CN114252710B - 一种机组并网同期系统同源核相的方法 - Google Patents

一种机组并网同期系统同源核相的方法 Download PDF

Info

Publication number
CN114252710B
CN114252710B CN202111103161.XA CN202111103161A CN114252710B CN 114252710 B CN114252710 B CN 114252710B CN 202111103161 A CN202111103161 A CN 202111103161A CN 114252710 B CN114252710 B CN 114252710B
Authority
CN
China
Prior art keywords
voltage
phase
transformer
synchronous
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111103161.XA
Other languages
English (en)
Other versions
CN114252710A (zh
Inventor
刘世富
张超
陈秀斌
钱准立
张玉成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadian Electric Power Research Institute Co Ltd
Original Assignee
Huadian Electric Power Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huadian Electric Power Research Institute Co Ltd filed Critical Huadian Electric Power Research Institute Co Ltd
Priority to CN202111103161.XA priority Critical patent/CN114252710B/zh
Publication of CN114252710A publication Critical patent/CN114252710A/zh
Application granted granted Critical
Publication of CN114252710B publication Critical patent/CN114252710B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R29/00Arrangements for measuring or indicating electric quantities not covered by groups G01R19/00 - G01R27/00
    • G01R29/18Indicating phase sequence; Indicating synchronism
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin

Abstract

本发明公开了一种机组并网同期系统同源核相的方法,解决发电机升压电网不具备停电条件或待并侧设备不具备受电条件,无法实施机组同期同源核相的问题。本发明创新性的提出通过启备变系统间接验证并解决机组同源核相问题,根据计算主变、高厂变、启备变转角关系,同期和快切PT二次接线相角关系,确定由启备变系统验证机组同期系统关系,利用电量记录分析仪,分别录取两个系统的二次滑压波形图进行对比分析,通过同期点验证同期系统接线的正确性。

Description

一种机组并网同期系统同源核相的方法
技术领域
本发明涉及一种机组并网同期系统同源核相的方法。
背景技术
发电厂机组并网系统,为验证系统侧和待并侧二次回路的接线正确性,应该进行同源核相,即发电机或系统的一次系统相连接,系统侧和待并侧两组PT在同一电源下,检验机组同期系统两组PT二次回路电源的电压、相位、频率是否一致,反过来,同期系统通过二次测量判断一次系统是否满足同期条件,发出并网指令,避免非同期合闸。目前,在运行机组升压站的母线系统及PT停电受制于电网调度,若升压站电网系统PT一次侧不满足停电条件,待并侧并网用PT的一次设备不满足系统受电条件;然而,就存在无法进行同源核相的问题,无法确定同期二次回路正确性,有180°相角合闸的重大安全隐患。国内发电厂发生多起机组180°非同期合闸的事故,造成重大的经济损失。
发明内容
本发明的目的在于克服现有技术中存在的上述不足,而提供一种通过启备变厂用电系统,间接验证机组并列侧和系统待并侧同期系统二次回路正确性的方法。
本发明解决上述问题所采用的技术方案是:一种机组并网同期系统同源核相的方法,其特征是,厂用电系统一次核相由高压核相棒进行一次核相,厂用电一次核相正确后高厂变低压侧与启备变低压侧可并网运行,厂用电快切装置验证二次回路正确性;启备变高压侧与主变高压侧直接,启备变低压侧、厂用电母线及高厂变低压相接,根据主变、高厂变和启备变转角关系,通过启备变高低压侧与高厂变低压侧电压的同期关系验证机组待并侧和并列侧的同期关系,完成二次回路同源核相,提高同期系统可靠性。
具体的,机组同期二次回路升压站是3/2接线方式,并列侧采用主变高压侧TV4的A相电压UAN,待并侧为I母线TV的A相电压UAN’或出线TV的A相电压UAN’’; 并列侧和待并侧电压相位、幅值选取一致,不存在转角和电压系数转换,二次回路电源同期点即一次回路电源同期点;
启备变快切系统高厂变低压侧PT1即厂用电工作进线开关PT1,快切采用PT1的B相电压Ubn,机组开机启动过程中,启备变低压侧PT2(备用进线开关PT)同6kV母线PT3为同源,以此同源系统对比机组并网同期系统电源,判断机组同期是否满足同源二次核相要求。
本发明不需要协调电网调度停电,或待并侧设备不具备受电条件,能通过启备变系统间接验证并解决同源核相问题,大大提高电气系统可靠和经济性。
本发明根据计算主变、高厂变、启备变转角关系,同期核快切PT二次接线相角关系,确定启备变系统验证同期系统关系,两套系统互相验证属首创。
本发明利用电量记录分析仪,将两个系统的二次滑压录波进行对比分析,验证同期点及接线正确性。
本发明与现有技术相比,具有以下优点和效果:通过主变、高厂变、启备变的星角方式分析系统侧、待并侧和厂用电之前的相角关系,通过快切系统和同期系统二次电源滑压录波,反应同期系统一次和二次关系,判断二次是否一次的相位一致。替代同期系统同源核相,相对传统的同源核相工作,减少电网调度协调工作和试验项目,缩短试验时间,提高经济效益。该技术推广后,普遍提高设备并网的可靠性。
附图说明
图1是机组同期并网二次回路图。
图2是备用电源快切二次回路图。
图3是某单位备用电源系统图。
图4是某单位假同期录波图。
具体实施方式
下面结合附图并通过实施例对本发明作进一步的详细说明,以下实施例是对本发明的解释而本发明并不局限于以下实施例。
实施例
参见图1至图4,本实施例中机组并网同期系统同源核相的方法,机组同期二次回路如图1所示,升压站是3/2接线方式,并列侧采用主变高压侧TV4的A相电压UAN,待并侧为I母线TV的A相电压UAN’或出线TV的A相电压UAN’’; 并列侧和待并侧电压相位、幅值选取一致,不存在转角和电压系数转换,二次回路电源同期点即一次回路电源同期点;
启备变快切系统如图2所示,高厂变低压侧PT1即厂用电工作进线开关PT1,快切采用PT1的B相电压Ubn,机组开机启动过程中,启备变低压侧PT2(备用进线开关PT)同6kV母线PT3为同源,以此同源系统对比机组并网同期系统电源,判断机组同期是否满足同源二次核相要求。
具体实施案例,某单位电气主系统主变YNd11,高厂变Dyn1yn1,启备变YNyn0yn0d,可知升压站电源与6kV厂用电相位一致。同期系统二次回路如图1所示,同期系统与快切系统的同源后二次相位一致。由6kV核相棒核实6kV厂用母线与工作进线、备用进线一次相位一致,快切装置处测试母线、工作进线和备用进线PT二次电源核相一致,二次回路与一次回路相位一致。通过备用电源二次回路机组同期主回路二次电源对比验证接线正确,也就是相当于验证同期系统的同源核相。具体方法是在机组假同期试验时,分别对工作进线PT和厂用电PT二次回路电源进线滑压录波,对机组待并侧PT(主变高压侧)和系统侧PT二次回路电源进线滑压录波,两组波形的时域同期点一致,从而验证同期二次回路和一次回路相位一致,替代机组同期的同源核相试验。
本说明书中未作详细描述的内容均属于本领域专业技术人员公知的现有技术。
虽然本发明已以实施例公开如上,但其并非用以限定本发明的保护范围,任何熟悉该项技术的技术人员,在不脱离本发明的构思和范围内所作的更动与润饰,均应属于本发明的保护范围。

Claims (1)

1.一种机组并网同期系统同源核相的方法,其特征是,厂用电系统一次核相由高压核相棒进行一次核相,厂用电一次核相正确后高厂变低压侧与启备变低压侧并网运行,厂用电快切装置验证二次回路正确性;启备变高压侧与主变高压侧相接,启备变低压侧、厂用电母线及高厂变低压相接,根据主变、高厂变和启备变转角关系,通过启备变高低压侧与高厂变低压侧电压的同期关系验证机组待并侧和并列侧的同期关系,完成二次回路同源核相,提高同期系统可靠性;
机组同期二次回路升压站是3/2接线方式,并列侧采用主变高压侧TV4的A相电压UAN,待并侧为I母线TV的A相电压UAN’或出线TV的A相电压UAN’’;并列侧和待并侧电压相位、幅值选取一致,不存在转角和电压系数转换,二次回路电源同期点即一次回路电源同期点;
启备变快切系统高厂变低压侧PT1即厂用电工作进线开关PT1,快切采用PT1的B相电压Ubn,机组开机启动过程中,启备变低压侧PT2同6kV母线PT3为同源,以此同源系统对比机组并网同期系统电源,判断机组同期是否满足同源二次核相要求。
CN202111103161.XA 2021-09-18 2021-09-18 一种机组并网同期系统同源核相的方法 Active CN114252710B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111103161.XA CN114252710B (zh) 2021-09-18 2021-09-18 一种机组并网同期系统同源核相的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111103161.XA CN114252710B (zh) 2021-09-18 2021-09-18 一种机组并网同期系统同源核相的方法

Publications (2)

Publication Number Publication Date
CN114252710A CN114252710A (zh) 2022-03-29
CN114252710B true CN114252710B (zh) 2023-08-18

Family

ID=80789910

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111103161.XA Active CN114252710B (zh) 2021-09-18 2021-09-18 一种机组并网同期系统同源核相的方法

Country Status (1)

Country Link
CN (1) CN114252710B (zh)

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006220481A (ja) * 2005-02-09 2006-08-24 Koken:Kk 静電型高圧同期検相方法及び装置
CN206057373U (zh) * 2016-08-23 2017-03-29 华电电力科学研究院 一种专用电力二次回路短接测试线
BR102016004445A2 (pt) * 2017-09-05 Method and system of digital measurement of high frequency signs
CN110112788A (zh) * 2019-05-17 2019-08-09 中国能源建设集团安徽电力建设第一工程有限公司 一种发电厂同期系统调试方法
CN110266012A (zh) * 2019-05-29 2019-09-20 华电电力科学研究院有限公司 一种光伏电站动态无功响应时间测试方法
CN110504712A (zh) * 2019-08-21 2019-11-26 西安热工研究院有限公司 一种燃气电厂π型同源核相系统及方法
CN110514911A (zh) * 2019-08-28 2019-11-29 西安热工研究院有限公司 一种发电厂高压母线电源核相的系统及方法
CN110854924A (zh) * 2019-11-04 2020-02-28 中国能源建设集团华东电力试验研究院有限公司 电气系统一次通压同期核相联动切换检验系统及检验方法
CN110854925A (zh) * 2019-11-04 2020-02-28 中国能源建设集团华东电力试验研究院有限公司 电气系统一次通压同期核相检验系统及检验方法
CN110880792A (zh) * 2019-11-04 2020-03-13 中国能源建设集团华东电力试验研究院有限公司 电气系统一次通压同期核相快速切换检验系统及检验方法
CN111342464A (zh) * 2020-04-21 2020-06-26 西安热工研究院有限公司 一种单母线系统接线方式机组核相的系统及方法
CN111458598A (zh) * 2020-02-18 2020-07-28 南京国电南自电网自动化有限公司 一种异步采样的多个同源录波波形对齐方法
CN111509780A (zh) * 2020-05-07 2020-08-07 西安邮电大学 一种基于变压器变比的同期定值调整系统及方法
CN112542077A (zh) * 2020-12-08 2021-03-23 广东电网有限责任公司 一种核相教学箱
CN112816800A (zh) * 2021-02-05 2021-05-18 西安热工研究院有限公司 一种基于低压厂用变的高压厂用电源核相系统及方法
CN113162040A (zh) * 2021-04-29 2021-07-23 西安热工研究院有限公司 一种发电厂高压厂用电源无压核相的系统及方法
CN113162111A (zh) * 2021-03-30 2021-07-23 中国能源建设集团华中电力试验研究院有限公司 一种减少发电厂并网过程中无功冲击的方法及系统
CN113189411A (zh) * 2021-02-04 2021-07-30 华能(天津)煤气化发电有限公司 一种含有出口断路器发电机组的同期电压回路的核相方法

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BR102016004445A2 (pt) * 2017-09-05 Method and system of digital measurement of high frequency signs
JP2006220481A (ja) * 2005-02-09 2006-08-24 Koken:Kk 静電型高圧同期検相方法及び装置
CN206057373U (zh) * 2016-08-23 2017-03-29 华电电力科学研究院 一种专用电力二次回路短接测试线
CN110112788A (zh) * 2019-05-17 2019-08-09 中国能源建设集团安徽电力建设第一工程有限公司 一种发电厂同期系统调试方法
CN110266012A (zh) * 2019-05-29 2019-09-20 华电电力科学研究院有限公司 一种光伏电站动态无功响应时间测试方法
CN110504712A (zh) * 2019-08-21 2019-11-26 西安热工研究院有限公司 一种燃气电厂π型同源核相系统及方法
CN110514911A (zh) * 2019-08-28 2019-11-29 西安热工研究院有限公司 一种发电厂高压母线电源核相的系统及方法
CN110854925A (zh) * 2019-11-04 2020-02-28 中国能源建设集团华东电力试验研究院有限公司 电气系统一次通压同期核相检验系统及检验方法
CN110854924A (zh) * 2019-11-04 2020-02-28 中国能源建设集团华东电力试验研究院有限公司 电气系统一次通压同期核相联动切换检验系统及检验方法
CN110880792A (zh) * 2019-11-04 2020-03-13 中国能源建设集团华东电力试验研究院有限公司 电气系统一次通压同期核相快速切换检验系统及检验方法
CN111458598A (zh) * 2020-02-18 2020-07-28 南京国电南自电网自动化有限公司 一种异步采样的多个同源录波波形对齐方法
CN111342464A (zh) * 2020-04-21 2020-06-26 西安热工研究院有限公司 一种单母线系统接线方式机组核相的系统及方法
CN111509780A (zh) * 2020-05-07 2020-08-07 西安邮电大学 一种基于变压器变比的同期定值调整系统及方法
CN112542077A (zh) * 2020-12-08 2021-03-23 广东电网有限责任公司 一种核相教学箱
CN113189411A (zh) * 2021-02-04 2021-07-30 华能(天津)煤气化发电有限公司 一种含有出口断路器发电机组的同期电压回路的核相方法
CN112816800A (zh) * 2021-02-05 2021-05-18 西安热工研究院有限公司 一种基于低压厂用变的高压厂用电源核相系统及方法
CN113162111A (zh) * 2021-03-30 2021-07-23 中国能源建设集团华中电力试验研究院有限公司 一种减少发电厂并网过程中无功冲击的方法及系统
CN113162040A (zh) * 2021-04-29 2021-07-23 西安热工研究院有限公司 一种发电厂高压厂用电源无压核相的系统及方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
由一起非同期事故谈同期定相的重要性和难点;牛利涛;何卫斐;马晨原;郭小勤;潘江龙;;电气时代(第02期);全文 *

Also Published As

Publication number Publication date
CN114252710A (zh) 2022-03-29

Similar Documents

Publication Publication Date Title
CN110854925B (zh) 电气系统一次通压同期核相检验系统及检验方法
CN110854924B (zh) 电气系统一次通压同期核相联动切换检验系统及检验方法
Guha et al. Anti-islanding techniques for Inverter-based Distributed Generation systems-A survey
CN106684927B (zh) 一种孤网系统中大型发电机组并网系统及并网方法
CN112858958B (zh) 一种高备变保护装置电流接线极性检测方法
CN112305350B (zh) 一种新能源机组调频测试平台功率模块的故障检测装置
CN114252710B (zh) 一种机组并网同期系统同源核相的方法
CN110247469B (zh) 一种备用电源的控制电路及控制电路的控制方法
Balasreedharan et al. An adaptive fault identification scheme for DC microgrid using event based classification
Kumar et al. Rate of change of frequency deviation based unintentional islanding detection for microgrids
CN210898551U (zh) 一种电气系统一次通压同期核相检验系统
CN211456713U (zh) 一种电气系统一次通压同期核相联动切换检验系统
Chandraratne et al. Development and implementation of an adaptive overcurrent protection algorithm for a modern power distribution network
Sena et al. An Approach to Detect Islanding in Photovoltaic Based Distributed Generation Systems using Sequence Components of Voltage
Liu et al. Probabilistic estimation of propagation of unbalance in distribution network with asymmetrical loads
Cipolletta et al. Detection of dips, swells and interruptions in DC power network
Liu et al. Automatic generation and initialization of EMT simulation models for large-scale AC-DC hybrid power system
Gkiokas et al. A hardware in the loop testbed for adaptive protection of non-inteconnected island systems with high RES penetration
Matthee et al. Standardized Impedance: Microgrid Perspective for Inrush Current Compliance
CN220754346U (zh) 一种逆变器跳闸自测电路
Kumar et al. Power quality improvement using custom power devices (AVC, DVR, APC)
Aniceto et al. Towards a full automatizated ultrafast black start through inverter-based generation
Pradhan et al. Fault detection in Islanded microgrid based on positive power sequence component
Costa et al. Interoperability Issues in PQ and PMU Measurements for Reduced Inertia Power Systems
US20230155371A1 (en) Controlling an inverter to emulate synchronous generator under fault conditions

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant