CN114304879A - Building engineering management comprehensive operation platform - Google Patents

Building engineering management comprehensive operation platform Download PDF

Info

Publication number
CN114304879A
CN114304879A CN202111544020.1A CN202111544020A CN114304879A CN 114304879 A CN114304879 A CN 114304879A CN 202111544020 A CN202111544020 A CN 202111544020A CN 114304879 A CN114304879 A CN 114304879A
Authority
CN
China
Prior art keywords
groove
base plate
building engineering
engineering management
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111544020.1A
Other languages
Chinese (zh)
Inventor
韩春花
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202111544020.1A priority Critical patent/CN114304879A/en
Publication of CN114304879A publication Critical patent/CN114304879A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The invention provides a building engineering management comprehensive operation platform, which comprises a base plate; the comprehensive operation table for building engineering management provided by the invention has the advantages that the positioning rod enters the inside of the lifting groove by rotating the positioning rod, so that the lifting rod can be moved upwards, one end of the lifting rod is not contacted with the ground, the moving wheel is contacted with the ground, the operation table can be pulled to be convenient to move, the problem that a worker needs to lift and move the operation table when transferring the operation table is avoided, meanwhile, the positioning rod is moved to the inside of the lifting groove, the height of the operation table can be quickly adjusted, the problem that the height adjusting speed of the operation table is slow by a screw rod is avoided, the insertion plate enters the inside of the insertion groove by rotating the first sun shield and the second sun shield and then pushing the pushing rod, so that the tops of the first sun shield and the second sun shield can be finished, and the operation table is prevented from being outdoors, the trouble of re-constructing the sunshade device is required.

Description

Building engineering management comprehensive operation platform
Technical Field
The invention relates to the technical field of constructional engineering, in particular to a comprehensive operation platform for constructional engineering management.
Background
The building engineering refers to an engineering entity formed by the construction of various building buildings and their auxiliary facilities and the installation of lines, pipes and equipment matched with them, wherein the building buildings refer to the engineering which has top covers, beams, columns, walls, foundations and can form internal spaces and meet the requirements of people for production, living, study and public activities.
Most of the existing engineering management operation platforms are fixedly provided with engineering drawing placing plates or engineering tools such as computers.
However, during the height adjustment of the existing operation table, the threaded rods are mostly rotated, so that the threaded rods enter the interior of the threaded cylinders, and then the effect of adjusting the height of the operation table is mostly achieved.
Therefore, there is a need to provide a comprehensive operation desk for building engineering management to solve the above technical problems.
Disclosure of Invention
The invention provides a comprehensive operation platform for building engineering management, which solves the problem that the height of the operation platform is adjusted at a low speed because the conventional operation platform is supported by a threaded rod.
In order to solve the above technical problems, the present invention provides a building engineering management integrated console, comprising: a substrate; the moving assembly is arranged on the base plate and comprises a sliding cylinder, a lifting rod is connected inside the sliding cylinder in a sliding mode, one end of the lifting rod is rotatably connected with a rotating disc, a positioning rod is fixedly installed on the rotating disc, a lifting groove is formed in the sliding cylinder, a positioning groove is formed in the sliding cylinder, a connecting plate is fixedly installed at one end of the sliding cylinder, and a moving wheel is fixedly installed on the connecting plate; the sunshade component, the sunshade component set up in on the base plate, the sunshade component includes the backup pad, it is connected with first sunshading board to rotate in the backup pad, the extension groove has been seted up to the inside of first sunshading board, the inside sliding connection of extension groove has the plugboard, the promotion groove has been seted up on the first sunshading board, the inside sliding connection in promotion groove has the catch bar, the right side of first sunshading board is provided with the second sunshading board, the spliced groove has been seted up on the second sunshading board.
Preferably, the sliding cylinders are fixedly installed at the bottom of the base plate and are provided with a plurality of sliding cylinders, the sliding cylinders are uniformly distributed around the base plate, the structures of the sliding cylinders are the same, and the moving wheel is located on one side of the connecting plate.
Preferably, the positioning rod is located inside the lifting groove, the positioning rod is connected with the lifting groove in a sliding mode, the lifting groove is communicated with the positioning grooves, the positioning grooves are arranged in multiple numbers, and the positioning grooves are evenly distributed on the sliding barrel.
Preferably, the supporting plates are fixedly mounted on the base plate, four supporting plates are arranged, the four supporting plates are symmetrically distributed on two sides of the base plate, and the fixing modes of the second sun visor and the first sun visor are the same.
Preferably, one end of the push rod is fixedly connected with the surface of the insertion plate, and the insertion plate is matched with the insertion groove.
Preferably, be provided with the progress on the base plate and look over the subassembly, the subassembly is looked over to the progress includes the standing groove, the inside rotation of standing groove is connected with the advance frame, it is connected with the threaded rod to rotate on the advance frame, threaded connection has the progress piece on the threaded rod.
Preferably, the placing groove is formed in the base plate, the progress frame is in sliding connection with the placing groove, the progress block is in sliding connection with the progress frame, the plurality of placing grooves are formed in the base plate, and the plurality of placing grooves are evenly distributed on the base plate.
Preferably, be provided with the drawing on the base plate and look over the subassembly, the drawing is looked over the subassembly and is including placing the piece, the inside of placing the piece has seted up the spread groove to place and seted up the mounting groove on the piece, sliding connection has the promotion piece on placing the piece, fixed mounting has the joint piece on the promotion piece, the inside of joint piece is provided with the marker pen.
Preferably, the placing block is fixedly arranged on the base plate and is obliquely arranged, and convex blocks are arranged at two ends of the pushing block and connected with the mounting grooves in a sliding mode.
Preferably, the joint piece adopts the rubber material to the inside of joint piece is offered and is used for placing the joint groove of marker pen, the bottom fixed mounting that promotes the piece has the clearance cotton that is used for the clearance to place the piece, it adopts transparent material to place the piece.
Compared with the related art, the comprehensive operation platform for building engineering management provided by the invention has the following beneficial effects:
the invention provides a building engineering management integrated operation platform, which can ensure that a positioning rod enters the inside of a lifting groove by rotating the positioning rod, so that the lifting rod can be moved upwards, one end of the lifting rod is not contacted with the ground, a moving wheel is contacted with the ground, the operation platform can be pulled to be convenient to move, the problem that a worker needs to lift and move the operation platform when transferring the operation platform is avoided, meanwhile, the positioning rod is moved to the inside of the lifting groove, the height of the operation platform can be quickly adjusted, the problem that the height adjusting speed of the operation platform is slow by a screw rod is avoided, and the insertion plate enters the inside of an insertion groove by rotating a first sun shield and a second sun shield and then pushing a pushing rod, so that the tops of the first sun shield and the second sun shield can be finished, and the operation platform is prevented from being outdoors, the trouble of re-constructing the sunshade device is required.
Drawings
Fig. 1 is a schematic structural diagram of a first embodiment of a comprehensive operation platform for building engineering management provided by the invention;
FIG. 2 is a perspective view of the slide cartridge shown in FIG. 1;
fig. 3 is a perspective view of the first sun visor shown in fig. 1;
fig. 4 is a perspective view of the second sun visor shown in fig. 1;
FIG. 5 is a perspective view of the lifter bar shown in FIG. 2;
FIG. 6 is a schematic structural diagram of a second embodiment of the integrated operation desk for construction engineering management provided by the invention;
fig. 7 is a perspective view of the placement block shown in fig. 6.
Reference numbers in the figures: 1. base plate, 2, remove the subassembly, 21, the slide cartridge, 22, the lifter, 23, the rolling disc, 24, the locating lever, 25, the lift groove, 26, the constant head tank, 27, the connecting plate, 28, remove the wheel, 3, the sunshade subassembly, 31, the backup pad, 32, first sunshading board, 33, the extension groove, 34, the plugboard, 35, the thrust groove, 36, the catch bar, 37, the second sunshading board, 38, the plugboard, 4, the subassembly is looked over to the progress, 41, the standing groove, 42, the progress frame, 43, the threaded rod, 44, the progress piece, 5, the subassembly is looked over to the drawing, 51, the piece of placing, 52, the connecting groove, 53, the mounting groove, 54, the catch block, 55, the joint piece, 56, the marker pen.
Detailed Description
The invention is further described with reference to the following figures and embodiments.
First embodiment
Please refer to fig. 1, fig. 2, fig. 3, fig. 4 and fig. 5 in combination, wherein fig. 1 is a schematic structural diagram of a first embodiment of a comprehensive operation desk for building engineering management according to the present invention; FIG. 2 is a perspective view of the slide cartridge shown in FIG. 1; fig. 3 is a perspective view of the first sun visor shown in fig. 1; fig. 4 is a perspective view of the second sun visor shown in fig. 1; fig. 5 is a perspective view of the lifter bar shown in fig. 2. A construction engineering management integrated operation table includes: a substrate 1; the moving assembly 2 is arranged on the substrate 1, the moving assembly 2 comprises a sliding cylinder 21, a lifting rod 22 is slidably connected inside the sliding cylinder 21, one end of the lifting rod 22 is rotatably connected with a rotating disc 23, a positioning rod 24 is fixedly mounted on the rotating disc 23, a lifting groove 25 is formed in the sliding cylinder 21, a positioning groove 26 is formed in the sliding cylinder 21, a connecting plate 27 is fixedly mounted at one end of the sliding cylinder 21, and a moving wheel 28 is fixedly mounted on the connecting plate 27; the sunshade component 3, the sunshade component 3 set up in on the base plate 1, the sunshade component 3 includes a support plate 31, rotate on the support plate 31 and be connected with first sunshading board 32, extension groove 33 has been seted up to the inside of first sunshading board 32, the inside sliding connection of extension groove 33 has plugboard 34, the promotion groove 35 has been seted up on the first sunshading board 32, the inside sliding connection of promotion groove 35 has catch bar 36, the right side of first sunshading board 32 is provided with second sunshading board 37, the plugboard 38 has been seted up on the second sunshading board 37.
The sliding cylinders 21 are fixedly installed at the bottom of the base plate 1, a plurality of sliding cylinders 21 are arranged, the sliding cylinders 21 are uniformly distributed around the base plate 1, the structures of the sliding cylinders 21 are the same, and the moving wheel 28 is located on one side of the connecting plate 27.
The plurality of slide cylinders 21 support and fix the substrate 1, and when the lift lever 22 moves upward, the substrate 1 is supported by the moving wheels 28, and the moving wheels 28 are universal wheels.
The positioning rod 24 is located inside the lifting groove 25, the positioning rod 24 is slidably connected with the inside of the lifting groove 25, the lifting groove 25 is communicated with the positioning groove 26, the positioning grooves 26 are provided in a plurality, and the positioning grooves 26 are uniformly distributed on the sliding barrel 21.
The arc is adopted at the top of constant head tank 26 for locating lever 24 is fixed a position by curved constant head tank 26 to locating lever 24 after entering the inside of constant head tank 26, makes and does not have the inside that external force effect down locating lever 24 can not remove to lift slot 25.
The supporting plates 31 are fixedly mounted on the base plate 1, four supporting plates 31 are provided, the four supporting plates 31 are symmetrically distributed on two sides of the base plate 1, and the fixing manner of the second sun visor 37 is the same as that of the first sun visor 32.
The second shade 37 is supported by the support plate 31.
One end of the push rod 36 is fixedly connected with the surface of the plug board 34, and the plug board 34 is matched with the plug groove 38.
The insertion of the peg 34 into the inside of the peg groove 38 positions the first 32 and second 37 sun visor plates such that the first 32 and second 37 sun visor plates cannot rotate.
The progress checking assembly 4 is arranged on the base plate 1, the progress checking assembly 4 comprises a placing groove 41, the inside of the placing groove 41 is rotatably connected with a progress frame 42, the progress frame 42 is rotatably connected with a threaded rod 43, and the threaded rod 43 is connected with a progress block 44 in a threaded manner.
When the progress of engineering needs to be demonstrated, rotatory threaded rod 43, threaded rod 43 is rotatory can drive progress piece 44 rebound to can adjust the height of progress piece 44 according to the progress of engineering, make the convenience look over the progress of engineering.
The placing groove 41 is opened on the substrate 1, the progress frame 42 is slidably connected with the placing groove 41, the progress block 44 is slidably connected with the progress frame 42, the placing grooves 41 are provided in a plurality, and the placing grooves 41 are uniformly distributed on the substrate 1.
The structure of the inside of a plurality of standing grooves 41 can show the progress of different projects, and the surface of progress frame 42 is provided with the progress bar for be convenient for cooperate progress piece 44 to look over the progress of project.
The working principle of the comprehensive operation platform for building engineering management provided by the invention is as follows:
when the operation table needs to be moved, the positioning rod 24 is rotated to enable the positioning rod 24 to be no longer clamped with the positioning groove 26, meanwhile, the positioning rod 24 enters the inside of the lifting groove 25, so that the positioning rod 24 can move up and down, the positioning rod 24 moves up to drive the rotating disc 23 to move up, the rotating disc 23 moves up to drive the lifting rod 22 to move up, the lifting rod 22 moves up to enable one end of the lifting rod 22 to be no longer in contact with the ground, the moving wheel 28 is in contact with the ground, the plurality of lifting rods 22 are moved in the same way, the plurality of moving wheels 28 are in contact with the ground, so that the operation table can be moved, when the operation table needs to be shaded, the first sunshading board 32 and the second sunshading board 37 are rotated to enable one end of the first sunshading board 32 and one end of the second sunshading board 37 to be on the same horizontal line, then, the pushing rod 36 is pushed, the movement of the pushing rod 36 will move the inserting plate 34, and the movement of the inserting plate 34 will make the inserting plate 34 enter the inside of the inserting groove 38, thereby completing the fixing of the first sun visor 32 and the second sun visor 37.
Compared with the related art, the comprehensive operation platform for building engineering management provided by the invention has the following beneficial effects:
by rotating the detent lever 24, the detent lever 24 enters the inside of the lift groove 25, and the lift lever 22 can be moved upward, one end of the lifting rod 22 is not contacted with the ground any more, and the moving wheel 28 is contacted with the ground, so that the operation table can be pulled to move conveniently, the problem that the operator needs to lift and move when transferring the operation table is avoided, meanwhile, the positioning rod 24 is moved into the lifting groove 25 to quickly adjust the height of the operating platform, so that the problem of low speed of adjusting the height of the operating platform through a screw is avoided, and by rotating the first sun visor 32 and the second sun visor 37, then, by pushing the push rod 36, the inserting plate 34 enters the inside of the inserting groove 38, so that the tops of the first sun visor 32 and the second sun visor 37 can be completed, and the trouble that the sun visor device needs to be rebuilt when the operation table is outdoors is avoided.
Second embodiment
Referring to fig. 6 and 7, based on the integrated operation console for building engineering management provided in the first embodiment of the present application, a second embodiment of the present application provides another integrated operation console for building engineering management. The second embodiment is only the preferred mode of the first embodiment, and the implementation of the second embodiment does not affect the implementation of the first embodiment alone.
Specifically, the difference of the operation panel is synthesized in building engineering management that the second embodiment of this application provided lies in, the operation panel is synthesized in building engineering management, it looks over subassembly 5 to be provided with the drawing on base plate 1, the drawing looks over subassembly 5 including placing piece 51, the inside of placing piece 51 has seted up the spread groove 52 to place and seted up mounting groove 53 on the piece 51, sliding connection has on placing piece 51 and has promoted piece 54, it has joint piece 55 to promote fixed mounting on the piece 54, the inside of joint piece 55 is provided with marker pen 56.
The placing block 51 is fixedly arranged on the base plate 1, the placing block 51 is obliquely arranged, and convex blocks are arranged at two ends of the pushing block 54 and are connected with the installing grooves 53 in a sliding mode.
The convex block positions the push block 54 so that the push block 54 can only move on the surface of the placement block 51.
Joint piece 55 adopts rubber material to the inside of joint piece 55 is offered and is used for placing the joint groove of marker pen 56, the bottom fixed mounting that promotes piece 54 has the clearance cotton that is used for the clearance to place piece 51, place piece 51 and adopt transparent material.
The inside joint groove of joint piece 55 is the arc, can carry out the centre gripping to marker pen 56 fixed to marker pen 56 adopts the water based pen, makes to be convenient for after the mark clean the mark.
The working principle is as follows:
when the mark is discussed to the drawing to needs, put into the inside of spread groove 52 with the drawing, then take off marker pen 56 by the inside of joint piece 55, make can see through the drawing of placing piece 51 to spread groove 52 inside and look over, and can also mark placing piece 51 through marker pen 56, and when needs were cleared up the mark of placing on piece 51, the slip promotes piece 54, it can drive the removal of clearance cotton to promote the piece 54 to remove, thereby can make the clearance cotton clear up the mark of placing piece 51 surface, the direct mark of current operation panel when discussing the drawing has been avoided on the drawing, cause the drawing to be vague, influence the normal viewing of drawing.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes, which are made by using the contents of the present specification and the accompanying drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (10)

1. A building engineering management integrated operation platform is characterized by comprising:
a substrate;
the moving assembly is arranged on the base plate and comprises a sliding cylinder, a lifting rod is connected inside the sliding cylinder in a sliding mode, one end of the lifting rod is rotatably connected with a rotating disc, a positioning rod is fixedly installed on the rotating disc, a lifting groove is formed in the sliding cylinder, a positioning groove is formed in the sliding cylinder, a connecting plate is fixedly installed at one end of the sliding cylinder, and a moving wheel is fixedly installed on the connecting plate;
the sunshade component, the sunshade component set up in on the base plate, the sunshade component includes the backup pad, it is connected with first sunshading board to rotate in the backup pad, the extension groove has been seted up to the inside of first sunshading board, the inside sliding connection of extension groove has the plugboard, the promotion groove has been seted up on the first sunshading board, the inside sliding connection in promotion groove has the catch bar, the right side of first sunshading board is provided with the second sunshading board, the spliced groove has been seted up on the second sunshading board.
2. The integrated operation desk for building engineering management according to claim 1, wherein the sliding cylinders are fixedly installed at the bottom of the base plate, and a plurality of sliding cylinders are provided, and are uniformly distributed around the base plate, and the structures of the plurality of sliding cylinders are the same, and the moving wheel is located at one side of the connecting plate.
3. The integrated operation desk for building engineering management according to claim 1, wherein the positioning rod is located inside the lifting groove and is slidably connected with the inside of the lifting groove, the lifting groove and the positioning groove are communicated with each other, the positioning groove is provided in plurality, and the positioning grooves are uniformly distributed on the sliding cylinder.
4. The integrated operation platform for building engineering management according to claim 1, wherein the supporting plates are fixedly installed on the base plate, four supporting plates are arranged, the four supporting plates are symmetrically distributed on two sides of the base plate, and the second sun visor and the first sun visor are fixed in the same manner.
5. The integrated operating platform for building engineering management according to claim 1, wherein one end of the push rod is fixedly connected with the surface of the inserting plate, and the inserting plate is matched with the inserting groove.
6. The building engineering management comprehensive operation platform according to claim 1, wherein a progress checking assembly is arranged on the base plate and comprises a placing groove, a progress frame is rotatably connected to the inside of the placing groove, a threaded rod is rotatably connected to the progress frame, and a progress block is connected to the threaded rod in a threaded manner.
7. The integrated operation desk for building engineering management according to claim 6, wherein the placement groove is opened on the base plate, the progress frame is slidably connected with the placement groove, the progress block is slidably connected with the progress frame, the placement grooves are provided in plurality, and the placement grooves are uniformly distributed on the base plate.
8. The comprehensive operation table for building engineering management according to claim 1, wherein a drawing viewing assembly is arranged on the base plate, the drawing viewing assembly comprises a placing block, a connecting groove is formed in the placing block, a mounting groove is formed in the placing block, a pushing block is connected to the placing block in a sliding mode, a clamping block is fixedly mounted on the pushing block, and a marking pen is arranged inside the clamping block.
9. The integrated operation platform for building engineering management according to claim 8, wherein the placing block is fixedly installed on the base plate and is installed obliquely, and convex blocks are arranged at two ends of the pushing block and connected with the installing grooves in a sliding mode.
10. The comprehensive operation table for building engineering management according to claim 8, wherein the clamping block is made of rubber, a clamping groove for placing the marking pen is formed in the clamping block, cleaning cotton for cleaning the placing block is fixedly installed at the bottom of the pushing block, and the placing block is made of transparent material.
CN202111544020.1A 2021-12-16 2021-12-16 Building engineering management comprehensive operation platform Pending CN114304879A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111544020.1A CN114304879A (en) 2021-12-16 2021-12-16 Building engineering management comprehensive operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111544020.1A CN114304879A (en) 2021-12-16 2021-12-16 Building engineering management comprehensive operation platform

Publications (1)

Publication Number Publication Date
CN114304879A true CN114304879A (en) 2022-04-12

Family

ID=81053103

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111544020.1A Pending CN114304879A (en) 2021-12-16 2021-12-16 Building engineering management comprehensive operation platform

Country Status (1)

Country Link
CN (1) CN114304879A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207651859U (en) * 2017-11-29 2018-07-24 杜春林 A kind of water conservancy equipment distribution box support device
CN210887988U (en) * 2019-08-23 2020-06-30 深圳市粤华建筑工程有限公司 Construction platform for building construction
CN211114488U (en) * 2019-11-05 2020-07-28 江启才 House sunshade roof convenient to assemble
CN212484435U (en) * 2020-08-26 2021-02-05 马金生 Progress display device that building engineering construction management used
CN212529149U (en) * 2020-04-17 2021-02-12 绍兴市载沣智能科技有限公司 Mobile teaching whiteboard convenient to use
CN113012601A (en) * 2021-03-08 2021-06-22 李为浩 A engineering progress display device for building engineering management

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207651859U (en) * 2017-11-29 2018-07-24 杜春林 A kind of water conservancy equipment distribution box support device
CN210887988U (en) * 2019-08-23 2020-06-30 深圳市粤华建筑工程有限公司 Construction platform for building construction
CN211114488U (en) * 2019-11-05 2020-07-28 江启才 House sunshade roof convenient to assemble
CN212529149U (en) * 2020-04-17 2021-02-12 绍兴市载沣智能科技有限公司 Mobile teaching whiteboard convenient to use
CN212484435U (en) * 2020-08-26 2021-02-05 马金生 Progress display device that building engineering construction management used
CN113012601A (en) * 2021-03-08 2021-06-22 李为浩 A engineering progress display device for building engineering management

Similar Documents

Publication Publication Date Title
CN211582074U (en) Engineering cost budget specialty workstation
CN114304879A (en) Building engineering management comprehensive operation platform
CN110695952A (en) Marking device is used in plank processing
CN110977228B (en) Manufacturing method of building beam column decorative curtain wall section steel keel frame
CN214303020U (en) Factory wall repair support
CN213654154U (en) Lifting type construction platform for house building engineering
CN220913869U (en) Mobilizable advertisement design is with publicity column
CN218675102U (en) Impulse voltage generator of transformer rectifier
CN215368797U (en) High-rise building construction platform of unloading
CN219789783U (en) Auxiliary mounting bracket applied to mounting and back covering of large-size painting and calligraphy
CN220436031U (en) Sedimentation detection device for construction engineering detection
CN212530715U (en) Energy-concerving and environment-protective building pipe fitting rack for civil engineering
CN220086936U (en) Lightning protection device for steel frame construction
CN219788402U (en) Six-axis robot operation table with lifting mechanism
CN218224779U (en) Bent plate drilling fixing device
CN214783902U (en) Swift pile device that drives that road was used
CN211818264U (en) Supporting auxiliary device for landscape building
CN220958875U (en) Air conditioner external unit installation appurtenance convenient to carry
CN214513471U (en) Fog gun machine for green construction
CN117344642A (en) Bailey beam connection positioning device
CN212990427U (en) Tourism management teaching show board that uses
CN214329808U (en) Building construction operation platform
CN216651686U (en) Civil engineering specialty convenient adjustment formula drawing table
CN214615710U (en) A rack for sharing bicycle
CN219991052U (en) Building construction bears device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220412

RJ01 Rejection of invention patent application after publication