Methods, systems and control units for exchanging backhaul information between radio nodes
CN109842886A (en) * 2019-01-07 2019-06-04 中国联合网络通信集团有限公司 Communication network subtracts frequency logout method and device
CN111132349A (en) * 2019-12-31 2020-05-08 中国移动通信集团江苏有限公司 Method, apparatus, device and medium for adjusting spectrum bandwidth
CN111314922A (en) * 2020-02-21 2020-06-19 宇龙计算机通信科技(深圳)有限公司 Method and related device for releasing spectrum resources

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8798548B1 (en) * 2013-03-15 2014-08-05 DGS Global Systems, Inc. Systems, methods, and devices having databases for electronic spectrum management

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105828388A (en) * 2015-01-05 2016-08-03 中国移动通信集团浙江有限公司 Network frequency processing method and network frequency processing device
CN107295527A (en) * 2016-03-31 2017-10-24 中国电信股份有限公司 Co-channel interference protection band division methods, apparatus and system
CN108738024A (en) * 2017-04-18 2018-11-02 中国移动通信有限公司研究院 A kind of method, apparatus and network for realizing that frequency spectrum is backsetted
WO2019072402A1 (en) * 2017-10-13 2019-04-18 Huawei Technologies Co., Ltd. Methods, systems and control units for exchanging backhaul information between radio nodes
CN109842886A (en) * 2019-01-07 2019-06-04 中国联合网络通信集团有限公司 Communication network subtracts frequency logout method and device
CN111132349A (en) * 2019-12-31 2020-05-08 中国移动通信集团江苏有限公司 Method, apparatus, device and medium for adjusting spectrum bandwidth
CN111314922A (en) * 2020-02-21 2020-06-19 宇龙计算机通信科技(深圳)有限公司 Method and related device for releasing spectrum resources

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
大数据分析助力2G设备退服动态调整;郑宗煜;《信息通信》;全文 *

Also Published As

Publication number Publication date
CN114339802A (en) 2022-04-12

Similar Documents

Publication Publication Date Title
CN109669774B (en) Hardware resource quantification method, hardware resource arrangement method, hardware resource quantification device and hardware resource arrangement device and network equipment
CN104901989B (en) A kind of Site Service offer system and method
CN112261120B (en) Cloud-side cooperative task unloading method and device for power distribution internet of things
CN117632361A (en) Resource scheduling method and device and related equipment
CN112689007B (en) Resource allocation method, device, computer equipment and storage medium
CN111966289A (en) Partition optimization method and system based on Kafka cluster
CN114240019A (en) Flexible resource value evaluation method and device suitable for new energy power system
CN112002949A (en) Monitoring management method and system for active equalization of power battery
CN114339802B (en) Capacity evaluation-based frequency-back method and device and computing equipment
CN112163734A (en) Cloud platform based dynamic scheduling method and device for setting computing resources
CN110707729B (en) Method and device for analyzing multi-region primary frequency modulation condition and storage medium
WO2017118129A1 (en) Spectrum resource sharing method and apparatus
CN116541128A (en) Load adjusting method, device, computing equipment and storage medium
CN111263383A (en) Access network configuration method, device, network management equipment and storage medium
CN111506425B (en) Method and device for processing quality of service data
CN112954728B (en) Network thickness evaluation method and device, storage medium and computer equipment
CN115623503A (en) Multi-layer network efficiency analysis processing method, device and equipment
CN115515171A (en) Load prediction method and device of SA network and electronic equipment
CN113392131A (en) Data processing method and device and computer equipment
CN110365799B (en) Cluster multi-node scheduling method and device and computer readable storage medium
CN111683296A (en) Video segmentation method and device, electronic equipment and storage medium
CN113762659A (en) Network resource configuration method and device and electronic equipment
CN111124287A (en) High-availability management method and device for Hadoop distributed file system
CN110554916A (en) Distributed cluster-based risk index calculation method and device
DE102013207603A1 (en) Computer-implemented method for processing job in common pool of resources, involves organizing acquired local topology information including storage topology and associated resource use information of common pool of resources

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant