CN1142397C - Two-purpose heat accumulating gas and electric boiler - Google Patents

Two-purpose heat accumulating gas and electric boiler Download PDF

Info

Publication number
CN1142397C
CN1142397C CNB991270290A CN99127029A CN1142397C CN 1142397 C CN1142397 C CN 1142397C CN B991270290 A CNB991270290 A CN B991270290A CN 99127029 A CN99127029 A CN 99127029A CN 1142397 C CN1142397 C CN 1142397C
Authority
CN
China
Prior art keywords
gas
drum
combustion chamber
boiler
heat accumulating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB991270290A
Other languages
Chinese (zh)
Other versions
CN1301941A (en
Inventor
程志华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANG'AN ENGINEERING APPLICATION TECHNOLOGY Co Ltd SHANGHAI
Original Assignee
GUANG'AN ENGINEERING APPLICATION TECHNOLOGY Co Ltd SHANGHAI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANG'AN ENGINEERING APPLICATION TECHNOLOGY Co Ltd SHANGHAI filed Critical GUANG'AN ENGINEERING APPLICATION TECHNOLOGY Co Ltd SHANGHAI
Priority to CNB991270290A priority Critical patent/CN1142397C/en
Publication of CN1301941A publication Critical patent/CN1301941A/en
Application granted granted Critical
Publication of CN1142397C publication Critical patent/CN1142397C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The present invention relates to a two-purpose heat accumulating gas and electric boiler which comprises a boiler barrel and a heating system, wherein the top walls of the boiler barrel are provided with a water outlet; the side walls at the lower part of the boiler barrel are provided with a water inlet; the heating system comprises a gas heating device and an electric heating device. The gas heating device comprises a gas inlet part, combustion chambers and a straight smoke tube; the gas inlet part is composed of a gas arranging chamber, a movable door, etc.; the outer walls at the lower part of an inner cavity of the boiler barrel are wound with a plurality of combustion chambers which radiate flow guiding pipes in an inclined way; swirling sheets which make smoke lift in a spiral way is arranged in the straight smoke tube. The electric heating device is arranged in the boiler barrel; the top of the straight smoke tube is provided with a smoke exhaust baffle plate which can be closed.

Description

Two-purpose heat accumulating gas and electric boiler
(1) technical field
The present invention relates to a kind of while can use two kinds of different clean energy resourcies to make the boiler of fuel, relates in particular to two-purpose heat accumulating gas and electric boiler.
(2) background technology
Data is learnt according to the retrieval: the present boiler that uses, adopt coal, oil, gas mostly, and select for use different burners to be installed on same the boiler, the two kinds of different fuel that can burn respectively, promptly oil, gas boiler for dual purpose come out already.Pneumoelectric boiler for dual purpose of the present invention only belongs to blank at home and abroad in fact.
Adopt the conventional boiler of natural minerals fuel, fuel mixes with air, by chemical reaction, emits heat, again in the mode of heat conduction, heat radiation and thermal convection current, becomes hot water or steam after water in the boiler is absorbed heat.The gas fume after burning flue of flowing through is discharged to chimney, has a large amount of CO in the flue gas 2, CO, SO 2, and NO xDeng the pernicious gas contaminated environment.
Boilers heated electrically is that electric energy is converted into heat energy, adds hot water and even finally produces a kind of equipment of steam, and it does not need complicated combustion chemistry reaction, so it does not need chimney, does not need burner hearth yet, to the Nature without any pollution.Combustion gas, natural gas particularly, character by fuel is determined, the pernicious gas that it is emitted after burning is very little, and is less to the destruction of human ecological environment, because its calorific capacity is very high, it is electric 10 to 20 times, therefore, from long-range viewpoint, it also is a kind of comparatively cheap clean energy resource.
Fast development and the adjustment of economic structure and the raising of people's living standard along with China's power construction, very big variation has taken place in various places electricity consumption formation, peak requirements increases, valley power consumption reduces in a large number, the electrical network peak-valley difference strengthens year by year, rate of load condensate descends year by year, and operation of power networks is difficulty day by day, and the utilization of resources is unreasonable.Country is in order to encourage to use low ebb, carry out tou power price, be higher than low ebb electricity price 3-5 when being peak of power consumption doubly, if electric boiler utilizes the low ebb electricity, with the water heating, the insulation storage is got up, for using daytime, so both adjustable lotus was kept away the peak, also can make the user use clean, the most cheap low ebb electricity, and power supply department and user are received more tangible benefits.When peak of power consumption, boiler drops into gaseous fuel at once and replenishes, and guarantees to produce, live with hot water or steam.
A kind of simple and easy pneumoelectric water heater is arranged at present, though this water heater also has chimney, and chimney can produce and pulls out wind.When the electrical heating of using separately wherein, can produce bigger radiation loss.
(3) summary of the invention
So, the objective of the invention is with the cleanest energy, a kind of two-purpose heat accumulating gas and electric boiler is provided, in a period of time, heat as the energy with electric energy, act as a fuel with combustion gas in the period at another section and to heat, when using electrical heating separately, can not produce the radiation loss that the structure because of gas-operated thermal bath facility causes simultaneously.The more important thing is that key of the present invention is " accumulation of heat ", can save the energy greatly in this process.
Purpose of the present invention is realized by following technical scheme.
A kind of two-purpose heat accumulating gas and electric boiler, it comprises the circular drum and a heater of a retaining, and a delivery port is arranged on the drum top wall, on the nearly lower sides of drum a water inlet is arranged, heater comprises gas-operated thermal bath facility and electric heater unit.Gas-operated thermal bath facility is included in induction part below the drum, makes the burner of fuel gas buring, in the combustion chamber part of drum inner chamber bottom and smoke evacuation part on the part of combustion chamber and that be connected with the combustor section branch, electric heater unit comprises the heating that is arranged in the drum, wherein, induction part comprise the gas combustion apparatus chamber, open the gas combustion apparatus chamber move the door, gas inlet device; One is arranged on the closable smoke evacuation baffle plate on the top of smoke evacuation part, wherein described move and described smoke evacuation baffle plate is closed when using electric heater unit separately.
In the above-mentioned gas-operated thermal bath facility, the combustion chamber part is made up of the combustion chamber of tubular, and an exhaust smoke hole is arranged at the top of combustion chamber, and a peephole device is arranged on the nearly lower part wall of combustion chamber, be wound with the radiation mozzle of a plurality of inclinations on the outer wall of combustion chamber, its low side is over against the water inlet of drum; The smoke evacuation part is made up of the diameter that is connected with the combustion chamber by the described exhaust smoke hole soaring smoke pipe of one or more tubulose more much smaller than the combustion chamber, be provided with the spinning disk that forces flue gas to rise twist in soaring smoke pipe, the smoke evacuation baffle plate is arranged on the top ends of soaring smoke pipe; Heating can insert in the drum at the sidepiece or the top of drum.
Advantage of the present invention is, compare with the boiler of prior art, the maximum characteristics of two-purpose heat accumulating gas and electric boiler of the present invention are to use valley electricity, thereby the expense of boiler heating is descended at double, have slowed down the peak of power consumption of power supply department and the contradiction of low ebb simultaneously again.Can utilize valley electricity accumulation of heat in night like this; use daytime; perhaps further heat with the hot water that the combustion gas of environmentally safe acts as a fuel to the accumulation of heat in night daytime; make two kinds of energy complementary advantages; both protected environment; reduce use cost again, also can save the energy during this external independent use electric energy.
(4) description of drawings
Below in conjunction with accompanying drawing, with one as an example the explanation embodiment describe the present invention in detail.
Fig. 1 is the longitudinal sectional view of one embodiment of the invention.
(5) specific embodiment
As shown in Figure 1, two-purpose heat accumulating gas and electric boiler of the present invention mainly comprises the tubular drum 7 and a heater of a retaining.One delivery port 11 is arranged on drum 7 top walls, a water inlet 2 is arranged on the sidewall of drum 7 nearly bottoms.Heater comprises gas-operated thermal bath facility and electric heater unit.
Gas-operated thermal bath facility is included in induction part below the drum 7, makes the burner of fuel gas buring, in the combustion chamber part of drum 7 inner chamber bottoms and smoke evacuation part on the part of combustion chamber and that be connected with the combustor section branch.Induction part comprises gas combustion apparatus chamber 1, open gas combustion apparatus chamber 1 move door 13, by the control device (not shown) of fuel gas inlet valve 16, filtration, decompression and pressure regulation combustion gas, send into the inlet duct that the steam line 17 of combustion gas is formed, burner comprises the cavum laryngis 14 and the nozzle 15 of mixing air and combustion gas.The combustion chamber part is made up of the combustion chamber 5 of tubular, and an exhaust smoke hole 18 is arranged at the top of combustion chamber 5, and a peephole device 4 is arranged on the nearly lower part wall of combustion chamber 5, is wound with the radiation mozzle 3 of a plurality of inclinations on the outer wall of combustion chamber 5.In the present embodiment, radiation mozzle 3 is fixed by welding on the outer wall of combustion chamber 5.The smoke evacuation part is made up of than the combustion chamber 5 much smaller soaring smoke pipes 8 of one or more tubulose (only illustrating among the figure) the diameter that is connected with combustion chamber 5 by exhaust smoke hole 18, in soaring smoke pipe 8, be provided with the spinning disk 9 that forces flue gas wherein to rise twist, a closable smoke evacuation baffle plate 12 arranged in the top ends of soaring smoke pipe 8.
Drum 7 is inverted U-shaped, in the present embodiment, is storage chamber between the wall of drum 7 and combustion chamber 5 and soaring smoke pipe 8 walls, and promptly water wherein will be heated or be heated into steam.
The boiler heating process of making fuel with combustion gas is described below.
Cold water enters drum 7 by water inlet 2, as be hot-water boiler, then water is full of the storage chamber of whole drum 7, as be steam boiler, then waterline should be controlled on the center line of boiler water gauge (not shown), reserve upper space,, send hot water or steam by delivery port 11 at last as storage that flashes to steam and output region.After the water inlet operation finishes, drop into the igniting preparatory stage, before the ventilation igniting, that opens the smoke evacuation baffle plate 12 of soaring smoke pipe 8 and bottom combustion chamber 1 moves door 13, making the fuel gas buring passage is the gravity-flow ventilation that soaring smoke pipe 8, combustion chamber 5 and gas combustion apparatus chamber 1 form the several seconds up and down, purpose is to exclude last time heating residual waste gas, starts the automatic controller (not shown) then.Open fuel gas inlet valve 16, combustion gas enters cavum laryngis 14 through controlling organization (not shown) such as filtration, decompression, pressure regulation through steam line 17, air is through moving door 13 in cavum laryngis 14 and combustion gas mixing, then enter nozzle 15, automatic controller is controlled the energising igniting immediately, by the flame color that peephole 4 is observed after lighting a fire, adjust combustion gas air inflow or air door, until normal condition.Combustion gas is burnt in combustion chamber 5 by nozzle 15, and the heat of high temperature flue gas that is produced is the heating surface radiant heat transfer around radiation mozzle 3 and combustion chamber 5 immediately.The minute bubbles that water heating back the produces mixing of constantly rising converges to the top delivery port 11 of drum 7 at last.And tiltedly horizontal some radiation mozzles 3 in the middle of burner hearth have certain gradient, can promote the water circulation.Flue gas constantly rises because chimney produces the attraction of pulling out wind and enters in the soaring smoke pipe 8.In soaring smoke pipe 8, because stopping of spinning disk 9, flue gas is forced to rise twist, because the effect of spinning disk 9, the spirality at soaring smoke pipe 8 edges is designed to increase by 3.29 times than straight-through distance apart from length, high-temperature flue gas is fully contacted with the wall of soaring smoke pipe 8 and conduct heat and heat, prolonged exothermic process, increased endothermic effect to stove water.Flue gas drains into outdoor from the smoke evacuation baffle plate 12 that can regulate at last.Owing to can not produce pernicious gas after fuel gas buring is intact, so can not pollute to environment.
The soaring smoke pipe 8 of foregoing description is arranged in the drum 7 of boiler, utilizing flue gas to discharge soaring smoke pipe 8 waste heat before heats boiler water, certainly, soaring smoke pipe 8 in the present embodiment not necessarily is arranged in the drum 7, it also can be connected with combustion chamber 5 and be arranged on outside the boiler, and the waste heat that utilizes flue gas preheats the outer water of boiler or heats.
Describe below with the electric heater unit of electric energy as the energy.As shown in Figure 1, be surrounded with the ring-type radiation mozzle 3 of above-mentioned a plurality of inclinations on the outer wall of combustion chamber 5, its low side is over against the water inlet 2 of drum 7, and its high side is away from water inlet 2.In the storage chamber of drum 7, in the plane of the close combustion chamber 5 of height on combustion chamber 5, the higher side of radiation mozzle 3 be water inlet 2 opposites above insert the water of one to n group heating 6 to drum and/or in the drum from the drum side, the quantity of heating 6 is specifically decided on the capacity of boiler.
Heating 6 is also can be from the top of drum 7 vertical or tilt to insert in the boiler, specifically decides on the boiler type.
The heat release and the endothermic process of the electric heater unit of present embodiment are described below.When needs use the night dip electricity to heat, because it does not need air to mix and the igniting operation, do not need chimney emission yet, as long as close a main switch behind the cutter, can make heating 6 evolutions of heat by automatic control sequence by the automaton (not shown) immediately, transmit the heat heating to boiler water.Because n is organized the top that heating 6 is arranged on water inlet 2 opposites in the drum, cold water is after water inlet 2 enters drum 7, a part directly rises along the drum wall, another part around the drum wall or oblique radiation mozzle 3 rise, and the temperature around the heating 6 is the highest, firing rate is the fastest, a large amount of hot water bubbles that produce conduct heat mutually with cold water on every side, because the bottom of heating 6 is provided with combustion chamber 5, this place's water capacity is reduced, and the upper water volume is bigger, helps the exchange of conducting heat, and forms circulation up and down, because behind the thermal band liter waterborne, following cold water is filled a vacancy immediately from bottom to top, and heated hot water is outwards supplied with from delivery port 11 along the shortest path.
Should be noted that when separately using heating 6 heating boilers,, to the required device of original combustion gas switching position again, as close and move door 13, in the cut-out air is gone into because its characteristic is different with combustion gas; Close smoke evacuation baffle plate 12, do not allow chimney produce and pull out wind.After two was blocked, combustion chamber 5, soaring smoke pipe 8 in the middle of being arranged on all were in the sealing keeping warm mode, can not produce radiation loss, and also favourable water ringing normally moves electrically heated boiler.Otherwise will cause the undesirable phenomenon of ventilation and heat in the boiler electrical heating furnace chamber, this phenomenon also is to cause one of boiler reason of still not having the dual-purpose burning on the same stage of pneumoelectric at present.As for this one-in-and-one-out move door 13 and smoke evacuation the closing of baffle plate 12, still operation automatically by hand, visual boiler capacity size is selected.All operation is better by hand for general microminiature boiler for dual purpose, and middle-size and small-size boiler for dual purpose can adopt air intake to move door 13 manual operations, and smoke evacuation baffle plate 12 is operated automatically, like this, can reduce labor intensity of operating personnel and maloperation.
Through test of many times, the gradient of the radiation mozzle 3 of the foregoing description is being preferably in more than 5 ° about 15 °, and its quantity is about 11 groups, and heating 6 is two or more sets, and the quantity of heating 6 changes with boiler concrete structure and capacity basically.The radiation mozzle 3 that like this, so is provided with forms best water circulation with above-mentioned water inlet 2, delivery port 11, heating 6, combustion chamber 5 and drum 7.
Need to prove that the use of two-purpose heat accumulating gas and electric boiler there is no the branch that uses daytime combustion gas and night to use the strictness of electric energy,, whenever all can use separately that perhaps gas and electricity use simultaneously, to improve heating load as long as need.
The foregoing description only is to illustrate for example, under the situation that does not break away from essence spirit of the present invention and scope, can also carry out various modifications and some part is replaced described embodiment, and these all drop within protection scope of the present invention.

Claims (7)

1. two-purpose heat accumulating gas and electric boiler, it mainly comprises the tubular drum (7) and a heater of a retaining, on drum (7) top wall a delivery port (11) is arranged, and on the nearly lower sides of drum (7) water inlet (2) is arranged, heater comprises gas-operated thermal bath facility and electric heater unit
Gas-operated thermal bath facility is included in induction part below the drum (7), makes the burner of fuel gas buring, in the combustion chamber part of drum (7) inner chamber bottom and smoke evacuation part on the part of combustion chamber and that be connected with the combustor section branch,
Electric heater unit comprises the heating (6) that is arranged in the drum (7), it is characterized in that;
Induction part comprises gas combustion apparatus chamber (1), opens (13), the gas inlet device of moving of gas combustion apparatus chamber (1);
One is arranged on the closable smoke evacuation baffle plate (12) on the top of smoke evacuation part, wherein describedly when using electric heater unit separately moves (13) and described smoke evacuation baffle plate (12) is closed.
2. two-purpose heat accumulating gas and electric boiler as claimed in claim 1 is characterized in that,
The combustion chamber part is made up of the combustion chamber (5) of tubular, one exhaust smoke hole (18) is arranged at the top of combustion chamber (5), one peephole device (4) is arranged on the nearly lower part wall of combustion chamber (5), be wound with the radiation mozzle (3) of a plurality of inclinations on the outer wall of combustion chamber (5), its low side is over against the water inlet (2) of drum (7);
The smoke evacuation part is made up of the diameter that is connected with combustion chamber (5) by described exhaust smoke hole (18) the soaring smoke pipe of one or more tubulose (8) more much smaller than the combustion chamber, be provided with the spinning disk (9) that forces flue gas to rise twist in soaring smoke pipe (8), smoke evacuation baffle plate (12) is arranged on the top ends of soaring smoke pipe (8);
The quantity of heating (6) is one or more groups.
3. two-purpose heat accumulating gas and electric boiler as claimed in claim 2 is characterized in that,
The radiation mozzle (3) of a plurality of inclinations is welded on the outer wall of combustion chamber (5).
4. two-purpose heat accumulating gas and electric boiler as claimed in claim 3 is characterized in that,
The angle of inclination of the radiation mozzle (3) that tilts is greater than 5 °, and its quantity is decided on the rated capacity of described boiler.
5. two-purpose heat accumulating gas and electric boiler as claimed in claim 4 is characterized in that,
Described soaring smoke pipe is in drum.
6. two-purpose heat accumulating gas and electric boiler as claimed in claim 4 is characterized in that,
Described soaring smoke pipe is in the drum outside.
7. two-purpose heat accumulating gas and electric boiler as claimed in claim 2 is characterized in that,
Heating (6) inserts the interior water of drum from the sidepiece of drum (7).
CNB991270290A 1999-12-29 1999-12-29 Two-purpose heat accumulating gas and electric boiler Expired - Fee Related CN1142397C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB991270290A CN1142397C (en) 1999-12-29 1999-12-29 Two-purpose heat accumulating gas and electric boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB991270290A CN1142397C (en) 1999-12-29 1999-12-29 Two-purpose heat accumulating gas and electric boiler

Publications (2)

Publication Number Publication Date
CN1301941A CN1301941A (en) 2001-07-04
CN1142397C true CN1142397C (en) 2004-03-17

Family

ID=5284688

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB991270290A Expired - Fee Related CN1142397C (en) 1999-12-29 1999-12-29 Two-purpose heat accumulating gas and electric boiler

Country Status (1)

Country Link
CN (1) CN1142397C (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100455948C (en) * 2007-06-28 2009-01-28 北京交通大学 Condensation type heat-storage type gas-firing boiler system
CN102927549B (en) * 2012-11-02 2014-08-13 张家港市威孚热能科技有限公司 Self-heat-accumulating type electrical heating pressure variable steam boiler device
CN107514622B (en) * 2017-07-31 2023-06-27 叶常青 Three-purpose steam engine for electricity, gas and biomass
CN108151321A (en) * 2018-02-08 2018-06-12 新疆乾坤环能投资有限公司 A kind of combustion gas is electrically coupled wisdom environment-protection boiler
CN108180628A (en) * 2018-02-08 2018-06-19 新疆乾坤环能投资有限公司 A kind of combustion gas is electrically coupled wisdom environment protection hot-water boiler
CN109990323A (en) * 2019-03-20 2019-07-09 西安交通大学 A kind of hearth fume waste heat recycle device
CN110017599B (en) * 2019-05-10 2024-01-23 四川省机械研究设计院(集团)有限公司 Dual-energy water heater capable of rapidly supplying heat
CN114110548B (en) * 2021-10-29 2023-11-24 国能四川天明发电有限公司 Steam supply equipment and control method thereof

Also Published As

Publication number Publication date
CN1301941A (en) 2001-07-04

Similar Documents

Publication Publication Date Title
CN1142397C (en) Two-purpose heat accumulating gas and electric boiler
PL202124B1 (en) Solid fuel burning method and heating boiler
CN205372642U (en) Energy -conserving return air stove
CN202182475U (en) Heat recovery combustion furnace
CN201508036U (en) Direct-combustion tube-typed split organic heat carrier boiler
CN109668181B (en) Multifunctional fuel steam energy-saving stove
CN203629009U (en) Normal pressure hot water boiler for half-gasification of biomass
CN103017207B (en) Heat-insulating energy-saving heating stove
CN2299937Y (en) Vertical hot-tube water jacket heating furnace
CN210861691U (en) Energy-saving environment-friendly boiler with inner container structure
CN2220023Y (en) Heating stove by using honeycomb briquet
CN103644649A (en) Atmospheric pressure hot water biomass boiler with semi-gasification combustion feature
CN101813326B (en) Tunable energy-saving firewood stove
CN2133777Y (en) Multi-function straightway coal-saving stove
RU2361154C1 (en) Method of heat transfer
CN2357270Y (en) Domestic gas auto-control constant temp. boiler
CN2402932Y (en) Multifunctional high-efficiency circulation heating stove
CN200975710Y (en) Air preheat energy saving stove
CN2413896Y (en) Heater for plastics extruder
CN2420521Y (en) High efficiency multipurpose stove
CN2295132Y (en) Domestic multi-function coal-saving micro poiler
CN2343538Y (en) Double fire grate back-fire horizontal boiler
CN2222881Y (en) horizontal gas hot-water stove
CN2299279Y (en) Hot water heating boiler having radiator inside
CN2132103Y (en) Domestic energy-saving hot water boiler

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20040317

Termination date: 20111229