CN114219301A - 5G electric power capital construction safety management system based on big data - Google Patents

5G electric power capital construction safety management system based on big data Download PDF

Info

Publication number
CN114219301A
CN114219301A CN202111542224.1A CN202111542224A CN114219301A CN 114219301 A CN114219301 A CN 114219301A CN 202111542224 A CN202111542224 A CN 202111542224A CN 114219301 A CN114219301 A CN 114219301A
Authority
CN
China
Prior art keywords
module
personnel
safety
management system
management module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111542224.1A
Other languages
Chinese (zh)
Inventor
马宇辉
程军
蒋征毅
陈荣健
毛水强
胡旭光
张波
李磊
周昀飞
刘新
林益豪
吴良建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Zhejiang Electric Power Co Ltd
Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Zhejiang Electric Power Co Ltd
Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Zhejiang Electric Power Co Ltd, Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Zhejiang Electric Power Co Ltd
Priority to CN202111542224.1A priority Critical patent/CN114219301A/en
Publication of CN114219301A publication Critical patent/CN114219301A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063112Skill-based matching of a person or a group to a task
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06398Performance of employee with respect to a job function
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C1/00Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people
    • G07C1/10Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people together with the recording, indicating or registering of other data, e.g. of signs of identity

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a 5G electric power infrastructure safety management system based on big data, which relates to the field of electric power infrastructure and comprises a safety management system terminal, a cloud platform connected with the safety management system terminal, a communication module, a personnel allocation management module, an appliance management module and an engineering team management module; the personnel distribution management module is used for personnel management and distribution and comprises a personnel information registration module, a personnel assessment module and a distribution module, wherein the personnel information registration module and the personnel assessment module are connected with the cloud platform and store information through the cloud platform; the instrument management module is used for managing materials and tools and comprises a material management module, a hardware management module and a replenishment notification module which are connected with the cloud platform, wherein the replenishment notification module is respectively connected with the material management module and the hardware management module and sends a replenishment notification through the replenishment notification module; and the engineering team management module is used for monitoring and managing an engineering team, and managers establish work tasks through the safety management system terminal.

Description

5G electric power capital construction safety management system based on big data
Technical Field
The invention relates to the field of electric power infrastructure, in particular to a 5G electric power infrastructure safety management system based on big data.
Background
In order to strengthen the construction of a power grid, better serve people and promote the development of social harmony, along with the development of science and technology, the development of a power grid business is different day by day, but nowadays, the power infrastructure work also faces double tests of speed and safety. The national grid company requires that each level of professions fully applies modern information technologies such as mobile interconnection, artificial intelligence and the like and advanced communication technologies around each link of a power system, business collaboration, data communication and unified internet of things management are comprehensively realized, and the company level intelligent energy comprehensive service platform has powerful functions and comprehensively forms a co-construction co-treatment shared energy internet ecosystem.
In the field of power grid infrastructure, a plurality of hidden dangers exist, including personnel allocation management problems, appliance management problems, engineering team management problems and safety monitoring problems.
Disclosure of Invention
The invention aims to provide a 5G electric power infrastructure safety management system based on big data.
In order to achieve the purpose, the invention provides the following technical scheme:
A5G electric power capital construction safety management system based on big data comprises a safety management system terminal, a cloud platform connected with the safety management system terminal, a communication module, a personnel allocation management module, an appliance management module and an engineering team management module;
the personnel distribution management module is used for personnel management and distribution and comprises a personnel information registration module, a personnel assessment module and a distribution module, wherein the personnel information registration module and the personnel assessment module are connected with the cloud platform and store information through the cloud platform;
the appliance management module is used for managing materials and tools and comprises a material management module, a hardware management module and a replenishment notification module which are connected with the cloud platform, wherein the replenishment notification module is respectively connected with the material management module and the hardware management module and sends a replenishment notification through the replenishment notification module;
the engineering team management module is used for monitoring and managing an engineering team, managers establish work tasks through the safety management system terminal, the work tasks comprise manpower, materials and time required by predicted work tasks, the engineering team management module compares the manpower, the materials and the time required by the engineering team when the engineering team actually completes the work tasks, the more the load and the load are, the lower the level is, the level of each work task of the engineering team is synthesized, and the ranking of each engineering team from high to low is performed.
According to the invention, online management operation and allocation are comprehensively realized through various aspects such as personnel, equipment, engineering teams and site safety, uneven personnel and resource allocation and lacked workers are avoided, the safety and the working efficiency are effectively improved, benign competition is effectively promoted by the engineering team management module, and unqualified and irregular engineering teams are eliminated.
Further, basic information, signing contracts and assessment results of personnel are input through the personnel information registration module, the basic information comprises names, sexes, ages, native locations, academic calendars, professions, fingerprints, irises, faces, contact ways and post recommendations, the post recommendations comprise a plurality of posts, and the posts are arranged from high to low in adaptation degree. The adaptation post can also be influenced by work experience, and personnel can punch a card on duty through fingerprints, irises or faces to confirm the working state.
Further, the personnel assessment module comprises a pre-post safety training score grade, a skill training score grade and a monthly assessment grade. When the staff allocation management module allocates staff, the grades may be allocated with help of priority or assigned to work tasks requiring corresponding grades.
Further, the work task comprises a work type, a required work post, the number of people on the required work post, a work priority level and a worker requirement level; the distribution module distributes the staff to be worked according to the work task information and the information input by the staff information registration module, and after distribution is completed, all the responsible staff of the engineering team log in the management system terminal to change the working state of the distributed staff from work waiting to working.
Furthermore, the distribution module is used for personnel distribution, the working state of the personnel is determined and the working task is established by logging in the management system terminal by the responsible personnel of each engineering team, the working state of the personnel and the working task are combined with the distribution module to extract the information of the personnel information registration module and the information of the personnel assessment module stored in the cloud platform, and the personnel to be worked are distributed to the corresponding working posts.
Furthermore, the material management module comprises material input information, the input information comprises the type, name, batch, quantity, storage place, manager and income time of the material, the input information is updated in real time, the quantity of the material is less than a limited numerical value, and a purchasing staff is informed of replenishment through the replenishment informing module.
Furthermore, the hardware management module is used for regularly pushing inspection messages to inspectors, and uploading inspection reports, inspection evaluations and inspection pictures when the inspectors perform inspection.
Further, still include the safety monitoring module, the safety monitoring module is used for monitoring site operation and accident backtracking, including installing a plurality of surveillance cameras at the job site, the surveillance camera passes through communication module and is connected with the cloud platform.
Further, the system also comprises a sanitation management module connected with the cloud platform, and the sanitation management module is used for managing the sanitation safety of a construction site and the sanitation safety of a canteen. The health problem affects the physical health of workers, the health problem is checked and supervised by inspectors and uploaded to the health management module to be stored in the cloud platform, and a graph can be drawn through the health management module to observe the health condition.
Furthermore, the system also comprises a safety spot check module, wherein the safety spot check module is connected with the safety monitoring module, and the safety spot check module randomly extracts the monitoring videos in the safety monitoring module.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, a 5G electric power infrastructure safety management system based on big data includes a safety management system terminal, a cloud platform connected to the safety management system terminal, a communication module, a personnel allocation management module, an appliance management module, and an engineering team management module;
the personnel distribution management module is used for personnel management and distribution and comprises a personnel information registration module, a personnel assessment module and a distribution module, wherein the personnel information registration module and the personnel assessment module are connected with the cloud platform and store information through the cloud platform;
the instrument management module is used for managing materials and tools and comprises a material management module, a hardware management module and a replenishment notification module which are connected with the cloud platform, wherein the replenishment notification module is respectively connected with the material management module and the hardware management module and sends a replenishment notification through the replenishment notification module;
the engineering team management module is used for monitoring and managing an engineering team, managers establish work tasks through the safety management system terminal, the work tasks comprise manpower, materials and time required by the expected work tasks, the engineering team management module compares the manpower, the materials and the time required by the engineering team when the engineering team actually completes the work tasks, the more the load is, the lower the level is, the level of each work task of the engineering team is integrated, and the high-to-low ranking is carried out on each engineering team (the more the actual manpower and material resource time is spent exceeds the expected value, the lower the level is).
Basic information, signing contract and assessment results of personnel are input through the personnel information registration module, the basic information comprises name, gender, age, native place, academic calendar, specialty, fingerprint, iris, face, contact way and post recommendation, and the post recommendation comprises a plurality of posts which are matched and arranged from high to low in the matching degree. The adaptation post can also be influenced by work experience, and personnel can punch a card on duty through fingerprints, irises or faces to confirm the working state. The personnel assessment module comprises a pre-post safety training score grade, a skill training score grade and a monthly assessment grade. When the staff allocation management module allocates staff, the grades may be allocated with help of priority or assigned to work tasks requiring corresponding grades. The work task comprises a work type, a required work post, the number of people on the required work post, a work priority level and a worker requirement level; the distribution module distributes the personnel to be worked according to the work task information and the information input by the personnel information registration module, and after distribution is completed, all the responsible personnel of the engineering team log in the management system terminal to change the working state of the distributed personnel from work waiting to working. The distribution module is used for personnel distribution, the working state of personnel is determined and a working task is established by logging in a management system terminal by the responsible personnel of each engineering team, the working state of personnel and the working task are combined with the distribution module to extract information of the personnel information registration module and information of the personnel assessment module stored in the cloud platform, and the personnel to be worked are distributed to corresponding working posts.
The material management module comprises material input information, the input information comprises the type, name, batch, quantity, storage place, manager and income time of the material, the input information is updated in real time, the quantity of the material is less than a limited numerical value, a procurement person is informed of replenishment through the replenishment informing module, the hardware management module is used for pushing inspection information to an inspector regularly, and when the inspector inspects, an inspection report, inspection evaluation and inspection pictures are uploaded.
Still include the safety monitoring module, the safety monitoring module is used for monitoring site operation and accident backtracking, including installing a plurality of surveillance cameras at the job site, the surveillance camera passes through communication module and is connected with the cloud platform. The system also comprises a sanitation management module connected with the cloud platform, and the sanitation management module is used for managing the sanitation and safety of a construction site and the sanitation and safety of a canteen. The health problem affects the health of workers, the health problem is checked and supervised by inspectors and uploaded to the health management module and stored in the cloud platform, a curve graph can be drawn through the health management module to observe the health condition, the safety spot check module is further included and connected with the safety monitoring module, and the safety spot check module randomly extracts monitoring videos in the safety monitoring module.
According to the invention, online management operation and allocation are comprehensively realized through various aspects such as personnel, equipment, engineering teams and site safety, uneven personnel and resource allocation and lacked workers are avoided, the safety and the working efficiency are effectively improved, benign competition is effectively promoted by the engineering team management module, and unqualified and irregular engineering teams are eliminated.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (10)

1. A5G electric power capital construction safety management system based on big data is characterized by comprising a safety management system terminal, a cloud platform connected with the safety management system terminal, a communication module, a personnel allocation management module, an appliance management module and an engineering team management module;
the personnel distribution management module is used for personnel management and distribution and comprises a personnel information registration module, a personnel assessment module and a distribution module, wherein the personnel information registration module and the personnel assessment module are connected with the cloud platform and store information through the cloud platform;
the appliance management module is used for managing materials and tools and comprises a material management module, a hardware management module and a replenishment notification module which are connected with the cloud platform, wherein the replenishment notification module is respectively connected with the material management module and the hardware management module and sends a replenishment notification through the replenishment notification module;
the engineering team management module is used for monitoring and managing an engineering team, managers establish work tasks through the safety management system terminal, the work tasks comprise manpower, materials and time required by predicted work tasks, the engineering team management module compares the manpower, the materials and the time required by the engineering team when the engineering team actually completes the work tasks, the more the load and the load are, the lower the level is, the level of each work task of the engineering team is synthesized, and the ranking of each engineering team from high to low is performed.
2. The 5G electric power infrastructure safety management system based on big data as claimed in claim 1, characterized in that basic information of personnel, signing contract and assessment results are entered through the personnel information registration module, the basic information includes name, sex, age, native place, academic calendar, specialty, fingerprint, iris, face, contact information and position recommendation, the position recommendation includes adapting a plurality of positions, and the positions are arranged from high degree of adaptation to low degree of adaptation.
3. The 5G electric power infrastructure safety management system based on big data as claimed in claim 1, characterized in that basic information of personnel, signing contract and assessment results are entered through the personnel information registration module, the basic information includes name, sex, age, native place, academic calendar, specialty, fingerprint, iris, face, contact information and position recommendation, the position recommendation includes adapting a plurality of positions, and the positions are arranged from high degree of adaptation to low degree of adaptation.
4. The big-data-based 5G electric power infrastructure safety management system as claimed in claim 1, wherein the work tasks include work type, required work post, number of people required work post, work priority level and worker requirement level; the distribution module distributes the staff to be worked according to the work task information and the information input by the staff information registration module, and after distribution is completed, all the responsible staff of the engineering team log in the management system terminal to change the working state of the distributed staff from work waiting to working.
5. The 5G electric power infrastructure safety management system based on big data as claimed in claim 4, wherein the allocation module is used for personnel allocation, through logging in of a management system terminal by each engineering team leader, determining of personnel working states and establishment of work tasks are performed, the personnel working states and the work tasks are combined with the allocation module to extract personnel information registration module information and personnel assessment module information stored in the cloud platform, and personnel waiting for work are allocated to corresponding work posts.
6. The big data-based 5G electric power infrastructure safety management system as claimed in claim 1, wherein the materials management module includes material entry information, the entered information includes material type, name, batch, quantity, storage place, manager and income time, the entered information is updated in real time, the quantity of the material is less than a defined value, and the buyer is notified of replenishment through the replenishment notification module.
7. The 5G power infrastructure safety management system based on big data as claimed in claim 1, wherein the hardware management module is used to periodically push inspection messages to inspectors, and when the inspectors inspect, upload inspection reports, inspection evaluations and inspection pictures.
8. The 5G electric power infrastructure safety management system based on big data according to any one of claims 1 to 7, characterized by further comprising a safety monitoring module, wherein the safety monitoring module is used for monitoring field construction operation and accident backtracking and comprises a plurality of monitoring cameras installed on a construction field, and the monitoring cameras are connected with the cloud platform through the communication module.
9. The big-data-based 5G power infrastructure safety management system according to claim 8, further comprising a sanitation management module connected with the cloud platform, wherein the sanitation management module is used for managing sanitation safety of a construction site and dining hall sanitation safety.
10. The 5G power infrastructure safety management system based on big data according to claim 1 or 8, further comprising a safety spot check module, wherein the safety spot check module is connected with the safety monitoring module, and the safety spot check module randomly extracts the monitoring videos in the safety monitoring module.
CN202111542224.1A 2021-12-16 2021-12-16 5G electric power capital construction safety management system based on big data Pending CN114219301A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111542224.1A CN114219301A (en) 2021-12-16 2021-12-16 5G electric power capital construction safety management system based on big data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111542224.1A CN114219301A (en) 2021-12-16 2021-12-16 5G electric power capital construction safety management system based on big data

Publications (1)

Publication Number Publication Date
CN114219301A true CN114219301A (en) 2022-03-22

Family

ID=80702849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111542224.1A Pending CN114219301A (en) 2021-12-16 2021-12-16 5G electric power capital construction safety management system based on big data

Country Status (1)

Country Link
CN (1) CN114219301A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105761023A (en) * 2016-03-16 2016-07-13 江苏省电力公司常州供电公司 Outsourcing team control system
CN107480959A (en) * 2017-09-06 2017-12-15 聊城市光明电力服务有限责任公司 A kind of power engineering project management and control application system
CN109670771A (en) * 2018-10-31 2019-04-23 中国大唐集团科学技术研究院有限公司 A kind of power engineering construction project management system
CN208888869U (en) * 2018-07-27 2019-05-21 温州市图盛科技有限公司 It is a kind of based on internet+external coordination construction team safety control platform
CN110189048A (en) * 2019-06-05 2019-08-30 武汉联云世纪科技有限公司 A kind of system effect appraisal management method and system based on cloud platform
CN110428236A (en) * 2019-08-15 2019-11-08 宁夏信友监理咨询管理股份有限公司 A kind of communication engineering construction whole process engineering consulting management system
CN110443526A (en) * 2019-08-27 2019-11-12 上海见慧企业发展有限公司 A kind of management platform system of working in dispersion team

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105761023A (en) * 2016-03-16 2016-07-13 江苏省电力公司常州供电公司 Outsourcing team control system
CN107480959A (en) * 2017-09-06 2017-12-15 聊城市光明电力服务有限责任公司 A kind of power engineering project management and control application system
CN208888869U (en) * 2018-07-27 2019-05-21 温州市图盛科技有限公司 It is a kind of based on internet+external coordination construction team safety control platform
CN109670771A (en) * 2018-10-31 2019-04-23 中国大唐集团科学技术研究院有限公司 A kind of power engineering construction project management system
CN110189048A (en) * 2019-06-05 2019-08-30 武汉联云世纪科技有限公司 A kind of system effect appraisal management method and system based on cloud platform
CN110428236A (en) * 2019-08-15 2019-11-08 宁夏信友监理咨询管理股份有限公司 A kind of communication engineering construction whole process engineering consulting management system
CN110443526A (en) * 2019-08-27 2019-11-12 上海见慧企业发展有限公司 A kind of management platform system of working in dispersion team

Similar Documents

Publication Publication Date Title
Huang et al. Development and validation of safety climate scales for mobile remote workers using utility/electrical workers as exemplar
Turoff et al. Dynamic emergency response management for large scale decision making in extreme hazardous events
CN110428112A (en) A kind of dual prevention mechanism management system of enterprise based under internet+mode
Teo et al. The indirect effect of safety investment on safety performance for building projects
CN105096047A (en) Overall process task control and assessment system and realization method thereof
CN103390218A (en) Three-chain coupling integrated emergency security system and method for emergencies
CN112598249A (en) Object evaluation method, device and equipment
CN115796399B (en) Intelligent scheduling method, device, equipment and storage medium based on electric power supplies
Choksi et al. Multiobjective based resource allocation and scheduling for postdisaster management using IoT
KR102481223B1 (en) A smart integrated safety management system that can support various safety management, including safety inspection and education, using digital technology
CN116739302A (en) Project delivery evaluation method, electronic device and storage medium
CN109492871B (en) Method, device and computer equipment for managing suppliers based on system monitoring
CN101957944A (en) Work evaluation system
Maslow A NEW MODEL FOR OBTAINING SUSTAINABLE COMPETITIVE ADVANTAGE.
CN114219301A (en) 5G electric power capital construction safety management system based on big data
Quartey Implications of HR outsourcing for HR practitioners work behaviors: Evidence from the mobile telecommunication industry in Ghana
CN108280582A (en) A kind of whole-round supply chain control tower and control method
JP2021149185A (en) Periodic inspection information cooperation system and periodic inspection information cooperation method
CN117350640A (en) Project progress management method and system
CN111652517A (en) Quantitative evaluation method and device for engineering bearing capacity
Thye et al. IT-benchmarking of clinical workflows: concept, implementation, and evaluation
CN112734359A (en) Science and technology project progress tracking system
Tarigan et al. Operational risk analysis of network Operation Center Division pt. IO
CN113593069A (en) Intelligent inspection system for mathematics twin
CN114091797A (en) Intelligent dispatching method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination