CN1143171A - Low pressure rear-end regulating peak gas pipe net system - Google Patents
Low pressure rear-end regulating peak gas pipe net system Download PDFInfo
- Publication number
- CN1143171A CN1143171A CN 96107804 CN96107804A CN1143171A CN 1143171 A CN1143171 A CN 1143171A CN 96107804 CN96107804 CN 96107804 CN 96107804 A CN96107804 A CN 96107804A CN 1143171 A CN1143171 A CN 1143171A
- Authority
- CN
- China
- Prior art keywords
- gas
- low pressure
- net system
- user
- gas pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Pipeline Systems (AREA)
Abstract
In the gas pipe net system comprising gas source tank, compressor, main pipeline, pressure regulator and courtyard user pipeline, low pressure gas holder is set in the courtyard user pipeline and has bypass pipe communicated to rear courtyard user pipeline. The said gas holder can supply gas to rear user at the gas peak period and can store gas at the gas valley period for the peak regulation. The present invention has simple and reasonable structure and can maintain the stable gas pressure in user's end.
Description
The present invention relates to a kind of device that is used to store the city inflammable gas, particularly a kind of low pressure rear-end regulating peak gas pipe net system.
At present, the inflammable gas that use in China cities and towns mainly is to concentrate aerogenesis, air storage and pipe network gas transmission form, and it consists essentially of air storage, the air supply system that is made of source of the gas cabinet, compressor, the person in charge net, regulator, garden and indoor pipeline.Because the city gas consumption is inhomogeneous, the load variations of gas distribution system, gas network is very big.Evenly produce air feed and the inhomogeneous contradiction with gas of user for solving source of the gas factory, and guarantee usefulness gas peak user's needs, current gas distribution technological scheme all is at the pipe network front end gas storage holder peak regulation to be set, and compressed again machine boosts, and delivers to the user by pipe network.The ability of supplying gas of compressor, pipeline, controlling device etc. must be chosen definite by peak gas consumption numerical value in the pipe network system, so all corresponding increases such as bore, capacity and power of the said equipment in the existing gas pipe net system, the also corresponding raising of its investment cost all brings certain trouble for operation and maintenance.And its peak regulation effect is not ideal enough, and gas pressure is also stable inadequately.
The objective of the invention is to overcome outside the deficiency that has in the technology, propose a kind of reasonable in design, simple in structure, little investment, the operation and maintenance facility, supply gas pressure is stable, caisson and compressor, transmission and distribution network and the low pressure rear-end regulating peak gas pipe net system that the pressure governor peak load is little and energy consumption is low.
Purpose of the present invention can reach by adopting following technical proposal: in the gas distribution pipe network system that is made of source of the gas cabinet, compressor, gas line network, pressure governor and the indoor pipeline of garden, be positioned on the indoor pipeline of garden of pressure governor low pressure rear-end the low pressure air-storage chamber is set, air-storage chamber is placed in the rare safety zones extremely of personnel such as building top; Draw bypass tube is connected with rear end garden user pipeline from low pressure gas storage chamber bottom.By this bypass tube the user of rear end is carried out peak air feed, low ebb gas storage and peak-shaving.For obtaining better effect is provided with reservoir hag and top band balancing weight thereof in described low pressure air-storage chamber top board, this panel edges is provided with some uniform rollers and moves up and down along the corresponding positioning guide rail of vertically setting up.
Accompanying drawing 1 is a systematic square frame schematic representation of the present invention
Accompanying drawing 2 is the structural representation of system of the present invention mesolow air-storage chamber.
Below in conjunction with embodiment and accompanying drawing the present invention is described in further detail.The air demand of certain town gas pipe network system is 5 cubic meters per day, wherein civilian is 74%, industrial is 26%, adopt a source of the gas gas holder, three compressors, 6 cover controlling devices and mesolow secondary network system come transmission ﹠ distribution coal gas, and source of the gas factory pressurizing point outlet gas pressure is 50 kPas, and surge-chamber outlet gas pressure is 1.5 kPas.Routinely its peak hour calculated flow rate of design of pipe networks be 7067 cubic metres/time.Now low pressure rear-end is a load cell with housing-group, Lou Dong, sets up 70 of the low pressure air-storage chambers of different size respectively in homes such as building tops, wherein: 100 cubic metres 26,50 cubic metres 34,20 cubic metres 10.Under this condition pipe network system peak hour calculated flow rate reduce to 4131 cubic metres/time.The contrast of pipe network system capital equipment parameter of the embodiment of the invention and design routinely is referring to subordinate list.Above-mentioned low pressure air-storage chamber is by brick or give the chamber body (1) of system block structure, and the top board (4) of reservoir hag that is placed in one (2) and top band balancing weight (3) thereof and four positioning guide rails (5) that are erected in chamber body (1) inboard constitute.The edge of top board (4) is evenly equipped with four rollers (6), and each roller (6) contacts with relative positioning guide rail (5) respectively, and drives top board (4) along its scroll-up/down.Chamber body (a 1) bottom bypass tube of installing (7) is connected with the garden user pipe of rear end.Adopt pipe network system transmission ﹠ distribution coal gas of the present invention with the gas low ebb time, to carry out air storage by all the low pressure air-storage chambers to the rear end, with the gas peak time, storage coal gas is sent the deficiency that additional pipe network is supplied gas, reach the purpose of peak regulation.
The present invention compared with prior art, because of decrease gas storage holder, pipe network, compression The specification of machine and adjusting device and investment cost is few, and it is stable with atmospheric pressure to have a user, Safe, but the characteristics such as gas dome easy maintenance automatic job. Therefore can be used to design and dig Dive and transform the City Gas Distribution pipe network system, improve its economic benefit and social benefit.
Subordinate list: low pressure rear-end regulating peak and conventional pipe network system capital equipment, pipe parameter contrast (quantity and identical length are together)
The transmission and distribution network system | Low pressure rear-end regulating peak | Conventional pipe network |
Gas storage holder capacity (cubic meter) | 10,000 | 20,000 |
Compressor flowrate (cubic meter/minute) power (kilowatt) | 39.42 55 | 60.65 75 |
The adjuster specification | DN 100 | DN 150 |
Middle pressure pipeline specification | DN 400 DN 250 DN 150 | DN 500 DN 300 DN 200 |
The low pressure pipeline specification | DN 250 DN 150 DN 125 | DN 300 DN 200 DN 150 |
Low pressure rear-end gas dome capacity and quantity | 100 cubic metres 26 50 cubic metres 34 20 cubic metres 10 | Do not have |
Claims (2)
1. low pressure rear-end regulating peak gas pipe net system, comprise source of the gas cabinet, compressor, transmission and distribution network, pressure governor and garden user pipeline, it is characterized in that being positioned on the pressure governor low pressure rear-end garden user pipeline low pressure air-storage chamber is set, its underpart is drawn bypass tube and is connected with the connecting tube of garden user pipeline.
2. low pressure rear-end regulating peak gas pipe net system according to claim 1, it is characterized in that described low pressure air-storage chamber is made of the top board (4) of chamber body (1), the reservoir hag (2) that is placed in one and top band balancing weight (3) thereof and the positioning guide rail (5) that plurality of vertical is set up, the edge of top board (4) is evenly equipped with and the contacted roller of corresponding positioning guide rail (5) (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 96107804 CN1143171A (en) | 1996-05-20 | 1996-05-20 | Low pressure rear-end regulating peak gas pipe net system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 96107804 CN1143171A (en) | 1996-05-20 | 1996-05-20 | Low pressure rear-end regulating peak gas pipe net system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1143171A true CN1143171A (en) | 1997-02-19 |
Family
ID=5119772
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 96107804 Pending CN1143171A (en) | 1996-05-20 | 1996-05-20 | Low pressure rear-end regulating peak gas pipe net system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1143171A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1101715C (en) * | 1999-05-18 | 2003-02-19 | 天津大学 | Adsorption technique and apparatus for regulating peaks in gas supply network |
CN100410580C (en) * | 2003-09-05 | 2008-08-13 | 牟万福 | Peak regulating method of jet set natural gas intelligent peak value regulating device |
CN100458268C (en) * | 2007-07-05 | 2009-02-04 | 大庆石油管理局 | Movable emergency peak regulation gas supplying device |
CN101839396A (en) * | 2010-05-12 | 2010-09-22 | 常州亿晶光电科技有限公司 | Double-air-source air path automatic switching pressurizer |
CN103851337A (en) * | 2012-12-03 | 2014-06-11 | 贵阳铝镁设计研究院有限公司 | Method and device for ensuring low-load stable operation of gas supply machines |
CN111365616A (en) * | 2020-03-13 | 2020-07-03 | 上海发电设备成套设计研究院有限责任公司 | Power type pressure regulating device |
-
1996
- 1996-05-20 CN CN 96107804 patent/CN1143171A/en active Pending
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1101715C (en) * | 1999-05-18 | 2003-02-19 | 天津大学 | Adsorption technique and apparatus for regulating peaks in gas supply network |
CN100410580C (en) * | 2003-09-05 | 2008-08-13 | 牟万福 | Peak regulating method of jet set natural gas intelligent peak value regulating device |
CN100458268C (en) * | 2007-07-05 | 2009-02-04 | 大庆石油管理局 | Movable emergency peak regulation gas supplying device |
CN101839396A (en) * | 2010-05-12 | 2010-09-22 | 常州亿晶光电科技有限公司 | Double-air-source air path automatic switching pressurizer |
CN101839396B (en) * | 2010-05-12 | 2015-07-15 | 常州亿晶光电科技有限公司 | Double-air-source air path automatic switching pressurizer |
CN103851337A (en) * | 2012-12-03 | 2014-06-11 | 贵阳铝镁设计研究院有限公司 | Method and device for ensuring low-load stable operation of gas supply machines |
CN103851337B (en) * | 2012-12-03 | 2017-10-10 | 贵阳铝镁设计研究院有限公司 | Ensure the method and device of gas exhaust machine underload stable operation |
CN111365616A (en) * | 2020-03-13 | 2020-07-03 | 上海发电设备成套设计研究院有限责任公司 | Power type pressure regulating device |
CN111365616B (en) * | 2020-03-13 | 2022-01-07 | 上海发电设备成套设计研究院有限责任公司 | Power type pressure regulating device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6787258B2 (en) | Hydrogen based energy storage apparatus and method | |
CN106150996B (en) | The air compressor machine team control control method calculated based on demand gas consumption | |
CN1143171A (en) | Low pressure rear-end regulating peak gas pipe net system | |
CN109607496A (en) | A kind of power plant combined cycle unit nitrogen charging maintenance method | |
CN109442817B (en) | Water power balance system of plant chilled water supply network | |
CN207921752U (en) | A kind of mesolow nitrogen complementation adjusting air supply system | |
CN113405025B (en) | Stable natural gas hydrogen-loading control method and application | |
CN209782246U (en) | Automatic pressure-regulating compressed air centralized air supply system | |
CN113849005B (en) | Intelligent feedback type pipe network pressure control system and method | |
CN205295090U (en) | Dual -purpose intelligent sewage treatment system of wind -powered electricity generation | |
CN204900216U (en) | Air compressor economizer system | |
CN2701919Y (en) | Automatic supercharging and stabilizing pressure water supply equipment connecting to water pipe network | |
CN212277942U (en) | Product stores up and uses integration comprehensive utilization system based on pressure energy electricity generation | |
CN209448427U (en) | It is a kind of to build full direct current supply and accumulating system | |
CN203348040U (en) | Power station steam-driven air compressor system | |
CN2366676Y (en) | LPG storage and applying installation for domestic use | |
CN220566207U (en) | Intelligent air compression station system | |
CN118442662A (en) | Clean workshop assembly | |
CN205774501U (en) | A kind of biomass thermal cogeneration system | |
CN112612257A (en) | Multi-energy collaborative optimization scheduling system | |
CN205662977U (en) | Solar photovoltaic becomes many pumps of power intelligence pumping system | |
CN218348433U (en) | Low-energy-consumption compressed air supply system for alumina production | |
CN103397941A (en) | Integrated system adopting electricity to storing electricity through air compression | |
CN221571203U (en) | Gravity flow type efficient molten salt energy storage system | |
CN218951157U (en) | Energy-storage type aeration system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C06 | Publication | ||
PB01 | Publication | ||
AD01 | Patent right deemed abandoned | ||
C20 | Patent right or utility model deemed to be abandoned or is abandoned |