CN114336604B - Coordinated peak shaving method based on power grid conveying capacity and power grid safety - Google Patents

Coordinated peak shaving method based on power grid conveying capacity and power grid safety Download PDF

Info

Publication number
CN114336604B
CN114336604B CN202111630824.3A CN202111630824A CN114336604B CN 114336604 B CN114336604 B CN 114336604B CN 202111630824 A CN202111630824 A CN 202111630824A CN 114336604 B CN114336604 B CN 114336604B
Authority
CN
China
Prior art keywords
power
peak
value
time
power grid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111630824.3A
Other languages
Chinese (zh)
Other versions
CN114336604A (en
Inventor
赵艳军
李明
王正军
马楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tunghsu Azure New Energy Co ltd
Dongxu Lantian Intelligent Energy Technology Co ltd
Original Assignee
Tunghsu Azure New Energy Co ltd
Dongxu Lantian Intelligent Energy Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tunghsu Azure New Energy Co ltd, Dongxu Lantian Intelligent Energy Technology Co ltd filed Critical Tunghsu Azure New Energy Co ltd
Priority to CN202111630824.3A priority Critical patent/CN114336604B/en
Publication of CN114336604A publication Critical patent/CN114336604A/en
Application granted granted Critical
Publication of CN114336604B publication Critical patent/CN114336604B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The application relates to a coordination peak shaving method based on power grid conveying capacity and power grid safety, which relates to the technical field of power grid coordination peak shaving, and comprises the steps of judging whether the current moment of a region reaches a preset moment or not; if the current time reaches the preset time, acquiring a first electric power value, wherein the first electric power value is the electric power value corresponding to the current time; acquiring a second power consumption value, wherein the second power consumption value is the power consumption value after the first power consumption value is acquired and the preset time elapses; calculating the power consumption peak power increase speed based on the first power consumption value, the second power consumption value and the preset time; determining a required peak shaver set based on the electricity consumption peak power increasing speed, wherein the required peak shaver set comprises a hydroelectric generator set and a thermal generator set; and if the electricity consumption peak power value reaches the load power value, controlling the required peak shaver set to supply power to the area. The application can reduce the occurrence of overload of the power grid.

Description

Coordinated peak shaving method based on power grid conveying capacity and power grid safety
Technical Field
The application relates to the technical field of power grid coordination peak shaving, in particular to a coordination peak shaving method based on power grid conveying capacity and power grid safety.
Background
In recent years, with the improvement of living standard, the electricity consumption continues to increase at a high speed, and a plurality of electricity consumption peak periods occur in one day, so that the power supply pressure of the power grid increases. Because of uneven power consumption load, overload of the power grid often occurs in the peak period of power consumption.
At present, in order to adapt to the change of electric load in a power supply area and reduce the overload condition of a power grid, a peak shaver set is needed to be put into for peak shaver, the peak shaver set is convenient and quick to start and stop, the peak shaver set generally comprises a gas turbine set, a pumped storage set and the like, and the starting speed of the pumped storage set is higher than that of the gas turbine set. The input of the peak shaving unit enables the power of the power grid to be balanced, the stability of the frequency of the power grid is maintained, but when the peak shaving unit is integrated into the power grid, the condition of untimely peak shaving can occur, so that the power grid enters an overload state, the power grid is unsafe to convey, and the power grid conveying capacity is affected.
Disclosure of Invention
In order to reduce the occurrence of overload of the power grid, the application provides a coordinated peak shaving method based on the power grid conveying capacity and the power grid safety.
In a first aspect, the application provides a coordinated peak shaving method based on power grid conveying capacity and power grid safety, which adopts the following technical scheme:
A coordinated peak shaving method based on power grid conveying capacity and power grid safety, comprising:
judging whether the current time of the area reaches a preset time or not, wherein the preset time is the initial time of any electricity utilization peak time;
if the current time reaches the preset time, acquiring a first electric power value, wherein the first electric power value is an electric power value corresponding to the current time;
acquiring a second power consumption value, wherein the second power consumption value is a power consumption value after a preset time passes after the first power consumption value is acquired;
calculating a power consumption peak power increase rate based on the first power consumption value, the second power consumption value and the preset time;
determining a required peak shaver set based on the electricity consumption peak power increasing speed, wherein the required peak shaver set comprises a hydroelectric generator set and a thermal generator set;
and if the electricity consumption peak power value reaches the load power value, controlling the required peak shaver set to supply power to the area.
By adopting the technical scheme, the electronic equipment judges whether the current moment of the area reaches the initial moment of any electricity utilization peak time period, if the current moment reaches the initial moment of the electricity utilization peak time period, the electronic equipment acquires the first electricity power value, and after the preset time, the electronic equipment acquires the second electricity power value. The electronic device calculates a power consumption peak power increase rate based on the first power consumption value, the second power consumption value, and the preset time. The electronic equipment determines a required peak shaver set based on the power consumption peak power increasing speed, wherein the required peak shaver set comprises a thermal generator set and a hydroelectric generator set, and the starting speed of the hydroelectric generator set is higher than that of the thermal generator set. When the power consumption peak power value reaches the load power value, the electronic equipment can timely supply power to the area through the control of the electronic equipment, so that the condition that the power grid enters overload is effectively reduced, and the power grid is safe to convey.
In another possible implementation manner, the determining the required peak shaver set based on the electricity consumption peak power increasing speed includes:
calculating a power increase time based on the peak power increase rate of electricity consumption, the power increase time being a time required for a first electric power value to increase to the load power value;
judging whether the power increasing time is smaller than a preset increasing time or not;
if the power increasing time is smaller than the preset increasing time, selecting a hydroelectric generating set;
and if the growth time is not less than the preset growth time, selecting a thermal generator set.
By adopting the technical scheme, the electronic equipment calculates the power increase time based on the power consumption peak increase speed. The electronic equipment judges whether the power increasing time is smaller than the preset increasing time, if the power increasing time is not smaller than the preset increasing time, the power consumption peak increasing speed is lower, the power consumption peak power value reaches the load power value for a longer time, and the thermal generator set is selected to supply power. If the power increasing time is smaller than the preset increasing time, the power consumption peak increasing speed is higher, the time for the power consumption peak power value to reach the load power value is shorter, and the starting speed of the hydroelectric generating set is higher than that of the thermal generating set, so that the hydroelectric generating set is selected to carry out peak regulation, and power supply can be carried out more timely. The electronic equipment can timely supply power when the power consumption peak power value reaches the load power value by selecting a proper peak regulating unit, so that the condition that the power grid enters overload is effectively reduced, and the power grid is safe to convey.
In another possible implementation manner, the determining whether the current time of the present area reaches the preset time further includes:
if the current time is not in any electricity peak time, acquiring a third electricity power value, wherein the third electricity power value is the electricity power value corresponding to the current time in the electricity level peak time;
acquiring a fourth power consumption value, wherein the fourth power consumption value is the power consumption value after the preset time passes after the third power consumption value is acquired;
calculating a peak power increase rate of the power level for use based on the third power value, the fourth power value, and the preset time;
judging whether the increase speed of the power level peak is greater than a preset increase speed or not;
and if the increase speed of the power consumption level peak is larger than the preset increase speed, determining that the power value of the power consumption level peak is abnormal.
By adopting the technical scheme, if the current moment is not in any electricity utilization peak time, the electronic equipment acquires the third electricity utilization value, and after the preset time, the electronic equipment acquires the fourth electricity utilization value. The electronic device calculates a peak power increase rate of the power level based on the third power value, the fourth power value, and the preset time. Judging whether the increase speed of the power consumption level peak is greater than a preset increase speed, if the increase speed of the power consumption level peak is greater than the preset increase speed, indicating that the power consumption level peak is abnormal and unstable, and possibly causing sudden increase of the power consumption level peak, thereby causing overload of the power grid.
In another possible implementation manner, the determining includes:
judging whether the power consumption level peak power value reaches the load power value or not;
and if the power consumption level peak power value reaches the load power value, sending a power supply signal to an energy storage system so that the energy storage system supplies power to the area.
By adopting the technical scheme, the electronic equipment judges whether the peak power value of the level reaches the load power value. If the peak power value of the power level reaches the load power value, the condition that the peak power value of the power level suddenly increases in the peak period of the power level is indicated. The electronic equipment sends a power supply signal to the energy storage system so that the energy storage system supplies power to the area, and damage to a power grid or the electronic equipment caused by sudden increase of the peak power value of the electric level is reduced.
In another possible implementation manner, the controlling the required peak shaver set to supply power to the local area further includes:
acquiring the number of historical call units of at least two of the areas, wherein the number of the historical call units is the number of call peak shaver units corresponding to any electricity peak time;
Calculating the required unit number based on the history calling unit number;
judging whether the number of the needed units is larger than the total number of peak shaving units or not;
if the number of the needed units is larger than the total number of the peak shaving units, determining a regional power grid to be accessed;
and controlling the regional power grid to be accessed to supply power to the regional.
By adopting the technical scheme, the electronic equipment acquires the historical call unit numbers of at least two of the areas, and calculates the required unit numbers based on the historical call unit numbers. Judging whether the number of the required units is larger than the total number of the peak shaving units, if the number of the required units is larger than the total number of the peak shaving units, indicating that all the peak shaving units can not meet the load requirement of a power grid along with the increase of the power consumption peak power value in the power consumption peak period, so that the phenomenon of overload of the power grid occurs. The electronic equipment confirms the regional power grid to be accessed and controls the regional power grid to be accessed to access the regional power grid to supply power, so that the condition that the power supply quantity is smaller than the power consumption quantity is reduced, and the overload condition of the power grid is further reduced.
In another possible implementation manner, the determining the to-be-accessed regional power grid includes:
acquiring a historical power supply state of at least one regional power grid in a preset range and position information of the at least one regional power grid, wherein the historical power supply state comprises an overload state and a non-overload state;
Determining at least one adjustable power regional power grid, wherein the at least one adjustable power regional power grid comprises a power grid with the historical power supply states being in a non-overload state;
calculating the electricity regulating distance of the at least one adjustable electricity regional power grid, wherein the electricity regulating distance is the distance between the adjustable electricity regional power grid and the current regional power grid;
and determining a regional power grid to be accessed based on the power adjustment distance, wherein the regional power grid to be accessed is a regional power grid corresponding to the minimum value in the power adjustment distance.
By adopting the technical scheme, the electronic equipment acquires the historical power supply state and the position information of at least one regional power grid in a preset range. And determining that all the historical power supply states are not overloaded regional power grids, wherein the fact that the historical power supply states are not overloaded indicates that the overload state of the regional power grids is low in possibility, so that the adjustable regional power grids can be adjusted. The electronic equipment calculates the power adjustment distance of each adjustable regional power grid respectively, determines the regional power grid to be connected based on the power adjustment distance, and the regional power grid to be connected is the regional power grid corresponding to the minimum value in the power adjustment distances. The regional power grid closest to the power grid is selected for power adjustment, so that loss in the power adjustment process is effectively reduced, and power can be supplied more timely.
In another possible implementation, the method further includes:
acquiring historical starting times of each peak shaver set in the area;
judging whether the historical starting times are larger than preset starting times or not;
and if the historical starting times are greater than the preset starting times, outputting overhaul information, wherein the overhaul information is used for indicating that the peak shaver set needs to be overhauled.
By adopting the technical scheme, the electronic equipment acquires the historical starting times of each peak shaver set in the area, judges whether the historical starting times are larger than the preset starting times, and if the historical starting times are larger than the preset starting times, the situation that the peak shaver sets are more in starting and stopping times and possibly have faults is indicated. The electronic equipment outputs overhaul information to prompt related staff to overhaul the peak shaver set in time, so that the failure of the peak shaver set is reduced, and the peak shaver set cannot be powered in time.
In a second aspect, the application provides a coordinated peak shaving device based on power grid conveying capacity and power grid safety, which adopts the following technical scheme:
a coordinated peak shaver based on power grid conveying capacity and power grid safety, comprising:
The first judging module is used for judging whether the current time of the area reaches a preset time or not, wherein the preset time is the initial time of any electricity utilization peak time;
the first acquisition module is used for acquiring a first electric power value when the current moment reaches the preset moment, wherein the first electric power value is an electric power value corresponding to the current moment;
the second acquisition module is used for acquiring a second power consumption value, wherein the second power consumption value is a power consumption value after the first power consumption value is acquired and the preset time elapses;
the first calculation module is used for calculating the power consumption peak power increase speed based on the first power consumption value, the second power consumption value and the preset time;
the first determining module is used for determining a required peak shaver set based on the electricity consumption peak power increasing speed, wherein the required peak shaver set comprises a hydroelectric generator set and a thermal generator set;
and the first control module is used for controlling the required peak shaver set to supply power to the area when the power consumption peak power value reaches the load power value.
By adopting the technical scheme, whether the current moment of the area reaches the initial moment of any electricity utilization peak time period is judged by the first judging module, if the current moment reaches the initial moment of any electricity utilization peak time period, the first electricity utilization power value is acquired by the first acquiring module, and after the preset time, the second electricity utilization power value is acquired by the second acquiring module. The first calculation module calculates a peak power increase rate of electricity consumption based on the first electricity consumption value, the second electricity consumption value and the preset time. The method comprises the steps that a required peak shaver set is determined through a first determining module based on the electricity consumption peak power increasing speed, wherein the required peak shaver set comprises a thermal generator set and a hydroelectric generator set, and the starting speed of the hydroelectric generator set is higher than that of the thermal generator set. When the peak power consumption reaches the load power value, the first control module controls the peak power regulation unit selected by the electronic equipment to timely supply power to the area, so that the condition that the power grid enters overload is effectively reduced, and the power grid is safe to convey.
In another possible implementation manner, the first determining module is specifically configured to, when determining the required peak shaver set based on the electricity consumption peak power growth speed:
calculating a power increase time based on the peak power increase rate of electricity consumption, the power increase time being a time required for a first electric power value to increase to the load power value;
judging whether the power increasing time is smaller than a preset increasing time or not;
if the power increasing time is smaller than the preset increasing time, selecting a hydroelectric generating set;
and if the growth time is not less than the preset growth time, selecting a thermal generator set.
In another possible implementation, the apparatus further includes:
the third acquisition module is used for acquiring a third electric power value when the current moment is not in any electricity utilization peak time period, wherein the third electric power value is an electric power utilization value corresponding to the current moment in an electricity utilization level peak time period;
the fourth acquisition module is used for acquiring a fourth power consumption value, wherein the fourth power consumption value is the power consumption value after the preset time passes after the third power consumption value is acquired;
a second calculation module for calculating a peak power increase rate of the power level for use based on the third power value, the fourth power value, and the preset time;
The second judging module is used for judging whether the increase speed of the power consumption level peak is greater than a preset increase speed or not;
and the second determining module is used for determining that the power value of the power consumption level peak is abnormal when the power consumption level peak increases at a speed greater than a preset increase speed.
In another possible implementation, the apparatus further includes:
the third judging module is used for judging whether the power consumption level peak power value reaches the load power value or not;
and the sending module is used for sending a power supply signal to an energy storage system when the power consumption level peak power value reaches the load power value, so that the energy storage system supplies power to the area.
In another possible implementation, the apparatus further includes:
a fifth obtaining module, configured to obtain the number of history call units of at least two of the local areas, where the number of history call units is the number of call peak shaver units corresponding to any electricity peak time period;
the third calculation module is used for calculating the required unit number based on the history calling unit number;
the fourth judging module is used for judging whether the number of the needed units is larger than the total number of peak shaving units or not;
the third determining module is used for determining a regional power grid to be accessed when the number of the required units is larger than the total number of the peak shaver units;
And the second control module is used for controlling the regional power grid to be accessed to supply power to the regional.
In another possible implementation manner, the third determining module is specifically configured to, when determining that the regional power grid is to be accessed:
acquiring a historical power supply state of at least one regional power grid in a preset range and position information of the at least one regional power grid, wherein the historical power supply state comprises an overload state and a non-overload state;
determining at least one adjustable power regional power grid, wherein the at least one adjustable power regional power grid comprises a power grid with the historical power supply states being in a non-overload state;
calculating the electricity regulating distance of the at least one adjustable electricity regional power grid, wherein the electricity regulating distance is the distance between the adjustable electricity regional power grid and the current regional power grid;
and determining a regional power grid to be accessed based on the power adjustment distance, wherein the regional power grid to be accessed is a regional power grid corresponding to the minimum value in the power adjustment distance.
In another possible implementation, the apparatus further includes:
a sixth obtaining module, configured to obtain a historical starting number of each peak shaver set in the present area;
a fifth judging module, configured to judge whether the historical startup time is greater than a preset startup time;
And the output module is used for outputting maintenance information when the historical starting times are larger than the preset starting times, wherein the maintenance information is used for indicating that the peak shaver set needs to be overhauled.
In a third aspect, the present application provides an electronic device, which adopts the following technical scheme:
an electronic device, the electronic device comprising:
one or more processors;
a memory;
one or more applications, wherein the one or more applications are stored in the memory and configured to be executed by the one or more processors, the one or more applications configured to: a coordinated peaking method based on grid transport capability and grid security is performed as shown in any one of the possible implementations according to the first aspect.
In a fourth aspect, the present application provides a computer readable storage medium, which adopts the following technical scheme:
a computer-readable storage medium, comprising: a computer program is stored that can be loaded by a processor and executed to implement a coordinated peaking method based on grid transport capability and grid security as shown in any one of the possible implementations of the first aspect.
In summary, the present application includes at least one of the following beneficial technical effects:
1. The electronic equipment judges whether the current time of the area reaches the initial time of any electricity utilization peak time, if the current time reaches the initial time of the electricity utilization peak time, the electronic equipment acquires the first electricity power value, and after the preset time, the electronic equipment acquires the second electricity power value. The electronic device calculates a power consumption peak power increase rate based on the first power consumption value, the second power consumption value, and the preset time. The electronic equipment determines a required peak shaver set based on the power consumption peak power increasing speed, wherein the required peak shaver set comprises a thermal generator set and a hydroelectric generator set, and the starting speed of the hydroelectric generator set is higher than that of the thermal generator set. The electronic equipment performs peak shaving by selecting a proper peak shaving unit, and when the power consumption peak power value reaches the load power value, the peak shaving unit can timely supply power to the area through the control of the electronic equipment, so that the condition that the power grid enters overload is effectively reduced, and the power grid is safe to convey;
2. if the current moment is not in any electricity utilization peak time, the electronic equipment acquires the third electricity utilization value, and after the preset time, the electronic equipment acquires the fourth electricity utilization value. The electronic device calculates a peak power increase rate of the power level based on the third power value, the fourth power value, and the preset time. Judging whether the increase speed of the power consumption level peak is greater than a preset increase speed, if the increase speed of the power consumption level peak is greater than the preset increase speed, indicating that the power consumption level peak is abnormal and unstable, and possibly causing sudden increase of the power consumption level peak, so that overload of the power grid occurs.
Drawings
Fig. 1 is a schematic flow chart of a coordinated peak shaving method based on power grid conveying capability and power grid safety according to an embodiment of the application.
Fig. 2 is a schematic flow chart of a coordinated peak shaver based on power grid conveying capability and power grid safety according to an embodiment of the application.
Fig. 3 is a schematic structural diagram of an electronic device according to an embodiment of the present application.
Detailed Description
The application is described in further detail below with reference to fig. 1-3.
Modifications of the embodiments which do not creatively contribute to the application may be made by those skilled in the art after reading the present specification, but are protected by patent laws within the scope of the claims of the present application.
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present application more apparent, the technical solutions of the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present application, and it is apparent that the described embodiments are some embodiments of the present application, but not all embodiments of the present application. All other embodiments, which can be made by those skilled in the art based on the embodiments of the application without making any inventive effort, are intended to be within the scope of the application.
In addition, the term "and/or" herein is merely an association relationship describing an association object, and means that three relationships may exist, for example, a and/or B may mean: a exists alone, A and B exist together, and B exists alone. In this context, unless otherwise specified, the term "/" generally indicates that the associated object is an "or" relationship.
Embodiments of the application are described in further detail below with reference to the drawings.
The embodiment of the application provides a coordinated peak shaving method based on power grid conveying capacity and power grid safety, which is executed by electronic equipment, wherein the electronic equipment can be a server or terminal equipment, and the server can be an independent physical server, a server cluster or a distributed system formed by a plurality of physical servers, or a cloud server for providing cloud computing service. The terminal device may be, but is not limited to, a smart phone, a tablet computer, a notebook computer, a desktop computer, etc., and the terminal device and the server may be directly or indirectly connected through wired or wireless communication, which is not limited herein, and as shown in fig. 1, the method includes step S101, step S102, step S103, step S104, step S105, and step S106, where,
Step S101, judging whether the current time of the area reaches the preset time.
The preset time is the initial time of any electricity utilization peak time.
For the embodiment of the application, the clock chip is arranged in the electronic equipment so as to obtain the current time of the area, and the current time can be obtained through the internet and the cloud server, which is not limited herein. The electronic device determines whether the current time reaches an initial time of any electricity peak period. For example: assume that the peak electricity consumption period in a day is:
10:00-15:00 and 18:00-21:00;
if the current time is 10:00 or 18:00, then indicates that the preset time is reached, 10:00 or 18: after 00, the peak power value of electricity consumption may continue to increase.
Step S102, if the current time reaches the preset time, a first electric power value is obtained.
The first electric power value is the electric power value corresponding to the current moment.
For the embodiment of the present application, assume that the current time is 18:00, electronic device acquisition 18: the power consumption value corresponding to 00 is 900KW, and 18:00 to facilitate calculation of the peak power rate of increase in the peak power of electricity in the peak period of electricity usage from 18:00 to 21:00.
Step S103, obtaining a second power consumption value.
For the embodiment of the present application, taking step S102 as an example, if the electronic device acquires the current time 18:00, assuming that the preset time is 1/60h (1 min), the electronic device obtains 18:01 and the power consumption is 1500KW. By acquiring acquisition 18:01 to facilitate calculation of the current peak power growth rate for electricity consumption in the peak electricity consumption period of 18:00-21:00.
Step S104, calculating the power consumption peak power increase speed based on the first power consumption value, the second power consumption value and the preset time.
For the embodiment of the application, taking step S102 and step S103 as examples, the electronic device calculates the peak power increase rate of electricity consumption:
peak power increase rate of electricity consumption= (1500-900)/(1/60=36000 KW/h;
indicating a 36000KW increase per hour in peak power consumption values during peak power consumption periods of 18:00-21:00.
Step S105, determining a required peak shaver set based on the power consumption peak power increase speed.
The required peak shaver set comprises a hydroelectric generating set and a thermal generating set.
For the embodiment of the application, the electronic equipment determines the required peak shaver set based on the power consumption peak power increasing speed, and the starting speed of the hydroelectric generator set is faster than that of the thermal generator set. The hydroelectric generating set can finish starting and power supply within 0.05h (3 min), but the power supply of the hydroelectric generating set is easily influenced by weather and climate. For the thermal power generating unit, the operation such as boiler preheating is needed to be carried out for 1/3h (20 min) before the thermal power generating unit is started, the starting time is longer than 1/6h (10 min), and the power supply of the thermal power generating unit is not influenced by weather and climate. Therefore, the hydraulic generator set is selected to supply power more timely, and the thermal generator set is selected to supply power more stably. And the electronic equipment supplies power by selecting a proper peak shaver set, so that the condition that the power grid enters overload is reduced.
And S106, if the peak power value of the electricity consumption reaches the load power value, controlling the required peak shaver set to supply power to the area.
For the embodiment of the application, assuming that the load power value is 9000KW, if the power consumption peak power value reaches 9000KW, the electronic equipment controls the required peak shaver set to supply power to the area. For example:
assuming that the current moment is 19:30 and the corresponding electricity consumption peak power value is 9000KW, the load power value 9000KW is reached, and the required peak shaver set is controlled to supply power to the area, so that the situation that the electricity consumption peak power value at 19:31 is larger than the load power value and overload of the power grid occurs is reduced.
One possible implementation manner of the embodiment of the present application, in step S105, the required peak shaver set is determined based on the increasing speed of the peak power of electricity consumption, which specifically includes step S1051 (not shown in the figure), step S1052 (not shown in the figure), step S1053 (not shown in the figure), and step S1054 (not shown in the figure), wherein,
step S1051 calculates a power increase time based on the peak power increase rate of electricity consumption.
Wherein the power increase time is the time required for the first electric power value to increase to the load power value.
For the embodiment of the present application, taking step S106 as an example, if the power consumption peak power increase speed in the power consumption peak period of 18:00-21:00 is 36000KW/h, and 18: the power consumption peak power value of 00 is 900KW, and the power increasing time from 900KW to 9000KW is calculated:
Power rise time= (9000-900)/(36000=0.225 h;
illustrating that the peak power usage value reaches the load power value when 18:13 in the peak power usage period of 18:00-21:00.
If the power increase rate of the electricity consumption peak in the electricity consumption peak period of 18:00-21:00 is 6000KW/h, and 18: the power consumption peak power value of 00 is 900KW, and the power increasing time from 900KW to 9000KW is calculated:
power increase time= (9000-900)/(6000=1.35 h;
illustrating that the peak power usage value reaches the load power value when 19:21 in the peak power usage period of 18:00-21:00.
The faster the peak power rate of electricity consumption increases, the shorter the power increase time, and thus the shorter the time to reach the load power value.
Step S1052, determine whether the power increase time is less than a preset increase time.
For the embodiment of the present application, it is assumed that the preset increase time is 0.3h (18 min), and taking step S1051 as an example, when the peak power increase speed of electricity consumption is 36000KW/h, the power increase time is 0.225h (13.5 min), which is smaller than the preset increase time is 0.3h (18 min). When the power consumption peak power increasing speed is 6000KW/h, the power increasing time is 1.35h (81 min) and is not less than the preset increasing time of 0.3h (18 min). The electronic equipment selects the peak shaver set by judging whether the peak shaver set is smaller than the preset increasing time, and can timely supply power to the area after the peak shaver set passes the power increasing time by selecting the proper peak shaver set, so that the phenomenon of overload of the power grid is reduced.
In step S1053, if the power increase time is less than the preset increase time, the hydro-generator set is selected.
For the embodiment of the application, taking step S1052 as an example, the power increasing time is 0.225h (13.5 min) which is less than the preset increasing time of 0.3h (18 min), because the hydroelectric generator is started quickly, the hydroelectric generator can be started within 0.05h (3 min) and is less than the preset increasing time, and when the peak power value of electricity consumption reaches the load power value, the starting can be completed within 0.225h (13.5 min) to supply electricity in time; however, the operation of boiler preheating and the like is required to be carried out for 1/3h (20 min) before the thermal generator set is started, the starting time is 1/6h (10 min), the preparation time and the starting time of the thermal generator set are longer than the preset increasing time of 0.3h (18 min), and the power supply cannot be completed within 0.225h (13.5 min), so that the hydraulic generator set is selected for peak shaving during peak shaving. The hydroelectric generating set is selected to supply power more timely, so that overload of the power grid is reduced to a great extent.
In step S1054, if the growth time is not less than the preset growth time, a thermal generator set is selected.
For the embodiment of the application, taking step S1052 as an example, the power increasing time is 1.35h (81 min), which is not less than the preset increasing time is 0.3h (18 min), because the thermal generator set can complete starting and power supply within 1.35h (81 min), and compared with the hydroelectric generator set, the thermal generator set is not easily influenced by weather and climate, so the thermal generator set is selected to supply power more stably.
One possible implementation manner of the embodiment of the present application, the method further includes step S107 (not shown in the figure), step S108 (not shown in the figure), step S109 (not shown in the figure), step 110 (not shown in the figure), and step S111 (not shown in the figure), and step S107 may be performed after step S101, where,
step S107, if the current moment is not in any electricity peak time, a third electricity power value is obtained.
And the third electric power value is the electric power value corresponding to the current moment in the electric level peak period.
For the embodiment of the application, assuming that the peak period of the power consumption level is 7:00-10:00, 15:00-18:00 and 21:00-24:00, if the current time is 9:00, obtaining the power consumption value corresponding to 9:00 as 850KW in the peak period of the power consumption level, and obtaining 9:00 to facilitate calculation of the power up rate of the power up level in the peak period of the power up level in the range of 7:00-10:00.
Step S108, a fourth power consumption value is obtained.
The fourth power consumption value is the power consumption value after the preset time passes after the third power consumption value is obtained.
For the embodiment of the present application, taking step S107 as an example, if the electronic device acquires the current time 9:00, assuming that the preset time is 1/60h (1 min), the electronic device obtains 9:01 and 1000KW. Acquisition 9 by acquisition: 01 to facilitate calculation of the peak power growth rate of electricity consumption in the peak electricity consumption period of 7:00-10:00.
Step S109, calculating a power increase rate of the peak power of the power level for use based on the third power value, the fourth power value, and the preset time.
For the embodiment of the present application, taking step S107 and step S108 as examples, the electronic device calculates the level peak power increase rate for use:
peak power increase rate with level= (1000-850)/(1/60=9000 KW/h;
indicating a 9000KW increase per hour in the peak power level value of the power level in the peak period of power level of 7:00 to 10:00.
Step S110, judging whether the power increasing speed of the peak power of the level is larger than a preset increasing speed.
For the embodiment of the application, taking step S109 as an example, assuming that the preset increasing speed is 3000KW/h, the increasing speed 9000KW/h of the power consumption level peak power is greater than the preset increasing speed 3000KW/h, which indicates that the increasing speed of the power consumption level peak power is suddenly increased in the period of the power consumption level peak.
In step S111, if the increase speed of the power consumption level peak is greater than the preset increase speed, it is determined that the power of the power consumption level peak is abnormal.
For the embodiment of the application, taking step S110 as an example, if the increase speed 9000KW/h of the power level peak is greater than the preset increase speed 3000KW/h, it indicates that the power level peak is abnormal, the power level peak power value may be fluctuated repeatedly, or the power level peak power value may be fluctuated in a short time.
In one possible implementation manner of the embodiment of the present application, the method further includes step S112 (not shown in the figure) and step S113 (not shown in the figure), and step S112 may be performed after step S111, where,
step S112, judging whether the peak power value of the level reaches the load power value.
For the embodiment of the present application, assuming that the peak power value of the level is 9000KW, the load power value 9000KW is reached. The peak power value of the level is used to reach the load power value, so that the condition that the peak power value of the level is suddenly increased is determined.
Step S113, if the power value of the level peak reaches the load power value, a power supply signal is sent to the energy storage system, so that the energy storage system supplies power to the area.
For the embodiment of the application, assuming that the peak power value of the level is 9000KW and reaches the load power value of 9000KW, a power supply signal is sent to the energy storage system so that the energy storage system supplies power to the area, wherein the energy storage system can be a high-energy battery or other energy storage systems. The energy storage system collects and stores the temporarily unused surplus electric quantity, and the energy storage system is selected to supply power more conveniently and rapidly, so that the overload condition of the power grid is effectively reduced, and the damage to the power grid or electronic equipment caused by sudden increase of the peak power value of the power level is reduced.
One possible implementation manner of the embodiment of the present application, the method further includes step S114 (not shown in the figure), step S115 (not shown in the figure), step S116 (not shown in the figure), step S117 (not shown in the figure), and step S118 (not shown in the figure), and step S114 may be performed before step S106, where,
step S114, the historical call set number of at least two of the areas is obtained.
The historical call unit number is the number of call peak shaving units corresponding to any electricity peak time.
For the embodiment of the application, the electronic device can acquire the historical call set number of the area from the database, and can also acquire the historical call set number from the cloud server, which is not limited herein. For example:
the electronic equipment acquires 3 historical call unit numbers from the database:
the number of historical call units in 2018 is 50;
the number of historical call units in 2019 is 70;
the number of historical call units in 2020 is 90.
By obtaining the history of the number of call sets, the number of sets required in 2021 can be predicted.
Step S115, calculating the required unit number based on the history calling unit number.
For the embodiment of the application, taking step S114 as an example, the number of units required for 2021 is 110 if the number of units to be called per year is 20, so that the number of units required for peak shaving in 2021 is effectively predicted.
And S116, judging whether the number of the needed units is larger than the total number of the peak shaver units.
For the embodiment of the application, the total number of peak shaver sets in 2021 is 105, and the number of required sets is 110 and is larger than the total number of peak shaver sets by 105, which indicates that when the power consumption peak power value reaches the load power value, the phenomenon that overload of the power grid can not be reduced by only carrying out peak shaver through the peak shaver sets. If the total number of peak shaver sets in 2021 is 115, the number of required sets is not more than 110 and is not more than 115, which means that when the peak power value of electricity reaches the load power value, the phenomenon of overload of the power grid can be reduced by only carrying out peak shaver through the peak shaver sets.
And S117, if the number of the needed units is larger than the total number of the peak shaving units, determining the regional power grid to be accessed.
For the embodiment of the application, if the number of the needed units is 110 and is larger than 105, the phenomenon that overload of the power grid can not be reduced by carrying out peak regulation only through the peak regulation unit when the power consumption peak power value reaches the load power value is indicated, and the electronic equipment is required to determine the power grid to be connected into the area so as to supply power, so that the overload of the power grid is reduced.
And step S118, controlling the regional power grid to be accessed to supply power to the regional.
For the embodiment of the application, after the electronic equipment determines the regional power grid to be accessed, when the number of the needed units is larger than the total number of the peak shaving units and the power consumption peak power value reaches the load power value, the regional power grid to be accessed is controlled to supply power to the regional power grid, so that the phenomenon of overload of the power grid is reduced.
In one possible implementation manner of the embodiment of the present application, the determining the to-be-accessed regional power grid in step S117 specifically includes step S1171 (not shown in the figure), step S1172 (not shown in the figure), step S1173 (not shown in the figure), and step S1174 (not shown in the figure), where,
step S1171, obtaining the historical power supply state of at least one regional power grid and the position information of at least one regional power grid in a preset range.
Wherein the historical power supply state includes an overload state and a non-overload state.
For the embodiment of the application, the preset range may be a circular range with a radius of 500km with the current regional power grid as the center, a square range with a diagonal length of 1000km with the current regional power grid as the center, or other types of preset ranges, which are not limited herein. The electronic device may obtain the historical power supply state and the location information of at least one regional power grid within a preset range from the database, or may also obtain the historical power supply state and the location information from the cloud server, which is not limited herein. For example:
The electronic equipment acquires historical power supply states and position information of all regional power grids in a circular range with the radius of 500km by taking the central position of a current regional power grid as a circle center from a database, and establishes a rectangular coordinate system by taking the current regional power grid as an origin, so that the position information of the regional power grids in a preset range is acquired, and 5 regional power grids are assumed to be acquired in the preset range:
regional power grid 1: the historical power supply state is 10 times of non-overload, 2 times of overload, and the position information is (100, 400);
regional power grid 2: the historical power supply state is 12 times of non-overload, 0 times of overload, and the position information is (200 );
regional power grid 3: the historical power supply state is 9 times of non-overload, 3 times of overload, and the position information is (200, 300);
regional power grid 4: the historical power supply state is 12 times of non-overload, 0 times of overload, and the position information is (100, 200);
regional power grid 5: the historical power supply state is 10 times of non-overload, 0 times of overload, and the position information is (300, 100).
By acquiring the historical power supply state and the position information of at least one regional power grid in a preset range, the regional power grid which is most suitable for supplying power to the current regional power grid is selected, so that the power supply is more convenient and rapid.
Step S1172, at least one adjustable electricity regional grid is determined.
The at least one adjustable power regional power grid comprises power grids with historical power supply states which are all in non-overload states.
For the embodiment of the present application, the regional power grids with no overload state in the historical power supply states are determined as the adjustable power regional power grids, and taking step S1171 as an example, the adjustable power regional power grids include the regional power grid 2, the regional power grid 4 and the regional power grid 4. The historical power supply states are all non-overload states, so that the possibility of overload states of the adjustable power grid is low, and the adjustable power grid can be adjusted.
In step S1173, a power adjustment distance of the at least one power adjustable regional power grid is calculated.
The power adjustment distance is the distance between the power adjustable regional power grid and the current regional power grid.
For the embodiment of the present application, taking step S1171 and step S1172 as examples, the distance between the adjustable power regional power grid is the distance between the adjustable power regional power grid and the origin in the rectangular coordinate system, and the power adjustment distances of all the adjustable power regional power grids are calculated according to the pythagorean theorem:
power adjustment distance of regional power grid 2 =
Power adjustment distance of regional power grid 4 =
The tuning distance of the regional power grid 5 =/>
The maximum power adjustment distance of the regional power grid 5 and the minimum power adjustment distance of the regional power grid 4 can be obtained.
The distance between the adjustable power regional power grid and the current power grid can be intuitively seen by calculating the power adjustment distance, so that a proper adjustable power regional power grid is selected for power adjustment.
Step S1174, determining the regional power grid to be accessed based on the power adjustment distance.
The regional power grid to be accessed is the regional power grid corresponding to the minimum value in the power adjustment distance.
For the embodiment of the present application, the electronic device determines that the regional power grid corresponding to the minimum value in the power adjustment distances is the regional power grid to be accessed, and takes step S1173 as an example, if the power adjustment distance of the regional power grid 4 is the minimum, it determines that the regional power grid 4 is the regional power grid to be accessed. The regional power grid closest to the power grid is selected for power adjustment, so that loss in the power adjustment process is effectively reduced, and power can be supplied more timely.
One possible implementation manner of the embodiment of the present application, the method further includes step S119 (not shown in the figure), step S120 (not shown in the figure), and step S121 (not shown in the figure), and step S119 may be performed after step S106, where,
step S119, obtaining the historical starting times of each peak shaver set in the area.
For the embodiment of the application, the electronic device may obtain the historical starting times of the area from the database, or may obtain the historical starting times of the area from the cloud server, which is not limited herein. For example:
The electronic equipment acquires the historical starting times of each peak shaver set in the area from the database:
the historical starting times of the peak shaver set 1 are 1000 times;
the historical starting times of the peak shaver set 2 are 2000 times;
the historical starting times of the peak shaver set 3 are 1500 times.
The more the historical starting times of the peak shaver set are, the greater the possibility that the peak shaver set is worn is indicated, so that the service life of the peak shaver set is influenced, and normal power supply cannot be performed.
Step S120, judging whether the historical starting times are larger than the preset starting times.
For the embodiment of the present application, taking step S119 as an example, assuming that the preset starting time is 1800 times, the historical starting time 2000 times of the peak shaver set 3 is greater than the preset starting time 1800 times, which indicates that the peak shaver set 3 may wear.
Step S121, if the historical starting times are larger than the preset starting times, the overhaul information is output.
The maintenance information is used for indicating that the peak shaver set needs maintenance.
For the embodiment of the present application, taking step S120 as an example, the electronic device outputs the maintenance information about the peak shaver set 3, where the maintenance information may be text information that "the peak shaver set 3 needs to be maintained" is sent to the user terminal device, or may be voice information that "the peak shaver set 3 needs to be maintained" sent by the speaker device, or may be other forms of maintenance information, which is not limited herein. The maintenance information is output to prompt relevant staff to maintain the peak shaver set in time, so that the situation that the peak shaver set is damaged and cannot be powered in time when the peak shaver set is required to power is reduced, and the power grid is overloaded is caused.
The above embodiment describes a coordinated peak shaving method based on power grid conveying capability and power grid safety from the aspect of a method flow, and the following embodiment describes a coordinated peak shaving device based on power grid conveying capability and power grid safety from the aspect of a virtual module or a virtual unit, specifically the following embodiment.
The embodiment of the application provides a coordinated peak shaver 20 based on power grid conveying capability and power grid safety, as shown in fig. 2, the coordinated peak shaver 20 based on power grid conveying capability and power grid safety may specifically include:
a first judging module 201, configured to judge whether a current time of the present area reaches a preset time, where the preset time is an initial time of any electricity peak period;
a first obtaining module 202, configured to obtain a first electric power value when the current time reaches a preset time, where the first electric power value is an electric power value corresponding to the current time;
the second obtaining module 203 is configured to obtain a second power consumption value, where the second power consumption value is a power consumption value after a preset time passes after the first power consumption value is obtained;
a first calculation module 204, configured to calculate a peak power increase rate of electricity consumption based on the first electricity consumption value, the second electricity consumption value, and the preset time;
A first determining module 205, configured to determine a required peak shaver set based on the power consumption peak power growth speed, where the required peak shaver set includes a hydroelectric generator set and a thermal generator set;
the first control module 206 is configured to control the required peak shaver set to supply power to the local area when the peak power value reaches the load power value.
By adopting the above technical solution, the first judging module 201 judges whether the current time reaches the initial time of any electricity consumption peak time, if the current time reaches the initial time of any electricity consumption peak time, the first obtaining module 202 obtains the first electricity consumption value, and after the preset time, the second obtaining module 203 obtains the second electricity consumption value. The first calculation module 204 calculates a peak power increase rate of electricity consumption based on the first electricity consumption value, the second electricity consumption value, and the preset time. The required peak shaver set is determined by the first determining module 205 based on the peak power increase rate of electricity consumption, and comprises a thermal generator set and a hydroelectric generator set, wherein the starting speed of the hydroelectric generator set is higher than that of the thermal generator set. When the peak power consumption reaches the load power value, the first control module 206 controls the peak power consumption unit selected by the electronic equipment to timely supply power, so that the condition that the power grid enters overload is effectively reduced, and the power grid transportation is safe.
In another possible implementation, the first determining module 205 is specifically configured to, when determining the required peak shaver set based on the power consumption peak power growth rate:
calculating a power increase time based on the peak power increase rate of the power consumption, the power increase time being a time required for the first electric power value to increase to the load power value;
judging whether the power increasing time is smaller than a preset increasing time or not;
if the power increasing time is smaller than the preset increasing time, selecting a hydroelectric generating set;
and if the growth time is not less than the preset growth time, selecting a thermal generator set.
In another possible implementation, the apparatus further includes:
the third acquisition module is used for acquiring a third electric power value when the current moment is not in any electricity utilization peak time period, wherein the third electric power value is the electric power utilization value corresponding to the current moment in the electricity utilization level peak time period;
the fourth acquisition module is used for acquiring a fourth power consumption value, wherein the fourth power consumption value is the power consumption value after the preset time passes after the third power consumption value is acquired;
the second calculation module is used for calculating the power increasing speed of the level peak based on the third power value, the fourth power value and the preset time;
The second judging module is used for judging whether the increase speed of the peak power of the power level is greater than a preset increase speed;
and the second determining module is used for determining that the power value of the power consumption level peak is abnormal when the power consumption level peak increases at a speed greater than a preset increase speed.
In another possible implementation, the apparatus further includes:
the third judging module is used for judging whether the peak power value of the level reaches the load power value;
and the transmitting module is used for transmitting a power supply signal to the energy storage system when the level peak power value reaches the load power value so that the energy storage system supplies power to the area.
In another possible implementation, the apparatus further includes:
the fifth acquisition module is used for acquiring the number of the history calling units of at least two of the areas, wherein the number of the history calling units is the number of the calling peak shaver units corresponding to any electricity peak time;
the third calculation module is used for calculating the required unit number based on the history calling unit number;
the fourth judging module is used for judging whether the number of the needed units is larger than the total number of peak shaving units;
the third determining module is used for determining a regional power grid to be accessed when the number of the required units is greater than the total number of peak shaving units;
and the second control module is used for controlling the regional power grid to be accessed to supply power to the regional.
In another possible implementation manner, the third determining module is specifically configured to, when determining that the regional power grid is to be accessed:
acquiring a historical power supply state of at least one regional power grid and position information of the at least one regional power grid in a preset range, wherein the historical power supply state comprises an overload state and a non-overload state;
determining at least one adjustable power regional power grid, wherein the at least one adjustable power regional power grid comprises power grids with historical power supply states which are all in non-overload states;
calculating the electricity adjusting distance of at least one adjustable electricity regional power grid, wherein the electricity adjusting distance is the distance between the adjustable electricity regional power grid and the current regional power grid;
and determining the regional power grid to be accessed based on the power adjustment distance, wherein the regional power grid to be accessed is the regional power grid corresponding to the minimum value in the power adjustment distance.
In another possible implementation, the apparatus further includes:
a sixth obtaining module, configured to obtain a historical starting number of each peak shaver set in the present area;
the fifth judging module is used for judging whether the historical starting times are larger than the preset starting times or not;
and the output module is used for outputting maintenance information when the historical starting times are greater than the preset starting times, wherein the maintenance information is used for indicating that the peak shaver set needs maintenance.
In the embodiment of the present application, the first judging module 201, the second judging module, the third judging module, the fourth judging module and the fifth judging module may be the same judging module, different judging modules or partially the same judging module. The first acquisition module 202, the second acquisition module 203, the third acquisition module, the fourth acquisition module, the fifth acquisition module, and the sixth acquisition module may be the same acquisition module, may be different acquisition modules, or may be partially the same acquisition module. The first computing module 204, the second computing module, and the third computing module may be the same computing module, may be different computing modules, or may be partially the same computing module. The first determining module 205, the second determining module, and the third determining module may be the same determining module, may be different determining modules, or may be partially the same determining module. The first control module 206 and the second control module may be the same control module or different control modules.
The embodiment of the application provides a coordinated peak shaving device 20 based on power grid conveying capability and power grid safety, which is suitable for the embodiment of the method and is not described herein.
In an embodiment of the present application, as shown in fig. 3, an electronic device 30 shown in fig. 3 includes: a processor 301 and a memory 303. Wherein the processor 301 is coupled to the memory 303, such as via a bus 302. Optionally, the electronic device 30 may also include a transceiver 304. It should be noted that, in practical applications, the transceiver 304 is not limited to one, and the structure of the electronic device 30 is not limited to the embodiment of the present application.
The processor 301 may be a CPU (Central Processing Unit ), general purpose processor, DSP (Digital Signal Processor, data signal processor), ASIC (Application Specific Integrated Circuit ), FPGA (Field Programmable Gate Array, field programmable gate array) or other programmable logic device, transistor logic device, hardware components, or any combination thereof. Which may implement or perform the various exemplary logic blocks, modules and circuits described in connection with this disclosure. Processor 301 may also be a combination of implementing computing functions. For example, comprising one or more combinations of microprocessors, a combination of a DSP and a microprocessor, and the like.
Bus 302 may include a path to transfer information between the components. Bus 302 may be a PCI (Peripheral Component Interconnect, peripheral component interconnect Standard) bus or an EISA (Extended Industry Standard Architecture ) bus, or the like. Bus 302 may be divided into an address bus, a data bus, a control bus, and the like. For ease of illustration, only one thick line is shown in fig. 3, but not only one bus or one type of bus.
The Memory 303 may be, but is not limited to, ROM (Read Only Memory) or other type of static storage device that can store static information and instructions, RAM (Random Access Memory ) or other type of dynamic storage device that can store information and instructions, EEPROM (Electrically Erasable Programmable Read Only Memory ), CD-ROM (Compact Disc Read Only Memory, compact disc Read Only Memory) or other optical disk storage, optical disk storage (including compact discs, laser discs, optical discs, digital versatile discs, blu-ray discs, etc.), magnetic disk storage media or other magnetic storage devices, or any other medium that can be used to carry or store desired application code in the form of instructions or data structures and that can be accessed by a computer.
The memory 303 is used for storing application program codes for executing the inventive arrangements and is controlled to be executed by the processor 301. The processor 301 is configured to execute the application code stored in the memory 303 to implement what is shown in the foregoing method embodiments.
Among them, electronic devices include, but are not limited to: mobile terminals such as mobile phones, notebook computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), in-vehicle terminals (e.g., in-vehicle navigation terminals), and the like, and stationary terminals such as digital TVs, desktop computers, and the like. But may also be a server or the like. The electronic device shown in fig. 3 is merely an example and should not be construed to limit the functionality and scope of use of the disclosed embodiments.
Embodiments of the present application provide a computer-readable storage medium having a computer program stored thereon, which when run on a computer, causes the computer to perform the corresponding method embodiments described above. Compared with the related art, in the embodiment of the application, the electronic equipment judges whether the current moment of the area reaches the initial moment of any electricity utilization peak time period, if the current moment reaches the initial moment of the electricity utilization peak time period, the electronic equipment acquires the first electricity utilization power value, and after the preset time, the electronic equipment acquires the second electricity utilization power value. The electronic device calculates a power consumption peak power increase rate based on the first power consumption value, the second power consumption value, and the preset time. The electronic equipment determines a required peak shaver set based on the power consumption peak power increasing speed, wherein the required peak shaver set comprises a thermal generator set and a hydroelectric generator set, and the starting speed of the hydroelectric generator set is higher than that of the thermal generator set. When the power consumption peak power value reaches the load power value, the electronic equipment can timely supply power to the area through the control of the electronic equipment, so that the condition that the power grid enters overload is effectively reduced, and the power grid is safe to convey.
It should be understood that, although the steps in the flowcharts of the figures are shown in order as indicated by the arrows, these steps are not necessarily performed in order as indicated by the arrows. The steps are not strictly limited in order and may be performed in other orders, unless explicitly stated herein. Moreover, at least some of the steps in the flowcharts of the figures may include a plurality of sub-steps or stages that are not necessarily performed at the same time, but may be performed at different times, the order of their execution not necessarily being sequential, but may be performed in turn or alternately with other steps or at least a portion of the other steps or stages.
The foregoing is only a partial embodiment of the present application, and it should be noted that it will be apparent to those skilled in the art that modifications and adaptations can be made without departing from the principles of the present application, and such modifications and adaptations are intended to be comprehended within the scope of the present application.

Claims (10)

1. A coordinated peak shaving method based on power grid transmission capacity and power grid safety, comprising the following steps:
Judging whether the current time of the area reaches a preset time or not, wherein the preset time is the initial time of any electricity utilization peak time;
if the current time reaches the preset time, acquiring a first electric power value, wherein the first electric power value is an electric power value corresponding to the current time;
acquiring a second power consumption value, wherein the second power consumption value is a power consumption value after a preset time passes after the first power consumption value is acquired;
calculating a power consumption peak power increase rate based on the first power consumption value, the second power consumption value and the preset time;
determining a required peak shaver set based on the electricity consumption peak power increasing speed, wherein the required peak shaver set comprises a hydroelectric generator set and a thermal generator set;
and if the electricity consumption peak power value reaches the load power value, controlling the required peak shaver set to supply power to the area.
2. The coordinated peak shaver method based on the power grid conveying capacity and the power grid safety according to claim 1, wherein the determining the required peak shaver set based on the power consumption peak power increasing speed comprises the following steps:
calculating a power increase time based on the peak power increase rate of electricity consumption, the power increase time being a time required for a first electric power value to increase to the load power value;
Judging whether the power increasing time is smaller than a preset increasing time or not;
if the power increasing time is smaller than the preset increasing time, selecting a hydroelectric generating set;
and if the growth time is not less than the preset growth time, selecting a thermal generator set.
3. The coordinated peak shaving method based on power grid transmission capability and power grid safety according to claim 1, wherein the determining whether the current time of the area reaches the preset time further comprises:
if the current time is not in any electricity peak time, acquiring a third electricity power value, wherein the third electricity power value is the electricity power value corresponding to the current time in the electricity level peak time;
acquiring a fourth power consumption value, wherein the fourth power consumption value is the power consumption value after the preset time passes after the third power consumption value is acquired;
calculating a peak power increase rate of the power level for use based on the third power value, the fourth power value, and the preset time;
judging whether the increase speed of the power level peak is greater than a preset increase speed or not;
and if the increase speed of the power consumption level peak is larger than the preset increase speed, determining that the power value of the power consumption level peak is abnormal.
4. A coordinated peak shaver method based on power grid conveying capacity and power grid safety according to claim 3, wherein the determining peak power value is abnormal, and further comprising:
judging whether the power consumption level peak power value reaches the load power value or not;
and if the power consumption level peak power value reaches the load power value, sending a power supply signal to an energy storage system so that the energy storage system supplies power to the area.
5. The coordinated peak shaver method based on the power grid conveying capability and the power grid safety according to claim 1, wherein the controlling the required peak shaver set to supply power to the local area further comprises:
acquiring the number of historical call units of at least two of the areas, wherein the number of the historical call units is the number of call peak shaver units corresponding to any electricity peak time;
calculating the required unit number based on the history calling unit number;
judging whether the number of the needed units is larger than the total number of peak shaving units or not;
if the number of the needed units is larger than the total number of the peak shaving units, determining a regional power grid to be accessed;
and controlling the regional power grid to be accessed to supply power to the regional.
6. The coordinated peak shaver method based on the power grid conveying capability and the power grid safety according to claim 5, wherein the determining the regional power grid to be accessed comprises:
acquiring a historical power supply state of at least one regional power grid in a preset range and position information of the at least one regional power grid, wherein the historical power supply state comprises an overload state and a non-overload state;
determining at least one adjustable power regional power grid, wherein the at least one adjustable power regional power grid comprises a power grid with the historical power supply states being in a non-overload state;
calculating the electricity regulating distance of the at least one adjustable electricity regional power grid, wherein the electricity regulating distance is the distance between the adjustable electricity regional power grid and the current regional power grid;
and determining a regional power grid to be accessed based on the power adjustment distance, wherein the regional power grid to be accessed is a regional power grid corresponding to the minimum value in the power adjustment distance.
7. A coordinated peak shaver method based on power grid conveying capability and power grid safety according to claim 1, wherein the method further comprises:
acquiring historical starting times of each peak shaver set in the area;
judging whether the historical starting times are larger than preset starting times or not;
And if the historical starting times are greater than the preset starting times, outputting overhaul information, wherein the overhaul information is used for indicating that the peak shaver set needs to be overhauled.
8. A coordinated peak shaver based on power grid conveying capacity and power grid safety, comprising:
the first judging module is used for judging whether the current time of the area reaches a preset time or not, wherein the preset time is the initial time of any electricity utilization peak time;
the first acquisition module is used for acquiring a first electric power value when the current moment reaches the preset moment, wherein the first electric power value is an electric power value corresponding to the current moment;
the second acquisition module is used for acquiring a second power consumption value, wherein the second power consumption value is a power consumption value after the first power consumption value is acquired and the preset time elapses;
the first calculation module is used for calculating the power consumption peak power increase speed based on the first power consumption value, the second power consumption value and the preset time;
the first determining module is used for determining a required peak shaver set based on the electricity consumption peak power increasing speed, wherein the required peak shaver set comprises a hydroelectric generator set and a thermal generator set;
And the first control module is used for controlling the required peak shaver set to supply power to the area when the power consumption peak power value reaches the load power value.
9. An electronic device, comprising:
one or more processors;
a memory;
one or more applications, wherein the one or more applications are stored in the memory and configured to be executed by the one or more processors, the one or more applications configured to: a coordinated peak shaver method based on the power grid conveying capability and the power grid safety according to any one of claims 1 to 7 is performed.
10. A computer readable storage medium having stored thereon a computer program, which when executed by a processor implements a grid transport capability and grid security based coordinated peaking method as claimed in any one of claims 1 to 7.
CN202111630824.3A 2021-12-28 2021-12-28 Coordinated peak shaving method based on power grid conveying capacity and power grid safety Active CN114336604B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111630824.3A CN114336604B (en) 2021-12-28 2021-12-28 Coordinated peak shaving method based on power grid conveying capacity and power grid safety

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111630824.3A CN114336604B (en) 2021-12-28 2021-12-28 Coordinated peak shaving method based on power grid conveying capacity and power grid safety

Publications (2)

Publication Number Publication Date
CN114336604A CN114336604A (en) 2022-04-12
CN114336604B true CN114336604B (en) 2023-11-10

Family

ID=81014471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111630824.3A Active CN114336604B (en) 2021-12-28 2021-12-28 Coordinated peak shaving method based on power grid conveying capacity and power grid safety

Country Status (1)

Country Link
CN (1) CN114336604B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117200461B (en) * 2023-11-07 2024-03-01 东方电子股份有限公司 All-element adjustment power grid dispatching method based on historical data

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4023043A (en) * 1974-08-16 1977-05-10 Megatherm Corporation Computerized peak-shaving system for alleviating electric utility peak loads
CN103066626A (en) * 2012-10-31 2013-04-24 中国电力科学研究院 Multi-source coordinating day-ahead generation scheduling method
CN110417048A (en) * 2019-07-05 2019-11-05 合肥工业大学 A kind of DC grid of consideration source net lotus constraint send receiving end combined adjusting peak optimization method
CN111211569A (en) * 2019-11-19 2020-05-29 国网浙江省电力有限公司金华供电公司 Optimal configuration method for flexible load participating in power grid peak shaving
CN111463808A (en) * 2020-05-21 2020-07-28 山东科技大学 Unit combination method considering probability risk standby transmission
CN113097996A (en) * 2021-03-18 2021-07-09 国网辽宁省电力有限公司 Load-saving and land-saving linkage scheduling method for electric heating heat storage device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4023043A (en) * 1974-08-16 1977-05-10 Megatherm Corporation Computerized peak-shaving system for alleviating electric utility peak loads
CN103066626A (en) * 2012-10-31 2013-04-24 中国电力科学研究院 Multi-source coordinating day-ahead generation scheduling method
CN110417048A (en) * 2019-07-05 2019-11-05 合肥工业大学 A kind of DC grid of consideration source net lotus constraint send receiving end combined adjusting peak optimization method
CN111211569A (en) * 2019-11-19 2020-05-29 国网浙江省电力有限公司金华供电公司 Optimal configuration method for flexible load participating in power grid peak shaving
CN111463808A (en) * 2020-05-21 2020-07-28 山东科技大学 Unit combination method considering probability risk standby transmission
CN113097996A (en) * 2021-03-18 2021-07-09 国网辽宁省电力有限公司 Load-saving and land-saving linkage scheduling method for electric heating heat storage device

Also Published As

Publication number Publication date
CN114336604A (en) 2022-04-12

Similar Documents

Publication Publication Date Title
US20190163152A1 (en) Power sharing in a mesh energy system
US20170330294A1 (en) Electric power supply and demand control apparatus, electric power supply and demand control method, and non-transitory storage medium
US20160273518A1 (en) Systems, methods and apparatus for improved energy management systems with security constrained dynamic dispatch for wind power management
US20130054987A1 (en) System and method for forcing data center power consumption to specific levels by dynamically adjusting equipment utilization
CN112070301B (en) User electricity consumption adjustment method, system and equipment
CN106992326B (en) Charging control method and device and electronic equipment
CN114336604B (en) Coordinated peak shaving method based on power grid conveying capacity and power grid safety
JP6168060B2 (en) Power management method, power management apparatus and program
JP6891998B2 (en) Control device and supply / demand adjustment control device
CN111444596A (en) Method and device for detecting frequency safety after power disturbance of power system
KR20120031753A (en) Apparatus and method for microgrid control
CN114221353B (en) Power grid regulation method, device, equipment, storage medium and computer program product
CN104969435A (en) Managing an energy storage system
JP2017175908A (en) Power generation control device and control method
US20170229881A1 (en) Resilient battery charging strategies to reduce battery degradation and self-discharging
CN114597927A (en) Distributed photovoltaic power generation energy storage method and device, electronic equipment and medium
US10714968B2 (en) Power control apparatus, power control system, and power control method
JP6413486B2 (en) Battery control device, battery control method, and battery control program
JPWO2017163934A1 (en) Power control system, control device, control method, and computer program
Yu et al. Risk-constrained operation for internet data centers under smart grid environment
CN112134311B (en) Control method, device, equipment and storage medium for small hydropower station power grid
CN116485262B (en) Evaluation method of pricing strategy, electronic equipment and storage medium
US20190131792A1 (en) Control apparatus, control method, and non-transitory storage medium
JP6804710B1 (en) Processing equipment, processing methods and programs
JPWO2018230019A1 (en) Power management system, power control device, power management method, and program

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant